SlideShare a Scribd company logo
1 of 49
Download to read offline
Chapter 6
Planning for
MICE Events

               E-mail: tpavit@hotmail.com
                            081-082-
                          . 081-082-7273
                                       1
Objectives
1.   Identify and define the planning requirements of the
     stakeholders of a convention or meeting
2.   Identify the stages and factors that need to be
     considered in the planning of a convention or meeting
3.   Review project planning techniques and explore their
     application in planning, organising and scheduling a
     convention or meeting
4.   Explore the components of the convention or meeting
     plan



                                                             2
Outline
1.   The Planning Requirements of the Stakeholders
2.   What is Planning and Why Plan?
3.   Three types / levels of plans
4.   Characteristics of project planning
5.   The project life cycle
6.   Planning the event




                                                     3
Introduction
• This chapter outlines and discusses the concept of
  planning and the planning requirements for the
  successful management and operation of a
  convention and meeting.
• It reviews the planning needs and identifies the use
  of project planning techniques as appropriate to
  ensure the satisfactory delivery of the event.
• Pre event planning is examined together with a
  discussion of factors to be considered in the
  planning of the conference program, the printed
  materials and the conference registration process.

                                                         4
Planning
• Planning is the process by which the manager or
  organizer looks towards the event to discover what
  various courses of action are available to arrange it,
  and which course of action would be the best.




                                                           5
Planning for MICE event
• So what are the ingredients for a successful
  convention or meeting?
• Obviously, they would include the identification of an
  appropriate venue and accommodation facilities,
  clarification of the catering requirements and the design
  and distribution of delegates invitations, along with other,
  smaller administrative and technical items.




                                                                 6
Planning for MICE event
• However, in order to ensure
  ultimate and complete
  customer satisfaction, the
  total event needs to be
  planned and coordinated in
  the most effective and
  efficient manner within the
  given time frame.


                                   7
The Planning Requirements
   of the Stakeholders



                            8
The Planning Requirements of the Stakeholders
• To ensure a successful convention or meeting a
  number of different stakeholders are involved:
      1. Client Company
      2. Conference organizer
      3. Various service suppliers (e.g. Venue & A/V)
• They all require the same type of information for
  the planning of a MICE event, but will focus on
  different aspects. For example:


                                                        9
The Planning Requirements of the Stakeholders
                    1.1 The Client company
                       • makes the decision to hold
                         a convention or meeting
                       • Set the objectives for the
                         event w/ PCO
                       • Identifies the potential
                         participants
                       • Set the dates and
                         establishes the budget.


                                                      10
The Planning Requirements of the Stakeholders
1.2 The Conference Organizers
  • Establishes the objectives of the event with the client
    company.
  • CFM which key personnel from the client organization
    will be involved in the event.
  • Identify the site and venue.
  • Lead and Coordinate all the various facets of the event
  • Establishing the program.
  • Establishing Pre and Post- Conference tours.
  • Brief and work with other suppliers such as florists, A/V,
    Transport company.
  • Manage the budget for the client company.

                                                                 11
The Planning Requirements of the Stakeholders
1.3 Venue
  • Liaises with the conference organizer
  • Identifies the number of delegates
  • Agrees the date for receipt of final
    numbers
  • Establishes the requirements for
    accommodation and facilities, including
    meeting rooms, Food and beverage
    services
  • Required timing of the program for
    staffing the event


                                                 12
The Planning Requirements of the Stakeholders

                   1.4 Suppliers
                      • Obtain a brief of the event
                        from the conference
                        organizer
                      • Establish the requirement




                                                      13
The Planning Requirements of the Stakeholders
•     Planning and the use of planning techniques are
      essential if the conference organizers is to ensure
      the satisfactory coordination of all the stakeholders
      and suppliers and:
       1. identify the tasks to be undertaken
       2. establish the appropriate time frames
       3. source who is to undertake each task, by when
                                            task,
          and to what standard
       4. coordinate all activities

                                                              14
What is Planning
and Why Plan?



                   15
What is planning & why planning?
What is Planning?
• Planning involves deciding what needs to be done,
  by whom and by when.
• It is “the systematic arrangement of tasks to
  accomplish an objective”




                                                      16
What is planning & why planning?
Why Planning?
  1. Planning provides direction enabling to identify
                           direction;
       where we are going and how to get there.
  2. Planning draws attention to the stages on the ways
       (how far we have accomplished objectives), identifies
       and clarifies sidetracks that may be necessary
  3. A plan helps to set and establish priorities that can
       assist in the scheduling of activities.
  4. The plan becomes a benchmark against which the
       actual progress towards the final objective can be
       compared.


                                                               17
What is planning & why planning?
              • It takes a great deal of time,
                care and patience to plan,
                manage and organize a MICE
                event - even the smallest
                event cannot be conjured up
                overnight
              • Some events might be
                annually organized, for
                instance, however when one
                year finishes the planning for
                next year’s event begins


                                                 18
Types of Plans


                 19
Three types or levels of plans
1. Strategic plan
• identifies the importance of planning and goal setting as
   tools for determining where a company wants to go and
   how it wants to get there




                                                              20
Three types or levels of plans
2. Operational plan
                plan
• focuses on planning & maintaining the work flows that
  make up the operational system of a business.
• It would verify how the financial resources, human
  resources, materials and so on are to be monitored to
  ensure the most effective completion of the tasks.
      •   A map of how to get there
      •   A mechanism for setting standards
      •   Clarification of what is to be done and how it is to be done
      •   Identification of the work areas and the priorities of the org


                                                                           21
Three types or levels of plans
3. Project or functional plan
• involves a sequence of choices or decisions that either
   commit or utilize resources over a period of time.
• To achieve successful in undertaking a project, it is
   important to prepare a plan.
• It has a clearly defined objective stated in terms of
   scope, schedule and cost



                                                            22
Three types or levels of plans
3. Project or functional plan (Cont.)
• Generally involves PCOs, AV suppliers, venues,
   accommodations, airlines, state tourism offices, etc. as
   to ensure that each project or functional plan would be
   successful
• In particular, event that are managed by conference
   organizers fall into the definition of a PROJECT



                                                              23
3. Three types / levels of plans




                                   24
project
The project life cycle


                         25
The project life cycle
1.   Putting together the bid or proposal
     for the convention or meeting
2.   Winning the bid
3.   Pre-event planning and organization
4.   Managing and organizing the actual
     convention or meeting
5.   Post-event evaluation and review
     planning


                                            26
The project life cycle
• All projects or functions to be organized by PCOs or event
  planners, they all have these four stages:
   Stage 1: project conception or feasibility study
              the need for a project is identified
   Stage 2: project planning or design
              a possible solution is developed
   Stage 3: project implementation or execution
              the project is carried out
   Stage 4: project termination and evaluation


                                                               27
Planning the events



                      28
Planning the events
1.   Pre-event planning
2.   Planning the program
3.   The convention or meeting blueprint
4.   Planning the printed materials
5.   Planning the registration process




                                           29
1. Pre-event planning
• The MICE project team needs to review whether the event
  design is both Viable and Feasible.
• In proposal and bid document, PCO will have identified the:
      • Type
      • Purpose and Objectives
      • Theme
      • Number of Day requirements
      • Potential delegates & Travel Requirement
      • Estimate overall budget


                                                                30
1. Pre-event planning
1.1 Task identification
There are several issues need to be considers for
    example;
  1. inspection and selection of the site and venue
  2. food & beverage; quality, service, menu, price, style,
     etc.
  3. transportation; venue accessibility
  4. entertainment and pizzazz to support the theme
  5. budget, legal aspects, other special requirements
  6. marketing & promotion
  7. miscellaneous; e.g. AV equipment, speakers, etc.

                                                              31
1. Pre-event planning
1.2 Organization of tasks
how these tasks in previous slice would be organized;
   1. plan what to be done and how those tasks should be
      done properly
   2. schedule tasks to be done orderly, prioritize them
      according to their critical requirements
   3. allocate and control resource as already scheduled
   4. control progress and costs
   5. communicate - clear and precise information should
      be communicated to appropriate people


                                                           32
1. Pre-event planning
• Popular techniques for preparing network diagrams
  is GANTT charts.
• A Gantt chart is simply a bar chart that plots the
  time required for each task. Focus on
     • Planning
     • Scheduling
     • Allocating and Controlling resources
     • Controlling progress and costs
     • Communicating


                                                       33
1. Pre-event planning




                        34
2. Planning the program
2.1 Program design
 How to balance the participants’ objectives and MICE
 event’s overall objectives
  • time for each session/activity, and an opening ceremony
  • the style of MICE event, e.g. a convention of 300-400
    people cannot take 15 minute for refreshments
  • times for participants to overlook exhibitions, build
    connection and do social activities


                                                              35
2. Planning the program
2.2 Pace and timing of the program consider:
  1. delegate profile, the need for participants to move
     out
  2. travel distance to venue and style of the event
  3. accompanying persons




                                                           36
2. Planning the program
2.3 Components of the program
  1. Formal sessions
      Plenary session, breakout session, opening session
  2. The provision of food and beverage
     (breakfast, lunch, dinner, refreshment,
     reception party, ending party, etc.)
  3. Exhibitions and tradeshows
  4. Free time and social activity


                                                           37
3. The meeting blueprint
• BLUE PRINT is a development
  and extension of the “Road
  Map” mentioned earlier.
• Each conference organizer will
  have a different format for
  this document, but the
  following information generally
  is included:


                                      38
3. The meeting blueprint
Information guiding or describing the event:
   1. contents page
   2. information on destination, venue, etc.
   3. a detailed list of contacts at the venue
   4. information on the event, e.g. meeting rooms,
       registration information & procedures, etc.
   5. a delegate registration list and room allocations
   6. daily ‘running sheet’ or day-to-day plan of each
       session or activity
   7. closing information and checklist
   8. evaluation information

                                                          39
4. Planning the printed materials
• A variety of printed materials that need to be planned
  and organized prior to the actual event;
   • Delegate registration     • Lists of diagram of the
     forms                       exhibitor stand
   • Conference brochures      • Information on sponsor
   • Programs                  • Ticket and vouchers
   • Participant name tags     • Special invitation letter
   • Delegate lists            • Signage and so on
   • Conference proceeding



                                                             40
5. Planning the registration process
• Conference organizers need to reflect on the
  processing of potential queues from perspective of
  the customer, that is the delegates. Points they
  should consider include:
      • Is it reasonable to expect delegates to wait
      • Is the priority process for serving delegates fair?
      • Do delegates feel in control of what is happening while they
        are waiting?
      • Is a conductive physical environment provided in which
        delegates can wait?



                                                                       41
5. Planning the registration process
• Delegate registration system can be structured as the
  following:
    1.   Single channel and single stage
    2.   Single channel and multiple stage
    3.   Multiple channel and multiple stage
    4.   Parallel single channel with single or multiple stage;
     this group, delegates could be divided alphabetically by
     their last name, or their country/region of origin (e.g.
     A-E, F-I, ... T-Z)
• Large events, registration might be organized one day to
  few days or a week before the actual event starts


                                                                  42
Single channel with single stage


Registration

   Desk
               F F F   F




                                   43
Single channel with multiple stages

  Registration
    Desk I

  Registration
    Desk II

  Registration        F F F   F
   Desk III




                                      44
Multiple channels with multiple stages

  Registration       Registration
    Desk BI           Desk AI

                                    F F F   F
  Registration       Registration
   Desk BII           Desk AII




  F F F          ก        ก ก




                                                45
Parallel single channel with multiple stages

      Registration
        Desk I
                             F F F   F
      Registration
        Desk II
                             F F F       F

      Registration
       Desk III

           F F F     ก   ก   ก               ก
              /



                                                 46
The Strategic event planning process




                                       47
The Strategic event planning process (cont.)




                                           48
Summary
• Efficient and effective planning is extremely important for the
  success of convention or meeting.
• The role of planning and, in particular, project planning, is critical
  in the planning, organization and scheduling of a MICE event.
• The key to success of planning of an event is the preparation of a
  project plan that covers the various stages of the event life cycle.
• Conference organizers planning MICE event must remember the
  leading time required to undertake certain activities, be methodical.
  Check and recheck target, and review the plan constantly to ensure
  that it is on schedule.
• They must also prepare a contingency plan case something goes
  wrong – disasters do happen.


                                                                           49

More Related Content

What's hot

TSM 102- Mice
TSM 102- MiceTSM 102- Mice
TSM 102- Micejay
 
Relationship between event and tourism
Relationship between event and tourismRelationship between event and tourism
Relationship between event and tourismAMALDASKH
 
Chapter 2 business structure of mice
Chapter 2   business structure of miceChapter 2   business structure of mice
Chapter 2 business structure of micePavit Tansakul
 
Chapter 5 managing marketing for mice industry
Chapter 5   managing marketing  for mice industryChapter 5   managing marketing  for mice industry
Chapter 5 managing marketing for mice industryPavit Tansakul
 
Chapter 3 Event Venues and Sites
Chapter 3 Event Venues and SitesChapter 3 Event Venues and Sites
Chapter 3 Event Venues and SitesDr. John V. Padua
 
STRATEGIC MANAGEMENT IN TOURISM AND HOSPITALITY.pptx
STRATEGIC MANAGEMENT IN TOURISM AND HOSPITALITY.pptxSTRATEGIC MANAGEMENT IN TOURISM AND HOSPITALITY.pptx
STRATEGIC MANAGEMENT IN TOURISM AND HOSPITALITY.pptxMichael Celis
 
Characteristics of the tourism industry
Characteristics of the tourism industryCharacteristics of the tourism industry
Characteristics of the tourism industryrodelsumampong
 
Components of mice industry
Components of mice industryComponents of mice industry
Components of mice industryBhavana2016
 
Tourism planning and development (Introduction)
Tourism planning and development (Introduction)Tourism planning and development (Introduction)
Tourism planning and development (Introduction)Mike Joseph
 
Chapter 10 financial issue for mice events
Chapter 10   financial issue for mice eventsChapter 10   financial issue for mice events
Chapter 10 financial issue for mice eventsPavit Tansakul
 
An Event Proposal: Wedding Anniversary Proposal
An Event Proposal: Wedding Anniversary ProposalAn Event Proposal: Wedding Anniversary Proposal
An Event Proposal: Wedding Anniversary Proposalchristian magallanes
 

What's hot (20)

TSM 102- Mice
TSM 102- MiceTSM 102- Mice
TSM 102- Mice
 
Relationship between event and tourism
Relationship between event and tourismRelationship between event and tourism
Relationship between event and tourism
 
Chapter 2 business structure of mice
Chapter 2   business structure of miceChapter 2   business structure of mice
Chapter 2 business structure of mice
 
Chapter 5 managing marketing for mice industry
Chapter 5   managing marketing  for mice industryChapter 5   managing marketing  for mice industry
Chapter 5 managing marketing for mice industry
 
Chapter 3 Event Venues and Sites
Chapter 3 Event Venues and SitesChapter 3 Event Venues and Sites
Chapter 3 Event Venues and Sites
 
Mice Tourism ppt
Mice Tourism pptMice Tourism ppt
Mice Tourism ppt
 
CONVENTION MANAGEMENT
CONVENTION MANAGEMENTCONVENTION MANAGEMENT
CONVENTION MANAGEMENT
 
Mice Tourism
Mice TourismMice Tourism
Mice Tourism
 
STRATEGIC MANAGEMENT IN TOURISM AND HOSPITALITY.pptx
STRATEGIC MANAGEMENT IN TOURISM AND HOSPITALITY.pptxSTRATEGIC MANAGEMENT IN TOURISM AND HOSPITALITY.pptx
STRATEGIC MANAGEMENT IN TOURISM AND HOSPITALITY.pptx
 
Characteristics of the tourism industry
Characteristics of the tourism industryCharacteristics of the tourism industry
Characteristics of the tourism industry
 
Chapter 4 Event Staging
Chapter 4 Event StagingChapter 4 Event Staging
Chapter 4 Event Staging
 
Itinerary
ItineraryItinerary
Itinerary
 
Components of mice industry
Components of mice industryComponents of mice industry
Components of mice industry
 
Trends and Issues in Tourism and Hospitality
Trends and Issues in Tourism and HospitalityTrends and Issues in Tourism and Hospitality
Trends and Issues in Tourism and Hospitality
 
Tourism planning and development (Introduction)
Tourism planning and development (Introduction)Tourism planning and development (Introduction)
Tourism planning and development (Introduction)
 
Lesson 7 event venues
Lesson 7   event venuesLesson 7   event venues
Lesson 7 event venues
 
Chapter 10 financial issue for mice events
Chapter 10   financial issue for mice eventsChapter 10   financial issue for mice events
Chapter 10 financial issue for mice events
 
Event Concept - mmaldana
Event Concept - mmaldanaEvent Concept - mmaldana
Event Concept - mmaldana
 
An Event Proposal: Wedding Anniversary Proposal
An Event Proposal: Wedding Anniversary ProposalAn Event Proposal: Wedding Anniversary Proposal
An Event Proposal: Wedding Anniversary Proposal
 
THE PSYCHOLOGY OF TRAVEL
THE PSYCHOLOGY OF TRAVELTHE PSYCHOLOGY OF TRAVEL
THE PSYCHOLOGY OF TRAVEL
 

Viewers also liked

Chapter 9 quality issue for mice event
Chapter 9   quality issue for mice eventChapter 9   quality issue for mice event
Chapter 9 quality issue for mice eventPavit Tansakul
 
Chapter 8 event coordination (logistics and staging)
Chapter 8   event coordination (logistics and staging)Chapter 8   event coordination (logistics and staging)
Chapter 8 event coordination (logistics and staging)Pavit Tansakul
 
Week 7 Procurement (Purchasing, Receiving And Storing) 2 2552
Week 7  Procurement (Purchasing, Receiving And Storing) 2 2552Week 7  Procurement (Purchasing, Receiving And Storing) 2 2552
Week 7 Procurement (Purchasing, Receiving And Storing) 2 2552Pavit Tansakul
 
chapter 5 - Non-alcoholic Beverages
chapter 5 - Non-alcoholic Beverageschapter 5 - Non-alcoholic Beverages
chapter 5 - Non-alcoholic BeveragesPavit Tansakul
 
Week 7 Procurement (Purchasing, Receiving And Storing) 3 2552
Week 7  Procurement (Purchasing, Receiving And Storing) 3 2552Week 7  Procurement (Purchasing, Receiving And Storing) 3 2552
Week 7 Procurement (Purchasing, Receiving And Storing) 3 2552Pavit Tansakul
 
Food receiving control
Food receiving controlFood receiving control
Food receiving controlRajendra Nabar
 
Food storing and issuing control
Food storing and issuing controlFood storing and issuing control
Food storing and issuing controlRajendra Nabar
 
Food purchasing control
Food purchasing controlFood purchasing control
Food purchasing controlRajendra Nabar
 

Viewers also liked (10)

Chapter 9 quality issue for mice event
Chapter 9   quality issue for mice eventChapter 9   quality issue for mice event
Chapter 9 quality issue for mice event
 
Chapter 8 event coordination (logistics and staging)
Chapter 8   event coordination (logistics and staging)Chapter 8   event coordination (logistics and staging)
Chapter 8 event coordination (logistics and staging)
 
Mice planning
Mice planningMice planning
Mice planning
 
Week 7 Procurement (Purchasing, Receiving And Storing) 2 2552
Week 7  Procurement (Purchasing, Receiving And Storing) 2 2552Week 7  Procurement (Purchasing, Receiving And Storing) 2 2552
Week 7 Procurement (Purchasing, Receiving And Storing) 2 2552
 
chapter 5 - Non-alcoholic Beverages
chapter 5 - Non-alcoholic Beverageschapter 5 - Non-alcoholic Beverages
chapter 5 - Non-alcoholic Beverages
 
Week 7 Procurement (Purchasing, Receiving And Storing) 3 2552
Week 7  Procurement (Purchasing, Receiving And Storing) 3 2552Week 7  Procurement (Purchasing, Receiving And Storing) 3 2552
Week 7 Procurement (Purchasing, Receiving And Storing) 3 2552
 
Food receiving control
Food receiving controlFood receiving control
Food receiving control
 
Food storing and issuing control
Food storing and issuing controlFood storing and issuing control
Food storing and issuing control
 
Food purchasing control
Food purchasing controlFood purchasing control
Food purchasing control
 
Food & beverage sop's
Food & beverage sop'sFood & beverage sop's
Food & beverage sop's
 

Similar to Chapter 6 Planning MICE Events

ppt on project planning
ppt on project planningppt on project planning
ppt on project planningAnuppandey80
 
Event Management - AK2012
Event Management - AK2012Event Management - AK2012
Event Management - AK2012Andre Knipe
 
Planning process group
Planning process groupPlanning process group
Planning process groupMudassir Iqbal
 
Marillac Strategic Planning Process Workplan
Marillac Strategic Planning Process WorkplanMarillac Strategic Planning Process Workplan
Marillac Strategic Planning Process Workplanjasongilmore
 
software (1).pptx
software (1).pptxsoftware (1).pptx
software (1).pptxayanadamtew
 
Holland Study - Implementation Plan (PDF).pdf
Holland Study - Implementation Plan (PDF).pdfHolland Study - Implementation Plan (PDF).pdf
Holland Study - Implementation Plan (PDF).pdfrozilawati
 
INTRODUCTION TO PROJECT MANAGMENT
INTRODUCTION TO PROJECT MANAGMENT INTRODUCTION TO PROJECT MANAGMENT
INTRODUCTION TO PROJECT MANAGMENT Harihara puthiran
 
1 successful project management, & concepts
1 successful project management, & concepts1 successful project management, & concepts
1 successful project management, & conceptsDaw Juguilon
 
Topic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdfTopic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdfHuyNguyen657394
 
Operational Planning: The Key to Building a Culture of Implementation and Focus
Operational Planning: The Key to Building a Culture of Implementation and FocusOperational Planning: The Key to Building a Culture of Implementation and Focus
Operational Planning: The Key to Building a Culture of Implementation and Focus4Good.org
 
Project management
Project managementProject management
Project managementArsh Koul
 

Similar to Chapter 6 Planning MICE Events (20)

041006-Program Management PMI NB - PMI Logo
041006-Program Management PMI NB - PMI Logo041006-Program Management PMI NB - PMI Logo
041006-Program Management PMI NB - PMI Logo
 
executing process group.pdf
executing process group.pdfexecuting process group.pdf
executing process group.pdf
 
ppt on project planning
ppt on project planningppt on project planning
ppt on project planning
 
Project Management.pptx
Project Management.pptxProject Management.pptx
Project Management.pptx
 
sample456.pptx
sample456.pptxsample456.pptx
sample456.pptx
 
assignment on project planning
assignment on project planningassignment on project planning
assignment on project planning
 
Event Management - AK2012
Event Management - AK2012Event Management - AK2012
Event Management - AK2012
 
Planning process group
Planning process groupPlanning process group
Planning process group
 
pmppgoav14.ppt
pmppgoav14.pptpmppgoav14.ppt
pmppgoav14.ppt
 
Marillac Strategic Planning Process Workplan
Marillac Strategic Planning Process WorkplanMarillac Strategic Planning Process Workplan
Marillac Strategic Planning Process Workplan
 
software (1).pptx
software (1).pptxsoftware (1).pptx
software (1).pptx
 
Project management
Project managementProject management
Project management
 
Holland Study - Implementation Plan (PDF).pdf
Holland Study - Implementation Plan (PDF).pdfHolland Study - Implementation Plan (PDF).pdf
Holland Study - Implementation Plan (PDF).pdf
 
Planning skill.pdf
Planning skill.pdfPlanning skill.pdf
Planning skill.pdf
 
INTRODUCTION TO PROJECT MANAGMENT
INTRODUCTION TO PROJECT MANAGMENT INTRODUCTION TO PROJECT MANAGMENT
INTRODUCTION TO PROJECT MANAGMENT
 
1 successful project management, & concepts
1 successful project management, & concepts1 successful project management, & concepts
1 successful project management, & concepts
 
Topic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdfTopic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdf
 
Operational Planning: The Key to Building a Culture of Implementation and Focus
Operational Planning: The Key to Building a Culture of Implementation and FocusOperational Planning: The Key to Building a Culture of Implementation and Focus
Operational Planning: The Key to Building a Culture of Implementation and Focus
 
Project Implementation.pptx
Project Implementation.pptxProject Implementation.pptx
Project Implementation.pptx
 
Project management
Project managementProject management
Project management
 

More from Pavit Tansakul

THB60-321 PPT Design Concept for Event @ 3/2563
THB60-321 PPT Design Concept for Event @ 3/2563THB60-321 PPT Design Concept for Event @ 3/2563
THB60-321 PPT Design Concept for Event @ 3/2563Pavit Tansakul
 
Chapter 4 : Basic cooking principle & food science
Chapter 4  : Basic cooking principle & food scienceChapter 4  : Basic cooking principle & food science
Chapter 4 : Basic cooking principle & food sciencePavit Tansakul
 
Chapter 3 kitchen tools and equipments
Chapter 3   kitchen tools and equipmentsChapter 3   kitchen tools and equipments
Chapter 3 kitchen tools and equipmentsPavit Tansakul
 
Chapter 1 the foodservice industry
Chapter 1   the foodservice industryChapter 1   the foodservice industry
Chapter 1 the foodservice industryPavit Tansakul
 
เลขที่นั่งสอบ FBM-341 ปลายภาค 3/2553
เลขที่นั่งสอบ FBM-341 ปลายภาค 3/2553เลขที่นั่งสอบ FBM-341 ปลายภาค 3/2553
เลขที่นั่งสอบ FBM-341 ปลายภาค 3/2553Pavit Tansakul
 
LOM-431 แบบประเมินโครงการการศึกษานอกสถานที่ MICE (3 2553)
LOM-431 แบบประเมินโครงการการศึกษานอกสถานที่  MICE (3 2553)LOM-431 แบบประเมินโครงการการศึกษานอกสถานที่  MICE (3 2553)
LOM-431 แบบประเมินโครงการการศึกษานอกสถานที่ MICE (3 2553)Pavit Tansakul
 
Field trip evaluation form FBM-341
Field trip evaluation  form FBM-341Field trip evaluation  form FBM-341
Field trip evaluation form FBM-341Pavit Tansakul
 
รายชื่อนักศึกษา3 2553
รายชื่อนักศึกษา3 2553รายชื่อนักศึกษา3 2553
รายชื่อนักศึกษา3 2553Pavit Tansakul
 
รายชื่อน.ศ.3 53
รายชื่อน.ศ.3 53รายชื่อน.ศ.3 53
รายชื่อน.ศ.3 53Pavit Tansakul
 
Chapter 2 Menus, Recipes and Calculation
Chapter 2   Menus, Recipes and CalculationChapter 2   Menus, Recipes and Calculation
Chapter 2 Menus, Recipes and CalculationPavit Tansakul
 
Chapter 1 - The Foodservice Industry
Chapter 1 - The Foodservice IndustryChapter 1 - The Foodservice Industry
Chapter 1 - The Foodservice IndustryPavit Tansakul
 
Chapter 1 - The Foodservice Industry
Chapter 1 - The Foodservice IndustryChapter 1 - The Foodservice Industry
Chapter 1 - The Foodservice IndustryPavit Tansakul
 
Ccocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตร
Ccocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตรCcocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตร
Ccocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตรPavit Tansakul
 
Cocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตร
Cocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตรCocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตร
Cocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตรPavit Tansakul
 
Chapter 8 Bar and Beverage Management
Chapter 8 Bar and Beverage ManagementChapter 8 Bar and Beverage Management
Chapter 8 Bar and Beverage ManagementPavit Tansakul
 
Microsoft power point chapter 7 establishing beverage & bar businesses
Microsoft power point   chapter 7 establishing beverage & bar businessesMicrosoft power point   chapter 7 establishing beverage & bar businesses
Microsoft power point chapter 7 establishing beverage & bar businessesPavit Tansakul
 
กำหนดการศึกษาดูงานนอกสถานที่ภูเก็ต 27-29 ต.ค. 2553 revise
กำหนดการศึกษาดูงานนอกสถานที่ภูเก็ต 27-29 ต.ค. 2553 reviseกำหนดการศึกษาดูงานนอกสถานที่ภูเก็ต 27-29 ต.ค. 2553 revise
กำหนดการศึกษาดูงานนอกสถานที่ภูเก็ต 27-29 ต.ค. 2553 revisePavit Tansakul
 
nt chapter 6 cocktails and mixed drink
nt   chapter 6 cocktails and mixed drinknt   chapter 6 cocktails and mixed drink
nt chapter 6 cocktails and mixed drinkPavit Tansakul
 

More from Pavit Tansakul (20)

THB60-321 PPT Design Concept for Event @ 3/2563
THB60-321 PPT Design Concept for Event @ 3/2563THB60-321 PPT Design Concept for Event @ 3/2563
THB60-321 PPT Design Concept for Event @ 3/2563
 
Chapter 4 : Basic cooking principle & food science
Chapter 4  : Basic cooking principle & food scienceChapter 4  : Basic cooking principle & food science
Chapter 4 : Basic cooking principle & food science
 
Chapter 3 kitchen tools and equipments
Chapter 3   kitchen tools and equipmentsChapter 3   kitchen tools and equipments
Chapter 3 kitchen tools and equipments
 
Chapter 1 the foodservice industry
Chapter 1   the foodservice industryChapter 1   the foodservice industry
Chapter 1 the foodservice industry
 
เลขที่นั่งสอบ FBM-341 ปลายภาค 3/2553
เลขที่นั่งสอบ FBM-341 ปลายภาค 3/2553เลขที่นั่งสอบ FBM-341 ปลายภาค 3/2553
เลขที่นั่งสอบ FBM-341 ปลายภาค 3/2553
 
LOM-431 แบบประเมินโครงการการศึกษานอกสถานที่ MICE (3 2553)
LOM-431 แบบประเมินโครงการการศึกษานอกสถานที่  MICE (3 2553)LOM-431 แบบประเมินโครงการการศึกษานอกสถานที่  MICE (3 2553)
LOM-431 แบบประเมินโครงการการศึกษานอกสถานที่ MICE (3 2553)
 
Field trip evaluation form FBM-341
Field trip evaluation  form FBM-341Field trip evaluation  form FBM-341
Field trip evaluation form FBM-341
 
Img
ImgImg
Img
 
รายชื่อนักศึกษา3 2553
รายชื่อนักศึกษา3 2553รายชื่อนักศึกษา3 2553
รายชื่อนักศึกษา3 2553
 
รายชื่อน.ศ.3 53
รายชื่อน.ศ.3 53รายชื่อน.ศ.3 53
รายชื่อน.ศ.3 53
 
Chapter 2 Menus, Recipes and Calculation
Chapter 2   Menus, Recipes and CalculationChapter 2   Menus, Recipes and Calculation
Chapter 2 Menus, Recipes and Calculation
 
Chapter 1 - The Foodservice Industry
Chapter 1 - The Foodservice IndustryChapter 1 - The Foodservice Industry
Chapter 1 - The Foodservice Industry
 
Chapter 1 - The Foodservice Industry
Chapter 1 - The Foodservice IndustryChapter 1 - The Foodservice Industry
Chapter 1 - The Foodservice Industry
 
Ccocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตร
Ccocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตรCcocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตร
Ccocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตร
 
Cocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตร
Cocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตรCocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตร
Cocktail Recipe ที่ใช้สอบปฏิบัติ 10 สูตร
 
Chapter 8 Bar and Beverage Management
Chapter 8 Bar and Beverage ManagementChapter 8 Bar and Beverage Management
Chapter 8 Bar and Beverage Management
 
Microsoft power point chapter 7 establishing beverage & bar businesses
Microsoft power point   chapter 7 establishing beverage & bar businessesMicrosoft power point   chapter 7 establishing beverage & bar businesses
Microsoft power point chapter 7 establishing beverage & bar businesses
 
กำหนดการศึกษาดูงานนอกสถานที่ภูเก็ต 27-29 ต.ค. 2553 revise
กำหนดการศึกษาดูงานนอกสถานที่ภูเก็ต 27-29 ต.ค. 2553 reviseกำหนดการศึกษาดูงานนอกสถานที่ภูเก็ต 27-29 ต.ค. 2553 revise
กำหนดการศึกษาดูงานนอกสถานที่ภูเก็ต 27-29 ต.ค. 2553 revise
 
nt chapter 6 cocktails and mixed drink
nt   chapter 6 cocktails and mixed drinknt   chapter 6 cocktails and mixed drink
nt chapter 6 cocktails and mixed drink
 
Course outline 2 2553
Course outline 2 2553Course outline 2 2553
Course outline 2 2553
 

Chapter 6 Planning MICE Events

  • 1. Chapter 6 Planning for MICE Events E-mail: tpavit@hotmail.com 081-082- . 081-082-7273 1
  • 2. Objectives 1. Identify and define the planning requirements of the stakeholders of a convention or meeting 2. Identify the stages and factors that need to be considered in the planning of a convention or meeting 3. Review project planning techniques and explore their application in planning, organising and scheduling a convention or meeting 4. Explore the components of the convention or meeting plan 2
  • 3. Outline 1. The Planning Requirements of the Stakeholders 2. What is Planning and Why Plan? 3. Three types / levels of plans 4. Characteristics of project planning 5. The project life cycle 6. Planning the event 3
  • 4. Introduction • This chapter outlines and discusses the concept of planning and the planning requirements for the successful management and operation of a convention and meeting. • It reviews the planning needs and identifies the use of project planning techniques as appropriate to ensure the satisfactory delivery of the event. • Pre event planning is examined together with a discussion of factors to be considered in the planning of the conference program, the printed materials and the conference registration process. 4
  • 5. Planning • Planning is the process by which the manager or organizer looks towards the event to discover what various courses of action are available to arrange it, and which course of action would be the best. 5
  • 6. Planning for MICE event • So what are the ingredients for a successful convention or meeting? • Obviously, they would include the identification of an appropriate venue and accommodation facilities, clarification of the catering requirements and the design and distribution of delegates invitations, along with other, smaller administrative and technical items. 6
  • 7. Planning for MICE event • However, in order to ensure ultimate and complete customer satisfaction, the total event needs to be planned and coordinated in the most effective and efficient manner within the given time frame. 7
  • 8. The Planning Requirements of the Stakeholders 8
  • 9. The Planning Requirements of the Stakeholders • To ensure a successful convention or meeting a number of different stakeholders are involved: 1. Client Company 2. Conference organizer 3. Various service suppliers (e.g. Venue & A/V) • They all require the same type of information for the planning of a MICE event, but will focus on different aspects. For example: 9
  • 10. The Planning Requirements of the Stakeholders 1.1 The Client company • makes the decision to hold a convention or meeting • Set the objectives for the event w/ PCO • Identifies the potential participants • Set the dates and establishes the budget. 10
  • 11. The Planning Requirements of the Stakeholders 1.2 The Conference Organizers • Establishes the objectives of the event with the client company. • CFM which key personnel from the client organization will be involved in the event. • Identify the site and venue. • Lead and Coordinate all the various facets of the event • Establishing the program. • Establishing Pre and Post- Conference tours. • Brief and work with other suppliers such as florists, A/V, Transport company. • Manage the budget for the client company. 11
  • 12. The Planning Requirements of the Stakeholders 1.3 Venue • Liaises with the conference organizer • Identifies the number of delegates • Agrees the date for receipt of final numbers • Establishes the requirements for accommodation and facilities, including meeting rooms, Food and beverage services • Required timing of the program for staffing the event 12
  • 13. The Planning Requirements of the Stakeholders 1.4 Suppliers • Obtain a brief of the event from the conference organizer • Establish the requirement 13
  • 14. The Planning Requirements of the Stakeholders • Planning and the use of planning techniques are essential if the conference organizers is to ensure the satisfactory coordination of all the stakeholders and suppliers and: 1. identify the tasks to be undertaken 2. establish the appropriate time frames 3. source who is to undertake each task, by when task, and to what standard 4. coordinate all activities 14
  • 15. What is Planning and Why Plan? 15
  • 16. What is planning & why planning? What is Planning? • Planning involves deciding what needs to be done, by whom and by when. • It is “the systematic arrangement of tasks to accomplish an objective” 16
  • 17. What is planning & why planning? Why Planning? 1. Planning provides direction enabling to identify direction; where we are going and how to get there. 2. Planning draws attention to the stages on the ways (how far we have accomplished objectives), identifies and clarifies sidetracks that may be necessary 3. A plan helps to set and establish priorities that can assist in the scheduling of activities. 4. The plan becomes a benchmark against which the actual progress towards the final objective can be compared. 17
  • 18. What is planning & why planning? • It takes a great deal of time, care and patience to plan, manage and organize a MICE event - even the smallest event cannot be conjured up overnight • Some events might be annually organized, for instance, however when one year finishes the planning for next year’s event begins 18
  • 20. Three types or levels of plans 1. Strategic plan • identifies the importance of planning and goal setting as tools for determining where a company wants to go and how it wants to get there 20
  • 21. Three types or levels of plans 2. Operational plan plan • focuses on planning & maintaining the work flows that make up the operational system of a business. • It would verify how the financial resources, human resources, materials and so on are to be monitored to ensure the most effective completion of the tasks. • A map of how to get there • A mechanism for setting standards • Clarification of what is to be done and how it is to be done • Identification of the work areas and the priorities of the org 21
  • 22. Three types or levels of plans 3. Project or functional plan • involves a sequence of choices or decisions that either commit or utilize resources over a period of time. • To achieve successful in undertaking a project, it is important to prepare a plan. • It has a clearly defined objective stated in terms of scope, schedule and cost 22
  • 23. Three types or levels of plans 3. Project or functional plan (Cont.) • Generally involves PCOs, AV suppliers, venues, accommodations, airlines, state tourism offices, etc. as to ensure that each project or functional plan would be successful • In particular, event that are managed by conference organizers fall into the definition of a PROJECT 23
  • 24. 3. Three types / levels of plans 24
  • 26. The project life cycle 1. Putting together the bid or proposal for the convention or meeting 2. Winning the bid 3. Pre-event planning and organization 4. Managing and organizing the actual convention or meeting 5. Post-event evaluation and review planning 26
  • 27. The project life cycle • All projects or functions to be organized by PCOs or event planners, they all have these four stages: Stage 1: project conception or feasibility study the need for a project is identified Stage 2: project planning or design a possible solution is developed Stage 3: project implementation or execution the project is carried out Stage 4: project termination and evaluation 27
  • 29. Planning the events 1. Pre-event planning 2. Planning the program 3. The convention or meeting blueprint 4. Planning the printed materials 5. Planning the registration process 29
  • 30. 1. Pre-event planning • The MICE project team needs to review whether the event design is both Viable and Feasible. • In proposal and bid document, PCO will have identified the: • Type • Purpose and Objectives • Theme • Number of Day requirements • Potential delegates & Travel Requirement • Estimate overall budget 30
  • 31. 1. Pre-event planning 1.1 Task identification There are several issues need to be considers for example; 1. inspection and selection of the site and venue 2. food & beverage; quality, service, menu, price, style, etc. 3. transportation; venue accessibility 4. entertainment and pizzazz to support the theme 5. budget, legal aspects, other special requirements 6. marketing & promotion 7. miscellaneous; e.g. AV equipment, speakers, etc. 31
  • 32. 1. Pre-event planning 1.2 Organization of tasks how these tasks in previous slice would be organized; 1. plan what to be done and how those tasks should be done properly 2. schedule tasks to be done orderly, prioritize them according to their critical requirements 3. allocate and control resource as already scheduled 4. control progress and costs 5. communicate - clear and precise information should be communicated to appropriate people 32
  • 33. 1. Pre-event planning • Popular techniques for preparing network diagrams is GANTT charts. • A Gantt chart is simply a bar chart that plots the time required for each task. Focus on • Planning • Scheduling • Allocating and Controlling resources • Controlling progress and costs • Communicating 33
  • 35. 2. Planning the program 2.1 Program design How to balance the participants’ objectives and MICE event’s overall objectives • time for each session/activity, and an opening ceremony • the style of MICE event, e.g. a convention of 300-400 people cannot take 15 minute for refreshments • times for participants to overlook exhibitions, build connection and do social activities 35
  • 36. 2. Planning the program 2.2 Pace and timing of the program consider: 1. delegate profile, the need for participants to move out 2. travel distance to venue and style of the event 3. accompanying persons 36
  • 37. 2. Planning the program 2.3 Components of the program 1. Formal sessions Plenary session, breakout session, opening session 2. The provision of food and beverage (breakfast, lunch, dinner, refreshment, reception party, ending party, etc.) 3. Exhibitions and tradeshows 4. Free time and social activity 37
  • 38. 3. The meeting blueprint • BLUE PRINT is a development and extension of the “Road Map” mentioned earlier. • Each conference organizer will have a different format for this document, but the following information generally is included: 38
  • 39. 3. The meeting blueprint Information guiding or describing the event: 1. contents page 2. information on destination, venue, etc. 3. a detailed list of contacts at the venue 4. information on the event, e.g. meeting rooms, registration information & procedures, etc. 5. a delegate registration list and room allocations 6. daily ‘running sheet’ or day-to-day plan of each session or activity 7. closing information and checklist 8. evaluation information 39
  • 40. 4. Planning the printed materials • A variety of printed materials that need to be planned and organized prior to the actual event; • Delegate registration • Lists of diagram of the forms exhibitor stand • Conference brochures • Information on sponsor • Programs • Ticket and vouchers • Participant name tags • Special invitation letter • Delegate lists • Signage and so on • Conference proceeding 40
  • 41. 5. Planning the registration process • Conference organizers need to reflect on the processing of potential queues from perspective of the customer, that is the delegates. Points they should consider include: • Is it reasonable to expect delegates to wait • Is the priority process for serving delegates fair? • Do delegates feel in control of what is happening while they are waiting? • Is a conductive physical environment provided in which delegates can wait? 41
  • 42. 5. Planning the registration process • Delegate registration system can be structured as the following: 1. Single channel and single stage 2. Single channel and multiple stage 3. Multiple channel and multiple stage 4. Parallel single channel with single or multiple stage; this group, delegates could be divided alphabetically by their last name, or their country/region of origin (e.g. A-E, F-I, ... T-Z) • Large events, registration might be organized one day to few days or a week before the actual event starts 42
  • 43. Single channel with single stage Registration Desk F F F F 43
  • 44. Single channel with multiple stages Registration Desk I Registration Desk II Registration F F F F Desk III 44
  • 45. Multiple channels with multiple stages Registration Registration Desk BI Desk AI F F F F Registration Registration Desk BII Desk AII F F F ก ก ก 45
  • 46. Parallel single channel with multiple stages Registration Desk I F F F F Registration Desk II F F F F Registration Desk III F F F ก ก ก ก / 46
  • 47. The Strategic event planning process 47
  • 48. The Strategic event planning process (cont.) 48
  • 49. Summary • Efficient and effective planning is extremely important for the success of convention or meeting. • The role of planning and, in particular, project planning, is critical in the planning, organization and scheduling of a MICE event. • The key to success of planning of an event is the preparation of a project plan that covers the various stages of the event life cycle. • Conference organizers planning MICE event must remember the leading time required to undertake certain activities, be methodical. Check and recheck target, and review the plan constantly to ensure that it is on schedule. • They must also prepare a contingency plan case something goes wrong – disasters do happen. 49