What   Are FRP Composites? Polymer Resin Matrix Reinforcing Fiber (Glass, Carbon, Kevlar, etc.) Interphase Coupling Agent
Advantages   of Carbon Fiber ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Engineering Support ,[object Object],[object Object],[object Object],[object Object]
Examples of Applications ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PCCP Hoop Strengthening
Cholla Power Plant Situation: The 66" circ line had experienced enough wire breaks that a possible rupture was a major concern. The original repair was only 40-60 linear feet depending on the condition of the pipe. We needed to be able to restore the pressure bearing capacity of the circ line, the overburden was only 8’. Challenges: Time restraint was a major factor, this job there was only a small window of time to do the entire job. The prep work for the job was limited to only within 2 weeks. To remove and replace the line would have involved too much time and disruption of the existing above ground infrastructure. Likewise external tensioning would have taken too long with too much disruption.
Solution: We went ahead and came up with a comparable solution that would not affect any of the above ground infrastructure and still provide the needed support. Carbon fiber was installed in two layers of 20 oz unidirectional in a hoop direction.  Conclusion: The original 40 linear feet was done in 2 days. After the completion of the work, APS requested us to complete an additional 120 lf. We mobilized within 72 working hours and completed the additional 120 lf within 5 days.
[object Object],Situation: Wire breaks in the 10' diameter pipes severely limited the capacity of the pipe to with stand internal pressure. The goal was to restore the capacity of the pipeline.  Challenges: All work needed to be done within the time frame of the shut down of 3 weeks for the # 3 circ line and 3 days for the #4 circ line. Replacement was far too costly and too much down time. Steel lining would reduce the flow, cause future corrosion, and would have high mobilization costs.
Solution: It was decided to install 20 oz of unidirectional carbon fiber in hoop direction, because this solution can be done quickly and with little invasiveness. Another supporting reason was because the risk of corrosion would be nonexistent.  Conclusion: Before installation took place it was discovered that there were severe cracks where the carbon fiber was to be installed in the hoop direction. 20 oz of carbon fiber was installed perpendicular to the cracks before installing in the hoop direction to help maintain the integrity of the pipe. The job was completed in the time required and is still functioning today.
Missing/Under designed reinforcing ,[object Object],[object Object],[object Object],[object Object]
 
 
Seismic Strengthening ,[object Object],[object Object]
AmeriSchools Academy  ,[object Object]
The Solution After several solutions were investigated, it was determined that seismic reinforcement could best be achieved with carbon-fiber composites applied to the exterior and interior wall surfaces.  North side of building after sandblasting to remove paint in areas where carbon-fiber is to be installed. Front entrance is shown with windows removed and surface sandblasted, now ready for 2 layers of fabric to be installed
The Results The application of carbon-fiber fabrics and laminates proved to be the least expensive and most effective way to provide seismic reinforcement. The client was very satisfied with the product and job coordination. Realizing the challenges the crew faced doing this in the summer when the temperature was between 110 and 120 degrees. The job was completed in time for the school to reopen for classes the end of July.  Shown below the crew is installing carbon-fiber laminates on the interior walls and openings. This shows the front entry after the application of bi-directional fabrics. Stucco was later added then painted.
Cutting or Drilling Structural Members ,[object Object],[object Object]
DEMA Renovation ,[object Object]
The Solution Fill the old penetrations that were not to be reused. Install 4” wide carbon fiber laminate strips to the underside of the planks in the areas where the penetrations had been filled.  At the areas where the new plumbing was protruding we overlaid 12” wide carbon fiber fabric strips in a cross hash pattern over the laminate going 24” past the plumbing on all sides.
The Results The strength lost because of the penetrations and the post tension cables being cut was restored. This allowed the restoration to continue at a great cost saving over replacing the floor planks. Which would have been an enormous construction issue at best.
The Summit at Copper Square ,[object Object]
The Solution Install one layer of uni-directional carbon fiber fabric the full width of the beams and wrapping the complete beam. It was determined that any beam with a core 8 ½” or less from the bottom of the beam need carbon fiber support. This replaced the 35 kips structural strength lost by the cores while maintaining the ceiling height in the hallways.
The Results Because some of the plumbing had already been installed the fabric had to be cut to allow the installers to wrap the fabric around the pipes. A second layer of fabric was installed over the cuts in a horizontal direction to prevent lose of strength from the cuts. The job was completed in 2 weeks and the contractor was able to get back on schedule with construction.
Low Cylinder Breaks
Adding Capacity ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Underground/Sewer/Water Infrastructure Vaults etc ,[object Object]
Roger Road Treatment Plant Situation: The digestive gasses eroded the existing concrete columns and deteriorated the existing reinforcement. Challenges: The sludge digester needed to be kept free of rocks and pebbles. The floor of the digester was slanted making scaffolding a challenge and more difficult to keep debris out.
Solution: Installers from the Arizona Repair Masons' Specialty Crew reinforced deteriorated columns with carbon fiber composites inside the drained digester tank of the sewage treatment plant. Damaged rebar was augmented with fiberglass rebar.  Conclusion: Company was happy with the end results of restoration to the columns. Columns being wrapped with Carbon fiber laminates in order to reinforce the eroded areas.
Deteriorated / Spalled Columns ,[object Object]
Added Touch Warehouse Badly spalled and deteriorated columns due to years of water coming from the scuppers with no down spouts.
Added Touch Warehouse ,[object Object],[object Object],[object Object]
Fatigued Members ,[object Object],[object Object],[object Object]
Central Stores—City of Phoenix   Situation: The wood beams that support the roof had been deflecting over a few years. The problems are exacerbated with the ponding of rain water in the dips created from the deflections. There were approximately 190 beams that required strengthening .  The Owner (The City of Phoenix) wanted us to arrest any continued deflections and increase the margin of safety for the users. Challenges: Work in the space was to continue without shutting down the users. Air conditioning replacement was going on simultaneously which caused poor ventilation.
Solution: Carbon fiber laminate reinforcing with fiberglass fabric stirrups were used. The Carbon laminates provide continuous adhesive reinforcing. The laminates were placed in the middle 8' of the beams, where the deflection was the greatest on the tension face. The glass fabrics were used to eliminate shear stresses on the ends and to transfer the tensile force of the laminates up through the natural axis.
Conclusion: Arizona Repair Masons helped insure that the original engineering was adequate to meet the loads with acceptable deflection by insisting that the original calcs be checked. Workers used respirators during operations. The overstress on the beams was reduced to less than .07% and the ponds on the roof were filled in with foam to shed future water.
 
 
 
 
Corrosion Mitigation ,[object Object]
Before Before
Shoring  Patching
completed Installing the carbon fiber
QUESTIONS

Weitere ähnliche Inhalte

Was ist angesagt?

Thrasher Commercial Group
Thrasher Commercial GroupThrasher Commercial Group
Thrasher Commercial GroupJill Reeves
 
Rc ccracks_repair(rev) 93
 Rc ccracks_repair(rev) 93 Rc ccracks_repair(rev) 93
Rc ccracks_repair(rev) 93NikHil NicK's
 
column jacketing
 column jacketing column jacketing
column jacketingmamilli
 
Water proofing treatement
Water proofing treatementWater proofing treatement
Water proofing treatementRajiva Gupta
 
ABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeJill Reeves
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structureshlok patel
 
A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...
A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...
A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...Gaurav Verma
 
Ann vii -structure repairs bihar
Ann vii -structure repairs biharAnn vii -structure repairs bihar
Ann vii -structure repairs biharVaishnav Mishra
 
Baylife pool service real estate property
Baylife pool service real estate propertyBaylife pool service real estate property
Baylife pool service real estate propertyDebra Swearingen
 
Astec Metal Roof Projects
Astec Metal Roof ProjectsAstec Metal Roof Projects
Astec Metal Roof ProjectsTony Loup
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 
BoroZyme Technologies ( Enzyme based Sun-Dried Bricks and Earthen House build...
BoroZyme Technologies ( Enzyme based Sun-Dried Bricks and Earthen House build...BoroZyme Technologies ( Enzyme based Sun-Dried Bricks and Earthen House build...
BoroZyme Technologies ( Enzyme based Sun-Dried Bricks and Earthen House build...Boron Inno
 
Hoop house construction_for_new_mexico
Hoop house construction_for_new_mexicoHoop house construction_for_new_mexico
Hoop house construction_for_new_mexicoGherghescu Gabriel
 
Dn tanks prestressed_concretetank
Dn tanks prestressed_concretetankDn tanks prestressed_concretetank
Dn tanks prestressed_concretetankAdrian Frantescu
 

Was ist angesagt? (20)

CE 165 Poster Final
CE 165 Poster FinalCE 165 Poster Final
CE 165 Poster Final
 
Glass Fiber Final Project
Glass Fiber Final ProjectGlass Fiber Final Project
Glass Fiber Final Project
 
Thrasher Commercial Group
Thrasher Commercial GroupThrasher Commercial Group
Thrasher Commercial Group
 
Rc ccracks_repair(rev) 93
 Rc ccracks_repair(rev) 93 Rc ccracks_repair(rev) 93
Rc ccracks_repair(rev) 93
 
column jacketing
 column jacketing column jacketing
column jacketing
 
Water proofing treatement
Water proofing treatementWater proofing treatement
Water proofing treatement
 
ABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel Bridge
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structure
 
A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...
A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...
A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...
 
Ann vii -structure repairs bihar
Ann vii -structure repairs biharAnn vii -structure repairs bihar
Ann vii -structure repairs bihar
 
Baylife pool service real estate property
Baylife pool service real estate propertyBaylife pool service real estate property
Baylife pool service real estate property
 
Astec Metal Roof Projects
Astec Metal Roof ProjectsAstec Metal Roof Projects
Astec Metal Roof Projects
 
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Lashis-Gele Water RC Reservoir, Existing Conditions
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
 
BoroZyme Technologies ( Enzyme based Sun-Dried Bricks and Earthen House build...
BoroZyme Technologies ( Enzyme based Sun-Dried Bricks and Earthen House build...BoroZyme Technologies ( Enzyme based Sun-Dried Bricks and Earthen House build...
BoroZyme Technologies ( Enzyme based Sun-Dried Bricks and Earthen House build...
 
Hoop house construction_for_new_mexico
Hoop house construction_for_new_mexicoHoop house construction_for_new_mexico
Hoop house construction_for_new_mexico
 
Dn tanks prestressed_concretetank
Dn tanks prestressed_concretetankDn tanks prestressed_concretetank
Dn tanks prestressed_concretetank
 
Kc x bldg_features
Kc x bldg_featuresKc x bldg_features
Kc x bldg_features
 
Jacketing
JacketingJacketing
Jacketing
 
Simmons Nov 2014
Simmons Nov 2014Simmons Nov 2014
Simmons Nov 2014
 

Ähnlich wie Carbon fiber wraps strengthen infrastructure

J&P Building Systems Ltd - An Introduction
J&P Building Systems Ltd - An IntroductionJ&P Building Systems Ltd - An Introduction
J&P Building Systems Ltd - An IntroductionJ and P Building Systems
 
Sesión técnica, sala KM 19, Epoxy pipeline technology
Sesión técnica, sala KM 19, Epoxy pipeline technologySesión técnica, sala KM 19, Epoxy pipeline technology
Sesión técnica, sala KM 19, Epoxy pipeline technologyLTDH2013
 
2018 general frc_2018_12
2018 general frc_2018_122018 general frc_2018_12
2018 general frc_2018_12AsuSSEBENA
 
ConSpec Associates, Inc 2019 Structural
ConSpec Associates, Inc 2019 StructuralConSpec Associates, Inc 2019 Structural
ConSpec Associates, Inc 2019 StructuralPatrick J. Morrissey
 
Jefferson County Historical High School
Jefferson County Historical High SchoolJefferson County Historical High School
Jefferson County Historical High SchoolMason Frascona
 
Infratructure defect
Infratructure defectInfratructure defect
Infratructure defecteighteen9ty
 
FYP Presentation group 1.pptx
FYP Presentation group 1.pptxFYP Presentation group 1.pptx
FYP Presentation group 1.pptxlongwalls4
 
autoclaved aerated concrete
autoclaved aerated concreteautoclaved aerated concrete
autoclaved aerated concreteSIVA Aruna
 
Case Study_Lake Windermere Great Britain_GB
Case Study_Lake Windermere Great Britain_GBCase Study_Lake Windermere Great Britain_GB
Case Study_Lake Windermere Great Britain_GBStefanie Straubert
 
Repairs Renovation Gilmore Backup
Repairs Renovation Gilmore BackupRepairs Renovation Gilmore Backup
Repairs Renovation Gilmore BackupLouisGilmore
 
Precast compound wall
Precast compound wallPrecast compound wall
Precast compound wallHarsh Bothra
 
Worcester library Post Tensioned Concrete Case Study
Worcester library Post Tensioned Concrete Case StudyWorcester library Post Tensioned Concrete Case Study
Worcester library Post Tensioned Concrete Case StudyCCL Concrete
 
Retrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptxRetrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptxDP NITHIN
 
St Thomas The Apostle, Elson Faculty Application
St Thomas The Apostle, Elson Faculty ApplicationSt Thomas The Apostle, Elson Faculty Application
St Thomas The Apostle, Elson Faculty Applicationsimonrundell
 
Industrial coating options for circulating fluidized bed boilers
Industrial coating options for circulating fluidized bed boilersIndustrial coating options for circulating fluidized bed boilers
Industrial coating options for circulating fluidized bed boilersTeknokraft
 

Ähnlich wie Carbon fiber wraps strengthen infrastructure (20)

J&P Building Systems Ltd - An Introduction
J&P Building Systems Ltd - An IntroductionJ&P Building Systems Ltd - An Introduction
J&P Building Systems Ltd - An Introduction
 
Sesión técnica, sala KM 19, Epoxy pipeline technology
Sesión técnica, sala KM 19, Epoxy pipeline technologySesión técnica, sala KM 19, Epoxy pipeline technology
Sesión técnica, sala KM 19, Epoxy pipeline technology
 
ECS Food For Thought_ presentation Final2
ECS Food For Thought_ presentation Final2ECS Food For Thought_ presentation Final2
ECS Food For Thought_ presentation Final2
 
Infrared heaters
Infrared heatersInfrared heaters
Infrared heaters
 
2018 general frc_2018_12
2018 general frc_2018_122018 general frc_2018_12
2018 general frc_2018_12
 
ConSpec Associates, Inc 2019 Structural
ConSpec Associates, Inc 2019 StructuralConSpec Associates, Inc 2019 Structural
ConSpec Associates, Inc 2019 Structural
 
Jefferson County Historical High School
Jefferson County Historical High SchoolJefferson County Historical High School
Jefferson County Historical High School
 
CoroBrick
CoroBrickCoroBrick
CoroBrick
 
Infratructure defect
Infratructure defectInfratructure defect
Infratructure defect
 
FYP Presentation group 1.pptx
FYP Presentation group 1.pptxFYP Presentation group 1.pptx
FYP Presentation group 1.pptx
 
autoclaved aerated concrete
autoclaved aerated concreteautoclaved aerated concrete
autoclaved aerated concrete
 
Fsi module 2 v2 reorganized corium
Fsi module 2 v2 reorganized coriumFsi module 2 v2 reorganized corium
Fsi module 2 v2 reorganized corium
 
Case Study_Lake Windermere Great Britain_GB
Case Study_Lake Windermere Great Britain_GBCase Study_Lake Windermere Great Britain_GB
Case Study_Lake Windermere Great Britain_GB
 
Repairs Renovation Gilmore Backup
Repairs Renovation Gilmore BackupRepairs Renovation Gilmore Backup
Repairs Renovation Gilmore Backup
 
Precast compound wall
Precast compound wallPrecast compound wall
Precast compound wall
 
Concrete Lego Block Ideas
Concrete Lego Block IdeasConcrete Lego Block Ideas
Concrete Lego Block Ideas
 
Worcester library Post Tensioned Concrete Case Study
Worcester library Post Tensioned Concrete Case StudyWorcester library Post Tensioned Concrete Case Study
Worcester library Post Tensioned Concrete Case Study
 
Retrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptxRetrofitting of RC members and repair works.pptx
Retrofitting of RC members and repair works.pptx
 
St Thomas The Apostle, Elson Faculty Application
St Thomas The Apostle, Elson Faculty ApplicationSt Thomas The Apostle, Elson Faculty Application
St Thomas The Apostle, Elson Faculty Application
 
Industrial coating options for circulating fluidized bed boilers
Industrial coating options for circulating fluidized bed boilersIndustrial coating options for circulating fluidized bed boilers
Industrial coating options for circulating fluidized bed boilers
 

Carbon fiber wraps strengthen infrastructure

  • 1. YOUR PARTNER WITH SOLUTIONS
  • 4. What Are FRP Composites? Polymer Resin Matrix Reinforcing Fiber (Glass, Carbon, Kevlar, etc.) Interphase Coupling Agent
  • 5.
  • 6.
  • 7.
  • 9. Cholla Power Plant Situation: The 66" circ line had experienced enough wire breaks that a possible rupture was a major concern. The original repair was only 40-60 linear feet depending on the condition of the pipe. We needed to be able to restore the pressure bearing capacity of the circ line, the overburden was only 8’. Challenges: Time restraint was a major factor, this job there was only a small window of time to do the entire job. The prep work for the job was limited to only within 2 weeks. To remove and replace the line would have involved too much time and disruption of the existing above ground infrastructure. Likewise external tensioning would have taken too long with too much disruption.
  • 10. Solution: We went ahead and came up with a comparable solution that would not affect any of the above ground infrastructure and still provide the needed support. Carbon fiber was installed in two layers of 20 oz unidirectional in a hoop direction. Conclusion: The original 40 linear feet was done in 2 days. After the completion of the work, APS requested us to complete an additional 120 lf. We mobilized within 72 working hours and completed the additional 120 lf within 5 days.
  • 11.
  • 12. Solution: It was decided to install 20 oz of unidirectional carbon fiber in hoop direction, because this solution can be done quickly and with little invasiveness. Another supporting reason was because the risk of corrosion would be nonexistent. Conclusion: Before installation took place it was discovered that there were severe cracks where the carbon fiber was to be installed in the hoop direction. 20 oz of carbon fiber was installed perpendicular to the cracks before installing in the hoop direction to help maintain the integrity of the pipe. The job was completed in the time required and is still functioning today.
  • 13.
  • 14.  
  • 15.  
  • 16.
  • 17.
  • 18. The Solution After several solutions were investigated, it was determined that seismic reinforcement could best be achieved with carbon-fiber composites applied to the exterior and interior wall surfaces. North side of building after sandblasting to remove paint in areas where carbon-fiber is to be installed. Front entrance is shown with windows removed and surface sandblasted, now ready for 2 layers of fabric to be installed
  • 19. The Results The application of carbon-fiber fabrics and laminates proved to be the least expensive and most effective way to provide seismic reinforcement. The client was very satisfied with the product and job coordination. Realizing the challenges the crew faced doing this in the summer when the temperature was between 110 and 120 degrees. The job was completed in time for the school to reopen for classes the end of July. Shown below the crew is installing carbon-fiber laminates on the interior walls and openings. This shows the front entry after the application of bi-directional fabrics. Stucco was later added then painted.
  • 20.
  • 21.
  • 22. The Solution Fill the old penetrations that were not to be reused. Install 4” wide carbon fiber laminate strips to the underside of the planks in the areas where the penetrations had been filled. At the areas where the new plumbing was protruding we overlaid 12” wide carbon fiber fabric strips in a cross hash pattern over the laminate going 24” past the plumbing on all sides.
  • 23. The Results The strength lost because of the penetrations and the post tension cables being cut was restored. This allowed the restoration to continue at a great cost saving over replacing the floor planks. Which would have been an enormous construction issue at best.
  • 24.
  • 25. The Solution Install one layer of uni-directional carbon fiber fabric the full width of the beams and wrapping the complete beam. It was determined that any beam with a core 8 ½” or less from the bottom of the beam need carbon fiber support. This replaced the 35 kips structural strength lost by the cores while maintaining the ceiling height in the hallways.
  • 26. The Results Because some of the plumbing had already been installed the fabric had to be cut to allow the installers to wrap the fabric around the pipes. A second layer of fabric was installed over the cuts in a horizontal direction to prevent lose of strength from the cuts. The job was completed in 2 weeks and the contractor was able to get back on schedule with construction.
  • 28.
  • 29.
  • 30. Roger Road Treatment Plant Situation: The digestive gasses eroded the existing concrete columns and deteriorated the existing reinforcement. Challenges: The sludge digester needed to be kept free of rocks and pebbles. The floor of the digester was slanted making scaffolding a challenge and more difficult to keep debris out.
  • 31. Solution: Installers from the Arizona Repair Masons' Specialty Crew reinforced deteriorated columns with carbon fiber composites inside the drained digester tank of the sewage treatment plant. Damaged rebar was augmented with fiberglass rebar. Conclusion: Company was happy with the end results of restoration to the columns. Columns being wrapped with Carbon fiber laminates in order to reinforce the eroded areas.
  • 32.
  • 33. Added Touch Warehouse Badly spalled and deteriorated columns due to years of water coming from the scuppers with no down spouts.
  • 34.
  • 35.
  • 36. Central Stores—City of Phoenix   Situation: The wood beams that support the roof had been deflecting over a few years. The problems are exacerbated with the ponding of rain water in the dips created from the deflections. There were approximately 190 beams that required strengthening . The Owner (The City of Phoenix) wanted us to arrest any continued deflections and increase the margin of safety for the users. Challenges: Work in the space was to continue without shutting down the users. Air conditioning replacement was going on simultaneously which caused poor ventilation.
  • 37. Solution: Carbon fiber laminate reinforcing with fiberglass fabric stirrups were used. The Carbon laminates provide continuous adhesive reinforcing. The laminates were placed in the middle 8' of the beams, where the deflection was the greatest on the tension face. The glass fabrics were used to eliminate shear stresses on the ends and to transfer the tensile force of the laminates up through the natural axis.
  • 38. Conclusion: Arizona Repair Masons helped insure that the original engineering was adequate to meet the loads with acceptable deflection by insisting that the original calcs be checked. Workers used respirators during operations. The overstress on the beams was reduced to less than .07% and the ponds on the roof were filled in with foam to shed future water.