A Study on Indian
 Power Sector




JASPAL SINGH                   ROLL-47
SACHIN RANGRAO DESHMUKH        ROLL-06
CHANDRA MOHAN VERMA            ROLL-56
ANINDYA KUNDU                  ROLL -22
PRAKASH POLLY MAZHUVANCHERRY   ROLL-26
Table of Contents
EXECUTIVE SUMMARY......................................................................................................................... 5
INTRODUCTION ...................................................................................................................................... 7
GENERATION .......................................................................................................................................... 8
   Capacity ................................................................................................................................................. 8
   Power Generation ................................................................................................................................ 11
   Emerging technologies.......................................................................................................................... 11
      Coal-based ........................................................................................................................................ 11
      Fluidized bed combustion ................................................................................................................. 11
      Nuclear Power .................................................................................................................................. 12
      Distributed generation ...................................................................................................................... 13
   Resources ............................................................................................................................................. 15
      Coal .................................................................................................................................................. 15
      Natural Gas ....................................................................................................................................... 16
DEMAND - SUPPLY .............................................................................................................................. 17
   Sectoral demand ................................................................................................................................... 17
ELECTRICITY DEMAND FORECAST .................................................................................................. 19
   Elasticity of electricity consumption with respect to GDP growth.......................................................... 20
TRANSMISSION .................................................................................................................................... 22
   Review ................................................................................................................................................. 22
   Overview and Structure ........................................................................................................................ 23
   National grid......................................................................................................................................... 25
   Grid discipline ...................................................................................................................................... 27
   Private investments in transmission ....................................................................................................... 28
   Technology in transmission .................................................................................................................. 29
      HVDC transmission .......................................................................................................................... 29
   Transmission cost structure ................................................................................................................... 30
DISTRIBUTION ...................................................................................................................................... 31
   Tariffs and financial performance of SEBs ............................................................................................ 32
   T&D losses ........................................................................................................................................... 32
   Measures to reduce losses ..................................................................................................................... 34
      Technical losses ................................................................................................................................ 34


                                                                         ~2~
Commercial losses ............................................................................................................................ 34
      Privatization ..................................................................................................................................... 34
   Distribution reforms.............................................................................................................................. 35
   New R-APDRP .................................................................................................................................... 36
REFORMS IN THE POWER SECTOR.................................................................................................... 36
   Pre Reform Stage.................................................................................................................................. 36
   Electricity Act 2003 .............................................................................................................................. 40
   Generation ............................................................................................................................................ 41
   Rural Electrification/Generation/Distribution ........................................................................................ 41
   Licensing .............................................................................................................................................. 42
   Trading and Captive Generation ........................................................................................................... 42
   Open Access ......................................................................................................................................... 43
   Distribution .......................................................................................................................................... 43
   Transmission ........................................................................................................................................ 44
   Tariff .................................................................................................................................................... 44
   Regulatory Commission........................................................................................................................ 45
   Policy Issues ......................................................................................................................................... 45
   Mega Power Policy ............................................................................................................................... 45
   Ultra Mega Power Projects ................................................................................................................... 46
   Consumer Interests ............................................................................................................................... 46
   Enforcements........................................................................................................................................ 47
   Dispute Resolution ............................................................................................................................... 47
   Electricity (Amendment) Act, 2007....................................................................................................... 47
   Demand Side Management ................................................................................................................... 48
   Environmental Reform in the Electricity Sector: ................................................................................... 49
STUDY OF SELECTED COMPANIES ................................................................................................... 51
   1. NTPC Ltd. ........................................................................................................................................ 51
   2. RELIANCE INFRASTRUCTURE LTD ........................................................................................... 52
   3. TATA POWER COMPANY LTD .................................................................................................... 53
   4. POWER GRID CORPORATION OF INDIA LTD ........................................................................... 53
   5. JP HYDROPOWER ......................................................................................................................... 53
MAJOR FINDINGS: ................................................................................................................................ 54


                                                                          ~3~
IMPACT OF CERC REGULATIONS ON CENTRAL PLAYERS ........................................................... 55
   Generation ........................................................................................................................................... 55
   Transmission ........................................................................................................................................ 58
IMPACT OF CERC REGULATIONS ON TARIFF AND END CUSTOMERS .......................................................... 59
ADVANCED METERING INFRASTRUCTURE................................................................................................. 60
RENEWABLE ENERGY......................................................................................................................... 69
   Renewable Energy Scenario in India ..................................................................................................... 69
   Co-Generation ...................................................................................................................................... 70
   Wind Power .......................................................................................................................................... 71
   Solar power .......................................................................................................................................... 71
   SPV Systems ........................................................................................................................................ 72
   Small hydroelectric plants ..................................................................................................................... 72
   Biomass Power ..................................................................................................................................... 72
      Potential ........................................................................................................................................... 72
   Different Technologies Used ................................................................................................................ 73
      Gasification ...................................................................................................................................... 73
      Geothermal Power ............................................................................................................................ 73
NUCLEAR POWER IN INDIA ....................................................................................................................... 75
REFERENCES......................................................................................................................................... 80




                                                                        ~4~
EXECUTIVE SUMMARY

Availability of power is one of the important ingredients for industrial growth. It is an important
infrastructure facility without which no industrial activity can be thought of in modern times.
Increasing automation of Indian industries has created huge demand of power in India. This huge
demand has resulted into demand supply gap in India in recent times.


This report is based on the extensive study of the power sector in India. Both global and domestic
perspectives of power sector focusing more on Indian players have been looked upon in this report.
It includes the literature review by scholars which has analyzed the subject of power sector more
extensively. The objective of this report is to get a comprehensive and apparent knowledge of the
power sector, and to study the changes in power sector over a period of time there by analyzing
various aspects of the power sector. In the report the power generation companies of the industry
chosen, are the top five and bottom five companies of the power sector in India, based on the sales
turnover. The trends in the demand, supply and generation in the power sector is discussed through
the trend analysis.

Before 2001, India‘s electricity-supply was mainly owned and operated by public sector. It was
running under the risk of bankruptcy. This created a serious impediment to investments in the
sector at the time when India desperately needed them. This led to the emergence of Private
players in the power sector.

The NTPC, Reliance Infra, Tata Power, Power Grid, & Torrent Power are the market leaders in the
power sector and have high Cumulative Annual Growth Rate (CAGR). This is because of the
government support, inflow of foreign investment, growing demand and use of latest technology
for power generation and transmission. The best management policies are adopted by these
companies. The small players GVK power, Indowind Energy, Energy Development, JP Hydro, and
KSK energy are also imparting new technology, and management policies to survive the
competition and meet the demand of power sector.

The methodology used in report includes comparative analysis of the top 5 and bottom 5
companies of the sector. The Potter‘s five forces analysis, SWOT analysis, Trend analysis & Ratio


                                              ~5~
analysis are used to analyze the industry of power sector. The various analysis shows that there has
been a continuous growth in generation and consumption of power in India.

Thermal, hydro and nuclear are three major source of power generation From the installed capacity
of only 1,362mw in 1947, has increased to 97000 MW as on March 2000 which has since crossed
100,000 MW mark India has become sixth largest producer and consumer of electricity in the
world equaling the capacities of UK and France combined. The number of consumers connected to
the Indian power grid exceeds is 75 million. Rural electrification is one significant initiative of the
industry to trigger economic development and generate employment by providing electricity as an
input for productive uses in agriculture and rural industries, and improve the quality of life of the
rural people.

The International Energy Outlook 2006 (IEO2006) projects strong growth for worldwide energy
demand over the 27-year projection period from 2003 to 2030. Much of the growth in energy
demand is among the developing countries in Asia, which includes China and India; demand in the
region nearly triples over the projection period. Total primary energy consumption in the
developing countries grows at an average annual rate of 3.0 percent between 2003 and 2030. In
contrast, for the developed countries—with its more mature energy-consuming nations—energy
use grows at a much slower average rate of 1.0 percent per year over the same period. This huge
increase in projected demand of energy in India and China makes analysis of energy sector of
these countries very important.


World electricity generation rose at an average annual rate of 3.7% from 1971 to 2004, greater
than the 2.1% growth in total primary energy supply. Total world consumption of marketed energy
is projected to increase by 50 percent from 2005 to 2030.




                                                ~6~
INTRODUCTION

An economy‘s growth, development, ability to handle global competition is all dependent on the
availability, reliability and quality of the power sector. As the Indian economy continues to surge
ahead, electrification and electricity services have been expanding concurrently to support the
growth rate. The demand for power is growing exponentially and the scope of growth of this sector
is immense.

Existing generation suffers from several recurrent problems. The efficiency and the availability of
the coal power plants are low by international standards. A majority of the plants use low-heat-
content and high-ash unwashed coal. This leads to a high number of airborne pollutants per unit of
power produced. Moreover, past investments have skewed generation toward coal-fired power
plants at the expense of peak-load capacity. In the context of fast-growing demand, large T&D
losses and poor pooling of loads at the national level exacerbate the lack of generating capacity.

India is one of the main manufacturers and users of energy. Globally, India is presently positioned
as the 11th largest manufacturers of energy. It is also the worlds‘ 6th largest energy users. In spite of
its extensive yearly energy output, Indian power sector is a regular importer of energy because of
huge disparity.

Global and Indian economy have decelerated, but power is one of the few commodities in short
supply in India. So, despite the sluggishness in production and demand for manufactured products,
India remains power hungry, both in terms of normal and peak power demand. Power is derived
from various sources in India. These include thermal power, hydropower or hydroelectricity, solar
power, biogas energy, wind power etc. The distribution of the power generated is undertaken by
Rural Electrification Corporation for electricity power supply.




                                                ~7~
GENERATION

 Capacity
The government has revised the capacity addition target to 78,700 MW from 78,577 for the
Eleventh Plan. However, while in 2007-08 it added capacities of 9,263 MW, in 2008-09 only
3,453.70 MW capacities were added against the target of 11,061 MW - 69 per cent below the
target. This was due to delays in the supply of critical components in thermal projects and non-
availability of fuel.

The capacity addition target for the Tenth Plan (2002-2007) was estimated at 41,110 MW, out of
which only 21,095 MW was achieved (2,872 MW was achieved in 2002-03, 3,952 MW in 2003-
04, 3,950 MW in 2004-05 3,468.8 MW in 2005-06 and 6,852.8 MW in 2006-07).

 Major projects commissioned in the central sector in 2007-08 and 2008-09 include:

  Sipat STPS-II in Chhattisgarh (thermal based, 1,000 MW)         •    Mejia TPS (block 6) in West Bengal (thermal based,
                                                                  250 MW)
  •     Ratnagiri CCPP-II (Block 3) in Maharashtra (thermal
  based, 740 MW)                                                  •       Teesta-V (unit 1, 2 and 3) in Sikkim (hydel based
                                                                  capacity of 170 MW each)
  •     Omkareshwar (block 1-8) in MP (hydel based, 65
  MW each)                                                        •    Kahalgaon in Bihar (thermal based, 1,000 MW)

  •     Kaiga APP (block 3) in Karnataka (nuclear based,          •    Bhilai TPP in Chhattisgarh (thermal based, 500 MW)
  220 MW)



  Major projects commissioned in the state sector in 2007-08 and 2008-09 include:
  Guru Har Govind (Lehra Mohabat) TPS-II project in               •        Rayalaseema TPS-II (unit 4) in Andhra Pradesh
  Punjab (thermal based, 250 MW)                                  (thermal based, 210 MW)

  •         Dholpur CCPP (ph 1) (unit GT 2 and ST) in             •    Bellary TPP (unit 1) in Karnataka (thermal based,
  Rajasthan (thermal based, 110MW each)                           500MW)

  •   Yamuna Nagar TPP in Haryana (thermal based, 300             •    Priyadarshni Jurala in Andhra Pradesh (hydro based,
  MW)                                                             39 MW)

  •       Maneri Bhali-II (unit 1, 2,3 and 4) in Uttrakhand       •   Santadih unit 5 in West Bengal (thermal based, 250
  (hydro based, 76 MW each)                                       MW)

  •         Korba East TPP (unit 1 and 2) in Chhattisgarh         •        Sagardighi TPP unit 1 in West Bengal (thermal
  (thermal based, 250MW each)                                     based, 300 MW)

  •     Dhuvaran CCPP Extn. (Unit ST) in Gujarat (thermal         •       Dugapur TPS Extn unit 7 in West Bengal (thermal
  based 40 MW)                                                    based, 300 MW)

  •     Paras TPS Extension (unit 1) in Maharashtra (thermal      •       Bakreshwar TPS-II unit 4 in West Bengal (thermal
  based, 250MW)                                                   based, 210 MW)

  •       Sanjay Gandhi (Birsinghpur) TPP Extension ST III        •     Purulia PSS unit (1,2,3 and 4) in West Bengal (hydro
  (unit 5) in Madhya Pradesh (thermal based, 500 MW)              based, 225 MW each)

                                                            ~8~
•   Balimela-II Extn unit 7 and 8 in Orissa (hydro based,         •     Valuthur CCPP Extn unit GT in Tamil Nadu (thermal
    75 MW each)                                                       based, 59.8 MW)

    •       GHT (Lehra Mohabbat) TPS-II in Punjab (thermal            •     Priyadarshini Jurala unit 2 in Andhra Pradesh (hydro
    based, 250 MW)                                                    based, 39 MW)

    •     Baglihar HEP unit 1,2 and 3 in Jammu and Kashmir            •   Varahi Extn unit 1 in Karnataka (hydro based, 115
    (hydro based, 150 MW each)                                        MW)

    •       Amarkantak TPS Extn unit 5 in Madhya Pradesh              •        Sagardighi TPP unit 2 in West Bengal (thermal
    (thermal based, 210 MW)                                           based, 300 MW)

    •       Ghatghar PSS unit 1 and 2 in Maharashtra (hydro
    based, 125 MW each)

Major projects commissioned in the private sector in 2007-08 and 2008-09 include:

OP Jindal (Raigarh) TPP phase I and II (unit 1, 2, 3 and 4) in Chhattisgarh (thermal based, 250 MW
each)
•     Torrent Power has synchronized Sugen CCPP block 1 in Gujarat of 376 MW
•     Tata power has synchronized Trombay TPS unit 8 in Maharashtra of 250 MW

The total installed capacity in India rose from 89,103 MW in 1997-98 to 147,965 MW by the end of
2008-09. In addition, around 19,509 MW of captive power capacity is connected to the grid (as on
March 2007).

Despite the rise in installed capacity, there has been a significant shortfall in capacity additions when
compared to the targets set over the last 10 years. This shortfall is the result of the absence of
significant capacity additions by the states and the private sector, which can be attributed to the poor
financial health of SEBs and private generators unable to achieve financial closure owing to inadequate
payment security mechanisms. Most of the projects in the private sector have been delayed owing to
expensive fuel costs (leading to unviable tariffs), delay in obtaining clearance from the CEA and
Ministry of Environment and Forest (MoE&F), signing of power purchase agreements (PPAs) and
roadblocks in achieving fuel linkage.

Over the past 11 years, there has been a marginal shift in the fuel mix. The thermal-hydel mix changed
from 72:25 in 1997-98 to 63:25 in 2008-09. The share of thermal plants fell on the back of increase in
the share of renewable energy-based plants over the past decade. The share of nuclear power plants in
the overall installed capacity, though, continues to remain low.




                                                                ~9~
Power                -         Installed        capacity           by                ownership




Source: CEA, CRISIL Research




                                                           Annual capacity additions

                                                           Source: CEA, CRISIL Research




                                                             Plan-wise capacity additions

                                                             Source: CEA, CRISIL Research




                                           ~ 10 ~
Power Generation
Power generation increased by 3 per cent, from 699.1 billion kWh in 2007-08 to 723.5 billion kWh in
2008-09. Between 1998-99 and 2008-09, it increased at a CAGR of 4.9 per cent, from 448 billion kWh
to 724 billion kWh.

The PLF of thermal power plants rose from 64.6 per cent in 1998-99 to 77.19 in 2008-09. The PLF of
Indian plants     is   lower   than that of their international counterparts on account of old plants,
inadequate maintenance, poor quality, unsatisfactory transmission               infrastructure and no means of
assured fuel supply.




                                                                       Average PLF

                                                                       Source: Planning Commission, CEA




Emerging technologies

Coal-based
Conventional coal-based plants have two major drawbacks - low overall efficiency levels and high
pollution levels. As a result, technological research has focused on the development of non-polluting
technologies using coal. The most popular of these technologies are fluidized bed combustion (FBC) and
integrated gasification combined cycle (IGCC).

Fluidized bed combustion
In FBC, air is blown at high pressure through finely ground coal. The particles mix with the air and form a
floating or fluidized bed. This bed acts like a fluid in which the constituent particles collide with one another. The
bed contains around 5 per cent coal (or fuel) and 95 per cent of inert material (such as ash or sand).




                                                      ~ 11 ~
The temperature in a FBC is 800-900 C, compared with 1,300-1,500C in pulverized coal combustion
(PCC). The lower temperature helps in minimizing the production of nitrous oxide. Furthermore, most of the
sulphur dioxide formed can also be absorbed with the help of absorbents like limestone.

The other advantages of FBC technology are its compact nature, ability to burn low calorific value coal (up to
1,800 kcal per kg) and produce less erosive ash. FBC-based plants also have lower capital costs (8-15 per cent
lower) as compared to PCC-based plants.

At present, the only constraint in using this technology is its small size. While the maximum size of a PCC-based
power plant unit could be around 1,500 MW, FBC plants have a maximum unit size of only 250 MW.

Integrated gasification combined cycle

IGCC technology is used to enhance the thermal efficiency of coal-based power plants and reduce emissions. In
IGCC plants, the coal is gasified using a gasifier. The gaseous coal is purified to remove pollutants such as
sulphur. The purified coal is subsequently burnt to generate hot gases, which are used to run a gas turbine. The
exhaust gases, containing waste heat, are used to boil water and generate steam. The steam is used to run a steam
turbine. IGCC technology can deliver thermal efficiency of up to 48-50 per cent. In addition, it can be used with
other heavy fuels such as refinery residues and petroleum coke.

 IGCC technology is also environment friendly, as pollutants such as sulphur dioxide and oxides of
nitrogen, are reduced to very low levels. However, the cost of IGCC plants is higher than conventional plants.

Nuclear Power
Nuclear power plants reduce carbon dioxide emissions. However, safety concerns abound, particularly those
relating to exposure to harmful nuclear radiations. In addition, the cost of a nuclear plant is around three times
higher than that of a gas-based plant. However, new technologies are being developed to address some of the
safety issues associated with nuclear power plants.

Pebble bed modular reactor

The pebble bed modular reactor (PBMR)differs from a conventional ‗light water‘ reactor as it utilizes no fuel
rods and cooling water. The fuel comprises nearly 15,000 small carbon and ceramic-coated specks of uranium that
are pressed into a small pebble. The pebble is coated with a layer of graphite. Inside the pebble, uranium
undergoes fission and releases heat. However, the graphite layer traps the radioactivity. Around 300,000 pebbles
are kept in a reactor, which is cooled by a flow of helium gas. The helium gas expands due to the heat and spins
an electricity generating turbine. However, since helium is chemically and radiologically inert, it does not become
radioactive as it circulates through the pebble bed.

                                                       ~ 12 ~
One of the main advantages of PBMR technology is that relatively small units producing 100-150 MW of power
can use it. In addition, the core of the reactor does not melt even at high temperatures, as the operating
temperature continues to remain below the melting point of the ceramic pebbles that contain the fuel. This
helps prevent safety hazards.

Distributed generation
In distributed generation, small generators are located near the consumer site, within the distribution system.
Distributed gencos are not directly connected to the transmission grid. Considering the technological
improvements and reduction in the costs of small generators, the amount of power consumption through
distributed generation is expected to rise in the future.

Comparison of different modes of generation:

Type of Generation          Advantages                                   Disadvantages
Thermal Power Plants        Low cost of generation                       Long gestation period
                            Abundant availability of coal.               Emissions of carbon dioxide and oxides of
                                                                         sulphur
                                                                         Lack of flexibility in operation.
Hydro Electric Plants       Low operating costs                          Long gestation period
                            The absence of emissions                     Economic and social costs associated with
                            Flexibility of operations                    the rehabilitation and resettlement of the
                                                                         population affected by the submergence of
                                                                         land
                                                                         Submergence of forests and loss of marine
                                                                         life due to large water reservoirs
                                                                         Possibility of inducing earthquakes
Nuclear Power Plants        Do not emit gases or particulate matter      Maintenance of high safety standards for
                            Low cost of generation                       eliminating the possibility of nuclear hazards
                                                                         High capital costs and long gestation period
Diesel Generation Sets      Short gestation period
                            High    efficiency    in    varying   load
                            conditions
                            Flexibility to use fuels such as HSD,
                            LDO, LSHS and FO
                            Modular installation (possible to add


                                                        ~ 13 ~
more units).




               ~ 14 ~
Resources
In India, power generation is largely dependent on coal, gas, nuclear and hydroelectric sources. Non-
conventional sources of energy such as wind and solar energy, account for a small share of the total
installed capacity. Fuel oil and diesel are largely used in captive power plants.

Coal
In India, the proportion of coal-based capacity has increased significantly over the years. According to
the Geological Survey of India, in January 2008, the total coal reserves in India were estimated at
around 257 billion tonnes (including the non-recoverable reserves under riverbeds or urban areas). Out
of this, proven reserves stood at 99 billion tonnes, while indicated reserves were 121 billion tonnes, the
rest being accounted by inferred reserves.

In India, the majority of coal reserves are concentrated in the eastern and south eastern regions.
Jharkhand, Orissa, Madhya Pradesh, Chhattisgarh, West Bengal and Andhra Pradesh account for around
95 per cent of the country‘s total coal reserves.

The power generation sector is the largest end-user of coal in India. In 2007-08, it made up for almost 71
per cent of total coal consumption.

In February 1997, the Central government allowed private sector companies to mine coal for captive
consumption; and for supply and distribution.

In the past, only Coal India Ltd (CIL), a public sector company, could undertake commercial mining and
supply of coal. CIL is organized into several regional subsidiaries, which mine coal in their respective
regions. Till March 1996, prices of all grades of coal were regulated. However, in April 1996, the prices
of A, B and C grades were deregulated. In February 1997, the price of D grade coal was also
deregulated. During 1990-2000, the average pithead price of coal increased at a CAGR of 11 per cent. In
June 2004, CIL increased the pithead price of coal by 14-16 per cent. Prices were revised again in
December 2007 - there was a 10 per cent increase by CIL and its subsidiaries, and by 15 per cent
increase by North Eastern Coal Fields Ltd. Even if prices rose further, it will not have any impact on the
power sector, as all PPAs have a fuel cost passage clause.

In view of high ash content of Indian coal, the MoE&F has stipulated that all future power plants
(situated 1,000 kms away from the pit-head) should be based on washed coal. But, the existing
washery capacity in India is not adequate to meet the requirements of the power sector. In

                                                    ~ 15 ~
addition, CIL does not have adequate funds to invest in coal washeries. However, the private sector has
undertaken some initiatives for setting up coal washeries with foreign participation as well as in
collaboration with CIL.

Natural Gas
Natural gas-based power generation capacity (including naphtha-based capacity) accounted for around
10 per cent of the total installed capacity as of March 2009. Further, of the total natural gas produced in
India, 35 per cent is sourced to generate electricity and 29 per cent to produce fertilizers.

At the end of 2007, the proven and recoverable reserves of natural gas in India were estimated at 1,055
billion cubic meters (bcm). Around 40 per cent of the gas reserves are located off the western coast, in
the Bombay High and the Hazira fields. In 2007-08, the gross production of natural gas was around 32.3
bcm. In the past, a large portion of gas production was flared or re-injected due to inadequate evacuation
infrastructure.

The Hazira-Vijaipur-Jagdishpur (HVJ) pipeline evacuates about 40 per cent of the gas produced in
India. Most of the fertilizers, petrochemicals and power plants based on natural gas are located along
this pipeline.

The consumption of natural gas for power generation and other end uses (like fertilizers) is expected
to increase significantly over the next 5-10 years, as natural gas is an environment friendly and
economic fuel. In India, the consumption of natural gas was 114.2 mmscmd in 2007-08. However, the
unmet demand continued to be around 20 mmscmd. At the current rate of production, the known and
recoverable gas reserves of India are expected to last for around 30 years. In order to supplement
domestic supply, India is expected to import natural gas, either through pipelines or as liquefied natural
gas (LNG). Hence, substantial investments will be required in receiving terminals, regasification plants
and cryogenic shipping vessels to import LNG. Additional investments are also required in pipelines for
the inland distribution of natural gas.

New domestic supply of natural gas has commenced from Reliance Industries Ltd (RIL)‘s KG Basin
block. It is currently producing 40 mmscmd of gas, and is expected to ramp this up to 80 mmscmd of
gas by December 2009. Also, discoveries of large natural gas reserves in Myanmar have prompted
several multinational companies to propose construction of pipelines to transport the surplus natural gas
to eastern and northern India. In addition, there are proposals to lay pipelines from West Asia to India

                                                  ~ 16 ~
(Afghanistan-Pakistan-India). The proposed pipelines include an onshore pipeline from Iran-Pakistan-
India and a submarine pipeline from Oman. However, neither proposal has progressed due to unresolved
political and economic issues.


DEMAND - SUPPLY
Demand for power registered at a CAGR of around 6 per cent from 1998-99 to 2008-09. Further, there
has been a sectoral shift in demand for electricity. The share of the industrial sector declined steadily till
2001-02, and then started rising at a flat rate. The share of industrial demand has increased from 25 per
cent in 2002-03 to 37 per cent in 2006-07. The agricultural consumption, after peaking at 31 per cent in
1998-99, declined to 22 per cent in 2006-07. Conversely, domestic demand rose steadily, from 20 per
cent in 1996-97 to 24 per cent in 2006-07.

As per the forecast of the Seventeenth Electric Power Survey (EPS), energy demand will increase at a
CAGR of 8.4 per cent to 969 billion kWh during the Eleventh Five-Year Plan period (2007-2012). Peak
demand is projected to register a CAGR of 12.3 per cent to 167,054 MW.

 The government has revised the capacity addition target to 78,700 MW from 78,577 MW for the
Eleventh Plan. However, in the first 2 years of the Eleventh Plan only 12,716.70 MW of capacity has
been added as against the target of 27,396 MW.

This is because only 9,263 MW against the target of 16,335 MW was added in 2007-08. In 2008-09, the
target fell short by 69 per cent due to delays in the supply of critical components of thermal projects and
non-availability of fuel. Therefore, in 2008-09, only 3,453.70 MW was added against the target of
11,061 MW.

Taking these factors into account, CRISIL Research estimates that only around 44,846 MW of
capacities will be added during the Eleventh Plan period. The central sector is expected to account for
a major portion of the capacity additions (37 per cent), followed by the state sector (35 per cent) and the
private sector (28 per cent), respectively.

Sectoral demand
The pattern of electricity consumption in the various sectors has changed considerably over the
years. During 1996-97 to 2006-07, electricity consumption in the agricultural, commercial, industrial
and domestic sectors increased at a CAGR of 4.9 per cent.
                                                  ~ 17 ~
Agricultural sector: The agricultural sector had a very low share of power consumption during the early
1970s. However, stress on rural electrification led to an increase in power consumption from 10-15 per
cent in 1970 to 31 per cent in 1998-99. But low tariffs and lack of proper metering resulted in under-
recoveries and inefficient utilization of power in this sector, which led to the sector‘s share in power
consumption declining to 22 per cent 2006-07.

Industrial sector: Electricity consumption in the industrial sector increased at a CAGR of 5.1 per cent
from 1996-97 to 2006-07. However, the share of the industrial sector in total electricity consumption fell
from 37.2 per cent in 1996-97 to 30.2 per cent in 2001-02; but with the opening up of the power sector,
it gradually rose to 37.6 per cent in 2006-07. In view of the continuous uptrend in industrial
electricity tariffs, power-intensive industries find it economical to set up captive power plants,
especially through co-generation. Further, irregular power supply and increasing shutdowns caused by
power shortages, has forced players to rely on captive power facilities.

Domestic sector: In the domestic sector, electricity consumption grew at a CAGR of 7.2 per cent from
1996-97 to 2006-07. The share of the domestic sector in total electricity consumption went up from 19.7
per cent in 1996-97 to 24.4 per cent in 2006-07, driven mainly by urbanization and the increasing usage
of household appliances (geysers, air-conditioners, etc).




                                                 ~ 18 ~
Power - Category-wise consumption

                                                                   Source: Central Electricity Authority (CEA)




Power - Demand and supply, Source: Ministry of Power, CEA


ELECTRICITY DEMAND FORECAST
Electric power surveys: The CEA constitutes a committee every 4-5 years that carries out a
comprehensive survey of various consumer segments for estimating the demand for power. The
committee publishes the EPS, which provides state-wise demand forecasts, both in terms of energy and
peak power requirements, for a 15-year period. It also provides a sector-wise estimate of energy demand
for a 5-year period.

The      consumer       segments       taken      into       account     by       the      EPS        are:

•     Domestic                                           •    Commercial

                                               ~ 19 ~
•         Agricultural                                      •   Public lighting

•            Industrial [low tension (LT) and high          •   Public waterworks
tension (HT), separately]
                                                            •   Non-industrial bulk consumers
•         Railway traction




                                                                        Power - Demand project ions

                                                                        Note: Figures are based on the 17th
                                                                        Electric Power Survey (EPS), published in
                                                                        February 2007. Source: CEA



Elasticity of electricity consumption with respect to GDP growth
Electricity consumption is strongly related to the level of economic activity. However, over the past 25
years the elasticity of electricity consumption vis-à-vis the gross domestic product (GDP) has been
gradually declining. This decline is likely to continue, owing to:

      •    An increase in the share of the services sector (about 56 per cent in 2007-08, compared to less
           than 30 per cent in 1990-91).
      •    Efforts by industries to improve energy efficiency (to enhance competitiveness) through more
           efficient technologies and energy audits.
      •    Greater reliance on captive power plants by power-intensive industries due to the high tariffs
           charged by SEBs and poor quality of grid power.

    The average annual GDP growth rate (at constant prices) during the Eighth, Ninth and Tenth Plan
periods was 5.9 per cent, 5.5 per cent and around 7.7 per cent, respectively. The annual growth in
electricity generation during these periods was 7.2 per cent, 5.7 per cent, and 4.4 per cent, respectively.
                                                       ~ 20 ~
Elasticity of electricity generation with respect to GDP is the percentage change     in   generation
corresponding to a 1 per cent change in GDP. The elasticity of electricity generation (not including
captive generation) with respect to GDP has fallen from around 1.47 during the Sixth Plan period to
around 0.60 during the Tenth Plan period. This implies that energy usage in the economy has
declined, partially due to a rise in the share of the services sector (which is less energy-intensive
as compared with the industrial sector) in the GDP and partially due to an improvement in energy
efficiency.




                                              ~ 21 ~
TRANSMISSION
Review
The transmission segment plays a key role in transmitting power continuously to various
distribution entities across the country. Further, the transmission sector needs concomitant capacity
additions in line with the generation capacity additions to enable seamless flow of power.

 The government‘s focus on providing electricity to rural areas has led to the power T&D system being
extended to remote villages. The total length of transmission lines in the country has increased
from 2.50 million circuit kilometers (ckm) in 1980-81 to 6.94 million ckm in 2006-07.




                                                                  Power-Transmission Lines

                                                                  The decline in 2003-04 is due to reconciliation in
                                                                  data done by the Data Supplying Organization in
                                                                  33/22 kV, 15/11 kV and in distribution lines up to
                                                                  500 volts.

                                                                  Source: CEA




    Transmission line addition (April 2008 to        Substation addition (April 2008 to March
    March 2009) Source: CEA                          2009) Source: CEA




                                                ~ 22 ~
Overview and Structure
A reliable T&D system is important for the proper and efficient transfer of power from generating
stations to load centers. A T&D system comprises transmission lines, substations, switching stations,
transformers and distribution lines.

In order to ensure reliable supply of power and optimal utilization of generating capacity, a T&D
system is organized in a grid, which interconnects various generating stations and load centers.
This ensures uninterrupted power supply to a load centre, even if there is a failure at the local
generating station or a maintenance shutdown. In addition, power can be transmitted through an
alternate route if a particular section of the transmission line is unavailable.

In India, the T&D system is a three-tier structure comprising distribution networks, state grids
and regional grids. These distribution networks and state grids are primarily owned and operated by the
respective SEBs or state governments (through state electricity departments). Most                  inter-state
transmission links are owned and operated by PGCIL, with some jointly owned by the SEBs
concerned. In addition, PGCIL owns and operates a number of inter-regional transmission lines (part of
the national grid) to facilitate the transfer of power from a surplus region to one with deficit.

The transmission capacity added, over the years, has been lower than the generation capacity addition.
This is also seen by lower investments in T&D compared to generation. Globally, every rupee
invested in generation has an equal amount invested in T&D, however in India, every rupee invested
in generation has a corresponding 50 paisa invested in T&D. This has also resulted into excess loading
of transmission lines at around 90 per cent.

The transmission capacity added as a part of the national grid in the previous year has been at a brisk
pace of 5,550 MW from December 2006 to December 2007. This has been in line with the target of
37,150 MW to be added by the end of Eleventh Plan. The current inter-regional capacity stands at
17,000 MW (as on December 2007).




                                                   ~ 23 ~
Transmission lines

                                                                    Source: Ministry of Power &CRISIL Research




    The transmission system in India operates at several voltage levels:

•       Extra high voltage (EHV): 765 kV, 400 kV and 220 kV

•       High voltage: 132 kV and 66 kV

•       Medium voltage: 33 kV, 11 kV, 6.6 kV and 3.3 kV

•       Low voltage: 1.1 kV, 220 volts and below

Transmission and sub-transmission systems supply power to the distribution system, which, in
turn,     supply   power    to   end consumers.     In order to facilitate the transfer of power between
neighbouring states, state grids are inter-connected through high-voltage transmission links to form a
regional grid. There are five regional grids:

•Northern region: Delhi, Haryana, Himachal Pradesh, Jammu and Kashmir, Punjab, Rajasthan,
Uttaranchal and Uttar Pradesh

•Eastern region: Bihar, Jharkhand, Orissa, Sikkim and West Bengal

•Western region: Dadra and Nagar Haveli, Daman and Diu, Chhattisgarh, Goa, Gujarat, Madhya
Pradesh, and Maharashtra

•Southern region: Andhra Pradesh, Karnataka, Kerala, Pondicherry and Tamil Nadu

•North-eastern region: Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland and
Tripura



                                                   ~ 24 ~
As peak demand for power does not take place at the same time in all states, it results in a surplus in one
state and deficit in another. Regional or inter-state grids facilitate the transfer of power from a surplus
region to the one facing a deficit. These regional grids also facilitate the optimal scheduling of
maintenance outages and better coordination between power plants.

These regional grids will be gradually integrated to form a national grid, whereby power from a
surplus region can be transferred to another, resulting in the optimal utilization of generating
capacity. For instance, the eastern region has some surplus power, which is transferred to the western
and northern regions as the two regions have deficit scenarios.

National grid
In order to optimize the utilization of generation capacity through the exchange of power
between the surplus and deficit regions, and exploit the uneven distribution of hydroelectric potential
across various regions, the Central government in 1981 approved a plan for setting up a national grid.

The plan envisaged setting up high-voltage transmission links across various regions in order to enable
the transfer of power from surplus to deficit regions.

The advantages of a national grid system are:

       A flatter demand curve (or a higher system load factor) on account of the exchange of power
       between regions, resulting in a better PLF and more economical operations;
       Lower investments required for new generation capacities (a full-scale national grid is expected
       to reduce the need for new capacities by up to 10,000 MW in the next 10 years.);
       Better scheduling of planned outages of power plants; and
       Improved stability of the grid, as the share of an individual generating station in the total
       capacity declines with greater integration of the power system.

The process of setting up the national grid was initiated with the formation of the central
sector power generating and transmission companies - National Thermal Power Corporation (NTPC),
National Hydroelectric Power Corporation (NHPC) and PGCIL. PGCIL was given the responsibility for
planning, constructing, operating and maintaining all inter-regional links and taking care of the
integrated operations of the national and regional grids.

A national grid would enable optimal utilization of energy resources by facilitating a uniform
thermal-hydel mix among various regions. From a regional perspective, the exploitation of
                                                 ~ 25 ~
thermal and hydroelectric resources may not be economically viable in some cases, although it may
be so from a national perspective. For instance, Arunachal Pradesh had a hydroelectric potential of
around 50,000 MW. (The hydro potential available in Arunachal Pradesh is the highest in the
country.) However, of this, only 400 MW has been developed and a further 3,000 MW is under
development by NHPC and NEEPCO. Another 23,000 MW of capacities are being planned by various
central and private sector players. However, in terms of installed capacity, 95 per cent of the potential is
yet to be developed. The hydroelectric potential of the north-eastern region and eastern region is around
60,000 MW and 10,000 MW, respectively. Hence, with the integration of the eastern and north-eastern
regions, the hydroelectric potential of the north-eastern region can be used to meet the peak
demand of the eastern region.

Setting up a national grid requires the gradual strengthening and improvement of regional grids,
and their progressive integration through extra high voltage (EHV) and HVDC transmission lines.
Coordination among the states within a region and among the various regions is critical for the operation
of the national grid. This would require an efficient and reliable communication system, comprising
microwave links and dedicated data/voice transmission lines between the load dispatch centers and
generating stations.

In addition, synchronization of frequencies is required to integrate regional grids. In the case of a
difference in frequencies, HVDC transmission would be effective in integrating the grids through an
asynchronous link. Although some inter-regional links are operational, these do not have adequate
capacity to transmit bulk power, and are often loaded to capacity. The national grid, when fully
operational (likely by around 2012), is expected to have a total inter-regional transmission capacity of
37,150 MW.

Major milestones in national grid Source: CRISIL Research




                                                  ~ 26 ~
Power - Inter-regional power capacity

                                                                Source: PGCIL




                                                                                      Inter-regional capacity
                                                                                      (till December 2007
                                                                                      17,000 MW)

                                                                                      Source: Working
                                                                                      Committee Report and
                                                                                      CRISIL Research




                                                                                     Expected Inter-regional
                                                                                     capacity by 2011-12
                                                                                     (37,150 MW)

                                                                                     Source: Working
                                                                                     Committee Report and
                                                                                     CRISIL Research



Grid discipline
Several problems related to the integrated operations of regional grids can be attributed to the lack of
discipline among grid constituents. Grid discipline involves maintaining the grid frequency within

                                               ~ 27 ~
tolerance limits (49.2-50.3 Hz) and complying with the directions of the Regional Load Despatch
Centers (RLDCs), with respect to load despatch and drawing of power.

There have been several instances of grid collapse after constituent states drew excess power or
because there were fluctuations in the grid frequency. Under the Electricity (Supply) Act, SEBs are
expected to comply with the directions of RLDCs to ensure the integrated operation of regional
grids. However, in the absence of adequate incentives and disincentives, RLDCs are unable to enforce
the directives.

Further, load management, through load shedding or backing down by each of the constituents, is an
important aspect of the operation of a grid system. Inadequate load dispatch and communication
facilities often result in lack of co-ordination with respect to the scheduling of load and generation
between states.

In 1999, the CERC drafted the Indian Grid Code, which, along with the incentives and
disincentives notified under the Availability-Based Tariff (ABT) Order, is expected to induce better
grid discipline among the various grid constituents.




Unscheduled interchange (UI) charges are levied on defaulting entities which overdraw/under draw from
the grid and disturb the grid balance. Previously, the UI charges had been escalated up to Rs 10 per
unit of excess capacity drawn. However, recently the CERC in order to improve the grid stability
reduced the band (i.e. From 50.5-49.0 Hz to 50.3-49.2 Hz), and charges to Rs 7.3 per unit of excess
units drawn.

Private investments in transmission
In 1998, the Central government enacted the Electricity Laws (Amendment) Act, which
recognized transmission as an independent activity (distinct from generation and distribution), and
allowed private investments in the sector.

According to the government policy, the STUs, SEBs or their successor entities and the central
transmission utility (CTU) PGCIL will identify transmission projects for the intra-state and inter-
state/inter-regional transmission of power, respectively.




                                                 ~ 28 ~
The STUs and CTU will invite private companies to implement these projects through an independent
private transmission company (IPTC) or on a JV basis.

The IPTC would be selected through an international competitive bidding process. The primary criteria
for selection would be the quoted transmission service charges (TSC) and the technical, managerial and
financial capabilities of the bidders. In the case of JV companies, the CTU and STUs could own an
equity stake of up to 26 per cent. JV partners could also be selected on the basis of an
international   competitive        bidding   process. Further, the primary selection criteria would be the
technical and financial strength of the bidders. Transmission service charges would be determined on a
cost plus basis under the supervision of the CERC or SERCs.

The IPTC‘s role will be limited to the construction, ownership and maintenance of transmission lines.
Operations of the grid, including load dispatch, scheduling and monitoring, will be undertaken by the
STUs and the CTU at the intra-state and inter-state/inter-regional level, respectively. The CTU and
STUs will be involved         in     the development phase for obtaining project approvals and various
regulatory and statutory clearances (such as environment and forest clearance and securing right-of-
way), and will transfer the same to the selected private companies.

Technology in transmission

HVDC transmission
One of the pre-requisites for integrating grids is to synchronies their frequencies. In India,
synchronous integration of regional grids was not possible due to variations in frequencies and voltages.
Therefore, the most viable alternative is the asynchronous transfer of power through HVDC
transmission links.

Advantages of HVDC transmission

       Cost consideration: DC conductors cost less than AC conductors, as DC transmission
       requires smaller conductors for carrying the same load of power. In addition, only two
       conductors are required for DC transmission, while AC transmission requires three.
       However, the cost of HVDC terminals is higher than that of AC substations. Hence, for a given
       load of power to be transferred, there is a break-even distance, beyond which, DC transmission
       would be more economical (approximately 600 km for 500 MW).



                                                    ~ 29 ~
Maintaining independence of the systems: Impact on a system (due to disturbances in the
      other) is eliminated due to asynchronous linking.
      Right of way: For an equivalent load of power transferred, HVDC transmission requires lesser
      right of way compared with AC lines, as each HVDC line can transmit a higher quantum of
      power.

Transmission cost structure
   Capital costs

   The capital costs of the transmission line network have a significant impact on transmission tariffs.
   Capital costs depend on:

   Configuration of the line :The configuration of the transmission line, in terms of voltage levels
   (220 kV, 400 kV, 765 kV etc), mode of transmission (AC or HVDC) and other parameters
   (single circuit or double circuit) have an impact on the overall capital cost per km.

   Although the capital cost of transmission projects can vary significantly, the average
   estimated costs per km for different configurations are:

   Transmission lines

   220 kV double circuit: Rs 5.0-6.0 million per ckm

   400 kV single circuit: Rs 7.5-8.0 million per ckm

   400 kV double circuit: Rs 11.0-11.5 million per ckm

   765 kV single circuit: Rs 15.0-16.0 million per ckm




      Transmission system components               Source: CRISIL Research
                                               ~ 30 ~
Cost of setting up a transmission line

                                                        Source: Industry publication




DISTRIBUTION
  Distribution is the last and critical leg in the supply of electricity, reaching end consumers such as
  residential, commercial, agricultural and industrial segments. Distribution has several components
  such as pricing to various customers, cross subsidization etc. However, as this is a lucrative
  business, it has been held by the respective state entities, with private participation being
  marginal (only 5-7 per cent of the total). Further, issues is distribution vary from T&D losses to
  rural electrification etc.

  The government has begun a number of initiatives to improve the electricity supply to villages. As
  part of its initiatives, the power distribution system has been extended to reach remote villages. At
  the end of 2008-09, a total of 488,926 villages were electrified. However, T&D losses in the country
  remain high at around 28 per cent, compared to an average 10-15 per cent in developed countries.
  This is because of inadequate metering and theft of electricity. (The difference in the amount of
  electricity supplied and the amount actually metered is usually reported as T&D losses.) High T&D
  losses are also attributed to the T&D of a large amount of power at low voltage - the rise in rural
  electrification has resulted in the proliferation of low voltage (less than 11 kV) transmission lines.

  T&D losses rose from 22.27 per cent in 1995-96 to an estimated 26.91 per cent in 2007-08. The
  losses peaked at 33.98 per cent in 2001-02, but since have registered a declining trend.




                                                ~ 31 ~
Power: T&D losses

                                                                              P: Projected; E: Estimate

                                                                              Source: CEA



Tariffs and financial performance of SEBs
   In India, average electricity tariffs are lower than the average cost of supply (cost of generation plus
   T&D costs). The gap between average tariff and average cost of supply has increased from 36 paisa
   per kWh in 2005-06 to 49 paisa per kWh in 2006-07. The main reason for this has been the
   annual losses of all SEBs which have been increasing continuously - the commercial losses of
   all SEBs have gone up from over Rs 40 billion in 1991-92 to Rs 257 billion in 2006-07.




                                                                              Power: Costs and tariffs

                                                                              Source: Planning Commission




T&D losses
   T&D losses can be classified into two main categories:

   Technical losses


                                                ~ 32 ~
The technical component of T&D losses has an inverse relationship with the voltage
   configuration of the T&D system. Transmission of bulk power of high voltage (400 kV, 220 KV,
   and 132 kV) over long distances is estimated to result in a loss of 4-5 per cent of the total energy
   transmitted, while distribution at low voltage levels is estimated to lead to a loss of 15-18 per cent of
   the total energy transmitted.

   Commercial losses

   Commercial losses occur due to non-metering, non-billing or pilferage of power. These losses can
   be largely attributed to faulty meters, reading errors, unmetered supply and unauthorized
   connections. On account of inadequate metering arrangement, it is difficult to estimate the
   extent of the loss and attribute it to a specific reason. Some of these losses are reported as
   ‗agricultural consumption‘ since most rural connections are unmetered. In addition, a large
   proportion of the losses can be attributed to theft through unauthorized connections in both rural and
   urban areas. Though commercial losses are not completely avoidable, they can be reduced
   substantially through investments.

   Reasons for high T&D losses

          A weak and inadequate T&D system.
          Large-scale rural electrification programme (due to low voltage distribution lines).
          Numerous transformation stages: This results in a high component of transformation losses.
          There are 5-6 transformation stages in the Indian T&D network due to the proliferation
          of low-voltage consumption. The use of low capacity and inefficient transformers results in
          higher losses and dis-economies of scale.
          Improper load management: This overloads transmission lines. Transmission lines should be
          loaded up to 50-60 per cent of their capacity. However, in India, transmission lines are
          generally loaded to 90 per cent of their capacity, and often operate on ‗alert condition'. As a
          result, a small disturbance in a section can cause a cascading grid failure.
          Pilferage and theft of energy.

A reduction in T&D losses by one percentage point is equivalent to the power generated from
a 600-700 MW plant. Although the cost of achieving the reduction is difficult to estimate, it
would be a fraction of the investment required for setting up a new capacity (around Rs 25 billion).


                                                 ~ 33 ~
Measures to reduce losses

Technical losses
Technical losses can be reduced by adopting the following measures:

       Reducing the length of LT lines by relocating distribution substations, installing additional
       substations and converting
       LT lines into HT lines.
       Installing capacitors at suitable locations.
       Reducing the number of transformation stages and using high-efficiency transformers.
       Installing time-of-day meters with incentives to promote the usage of off-peak energy, in order to
       reduce over-loading of T&D lines.
       Using better equipment such as all aluminum alloy conductors (AAACs); this can reduce heat
       losses by 8-12 per cent and eliminate magnetic losses. Although AAACs are priced around 10
       per cent higher than aluminum conductor steel reinforced (ACSR), their average life is 60-80
       years, as compared with around 30 years for ACSR.
       Installing high-quality energy meters at the premises of all consumers and substations.

Commercial losses
Commercial losses can be reduced by adopting the following measures:

       Supplying metered energy to all consumers.
       Prompt calibration, replacement of faulty meters and using tamper-proof meters.
       Preventing pilferage through stronger legislation and better enforcement.




Privatization
Privatization of distribution is generally accepted as the first phase in the reforms and restructuring of
the power sector. With private participation in power distribution, significant benefits are expected to
accrue, such as:

       Reduction in T&D losses.
       Improvement in metering and billing practices.
       Improvement in revenue collection.

                                                  ~ 34 ~
Distribution reforms
To improve distribution, the government formulated the Accelerated Power Development Reform
Programme (APDRP).This programme aims to improve the financial viability of state power utilities,
reduce aggregate technical and commercial losses to around 10 per cent, improve customer satisfaction,
and increase reliability and quality of power supply.

The APDRP has two components -investment and incentive components. Under the investment
component, the government provides assistance worth 50 per cent of the project cost, of which 25
per cent is a grant and 25 per cent is a loan. The balance 50 per cent has to be arranged by the
utilities either through internal resource generation or from financial institutions or from other sources of
funds (such as state government, the Rural Electrification Corporation, Life Insurance Corporation,
ICICI, SIDBI and market bonds). Special category states such as Jammu and Kashmir, Himachal
Pradesh, Uttaranchal and Sikkim receive full assistance from the Central government, out of which 90
per cent is grant and the remaining 10 per cent is loan. Priority is given to projects from those states that
have committed to a time-bound programme of reforms as elaborated in the Memorandum                       of
Understanding (MoU) and Memorandum of Agreement (MoA), and are progressing on those
commitments.




Conditions of the MoU are:

•       Setting up SERC                                   Filling and implementation of tariff orders

•       Securitization of CPSUs dues                      Energy audit at 11 kV level

•       Metering of all consumers                         Maintenance of grid discipline

         Metering of 11 kV feeder

    Conditions of the MoA are:

    •      Constitution of Distribution Reform Committee at the state level

    •      Identification of nodal officer




                                                  ~ 35 ~
As part of the incentive component, the utilities are rewarded for actual cash loss
reductions by waiving half of the cash losses reduced by way of free grant. The cash losses
are calculated as the net of subsidy and receivables. Up to March 31, 2008, the funds released
under this component were Rs 28.8 billion. The disbursement for 2006-07 and 2007-08 was Rs
10.2 billion and Rs 14.0 billion, respectively. (This includes both the investment and incentive
components.)

New R-APDRP
Till December 2008, the Government of India had sanctioned 571 projects, amounting to Rs
170.33 billion to strengthen and upgrade sub-transmission and distribution systems of the various
states. The states have so far utilized Rs 126.07 billion. An amount of Rs 28.79 billion has also
been released to nine states for achieving reduction in cash losses under the incentive component
of the programme.

 As per the new APDRP policy, projects under the scheme shall be taken up in two parts:

       Part-A includes the projects for establishing baseline data and IT applications for
       energy accounting/auditing and IT-based consumer service centers.
       Part-B includes the regular distribution strengthening projects


REFORMS IN THE POWER SECTOR
Pre Reform Stage
Confronted with unprecedented economic crisis in 1991, Government of India embarked upon a
massive cleanup exercise encompassing all policies having financial involvement of
Governments- both at the level of Union and States.

Since after Electricity (supply) Act 1948, the power sector was mainly under the government
control which owned 95 % of distribution and around 98% of generation through states' and
central government utilities, the power sector was chiefly funded by support from government
budgets in the form of long term, concessional interest loans. These utilities were made to carry
forward the political agenda of the ruling parties of the day and the cross- subsidization i.e.
charging industrial and commercial consumers above the cost of supply and to charge
agricultural and domestic consumers below cost of supply was an integral part of the functioning
of the utilities.



                                            ~ 36 ~
POWER SECTOR REFORMS

   YEAR         MAJOR DEVELOPMENTS
   1991      The Electricity Laws (Amendment) Act, 1991--Notification. Amends the Indian
             Electricity Act, 1910 and the Electricity (Supply) Act, 1948 by
              Private Sector allowed to establish generation projects of all types (except
             nuclear)
              100% foreign investment & ownership allowed
              New pricing structure for sales to SEBs.
              5 Year Tax holiday; import duties slashed on power projects
   1992      Intensive wooing of foreign investors in US, Europe & Japan
   1992-97   8 projects given "fast-track" status.
              Sovereign guarantees from Central Government.
              Seven reached financial closure
              Dabhol (Enron), Bhadravati (Ispat), Jegurupadu (GVK), Vishakhapatnam
             (Hinduja), Ib Valley (AES), Neyveli (CMS),Mangalore
               (Cogentrix)
   1995-96   World Bank Reform Model - First Test Case Orissa
               Orissa Electricity Reform Act passed
               Establishment of Orissa Electricity Regulatory Commission
               SEB unbundled into Orissa Power Generating Company (OPGC),           Orissa
             Hydel Power Corporation (OHPC) and Grid Corporation of         Orissa (GRIDCO)
               Distribution privatized
   1996      Chief Ministers Conference: Common Minimum Action Plan for Power:
             Recommend policy to create CERC and SERCs
               Licensing, planning and other related functions to be delegated to   SERCs.
               Appeals against orders of SERCs to be in respective High Courts
               SERC to determine retail tariffs, including wheeling charges etc.,   which
             will ensure a minimum overall 3% rate of return.
               Cross -subsidization between categories of consumers may be      allowed by
             SERCs, but no sector to pay less than 50% of the   average cost of supply (cost



                                         ~ 37 ~
of generation plus transmission and        distribution). Tariffs for agricultural
       sector not to be less than Rs.0.50 Kwh and to be brought to 50% of the average
       costing not   more than three years.
         Recommendations of SERCs to be mandatory, but financial              implications
       any deviations made by State/UT Government, to be            provide for the explicitly
       in the State budget.
         Fuel Adjustment Charges (FCA) to be automatically incorporated in             the
       tariff.
         Package of incentives and disincentives to encourage and          facilitate the
       implementation of tariff rationalization by the States.
         States to allow maximum possible autonomy to the SEBs, which              are to be
       restructured and corporatized and run on commercial          basis. SEBs to
       professionalize their technical inventory manpower and project management
       practices.
1997   CEA Clearance exempted for projects under 1000MW but State Government
       environment clearance required up to 250-500 MW
         Liquid fuel policy -- naphtha allocations to IPPs
1998   Mega-Power Policy: special incentives for the construction and operation of
       hydro-electric power plants of at least 500 MW and thermal plants of at least
       1,000 MW.
       - The Electricity Laws (Amendment) Act, 1998 and Electricity Regulatory
       Commissions Ordinance -- Notification.
        Creation of Central Transmission Utility
        STUs to be set up with government companies
        Establishment of CERC and SERCs
        Rationalization of electricity tariffs,
        Policies regarding subsidies
        Promotion of efficient and environmentally benign policies
       - Power Grid notified as Central Transmission Utility
       - Haryana Electricity Reforms Act:
        HSEB unbundled into Haryana Vidyut Prasaran Nigam Ltd., a Trans Co.

                                   ~ 38 ~
(HVPNL) and Haryana Power Corporation Ltd.
        Creation of HERC
        Two Government owned distribution companies viz. Uttar Haryana Bijli
       Vitaran Nigam Ltd. (UHBVNL) and Dakshin Haryana Bijli Vitaran Nigam
       (DHBVNL) have been established.
        DFID's technical co-operation grant of 15 million pounds available for
       reforms.
1999   Andhra Pradesh Electricity Reforms Act
       APSEB unbundled into Andhra Pradesh Generation Company Ltd.
        (APGENCO) and Andhra Pradesh Transmission Company Ltd.
        (APTRANSCO for transmission & distribution)
        Creation of APERC
        Other Developments:
        World Bank loan of US $ 210 million under the APL
        DFID's 28 million pounds as technical co-operation grant.
        CIDA technical assistance of Canadian $ 4 million.
       - Karnataka Electricity Reforms Act
        KEB and KPCL transformed into new companies: Karnataka Power
       Transmission Corporation Ltd. (KPTCL) and Visvesvaraya Vidyut Nigama
       Ltd., a GENCO, (VVNL)
        Creation of KERC
       Other Developments:
        KPTCL has carved out five Regional Business Centers (RBC) for five
       identified zones.
2000   Power Ministers' Conference and Electricity Bill 2000 (draft):
        Functional disaggregation of generation, transmission and distribution with a
       view to creating independent profit centres and accountability;
        Re organization and restructuring of the State Electricity Boards
        in accordance with the model, phasing and sequencing to be determined by
       the respective State Governments
        States to determine the extent, nature and pace of privatization.

                                  ~ 39 ~
(public sector entities may continue if the States find them sustainable);
                      Transmission to be separated as an independent function for creation of
                     transmission highways that would enable viable public and private
                     investments;
                      Amendments to the Indian Electricity Act, 1910 made in 1998 for facilitating
                     private investment in transmission have been broadly retained except that the
                     private transmission companies would be regulated by the Regulatory
                     Commissions and Transmission Centres inst under the direction, supervision
                     and control of the Central/State Transmission Utilities;
                      Present entitlements of States to cheaper power from existing generating
                     stations to remain undisturbed;
                      Provision of compulsory metering for enhancing accountability and viability;
                      Central and State Electricity Regulatory Commissions to continue broadly on
                     the lines of the Electricity Regulatory Commissions Act, 1998;
                      State Regulatory Commissions enjoined to recognize in their functioning the
                     need for equitable supply of electricity to rural areas and to weaker sections;
                      Stringent provisions to minimize theft and misuse.

Source: www.cea.nic.in/power_sec_reports/general_review/0405/index.pdf

Electricity Act 2003
An Act to consolidate the laws relating to generation, transmission, distribution, trading and use
of electricity and generally for taking measures conducive to development                of electricity
industry, promoting competition therein, protecting interest of consumers and supply of
electricity to all areas, rationalization of electricity tariff, ensuring transparent policies regarding
subsidies, promotion of efficient and environmentally benign policies constitution of Central
Electricity Authority, Regulatory Commissions and establishment of Appellate Tribunal and
for matters connected therewith or incidental thereto.




                                                    ~ 40 ~
Enabled Market Model under EA 2003

Generation

Any Company, association or body of individuals (even unincorporated) can generate electricity
without requirement of techno-economic clearance of CEA, or approval of State Government or
regulator, except in case of hydropower station for which written consent of Central Electricity
Authority is required.
A Generating Company can supply electricity directly to more than one consumer and is vested
with the duty to establish, operate and maintain sub-stations, tie lines etc.
Any entity, (company, co-operative society or association of persons) can establish a Captive
Generation Plant (CGP) primarily for its own use without any entry barriers. Open access is to be
provided to all CGPs. No cross-subsidy surcharge would be levied on the persons who have
established CGP for carrying electricity to destination of his own use.

Rural Electrification/Generation/Distribution

Government of India will have to formulate a National Policy after consulting State
Governments & CEA, to govern (i) rural electrification and local distribution through local

                                              ~ 41 ~
bodies5, and (ii) rural off-grid supply including those based on renewable/nonconventional
energy resources.
No license is required for generating or distributing in rural areas notified by the State Govt.


Licensing

Trading has been recognized as a separate licensed activity along with transmission and
distribution. However, a license is not required in respect of (i) trading by a distribution licensee,
(ii) transmission, distribution or trading by any Govt., as the Govt. would be deemed a licensee.
Electricity Regulatory Commission (ERC), on the recommendation of Government, in
accordance with the national electricity policy and public interest can exempt any of the local
bodies6 from requiring license.


Trading and Captive Generation

Trading, i.e., purchase of electricity for resale, is a separate licensed activity, except for
distribution licensees who do not require a separate trading license. Traders can enter into direct
contracts with the consumers and determine its terms and conditions (including tariff).
The Appropriate Commission may specify
       The entry barriers for traders – technical requirements, capital adequacy
       requirement, and credit-worthiness;
       Duties re. supply and trading in electricity to be discharged by a trader; and
       Fix trading margin in intra-state trading if considered necessary.
       ERCs have to develop trading market and have to be guided by National Tariff Policy.




                                              ~ 42 ~
Open Access

Open access means non-discriminatory use of transmission lines, distribution system and
associated facilities by any licensee/consumer/Genco in accordance with ERC regulations.
The licensees, consumers and Gencos have to pay transmission/wheeling charges for open
access. Consumers has to also pay a surcharge (to be utilized to meet cross subsidy) determined
by ERC, for open access.
ERC may order any licensee owning intervening transmission facilities to provide use of
facilities to any other licensee, to the extent of surplus capacity.
A State Transmission Utility is obliged to provide non-discriminatory open access to its
transmission system for use by a licensee or Genco forthwith, or by any consumer once
distribution level open access has been provided.
There is no statutory time limit for introduction of open access. ERC has to determine by June
10, 2004 the phases and conditions, subject to which open access would be introduced.

Distribution

The distribution licensee has a mandatory duty to supply on request of consumer in a time bound
manner if the consumer agrees to pay the applicable tariff. ERC is empowered to suspend or
revoke license of a Discom for failure to maintain
Uninterrupted supply. Distribution licensee is empowered to recover charges/expenses/security
and disconnect supply for non-payment of dues.
Discoms can enter into direct contracts with consumers.
Discoms can engage in other businesses but have to share revenue to reduce wheeling charges,
and maintains separate accounts for the same.
ERCs may grant more than one distribution licenses can be issued in a given area, permitting
them to supply electricity through their own distribution system. To get a subsequent distribution
license any person will have to comply with additional requirements prescribed by GoI regarding
capital adequacy, creditworthiness, or Code of Conduct etc. If an applicant meets such
requirements, he shall not be denied grant of the license.




                                               ~ 43 ~
ERCs may permit by regulations a consumer/class to receive supply of electricity from anyone
other than the distribution licensee of the area of supply – against payment of wheeling charge &
surcharge in lieu of cross subsidy.
Distribution licensee is free to undertake distribution for a specified area within his area of
supply without need for a separate license. Provided that the distribution licensee shall remain
liable for the supply.


Transmission

To secure non-discriminatory open access, transmission has been segregated as a wires function
without any trading (buying and selling). Central transmission utility (CTU) and all State
transmission utilities (STUs) are deemed licensee.
CTU and STUs functions are (i) Transmission; (ii) planning & co-ordination of transmission
system; (iii) development of efficient and economical transmission lines from generating stations
to load centers; (iv) providing non-discriminatory open access to the system.
RLDCs and SLDCs are empowered to issue directions, and exercise supervision & control to
ensure stability, efficiency & economy of grid operation in the region and the State respectively.
Licensees, generating companies and other persons connected with operation of power system
shall comply. SLDC shall ensure compliance with RLDC directions.
Pending creation of separate RLDCs & SLDCs, the CTU and the STU shall perform the role.


Tariff

Government has been distanced from determination of tariff. This power has been vested in the
CERC/SERC. In determination of tariff CERC/SERC shall be guided by factors including
National Electricity Policy, tariff policy (formulated by Central Government), CERC‘s principles
and methodologies for setting tariff and principles rewarding efficiency and multiyear tariff.
In case tariff is determined through transparent bidding as per Government of India guidelines,
the same shall be adopted by the ERCs.
To promote competition among distribution licensees, where there are 2 or more distribution
licensees supplying in an area, the ERC may fix only maximum ceiling of tariff for retail sale.
The PPAs/BSAs entered into before 10th June, 2003 have not been explicitly saved or granted a
protection from regulatory intervention.

                                             ~ 44 ~
Regulatory Commission

It is mandatory to establish SERCs within 6 months from 10th June, 2003. Joint Commission can
be constituted for two or more States or Union territories or both by mutual agreement.
The new functions to be performed by CERC/ SERC include specifying Grid Code, Supply Code
(only SERC), levy fees, fix trading margins in interstate trading.
In exercise of their functions, ERCs shall be guided by – National Electricity Policy, National
Electricity Plan & Tariff Policy; directions of GoI/State Government concerned, in matters of
policy involving public interest – where such Government‘s decision shall be final as to whether
the directions relates to a policy involving public interest. There is no express provision enabling
ERCs to depart from such directions.
Provision for separate ERC funds (not consolidated funds) for finance of ERC expenditures.


Policy Issues

Central Government shall prepare, publish and revise National Electricity Policy and Tariff
policy in consultation with State Governments and CEA9.
The implementation of the Act is largely dependent on the nature and scope of the diverse policy
instruments to be issued by Government, and institutions like Special Courts, Appellate
Electricity Tribunal, NLDC, RLDC, SLDC, SERCs and SEB successors to be constituted by
Government‘s. It is noteworthy that these instruments will have a bearing are:-
       Role and functioning of ERCs,
      Role and functioning of CEA,
      Market development,
      Governance of the sector – regulation, grid operations, safety issues, and
      Enforcement.



Mega Power Policy


Eligibility: Inter-state projects of 700 MW (thermal) and 350 MW (hydro) for Jammu & Kashmir
and North Eastern states; 1,000 MW (thermal) and 500 MW (hydro) for others.
• Exemption from custom duties, excise & central levies.

                                             ~ 45 ~
• Increased ECB capital limits.
• State Implementation support.
• Decreased import duty on fuel i.e. coal & liquid fuel
• Deemed export benefits to domestic bidders
• Price preference to PSU bidders
• Preconditions: Purchasing state must have ERC;
Must agree in principle to privatize distribution in cities of >10 million population



Ultra Mega Power Projects

• Nine sites identified; each project size about 4,000 MW; Total estimated investment of Rs 160
billion.
• Projects to be completed on built-own-operate (BOO) basis.
• Successful bidder finalized on tariff based competitive bidding; takes over SPV from PFC.
• PFC is the nodal agency for setting up the special purpose vehicle (SPV) for project (100 per
cent subsidiary)
• Projects to use supercritical technology based on pithead (captive block) or imported coal
(coastal).
• Full exemption of central excise duty on goods procured under supercritical technology.
• Five coastal sites identified including Mundra in Gujarat awarded to Tata Power.




Consumer Interests

Creation of a Consumer redressal forum (CRF) by Distribution licensee in a time bound manner.
The consumers aggrieved from CRF can approach to an ‗ombudsman‘10.
Distribution licensee has to supply electricity within 1 month from the date of request for supply,
except where capital works are required for connectivity. Failure of distribution licensee to
supply within said time period would attract penalty.




                                              ~ 46 ~
Enforcements

Suitable provisions for provisional assessments and recovery of compensatory fines may be able
to address a long-standing vacuum in law.
Special Courts are to be established by Government‘s for speedy disposal of cases relating to
theft of electricity.
The scope of offences has been expanded and enhanced punishments have been prescribed for
subsequent or continuing offences.
Stronger powers (accompanied with better safeguards) have been provided for conducting
inspections/search/seizure.

Dispute Resolution

The appeal against all orders of ERC/adjudication officer would lie to an expert Appellate
Tribunal (an expert body), which shall dispose appeals within prescribed time.
Appeal from appellate tribunal lies to Supreme Court. The appeal to Supreme Court is limited to
substantial question of law.



Electricity (Amendment) Act, 2007.

The Electricity (Amendment) Act, 2007, amending certain provisions of the Electricity Act,
2003, has been enacted on 29th May, 2007 and brought into force w.e.f. 15.06.2007. The main
features of the amendment Act are: -

        Central Government, jointly with State Governments, to endeavor to provide access to
electricity to all areas including villages and hamlets through rural electricity infrastructure and
electrification of households.
        No License required for sale from captive units.
        Deletions of the provisions for elimination of cross subsidies. The provisions for
reduction of cross subsidies would continue.
        Definition of theft expanded to cover use of tampered meters and use for unauthorized
purpose. Theft made explicitly cognizable and non-bail able.




                                             ~ 47 ~
Demand Side Management

Demand-side management is used to describe the actions of a utility, beyond the customer's
meter, with the objective of altering the end-use of electricity - whether it be to increase demand,
decrease it, shift it between high and low peak periods, or manage it when there are intermittent
load demands - in the overall interests of reducing utility costs. In other words DSM is the
implementation of those measures that help the customers to use electricity more efficiency and
it doing so reduce the customers to use the utility costs. DSM can be achieved through.

      Improving the efficiency of various end-uses through better housekeeping correcting
energy leakages, system conversion losses, etc ;
      Developing and promoting energy efficient technologies, and
      Demand management through adopting soft options like higher prices during peak hours,
concessional rates during off-peak hours seasonal tariffs, interruptible tariffs, etc.

DSM, in a wider definition, also includes options such as renewable energy systems, combined
heat and power systems, independent power purchase, etc, that utility to meet the customer's

                                               ~ 48 ~
demand at the lowest possible cost. Often the terms energy efficiency and DSM are used
interchangeably. However, it is important to point out that DSM explicitly refers to all those
activities that involve deliberate intervention by the utility in the marketplace so as to alter the
consumer's load profile. Energy efficiency issued in an all encompassing sense and includes any
activity that would directly or indirectly lead to an increase in energy efficiency. To make this
distinction precise, a program that encourages customers to install energy efficient lighting
systems through a rebate program would fall under DSM. On the other hand, customer purchases
of energy efficient lighting as a reaction to the perceived need for conservation is not DSM but
energy efficiency gains.

There has been growing recognition of the importance of energy efficiency in India's electricity
sectors. The Ministry of Power (MoP) is the nodal agency for energy conservation in the
country. The Bureau of Energy Efficiency (BEE), an autonomous body under the MoP, was set
up in 1989 to coordinate initiatives and activities on energy conservation. Several state electricity
boards (SEBs) have also set up Energy Conservation Cells, some of which have been assisting
industries in conducting energy audits. Several reports have been attempted to estimate the
potential for energy conservation in various consuming sectors and have also identified various
Energy Efficiency technologies (EETs) for important end-uses. The National Energy Efficiency
Program (NEEP) of the Government of India (GOI) has targeted savings of about 5000 MW to
be realized by the end of the Eighth plan through both demand (2750 MW) and supply side
(2250 MW) efficiency improvements. In terms of Government policies, there are special
equipment in the first year, subsidies for energy audits, reduced customs duty for selected control
equipment for managing energy use, and so on.


Environmental Reform in the Electricity Sector:

Enhanced economic activity and population growth have led to increasing energy demand that in
turn has spurred electricity generation. But large-scale electricity generation and distribution
have adverse environmental impacts, varying by the technologies employed and their locations.
These need to be addressed so that energy services can be enhanced in harmony with the
environment, within our ecological footprints. Due to the ―externalities‖ of electricity generation,
that is, the negative impacts not directly affecting or being restricted to those involved, the costs


                                              ~ 49 ~
of impact mitigation are typically not included in electricity prices. Consideration for the
environment has therefore to be forced into the reckoning, or preferably integrated into the
system, hence the importance of environment policy in the context of the power sector.

Focusing on environmental issues and policies applicable to the power sector in China and India.
These countries generate 68% of the electricity generated in developing Asia, but with a total
population of about 2.4 billion, have large unmet needs.

In approaching the problem of environmental protection in the power sector in rapidly
developing country, our analytical framework consists of identification of those state
environmental policies and regulations that pertain to the power sector, both directly and
indirectly, assessment of the barriers encountered, and finally recommendations of likely
solutions to circumvent these problems.

Let us consider the impacts of electricity generation on the environment. The focus is on to list
the national environmental policies that affect these impacts, beginning with general direction,
proceeding to specific rules and standards and then to alternatives to conventional electricity
generation. This leads to the problems that beset effective policy implementation.




                                            ~ 50 ~
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector
Domain Study Indian Power Sector

Weitere ähnliche Inhalte

Was ist angesagt?

Cs610 lec 01 45
Cs610 lec 01 45Cs610 lec 01 45
Cs610 lec 01 45Asim khan
 
Kioti Daedong DK45 Tractor Service Repair Manual
Kioti Daedong DK45 Tractor Service Repair ManualKioti Daedong DK45 Tractor Service Repair Manual
Kioti Daedong DK45 Tractor Service Repair Manualhjsnekmde
 
Kioti daedong dk45 s tractor service repair manual
Kioti daedong dk45 s tractor service repair manualKioti daedong dk45 s tractor service repair manual
Kioti daedong dk45 s tractor service repair manualfjskekdmjekm
 
Kioti Daedong DK451 Tractor Service Repair Manual
Kioti Daedong DK451 Tractor Service Repair ManualKioti Daedong DK451 Tractor Service Repair Manual
Kioti Daedong DK451 Tractor Service Repair Manualkjksemjdmkdm
 
Kioti daedong dk451 tractor service repair manual
Kioti daedong dk451 tractor service repair manualKioti daedong dk451 tractor service repair manual
Kioti daedong dk451 tractor service repair manualfjsjjekdkme
 
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance SummariesLink SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summariesgasanden
 
Kioti daedong ck30 tractor service repair manual
Kioti daedong ck30 tractor service repair manualKioti daedong ck30 tractor service repair manual
Kioti daedong ck30 tractor service repair manualfjsefksemmm
 
Kioti daedong ck30 h tractor service repair manual
Kioti daedong ck30 h tractor service repair manualKioti daedong ck30 h tractor service repair manual
Kioti daedong ck30 h tractor service repair manualfjskeksemm
 
Kioti daedong ck25 tractor service repair manual
Kioti daedong ck25 tractor service repair manualKioti daedong ck25 tractor service repair manual
Kioti daedong ck25 tractor service repair manualfjjskekmsemm
 
Kioti daedong ck25 h tractor service repair manual
Kioti daedong ck25 h tractor service repair manualKioti daedong ck25 h tractor service repair manual
Kioti daedong ck25 h tractor service repair manualfjjksekfksmem
 
Engineering chemistry
Engineering chemistryEngineering chemistry
Engineering chemistrystudent
 
Calc ii complete
Calc ii completeCalc ii complete
Calc ii completeyalfindira
 

Was ist angesagt? (13)

Cs610 lec 01 45
Cs610 lec 01 45Cs610 lec 01 45
Cs610 lec 01 45
 
Kioti Daedong DK45 Tractor Service Repair Manual
Kioti Daedong DK45 Tractor Service Repair ManualKioti Daedong DK45 Tractor Service Repair Manual
Kioti Daedong DK45 Tractor Service Repair Manual
 
Kioti daedong dk45 s tractor service repair manual
Kioti daedong dk45 s tractor service repair manualKioti daedong dk45 s tractor service repair manual
Kioti daedong dk45 s tractor service repair manual
 
Kioti Daedong DK451 Tractor Service Repair Manual
Kioti Daedong DK451 Tractor Service Repair ManualKioti Daedong DK451 Tractor Service Repair Manual
Kioti Daedong DK451 Tractor Service Repair Manual
 
Kioti daedong dk451 tractor service repair manual
Kioti daedong dk451 tractor service repair manualKioti daedong dk451 tractor service repair manual
Kioti daedong dk451 tractor service repair manual
 
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance SummariesLink SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summaries
 
Kioti daedong ck30 tractor service repair manual
Kioti daedong ck30 tractor service repair manualKioti daedong ck30 tractor service repair manual
Kioti daedong ck30 tractor service repair manual
 
Kioti daedong ck30 h tractor service repair manual
Kioti daedong ck30 h tractor service repair manualKioti daedong ck30 h tractor service repair manual
Kioti daedong ck30 h tractor service repair manual
 
Kioti daedong ck25 tractor service repair manual
Kioti daedong ck25 tractor service repair manualKioti daedong ck25 tractor service repair manual
Kioti daedong ck25 tractor service repair manual
 
Kioti daedong ck25 h tractor service repair manual
Kioti daedong ck25 h tractor service repair manualKioti daedong ck25 h tractor service repair manual
Kioti daedong ck25 h tractor service repair manual
 
Engineering chemistry
Engineering chemistryEngineering chemistry
Engineering chemistry
 
Calc ii complete
Calc ii completeCalc ii complete
Calc ii complete
 
DNV Liquified Gas Terminal
DNV Liquified Gas TerminalDNV Liquified Gas Terminal
DNV Liquified Gas Terminal
 

Ähnlich wie Domain Study Indian Power Sector

Mastering the Art of Battery Reconditioning
Mastering the Art of Battery ReconditioningMastering the Art of Battery Reconditioning
Mastering the Art of Battery Reconditioningpredsek
 
59582162 dpr
59582162 dpr59582162 dpr
59582162 dprablaze7
 
133688798 frequency-planning-guidelines-alu
133688798 frequency-planning-guidelines-alu133688798 frequency-planning-guidelines-alu
133688798 frequency-planning-guidelines-alupkamoto
 
Spm6600 Dx6i Manual Lo Res
Spm6600 Dx6i Manual Lo ResSpm6600 Dx6i Manual Lo Res
Spm6600 Dx6i Manual Lo Resguestada3c8
 
Ventilation guidelines for minnesota commercial kitchens
Ventilation guidelines for minnesota commercial kitchensVentilation guidelines for minnesota commercial kitchens
Ventilation guidelines for minnesota commercial kitchensOsama Bekhit
 
El último vuelo del discovery
El último vuelo del discoveryEl último vuelo del discovery
El último vuelo del discoveryJaume Satorra
 
Pluripotent stem-cell-handbook-from-nature-and-thermoscience
Pluripotent stem-cell-handbook-from-nature-and-thermosciencePluripotent stem-cell-handbook-from-nature-and-thermoscience
Pluripotent stem-cell-handbook-from-nature-and-thermoscienceAmira moustafa
 
538352main sts134 presskit_508
538352main sts134 presskit_508538352main sts134 presskit_508
538352main sts134 presskit_508Sérgio Sacani
 
Ingersoll rand zx75 load excavator service repair manual
Ingersoll rand zx75 load excavator service repair manualIngersoll rand zx75 load excavator service repair manual
Ingersoll rand zx75 load excavator service repair manualfiksfejjsekkmme
 
Ingersoll rand zx125 load excavator service repair manual
Ingersoll rand zx125 load excavator service repair manualIngersoll rand zx125 load excavator service repair manual
Ingersoll rand zx125 load excavator service repair manualyfhjsjefkksemme
 
Ingersoll rand zx125 load excavator service repair manual
Ingersoll rand zx125 load excavator service repair manualIngersoll rand zx125 load excavator service repair manual
Ingersoll rand zx125 load excavator service repair manualufjjsejfkskemme
 
Ingersoll rand zx125 load excavator service repair manual
Ingersoll rand zx125 load excavator service repair manualIngersoll rand zx125 load excavator service repair manual
Ingersoll rand zx125 load excavator service repair manualfujsekfkksmemxs
 
Ingersoll rand zx75 load excavator service repair manual
Ingersoll rand zx75 load excavator service repair manualIngersoll rand zx75 load excavator service repair manual
Ingersoll rand zx75 load excavator service repair manualufdjskeksmemzx
 
Supra-Clean® and Supra-Poly® Solid Phase Extraction (SPE) Application Notebook
Supra-Clean® and Supra-Poly® Solid Phase Extraction (SPE) Application NotebookSupra-Clean® and Supra-Poly® Solid Phase Extraction (SPE) Application Notebook
Supra-Clean® and Supra-Poly® Solid Phase Extraction (SPE) Application NotebookPerkinElmer, Inc.
 
Nx 10 for engineering design
Nx 10 for engineering designNx 10 for engineering design
Nx 10 for engineering designSergio Barrios
 
NX10 for Engineering Design
NX10 for Engineering DesignNX10 for Engineering Design
NX10 for Engineering DesignNam Hoai
 

Ähnlich wie Domain Study Indian Power Sector (20)

Mastering the Art of Battery Reconditioning
Mastering the Art of Battery ReconditioningMastering the Art of Battery Reconditioning
Mastering the Art of Battery Reconditioning
 
ezMaster User manual
ezMaster User manualezMaster User manual
ezMaster User manual
 
59582162 dpr
59582162 dpr59582162 dpr
59582162 dpr
 
133688798 frequency-planning-guidelines-alu
133688798 frequency-planning-guidelines-alu133688798 frequency-planning-guidelines-alu
133688798 frequency-planning-guidelines-alu
 
Spm6600 Dx6i Manual Lo Res
Spm6600 Dx6i Manual Lo ResSpm6600 Dx6i Manual Lo Res
Spm6600 Dx6i Manual Lo Res
 
Ventilation guidelines for minnesota commercial kitchens
Ventilation guidelines for minnesota commercial kitchensVentilation guidelines for minnesota commercial kitchens
Ventilation guidelines for minnesota commercial kitchens
 
Alnor hvac handbook
Alnor hvac handbookAlnor hvac handbook
Alnor hvac handbook
 
El último vuelo del discovery
El último vuelo del discoveryEl último vuelo del discovery
El último vuelo del discovery
 
Fr a200
Fr a200Fr a200
Fr a200
 
Pluripotent stem-cell-handbook-from-nature-and-thermoscience
Pluripotent stem-cell-handbook-from-nature-and-thermosciencePluripotent stem-cell-handbook-from-nature-and-thermoscience
Pluripotent stem-cell-handbook-from-nature-and-thermoscience
 
538352main sts134 presskit_508
538352main sts134 presskit_508538352main sts134 presskit_508
538352main sts134 presskit_508
 
Press Kit for Space Shuttle Endeavour's Final Mission, STS-134
Press Kit for Space Shuttle Endeavour's Final Mission, STS-134Press Kit for Space Shuttle Endeavour's Final Mission, STS-134
Press Kit for Space Shuttle Endeavour's Final Mission, STS-134
 
Ingersoll rand zx75 load excavator service repair manual
Ingersoll rand zx75 load excavator service repair manualIngersoll rand zx75 load excavator service repair manual
Ingersoll rand zx75 load excavator service repair manual
 
Ingersoll rand zx125 load excavator service repair manual
Ingersoll rand zx125 load excavator service repair manualIngersoll rand zx125 load excavator service repair manual
Ingersoll rand zx125 load excavator service repair manual
 
Ingersoll rand zx125 load excavator service repair manual
Ingersoll rand zx125 load excavator service repair manualIngersoll rand zx125 load excavator service repair manual
Ingersoll rand zx125 load excavator service repair manual
 
Ingersoll rand zx125 load excavator service repair manual
Ingersoll rand zx125 load excavator service repair manualIngersoll rand zx125 load excavator service repair manual
Ingersoll rand zx125 load excavator service repair manual
 
Ingersoll rand zx75 load excavator service repair manual
Ingersoll rand zx75 load excavator service repair manualIngersoll rand zx75 load excavator service repair manual
Ingersoll rand zx75 load excavator service repair manual
 
Supra-Clean® and Supra-Poly® Solid Phase Extraction (SPE) Application Notebook
Supra-Clean® and Supra-Poly® Solid Phase Extraction (SPE) Application NotebookSupra-Clean® and Supra-Poly® Solid Phase Extraction (SPE) Application Notebook
Supra-Clean® and Supra-Poly® Solid Phase Extraction (SPE) Application Notebook
 
Nx 10 for engineering design
Nx 10 for engineering designNx 10 for engineering design
Nx 10 for engineering design
 
NX10 for Engineering Design
NX10 for Engineering DesignNX10 for Engineering Design
NX10 for Engineering Design
 

Mehr von Jaspal Bhatia

Renewable Energy Certificate
Renewable Energy CertificateRenewable Energy Certificate
Renewable Energy CertificateJaspal Bhatia
 
Pelican Landing case
Pelican Landing casePelican Landing case
Pelican Landing caseJaspal Bhatia
 
Retail Virtual Modelling
Retail Virtual ModellingRetail Virtual Modelling
Retail Virtual ModellingJaspal Bhatia
 
Business Strategy Retail Wal Mart
Business Strategy Retail Wal MartBusiness Strategy Retail Wal Mart
Business Strategy Retail Wal MartJaspal Bhatia
 
Financial Analysis HCC
Financial Analysis HCCFinancial Analysis HCC
Financial Analysis HCCJaspal Bhatia
 
Marketing Edible Oil Industry
Marketing Edible Oil IndustryMarketing Edible Oil Industry
Marketing Edible Oil IndustryJaspal Bhatia
 

Mehr von Jaspal Bhatia (7)

Renewable Energy Certificate
Renewable Energy CertificateRenewable Energy Certificate
Renewable Energy Certificate
 
Pelican Landing case
Pelican Landing casePelican Landing case
Pelican Landing case
 
Retail Virtual Modelling
Retail Virtual ModellingRetail Virtual Modelling
Retail Virtual Modelling
 
Business Strategy Retail Wal Mart
Business Strategy Retail Wal MartBusiness Strategy Retail Wal Mart
Business Strategy Retail Wal Mart
 
Strategy Apple Case
Strategy Apple CaseStrategy Apple Case
Strategy Apple Case
 
Financial Analysis HCC
Financial Analysis HCCFinancial Analysis HCC
Financial Analysis HCC
 
Marketing Edible Oil Industry
Marketing Edible Oil IndustryMarketing Edible Oil Industry
Marketing Edible Oil Industry
 

Kürzlich hochgeladen

ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 

Kürzlich hochgeladen (20)

ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 

Domain Study Indian Power Sector

  • 1. A Study on Indian Power Sector JASPAL SINGH ROLL-47 SACHIN RANGRAO DESHMUKH ROLL-06 CHANDRA MOHAN VERMA ROLL-56 ANINDYA KUNDU ROLL -22 PRAKASH POLLY MAZHUVANCHERRY ROLL-26
  • 2. Table of Contents EXECUTIVE SUMMARY......................................................................................................................... 5 INTRODUCTION ...................................................................................................................................... 7 GENERATION .......................................................................................................................................... 8 Capacity ................................................................................................................................................. 8 Power Generation ................................................................................................................................ 11 Emerging technologies.......................................................................................................................... 11 Coal-based ........................................................................................................................................ 11 Fluidized bed combustion ................................................................................................................. 11 Nuclear Power .................................................................................................................................. 12 Distributed generation ...................................................................................................................... 13 Resources ............................................................................................................................................. 15 Coal .................................................................................................................................................. 15 Natural Gas ....................................................................................................................................... 16 DEMAND - SUPPLY .............................................................................................................................. 17 Sectoral demand ................................................................................................................................... 17 ELECTRICITY DEMAND FORECAST .................................................................................................. 19 Elasticity of electricity consumption with respect to GDP growth.......................................................... 20 TRANSMISSION .................................................................................................................................... 22 Review ................................................................................................................................................. 22 Overview and Structure ........................................................................................................................ 23 National grid......................................................................................................................................... 25 Grid discipline ...................................................................................................................................... 27 Private investments in transmission ....................................................................................................... 28 Technology in transmission .................................................................................................................. 29 HVDC transmission .......................................................................................................................... 29 Transmission cost structure ................................................................................................................... 30 DISTRIBUTION ...................................................................................................................................... 31 Tariffs and financial performance of SEBs ............................................................................................ 32 T&D losses ........................................................................................................................................... 32 Measures to reduce losses ..................................................................................................................... 34 Technical losses ................................................................................................................................ 34 ~2~
  • 3. Commercial losses ............................................................................................................................ 34 Privatization ..................................................................................................................................... 34 Distribution reforms.............................................................................................................................. 35 New R-APDRP .................................................................................................................................... 36 REFORMS IN THE POWER SECTOR.................................................................................................... 36 Pre Reform Stage.................................................................................................................................. 36 Electricity Act 2003 .............................................................................................................................. 40 Generation ............................................................................................................................................ 41 Rural Electrification/Generation/Distribution ........................................................................................ 41 Licensing .............................................................................................................................................. 42 Trading and Captive Generation ........................................................................................................... 42 Open Access ......................................................................................................................................... 43 Distribution .......................................................................................................................................... 43 Transmission ........................................................................................................................................ 44 Tariff .................................................................................................................................................... 44 Regulatory Commission........................................................................................................................ 45 Policy Issues ......................................................................................................................................... 45 Mega Power Policy ............................................................................................................................... 45 Ultra Mega Power Projects ................................................................................................................... 46 Consumer Interests ............................................................................................................................... 46 Enforcements........................................................................................................................................ 47 Dispute Resolution ............................................................................................................................... 47 Electricity (Amendment) Act, 2007....................................................................................................... 47 Demand Side Management ................................................................................................................... 48 Environmental Reform in the Electricity Sector: ................................................................................... 49 STUDY OF SELECTED COMPANIES ................................................................................................... 51 1. NTPC Ltd. ........................................................................................................................................ 51 2. RELIANCE INFRASTRUCTURE LTD ........................................................................................... 52 3. TATA POWER COMPANY LTD .................................................................................................... 53 4. POWER GRID CORPORATION OF INDIA LTD ........................................................................... 53 5. JP HYDROPOWER ......................................................................................................................... 53 MAJOR FINDINGS: ................................................................................................................................ 54 ~3~
  • 4. IMPACT OF CERC REGULATIONS ON CENTRAL PLAYERS ........................................................... 55 Generation ........................................................................................................................................... 55 Transmission ........................................................................................................................................ 58 IMPACT OF CERC REGULATIONS ON TARIFF AND END CUSTOMERS .......................................................... 59 ADVANCED METERING INFRASTRUCTURE................................................................................................. 60 RENEWABLE ENERGY......................................................................................................................... 69 Renewable Energy Scenario in India ..................................................................................................... 69 Co-Generation ...................................................................................................................................... 70 Wind Power .......................................................................................................................................... 71 Solar power .......................................................................................................................................... 71 SPV Systems ........................................................................................................................................ 72 Small hydroelectric plants ..................................................................................................................... 72 Biomass Power ..................................................................................................................................... 72 Potential ........................................................................................................................................... 72 Different Technologies Used ................................................................................................................ 73 Gasification ...................................................................................................................................... 73 Geothermal Power ............................................................................................................................ 73 NUCLEAR POWER IN INDIA ....................................................................................................................... 75 REFERENCES......................................................................................................................................... 80 ~4~
  • 5. EXECUTIVE SUMMARY Availability of power is one of the important ingredients for industrial growth. It is an important infrastructure facility without which no industrial activity can be thought of in modern times. Increasing automation of Indian industries has created huge demand of power in India. This huge demand has resulted into demand supply gap in India in recent times. This report is based on the extensive study of the power sector in India. Both global and domestic perspectives of power sector focusing more on Indian players have been looked upon in this report. It includes the literature review by scholars which has analyzed the subject of power sector more extensively. The objective of this report is to get a comprehensive and apparent knowledge of the power sector, and to study the changes in power sector over a period of time there by analyzing various aspects of the power sector. In the report the power generation companies of the industry chosen, are the top five and bottom five companies of the power sector in India, based on the sales turnover. The trends in the demand, supply and generation in the power sector is discussed through the trend analysis. Before 2001, India‘s electricity-supply was mainly owned and operated by public sector. It was running under the risk of bankruptcy. This created a serious impediment to investments in the sector at the time when India desperately needed them. This led to the emergence of Private players in the power sector. The NTPC, Reliance Infra, Tata Power, Power Grid, & Torrent Power are the market leaders in the power sector and have high Cumulative Annual Growth Rate (CAGR). This is because of the government support, inflow of foreign investment, growing demand and use of latest technology for power generation and transmission. The best management policies are adopted by these companies. The small players GVK power, Indowind Energy, Energy Development, JP Hydro, and KSK energy are also imparting new technology, and management policies to survive the competition and meet the demand of power sector. The methodology used in report includes comparative analysis of the top 5 and bottom 5 companies of the sector. The Potter‘s five forces analysis, SWOT analysis, Trend analysis & Ratio ~5~
  • 6. analysis are used to analyze the industry of power sector. The various analysis shows that there has been a continuous growth in generation and consumption of power in India. Thermal, hydro and nuclear are three major source of power generation From the installed capacity of only 1,362mw in 1947, has increased to 97000 MW as on March 2000 which has since crossed 100,000 MW mark India has become sixth largest producer and consumer of electricity in the world equaling the capacities of UK and France combined. The number of consumers connected to the Indian power grid exceeds is 75 million. Rural electrification is one significant initiative of the industry to trigger economic development and generate employment by providing electricity as an input for productive uses in agriculture and rural industries, and improve the quality of life of the rural people. The International Energy Outlook 2006 (IEO2006) projects strong growth for worldwide energy demand over the 27-year projection period from 2003 to 2030. Much of the growth in energy demand is among the developing countries in Asia, which includes China and India; demand in the region nearly triples over the projection period. Total primary energy consumption in the developing countries grows at an average annual rate of 3.0 percent between 2003 and 2030. In contrast, for the developed countries—with its more mature energy-consuming nations—energy use grows at a much slower average rate of 1.0 percent per year over the same period. This huge increase in projected demand of energy in India and China makes analysis of energy sector of these countries very important. World electricity generation rose at an average annual rate of 3.7% from 1971 to 2004, greater than the 2.1% growth in total primary energy supply. Total world consumption of marketed energy is projected to increase by 50 percent from 2005 to 2030. ~6~
  • 7. INTRODUCTION An economy‘s growth, development, ability to handle global competition is all dependent on the availability, reliability and quality of the power sector. As the Indian economy continues to surge ahead, electrification and electricity services have been expanding concurrently to support the growth rate. The demand for power is growing exponentially and the scope of growth of this sector is immense. Existing generation suffers from several recurrent problems. The efficiency and the availability of the coal power plants are low by international standards. A majority of the plants use low-heat- content and high-ash unwashed coal. This leads to a high number of airborne pollutants per unit of power produced. Moreover, past investments have skewed generation toward coal-fired power plants at the expense of peak-load capacity. In the context of fast-growing demand, large T&D losses and poor pooling of loads at the national level exacerbate the lack of generating capacity. India is one of the main manufacturers and users of energy. Globally, India is presently positioned as the 11th largest manufacturers of energy. It is also the worlds‘ 6th largest energy users. In spite of its extensive yearly energy output, Indian power sector is a regular importer of energy because of huge disparity. Global and Indian economy have decelerated, but power is one of the few commodities in short supply in India. So, despite the sluggishness in production and demand for manufactured products, India remains power hungry, both in terms of normal and peak power demand. Power is derived from various sources in India. These include thermal power, hydropower or hydroelectricity, solar power, biogas energy, wind power etc. The distribution of the power generated is undertaken by Rural Electrification Corporation for electricity power supply. ~7~
  • 8. GENERATION Capacity The government has revised the capacity addition target to 78,700 MW from 78,577 for the Eleventh Plan. However, while in 2007-08 it added capacities of 9,263 MW, in 2008-09 only 3,453.70 MW capacities were added against the target of 11,061 MW - 69 per cent below the target. This was due to delays in the supply of critical components in thermal projects and non- availability of fuel. The capacity addition target for the Tenth Plan (2002-2007) was estimated at 41,110 MW, out of which only 21,095 MW was achieved (2,872 MW was achieved in 2002-03, 3,952 MW in 2003- 04, 3,950 MW in 2004-05 3,468.8 MW in 2005-06 and 6,852.8 MW in 2006-07). Major projects commissioned in the central sector in 2007-08 and 2008-09 include: Sipat STPS-II in Chhattisgarh (thermal based, 1,000 MW) • Mejia TPS (block 6) in West Bengal (thermal based, 250 MW) • Ratnagiri CCPP-II (Block 3) in Maharashtra (thermal based, 740 MW) • Teesta-V (unit 1, 2 and 3) in Sikkim (hydel based capacity of 170 MW each) • Omkareshwar (block 1-8) in MP (hydel based, 65 MW each) • Kahalgaon in Bihar (thermal based, 1,000 MW) • Kaiga APP (block 3) in Karnataka (nuclear based, • Bhilai TPP in Chhattisgarh (thermal based, 500 MW) 220 MW) Major projects commissioned in the state sector in 2007-08 and 2008-09 include: Guru Har Govind (Lehra Mohabat) TPS-II project in • Rayalaseema TPS-II (unit 4) in Andhra Pradesh Punjab (thermal based, 250 MW) (thermal based, 210 MW) • Dholpur CCPP (ph 1) (unit GT 2 and ST) in • Bellary TPP (unit 1) in Karnataka (thermal based, Rajasthan (thermal based, 110MW each) 500MW) • Yamuna Nagar TPP in Haryana (thermal based, 300 • Priyadarshni Jurala in Andhra Pradesh (hydro based, MW) 39 MW) • Maneri Bhali-II (unit 1, 2,3 and 4) in Uttrakhand • Santadih unit 5 in West Bengal (thermal based, 250 (hydro based, 76 MW each) MW) • Korba East TPP (unit 1 and 2) in Chhattisgarh • Sagardighi TPP unit 1 in West Bengal (thermal (thermal based, 250MW each) based, 300 MW) • Dhuvaran CCPP Extn. (Unit ST) in Gujarat (thermal • Dugapur TPS Extn unit 7 in West Bengal (thermal based 40 MW) based, 300 MW) • Paras TPS Extension (unit 1) in Maharashtra (thermal • Bakreshwar TPS-II unit 4 in West Bengal (thermal based, 250MW) based, 210 MW) • Sanjay Gandhi (Birsinghpur) TPP Extension ST III • Purulia PSS unit (1,2,3 and 4) in West Bengal (hydro (unit 5) in Madhya Pradesh (thermal based, 500 MW) based, 225 MW each) ~8~
  • 9. Balimela-II Extn unit 7 and 8 in Orissa (hydro based, • Valuthur CCPP Extn unit GT in Tamil Nadu (thermal 75 MW each) based, 59.8 MW) • GHT (Lehra Mohabbat) TPS-II in Punjab (thermal • Priyadarshini Jurala unit 2 in Andhra Pradesh (hydro based, 250 MW) based, 39 MW) • Baglihar HEP unit 1,2 and 3 in Jammu and Kashmir • Varahi Extn unit 1 in Karnataka (hydro based, 115 (hydro based, 150 MW each) MW) • Amarkantak TPS Extn unit 5 in Madhya Pradesh • Sagardighi TPP unit 2 in West Bengal (thermal (thermal based, 210 MW) based, 300 MW) • Ghatghar PSS unit 1 and 2 in Maharashtra (hydro based, 125 MW each) Major projects commissioned in the private sector in 2007-08 and 2008-09 include: OP Jindal (Raigarh) TPP phase I and II (unit 1, 2, 3 and 4) in Chhattisgarh (thermal based, 250 MW each) • Torrent Power has synchronized Sugen CCPP block 1 in Gujarat of 376 MW • Tata power has synchronized Trombay TPS unit 8 in Maharashtra of 250 MW The total installed capacity in India rose from 89,103 MW in 1997-98 to 147,965 MW by the end of 2008-09. In addition, around 19,509 MW of captive power capacity is connected to the grid (as on March 2007). Despite the rise in installed capacity, there has been a significant shortfall in capacity additions when compared to the targets set over the last 10 years. This shortfall is the result of the absence of significant capacity additions by the states and the private sector, which can be attributed to the poor financial health of SEBs and private generators unable to achieve financial closure owing to inadequate payment security mechanisms. Most of the projects in the private sector have been delayed owing to expensive fuel costs (leading to unviable tariffs), delay in obtaining clearance from the CEA and Ministry of Environment and Forest (MoE&F), signing of power purchase agreements (PPAs) and roadblocks in achieving fuel linkage. Over the past 11 years, there has been a marginal shift in the fuel mix. The thermal-hydel mix changed from 72:25 in 1997-98 to 63:25 in 2008-09. The share of thermal plants fell on the back of increase in the share of renewable energy-based plants over the past decade. The share of nuclear power plants in the overall installed capacity, though, continues to remain low. ~9~
  • 10. Power - Installed capacity by ownership Source: CEA, CRISIL Research Annual capacity additions Source: CEA, CRISIL Research Plan-wise capacity additions Source: CEA, CRISIL Research ~ 10 ~
  • 11. Power Generation Power generation increased by 3 per cent, from 699.1 billion kWh in 2007-08 to 723.5 billion kWh in 2008-09. Between 1998-99 and 2008-09, it increased at a CAGR of 4.9 per cent, from 448 billion kWh to 724 billion kWh. The PLF of thermal power plants rose from 64.6 per cent in 1998-99 to 77.19 in 2008-09. The PLF of Indian plants is lower than that of their international counterparts on account of old plants, inadequate maintenance, poor quality, unsatisfactory transmission infrastructure and no means of assured fuel supply. Average PLF Source: Planning Commission, CEA Emerging technologies Coal-based Conventional coal-based plants have two major drawbacks - low overall efficiency levels and high pollution levels. As a result, technological research has focused on the development of non-polluting technologies using coal. The most popular of these technologies are fluidized bed combustion (FBC) and integrated gasification combined cycle (IGCC). Fluidized bed combustion In FBC, air is blown at high pressure through finely ground coal. The particles mix with the air and form a floating or fluidized bed. This bed acts like a fluid in which the constituent particles collide with one another. The bed contains around 5 per cent coal (or fuel) and 95 per cent of inert material (such as ash or sand). ~ 11 ~
  • 12. The temperature in a FBC is 800-900 C, compared with 1,300-1,500C in pulverized coal combustion (PCC). The lower temperature helps in minimizing the production of nitrous oxide. Furthermore, most of the sulphur dioxide formed can also be absorbed with the help of absorbents like limestone. The other advantages of FBC technology are its compact nature, ability to burn low calorific value coal (up to 1,800 kcal per kg) and produce less erosive ash. FBC-based plants also have lower capital costs (8-15 per cent lower) as compared to PCC-based plants. At present, the only constraint in using this technology is its small size. While the maximum size of a PCC-based power plant unit could be around 1,500 MW, FBC plants have a maximum unit size of only 250 MW. Integrated gasification combined cycle IGCC technology is used to enhance the thermal efficiency of coal-based power plants and reduce emissions. In IGCC plants, the coal is gasified using a gasifier. The gaseous coal is purified to remove pollutants such as sulphur. The purified coal is subsequently burnt to generate hot gases, which are used to run a gas turbine. The exhaust gases, containing waste heat, are used to boil water and generate steam. The steam is used to run a steam turbine. IGCC technology can deliver thermal efficiency of up to 48-50 per cent. In addition, it can be used with other heavy fuels such as refinery residues and petroleum coke. IGCC technology is also environment friendly, as pollutants such as sulphur dioxide and oxides of nitrogen, are reduced to very low levels. However, the cost of IGCC plants is higher than conventional plants. Nuclear Power Nuclear power plants reduce carbon dioxide emissions. However, safety concerns abound, particularly those relating to exposure to harmful nuclear radiations. In addition, the cost of a nuclear plant is around three times higher than that of a gas-based plant. However, new technologies are being developed to address some of the safety issues associated with nuclear power plants. Pebble bed modular reactor The pebble bed modular reactor (PBMR)differs from a conventional ‗light water‘ reactor as it utilizes no fuel rods and cooling water. The fuel comprises nearly 15,000 small carbon and ceramic-coated specks of uranium that are pressed into a small pebble. The pebble is coated with a layer of graphite. Inside the pebble, uranium undergoes fission and releases heat. However, the graphite layer traps the radioactivity. Around 300,000 pebbles are kept in a reactor, which is cooled by a flow of helium gas. The helium gas expands due to the heat and spins an electricity generating turbine. However, since helium is chemically and radiologically inert, it does not become radioactive as it circulates through the pebble bed. ~ 12 ~
  • 13. One of the main advantages of PBMR technology is that relatively small units producing 100-150 MW of power can use it. In addition, the core of the reactor does not melt even at high temperatures, as the operating temperature continues to remain below the melting point of the ceramic pebbles that contain the fuel. This helps prevent safety hazards. Distributed generation In distributed generation, small generators are located near the consumer site, within the distribution system. Distributed gencos are not directly connected to the transmission grid. Considering the technological improvements and reduction in the costs of small generators, the amount of power consumption through distributed generation is expected to rise in the future. Comparison of different modes of generation: Type of Generation Advantages Disadvantages Thermal Power Plants Low cost of generation Long gestation period Abundant availability of coal. Emissions of carbon dioxide and oxides of sulphur Lack of flexibility in operation. Hydro Electric Plants Low operating costs Long gestation period The absence of emissions Economic and social costs associated with Flexibility of operations the rehabilitation and resettlement of the population affected by the submergence of land Submergence of forests and loss of marine life due to large water reservoirs Possibility of inducing earthquakes Nuclear Power Plants Do not emit gases or particulate matter Maintenance of high safety standards for Low cost of generation eliminating the possibility of nuclear hazards High capital costs and long gestation period Diesel Generation Sets Short gestation period High efficiency in varying load conditions Flexibility to use fuels such as HSD, LDO, LSHS and FO Modular installation (possible to add ~ 13 ~
  • 14. more units). ~ 14 ~
  • 15. Resources In India, power generation is largely dependent on coal, gas, nuclear and hydroelectric sources. Non- conventional sources of energy such as wind and solar energy, account for a small share of the total installed capacity. Fuel oil and diesel are largely used in captive power plants. Coal In India, the proportion of coal-based capacity has increased significantly over the years. According to the Geological Survey of India, in January 2008, the total coal reserves in India were estimated at around 257 billion tonnes (including the non-recoverable reserves under riverbeds or urban areas). Out of this, proven reserves stood at 99 billion tonnes, while indicated reserves were 121 billion tonnes, the rest being accounted by inferred reserves. In India, the majority of coal reserves are concentrated in the eastern and south eastern regions. Jharkhand, Orissa, Madhya Pradesh, Chhattisgarh, West Bengal and Andhra Pradesh account for around 95 per cent of the country‘s total coal reserves. The power generation sector is the largest end-user of coal in India. In 2007-08, it made up for almost 71 per cent of total coal consumption. In February 1997, the Central government allowed private sector companies to mine coal for captive consumption; and for supply and distribution. In the past, only Coal India Ltd (CIL), a public sector company, could undertake commercial mining and supply of coal. CIL is organized into several regional subsidiaries, which mine coal in their respective regions. Till March 1996, prices of all grades of coal were regulated. However, in April 1996, the prices of A, B and C grades were deregulated. In February 1997, the price of D grade coal was also deregulated. During 1990-2000, the average pithead price of coal increased at a CAGR of 11 per cent. In June 2004, CIL increased the pithead price of coal by 14-16 per cent. Prices were revised again in December 2007 - there was a 10 per cent increase by CIL and its subsidiaries, and by 15 per cent increase by North Eastern Coal Fields Ltd. Even if prices rose further, it will not have any impact on the power sector, as all PPAs have a fuel cost passage clause. In view of high ash content of Indian coal, the MoE&F has stipulated that all future power plants (situated 1,000 kms away from the pit-head) should be based on washed coal. But, the existing washery capacity in India is not adequate to meet the requirements of the power sector. In ~ 15 ~
  • 16. addition, CIL does not have adequate funds to invest in coal washeries. However, the private sector has undertaken some initiatives for setting up coal washeries with foreign participation as well as in collaboration with CIL. Natural Gas Natural gas-based power generation capacity (including naphtha-based capacity) accounted for around 10 per cent of the total installed capacity as of March 2009. Further, of the total natural gas produced in India, 35 per cent is sourced to generate electricity and 29 per cent to produce fertilizers. At the end of 2007, the proven and recoverable reserves of natural gas in India were estimated at 1,055 billion cubic meters (bcm). Around 40 per cent of the gas reserves are located off the western coast, in the Bombay High and the Hazira fields. In 2007-08, the gross production of natural gas was around 32.3 bcm. In the past, a large portion of gas production was flared or re-injected due to inadequate evacuation infrastructure. The Hazira-Vijaipur-Jagdishpur (HVJ) pipeline evacuates about 40 per cent of the gas produced in India. Most of the fertilizers, petrochemicals and power plants based on natural gas are located along this pipeline. The consumption of natural gas for power generation and other end uses (like fertilizers) is expected to increase significantly over the next 5-10 years, as natural gas is an environment friendly and economic fuel. In India, the consumption of natural gas was 114.2 mmscmd in 2007-08. However, the unmet demand continued to be around 20 mmscmd. At the current rate of production, the known and recoverable gas reserves of India are expected to last for around 30 years. In order to supplement domestic supply, India is expected to import natural gas, either through pipelines or as liquefied natural gas (LNG). Hence, substantial investments will be required in receiving terminals, regasification plants and cryogenic shipping vessels to import LNG. Additional investments are also required in pipelines for the inland distribution of natural gas. New domestic supply of natural gas has commenced from Reliance Industries Ltd (RIL)‘s KG Basin block. It is currently producing 40 mmscmd of gas, and is expected to ramp this up to 80 mmscmd of gas by December 2009. Also, discoveries of large natural gas reserves in Myanmar have prompted several multinational companies to propose construction of pipelines to transport the surplus natural gas to eastern and northern India. In addition, there are proposals to lay pipelines from West Asia to India ~ 16 ~
  • 17. (Afghanistan-Pakistan-India). The proposed pipelines include an onshore pipeline from Iran-Pakistan- India and a submarine pipeline from Oman. However, neither proposal has progressed due to unresolved political and economic issues. DEMAND - SUPPLY Demand for power registered at a CAGR of around 6 per cent from 1998-99 to 2008-09. Further, there has been a sectoral shift in demand for electricity. The share of the industrial sector declined steadily till 2001-02, and then started rising at a flat rate. The share of industrial demand has increased from 25 per cent in 2002-03 to 37 per cent in 2006-07. The agricultural consumption, after peaking at 31 per cent in 1998-99, declined to 22 per cent in 2006-07. Conversely, domestic demand rose steadily, from 20 per cent in 1996-97 to 24 per cent in 2006-07. As per the forecast of the Seventeenth Electric Power Survey (EPS), energy demand will increase at a CAGR of 8.4 per cent to 969 billion kWh during the Eleventh Five-Year Plan period (2007-2012). Peak demand is projected to register a CAGR of 12.3 per cent to 167,054 MW. The government has revised the capacity addition target to 78,700 MW from 78,577 MW for the Eleventh Plan. However, in the first 2 years of the Eleventh Plan only 12,716.70 MW of capacity has been added as against the target of 27,396 MW. This is because only 9,263 MW against the target of 16,335 MW was added in 2007-08. In 2008-09, the target fell short by 69 per cent due to delays in the supply of critical components of thermal projects and non-availability of fuel. Therefore, in 2008-09, only 3,453.70 MW was added against the target of 11,061 MW. Taking these factors into account, CRISIL Research estimates that only around 44,846 MW of capacities will be added during the Eleventh Plan period. The central sector is expected to account for a major portion of the capacity additions (37 per cent), followed by the state sector (35 per cent) and the private sector (28 per cent), respectively. Sectoral demand The pattern of electricity consumption in the various sectors has changed considerably over the years. During 1996-97 to 2006-07, electricity consumption in the agricultural, commercial, industrial and domestic sectors increased at a CAGR of 4.9 per cent. ~ 17 ~
  • 18. Agricultural sector: The agricultural sector had a very low share of power consumption during the early 1970s. However, stress on rural electrification led to an increase in power consumption from 10-15 per cent in 1970 to 31 per cent in 1998-99. But low tariffs and lack of proper metering resulted in under- recoveries and inefficient utilization of power in this sector, which led to the sector‘s share in power consumption declining to 22 per cent 2006-07. Industrial sector: Electricity consumption in the industrial sector increased at a CAGR of 5.1 per cent from 1996-97 to 2006-07. However, the share of the industrial sector in total electricity consumption fell from 37.2 per cent in 1996-97 to 30.2 per cent in 2001-02; but with the opening up of the power sector, it gradually rose to 37.6 per cent in 2006-07. In view of the continuous uptrend in industrial electricity tariffs, power-intensive industries find it economical to set up captive power plants, especially through co-generation. Further, irregular power supply and increasing shutdowns caused by power shortages, has forced players to rely on captive power facilities. Domestic sector: In the domestic sector, electricity consumption grew at a CAGR of 7.2 per cent from 1996-97 to 2006-07. The share of the domestic sector in total electricity consumption went up from 19.7 per cent in 1996-97 to 24.4 per cent in 2006-07, driven mainly by urbanization and the increasing usage of household appliances (geysers, air-conditioners, etc). ~ 18 ~
  • 19. Power - Category-wise consumption Source: Central Electricity Authority (CEA) Power - Demand and supply, Source: Ministry of Power, CEA ELECTRICITY DEMAND FORECAST Electric power surveys: The CEA constitutes a committee every 4-5 years that carries out a comprehensive survey of various consumer segments for estimating the demand for power. The committee publishes the EPS, which provides state-wise demand forecasts, both in terms of energy and peak power requirements, for a 15-year period. It also provides a sector-wise estimate of energy demand for a 5-year period. The consumer segments taken into account by the EPS are: • Domestic • Commercial ~ 19 ~
  • 20. Agricultural • Public lighting • Industrial [low tension (LT) and high • Public waterworks tension (HT), separately] • Non-industrial bulk consumers • Railway traction Power - Demand project ions Note: Figures are based on the 17th Electric Power Survey (EPS), published in February 2007. Source: CEA Elasticity of electricity consumption with respect to GDP growth Electricity consumption is strongly related to the level of economic activity. However, over the past 25 years the elasticity of electricity consumption vis-à-vis the gross domestic product (GDP) has been gradually declining. This decline is likely to continue, owing to: • An increase in the share of the services sector (about 56 per cent in 2007-08, compared to less than 30 per cent in 1990-91). • Efforts by industries to improve energy efficiency (to enhance competitiveness) through more efficient technologies and energy audits. • Greater reliance on captive power plants by power-intensive industries due to the high tariffs charged by SEBs and poor quality of grid power. The average annual GDP growth rate (at constant prices) during the Eighth, Ninth and Tenth Plan periods was 5.9 per cent, 5.5 per cent and around 7.7 per cent, respectively. The annual growth in electricity generation during these periods was 7.2 per cent, 5.7 per cent, and 4.4 per cent, respectively. ~ 20 ~
  • 21. Elasticity of electricity generation with respect to GDP is the percentage change in generation corresponding to a 1 per cent change in GDP. The elasticity of electricity generation (not including captive generation) with respect to GDP has fallen from around 1.47 during the Sixth Plan period to around 0.60 during the Tenth Plan period. This implies that energy usage in the economy has declined, partially due to a rise in the share of the services sector (which is less energy-intensive as compared with the industrial sector) in the GDP and partially due to an improvement in energy efficiency. ~ 21 ~
  • 22. TRANSMISSION Review The transmission segment plays a key role in transmitting power continuously to various distribution entities across the country. Further, the transmission sector needs concomitant capacity additions in line with the generation capacity additions to enable seamless flow of power. The government‘s focus on providing electricity to rural areas has led to the power T&D system being extended to remote villages. The total length of transmission lines in the country has increased from 2.50 million circuit kilometers (ckm) in 1980-81 to 6.94 million ckm in 2006-07. Power-Transmission Lines The decline in 2003-04 is due to reconciliation in data done by the Data Supplying Organization in 33/22 kV, 15/11 kV and in distribution lines up to 500 volts. Source: CEA Transmission line addition (April 2008 to Substation addition (April 2008 to March March 2009) Source: CEA 2009) Source: CEA ~ 22 ~
  • 23. Overview and Structure A reliable T&D system is important for the proper and efficient transfer of power from generating stations to load centers. A T&D system comprises transmission lines, substations, switching stations, transformers and distribution lines. In order to ensure reliable supply of power and optimal utilization of generating capacity, a T&D system is organized in a grid, which interconnects various generating stations and load centers. This ensures uninterrupted power supply to a load centre, even if there is a failure at the local generating station or a maintenance shutdown. In addition, power can be transmitted through an alternate route if a particular section of the transmission line is unavailable. In India, the T&D system is a three-tier structure comprising distribution networks, state grids and regional grids. These distribution networks and state grids are primarily owned and operated by the respective SEBs or state governments (through state electricity departments). Most inter-state transmission links are owned and operated by PGCIL, with some jointly owned by the SEBs concerned. In addition, PGCIL owns and operates a number of inter-regional transmission lines (part of the national grid) to facilitate the transfer of power from a surplus region to one with deficit. The transmission capacity added, over the years, has been lower than the generation capacity addition. This is also seen by lower investments in T&D compared to generation. Globally, every rupee invested in generation has an equal amount invested in T&D, however in India, every rupee invested in generation has a corresponding 50 paisa invested in T&D. This has also resulted into excess loading of transmission lines at around 90 per cent. The transmission capacity added as a part of the national grid in the previous year has been at a brisk pace of 5,550 MW from December 2006 to December 2007. This has been in line with the target of 37,150 MW to be added by the end of Eleventh Plan. The current inter-regional capacity stands at 17,000 MW (as on December 2007). ~ 23 ~
  • 24. Transmission lines Source: Ministry of Power &CRISIL Research The transmission system in India operates at several voltage levels: • Extra high voltage (EHV): 765 kV, 400 kV and 220 kV • High voltage: 132 kV and 66 kV • Medium voltage: 33 kV, 11 kV, 6.6 kV and 3.3 kV • Low voltage: 1.1 kV, 220 volts and below Transmission and sub-transmission systems supply power to the distribution system, which, in turn, supply power to end consumers. In order to facilitate the transfer of power between neighbouring states, state grids are inter-connected through high-voltage transmission links to form a regional grid. There are five regional grids: •Northern region: Delhi, Haryana, Himachal Pradesh, Jammu and Kashmir, Punjab, Rajasthan, Uttaranchal and Uttar Pradesh •Eastern region: Bihar, Jharkhand, Orissa, Sikkim and West Bengal •Western region: Dadra and Nagar Haveli, Daman and Diu, Chhattisgarh, Goa, Gujarat, Madhya Pradesh, and Maharashtra •Southern region: Andhra Pradesh, Karnataka, Kerala, Pondicherry and Tamil Nadu •North-eastern region: Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland and Tripura ~ 24 ~
  • 25. As peak demand for power does not take place at the same time in all states, it results in a surplus in one state and deficit in another. Regional or inter-state grids facilitate the transfer of power from a surplus region to the one facing a deficit. These regional grids also facilitate the optimal scheduling of maintenance outages and better coordination between power plants. These regional grids will be gradually integrated to form a national grid, whereby power from a surplus region can be transferred to another, resulting in the optimal utilization of generating capacity. For instance, the eastern region has some surplus power, which is transferred to the western and northern regions as the two regions have deficit scenarios. National grid In order to optimize the utilization of generation capacity through the exchange of power between the surplus and deficit regions, and exploit the uneven distribution of hydroelectric potential across various regions, the Central government in 1981 approved a plan for setting up a national grid. The plan envisaged setting up high-voltage transmission links across various regions in order to enable the transfer of power from surplus to deficit regions. The advantages of a national grid system are: A flatter demand curve (or a higher system load factor) on account of the exchange of power between regions, resulting in a better PLF and more economical operations; Lower investments required for new generation capacities (a full-scale national grid is expected to reduce the need for new capacities by up to 10,000 MW in the next 10 years.); Better scheduling of planned outages of power plants; and Improved stability of the grid, as the share of an individual generating station in the total capacity declines with greater integration of the power system. The process of setting up the national grid was initiated with the formation of the central sector power generating and transmission companies - National Thermal Power Corporation (NTPC), National Hydroelectric Power Corporation (NHPC) and PGCIL. PGCIL was given the responsibility for planning, constructing, operating and maintaining all inter-regional links and taking care of the integrated operations of the national and regional grids. A national grid would enable optimal utilization of energy resources by facilitating a uniform thermal-hydel mix among various regions. From a regional perspective, the exploitation of ~ 25 ~
  • 26. thermal and hydroelectric resources may not be economically viable in some cases, although it may be so from a national perspective. For instance, Arunachal Pradesh had a hydroelectric potential of around 50,000 MW. (The hydro potential available in Arunachal Pradesh is the highest in the country.) However, of this, only 400 MW has been developed and a further 3,000 MW is under development by NHPC and NEEPCO. Another 23,000 MW of capacities are being planned by various central and private sector players. However, in terms of installed capacity, 95 per cent of the potential is yet to be developed. The hydroelectric potential of the north-eastern region and eastern region is around 60,000 MW and 10,000 MW, respectively. Hence, with the integration of the eastern and north-eastern regions, the hydroelectric potential of the north-eastern region can be used to meet the peak demand of the eastern region. Setting up a national grid requires the gradual strengthening and improvement of regional grids, and their progressive integration through extra high voltage (EHV) and HVDC transmission lines. Coordination among the states within a region and among the various regions is critical for the operation of the national grid. This would require an efficient and reliable communication system, comprising microwave links and dedicated data/voice transmission lines between the load dispatch centers and generating stations. In addition, synchronization of frequencies is required to integrate regional grids. In the case of a difference in frequencies, HVDC transmission would be effective in integrating the grids through an asynchronous link. Although some inter-regional links are operational, these do not have adequate capacity to transmit bulk power, and are often loaded to capacity. The national grid, when fully operational (likely by around 2012), is expected to have a total inter-regional transmission capacity of 37,150 MW. Major milestones in national grid Source: CRISIL Research ~ 26 ~
  • 27. Power - Inter-regional power capacity Source: PGCIL Inter-regional capacity (till December 2007 17,000 MW) Source: Working Committee Report and CRISIL Research Expected Inter-regional capacity by 2011-12 (37,150 MW) Source: Working Committee Report and CRISIL Research Grid discipline Several problems related to the integrated operations of regional grids can be attributed to the lack of discipline among grid constituents. Grid discipline involves maintaining the grid frequency within ~ 27 ~
  • 28. tolerance limits (49.2-50.3 Hz) and complying with the directions of the Regional Load Despatch Centers (RLDCs), with respect to load despatch and drawing of power. There have been several instances of grid collapse after constituent states drew excess power or because there were fluctuations in the grid frequency. Under the Electricity (Supply) Act, SEBs are expected to comply with the directions of RLDCs to ensure the integrated operation of regional grids. However, in the absence of adequate incentives and disincentives, RLDCs are unable to enforce the directives. Further, load management, through load shedding or backing down by each of the constituents, is an important aspect of the operation of a grid system. Inadequate load dispatch and communication facilities often result in lack of co-ordination with respect to the scheduling of load and generation between states. In 1999, the CERC drafted the Indian Grid Code, which, along with the incentives and disincentives notified under the Availability-Based Tariff (ABT) Order, is expected to induce better grid discipline among the various grid constituents. Unscheduled interchange (UI) charges are levied on defaulting entities which overdraw/under draw from the grid and disturb the grid balance. Previously, the UI charges had been escalated up to Rs 10 per unit of excess capacity drawn. However, recently the CERC in order to improve the grid stability reduced the band (i.e. From 50.5-49.0 Hz to 50.3-49.2 Hz), and charges to Rs 7.3 per unit of excess units drawn. Private investments in transmission In 1998, the Central government enacted the Electricity Laws (Amendment) Act, which recognized transmission as an independent activity (distinct from generation and distribution), and allowed private investments in the sector. According to the government policy, the STUs, SEBs or their successor entities and the central transmission utility (CTU) PGCIL will identify transmission projects for the intra-state and inter- state/inter-regional transmission of power, respectively. ~ 28 ~
  • 29. The STUs and CTU will invite private companies to implement these projects through an independent private transmission company (IPTC) or on a JV basis. The IPTC would be selected through an international competitive bidding process. The primary criteria for selection would be the quoted transmission service charges (TSC) and the technical, managerial and financial capabilities of the bidders. In the case of JV companies, the CTU and STUs could own an equity stake of up to 26 per cent. JV partners could also be selected on the basis of an international competitive bidding process. Further, the primary selection criteria would be the technical and financial strength of the bidders. Transmission service charges would be determined on a cost plus basis under the supervision of the CERC or SERCs. The IPTC‘s role will be limited to the construction, ownership and maintenance of transmission lines. Operations of the grid, including load dispatch, scheduling and monitoring, will be undertaken by the STUs and the CTU at the intra-state and inter-state/inter-regional level, respectively. The CTU and STUs will be involved in the development phase for obtaining project approvals and various regulatory and statutory clearances (such as environment and forest clearance and securing right-of- way), and will transfer the same to the selected private companies. Technology in transmission HVDC transmission One of the pre-requisites for integrating grids is to synchronies their frequencies. In India, synchronous integration of regional grids was not possible due to variations in frequencies and voltages. Therefore, the most viable alternative is the asynchronous transfer of power through HVDC transmission links. Advantages of HVDC transmission Cost consideration: DC conductors cost less than AC conductors, as DC transmission requires smaller conductors for carrying the same load of power. In addition, only two conductors are required for DC transmission, while AC transmission requires three. However, the cost of HVDC terminals is higher than that of AC substations. Hence, for a given load of power to be transferred, there is a break-even distance, beyond which, DC transmission would be more economical (approximately 600 km for 500 MW). ~ 29 ~
  • 30. Maintaining independence of the systems: Impact on a system (due to disturbances in the other) is eliminated due to asynchronous linking. Right of way: For an equivalent load of power transferred, HVDC transmission requires lesser right of way compared with AC lines, as each HVDC line can transmit a higher quantum of power. Transmission cost structure Capital costs The capital costs of the transmission line network have a significant impact on transmission tariffs. Capital costs depend on: Configuration of the line :The configuration of the transmission line, in terms of voltage levels (220 kV, 400 kV, 765 kV etc), mode of transmission (AC or HVDC) and other parameters (single circuit or double circuit) have an impact on the overall capital cost per km. Although the capital cost of transmission projects can vary significantly, the average estimated costs per km for different configurations are: Transmission lines 220 kV double circuit: Rs 5.0-6.0 million per ckm 400 kV single circuit: Rs 7.5-8.0 million per ckm 400 kV double circuit: Rs 11.0-11.5 million per ckm 765 kV single circuit: Rs 15.0-16.0 million per ckm Transmission system components Source: CRISIL Research ~ 30 ~
  • 31. Cost of setting up a transmission line Source: Industry publication DISTRIBUTION Distribution is the last and critical leg in the supply of electricity, reaching end consumers such as residential, commercial, agricultural and industrial segments. Distribution has several components such as pricing to various customers, cross subsidization etc. However, as this is a lucrative business, it has been held by the respective state entities, with private participation being marginal (only 5-7 per cent of the total). Further, issues is distribution vary from T&D losses to rural electrification etc. The government has begun a number of initiatives to improve the electricity supply to villages. As part of its initiatives, the power distribution system has been extended to reach remote villages. At the end of 2008-09, a total of 488,926 villages were electrified. However, T&D losses in the country remain high at around 28 per cent, compared to an average 10-15 per cent in developed countries. This is because of inadequate metering and theft of electricity. (The difference in the amount of electricity supplied and the amount actually metered is usually reported as T&D losses.) High T&D losses are also attributed to the T&D of a large amount of power at low voltage - the rise in rural electrification has resulted in the proliferation of low voltage (less than 11 kV) transmission lines. T&D losses rose from 22.27 per cent in 1995-96 to an estimated 26.91 per cent in 2007-08. The losses peaked at 33.98 per cent in 2001-02, but since have registered a declining trend. ~ 31 ~
  • 32. Power: T&D losses P: Projected; E: Estimate Source: CEA Tariffs and financial performance of SEBs In India, average electricity tariffs are lower than the average cost of supply (cost of generation plus T&D costs). The gap between average tariff and average cost of supply has increased from 36 paisa per kWh in 2005-06 to 49 paisa per kWh in 2006-07. The main reason for this has been the annual losses of all SEBs which have been increasing continuously - the commercial losses of all SEBs have gone up from over Rs 40 billion in 1991-92 to Rs 257 billion in 2006-07. Power: Costs and tariffs Source: Planning Commission T&D losses T&D losses can be classified into two main categories: Technical losses ~ 32 ~
  • 33. The technical component of T&D losses has an inverse relationship with the voltage configuration of the T&D system. Transmission of bulk power of high voltage (400 kV, 220 KV, and 132 kV) over long distances is estimated to result in a loss of 4-5 per cent of the total energy transmitted, while distribution at low voltage levels is estimated to lead to a loss of 15-18 per cent of the total energy transmitted. Commercial losses Commercial losses occur due to non-metering, non-billing or pilferage of power. These losses can be largely attributed to faulty meters, reading errors, unmetered supply and unauthorized connections. On account of inadequate metering arrangement, it is difficult to estimate the extent of the loss and attribute it to a specific reason. Some of these losses are reported as ‗agricultural consumption‘ since most rural connections are unmetered. In addition, a large proportion of the losses can be attributed to theft through unauthorized connections in both rural and urban areas. Though commercial losses are not completely avoidable, they can be reduced substantially through investments. Reasons for high T&D losses A weak and inadequate T&D system. Large-scale rural electrification programme (due to low voltage distribution lines). Numerous transformation stages: This results in a high component of transformation losses. There are 5-6 transformation stages in the Indian T&D network due to the proliferation of low-voltage consumption. The use of low capacity and inefficient transformers results in higher losses and dis-economies of scale. Improper load management: This overloads transmission lines. Transmission lines should be loaded up to 50-60 per cent of their capacity. However, in India, transmission lines are generally loaded to 90 per cent of their capacity, and often operate on ‗alert condition'. As a result, a small disturbance in a section can cause a cascading grid failure. Pilferage and theft of energy. A reduction in T&D losses by one percentage point is equivalent to the power generated from a 600-700 MW plant. Although the cost of achieving the reduction is difficult to estimate, it would be a fraction of the investment required for setting up a new capacity (around Rs 25 billion). ~ 33 ~
  • 34. Measures to reduce losses Technical losses Technical losses can be reduced by adopting the following measures: Reducing the length of LT lines by relocating distribution substations, installing additional substations and converting LT lines into HT lines. Installing capacitors at suitable locations. Reducing the number of transformation stages and using high-efficiency transformers. Installing time-of-day meters with incentives to promote the usage of off-peak energy, in order to reduce over-loading of T&D lines. Using better equipment such as all aluminum alloy conductors (AAACs); this can reduce heat losses by 8-12 per cent and eliminate magnetic losses. Although AAACs are priced around 10 per cent higher than aluminum conductor steel reinforced (ACSR), their average life is 60-80 years, as compared with around 30 years for ACSR. Installing high-quality energy meters at the premises of all consumers and substations. Commercial losses Commercial losses can be reduced by adopting the following measures: Supplying metered energy to all consumers. Prompt calibration, replacement of faulty meters and using tamper-proof meters. Preventing pilferage through stronger legislation and better enforcement. Privatization Privatization of distribution is generally accepted as the first phase in the reforms and restructuring of the power sector. With private participation in power distribution, significant benefits are expected to accrue, such as: Reduction in T&D losses. Improvement in metering and billing practices. Improvement in revenue collection. ~ 34 ~
  • 35. Distribution reforms To improve distribution, the government formulated the Accelerated Power Development Reform Programme (APDRP).This programme aims to improve the financial viability of state power utilities, reduce aggregate technical and commercial losses to around 10 per cent, improve customer satisfaction, and increase reliability and quality of power supply. The APDRP has two components -investment and incentive components. Under the investment component, the government provides assistance worth 50 per cent of the project cost, of which 25 per cent is a grant and 25 per cent is a loan. The balance 50 per cent has to be arranged by the utilities either through internal resource generation or from financial institutions or from other sources of funds (such as state government, the Rural Electrification Corporation, Life Insurance Corporation, ICICI, SIDBI and market bonds). Special category states such as Jammu and Kashmir, Himachal Pradesh, Uttaranchal and Sikkim receive full assistance from the Central government, out of which 90 per cent is grant and the remaining 10 per cent is loan. Priority is given to projects from those states that have committed to a time-bound programme of reforms as elaborated in the Memorandum of Understanding (MoU) and Memorandum of Agreement (MoA), and are progressing on those commitments. Conditions of the MoU are: • Setting up SERC Filling and implementation of tariff orders • Securitization of CPSUs dues Energy audit at 11 kV level • Metering of all consumers Maintenance of grid discipline Metering of 11 kV feeder Conditions of the MoA are: • Constitution of Distribution Reform Committee at the state level • Identification of nodal officer ~ 35 ~
  • 36. As part of the incentive component, the utilities are rewarded for actual cash loss reductions by waiving half of the cash losses reduced by way of free grant. The cash losses are calculated as the net of subsidy and receivables. Up to March 31, 2008, the funds released under this component were Rs 28.8 billion. The disbursement for 2006-07 and 2007-08 was Rs 10.2 billion and Rs 14.0 billion, respectively. (This includes both the investment and incentive components.) New R-APDRP Till December 2008, the Government of India had sanctioned 571 projects, amounting to Rs 170.33 billion to strengthen and upgrade sub-transmission and distribution systems of the various states. The states have so far utilized Rs 126.07 billion. An amount of Rs 28.79 billion has also been released to nine states for achieving reduction in cash losses under the incentive component of the programme. As per the new APDRP policy, projects under the scheme shall be taken up in two parts: Part-A includes the projects for establishing baseline data and IT applications for energy accounting/auditing and IT-based consumer service centers. Part-B includes the regular distribution strengthening projects REFORMS IN THE POWER SECTOR Pre Reform Stage Confronted with unprecedented economic crisis in 1991, Government of India embarked upon a massive cleanup exercise encompassing all policies having financial involvement of Governments- both at the level of Union and States. Since after Electricity (supply) Act 1948, the power sector was mainly under the government control which owned 95 % of distribution and around 98% of generation through states' and central government utilities, the power sector was chiefly funded by support from government budgets in the form of long term, concessional interest loans. These utilities were made to carry forward the political agenda of the ruling parties of the day and the cross- subsidization i.e. charging industrial and commercial consumers above the cost of supply and to charge agricultural and domestic consumers below cost of supply was an integral part of the functioning of the utilities. ~ 36 ~
  • 37. POWER SECTOR REFORMS YEAR MAJOR DEVELOPMENTS 1991 The Electricity Laws (Amendment) Act, 1991--Notification. Amends the Indian Electricity Act, 1910 and the Electricity (Supply) Act, 1948 by Private Sector allowed to establish generation projects of all types (except nuclear) 100% foreign investment & ownership allowed New pricing structure for sales to SEBs. 5 Year Tax holiday; import duties slashed on power projects 1992 Intensive wooing of foreign investors in US, Europe & Japan 1992-97 8 projects given "fast-track" status. Sovereign guarantees from Central Government. Seven reached financial closure Dabhol (Enron), Bhadravati (Ispat), Jegurupadu (GVK), Vishakhapatnam (Hinduja), Ib Valley (AES), Neyveli (CMS),Mangalore (Cogentrix) 1995-96 World Bank Reform Model - First Test Case Orissa Orissa Electricity Reform Act passed Establishment of Orissa Electricity Regulatory Commission SEB unbundled into Orissa Power Generating Company (OPGC), Orissa Hydel Power Corporation (OHPC) and Grid Corporation of Orissa (GRIDCO) Distribution privatized 1996 Chief Ministers Conference: Common Minimum Action Plan for Power: Recommend policy to create CERC and SERCs Licensing, planning and other related functions to be delegated to SERCs. Appeals against orders of SERCs to be in respective High Courts SERC to determine retail tariffs, including wheeling charges etc., which will ensure a minimum overall 3% rate of return. Cross -subsidization between categories of consumers may be allowed by SERCs, but no sector to pay less than 50% of the average cost of supply (cost ~ 37 ~
  • 38. of generation plus transmission and distribution). Tariffs for agricultural sector not to be less than Rs.0.50 Kwh and to be brought to 50% of the average costing not more than three years. Recommendations of SERCs to be mandatory, but financial implications any deviations made by State/UT Government, to be provide for the explicitly in the State budget. Fuel Adjustment Charges (FCA) to be automatically incorporated in the tariff. Package of incentives and disincentives to encourage and facilitate the implementation of tariff rationalization by the States. States to allow maximum possible autonomy to the SEBs, which are to be restructured and corporatized and run on commercial basis. SEBs to professionalize their technical inventory manpower and project management practices. 1997 CEA Clearance exempted for projects under 1000MW but State Government environment clearance required up to 250-500 MW Liquid fuel policy -- naphtha allocations to IPPs 1998 Mega-Power Policy: special incentives for the construction and operation of hydro-electric power plants of at least 500 MW and thermal plants of at least 1,000 MW. - The Electricity Laws (Amendment) Act, 1998 and Electricity Regulatory Commissions Ordinance -- Notification. Creation of Central Transmission Utility STUs to be set up with government companies Establishment of CERC and SERCs Rationalization of electricity tariffs, Policies regarding subsidies Promotion of efficient and environmentally benign policies - Power Grid notified as Central Transmission Utility - Haryana Electricity Reforms Act: HSEB unbundled into Haryana Vidyut Prasaran Nigam Ltd., a Trans Co. ~ 38 ~
  • 39. (HVPNL) and Haryana Power Corporation Ltd. Creation of HERC Two Government owned distribution companies viz. Uttar Haryana Bijli Vitaran Nigam Ltd. (UHBVNL) and Dakshin Haryana Bijli Vitaran Nigam (DHBVNL) have been established. DFID's technical co-operation grant of 15 million pounds available for reforms. 1999 Andhra Pradesh Electricity Reforms Act APSEB unbundled into Andhra Pradesh Generation Company Ltd. (APGENCO) and Andhra Pradesh Transmission Company Ltd. (APTRANSCO for transmission & distribution) Creation of APERC Other Developments: World Bank loan of US $ 210 million under the APL DFID's 28 million pounds as technical co-operation grant. CIDA technical assistance of Canadian $ 4 million. - Karnataka Electricity Reforms Act KEB and KPCL transformed into new companies: Karnataka Power Transmission Corporation Ltd. (KPTCL) and Visvesvaraya Vidyut Nigama Ltd., a GENCO, (VVNL) Creation of KERC Other Developments: KPTCL has carved out five Regional Business Centers (RBC) for five identified zones. 2000 Power Ministers' Conference and Electricity Bill 2000 (draft): Functional disaggregation of generation, transmission and distribution with a view to creating independent profit centres and accountability; Re organization and restructuring of the State Electricity Boards in accordance with the model, phasing and sequencing to be determined by the respective State Governments States to determine the extent, nature and pace of privatization. ~ 39 ~
  • 40. (public sector entities may continue if the States find them sustainable); Transmission to be separated as an independent function for creation of transmission highways that would enable viable public and private investments; Amendments to the Indian Electricity Act, 1910 made in 1998 for facilitating private investment in transmission have been broadly retained except that the private transmission companies would be regulated by the Regulatory Commissions and Transmission Centres inst under the direction, supervision and control of the Central/State Transmission Utilities; Present entitlements of States to cheaper power from existing generating stations to remain undisturbed; Provision of compulsory metering for enhancing accountability and viability; Central and State Electricity Regulatory Commissions to continue broadly on the lines of the Electricity Regulatory Commissions Act, 1998; State Regulatory Commissions enjoined to recognize in their functioning the need for equitable supply of electricity to rural areas and to weaker sections; Stringent provisions to minimize theft and misuse. Source: www.cea.nic.in/power_sec_reports/general_review/0405/index.pdf Electricity Act 2003 An Act to consolidate the laws relating to generation, transmission, distribution, trading and use of electricity and generally for taking measures conducive to development of electricity industry, promoting competition therein, protecting interest of consumers and supply of electricity to all areas, rationalization of electricity tariff, ensuring transparent policies regarding subsidies, promotion of efficient and environmentally benign policies constitution of Central Electricity Authority, Regulatory Commissions and establishment of Appellate Tribunal and for matters connected therewith or incidental thereto. ~ 40 ~
  • 41. Enabled Market Model under EA 2003 Generation Any Company, association or body of individuals (even unincorporated) can generate electricity without requirement of techno-economic clearance of CEA, or approval of State Government or regulator, except in case of hydropower station for which written consent of Central Electricity Authority is required. A Generating Company can supply electricity directly to more than one consumer and is vested with the duty to establish, operate and maintain sub-stations, tie lines etc. Any entity, (company, co-operative society or association of persons) can establish a Captive Generation Plant (CGP) primarily for its own use without any entry barriers. Open access is to be provided to all CGPs. No cross-subsidy surcharge would be levied on the persons who have established CGP for carrying electricity to destination of his own use. Rural Electrification/Generation/Distribution Government of India will have to formulate a National Policy after consulting State Governments & CEA, to govern (i) rural electrification and local distribution through local ~ 41 ~
  • 42. bodies5, and (ii) rural off-grid supply including those based on renewable/nonconventional energy resources. No license is required for generating or distributing in rural areas notified by the State Govt. Licensing Trading has been recognized as a separate licensed activity along with transmission and distribution. However, a license is not required in respect of (i) trading by a distribution licensee, (ii) transmission, distribution or trading by any Govt., as the Govt. would be deemed a licensee. Electricity Regulatory Commission (ERC), on the recommendation of Government, in accordance with the national electricity policy and public interest can exempt any of the local bodies6 from requiring license. Trading and Captive Generation Trading, i.e., purchase of electricity for resale, is a separate licensed activity, except for distribution licensees who do not require a separate trading license. Traders can enter into direct contracts with the consumers and determine its terms and conditions (including tariff). The Appropriate Commission may specify The entry barriers for traders – technical requirements, capital adequacy requirement, and credit-worthiness; Duties re. supply and trading in electricity to be discharged by a trader; and Fix trading margin in intra-state trading if considered necessary. ERCs have to develop trading market and have to be guided by National Tariff Policy. ~ 42 ~
  • 43. Open Access Open access means non-discriminatory use of transmission lines, distribution system and associated facilities by any licensee/consumer/Genco in accordance with ERC regulations. The licensees, consumers and Gencos have to pay transmission/wheeling charges for open access. Consumers has to also pay a surcharge (to be utilized to meet cross subsidy) determined by ERC, for open access. ERC may order any licensee owning intervening transmission facilities to provide use of facilities to any other licensee, to the extent of surplus capacity. A State Transmission Utility is obliged to provide non-discriminatory open access to its transmission system for use by a licensee or Genco forthwith, or by any consumer once distribution level open access has been provided. There is no statutory time limit for introduction of open access. ERC has to determine by June 10, 2004 the phases and conditions, subject to which open access would be introduced. Distribution The distribution licensee has a mandatory duty to supply on request of consumer in a time bound manner if the consumer agrees to pay the applicable tariff. ERC is empowered to suspend or revoke license of a Discom for failure to maintain Uninterrupted supply. Distribution licensee is empowered to recover charges/expenses/security and disconnect supply for non-payment of dues. Discoms can enter into direct contracts with consumers. Discoms can engage in other businesses but have to share revenue to reduce wheeling charges, and maintains separate accounts for the same. ERCs may grant more than one distribution licenses can be issued in a given area, permitting them to supply electricity through their own distribution system. To get a subsequent distribution license any person will have to comply with additional requirements prescribed by GoI regarding capital adequacy, creditworthiness, or Code of Conduct etc. If an applicant meets such requirements, he shall not be denied grant of the license. ~ 43 ~
  • 44. ERCs may permit by regulations a consumer/class to receive supply of electricity from anyone other than the distribution licensee of the area of supply – against payment of wheeling charge & surcharge in lieu of cross subsidy. Distribution licensee is free to undertake distribution for a specified area within his area of supply without need for a separate license. Provided that the distribution licensee shall remain liable for the supply. Transmission To secure non-discriminatory open access, transmission has been segregated as a wires function without any trading (buying and selling). Central transmission utility (CTU) and all State transmission utilities (STUs) are deemed licensee. CTU and STUs functions are (i) Transmission; (ii) planning & co-ordination of transmission system; (iii) development of efficient and economical transmission lines from generating stations to load centers; (iv) providing non-discriminatory open access to the system. RLDCs and SLDCs are empowered to issue directions, and exercise supervision & control to ensure stability, efficiency & economy of grid operation in the region and the State respectively. Licensees, generating companies and other persons connected with operation of power system shall comply. SLDC shall ensure compliance with RLDC directions. Pending creation of separate RLDCs & SLDCs, the CTU and the STU shall perform the role. Tariff Government has been distanced from determination of tariff. This power has been vested in the CERC/SERC. In determination of tariff CERC/SERC shall be guided by factors including National Electricity Policy, tariff policy (formulated by Central Government), CERC‘s principles and methodologies for setting tariff and principles rewarding efficiency and multiyear tariff. In case tariff is determined through transparent bidding as per Government of India guidelines, the same shall be adopted by the ERCs. To promote competition among distribution licensees, where there are 2 or more distribution licensees supplying in an area, the ERC may fix only maximum ceiling of tariff for retail sale. The PPAs/BSAs entered into before 10th June, 2003 have not been explicitly saved or granted a protection from regulatory intervention. ~ 44 ~
  • 45. Regulatory Commission It is mandatory to establish SERCs within 6 months from 10th June, 2003. Joint Commission can be constituted for two or more States or Union territories or both by mutual agreement. The new functions to be performed by CERC/ SERC include specifying Grid Code, Supply Code (only SERC), levy fees, fix trading margins in interstate trading. In exercise of their functions, ERCs shall be guided by – National Electricity Policy, National Electricity Plan & Tariff Policy; directions of GoI/State Government concerned, in matters of policy involving public interest – where such Government‘s decision shall be final as to whether the directions relates to a policy involving public interest. There is no express provision enabling ERCs to depart from such directions. Provision for separate ERC funds (not consolidated funds) for finance of ERC expenditures. Policy Issues Central Government shall prepare, publish and revise National Electricity Policy and Tariff policy in consultation with State Governments and CEA9. The implementation of the Act is largely dependent on the nature and scope of the diverse policy instruments to be issued by Government, and institutions like Special Courts, Appellate Electricity Tribunal, NLDC, RLDC, SLDC, SERCs and SEB successors to be constituted by Government‘s. It is noteworthy that these instruments will have a bearing are:-  Role and functioning of ERCs,  Role and functioning of CEA,  Market development,  Governance of the sector – regulation, grid operations, safety issues, and  Enforcement. Mega Power Policy Eligibility: Inter-state projects of 700 MW (thermal) and 350 MW (hydro) for Jammu & Kashmir and North Eastern states; 1,000 MW (thermal) and 500 MW (hydro) for others. • Exemption from custom duties, excise & central levies. ~ 45 ~
  • 46. • Increased ECB capital limits. • State Implementation support. • Decreased import duty on fuel i.e. coal & liquid fuel • Deemed export benefits to domestic bidders • Price preference to PSU bidders • Preconditions: Purchasing state must have ERC; Must agree in principle to privatize distribution in cities of >10 million population Ultra Mega Power Projects • Nine sites identified; each project size about 4,000 MW; Total estimated investment of Rs 160 billion. • Projects to be completed on built-own-operate (BOO) basis. • Successful bidder finalized on tariff based competitive bidding; takes over SPV from PFC. • PFC is the nodal agency for setting up the special purpose vehicle (SPV) for project (100 per cent subsidiary) • Projects to use supercritical technology based on pithead (captive block) or imported coal (coastal). • Full exemption of central excise duty on goods procured under supercritical technology. • Five coastal sites identified including Mundra in Gujarat awarded to Tata Power. Consumer Interests Creation of a Consumer redressal forum (CRF) by Distribution licensee in a time bound manner. The consumers aggrieved from CRF can approach to an ‗ombudsman‘10. Distribution licensee has to supply electricity within 1 month from the date of request for supply, except where capital works are required for connectivity. Failure of distribution licensee to supply within said time period would attract penalty. ~ 46 ~
  • 47. Enforcements Suitable provisions for provisional assessments and recovery of compensatory fines may be able to address a long-standing vacuum in law. Special Courts are to be established by Government‘s for speedy disposal of cases relating to theft of electricity. The scope of offences has been expanded and enhanced punishments have been prescribed for subsequent or continuing offences. Stronger powers (accompanied with better safeguards) have been provided for conducting inspections/search/seizure. Dispute Resolution The appeal against all orders of ERC/adjudication officer would lie to an expert Appellate Tribunal (an expert body), which shall dispose appeals within prescribed time. Appeal from appellate tribunal lies to Supreme Court. The appeal to Supreme Court is limited to substantial question of law. Electricity (Amendment) Act, 2007. The Electricity (Amendment) Act, 2007, amending certain provisions of the Electricity Act, 2003, has been enacted on 29th May, 2007 and brought into force w.e.f. 15.06.2007. The main features of the amendment Act are: -  Central Government, jointly with State Governments, to endeavor to provide access to electricity to all areas including villages and hamlets through rural electricity infrastructure and electrification of households.  No License required for sale from captive units.  Deletions of the provisions for elimination of cross subsidies. The provisions for reduction of cross subsidies would continue.  Definition of theft expanded to cover use of tampered meters and use for unauthorized purpose. Theft made explicitly cognizable and non-bail able. ~ 47 ~
  • 48. Demand Side Management Demand-side management is used to describe the actions of a utility, beyond the customer's meter, with the objective of altering the end-use of electricity - whether it be to increase demand, decrease it, shift it between high and low peak periods, or manage it when there are intermittent load demands - in the overall interests of reducing utility costs. In other words DSM is the implementation of those measures that help the customers to use electricity more efficiency and it doing so reduce the customers to use the utility costs. DSM can be achieved through.  Improving the efficiency of various end-uses through better housekeeping correcting energy leakages, system conversion losses, etc ;  Developing and promoting energy efficient technologies, and  Demand management through adopting soft options like higher prices during peak hours, concessional rates during off-peak hours seasonal tariffs, interruptible tariffs, etc. DSM, in a wider definition, also includes options such as renewable energy systems, combined heat and power systems, independent power purchase, etc, that utility to meet the customer's ~ 48 ~
  • 49. demand at the lowest possible cost. Often the terms energy efficiency and DSM are used interchangeably. However, it is important to point out that DSM explicitly refers to all those activities that involve deliberate intervention by the utility in the marketplace so as to alter the consumer's load profile. Energy efficiency issued in an all encompassing sense and includes any activity that would directly or indirectly lead to an increase in energy efficiency. To make this distinction precise, a program that encourages customers to install energy efficient lighting systems through a rebate program would fall under DSM. On the other hand, customer purchases of energy efficient lighting as a reaction to the perceived need for conservation is not DSM but energy efficiency gains. There has been growing recognition of the importance of energy efficiency in India's electricity sectors. The Ministry of Power (MoP) is the nodal agency for energy conservation in the country. The Bureau of Energy Efficiency (BEE), an autonomous body under the MoP, was set up in 1989 to coordinate initiatives and activities on energy conservation. Several state electricity boards (SEBs) have also set up Energy Conservation Cells, some of which have been assisting industries in conducting energy audits. Several reports have been attempted to estimate the potential for energy conservation in various consuming sectors and have also identified various Energy Efficiency technologies (EETs) for important end-uses. The National Energy Efficiency Program (NEEP) of the Government of India (GOI) has targeted savings of about 5000 MW to be realized by the end of the Eighth plan through both demand (2750 MW) and supply side (2250 MW) efficiency improvements. In terms of Government policies, there are special equipment in the first year, subsidies for energy audits, reduced customs duty for selected control equipment for managing energy use, and so on. Environmental Reform in the Electricity Sector: Enhanced economic activity and population growth have led to increasing energy demand that in turn has spurred electricity generation. But large-scale electricity generation and distribution have adverse environmental impacts, varying by the technologies employed and their locations. These need to be addressed so that energy services can be enhanced in harmony with the environment, within our ecological footprints. Due to the ―externalities‖ of electricity generation, that is, the negative impacts not directly affecting or being restricted to those involved, the costs ~ 49 ~
  • 50. of impact mitigation are typically not included in electricity prices. Consideration for the environment has therefore to be forced into the reckoning, or preferably integrated into the system, hence the importance of environment policy in the context of the power sector. Focusing on environmental issues and policies applicable to the power sector in China and India. These countries generate 68% of the electricity generated in developing Asia, but with a total population of about 2.4 billion, have large unmet needs. In approaching the problem of environmental protection in the power sector in rapidly developing country, our analytical framework consists of identification of those state environmental policies and regulations that pertain to the power sector, both directly and indirectly, assessment of the barriers encountered, and finally recommendations of likely solutions to circumvent these problems. Let us consider the impacts of electricity generation on the environment. The focus is on to list the national environmental policies that affect these impacts, beginning with general direction, proceeding to specific rules and standards and then to alternatives to conventional electricity generation. This leads to the problems that beset effective policy implementation. ~ 50 ~