SlideShare a Scribd company logo
1 of 28
Download to read offline
Instrumentation with Field Bus Technology:

    Building Foundation to Meet Future
    Challenges




    Jasbir Singh
    Vice President (Instrument)
Field Bus: A Way Forward>>>>
                                               Fieldbus Control System
Conventional System
                       Plant Operation
                                                                      Device Management
                          & Control
                                                                      Diagnostics Server
                                               Automatic
                                               Alarm Notification
                                               from Device


                                                                    BENEFIT FORM FIELD BUS
                                                               New Technology to achieve high
                                                               quality, low cost and expendibilty
                                            Intelligent        Optimize operation by improving
      Control Output
                                              Device
           MV
                                 AI                            control model precision
                                      PID          AI
                                                               Improve process safety / stability by
                                      AO
                                                               more process information
                                                               Predictive maintenance based on
                                   Diag
                                           Full Digital        device diagnose data
                                         Communication         Acquire field information to improve
                                                               process capability


                                                                                       Slide No. 2
Field Bus: A Way Forward>>>>


            Why Field bus ?




              What gain ?


                               Slide No. 3
Field Bus: A Way Forward>>>>
The Business Perspective – How can we
survive in the competitive world………..
                                          Reliable Project
                     Fast Commissioning
                                          Documentation
                       & Startup                              Reduce cost of
                                                                  poor
                                                                 quality
    Increase
    Return on
Capital investment                                           Reduce Maintenance
                                                                  costs

       Low Capital
       Investment                                            Improve predictability



                                                                     Slide No. 4
Field Bus: A Way Forward>>>>

                             Increase ROI


 Reduce Capital                                    Increase Profitability

                                                            Increase Revenue
                        Reduce Costs

                                               Increase Productivity   Reduction of losses

                                                      Increased
      Reduced
                             Reduced                     Yield
  Project Capital
                           Feed stocks                 Product
    Installation &                                                           Reduced
                        Energy and Utilities         Consistency
  Commissioning                                                        Unscheduled Downtime
                           Maintenance               New product
        Cost,                                                             Small stoppages
                              waste               Equipment Capacity
       Spares                                                          Scheduled Shutdowns
                         Abnormal Events           Equip. Efficiency
     Inventory /                                                             Duration
                        Low grade product
  Addition of new                                                           variability
                            Penalties
Device at every point
       of time

                                                                             Slide No. 5
Field Bus: A Way Forward>>>>

 Refineries on FF:

  2.3 million barrel /day      Nanhi
  30,000 FF devices and commissioned in 2005. Field
  bus foundation used for entire plant automation
  TENCO Refinery                     Russia
  45,000 FF devices and commissioned in 2006. Field
  bus foundation used for entire plant automation
  ConocoPhilips YERP Refinery        Saudi Arabia
  25,000 FF devices and commissioned in 2006. Field
  bus foundation used for entire plant automation



                                             Slide No. 6
Field Bus: A Way Forward>>>>

 Refineries on FF:

  Petro Rebigh                   Saudi Arabia
  30,000 FF devices and commissioned in 2006.
  Field bus foundation used for entire plant
  automation
Field Bus: A Way Forward>>>>

 Chevron Refineries under going FF:

  325,000 barrel /day            Mississippi
  300,000 barrel /day            Mississippi
  260,000 barrel /day            California
  225,000 barrel /day            California
  45,000 barrel /day             Salt lake
  52,000 barrel /day             Canada
  210,000 barrel /day            UK
  54,000 barrel /day             Hawaii
  112,000 barrel /day            South Africa
Field Bus: A Way Forward>>>>
Emerson to Digitally Automate China's Largest Integrated
Refining/Petrochemical Facility:
EPM has been selected to digitally automate the Fujian
Refining and Ethylene Joint Venture Project in Quanzhou City,
Fujian Province, China. It is the largest integrated refining and
petrochemicals project ever undertaken in China. Project
startup is expected by 2009.
EPM will serve as the Main Instrument and Controls Contractor
(MICC) on the project, and will install its PlantWeb. The PlantWeb
installation will include eight DeltaV, AMS, safety instrumented
system (SIS), fire and gas systems, Rosemount pressure and
temperature transmitters, plus Fisher digital valve controllers, all
utilizing FOUNDATION fieldbus, HART, OPC and Modbus
communication technologies, and delivering information to a real-
time database.
Field Bus: A Way Forward>>>>
Emerson to Digitally Automate China's Largest Integrated
Refining/Petrochemical Facility:
The project will expand the existing refinery at Quanzhou, Fujian
Province, from 80,000 barrels per day to 240,000 barrels per day.
The upgraded refinery will primarily refine and process sour Arabian
crude. In addition, new petrochemical facilities will be constructed,
including an 800,000 tons-per-year ethylene steam cracker, an
800,000 tons-per-year polyethylene unit, a 400,000 tons-per-year
polypropylene unit, and an aromatics complex to produce
700,000 tons per year of paraxylene. A 300,000-tons crude berth
and associated utilities will also be built.
Field Bus: A Way Forward>>>>
Yokogawa awarded for Package Order to Supply Control
Systems for Petrochemical Complex in Singapore:
Yokogawa has received a package order from Shell Eastern
Petroleum (Pte) Ltd (SEPL) to supply control systems for the
Shell Eastern Petrochemicals Complex (SEPC) in Singapore.
At the SEPC, SEPL is constructing a new petrochemical plant
that will annually produce 800 thousand tons of ethylene and
750 thousand tons of mono-ethylene glycol and upgrading an
existing petroleum refinery with a refining capacity of 500
thousand bpd. Yokogawa shall deliver the control systems using the
latest FOUNDATION fieldbus technology for these upgrade and
expansion projects by December 2008. The delivered systems
will include the CS 3000, ProSafe-RS, Exaquantum (PIMS)
and EJX.
Field Bus: A Way Forward>>>>
Yokogawa awarded as main system supplier for ESSAR refinery
expansion project:
Yokogawa secure the order as Main Automation Contractor &
supplier of DCS, ESD and F&G system for Essar refinery
expansion from 10.5 to 34 MMTPA. Yokogawa shall deliver the
control systems using the latest FOUNDATION field bus technology
for this expansion projects by December 2009. The Overall system
supply will include the CS 3000 VP, Triconex ESD from Invensys,
ProSafe-RS for F&G.
Field Bus: A Way Forward>>>>

Honeywell’s 2007 Users Group Americas Symposium:
The Honeywell 2007 Users' Group Americas Symposium was
held June 10-14th in Phoenix at the Arizona Resort and Spa. A
record attendance of over 1,700 people from around the world
participated in the event that included a general session on
industry innovations and advancements, technology and
solutions update sessions, industry break out sessions, and an
exposition demonstrating key Honeywell products, solutions,
and services. Honeywell is also attracting a lot of recognition
for their innovative highly integrated POMS and Experion PKS
Batch Control System solution for the Pharmaceutical industry.
In ARC’s view, the new system comes closest to meeting a full
implementation of the ISA 88 batch standard.
Field Bus: A Way Forward>>>>

Honeywell secure $ 4.7 million automation project of
cement plant in west Virginia with FF:
• Qatar Shell Improves Efficiency of GTL Plant
Honeywell was selected by Qatar Shell GTL Ltd. to design and
implement the integrated process automation system for the
Pearl Gas to Liquids (GTL) plant. This includes installation
of the Experion Process Knowledge System (PKS) Release
300, with FOUNDATION fieldbus communication, to tie
together all critical subsystems in the plant.
With the integrated automation platform, Qatar Shell GTL Ltd.
will be able to efficiently control GTL operations from
production at the platforms, to processing at the on-shore
plant, to shipping of the finished product.
Field Bus: A Way Forward>>>>

Honeywell Signs MAC Agreement with BP Exploration &
Production:
Honeywell has signed a six-year agreement with BP Exploration to
provide Main Automation Contractor (MAC) services at the oil and gas
leader’s new and existing facilities. Honeywell will help BP Exploration
& Production (E&P) accelerate production schedules and improve
efficiency in these facilities by integrating all levels of plant operations
and automating critical processes.
Honeywell can apply its integrated strategy to each design phase,
including front-end engineering development, early operator training
and process simulation, advanced control modeling, process
validation and advanced process control. This integrated approach
will result in common interfaces across production and business
systems for increased safety and efficiency, higher plant availability,
lower operating expenditures and reduced engineering.
                                                              Slide No. 15
Field Bus: A Way Forward>>>>

INVENSYS IS THE SYSTEM SUUPLIER FOR RELIENCE
REFINERY EXPANSION:
Invensys is the Main automation contractor and system supplier for
upcoming refinery and polypropylene plant. The refinery capacity is doubled
to 62.5 MMTPA with current expansion. This is state of art plant with fully
automated and Foundation Field bus system in most of the control loops.
The plant FF system is commissioned with advance diagnostic module from
MTL. Reliance award Invensys first refinery full automation i.e. DCS,
ESD,TAS,OFFSITES and Field Instruments like Transmitters. Based on past
experience having Invensys system in Old refinery , Reliance extend all the
full automation portfolio of Invensys to new refinery. Reliance uses Invensys
Solutions like Enterprise Control system, Online Optimization package and
their major New project like KGD6 also Invensys solutions are selected.
JERP Expansion total Solution are extended in the same system with all new
technology implemented while maintaining all old Hardware.

.
                                                              Slide No. 16
Field Bus: A Way Forward>>>>

ABB system and Asset Master: a New Comprehensive
Field Device Management and Optimization Solution:
ABB introduced Asset Master, a new software solution that
helps user to meet these objectives, as well as providing
traditional set-up tools for instrumentation configuration and
calibration.
ABB system used state of art plant operation on Profibus
DP for high precision Fibre production in Thailand using
multiple protocol for information exchange with other
systems.
Field Bus: A Way Forward>>>>
                                                                                       MIS / PIM
                      New Extension                                                  ETHERNET

                                                                                        (Existing Plant)
                                         PRM /
                  HIS          HIS                        EWS
                                         AMS
                                                                                        BUS


                                                                 HART


                                                        PROCESS FIELD BUS




        Mod Bus



                                                              OmROn
                            Optic
                            Fibre
                                                                            TCP IP
                                      Touch
                                      Panels
                                         Remote I / O
         Device Net
         Remote I/O


                                                                                            Slide No. 18
Field Bus: A Way Forward>>>>

Reduction in Terminations                          40%
Reduction in I/O Cards                             60%
Reduction in Panel Space                           50%
Reduction in # Transmitters (multi variable)       10%
Reduction in erection hardware                     40%
Reduction in Installation & commissioning time     50%
Reduction in Home run wiring                       40%
Reduction due to remote diagnostics              > 50%
Reduction in time to add new device                70%
Reduction in Calibration time                      70%
Increase in Device cost                            10 %
Field Bus: A Way Forward>>>>

General advantages:
      DESCRIPTION                   ANALOG INSTRUMENTS                FF DEVICES

 Control Valve             3 Hrs.                            15 Min
 calibration

 Transmitter calibration   1.5 Hrs.                          15 Min


 Termination checking      30 min                            5 Min


 Loop Checking             3 ~ 4 Hrs.                        20 Min
 Special tool required     Yes, loop validator, ma source,   From DCS / Hand Held
 for Calibration           hand tools                        communicator

 Device calibration &      Calibration at Field / workshop   On line from HOST (DCS)
 parameterization

 Detection of Defect       Mostly physical inspection at     From DCS Automatically
                           different level is required       Generated

 Maintenance /             To be entered Manually            Automatically captured &
 calibration History                                         stored in DCS

 Skill up Training         No special training               Additional Training needed



                                                                              Slide No. 20
Field Bus: A Way Forward>>>>
Three- Level Diagnostics Module
Three-
                                                  Level 3
- “Abnormality Analysis”
  “Abnormality Analysis”



                            Level 2
                                                            Operations
                                          Drift




                                           Loop
            µP

                               External
                              influence
     Electronics   Sensor
     Defective      Drift




             Device
Field Bus: A Way Forward>>>>
                                                            Level 4      Enterprise 
 Four – Level FF Management Module                                        Network



 - “Abnormality Analysis”
   “Abnormality Analysis”
                                              Level 3



                                                                      Communication
                          Level 2

                                                                      & Networking
                                                 Drift

                                                         Operations
                FF Accessories
Level 1A


                                               Loop

Level 1                       FF Sensors
                 µP
                                   External
                                  influence
                         Sensor
           Electronics
                          Drift
           Defective


                      Device
Field Bus: A Way Forward>>>>
    Valve diagnostics                                     Over a period of time,
                                                          control valve packing
                                                          requires tightening
                                                          depending on the
                                                          packing material and
                                                          wear and tear in order
                           Hunting
                                                          to avoid fugitive
                                                          emissions
                                              e
                                       al u
                                     sv
                     lue      ces
                  va
                           Pro
              t
            Se
                                              Output to valve




                                                            Slide No. 23
Field Bus: A Way Forward>>>>
Overall Plant Information:




                               Slide No. 24
Field Bus: A Way Forward>>>>

Loop Level Diagnosis:
Field Bus: A Way Forward>>>>
Loop Level Diagnosis: Overview status




                                        Slide No. 26
Field Bus: A Way Forward>>>>


  Reduction of plant devices due to
  availability of multivariable devices
  Specific Information shall be available at
  different level (Top management, Engineer
  & shop floor)
  Control at on wire is possible for majority of
  loops
  Audit trail available for maintenance
  Need based Maintenance and spare planning
  shall be possible
  Advance process control shall be possible
  with multiple data in structured form
  Trouble shooting and its recovery is easy
Field Bus: A Way Forward>>>>




 For more technical Information on Field Bus
 Foundation contact:
 Jasbir Singh
Jasbirsingh@essar.com
 09825318147

More Related Content

What's hot

Aim for maintain & improve w chin arc 2008
Aim for maintain & improve w chin arc 2008Aim for maintain & improve w chin arc 2008
Aim for maintain & improve w chin arc 2008ARC Advisory Group
 
IFS Marget Segment Overview
IFS Marget Segment OverviewIFS Marget Segment Overview
IFS Marget Segment Overviewdaeager
 
Industrial Automation Services
Industrial Automation ServicesIndustrial Automation Services
Industrial Automation Servicesvinodpandeyaxcend
 
Mainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3bMainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3bRobdeHeus
 
DeliveryTrack Datasheet
DeliveryTrack DatasheetDeliveryTrack Datasheet
DeliveryTrack Datasheetmcdonald347
 
World Class Manufacturing Asset Utilization
World Class Manufacturing Asset UtilizationWorld Class Manufacturing Asset Utilization
World Class Manufacturing Asset Utilizationlksnyder
 
Electronic Software Delivery at IOM
Electronic Software Delivery at IOMElectronic Software Delivery at IOM
Electronic Software Delivery at IOMFlexera
 
Pv performance services
Pv performance servicesPv performance services
Pv performance servicesConvertitalia
 
Suntron Brochure
Suntron BrochureSuntron Brochure
Suntron Brochurejen_winters
 
Care presentatie oktober 2011
Care presentatie oktober 2011Care presentatie oktober 2011
Care presentatie oktober 2011meijerandre
 
10 Key Points of a Value Driven Solution by Tavant Technologies
10 Key Points of a Value Driven Solution by Tavant Technologies10 Key Points of a Value Driven Solution by Tavant Technologies
10 Key Points of a Value Driven Solution by Tavant TechnologiesTavant Technologies Inc.
 
SmartCompo Brochure
SmartCompo BrochureSmartCompo Brochure
SmartCompo BrochureTVSi
 
Dfr Presentation
Dfr   PresentationDfr   Presentation
Dfr Presentationeraz
 
Avon Material Handling Preventative Maintenance Case Study
Avon Material Handling Preventative Maintenance Case StudyAvon Material Handling Preventative Maintenance Case Study
Avon Material Handling Preventative Maintenance Case Studyintelligrated
 
Development portfolio
Development portfolioDevelopment portfolio
Development portfolioDGWilkin
 
Safety in special environments - solutions developed by swiss IT-Factory
Safety in special environments - solutions developed by swiss IT-FactorySafety in special environments - solutions developed by swiss IT-Factory
Safety in special environments - solutions developed by swiss IT-FactoryMinnovarc
 

What's hot (18)

Aim for maintain & improve w chin arc 2008
Aim for maintain & improve w chin arc 2008Aim for maintain & improve w chin arc 2008
Aim for maintain & improve w chin arc 2008
 
IFS Marget Segment Overview
IFS Marget Segment OverviewIFS Marget Segment Overview
IFS Marget Segment Overview
 
Embrace private cloud with confidence
Embrace private cloud with confidenceEmbrace private cloud with confidence
Embrace private cloud with confidence
 
Industrial Automation Services
Industrial Automation ServicesIndustrial Automation Services
Industrial Automation Services
 
Mainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3bMainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3b
 
DeliveryTrack Datasheet
DeliveryTrack DatasheetDeliveryTrack Datasheet
DeliveryTrack Datasheet
 
World Class Manufacturing Asset Utilization
World Class Manufacturing Asset UtilizationWorld Class Manufacturing Asset Utilization
World Class Manufacturing Asset Utilization
 
Launch brochure
Launch brochureLaunch brochure
Launch brochure
 
Electronic Software Delivery at IOM
Electronic Software Delivery at IOMElectronic Software Delivery at IOM
Electronic Software Delivery at IOM
 
Pv performance services
Pv performance servicesPv performance services
Pv performance services
 
Suntron Brochure
Suntron BrochureSuntron Brochure
Suntron Brochure
 
Care presentatie oktober 2011
Care presentatie oktober 2011Care presentatie oktober 2011
Care presentatie oktober 2011
 
10 Key Points of a Value Driven Solution by Tavant Technologies
10 Key Points of a Value Driven Solution by Tavant Technologies10 Key Points of a Value Driven Solution by Tavant Technologies
10 Key Points of a Value Driven Solution by Tavant Technologies
 
SmartCompo Brochure
SmartCompo BrochureSmartCompo Brochure
SmartCompo Brochure
 
Dfr Presentation
Dfr   PresentationDfr   Presentation
Dfr Presentation
 
Avon Material Handling Preventative Maintenance Case Study
Avon Material Handling Preventative Maintenance Case StudyAvon Material Handling Preventative Maintenance Case Study
Avon Material Handling Preventative Maintenance Case Study
 
Development portfolio
Development portfolioDevelopment portfolio
Development portfolio
 
Safety in special environments - solutions developed by swiss IT-Factory
Safety in special environments - solutions developed by swiss IT-FactorySafety in special environments - solutions developed by swiss IT-Factory
Safety in special environments - solutions developed by swiss IT-Factory
 

Viewers also liked

End User Conf. Mumbai (19.06.09)
End User Conf. Mumbai (19.06.09)End User Conf. Mumbai (19.06.09)
End User Conf. Mumbai (19.06.09)Jasbir Singh
 
Controlled Bus Architecture (CBA)
Controlled Bus Architecture (CBA)Controlled Bus Architecture (CBA)
Controlled Bus Architecture (CBA)Vicor Corporation
 
Legal Finance
Legal FinanceLegal Finance
Legal Financelegal5
 
Social Media Presentation
Social Media PresentationSocial Media Presentation
Social Media Presentationjimlove
 
Does Blair Answer The Question An Analysis Of His Performance At
Does Blair Answer The Question An Analysis Of His Performance AtDoes Blair Answer The Question An Analysis Of His Performance At
Does Blair Answer The Question An Analysis Of His Performance Atlegal5
 
Valley Wealth Economy Presentation - March 09
Valley Wealth Economy Presentation - March 09Valley Wealth Economy Presentation - March 09
Valley Wealth Economy Presentation - March 09jeffburrow
 
081212公益Ceo聯誼會簡報
081212公益Ceo聯誼會簡報081212公益Ceo聯誼會簡報
081212公益Ceo聯誼會簡報npo.ceo
 
859 0708fedlegalempguide
859 0708fedlegalempguide859 0708fedlegalempguide
859 0708fedlegalempguidelegal5
 
Sa 8th Cir Rose Tulane
Sa 8th Cir Rose TulaneSa 8th Cir Rose Tulane
Sa 8th Cir Rose Tulaneguest90299f9
 
Lku lytte til ordet og hinanden
Lku lytte til ordet og hinandenLku lytte til ordet og hinanden
Lku lytte til ordet og hinandenMogens Mogensen
 
Future of Voice & WebRTC - Implications & Opportunities for telcos (service p...
Future of Voice & WebRTC - Implications & Opportunities for telcos (service p...Future of Voice & WebRTC - Implications & Opportunities for telcos (service p...
Future of Voice & WebRTC - Implications & Opportunities for telcos (service p...Dean Bubley
 
Fall Of Inca And Aztec
Fall Of Inca And AztecFall Of Inca And Aztec
Fall Of Inca And Aztecrandalld
 
Legal Document
Legal DocumentLegal Document
Legal Documentlegal5
 

Viewers also liked (20)

End User Conf. Mumbai (19.06.09)
End User Conf. Mumbai (19.06.09)End User Conf. Mumbai (19.06.09)
End User Conf. Mumbai (19.06.09)
 
Controlled Bus Architecture (CBA)
Controlled Bus Architecture (CBA)Controlled Bus Architecture (CBA)
Controlled Bus Architecture (CBA)
 
Legal Finance
Legal FinanceLegal Finance
Legal Finance
 
Ohs to China 2011
Ohs to China 2011Ohs to China 2011
Ohs to China 2011
 
Social Media Presentation
Social Media PresentationSocial Media Presentation
Social Media Presentation
 
Does Blair Answer The Question An Analysis Of His Performance At
Does Blair Answer The Question An Analysis Of His Performance AtDoes Blair Answer The Question An Analysis Of His Performance At
Does Blair Answer The Question An Analysis Of His Performance At
 
Valley Wealth Economy Presentation - March 09
Valley Wealth Economy Presentation - March 09Valley Wealth Economy Presentation - March 09
Valley Wealth Economy Presentation - March 09
 
081212公益Ceo聯誼會簡報
081212公益Ceo聯誼會簡報081212公益Ceo聯誼會簡報
081212公益Ceo聯誼會簡報
 
859 0708fedlegalempguide
859 0708fedlegalempguide859 0708fedlegalempguide
859 0708fedlegalempguide
 
1.4.7power
1.4.7power1.4.7power
1.4.7power
 
VIPnet & social media
VIPnet & social mediaVIPnet & social media
VIPnet & social media
 
Sa 8th Cir Rose Tulane
Sa 8th Cir Rose TulaneSa 8th Cir Rose Tulane
Sa 8th Cir Rose Tulane
 
Lku lytte til ordet og hinanden
Lku lytte til ordet og hinandenLku lytte til ordet og hinanden
Lku lytte til ordet og hinanden
 
7.2.3
7.2.37.2.3
7.2.3
 
Future of Voice & WebRTC - Implications & Opportunities for telcos (service p...
Future of Voice & WebRTC - Implications & Opportunities for telcos (service p...Future of Voice & WebRTC - Implications & Opportunities for telcos (service p...
Future of Voice & WebRTC - Implications & Opportunities for telcos (service p...
 
1.3.4example
1.3.4example1.3.4example
1.3.4example
 
Fall Of Inca And Aztec
Fall Of Inca And AztecFall Of Inca And Aztec
Fall Of Inca And Aztec
 
Amager kirkeudvikling-1
Amager kirkeudvikling-1Amager kirkeudvikling-1
Amager kirkeudvikling-1
 
Legal Document
Legal DocumentLegal Document
Legal Document
 
5 Troen
5   Troen5   Troen
5 Troen
 

Similar to Cii 29.12.08

Best practices for fieldbus and hart project implementation and lifecycle ben...
Best practices for fieldbus and hart project implementation and lifecycle ben...Best practices for fieldbus and hart project implementation and lifecycle ben...
Best practices for fieldbus and hart project implementation and lifecycle ben...ARC Advisory Group
 
Caveo Corporation 10
Caveo Corporation 10Caveo Corporation 10
Caveo Corporation 10Hans Olo
 
Ff Presdentation User Conference Mumbai Automation 2008
Ff Presdentation   User Conference Mumbai Automation 2008Ff Presdentation   User Conference Mumbai Automation 2008
Ff Presdentation User Conference Mumbai Automation 2008Jasbir Singh
 
Sustainability: Process Field Networks
Sustainability: Process Field NetworksSustainability: Process Field Networks
Sustainability: Process Field NetworksARC Advisory Group
 
Sustainability through Process Field Networks
Sustainability through Process Field NetworksSustainability through Process Field Networks
Sustainability through Process Field NetworksARC Advisory Group
 
HCLT Brochure: Value Engineering
HCLT Brochure: Value EngineeringHCLT Brochure: Value Engineering
HCLT Brochure: Value EngineeringHCL Technologies
 
HCLT Whitepaper: Value Engineering
HCLT Whitepaper: Value EngineeringHCLT Whitepaper: Value Engineering
HCLT Whitepaper: Value EngineeringHCL Technologies
 
Pack Upgrade Mp2 to INFOR EAM Business Edition, Datastream Arabia INFOR EAM C...
Pack Upgrade Mp2 to INFOR EAM Business Edition, Datastream Arabia INFOR EAM C...Pack Upgrade Mp2 to INFOR EAM Business Edition, Datastream Arabia INFOR EAM C...
Pack Upgrade Mp2 to INFOR EAM Business Edition, Datastream Arabia INFOR EAM C...jcvd12
 
Source2VALUE
Source2VALUESource2VALUE
Source2VALUEcoenburki
 
Res Tful Enterprise Development
Res Tful Enterprise DevelopmentRes Tful Enterprise Development
Res Tful Enterprise DevelopmentConSanFrancisco123
 
Smart Connected Assembly at Atlas Copco
Smart Connected Assembly at Atlas CopcoSmart Connected Assembly at Atlas Copco
Smart Connected Assembly at Atlas CopcoDamian Reclik
 
Managing and Solving Production Based Customer Complaints and Concerns
Managing and Solving Production Based Customer Complaints and ConcernsManaging and Solving Production Based Customer Complaints and Concerns
Managing and Solving Production Based Customer Complaints and ConcernsIBS America
 
Managing shopfloor energy consumption in a smart factory
Managing shopfloor energy consumption in a smart factoryManaging shopfloor energy consumption in a smart factory
Managing shopfloor energy consumption in a smart factoryJulian Krenge
 
Pharmprocess0405 predmaint
Pharmprocess0405 predmaintPharmprocess0405 predmaint
Pharmprocess0405 predmaintkhaneducation
 

Similar to Cii 29.12.08 (20)

Best practices for fieldbus and hart project implementation and lifecycle ben...
Best practices for fieldbus and hart project implementation and lifecycle ben...Best practices for fieldbus and hart project implementation and lifecycle ben...
Best practices for fieldbus and hart project implementation and lifecycle ben...
 
Caveo Corporation 10
Caveo Corporation 10Caveo Corporation 10
Caveo Corporation 10
 
Ff Presdentation User Conference Mumbai Automation 2008
Ff Presdentation   User Conference Mumbai Automation 2008Ff Presdentation   User Conference Mumbai Automation 2008
Ff Presdentation User Conference Mumbai Automation 2008
 
Sustainability: Process Field Networks
Sustainability: Process Field NetworksSustainability: Process Field Networks
Sustainability: Process Field Networks
 
Sustainability through Process Field Networks
Sustainability through Process Field NetworksSustainability through Process Field Networks
Sustainability through Process Field Networks
 
CPM and Operations Management
CPM and Operations ManagementCPM and Operations Management
CPM and Operations Management
 
ISP/Hosting
ISP/HostingISP/Hosting
ISP/Hosting
 
HCLT Brochure: Value Engineering
HCLT Brochure: Value EngineeringHCLT Brochure: Value Engineering
HCLT Brochure: Value Engineering
 
HCLT Whitepaper: Value Engineering
HCLT Whitepaper: Value EngineeringHCLT Whitepaper: Value Engineering
HCLT Whitepaper: Value Engineering
 
Pack Upgrade Mp2 to INFOR EAM Business Edition, Datastream Arabia INFOR EAM C...
Pack Upgrade Mp2 to INFOR EAM Business Edition, Datastream Arabia INFOR EAM C...Pack Upgrade Mp2 to INFOR EAM Business Edition, Datastream Arabia INFOR EAM C...
Pack Upgrade Mp2 to INFOR EAM Business Edition, Datastream Arabia INFOR EAM C...
 
Source2VALUE
Source2VALUESource2VALUE
Source2VALUE
 
Embedded Service Oriented Monitoring for the Energy Aware Factory
Embedded Service Oriented Monitoring for the Energy Aware Factory Embedded Service Oriented Monitoring for the Energy Aware Factory
Embedded Service Oriented Monitoring for the Energy Aware Factory
 
Res Tful Enterprise Development
Res Tful Enterprise DevelopmentRes Tful Enterprise Development
Res Tful Enterprise Development
 
Analytics in the Manufacturing industry
Analytics in the Manufacturing industryAnalytics in the Manufacturing industry
Analytics in the Manufacturing industry
 
1415 reed
1415 reed1415 reed
1415 reed
 
Smart Connected Assembly at Atlas Copco
Smart Connected Assembly at Atlas CopcoSmart Connected Assembly at Atlas Copco
Smart Connected Assembly at Atlas Copco
 
Managing and Solving Production Based Customer Complaints and Concerns
Managing and Solving Production Based Customer Complaints and ConcernsManaging and Solving Production Based Customer Complaints and Concerns
Managing and Solving Production Based Customer Complaints and Concerns
 
Managing shopfloor energy consumption in a smart factory
Managing shopfloor energy consumption in a smart factoryManaging shopfloor energy consumption in a smart factory
Managing shopfloor energy consumption in a smart factory
 
VmTurbo
VmTurboVmTurbo
VmTurbo
 
Pharmprocess0405 predmaint
Pharmprocess0405 predmaintPharmprocess0405 predmaint
Pharmprocess0405 predmaint
 

Recently uploaded

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 

Recently uploaded (20)

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 

Cii 29.12.08

  • 1. Instrumentation with Field Bus Technology: Building Foundation to Meet Future Challenges Jasbir Singh Vice President (Instrument)
  • 2. Field Bus: A Way Forward>>>> Fieldbus Control System Conventional System Plant Operation Device Management & Control Diagnostics Server Automatic Alarm Notification from Device BENEFIT FORM FIELD BUS New Technology to achieve high quality, low cost and expendibilty Intelligent Optimize operation by improving Control Output Device MV AI control model precision PID AI Improve process safety / stability by AO more process information Predictive maintenance based on Diag Full Digital device diagnose data Communication Acquire field information to improve process capability Slide No. 2
  • 3. Field Bus: A Way Forward>>>> Why Field bus ? What gain ? Slide No. 3
  • 4. Field Bus: A Way Forward>>>> The Business Perspective – How can we survive in the competitive world……….. Reliable Project Fast Commissioning Documentation & Startup Reduce cost of poor quality Increase Return on Capital investment Reduce Maintenance costs Low Capital Investment Improve predictability Slide No. 4
  • 5. Field Bus: A Way Forward>>>> Increase ROI Reduce Capital Increase Profitability Increase Revenue Reduce Costs Increase Productivity Reduction of losses Increased Reduced Reduced Yield Project Capital Feed stocks Product Installation & Reduced Energy and Utilities Consistency Commissioning Unscheduled Downtime Maintenance New product Cost, Small stoppages waste Equipment Capacity Spares Scheduled Shutdowns Abnormal Events Equip. Efficiency Inventory / Duration Low grade product Addition of new variability Penalties Device at every point of time Slide No. 5
  • 6. Field Bus: A Way Forward>>>> Refineries on FF: 2.3 million barrel /day Nanhi 30,000 FF devices and commissioned in 2005. Field bus foundation used for entire plant automation TENCO Refinery Russia 45,000 FF devices and commissioned in 2006. Field bus foundation used for entire plant automation ConocoPhilips YERP Refinery Saudi Arabia 25,000 FF devices and commissioned in 2006. Field bus foundation used for entire plant automation Slide No. 6
  • 7. Field Bus: A Way Forward>>>> Refineries on FF: Petro Rebigh Saudi Arabia 30,000 FF devices and commissioned in 2006. Field bus foundation used for entire plant automation
  • 8. Field Bus: A Way Forward>>>> Chevron Refineries under going FF: 325,000 barrel /day Mississippi 300,000 barrel /day Mississippi 260,000 barrel /day California 225,000 barrel /day California 45,000 barrel /day Salt lake 52,000 barrel /day Canada 210,000 barrel /day UK 54,000 barrel /day Hawaii 112,000 barrel /day South Africa
  • 9. Field Bus: A Way Forward>>>> Emerson to Digitally Automate China's Largest Integrated Refining/Petrochemical Facility: EPM has been selected to digitally automate the Fujian Refining and Ethylene Joint Venture Project in Quanzhou City, Fujian Province, China. It is the largest integrated refining and petrochemicals project ever undertaken in China. Project startup is expected by 2009. EPM will serve as the Main Instrument and Controls Contractor (MICC) on the project, and will install its PlantWeb. The PlantWeb installation will include eight DeltaV, AMS, safety instrumented system (SIS), fire and gas systems, Rosemount pressure and temperature transmitters, plus Fisher digital valve controllers, all utilizing FOUNDATION fieldbus, HART, OPC and Modbus communication technologies, and delivering information to a real- time database.
  • 10. Field Bus: A Way Forward>>>> Emerson to Digitally Automate China's Largest Integrated Refining/Petrochemical Facility: The project will expand the existing refinery at Quanzhou, Fujian Province, from 80,000 barrels per day to 240,000 barrels per day. The upgraded refinery will primarily refine and process sour Arabian crude. In addition, new petrochemical facilities will be constructed, including an 800,000 tons-per-year ethylene steam cracker, an 800,000 tons-per-year polyethylene unit, a 400,000 tons-per-year polypropylene unit, and an aromatics complex to produce 700,000 tons per year of paraxylene. A 300,000-tons crude berth and associated utilities will also be built.
  • 11. Field Bus: A Way Forward>>>> Yokogawa awarded for Package Order to Supply Control Systems for Petrochemical Complex in Singapore: Yokogawa has received a package order from Shell Eastern Petroleum (Pte) Ltd (SEPL) to supply control systems for the Shell Eastern Petrochemicals Complex (SEPC) in Singapore. At the SEPC, SEPL is constructing a new petrochemical plant that will annually produce 800 thousand tons of ethylene and 750 thousand tons of mono-ethylene glycol and upgrading an existing petroleum refinery with a refining capacity of 500 thousand bpd. Yokogawa shall deliver the control systems using the latest FOUNDATION fieldbus technology for these upgrade and expansion projects by December 2008. The delivered systems will include the CS 3000, ProSafe-RS, Exaquantum (PIMS) and EJX.
  • 12. Field Bus: A Way Forward>>>> Yokogawa awarded as main system supplier for ESSAR refinery expansion project: Yokogawa secure the order as Main Automation Contractor & supplier of DCS, ESD and F&G system for Essar refinery expansion from 10.5 to 34 MMTPA. Yokogawa shall deliver the control systems using the latest FOUNDATION field bus technology for this expansion projects by December 2009. The Overall system supply will include the CS 3000 VP, Triconex ESD from Invensys, ProSafe-RS for F&G.
  • 13. Field Bus: A Way Forward>>>> Honeywell’s 2007 Users Group Americas Symposium: The Honeywell 2007 Users' Group Americas Symposium was held June 10-14th in Phoenix at the Arizona Resort and Spa. A record attendance of over 1,700 people from around the world participated in the event that included a general session on industry innovations and advancements, technology and solutions update sessions, industry break out sessions, and an exposition demonstrating key Honeywell products, solutions, and services. Honeywell is also attracting a lot of recognition for their innovative highly integrated POMS and Experion PKS Batch Control System solution for the Pharmaceutical industry. In ARC’s view, the new system comes closest to meeting a full implementation of the ISA 88 batch standard.
  • 14. Field Bus: A Way Forward>>>> Honeywell secure $ 4.7 million automation project of cement plant in west Virginia with FF: • Qatar Shell Improves Efficiency of GTL Plant Honeywell was selected by Qatar Shell GTL Ltd. to design and implement the integrated process automation system for the Pearl Gas to Liquids (GTL) plant. This includes installation of the Experion Process Knowledge System (PKS) Release 300, with FOUNDATION fieldbus communication, to tie together all critical subsystems in the plant. With the integrated automation platform, Qatar Shell GTL Ltd. will be able to efficiently control GTL operations from production at the platforms, to processing at the on-shore plant, to shipping of the finished product.
  • 15. Field Bus: A Way Forward>>>> Honeywell Signs MAC Agreement with BP Exploration & Production: Honeywell has signed a six-year agreement with BP Exploration to provide Main Automation Contractor (MAC) services at the oil and gas leader’s new and existing facilities. Honeywell will help BP Exploration & Production (E&P) accelerate production schedules and improve efficiency in these facilities by integrating all levels of plant operations and automating critical processes. Honeywell can apply its integrated strategy to each design phase, including front-end engineering development, early operator training and process simulation, advanced control modeling, process validation and advanced process control. This integrated approach will result in common interfaces across production and business systems for increased safety and efficiency, higher plant availability, lower operating expenditures and reduced engineering. Slide No. 15
  • 16. Field Bus: A Way Forward>>>> INVENSYS IS THE SYSTEM SUUPLIER FOR RELIENCE REFINERY EXPANSION: Invensys is the Main automation contractor and system supplier for upcoming refinery and polypropylene plant. The refinery capacity is doubled to 62.5 MMTPA with current expansion. This is state of art plant with fully automated and Foundation Field bus system in most of the control loops. The plant FF system is commissioned with advance diagnostic module from MTL. Reliance award Invensys first refinery full automation i.e. DCS, ESD,TAS,OFFSITES and Field Instruments like Transmitters. Based on past experience having Invensys system in Old refinery , Reliance extend all the full automation portfolio of Invensys to new refinery. Reliance uses Invensys Solutions like Enterprise Control system, Online Optimization package and their major New project like KGD6 also Invensys solutions are selected. JERP Expansion total Solution are extended in the same system with all new technology implemented while maintaining all old Hardware. . Slide No. 16
  • 17. Field Bus: A Way Forward>>>> ABB system and Asset Master: a New Comprehensive Field Device Management and Optimization Solution: ABB introduced Asset Master, a new software solution that helps user to meet these objectives, as well as providing traditional set-up tools for instrumentation configuration and calibration. ABB system used state of art plant operation on Profibus DP for high precision Fibre production in Thailand using multiple protocol for information exchange with other systems.
  • 18. Field Bus: A Way Forward>>>> MIS / PIM New Extension ETHERNET (Existing Plant) PRM / HIS HIS EWS AMS BUS HART PROCESS FIELD BUS Mod Bus OmROn Optic Fibre TCP IP Touch Panels Remote I / O Device Net Remote I/O Slide No. 18
  • 19. Field Bus: A Way Forward>>>> Reduction in Terminations 40% Reduction in I/O Cards 60% Reduction in Panel Space 50% Reduction in # Transmitters (multi variable) 10% Reduction in erection hardware 40% Reduction in Installation & commissioning time 50% Reduction in Home run wiring 40% Reduction due to remote diagnostics > 50% Reduction in time to add new device 70% Reduction in Calibration time 70% Increase in Device cost 10 %
  • 20. Field Bus: A Way Forward>>>> General advantages: DESCRIPTION ANALOG INSTRUMENTS FF DEVICES Control Valve 3 Hrs. 15 Min calibration Transmitter calibration 1.5 Hrs. 15 Min Termination checking 30 min 5 Min Loop Checking 3 ~ 4 Hrs. 20 Min Special tool required Yes, loop validator, ma source, From DCS / Hand Held for Calibration hand tools communicator Device calibration & Calibration at Field / workshop On line from HOST (DCS) parameterization Detection of Defect Mostly physical inspection at From DCS Automatically different level is required Generated Maintenance / To be entered Manually Automatically captured & calibration History stored in DCS Skill up Training No special training Additional Training needed Slide No. 20
  • 21. Field Bus: A Way Forward>>>> Three- Level Diagnostics Module Three- Level 3 - “Abnormality Analysis” “Abnormality Analysis” Level 2 Operations Drift Loop µP External influence Electronics Sensor Defective Drift Device
  • 22. Field Bus: A Way Forward>>>> Level 4 Enterprise  Four – Level FF Management Module Network - “Abnormality Analysis” “Abnormality Analysis” Level 3 Communication Level 2 & Networking Drift Operations FF Accessories Level 1A Loop Level 1 FF Sensors µP External influence Sensor Electronics Drift Defective Device
  • 23. Field Bus: A Way Forward>>>> Valve diagnostics Over a period of time, control valve packing requires tightening depending on the packing material and wear and tear in order Hunting to avoid fugitive emissions e al u sv lue ces va Pro t Se Output to valve Slide No. 23
  • 24. Field Bus: A Way Forward>>>> Overall Plant Information: Slide No. 24
  • 25. Field Bus: A Way Forward>>>> Loop Level Diagnosis:
  • 26. Field Bus: A Way Forward>>>> Loop Level Diagnosis: Overview status Slide No. 26
  • 27. Field Bus: A Way Forward>>>> Reduction of plant devices due to availability of multivariable devices Specific Information shall be available at different level (Top management, Engineer & shop floor) Control at on wire is possible for majority of loops Audit trail available for maintenance Need based Maintenance and spare planning shall be possible Advance process control shall be possible with multiple data in structured form Trouble shooting and its recovery is easy
  • 28. Field Bus: A Way Forward>>>> For more technical Information on Field Bus Foundation contact: Jasbir Singh Jasbirsingh@essar.com 09825318147