Reduction And Re-use of Energy in
Institutional Data Centres (RARE-IDC)
Steve Bowes-Phipps, Data Centre
Manager, University of Hertfordshire
http://rare-idc.herts.ac.uk
Reduction And Re-use of Energy in
 Institutional Data Centres (RARE-IDC)
Reduction and Re-use of Energy in Institutional Data Centres (RARE-IDC)

                Data Centre Leaders Award Winner 2010
                     “Innovation in a Micro-Data Centre”


                2011 Uptime Institute Green Enterprise IT AwardTM Winner
                     “Innovation in a Smaller Data Centre <1000 sq ft”


                2010 Met with “Participant” status demonstrating compliance with the EU
                   Code of Conduct for Data Centres




                Winner of Green Gown Awards 2011
Reduction And Re-use of Energy in
    Institutional Data Centres (RARE-IDC)
Overview

•    Background
•    Approach
•    Constraints and Design
•    Results
•    Successful Outcomes
•    Learning

• Q&A
Reduction And Re-use of Energy in
    Institutional Data Centres (RARE-IDC)
    Background to the RARE-IDC project


•    Refurbishment of one of two main 75m2 Data Centres for the University
•    Funding had already been allocated in order to overcome several legacy risks
•    We share many issues with other Public Sector institutions
•    Sector leader in environmental management – consistently ranked in the
     top ten of the People and Planet Green League
•    Joint Information Systems Committee (JISC) funding brought new constraints and new
     objectives:
      •   “An exemplar of a Green Data Centre for the HE/FE Sector”
      •   “A model for other institutions to follow and learn from”
      •   “Meet the business need with capacity, resilience and economy for at least ten years”
Reduction And Re-use of Energy in
    Institutional Data Centres (RARE-IDC)
Background to the RARE-IDC project

•    What were the benefits?
      •   National and international prestige and enhancing this University’s reputation for
          pioneering development.
      •   Lower energy bills – not just in the Data Centre itself
      •   Applying the techniques and technologies to other facilities across campus
      •   Increased green skills within UH
      •   Knowledge sharing with other institutions working on similar or mutually beneficial
          schemes
Reduction And Re-use of Energy in
    Institutional Data Centres (RARE-IDC)
    Approach
•    Mitigated the risks with the existing facility by moving into a temporary room
•    Bolstered our skills in best practices, cutting-edge sustainable technologies and thought
     leadership on reducing the carbon impact of Data Centres
•    Opted for a tender process that included “Design and Build”.
•    Design & Build Contract
       – “Open process”
       – Large No. Of responses, difficult to compare
       – I.T.T. must reflect the exact deliverables
       – Must be able to challenge the responses
       – Supplier has ownership of design
       – Fixed cost
•    Pre-Qualification Questionnaire (PQQ) help to reduce No. of appropriate responses
•    The Invitation to Tender (I.T.T)
       – Included Best Practices (EU Code of Conduct for Data Centres)
       – British & International Standards (TIA942)
Reduction And Re-use of Energy in
  Institutional Data Centres (RARE-IDC)
 Constraints

• Pillars
• Riser
• Capacity
• Contamination from work areas
• Overhead bulkhead
• Lack of under floor capacity
(only 250mm)
• Legacy incorrect (and
dangerous) power cabling
• Limited plant space
• Restricted external build space
• “Meet-Me” point for all network
cabling
• No external walls
Reduction And Re-use of Energy in
Institutional Data Centres (RARE-IDC)
New Data Centre Design
Reduction And Re-use of Energy in
Institutional Data Centres (RARE-IDC)
Results

          Energy Consumed Per
          Hour                           Before:           After:
          Total IT Load                  120kW            120kW
          Total Facility Load            264kW            146kW
          Electricity used per Year   2,312,640KWh     1,282,464kWh
          Annual Carbon Footprint      1,394 Tons        773 Tons


          Reduction in                CO2 Emissions    Equivalent to
          1 Year                        621 Tons      117 Fewer Cars
          5 Years                      3,106 Tons     586 Fewer Cars
          10 Years                     6,212 Tons     1,172 Fewer Cars
Reduction And Re-use of Energy in
Institutional Data Centres (RARE-IDC)
Breakdown of Original Energy Requirements


                                                  •   PUE Approximated at 2.2
      Before Data Centre Energy Usage
                                                  •   IT Load at 45%

    IT Load
                                 Cooling System   •   Cooling System taking up 42% of total
      45%
                                      42%
                                                       Power

                    Electrical
                                                  •   Electrical usage significant at 13%
                       13%
Reduction And Re-use of Energy in
Institutional Data Centres (RARE-IDC)
Breakdown of UH Data Centre Energy Requirements


                                             •   PUE Now down to 1.19L2,MD – 1.33L2,MD
    After Data Centre Energy Usage
                                                 Target = 1.22
                                                 Actual = 1.26L2,MD

   IT Load
     80%
                                             •   IT Load increased from 45% to 80%
                           Cooling System
                                19%
                                             •   Cooling usage decreased
                                                      from 42% to 19%
                                Electrical
                                   1%
                                             •   Electrical usage decreased
                                                      from 13% to 1%
                                                      (UPS losses and lighting, etc.)
Reduction And Re-use of Energy in
Institutional Data Centres (RARE-IDC)
Successful Outcomes
   •   Capability of project to act as an exemplar to the wider market in relation to the issues of
       the smaller centre
           The first University in Europe to achieve compliance against the EU Code of Conduct for Data
            Centres
           Our pathfinder project enables others to follow our success and apply the lessons we’ve
            learned along the way
           Refurbishment not new Build
           Re-use of some Equipment
           “Free Air” Cooling for 86% of the year (based on local weather conditions)
           Increase in capacity of 69% & a 55% reduction in the carbon footprint of the Data Centre
           Operational cost savings of £186,000 per annum (inc Carbon cost £12/Tonne CO2)
           Using a contained Hot Aisle configuration, waste heat is recycled into the building’s hot water
            supply
           Working with JISC to further EC-wide knowledge-sharing through the e-infranet project
Reduction And Re-use of Energy in
    Institutional Data Centres (RARE-IDC)
    Learning
•    Size doesn’t matter!
      – Treat the project the same as any other
      – Learn from others
      – EU Code of Conduct for Data Centres (http://bit.ly/h4FA7)
•    Realising that not all DC providers are the same
      – Involve your provider as partner
      – Don’t be afraid to challenge
•    Cultural changes that breed success
      – Work closely with Estates
      – Embedding sustainable processes and technology
      – To maintain compliance, continually improve
•    Dissemination of outcomes
      – Blog http://rare-idc.blogs.herts.ac.uk/
Reduction And Re-use of Energy in
Institutional Data Centres (RARE-IDC)

Thank You

Any Questions?

Weitere ähnliche Inhalte

Was ist angesagt?

Improving your PUE while consolidating into an existing live data center
Improving your PUE while consolidating into an existing live data centerImproving your PUE while consolidating into an existing live data center
Improving your PUE while consolidating into an existing live data centerSchneider Electric
 
Implementing energy efficient data centers
Implementing energy efficient  data centersImplementing energy efficient  data centers
Implementing energy efficient data centersSchneider Electric India
 
CDM in Reduction in Transmission and Distribution Losses
CDM in Reduction in Transmission and Distribution LossesCDM in Reduction in Transmission and Distribution Losses
CDM in Reduction in Transmission and Distribution LossesKrishan Kapil
 
E source energy managers conf 4 24-13-final
E source energy managers conf 4 24-13-finalE source energy managers conf 4 24-13-final
E source energy managers conf 4 24-13-finaljosh whitney
 
Data Center Energy Efficiency Best Practices
Data Center Energy Efficiency Best PracticesData Center Energy Efficiency Best Practices
Data Center Energy Efficiency Best Practices42U Data Center Solutions
 
Microgrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerMicrogrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerSchneider Electric
 
Energy, Energy Efficiency &amp; Sustainability
Energy, Energy Efficiency &amp; SustainabilityEnergy, Energy Efficiency &amp; Sustainability
Energy, Energy Efficiency &amp; SustainabilityGideonRichards
 
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...Schneider Electric
 
Ambicales Solar Profile
Ambicales Solar ProfileAmbicales Solar Profile
Ambicales Solar ProfileAmbicales
 
GreenComputing_15thFeb16_Siddharth_latest
GreenComputing_15thFeb16_Siddharth_latestGreenComputing_15thFeb16_Siddharth_latest
GreenComputing_15thFeb16_Siddharth_latestSiddharth Dwivedi
 
Benchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data CenterBenchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data CenterAFCOM
 
The Data Center in Real Time: Monitoring Tools Overview & Demo
The Data Center in Real Time: Monitoring Tools Overview & DemoThe Data Center in Real Time: Monitoring Tools Overview & Demo
The Data Center in Real Time: Monitoring Tools Overview & Demo42U Data Center Solutions
 
Sustainabile use of personal computing
Sustainabile use of personal computingSustainabile use of personal computing
Sustainabile use of personal computingJustin Thomas
 
(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document emailsgraham007
 

Was ist angesagt? (20)

Improving your PUE while consolidating into an existing live data center
Improving your PUE while consolidating into an existing live data centerImproving your PUE while consolidating into an existing live data center
Improving your PUE while consolidating into an existing live data center
 
Implementing energy efficient data centers
Implementing energy efficient  data centersImplementing energy efficient  data centers
Implementing energy efficient data centers
 
CDM in Reduction in Transmission and Distribution Losses
CDM in Reduction in Transmission and Distribution LossesCDM in Reduction in Transmission and Distribution Losses
CDM in Reduction in Transmission and Distribution Losses
 
E source energy managers conf 4 24-13-final
E source energy managers conf 4 24-13-finalE source energy managers conf 4 24-13-final
E source energy managers conf 4 24-13-final
 
Data Center Energy Efficiency Best Practices
Data Center Energy Efficiency Best PracticesData Center Energy Efficiency Best Practices
Data Center Energy Efficiency Best Practices
 
Microgrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerMicrogrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & power
 
Utilities
UtilitiesUtilities
Utilities
 
Dr. Dan Arvizu
Dr. Dan ArvizuDr. Dan Arvizu
Dr. Dan Arvizu
 
Green Computing
Green ComputingGreen Computing
Green Computing
 
Energy, Energy Efficiency &amp; Sustainability
Energy, Energy Efficiency &amp; SustainabilityEnergy, Energy Efficiency &amp; Sustainability
Energy, Energy Efficiency &amp; Sustainability
 
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
 
Ambicales Solar Profile
Ambicales Solar ProfileAmbicales Solar Profile
Ambicales Solar Profile
 
GreenComputing_15thFeb16_Siddharth_latest
GreenComputing_15thFeb16_Siddharth_latestGreenComputing_15thFeb16_Siddharth_latest
GreenComputing_15thFeb16_Siddharth_latest
 
Data Center Server Rack Strategies
Data Center Server Rack StrategiesData Center Server Rack Strategies
Data Center Server Rack Strategies
 
Green Cloud Computing
Green Cloud ComputingGreen Cloud Computing
Green Cloud Computing
 
Benchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data CenterBenchmark the Relative Performance of Your Data Center
Benchmark the Relative Performance of Your Data Center
 
The Data Center in Real Time: Monitoring Tools Overview & Demo
The Data Center in Real Time: Monitoring Tools Overview & DemoThe Data Center in Real Time: Monitoring Tools Overview & Demo
The Data Center in Real Time: Monitoring Tools Overview & Demo
 
Energy Efficiency Reducing Impact Energy
Energy Efficiency Reducing Impact EnergyEnergy Efficiency Reducing Impact Energy
Energy Efficiency Reducing Impact Energy
 
Sustainabile use of personal computing
Sustainabile use of personal computingSustainabile use of personal computing
Sustainabile use of personal computing
 
(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email
 

Andere mochten auch

Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...
Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...JISC's Green ICT Programme
 
MiM Employment Report 2012, London Business School
MiM Employment Report 2012, London Business SchoolMiM Employment Report 2012, London Business School
MiM Employment Report 2012, London Business SchoolLondon Business School
 
MBA Employment report 2013 - London Business School
MBA Employment report 2013 - London  Business SchoolMBA Employment report 2013 - London  Business School
MBA Employment report 2013 - London Business SchoolLondon Business School
 
SK Telecom - Smart Class Story
SK Telecom - Smart Class StorySK Telecom - Smart Class Story
SK Telecom - Smart Class Storysksmartclass
 
2015 FOSScon NAVER OSS Governance
2015 FOSScon NAVER OSS Governance2015 FOSScon NAVER OSS Governance
2015 FOSScon NAVER OSS GovernanceNAVER Engineering
 
AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)
AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)
AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)Amazon Web Services Korea
 
International Business Strategy of IKEA
International Business Strategy of IKEAInternational Business Strategy of IKEA
International Business Strategy of IKEASungwhan Kim
 
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...Probir Bidhan
 
The Great State of Design with CSS Grid Layout and Friends
The Great State of Design with CSS Grid Layout and FriendsThe Great State of Design with CSS Grid Layout and Friends
The Great State of Design with CSS Grid Layout and FriendsStacy Kvernmo
 

Andere mochten auch (9)

Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...
Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...
 
MiM Employment Report 2012, London Business School
MiM Employment Report 2012, London Business SchoolMiM Employment Report 2012, London Business School
MiM Employment Report 2012, London Business School
 
MBA Employment report 2013 - London Business School
MBA Employment report 2013 - London  Business SchoolMBA Employment report 2013 - London  Business School
MBA Employment report 2013 - London Business School
 
SK Telecom - Smart Class Story
SK Telecom - Smart Class StorySK Telecom - Smart Class Story
SK Telecom - Smart Class Story
 
2015 FOSScon NAVER OSS Governance
2015 FOSScon NAVER OSS Governance2015 FOSScon NAVER OSS Governance
2015 FOSScon NAVER OSS Governance
 
AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)
AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)
AWS Enterprise Summit :: 하이브리드 클라우드 인프라를 통한 데이터센터 확장과 마이그레이션 방안 (조성진 매니저)
 
International Business Strategy of IKEA
International Business Strategy of IKEAInternational Business Strategy of IKEA
International Business Strategy of IKEA
 
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
 
The Great State of Design with CSS Grid Layout and Friends
The Great State of Design with CSS Grid Layout and FriendsThe Great State of Design with CSS Grid Layout and Friends
The Great State of Design with CSS Grid Layout and Friends
 

Ähnlich wie Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - eu code of conduct experiences

Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centrepaul_mathews
 
Siemon Carrie Higbie
Siemon Carrie HigbieSiemon Carrie Higbie
Siemon Carrie Higbiewlambert_2001
 
Green data center_rahul ppt
Green data center_rahul pptGreen data center_rahul ppt
Green data center_rahul pptRAHUL KAUSHAL
 
Green IT - Unitedworld School of Business
Green IT - Unitedworld School of BusinessGreen IT - Unitedworld School of Business
Green IT - Unitedworld School of BusinessArnab Roy Chowdhury
 
Commercial Overview DC Session 3 The Greening Of The Data Centre
Commercial Overview   DC Session 3   The Greening Of The Data CentreCommercial Overview   DC Session 3   The Greening Of The Data Centre
Commercial Overview DC Session 3 The Greening Of The Data Centrepaul_mathews
 
Green computing by hafiz umair
Green computing by hafiz umairGreen computing by hafiz umair
Green computing by hafiz umairHafiz Umair
 
Building a Sustainable Data Center
Building a Sustainable Data CenterBuilding a Sustainable Data Center
Building a Sustainable Data CenterAngela Miller
 
Energy seminar march_28_final
Energy seminar march_28_finalEnergy seminar march_28_final
Energy seminar march_28_finalCOPSY org
 
Ruw green i-troadmap
Ruw green i-troadmapRuw green i-troadmap
Ruw green i-troadmapGreenology
 
2013-03-11-seminario-artecs-mzapater
2013-03-11-seminario-artecs-mzapater2013-03-11-seminario-artecs-mzapater
2013-03-11-seminario-artecs-mzapatergreendisc
 
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...Upsite Technologies
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxSchneider Electric
 

Ähnlich wie Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - eu code of conduct experiences (20)

Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
 
Siemon Carrie Higbie
Siemon Carrie HigbieSiemon Carrie Higbie
Siemon Carrie Higbie
 
Green IT Concept
Green IT ConceptGreen IT Concept
Green IT Concept
 
Green data center_rahul ppt
Green data center_rahul pptGreen data center_rahul ppt
Green data center_rahul ppt
 
Green IT - Unitedworld School of Business
Green IT - Unitedworld School of BusinessGreen IT - Unitedworld School of Business
Green IT - Unitedworld School of Business
 
Energy Efficiency in Data Centers
Energy Efficiency in Data CentersEnergy Efficiency in Data Centers
Energy Efficiency in Data Centers
 
Steve hammond nrel
Steve hammond nrelSteve hammond nrel
Steve hammond nrel
 
The next wave of GreenIT
The next wave of GreenITThe next wave of GreenIT
The next wave of GreenIT
 
Can the Cloud Be Green?
Can the Cloud Be Green?Can the Cloud Be Green?
Can the Cloud Be Green?
 
Green it
Green it Green it
Green it
 
Commercial Overview DC Session 3 The Greening Of The Data Centre
Commercial Overview   DC Session 3   The Greening Of The Data CentreCommercial Overview   DC Session 3   The Greening Of The Data Centre
Commercial Overview DC Session 3 The Greening Of The Data Centre
 
Green computing by hafiz umair
Green computing by hafiz umairGreen computing by hafiz umair
Green computing by hafiz umair
 
Building a Sustainable Data Center
Building a Sustainable Data CenterBuilding a Sustainable Data Center
Building a Sustainable Data Center
 
Energy seminar march_28_final
Energy seminar march_28_finalEnergy seminar march_28_final
Energy seminar march_28_final
 
Ruw green i-troadmap
Ruw green i-troadmapRuw green i-troadmap
Ruw green i-troadmap
 
2013-03-11-seminario-artecs-mzapater
2013-03-11-seminario-artecs-mzapater2013-03-11-seminario-artecs-mzapater
2013-03-11-seminario-artecs-mzapater
 
PUE Reconsidered
PUE ReconsideredPUE Reconsidered
PUE Reconsidered
 
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
Strategies for Re-Using Data Center Heat Energy and Their Impact on PUE (Both...
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
1.1 integrating renewables srm
1.1 integrating renewables   srm1.1 integrating renewables   srm
1.1 integrating renewables srm
 

Mehr von JISC's Green ICT Programme

What does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find outWhat does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find outJISC's Green ICT Programme
 
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIsData Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIsJISC's Green ICT Programme
 
Better Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT SpendBetter Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT SpendJISC's Green ICT Programme
 
Understanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services ProjectUnderstanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services ProjectJISC's Green ICT Programme
 
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14JISC's Green ICT Programme
 
Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...JISC's Green ICT Programme
 
US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings JISC's Green ICT Programme
 
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...JISC's Green ICT Programme
 
The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs - The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs - JISC's Green ICT Programme
 
Energy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeEnergy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeJISC's Green ICT Programme
 
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...JISC's Green ICT Programme
 
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activitiesUnderstanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activitiesJISC's Green ICT Programme
 
Ppt 1 le leeds - welcome alan real ( university of leeds )
Ppt 1 le   leeds - welcome alan real ( university of leeds )Ppt 1 le   leeds - welcome alan real ( university of leeds )
Ppt 1 le leeds - welcome alan real ( university of leeds )JISC's Green ICT Programme
 
Ppt6 london - james harbridge ( intellect uk ) crc policy update
Ppt6   london - james harbridge ( intellect uk ) crc policy updatePpt6   london - james harbridge ( intellect uk ) crc policy update
Ppt6 london - james harbridge ( intellect uk ) crc policy updateJISC's Green ICT Programme
 
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...JISC's Green ICT Programme
 
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...JISC's Green ICT Programme
 
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3   london - sophia ( operation intelligence ) what is the eu code of conductPpt3   london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conductJISC's Green ICT Programme
 
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...
Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...JISC's Green ICT Programme
 
Ppt1 london -simon allen ( concurrent thinking ) welcome
Ppt1   london -simon allen ( concurrent thinking ) welcomePpt1   london -simon allen ( concurrent thinking ) welcome
Ppt1 london -simon allen ( concurrent thinking ) welcomeJISC's Green ICT Programme
 
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...JISC's Green ICT Programme
 

Mehr von JISC's Green ICT Programme (20)

What does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find outWhat does central IT really cost? - An attempt to find out
What does central IT really cost? - An attempt to find out
 
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIsData Centre Compute and Overhead Costs - Delivering End-to-end KPIs
Data Centre Compute and Overhead Costs - Delivering End-to-end KPIs
 
Better Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT SpendBetter Decision Making by Understanding IT Spend
Better Decision Making by Understanding IT Spend
 
Understanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services ProjectUnderstanding IT Costs - Part of Jisc's Costing IT Services Project
Understanding IT Costs - Part of Jisc's Costing IT Services Project
 
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
CARBS Project Presentation - Jisc Cost of IT Services 10-02-14
 
Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...Circling the Square! - Understanding and Minimising the Costs of Providing Di...
Circling the Square! - Understanding and Minimising the Costs of Providing Di...
 
US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings US Trends in Data Centre Design with NREL Examples of Large Energy Savings
US Trends in Data Centre Design with NREL Examples of Large Energy Savings
 
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
Migrating from a physical to a hosted Data Centre - Experiences of a small Un...
 
The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs - The “Financial X-ray” of IT Services costs -
The “Financial X-ray” of IT Services costs -
 
Energy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeEnergy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of Cambridge
 
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
What does central IT really cost? An attempt to find out! - Heidi Fraser-Krau...
 
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activitiesUnderstanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
Understanding Data Centre Costs: Lessons from e-InfraNet and JISC activities
 
Ppt 1 le leeds - welcome alan real ( university of leeds )
Ppt 1 le   leeds - welcome alan real ( university of leeds )Ppt 1 le   leeds - welcome alan real ( university of leeds )
Ppt 1 le leeds - welcome alan real ( university of leeds )
 
Ppt6 london - james harbridge ( intellect uk ) crc policy update
Ppt6   london - james harbridge ( intellect uk ) crc policy updatePpt6   london - james harbridge ( intellect uk ) crc policy update
Ppt6 london - james harbridge ( intellect uk ) crc policy update
 
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...Ppt4   london -  michael rudgyard ( concurrent thinking ) driving efficiencie...
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
 
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...Ppt4   exp leeds - alan real and jon summers ( university of leeds ) experien...
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
 
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3   london - sophia ( operation intelligence ) what is the eu code of conductPpt3   london - sophia ( operation intelligence ) what is the eu code of conduct
Ppt3 london - sophia ( operation intelligence ) what is the eu code of conduct
 
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...
Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...Ppt2   london - mike walker ( defra )  background to the eu code of conduct j...
Ppt2 london - mike walker ( defra ) background to the eu code of conduct j...
 
Ppt1 london -simon allen ( concurrent thinking ) welcome
Ppt1   london -simon allen ( concurrent thinking ) welcomePpt1   london -simon allen ( concurrent thinking ) welcome
Ppt1 london -simon allen ( concurrent thinking ) welcome
 
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
The Welsh Video Network: Supporting Video Conferencing in Welsh Education: Us...
 

Ppt4 exp birmingham - steve bowes phipps ( university of hertfordshire ) - eu code of conduct experiences

  • 1. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Steve Bowes-Phipps, Data Centre Manager, University of Hertfordshire http://rare-idc.herts.ac.uk
  • 2. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Reduction and Re-use of Energy in Institutional Data Centres (RARE-IDC) Data Centre Leaders Award Winner 2010 “Innovation in a Micro-Data Centre” 2011 Uptime Institute Green Enterprise IT AwardTM Winner “Innovation in a Smaller Data Centre <1000 sq ft” 2010 Met with “Participant” status demonstrating compliance with the EU Code of Conduct for Data Centres Winner of Green Gown Awards 2011
  • 3. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Overview • Background • Approach • Constraints and Design • Results • Successful Outcomes • Learning • Q&A
  • 4. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Background to the RARE-IDC project • Refurbishment of one of two main 75m2 Data Centres for the University • Funding had already been allocated in order to overcome several legacy risks • We share many issues with other Public Sector institutions • Sector leader in environmental management – consistently ranked in the top ten of the People and Planet Green League • Joint Information Systems Committee (JISC) funding brought new constraints and new objectives: • “An exemplar of a Green Data Centre for the HE/FE Sector” • “A model for other institutions to follow and learn from” • “Meet the business need with capacity, resilience and economy for at least ten years”
  • 5. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Background to the RARE-IDC project • What were the benefits? • National and international prestige and enhancing this University’s reputation for pioneering development. • Lower energy bills – not just in the Data Centre itself • Applying the techniques and technologies to other facilities across campus • Increased green skills within UH • Knowledge sharing with other institutions working on similar or mutually beneficial schemes
  • 6. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Approach • Mitigated the risks with the existing facility by moving into a temporary room • Bolstered our skills in best practices, cutting-edge sustainable technologies and thought leadership on reducing the carbon impact of Data Centres • Opted for a tender process that included “Design and Build”. • Design & Build Contract – “Open process” – Large No. Of responses, difficult to compare – I.T.T. must reflect the exact deliverables – Must be able to challenge the responses – Supplier has ownership of design – Fixed cost • Pre-Qualification Questionnaire (PQQ) help to reduce No. of appropriate responses • The Invitation to Tender (I.T.T) – Included Best Practices (EU Code of Conduct for Data Centres) – British & International Standards (TIA942)
  • 7. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Constraints • Pillars • Riser • Capacity • Contamination from work areas • Overhead bulkhead • Lack of under floor capacity (only 250mm) • Legacy incorrect (and dangerous) power cabling • Limited plant space • Restricted external build space • “Meet-Me” point for all network cabling • No external walls
  • 8. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) New Data Centre Design
  • 9. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Results Energy Consumed Per Hour Before: After: Total IT Load 120kW 120kW Total Facility Load 264kW 146kW Electricity used per Year 2,312,640KWh 1,282,464kWh Annual Carbon Footprint 1,394 Tons 773 Tons Reduction in CO2 Emissions Equivalent to 1 Year 621 Tons 117 Fewer Cars 5 Years 3,106 Tons 586 Fewer Cars 10 Years 6,212 Tons 1,172 Fewer Cars
  • 10. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Breakdown of Original Energy Requirements • PUE Approximated at 2.2 Before Data Centre Energy Usage • IT Load at 45% IT Load Cooling System • Cooling System taking up 42% of total 45% 42% Power Electrical • Electrical usage significant at 13% 13%
  • 11. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Breakdown of UH Data Centre Energy Requirements • PUE Now down to 1.19L2,MD – 1.33L2,MD After Data Centre Energy Usage Target = 1.22 Actual = 1.26L2,MD IT Load 80% • IT Load increased from 45% to 80% Cooling System 19% • Cooling usage decreased from 42% to 19% Electrical 1% • Electrical usage decreased from 13% to 1% (UPS losses and lighting, etc.)
  • 12. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Successful Outcomes • Capability of project to act as an exemplar to the wider market in relation to the issues of the smaller centre  The first University in Europe to achieve compliance against the EU Code of Conduct for Data Centres  Our pathfinder project enables others to follow our success and apply the lessons we’ve learned along the way  Refurbishment not new Build  Re-use of some Equipment  “Free Air” Cooling for 86% of the year (based on local weather conditions)  Increase in capacity of 69% & a 55% reduction in the carbon footprint of the Data Centre  Operational cost savings of £186,000 per annum (inc Carbon cost £12/Tonne CO2)  Using a contained Hot Aisle configuration, waste heat is recycled into the building’s hot water supply  Working with JISC to further EC-wide knowledge-sharing through the e-infranet project
  • 13. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Learning • Size doesn’t matter! – Treat the project the same as any other – Learn from others – EU Code of Conduct for Data Centres (http://bit.ly/h4FA7) • Realising that not all DC providers are the same – Involve your provider as partner – Don’t be afraid to challenge • Cultural changes that breed success – Work closely with Estates – Embedding sustainable processes and technology – To maintain compliance, continually improve • Dissemination of outcomes – Blog http://rare-idc.blogs.herts.ac.uk/
  • 14. Reduction And Re-use of Energy in Institutional Data Centres (RARE-IDC) Thank You Any Questions?