SlideShare ist ein Scribd-Unternehmen logo
1 von 41
Downloaden Sie, um offline zu lesen
Foundation Data

Foundation Numbers and sizes

             Length      Width        Depth                          Page
 Number        (ft)       (ft)         (ft)       Area (ft^3)
   10         137          3           3.5          1438.5             2
   11         131          3           2.5          982.5              5
   12          88          3           1.5           396               8
   13          87          3           1.5          391.5             10
   14          85          3           1.5          382.5             13
   15          86          3           1.5           387              16
   16          83          3           1.5          373.5             19
   21         125          3           1.5          562.5             22
   26         119          3           1.5          535.5             25
   27         233          3            2            1398             28
   29         175          3            5            2625             31
   30          60          3            5            900              34
   31         176          3            5            2640             36
   32         177          3            5            2655             39


All reinforcements used in the foundations are in the following pages. They are broken into sections by
the foundation number, followed by the top, bottom, and shear reinforcement data.
Foundation 10

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #5         5            0       8    1.38    1.55
    2        #6         6            8      38    2.51    2.64
    3        #5         6           38      58    1.82    1.86
    4        #6        10           58      88    4.21     4.4
    5        #6         9           88     104    3.88    3.96
    6        #6         5          104     128    1.88     2.2
    7        #5         5          128     137    0.25    1.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6        10            0      24    4.33     4.4
    2        #6         9           24      48    3.73    3.96
    3        #6         8           48      72    3.39    3.52
    4        #6        14           72      96    5.76    6.16
    5        #5         5           96     115    0.69    1.55
    6        #4         7          115     137    1.36     1.4
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
   #5        18          0      4.79    0.38    0.41
   #5        18       12.21      18     0.38    0.41
   #5        18         18       23     0.38    0.41
                        23       29       0       0
   #5        18         29     34.79    0.38    0.41
   #5        18       42.21      45     0.38    0.41
   #5        18         45       48     0.38    0.41
   #5        18         48       52     0.38    0.41
   #5        18         52     54.79    0.38    0.41
   #5        18       62.21      67     0.38    0.41
   #5        18         67       71     0.38    0.41
                        71       76       0       0
   #5        18         76       80     0.38    0.41
   #5        18         80     84.79    0.38    0.41
   #5        18       92.21      96     0.38    0.41
   #5        18         96       99     0.38    0.41
   #5        18         99     100.79   0.38    0.41
                      108.21    116       0       0
                       116     124.79     0       0
                      132.21    137       0       0
Foundation #11

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3        12            0       5    1.23    1.32
    2        #4        16            5      35    3.15     3.2
    3        #4        16           35      55    3.15     3.2
    4        #4        16           55      85    3.15     3.2
    5        #4        16           85     101    3.15     3.2
    6        #4        13          101     125    2.55     2.6
    7        #3         8          125     131    0.86    0.88




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #7         5            0      20    2.79      3
    2        #6        10           20      45    4.35     4.4
    3        #7         7           45      70    4.09     4.2
    4        #8         5           70      93    3.91    3.95
    5        #7         6           93     113    3.12     3.6
    6        #6         6          113     131    2.48    2.64
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
   #4        12          0      2.79    0.36     0.4
   #4        12        8.21      13     0.36     0.4
                        13       19       0       0
                        19       25       0       0
   #4        12         25     32.79    0.36     0.4
   #4        12       38.21    43.07    0.36     0.4
   #4        12       43.07      45     0.36     0.4
   #4        12         45     47.93    0.36     0.4
   #4        12       47.93    52.79    0.36     0.4
   #4        12       58.21      66     0.36     0.4
   #4        12         66       70     0.36     0.4
                        70       75       0       0
   #4        12         75     82.79    0.36     0.4
   #4        12       88.21      93     0.36     0.4
   #4        12         93     98.79    0.36     0.4
   #4        12       104.21    110     0.36     0.4
   #4        12        110      114     0.36     0.4
                       114      118       0       0
   #4        12        118     122.79   0.36     0.4
                      128.21    131       0       0
Foundation #12

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0       4    0.42      1
    2        #5         5            4      34    1.48    1.55
    3        #6         5           34      54    2.13     2.2
    4        #5         5           54      84    1.49    1.55
    5        #4         5           84      88    0.46      1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6         6            0      17    2.42    2.64
    2        #7         9           17      44    5.11     5.4
    3        #7         9           44      73    5.12     5.4
    4        #6         6           73      88    2.51    2.64
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
   #3         6         0     2.28    0.35    0.44
   #3         6       5.72      11    0.35    0.44
                       11       18      0       0
                       18       25      0       0
   #3        3         25     32.28   0.66    0.88
   #3        3        35.72     44    0.82    0.88
   #3        3         44     52.28   0.82    0.88
   #3        3        55.72     63    0.65    0.88
                       63       70      0       0
                       70       77      0       0
   #3        6         77     82.28   0.35    0.44
   #3        6        85.72     88    0.35    0.44
Foundation #13

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       3    0.32    0.55
    2        #4         7            3      33    1.33     1.4
    3        #4        10           33      53     1.9      2
    4        #4         7           53      83    1.34     1.4
    5        #3         5           83      87     0.3    0.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4        10            0      17    1.87      2
    2        #5        15           17      43    4.63    4.65
    3        #6        11           43      69    4.65    4.84
    4        #5         6           69      87    1.84    1.86
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
   #3         6         0     1.78    0.35    0.44
   #3         6       5.22      10    0.35    0.44
                       10       17      0       0
                       17       25      0       0
   #3        3         25     31.78    0.5    0.88
   #3        3        35.22     43    0.65    0.88
   #3        3         43     51.78   0.66    0.88
   #3        3        55.22     62    0.49    0.88
                       62       69      0       0
                       69       77      0       0
   #3        6         77     81.78   0.35    0.44
   #3        6        85.22     87    0.35    0.44
Foundation #14

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       2    0.07    0.55
    2        #4         6            2      32    1.13     1.2
    3        #4         7           32      52    1.38     1.4
    4        #4         6           52      82    1.11     1.2
    5        #3         7           82      85     0.7    0.77




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         6            0      16    1.18     1.2
    2        #5        11           16      42    3.31    3.41
    3        #5        11           42      68    3.32    3.41
    4        #4         6           68      85    1.16     1.2
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
                      4.23       6      0       0
                        6       15      0       0
                       15       25      0       0
   #3        6         25     30.77   0.35    0.44
   #3        6        34.23     37    0.35    0.44
   #3        6         37     39.74   0.35    0.44
                      39.74     42      0       0
                       42     45.26     0       0
   #3        6        45.26     48    0.35    0.44
   #3        6         48     50.77   0.35    0.44
   #3        6        54.23     60    0.35    0.44
                       60       69      0       0
                       69       78      0       0
                       78     80.77     0       0
Foundation #15

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       3    0.15    0.55
    2        #3        10            3      33    1.07     1.1
    3        #3        13           33      53    1.43    1.43
    4        #3        10           53      83    1.09     1.1
    5        #3         5           83      86    0.15    0.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         7            0      17    1.39     1.4
    2        #5        11           17      43    3.33    3.41
    3        #6         8           43      69    3.33    3.52
    4        #5         5           69      86    1.37    1.55
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
                        0     1.27      0       0
                      4.73       8      0       0
                        8       17      0       0
                       17       26      0       0
   #3        6         26     31.27   0.35    0.44
   #3        6        34.73     38    0.35    0.44
                       38       41      0       0
                       41       45      0       0
   #3        6         45       48    0.35    0.44
   #3        6         48     51.27   0.35    0.44
   #3        6        54.73     60    0.35    0.44
                       60       69      0       0
                       69       78      0       0
                       78     81.27     0       0
                      84.73     86      0       0
Foundation #16

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       1    0.01    0.55
    2        #4         8            1      31    1.44     1.6
    3        #3        10           31      51    1.03     1.1
    4        #4         7           51      81    1.37     1.4
    5        #3        10           81      83    1.02     1.1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3        10            0      20    1.05     1.1
    2        #4        13           20      43    2.46     2.6
    3        #4        13           43      64    2.49     2.6
    4        #3        10           64      83    1.02     1.1
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
                      3.24       5      0       0
                        5       15      0       0
                       15       25      0       0
                       25     29.76     0       0
   #3        6        33.24     36    0.35    0.44
                       36       39      0       0
                       39       44      0       0
                       44       47      0       0
   #3        6         47     49.76   0.35    0.44
                      53.24     58      0       0
                       58       68      0       0
                       68       78      0       0
                       78     79.76     0       0
Foundation #21

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       2    0.13    0.55
    2        #4         7            2      32    1.39     1.4
    3        #5         5           32      52    1.43    1.55
    4        #4         7           52      82    1.38     1.4
    5        #4         5           82      98    0.98      1
    6        #5         5           98     122    1.48    1.55
    7        #4         5          122     125    0.97      1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #5         6            0      21     1.8    1.86
    2        #6        10           21      42    4.14     4.4
    3        #5        12           42      68    3.68    3.72
    4        #4        16           68      90    3.17     3.2
    5        #5        11           90     108    3.24    3.41
    6        #5         5          108     125    1.53    1.55
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
                       4.23       7       0       0
                         7       15       0       0
                        15       24       0       0
   #3        6          24     30.77    0.35    0.44
   #3        6        34.23      37     0.36    0.44
   #3        6          37     39.74    0.35    0.44
                      39.74      42       0       0
                        42     45.26      0       0
   #3        6        45.26      48     0.35    0.44
   #3        6          48     50.77    0.35    0.44
   #3        6        54.23      60     0.35    0.44
                        60       67       0       0
                        67       75       0       0
   #3        6          75     80.77    0.35    0.44
   #3        6        84.23      90     0.35    0.44
   #3        6          90     96.77    0.35    0.44
   #3        6        100.23    106     0.35    0.44
                       106      112       0       0
                       112      118       0       0
                       118     120.77     0       0
Foundation #26

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       2    0.09    0.55
    2        #4         8            2      20    1.55     1.6
    3        #4         8           20      47    1.49     1.6
    4        #4         8           47      82    1.54     1.6
    5        #3        10           82     117    1.05     1.1
    6        #3         5          117     119     0.1    0.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         7            0      12    0.67    0.77
    2        #3        15           12      34    1.61    1.65
    3        #4        17           34      63    3.28     3.4
    4        #3         8           63     100    0.79    0.88
    5        #3         6          100     119    0.65    0.66
Shear Reinforcement

  Size      Spc       Start    End     Req.    Prov.
            (in)       (ft)     (ft)   (in2)   (in2)
                      3.74       5       0       0
                        5        9       0       0
                        9       14       0       0
                       14     18.26      0       0
                      21.74     23       0       0
                       23       31       0       0
                       31       40       0       0
   #3        6         40     45.26    0.35    0.44
   #3        6        48.74     54     0.35    0.44
                       54       67       0       0
                       67     80.26      0       0
                      83.74     99       0       0
                       99      114       0       0
                       114    115.26     0       0
Foundation #27

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #5         5            0       8    1.38    1.55
    2        #6         6            8      38    2.51    2.64
    3        #5         6           38      58    1.82    1.86
    4        #6        10           58      88    4.21     4.4
    5        #6         9           88     104    3.88    3.96
    6        #6         5          104     128    1.88     2.2
    7        #5         5          128     137    0.25    1.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6        10            0      24    4.33     4.4
    2        #6         9           24      48    3.73    3.96
    3        #6         8           48      72    3.39    3.52
    4        #6        14           72      96    5.76    6.16
    5        #5         5           96     115    0.69    1.55
    6        #4         7          115     137    1.36     1.4
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
   #5        18          0      4.79    0.38    0.41
   #5        18       12.21      18     0.38    0.41
   #5        18         18       23     0.38    0.41
                        23       29       0       0
   #5        18         29     34.79    0.38    0.41
   #5        18       42.21      45     0.38    0.41
   #5        18         45       48     0.38    0.41
   #5        18         48       52     0.38    0.41
   #5        18         52     54.79    0.38    0.41
   #5        18       62.21      67     0.38    0.41
   #5        18         67       71     0.38    0.41
                        71       76       0       0
   #5        18         76       80     0.38    0.41
   #5        18         80     84.79    0.38    0.41
   #5        18       92.21      96     0.38    0.41
   #5        18         96       99     0.38    0.41
   #5        18         99     100.79   0.38    0.41
                      108.21    116       0       0
                       116     124.79     0       0
                      132.21    137       0       0
Foundation #29

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0       4    0.42      1
    2        #5         5            4      34    1.48    1.55
    3        #6         5           34      54    2.13     2.2
    4        #5         5           54      84    1.49    1.55
    5        #4         5           84      88    0.46      1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6         6            0      17    2.42    2.64
    2        #7         9           17      44    5.11     5.4
    3        #7         9           44      73    5.12     5.4
    4        #6         6           73      88    2.51    2.64
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
   #3         6         0     2.28    0.35    0.44
   #3         6       5.72      11    0.35    0.44
                       11       18      0       0
                       18       25      0       0
   #3        3         25     32.28   0.66    0.88
   #3        3        35.72     44    0.82    0.88
   #3        3         44     52.28   0.82    0.88
   #3        3        55.72     63    0.65    0.88
                       63       70      0       0
                       70       77      0       0
   #3        6         77     82.28   0.35    0.44
   #3        6        85.72     88    0.35    0.44
Foundation #30

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       7    0.03    0.55
    2        #3         5            7      25    0.32    0.55
    3        #4         8           25      52    1.59     1.6
    4        #3        13           52      60    1.42    1.43




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0      18    0.26    0.55
    2        #3         5           18      38    0.15    0.55
    3        #4        12           38      60    2.21     2.4
Shear Reinforcement

  Seg.      Size      Spc    Start    End    Req.    Prov.
                      (in)    (ft)    (ft)   (in2)   (in2)
    1                          0     2.23      0             0
    2                        12.77     16      0             0
    3                         16     20.23     0             0
    4                        30.77     39      0             0
    5                         39     47.23     0             0
    6                        57.77     60      0             0
Foundation #31

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       8    0.26    0.55
    2        #3         8            8      33    0.87    0.88
    3        #3         6           33      43    0.63    0.66
    4        #4         6           43      68    1.18     1.2
    5        #4         5           68      93    0.92      1
    6        #4         9           93     123    1.76     1.8
    7        #4         9          123     148    1.78     1.8
    8        #3        17          148     168    1.82    1.87
    9        #3        17          168     176    1.84    1.87




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0      21    0.98      1
    2        #5         7           21      38    2.16    2.17
    3        #4        10           38      56      2       2
    4        #5         6           56      81    1.72    1.86
    5        #4        11           81     105     2.2     2.2
    6        #5        11          105     136    3.41    3.41
    7        #4         5          136     158      0       1
    8        #5        10          158     176    2.87     3.1
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
                         0      2.79      0       0
                      13.21      20       0       0
                        20     27.79      0       0
                      48.21      55       0       0
                        55     62.79      0       0
                      73.21      80       0       0
                        80     87.79      0       0
                      98.21     107       0       0
                       107     116.79     0       0
   #5        18       116.79   117.79   0.35    0.41
   #5        18       128.21   129.21   0.35    0.41
   #5        18       129.21    136     0.35    0.41
                       136     142.79     0       0
                      153.21    157       0       0
                       157     161.79     0       0
   #5        18       161.79   162.79   0.35    0.41
                      173.21    176       0       0
Foundation #32

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       8    0.22    0.55
    2        #4         5            8      33    0.97      1
    3        #3         6           33      43    0.61    0.66
    4        #4         6           43      68    1.16     1.2
    5        #4         5           68      93    0.89      1
    6        #5         6           93     123    1.78    1.86
    7        #5         6          123     148    1.76    1.86
    8        #4        10          148     168    1.99      2
    9        #5         7          168     177    2.01    2.17




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0      22    0.91      1
    2        #5         7           22      38    2.12    2.17
    3        #4        10           38      57    1.98      2
    4        #5         6           57      82    1.72    1.86
    5        #4        11           82     107    2.19     2.2
    6        #5        12          107     137    3.42    3.72
    7        #4         5          137     158      0       1
    8        #4        16          158     177    3.15     3.2
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
                         0      3.29      0       0
                      13.71      21       0       0
                        21     28.29      0       0
                      48.71      56       0       0
                        56     63.29      0       0
                      73.71      81       0       0
                        81     88.29      0       0
                      98.71     108       0       0
                       108     117.29     0       0
   #5        18       117.29   118.29   0.35    0.41
   #5        18       128.71    130     0.35    0.41
                       130      137       0       0
                       137     143.29     0       0
                      153.71    158       0       0
                       158     162.29     0       0
   #5        18       162.29   163.29   0.35    0.41
                      173.71    177       0       0
Foundation Analysis

Weitere ähnliche Inhalte

Was ist angesagt?

Massey ferguson mf 398 tractor, b18008 parts catalogue manual
Massey ferguson mf 398 tractor,   b18008 parts catalogue manualMassey ferguson mf 398 tractor,   b18008 parts catalogue manual
Massey ferguson mf 398 tractor, b18008 parts catalogue manualfjsjjekdkme
 
Lintech ball screw_option_specsheet
Lintech ball screw_option_specsheetLintech ball screw_option_specsheet
Lintech ball screw_option_specsheetElectromate
 
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...fhsjejfsekkkm
 
Massey ferguson mf 20 combine parts catalogue manual
Massey ferguson mf 20 combine parts catalogue manualMassey ferguson mf 20 combine parts catalogue manual
Massey ferguson mf 20 combine parts catalogue manualjfdjskmdmme
 
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manualMassey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manualfjsjjekdkme
 
Webcast: 4th quarter 2006
Webcast: 4th quarter 2006Webcast: 4th quarter 2006
Webcast: 4th quarter 2006Petrobras
 
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manualMassey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manualfjsjjekdkme
 
Hyundai hdf35 3 forklift truck service repair manual
Hyundai hdf35 3 forklift truck service repair manualHyundai hdf35 3 forklift truck service repair manual
Hyundai hdf35 3 forklift truck service repair manualfjskemdme
 
Dijet draaibeitels-cnmg
Dijet draaibeitels-cnmgDijet draaibeitels-cnmg
Dijet draaibeitels-cnmgMx Sanook
 
1 d%20engine%20mechanical%2045 73
1 d%20engine%20mechanical%2045 731 d%20engine%20mechanical%2045 73
1 d%20engine%20mechanical%2045 73Mo Thegrindgixer
 
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manualMassey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manualfjskemdme
 
Nuts bolts-screws-washers
Nuts bolts-screws-washersNuts bolts-screws-washers
Nuts bolts-screws-washersObuekwec
 
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor,   193552 (gb) parts catalogue manualMassey ferguson mf 265 tractor,   193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manualfjsjjekdkme
 
Massey ferguson mf290 tractor ( 387021 (gb)) parts catalogue manual
Massey ferguson mf290 tractor (  387021 (gb)) parts catalogue manualMassey ferguson mf290 tractor (  387021 (gb)) parts catalogue manual
Massey ferguson mf290 tractor ( 387021 (gb)) parts catalogue manualfujsjefjkskem
 
Hyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manualHyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manualfjskemdme
 

Was ist angesagt? (17)

Massey ferguson mf 398 tractor, b18008 parts catalogue manual
Massey ferguson mf 398 tractor,   b18008 parts catalogue manualMassey ferguson mf 398 tractor,   b18008 parts catalogue manual
Massey ferguson mf 398 tractor, b18008 parts catalogue manual
 
Lintech ball screw_option_specsheet
Lintech ball screw_option_specsheetLintech ball screw_option_specsheet
Lintech ball screw_option_specsheet
 
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
 
FM 753
FM 753FM 753
FM 753
 
Massey ferguson mf 20 combine parts catalogue manual
Massey ferguson mf 20 combine parts catalogue manualMassey ferguson mf 20 combine parts catalogue manual
Massey ferguson mf 20 combine parts catalogue manual
 
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manualMassey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
 
Webcast: 4th quarter 2006
Webcast: 4th quarter 2006Webcast: 4th quarter 2006
Webcast: 4th quarter 2006
 
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manualMassey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
 
Hyundai hdf35 3 forklift truck service repair manual
Hyundai hdf35 3 forklift truck service repair manualHyundai hdf35 3 forklift truck service repair manual
Hyundai hdf35 3 forklift truck service repair manual
 
Dijet draaibeitels-cnmg
Dijet draaibeitels-cnmgDijet draaibeitels-cnmg
Dijet draaibeitels-cnmg
 
1 d%20engine%20mechanical%2045 73
1 d%20engine%20mechanical%2045 731 d%20engine%20mechanical%2045 73
1 d%20engine%20mechanical%2045 73
 
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manualMassey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
 
Assignment model problems
Assignment model problemsAssignment model problems
Assignment model problems
 
Nuts bolts-screws-washers
Nuts bolts-screws-washersNuts bolts-screws-washers
Nuts bolts-screws-washers
 
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor,   193552 (gb) parts catalogue manualMassey ferguson mf 265 tractor,   193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
 
Massey ferguson mf290 tractor ( 387021 (gb)) parts catalogue manual
Massey ferguson mf290 tractor (  387021 (gb)) parts catalogue manualMassey ferguson mf290 tractor (  387021 (gb)) parts catalogue manual
Massey ferguson mf290 tractor ( 387021 (gb)) parts catalogue manual
 
Hyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manualHyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manual
 

Andere mochten auch

Making it Matter: Supporting education in the developing world through open a...
Making it Matter: Supporting education in the developing world through open a...Making it Matter: Supporting education in the developing world through open a...
Making it Matter: Supporting education in the developing world through open a...Marieke Guy
 
ARC Media Group 2010 Overview
ARC Media Group 2010 OverviewARC Media Group 2010 Overview
ARC Media Group 2010 OverviewtheMRAnderson
 
CTD Wi14 Weekly Workshop: How People Learn
CTD Wi14 Weekly Workshop: How People LearnCTD Wi14 Weekly Workshop: How People Learn
CTD Wi14 Weekly Workshop: How People LearnPeter Newbury
 
CTD Fa14 Weekly Workshop: How People Learn
CTD Fa14 Weekly Workshop: How People LearnCTD Fa14 Weekly Workshop: How People Learn
CTD Fa14 Weekly Workshop: How People LearnPeter Newbury
 
CIRTL Class Meeting 1: How People Learn
CIRTL Class Meeting 1: How People LearnCIRTL Class Meeting 1: How People Learn
CIRTL Class Meeting 1: How People LearnPeter Newbury
 
2009 Tech Columbus Annual Report
2009 Tech Columbus Annual Report2009 Tech Columbus Annual Report
2009 Tech Columbus Annual ReportRev1 Ventures
 

Andere mochten auch (8)

Making it Matter: Supporting education in the developing world through open a...
Making it Matter: Supporting education in the developing world through open a...Making it Matter: Supporting education in the developing world through open a...
Making it Matter: Supporting education in the developing world through open a...
 
ARC Media Group 2010 Overview
ARC Media Group 2010 OverviewARC Media Group 2010 Overview
ARC Media Group 2010 Overview
 
Wheel Tracks April 2014
Wheel Tracks April 2014Wheel Tracks April 2014
Wheel Tracks April 2014
 
CTD Wi14 Weekly Workshop: How People Learn
CTD Wi14 Weekly Workshop: How People LearnCTD Wi14 Weekly Workshop: How People Learn
CTD Wi14 Weekly Workshop: How People Learn
 
CTD Fa14 Weekly Workshop: How People Learn
CTD Fa14 Weekly Workshop: How People LearnCTD Fa14 Weekly Workshop: How People Learn
CTD Fa14 Weekly Workshop: How People Learn
 
CIRTL Class Meeting 1: How People Learn
CIRTL Class Meeting 1: How People LearnCIRTL Class Meeting 1: How People Learn
CIRTL Class Meeting 1: How People Learn
 
2009 Tech Columbus Annual Report
2009 Tech Columbus Annual Report2009 Tech Columbus Annual Report
2009 Tech Columbus Annual Report
 
DFidoCV15
DFidoCV15DFidoCV15
DFidoCV15
 

Ähnlich wie Foundation Analysis

Foundation data
Foundation dataFoundation data
Foundation dataJ C
 
Vpectrl3 ram foundation - continuous foundation design
Vpectrl3   ram foundation - continuous foundation designVpectrl3   ram foundation - continuous foundation design
Vpectrl3 ram foundation - continuous foundation designcathexis123
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Purple Vision
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Purple Vision
 
Triangulation Sample
Triangulation  SampleTriangulation  Sample
Triangulation SampleChattichai
 
Stocks price
Stocks priceStocks price
Stocks priceiipmff2
 
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53Aj Yawwalak
 
The Science and Practice of Cartographic Interaction
The Science and Practice of Cartographic InteractionThe Science and Practice of Cartographic Interaction
The Science and Practice of Cartographic Interactionreroth
 
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...Nesma
 
Portaria sit 319
Portaria sit 319Portaria sit 319
Portaria sit 319Nestor Neto
 
Writing Readable Code with Pipes
Writing Readable Code with PipesWriting Readable Code with Pipes
Writing Readable Code with PipesRsquared Academy
 
คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5Aj Yawwalak
 
Production forecast and fuel 2020 rev00.pdf
Production forecast and fuel 2020 rev00.pdfProduction forecast and fuel 2020 rev00.pdf
Production forecast and fuel 2020 rev00.pdfssuserb71d4d
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete PresentationJosue Campos
 

Ähnlich wie Foundation Analysis (20)

Foundation data
Foundation dataFoundation data
Foundation data
 
Vpectrl3 ram foundation - continuous foundation design
Vpectrl3   ram foundation - continuous foundation designVpectrl3   ram foundation - continuous foundation design
Vpectrl3 ram foundation - continuous foundation design
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
 
Triangulation Sample
Triangulation  SampleTriangulation  Sample
Triangulation Sample
 
Stocks price
Stocks priceStocks price
Stocks price
 
10
1010
10
 
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
 
Dynaboltinstall
DynaboltinstallDynaboltinstall
Dynaboltinstall
 
The Science and Practice of Cartographic Interaction
The Science and Practice of Cartographic InteractionThe Science and Practice of Cartographic Interaction
The Science and Practice of Cartographic Interaction
 
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
 
Portaria sit 319
Portaria sit 319Portaria sit 319
Portaria sit 319
 
Writing Readable Code with Pipes
Writing Readable Code with PipesWriting Readable Code with Pipes
Writing Readable Code with Pipes
 
Bolt details
Bolt detailsBolt details
Bolt details
 
คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5
 
mansoane
mansoanemansoane
mansoane
 
Statistics.docx
Statistics.docxStatistics.docx
Statistics.docx
 
Production forecast and fuel 2020 rev00.pdf
Production forecast and fuel 2020 rev00.pdfProduction forecast and fuel 2020 rev00.pdf
Production forecast and fuel 2020 rev00.pdf
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete Presentation
 
508202
508202508202
508202
 

Mehr von J C

Structural calculations (conections and slab)
Structural calculations (conections and slab)Structural calculations (conections and slab)
Structural calculations (conections and slab)J C
 
Summary of costs
Summary of costsSummary of costs
Summary of costsJ C
 
Summary of loan and payments
Summary of loan and paymentsSummary of loan and payments
Summary of loan and paymentsJ C
 
Gutter sizing data
Gutter sizing dataGutter sizing data
Gutter sizing dataJ C
 
Irrigation savings
Irrigation savingsIrrigation savings
Irrigation savingsJ C
 
Water storage data
Water storage dataWater storage data
Water storage dataJ C
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklistJ C
 
Leed consultant review
Leed consultant reviewLeed consultant review
Leed consultant reviewJ C
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklistJ C
 
Loan analysis
Loan analysisLoan analysis
Loan analysisJ C
 
Costs
CostsCosts
CostsJ C
 
Schedule
ScheduleSchedule
ScheduleJ C
 
Final pv system
Final pv systemFinal pv system
Final pv systemJ C
 
Pv system analysis
Pv system analysisPv system analysis
Pv system analysisJ C
 
Pv system sizing
Pv system sizingPv system sizing
Pv system sizingJ C
 
Structural costs
Structural costsStructural costs
Structural costsJ C
 
Irrigation Plan
Irrigation PlanIrrigation Plan
Irrigation PlanJ C
 
Irrigation demand
Irrigation demandIrrigation demand
Irrigation demandJ C
 
Storage capacity
Storage capacityStorage capacity
Storage capacityJ C
 
Water Collected On Roof
Water Collected On RoofWater Collected On Roof
Water Collected On RoofJ C
 

Mehr von J C (20)

Structural calculations (conections and slab)
Structural calculations (conections and slab)Structural calculations (conections and slab)
Structural calculations (conections and slab)
 
Summary of costs
Summary of costsSummary of costs
Summary of costs
 
Summary of loan and payments
Summary of loan and paymentsSummary of loan and payments
Summary of loan and payments
 
Gutter sizing data
Gutter sizing dataGutter sizing data
Gutter sizing data
 
Irrigation savings
Irrigation savingsIrrigation savings
Irrigation savings
 
Water storage data
Water storage dataWater storage data
Water storage data
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
 
Leed consultant review
Leed consultant reviewLeed consultant review
Leed consultant review
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
 
Loan analysis
Loan analysisLoan analysis
Loan analysis
 
Costs
CostsCosts
Costs
 
Schedule
ScheduleSchedule
Schedule
 
Final pv system
Final pv systemFinal pv system
Final pv system
 
Pv system analysis
Pv system analysisPv system analysis
Pv system analysis
 
Pv system sizing
Pv system sizingPv system sizing
Pv system sizing
 
Structural costs
Structural costsStructural costs
Structural costs
 
Irrigation Plan
Irrigation PlanIrrigation Plan
Irrigation Plan
 
Irrigation demand
Irrigation demandIrrigation demand
Irrigation demand
 
Storage capacity
Storage capacityStorage capacity
Storage capacity
 
Water Collected On Roof
Water Collected On RoofWater Collected On Roof
Water Collected On Roof
 

Kürzlich hochgeladen

Verified Trusted Call Girls Ambattur Chennai ✔✔7427069034 Independent Chenna...
Verified Trusted Call Girls Ambattur Chennai ✔✔7427069034  Independent Chenna...Verified Trusted Call Girls Ambattur Chennai ✔✔7427069034  Independent Chenna...
Verified Trusted Call Girls Ambattur Chennai ✔✔7427069034 Independent Chenna... Shivani Pandey
 
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser... Shivani Pandey
 
Mumbai ] Call Girls Service Mumbai ₹7.5k Pick Up & Drop With Cash Payment 983...
Mumbai ] Call Girls Service Mumbai ₹7.5k Pick Up & Drop With Cash Payment 983...Mumbai ] Call Girls Service Mumbai ₹7.5k Pick Up & Drop With Cash Payment 983...
Mumbai ] Call Girls Service Mumbai ₹7.5k Pick Up & Drop With Cash Payment 983...hotbabesbook
 
Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...
Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...
Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...ritikasharma
 
𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...
𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...
𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...rahim quresi
 
Verified Trusted Call Girls Egmore Chennai ✔✔7427069034 Independent Chennai ...
Verified Trusted Call Girls Egmore Chennai ✔✔7427069034  Independent Chennai ...Verified Trusted Call Girls Egmore Chennai ✔✔7427069034  Independent Chennai ...
Verified Trusted Call Girls Egmore Chennai ✔✔7427069034 Independent Chennai ... Shivani Pandey
 
College Call Girls Pune 8617697112 Short 1500 Night 6000 Best call girls Service
College Call Girls Pune 8617697112 Short 1500 Night 6000 Best call girls ServiceCollege Call Girls Pune 8617697112 Short 1500 Night 6000 Best call girls Service
College Call Girls Pune 8617697112 Short 1500 Night 6000 Best call girls ServiceNitya salvi
 
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...mriyagarg453
 
Call Girls In Warangal Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Warangal Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Warangal Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Warangal Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service En...HyderabadDolls
 
Model Call Girls In Velappanchavadi WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Velappanchavadi WhatsApp Booking 7427069034 call girl ser...Model Call Girls In Velappanchavadi WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Velappanchavadi WhatsApp Booking 7427069034 call girl ser... Shivani Pandey
 
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...rajveermohali2022
 
Dum Dum ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready...
Dum Dum ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready...Dum Dum ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready...
Dum Dum ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready...ritikasharma
 
VIP Model Call Girls Koregaon Park ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Koregaon Park ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Koregaon Park ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Koregaon Park ( Pune ) Call ON 8005736733 Starting From ...SUHANI PANDEY
 
Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034 Independent Chenna...
Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034  Independent Chenna...Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034  Independent Chenna...
Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034 Independent Chenna... Shivani Pandey
 
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service AvailableCall Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service AvailableNitya salvi
 
📞 Contact Number 8617370543VIP Rajsamand Call Girls
📞 Contact Number 8617370543VIP Rajsamand Call Girls📞 Contact Number 8617370543VIP Rajsamand Call Girls
📞 Contact Number 8617370543VIP Rajsamand Call GirlsNitya salvi
 
Bhimtal ❤CALL GIRL 8617697112 ❤CALL GIRLS IN Bhimtal ESCORT SERVICE❤CALL GIRL
Bhimtal ❤CALL GIRL 8617697112 ❤CALL GIRLS IN Bhimtal ESCORT SERVICE❤CALL GIRLBhimtal ❤CALL GIRL 8617697112 ❤CALL GIRLS IN Bhimtal ESCORT SERVICE❤CALL GIRL
Bhimtal ❤CALL GIRL 8617697112 ❤CALL GIRLS IN Bhimtal ESCORT SERVICE❤CALL GIRLNitya salvi
 
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Kanpur call girls 📞 8617697112 At Low Cost Cash Payment Booking
Kanpur call girls 📞 8617697112 At Low Cost Cash Payment BookingKanpur call girls 📞 8617697112 At Low Cost Cash Payment Booking
Kanpur call girls 📞 8617697112 At Low Cost Cash Payment BookingNitya salvi
 

Kürzlich hochgeladen (20)

Verified Trusted Call Girls Ambattur Chennai ✔✔7427069034 Independent Chenna...
Verified Trusted Call Girls Ambattur Chennai ✔✔7427069034  Independent Chenna...Verified Trusted Call Girls Ambattur Chennai ✔✔7427069034  Independent Chenna...
Verified Trusted Call Girls Ambattur Chennai ✔✔7427069034 Independent Chenna...
 
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
 
Mumbai ] Call Girls Service Mumbai ₹7.5k Pick Up & Drop With Cash Payment 983...
Mumbai ] Call Girls Service Mumbai ₹7.5k Pick Up & Drop With Cash Payment 983...Mumbai ] Call Girls Service Mumbai ₹7.5k Pick Up & Drop With Cash Payment 983...
Mumbai ] Call Girls Service Mumbai ₹7.5k Pick Up & Drop With Cash Payment 983...
 
Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...
Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...
Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...
 
𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...
𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...
𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...
 
Verified Trusted Call Girls Egmore Chennai ✔✔7427069034 Independent Chennai ...
Verified Trusted Call Girls Egmore Chennai ✔✔7427069034  Independent Chennai ...Verified Trusted Call Girls Egmore Chennai ✔✔7427069034  Independent Chennai ...
Verified Trusted Call Girls Egmore Chennai ✔✔7427069034 Independent Chennai ...
 
College Call Girls Pune 8617697112 Short 1500 Night 6000 Best call girls Service
College Call Girls Pune 8617697112 Short 1500 Night 6000 Best call girls ServiceCollege Call Girls Pune 8617697112 Short 1500 Night 6000 Best call girls Service
College Call Girls Pune 8617697112 Short 1500 Night 6000 Best call girls Service
 
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
 
Call Girls In Warangal Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Warangal Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Warangal Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Warangal Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service En...
 
Model Call Girls In Velappanchavadi WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Velappanchavadi WhatsApp Booking 7427069034 call girl ser...Model Call Girls In Velappanchavadi WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Velappanchavadi WhatsApp Booking 7427069034 call girl ser...
 
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
 
Dum Dum ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready...
Dum Dum ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready...Dum Dum ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready...
Dum Dum ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready...
 
VIP Model Call Girls Koregaon Park ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Koregaon Park ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Koregaon Park ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Koregaon Park ( Pune ) Call ON 8005736733 Starting From ...
 
Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034 Independent Chenna...
Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034  Independent Chenna...Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034  Independent Chenna...
Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034 Independent Chenna...
 
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service AvailableCall Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
 
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
📞 Contact Number 8617370543VIP Rajsamand Call Girls
📞 Contact Number 8617370543VIP Rajsamand Call Girls📞 Contact Number 8617370543VIP Rajsamand Call Girls
📞 Contact Number 8617370543VIP Rajsamand Call Girls
 
Bhimtal ❤CALL GIRL 8617697112 ❤CALL GIRLS IN Bhimtal ESCORT SERVICE❤CALL GIRL
Bhimtal ❤CALL GIRL 8617697112 ❤CALL GIRLS IN Bhimtal ESCORT SERVICE❤CALL GIRLBhimtal ❤CALL GIRL 8617697112 ❤CALL GIRLS IN Bhimtal ESCORT SERVICE❤CALL GIRL
Bhimtal ❤CALL GIRL 8617697112 ❤CALL GIRLS IN Bhimtal ESCORT SERVICE❤CALL GIRL
 
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Kanpur call girls 📞 8617697112 At Low Cost Cash Payment Booking
Kanpur call girls 📞 8617697112 At Low Cost Cash Payment BookingKanpur call girls 📞 8617697112 At Low Cost Cash Payment Booking
Kanpur call girls 📞 8617697112 At Low Cost Cash Payment Booking
 

Foundation Analysis

  • 1. Foundation Data Foundation Numbers and sizes Length Width Depth Page Number (ft) (ft) (ft) Area (ft^3) 10 137 3 3.5 1438.5 2 11 131 3 2.5 982.5 5 12 88 3 1.5 396 8 13 87 3 1.5 391.5 10 14 85 3 1.5 382.5 13 15 86 3 1.5 387 16 16 83 3 1.5 373.5 19 21 125 3 1.5 562.5 22 26 119 3 1.5 535.5 25 27 233 3 2 1398 28 29 175 3 5 2625 31 30 60 3 5 900 34 31 176 3 5 2640 36 32 177 3 5 2655 39 All reinforcements used in the foundations are in the following pages. They are broken into sections by the foundation number, followed by the top, bottom, and shear reinforcement data.
  • 2. Foundation 10 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #5 5 0 8 1.38 1.55 2 #6 6 8 38 2.51 2.64 3 #5 6 38 58 1.82 1.86 4 #6 10 58 88 4.21 4.4 5 #6 9 88 104 3.88 3.96 6 #6 5 104 128 1.88 2.2 7 #5 5 128 137 0.25 1.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 10 0 24 4.33 4.4 2 #6 9 24 48 3.73 3.96 3 #6 8 48 72 3.39 3.52 4 #6 14 72 96 5.76 6.16 5 #5 5 96 115 0.69 1.55 6 #4 7 115 137 1.36 1.4
  • 3. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #5 18 0 4.79 0.38 0.41 #5 18 12.21 18 0.38 0.41 #5 18 18 23 0.38 0.41 23 29 0 0 #5 18 29 34.79 0.38 0.41 #5 18 42.21 45 0.38 0.41 #5 18 45 48 0.38 0.41 #5 18 48 52 0.38 0.41 #5 18 52 54.79 0.38 0.41 #5 18 62.21 67 0.38 0.41 #5 18 67 71 0.38 0.41 71 76 0 0 #5 18 76 80 0.38 0.41 #5 18 80 84.79 0.38 0.41 #5 18 92.21 96 0.38 0.41 #5 18 96 99 0.38 0.41 #5 18 99 100.79 0.38 0.41 108.21 116 0 0 116 124.79 0 0 132.21 137 0 0
  • 4.
  • 5. Foundation #11 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 12 0 5 1.23 1.32 2 #4 16 5 35 3.15 3.2 3 #4 16 35 55 3.15 3.2 4 #4 16 55 85 3.15 3.2 5 #4 16 85 101 3.15 3.2 6 #4 13 101 125 2.55 2.6 7 #3 8 125 131 0.86 0.88 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #7 5 0 20 2.79 3 2 #6 10 20 45 4.35 4.4 3 #7 7 45 70 4.09 4.2 4 #8 5 70 93 3.91 3.95 5 #7 6 93 113 3.12 3.6 6 #6 6 113 131 2.48 2.64
  • 6. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #4 12 0 2.79 0.36 0.4 #4 12 8.21 13 0.36 0.4 13 19 0 0 19 25 0 0 #4 12 25 32.79 0.36 0.4 #4 12 38.21 43.07 0.36 0.4 #4 12 43.07 45 0.36 0.4 #4 12 45 47.93 0.36 0.4 #4 12 47.93 52.79 0.36 0.4 #4 12 58.21 66 0.36 0.4 #4 12 66 70 0.36 0.4 70 75 0 0 #4 12 75 82.79 0.36 0.4 #4 12 88.21 93 0.36 0.4 #4 12 93 98.79 0.36 0.4 #4 12 104.21 110 0.36 0.4 #4 12 110 114 0.36 0.4 114 118 0 0 #4 12 118 122.79 0.36 0.4 128.21 131 0 0
  • 7.
  • 8. Foundation #12 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 4 0.42 1 2 #5 5 4 34 1.48 1.55 3 #6 5 34 54 2.13 2.2 4 #5 5 54 84 1.49 1.55 5 #4 5 84 88 0.46 1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 6 0 17 2.42 2.64 2 #7 9 17 44 5.11 5.4 3 #7 9 44 73 5.12 5.4 4 #6 6 73 88 2.51 2.64
  • 9. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #3 6 0 2.28 0.35 0.44 #3 6 5.72 11 0.35 0.44 11 18 0 0 18 25 0 0 #3 3 25 32.28 0.66 0.88 #3 3 35.72 44 0.82 0.88 #3 3 44 52.28 0.82 0.88 #3 3 55.72 63 0.65 0.88 63 70 0 0 70 77 0 0 #3 6 77 82.28 0.35 0.44 #3 6 85.72 88 0.35 0.44
  • 10. Foundation #13 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 3 0.32 0.55 2 #4 7 3 33 1.33 1.4 3 #4 10 33 53 1.9 2 4 #4 7 53 83 1.34 1.4 5 #3 5 83 87 0.3 0.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 10 0 17 1.87 2 2 #5 15 17 43 4.63 4.65 3 #6 11 43 69 4.65 4.84 4 #5 6 69 87 1.84 1.86
  • 11. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #3 6 0 1.78 0.35 0.44 #3 6 5.22 10 0.35 0.44 10 17 0 0 17 25 0 0 #3 3 25 31.78 0.5 0.88 #3 3 35.22 43 0.65 0.88 #3 3 43 51.78 0.66 0.88 #3 3 55.22 62 0.49 0.88 62 69 0 0 69 77 0 0 #3 6 77 81.78 0.35 0.44 #3 6 85.22 87 0.35 0.44
  • 12.
  • 13. Foundation #14 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 2 0.07 0.55 2 #4 6 2 32 1.13 1.2 3 #4 7 32 52 1.38 1.4 4 #4 6 52 82 1.11 1.2 5 #3 7 82 85 0.7 0.77 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 6 0 16 1.18 1.2 2 #5 11 16 42 3.31 3.41 3 #5 11 42 68 3.32 3.41 4 #4 6 68 85 1.16 1.2
  • 14. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 4.23 6 0 0 6 15 0 0 15 25 0 0 #3 6 25 30.77 0.35 0.44 #3 6 34.23 37 0.35 0.44 #3 6 37 39.74 0.35 0.44 39.74 42 0 0 42 45.26 0 0 #3 6 45.26 48 0.35 0.44 #3 6 48 50.77 0.35 0.44 #3 6 54.23 60 0.35 0.44 60 69 0 0 69 78 0 0 78 80.77 0 0
  • 15.
  • 16. Foundation #15 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 3 0.15 0.55 2 #3 10 3 33 1.07 1.1 3 #3 13 33 53 1.43 1.43 4 #3 10 53 83 1.09 1.1 5 #3 5 83 86 0.15 0.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 7 0 17 1.39 1.4 2 #5 11 17 43 3.33 3.41 3 #6 8 43 69 3.33 3.52 4 #5 5 69 86 1.37 1.55
  • 17. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 0 1.27 0 0 4.73 8 0 0 8 17 0 0 17 26 0 0 #3 6 26 31.27 0.35 0.44 #3 6 34.73 38 0.35 0.44 38 41 0 0 41 45 0 0 #3 6 45 48 0.35 0.44 #3 6 48 51.27 0.35 0.44 #3 6 54.73 60 0.35 0.44 60 69 0 0 69 78 0 0 78 81.27 0 0 84.73 86 0 0
  • 18.
  • 19. Foundation #16 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 1 0.01 0.55 2 #4 8 1 31 1.44 1.6 3 #3 10 31 51 1.03 1.1 4 #4 7 51 81 1.37 1.4 5 #3 10 81 83 1.02 1.1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 10 0 20 1.05 1.1 2 #4 13 20 43 2.46 2.6 3 #4 13 43 64 2.49 2.6 4 #3 10 64 83 1.02 1.1
  • 20. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 3.24 5 0 0 5 15 0 0 15 25 0 0 25 29.76 0 0 #3 6 33.24 36 0.35 0.44 36 39 0 0 39 44 0 0 44 47 0 0 #3 6 47 49.76 0.35 0.44 53.24 58 0 0 58 68 0 0 68 78 0 0 78 79.76 0 0
  • 21.
  • 22. Foundation #21 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 2 0.13 0.55 2 #4 7 2 32 1.39 1.4 3 #5 5 32 52 1.43 1.55 4 #4 7 52 82 1.38 1.4 5 #4 5 82 98 0.98 1 6 #5 5 98 122 1.48 1.55 7 #4 5 122 125 0.97 1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #5 6 0 21 1.8 1.86 2 #6 10 21 42 4.14 4.4 3 #5 12 42 68 3.68 3.72 4 #4 16 68 90 3.17 3.2 5 #5 11 90 108 3.24 3.41 6 #5 5 108 125 1.53 1.55
  • 23. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 4.23 7 0 0 7 15 0 0 15 24 0 0 #3 6 24 30.77 0.35 0.44 #3 6 34.23 37 0.36 0.44 #3 6 37 39.74 0.35 0.44 39.74 42 0 0 42 45.26 0 0 #3 6 45.26 48 0.35 0.44 #3 6 48 50.77 0.35 0.44 #3 6 54.23 60 0.35 0.44 60 67 0 0 67 75 0 0 #3 6 75 80.77 0.35 0.44 #3 6 84.23 90 0.35 0.44 #3 6 90 96.77 0.35 0.44 #3 6 100.23 106 0.35 0.44 106 112 0 0 112 118 0 0 118 120.77 0 0
  • 24.
  • 25. Foundation #26 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 2 0.09 0.55 2 #4 8 2 20 1.55 1.6 3 #4 8 20 47 1.49 1.6 4 #4 8 47 82 1.54 1.6 5 #3 10 82 117 1.05 1.1 6 #3 5 117 119 0.1 0.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 7 0 12 0.67 0.77 2 #3 15 12 34 1.61 1.65 3 #4 17 34 63 3.28 3.4 4 #3 8 63 100 0.79 0.88 5 #3 6 100 119 0.65 0.66
  • 26. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 3.74 5 0 0 5 9 0 0 9 14 0 0 14 18.26 0 0 21.74 23 0 0 23 31 0 0 31 40 0 0 #3 6 40 45.26 0.35 0.44 #3 6 48.74 54 0.35 0.44 54 67 0 0 67 80.26 0 0 83.74 99 0 0 99 114 0 0 114 115.26 0 0
  • 27.
  • 28. Foundation #27 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #5 5 0 8 1.38 1.55 2 #6 6 8 38 2.51 2.64 3 #5 6 38 58 1.82 1.86 4 #6 10 58 88 4.21 4.4 5 #6 9 88 104 3.88 3.96 6 #6 5 104 128 1.88 2.2 7 #5 5 128 137 0.25 1.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 10 0 24 4.33 4.4 2 #6 9 24 48 3.73 3.96 3 #6 8 48 72 3.39 3.52 4 #6 14 72 96 5.76 6.16 5 #5 5 96 115 0.69 1.55 6 #4 7 115 137 1.36 1.4
  • 29. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #5 18 0 4.79 0.38 0.41 #5 18 12.21 18 0.38 0.41 #5 18 18 23 0.38 0.41 23 29 0 0 #5 18 29 34.79 0.38 0.41 #5 18 42.21 45 0.38 0.41 #5 18 45 48 0.38 0.41 #5 18 48 52 0.38 0.41 #5 18 52 54.79 0.38 0.41 #5 18 62.21 67 0.38 0.41 #5 18 67 71 0.38 0.41 71 76 0 0 #5 18 76 80 0.38 0.41 #5 18 80 84.79 0.38 0.41 #5 18 92.21 96 0.38 0.41 #5 18 96 99 0.38 0.41 #5 18 99 100.79 0.38 0.41 108.21 116 0 0 116 124.79 0 0 132.21 137 0 0
  • 30.
  • 31. Foundation #29 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 4 0.42 1 2 #5 5 4 34 1.48 1.55 3 #6 5 34 54 2.13 2.2 4 #5 5 54 84 1.49 1.55 5 #4 5 84 88 0.46 1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 6 0 17 2.42 2.64 2 #7 9 17 44 5.11 5.4 3 #7 9 44 73 5.12 5.4 4 #6 6 73 88 2.51 2.64
  • 32. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #3 6 0 2.28 0.35 0.44 #3 6 5.72 11 0.35 0.44 11 18 0 0 18 25 0 0 #3 3 25 32.28 0.66 0.88 #3 3 35.72 44 0.82 0.88 #3 3 44 52.28 0.82 0.88 #3 3 55.72 63 0.65 0.88 63 70 0 0 70 77 0 0 #3 6 77 82.28 0.35 0.44 #3 6 85.72 88 0.35 0.44
  • 33.
  • 34. Foundation #30 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 7 0.03 0.55 2 #3 5 7 25 0.32 0.55 3 #4 8 25 52 1.59 1.6 4 #3 13 52 60 1.42 1.43 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 18 0.26 0.55 2 #3 5 18 38 0.15 0.55 3 #4 12 38 60 2.21 2.4
  • 35. Shear Reinforcement Seg. Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 1 0 2.23 0 0 2 12.77 16 0 0 3 16 20.23 0 0 4 30.77 39 0 0 5 39 47.23 0 0 6 57.77 60 0 0
  • 36. Foundation #31 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 8 0.26 0.55 2 #3 8 8 33 0.87 0.88 3 #3 6 33 43 0.63 0.66 4 #4 6 43 68 1.18 1.2 5 #4 5 68 93 0.92 1 6 #4 9 93 123 1.76 1.8 7 #4 9 123 148 1.78 1.8 8 #3 17 148 168 1.82 1.87 9 #3 17 168 176 1.84 1.87 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 21 0.98 1 2 #5 7 21 38 2.16 2.17 3 #4 10 38 56 2 2 4 #5 6 56 81 1.72 1.86 5 #4 11 81 105 2.2 2.2 6 #5 11 105 136 3.41 3.41 7 #4 5 136 158 0 1 8 #5 10 158 176 2.87 3.1
  • 37. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 0 2.79 0 0 13.21 20 0 0 20 27.79 0 0 48.21 55 0 0 55 62.79 0 0 73.21 80 0 0 80 87.79 0 0 98.21 107 0 0 107 116.79 0 0 #5 18 116.79 117.79 0.35 0.41 #5 18 128.21 129.21 0.35 0.41 #5 18 129.21 136 0.35 0.41 136 142.79 0 0 153.21 157 0 0 157 161.79 0 0 #5 18 161.79 162.79 0.35 0.41 173.21 176 0 0
  • 38.
  • 39. Foundation #32 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 8 0.22 0.55 2 #4 5 8 33 0.97 1 3 #3 6 33 43 0.61 0.66 4 #4 6 43 68 1.16 1.2 5 #4 5 68 93 0.89 1 6 #5 6 93 123 1.78 1.86 7 #5 6 123 148 1.76 1.86 8 #4 10 148 168 1.99 2 9 #5 7 168 177 2.01 2.17 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 22 0.91 1 2 #5 7 22 38 2.12 2.17 3 #4 10 38 57 1.98 2 4 #5 6 57 82 1.72 1.86 5 #4 11 82 107 2.19 2.2 6 #5 12 107 137 3.42 3.72 7 #4 5 137 158 0 1 8 #4 16 158 177 3.15 3.2
  • 40. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 0 3.29 0 0 13.71 21 0 0 21 28.29 0 0 48.71 56 0 0 56 63.29 0 0 73.71 81 0 0 81 88.29 0 0 98.71 108 0 0 108 117.29 0 0 #5 18 117.29 118.29 0.35 0.41 #5 18 128.71 130 0.35 0.41 130 137 0 0 137 143.29 0 0 153.71 158 0 0 158 162.29 0 0 #5 18 162.29 163.29 0.35 0.41 173.71 177 0 0