Scrum Overview
Jaladhi Bhatt
Birth of Scrum
• Term adopted from rugby football: a
scrum is way to restart the game after
an interruption, where the forward
of each side come together in a tight
formation and struggle to gain
possession of the ball when it is
tossed among them.
Impediments of Project Execution
Organizing Team
Changes in Scope
Unclear Rules
Where needs to apply Scrum ?
Predictable Chaotic Anarchy
It is typical to adopt the
defined (theoretical)
modeling approach when
underlying mechanism by
which process operates are
reasonably well understood
When the process is too
complicated for the
defined approach, the
empirical approach is the
appropriate choice
Unknown
Known Unknown
Requirement
Technology
Potentially Shippable
Product Increment
What is Scrum ?
Product Backlog Sprint Planning Sprint Backlog
2 – 4
Week
Sprint
Daily Scrum
Meeting3
Scrum Detailing
DEVELOP
DEPLOY
RELEASE
Feedback, Review & Accept
STORY - 1
Develop, Integrate, Test
INITIATE
Define Requirements &
Priorities
CONTINUOUS VISIBILITY
REVISE
Clients,
Developers
& Users
INTEGRATE
& TEST
INTEGRATE
& TEST
Project Execution Results
Running(&Tested)Features
Time
Technical
Debt
WEAK “done”
What is Sprint ?
Submit An Idea Help Realize an
Idea..!!
Exhibit Your
Collaboration…!!
Why Agility Practice
In
Software Development ?
Individual and Interaction V/s. Processes & Tools
Working Software V/s. Comprehensive Documentation
Customer Collaboration V/s. Contract Negotiation
Responding to Change V/s. Following Plan
12 Agile Principal’s
1. Our Highest priority is to satisfy the customer through early and continuous delivery of valuable software
2. Welcome changing requirements, even late in development, Agile processes harness change for the customer's competitive advantage.
3. Deliver working software frequently, from a couple of weeks to a couple of months, with a preferences to the shorter timescale.
4. Business people and developers must work together daily through the project.
5. Build project around motivated individuals. Give them the environment and support they need and trust them to get the job done.
6. Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a Constance pace indefinitely.
7. Working software is primary measure of progress.
8. The most efficient and effective method of conveying information to and within a development team is face-to-face conversation
9. Continuous attention to technical excellence and good design enhances agility.
10. Simplicity - the art of maximizing the amount of work node done - is essential.
11.The best architectures, requirements, and designs emerge from self-organizing teams.
12.At regular intervals, the team reflects on how to become more effective , then tunes and adjusts its behavior accordingly.
Scrum Framework Artifacts
1. Product Backlog Refinements(PBS)
• What: PBS is the process through which product backlog items are reviewed by the
Scrum team and revised, providing more detail and ensuring that there is greater
clarity in the requirements for that item: acceptance criteria, diagrams (architectural,
process flow, UI designs, etc..) example data, test cases
• Who: All members of the Scrum team should be involved in product backlog
refinements. This measures that the whole team understands what is required from
each product backlog item that may be taken into a sprint.
• When: PBS should be an ongoing process. However, some teams find it useful to
have a planned mid-sprint session that allows for product backlog items that are
candidates for the next sprint to be discussed
Scrum Framework Artifacts
1. Product Backlog Refinements(PBS)
• Keep the Product Backlog in order
• Remove or demote Product Backlog Items (PBI) that no longer seem important
• Add or Promote Product Backlog items (PBI) that raise or become more important.
• Split Product Backlog Items (PBI) into smaller items
• Merge Product Backlog Items (PBI) into larger items
• Estimate Product Backlog
Scrum Framework Artifacts
2. SPRINT (ITERATION) PLANNING
i. Selection – What can be done
• PO & Development Team discuss PBI
• Development Team determines how much work can be done according to
the historical data for velocity
• NO ONE can push more work to the Development Team
• Focus on WHAT
2 hours/
Week
Time Box
Scrum Framework Artifacts
2. SPRINT (ITERATION) PLANNING
ii. Planning – How to get it done?
• Developing Team decides how to produce the committed increments
according to the DoD
• JIT (Just IN Time) Design is to conduct Decompose larger items to smaller
ones; in the format of Features or Tasks
• Focus on HOW
15
Minutes
Time Box
Scrum Framework Artifacts
3. DAILY SCRUM / STAND-UP
• Daily, Stand-up; Same time same place
• BROADCAST individual updates to everyone
• Not a status check-up meeting; team member making COMMITMENTS in front of peers
• NO PROBLEM SOLVING during the meeting
• Everyone is invited but ONY SCRUM ROLES can speak
• 3 Questions to be answered
• What did I get DONE yesterday?
• What will I get DONE today?
• Any impediments blocking me?
15
Minutes
Time Box
Scrum Framework Artifacts
4. SPRINT REVIEW
• Team presents what is accomplished (DONE) during the sprint
• It typically take the form of a demo of new features or underlying
architecture
• Informal : 2 – hour preparation time rule – NO SLIDES
• All Stakeholders and interested parties are invited
1 Hour/
Week
Time Box
Scrum Framework Artifacts
5. SPRINT RETROSPECTIVE
• Continues improvements
• Every Sprint; right after the Sprint Review
• Whole team participates
• Other interested parties are welcome but only team speaks.
• 3-Question Format:
• What shall we start doing ?
• What shall we stop doing ?
• What shall we keep doing ?
1 Hour/
Week
Time Box
Scrum Framework Artifacts
THE DEVELOPMENT TEAM
CHARACTERISTICS
• 5-9 People
• Cross Functional
• Business Analysis
• UX/UE
• Programmer
• Tester
• Deployment
• Self-Managed
• No Management Title
• Team Accountability
• Team takes most of the project management Task
MISSION
• Delivery Product Increment
• Managed Spring Backlog
• Track Progress
• Decide the best way to work
• Collaborated as a Team
• Make continuous self-improvements
Scrum Framework Artifacts
PRODUCT OWNER
CHARACTERISTICS
• One person playing the role
• Authorized to make decisions
• Drives product success
• Represents project to the stakeholders
• Represents stakeholders to the project
• Collaborates with everyone
MISSION
• Creates Product Vision
• Defines the feature of the product
• Responsible for ROI (Return of Investments)
• Prioritize feature per market value
• Adjust Features/ priority according to the
market feedback
• Ensure the readiness of sprint input
• Accept / Rejects work result
Scrum Framework Artifacts
SCRUM MASTER
CHARACTERISTICS
• Represents team to the management
• Represents management to the team
• No Management Title
• Authorized “sheep-dog”
• Functions as a coach rather than being a
player
• Change Agent
• Listen rather than tell
• A servant Leader
MISSION
• Responsible for enacting Scrum values and
principles
• Remove impediments
• Serves the Product Owner and the team
• Protect the team
• Facilitates team collaboration / productivity
Scrum Artifacts
1. PRODUCT BACKLOG
• A DYNAMIC list of functionalities
the product MIGHT include
• Other work providing value to the
users
• A health Product Backlog must be
DEEP:
• Detailed Appropriately
• Estimated
• Emerged
• Prioritized/ Ordered
• Open to all but ultimately groomed
by the Product Owner
• Focus on WHAT brings the biggest
value
2. SPRINT BACKLOG
• A Subset of Product Backlog – PBI’s
team believes fit into one sprint
• Product Backlog items (PBI) are
broken down into smaller pieces
• Technical tasks, including JIT (Just
In Time) design, are also included
• Focus on HOW the team gets the
work done and deliver the value in
one sprint
• Emergent – Sprint Backlog Items
(SBI) can be added, edited or deleted
by the team.
• The development team owns this
asset
3. INCREMENT
• The sum of all the PBIs completed
during a Sprint and ALL PREVIOUS
Sprint
• Potentially shippable and meet the
Definition of Done
• Must be in useable condition
regardless whether or not PO decides
to release it.
• Measurement of Burn-down chart
and Task board.
5 Core Values
SPRINT
• All work need to be DONE
deliver working software every
sprint
• Is NOT a mini-waterfall
• Sprint length DOES NOT
CHANGE
• NOT REQUIREMENT
CHANGE inside one Sprint
• Cancelling a sprint – rarely
happens
1 -4
Weeks
Time Box
Agile Requirement Management & User Story
• What is User Story?
• Card
• Conversation
• Confirmation
As a [User Role],
I want to [accomplish a result],
So that [I can get some business value].
• Independent
• Negotiable
• Valued
• Estimated
• Sized Appropriately
• Testable• Vertical Slices
• A Small PSPI* instead of
task
• Definition of DONE
• Exit Criteria f how PO accepts work from the
Development Team
• Definition of Ready
• Entry Criteria of when the work is ready for the
Development Team to commit
• *PSPI – Potentially Shippable Product Increment
Acceptance Criteria & Backlog Refinement
• A very important and Common element in DoR
• Define WHAT, not HOW – Different from Functional Tests
• Given / When / Then Format
• Given: [ a pre-condition]
• When: [ user inputs]
• Then: [user gets expected results]
• Useful tool during Product Backlog Refinements
Write AC
EPIC
EPIC
EPIC
Theme
EPIC
EPIC
Story
Write AC
Test Driven Work
• Create tests, then create the work to pass the tests
• Acceptance Test Driven Development
• Test Driven Development
• Test provide a safety net for future work
• Test imply and drive design – Testing is a design activity
Test Driven Work
Relative Estimation
• Absolute estimates: a precise
measurement with a ‘unit’, e.g.
KG, KM, Hours, etc..
• Relative estimates: a
comparison(multiplier) between two
items, or grouping of items with
equivalent difficult
In Agile, relative estimation is a distinct flavor because:
• It avoids seeking unnecessary prevision: estimate is never precise
• Estimates differs from commitments: when producing a product, the effort needed has nothing to do with the
time spent on it
• It avoids the “evil undone work” : 50% of planned time spent doesn’t lead to 50% completion – we track
‘Done’ only.
• It helps to find the appropriate granularity when breaking down the work : the more granular the items are the
easier to estimate
Agile Planning & Tracking
• Release level planning & Tracking
• Who/What/When:
• Product Owner & Team/Product backlog refinement activity/
decides when to release what
• How:
• (Re)estimates the entire Product Backlog
• Find the historical date for VELOCITY
• # of sprints needed = Product backlog size / velocity
• Tool / Technology
• Feature Burn-up Chart
• Tracking:
• Release content and priority will be adjusted EVERY SPRINT
according to the market feedback and team velocity
Agile Planning & Tracking
• Sprint Level Planning & Tracking
• Tool / Technology
• Planning Poker
• Tracking
• Sprint backlog will be adjusted EVERYDAY according to the
team work result, and their impediments/ dependencies
identified during the sprint
• Daily Planning & Tracking
• Daily scrum is a daily re-planning activity
• Team member track their work in REAL TIME by updating
their work on the task board.
Roadmap to Scrum Master ( CSM )

Weitere ähnliche Inhalte

Was ist angesagt?

How to be a great scrum master
How to be a great scrum masterHow to be a great scrum master
How to be a great scrum master
Daniel Shupp
 

Was ist angesagt? (20)

The Importance of having a Sprint Goal
The Importance of having a Sprint GoalThe Importance of having a Sprint Goal
The Importance of having a Sprint Goal
 
How to be a great scrum master
How to be a great scrum masterHow to be a great scrum master
How to be a great scrum master
 
Agile Scrum Training Process
Agile Scrum Training ProcessAgile Scrum Training Process
Agile Scrum Training Process
 
scrum
scrumscrum
scrum
 
Agile Scrum Training, Day 1 (1/2)
Agile Scrum Training, Day 1 (1/2)Agile Scrum Training, Day 1 (1/2)
Agile Scrum Training, Day 1 (1/2)
 
How to Become an Indispensable Scrum Master
How to Become an Indispensable Scrum MasterHow to Become an Indispensable Scrum Master
How to Become an Indispensable Scrum Master
 
Agile (Scrum)
Agile (Scrum)Agile (Scrum)
Agile (Scrum)
 
Scrum Training (One Day)
Scrum Training (One Day)Scrum Training (One Day)
Scrum Training (One Day)
 
Scrum Process
Scrum ProcessScrum Process
Scrum Process
 
Scrum In Ten Slides (v2.0) 2018
Scrum In Ten Slides (v2.0) 2018Scrum In Ten Slides (v2.0) 2018
Scrum In Ten Slides (v2.0) 2018
 
Agile Simplified
Agile SimplifiedAgile Simplified
Agile Simplified
 
Scrum 101
Scrum 101Scrum 101
Scrum 101
 
Agile - Scrum Presentation
Agile - Scrum PresentationAgile - Scrum Presentation
Agile - Scrum Presentation
 
Agile scrum roles
Agile scrum rolesAgile scrum roles
Agile scrum roles
 
Essentials of Scrum
Essentials of ScrumEssentials of Scrum
Essentials of Scrum
 
Scrum Master Training at UM DI | 22nd and 23rd of Feb 2017
Scrum Master Training at UM DI | 22nd and 23rd of Feb 2017Scrum Master Training at UM DI | 22nd and 23rd of Feb 2017
Scrum Master Training at UM DI | 22nd and 23rd of Feb 2017
 
Scrum Simulation with LEGO, Agile Game
Scrum Simulation with LEGO, Agile GameScrum Simulation with LEGO, Agile Game
Scrum Simulation with LEGO, Agile Game
 
Scrum 101
Scrum 101 Scrum 101
Scrum 101
 
Less intro workshop
Less intro workshopLess intro workshop
Less intro workshop
 
Scrum
ScrumScrum
Scrum
 

Andere mochten auch

What is a SCRUM Master
What is a SCRUM MasterWhat is a SCRUM Master
What is a SCRUM Master
Joost Mulders
 
Overview of Agile Methodology
Overview of Agile MethodologyOverview of Agile Methodology
Overview of Agile Methodology
Haresh Karkar
 
What makes an outstanding Finance Director?
What makes an outstanding Finance Director?What makes an outstanding Finance Director?
What makes an outstanding Finance Director?
Steve Leith
 
Sesion 4 producto 5
Sesion 4  producto  5Sesion 4  producto  5
Sesion 4 producto 5
evita03
 

Andere mochten auch (20)

What is a SCRUM Master
What is a SCRUM MasterWhat is a SCRUM Master
What is a SCRUM Master
 
10 Questions For Your Scrum Master Interview
10 Questions For Your Scrum Master Interview10 Questions For Your Scrum Master Interview
10 Questions For Your Scrum Master Interview
 
Overview of Agile Methodology
Overview of Agile MethodologyOverview of Agile Methodology
Overview of Agile Methodology
 
Cwc
CwcCwc
Cwc
 
97 2003
97 200397 2003
97 2003
 
What makes an outstanding Finance Director?
What makes an outstanding Finance Director?What makes an outstanding Finance Director?
What makes an outstanding Finance Director?
 
Sthlm Stadsbiblioteket Starta Eget kväll 2013-02-07
Sthlm Stadsbiblioteket Starta Eget kväll  2013-02-07Sthlm Stadsbiblioteket Starta Eget kväll  2013-02-07
Sthlm Stadsbiblioteket Starta Eget kväll 2013-02-07
 
De kracht van Digital Storytelling
De kracht van Digital StorytellingDe kracht van Digital Storytelling
De kracht van Digital Storytelling
 
Sesion 4 producto 5
Sesion 4  producto  5Sesion 4  producto  5
Sesion 4 producto 5
 
New deal
New  dealNew  deal
New deal
 
Os Desafios na Gestão de Roadmap de Produto em Times Ágeis (Scrum Gathering R...
Os Desafios na Gestão de Roadmap de Produto em Times Ágeis (Scrum Gathering R...Os Desafios na Gestão de Roadmap de Produto em Times Ágeis (Scrum Gathering R...
Os Desafios na Gestão de Roadmap de Produto em Times Ágeis (Scrum Gathering R...
 
Palestra sobre metodologia Scrum
Palestra sobre metodologia ScrumPalestra sobre metodologia Scrum
Palestra sobre metodologia Scrum
 
UX for emerging technologies & context-aware computing
UX for emerging technologies & context-aware computingUX for emerging technologies & context-aware computing
UX for emerging technologies & context-aware computing
 
The Role of the Scrum Master
The Role of the Scrum MasterThe Role of the Scrum Master
The Role of the Scrum Master
 
Simulado Scrum master
Simulado Scrum masterSimulado Scrum master
Simulado Scrum master
 
Scrum Clock 2 week
Scrum Clock 2 weekScrum Clock 2 week
Scrum Clock 2 week
 
Certified ScrumMaster Training
Certified ScrumMaster TrainingCertified ScrumMaster Training
Certified ScrumMaster Training
 
Scrum training day 1
Scrum training day 1Scrum training day 1
Scrum training day 1
 
Sample Agile Scrum Certification Exam Questions
Sample Agile Scrum Certification Exam QuestionsSample Agile Scrum Certification Exam Questions
Sample Agile Scrum Certification Exam Questions
 
SCRUM Core Concepts
SCRUM Core ConceptsSCRUM Core Concepts
SCRUM Core Concepts
 

Ähnlich wie Roadmap to Scrum Master ( CSM )

Agile - Basics.pptxjvjplhxitstistidara तिहोचपवपज्वो
Agile - Basics.pptxjvjplhxitstistidara तिहोचपवपज्वोAgile - Basics.pptxjvjplhxitstistidara तिहोचपवपज्वो
Agile - Basics.pptxjvjplhxitstistidara तिहोचपवपज्वो
MnyMehr
 
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
duhitha2
 

Ähnlich wie Roadmap to Scrum Master ( CSM ) (20)

Agile by KD
Agile by KDAgile by KD
Agile by KD
 
Agile by KD
Agile by KDAgile by KD
Agile by KD
 
Practicing Agile through Scrum
Practicing Agile through ScrumPracticing Agile through Scrum
Practicing Agile through Scrum
 
Scrum in action
Scrum in actionScrum in action
Scrum in action
 
SCRUM Intro
SCRUM IntroSCRUM Intro
SCRUM Intro
 
Agile Scrum CMMI
Agile Scrum CMMIAgile Scrum CMMI
Agile Scrum CMMI
 
Introduction to scrum
Introduction to scrumIntroduction to scrum
Introduction to scrum
 
Agile with scrum methodology
Agile with scrum methodologyAgile with scrum methodology
Agile with scrum methodology
 
Agile methodology
Agile methodologyAgile methodology
Agile methodology
 
Agile - Basics.pptxjvjplhxitstistidara तिहोचपवपज्वो
Agile - Basics.pptxjvjplhxitstistidara तिहोचपवपज्वोAgile - Basics.pptxjvjplhxitstistidara तिहोचपवपज्वो
Agile - Basics.pptxjvjplhxitstistidara तिहोचपवपज्वो
 
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
 
Agile Scrum Quick Reference Card
Agile Scrum Quick Reference CardAgile Scrum Quick Reference Card
Agile Scrum Quick Reference Card
 
aa.pdf
aa.pdfaa.pdf
aa.pdf
 
Agile SCRUM presentation HJT_Final
Agile SCRUM presentation HJT_FinalAgile SCRUM presentation HJT_Final
Agile SCRUM presentation HJT_Final
 
SCRUM and Poker Game In Agile Project
SCRUM and Poker Game In Agile ProjectSCRUM and Poker Game In Agile Project
SCRUM and Poker Game In Agile Project
 
Scrum at a Glance
Scrum at a GlanceScrum at a Glance
Scrum at a Glance
 
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdfTeaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
 
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdfTeaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
 
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
 
Scrum Overview
Scrum OverviewScrum Overview
Scrum Overview
 

Kürzlich hochgeladen

Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 

Kürzlich hochgeladen (15)

internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 

Roadmap to Scrum Master ( CSM )

  • 2. Birth of Scrum • Term adopted from rugby football: a scrum is way to restart the game after an interruption, where the forward of each side come together in a tight formation and struggle to gain possession of the ball when it is tossed among them.
  • 3. Impediments of Project Execution Organizing Team Changes in Scope Unclear Rules
  • 4. Where needs to apply Scrum ? Predictable Chaotic Anarchy It is typical to adopt the defined (theoretical) modeling approach when underlying mechanism by which process operates are reasonably well understood When the process is too complicated for the defined approach, the empirical approach is the appropriate choice Unknown Known Unknown Requirement Technology
  • 5. Potentially Shippable Product Increment What is Scrum ? Product Backlog Sprint Planning Sprint Backlog 2 – 4 Week Sprint Daily Scrum Meeting3
  • 6. Scrum Detailing DEVELOP DEPLOY RELEASE Feedback, Review & Accept STORY - 1 Develop, Integrate, Test INITIATE Define Requirements & Priorities CONTINUOUS VISIBILITY REVISE Clients, Developers & Users INTEGRATE & TEST INTEGRATE & TEST
  • 8. What is Sprint ? Submit An Idea Help Realize an Idea..!! Exhibit Your Collaboration…!!
  • 9. Why Agility Practice In Software Development ? Individual and Interaction V/s. Processes & Tools Working Software V/s. Comprehensive Documentation Customer Collaboration V/s. Contract Negotiation Responding to Change V/s. Following Plan
  • 10. 12 Agile Principal’s 1. Our Highest priority is to satisfy the customer through early and continuous delivery of valuable software 2. Welcome changing requirements, even late in development, Agile processes harness change for the customer's competitive advantage. 3. Deliver working software frequently, from a couple of weeks to a couple of months, with a preferences to the shorter timescale. 4. Business people and developers must work together daily through the project. 5. Build project around motivated individuals. Give them the environment and support they need and trust them to get the job done. 6. Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a Constance pace indefinitely. 7. Working software is primary measure of progress. 8. The most efficient and effective method of conveying information to and within a development team is face-to-face conversation 9. Continuous attention to technical excellence and good design enhances agility. 10. Simplicity - the art of maximizing the amount of work node done - is essential. 11.The best architectures, requirements, and designs emerge from self-organizing teams. 12.At regular intervals, the team reflects on how to become more effective , then tunes and adjusts its behavior accordingly.
  • 11. Scrum Framework Artifacts 1. Product Backlog Refinements(PBS) • What: PBS is the process through which product backlog items are reviewed by the Scrum team and revised, providing more detail and ensuring that there is greater clarity in the requirements for that item: acceptance criteria, diagrams (architectural, process flow, UI designs, etc..) example data, test cases • Who: All members of the Scrum team should be involved in product backlog refinements. This measures that the whole team understands what is required from each product backlog item that may be taken into a sprint. • When: PBS should be an ongoing process. However, some teams find it useful to have a planned mid-sprint session that allows for product backlog items that are candidates for the next sprint to be discussed
  • 12. Scrum Framework Artifacts 1. Product Backlog Refinements(PBS) • Keep the Product Backlog in order • Remove or demote Product Backlog Items (PBI) that no longer seem important • Add or Promote Product Backlog items (PBI) that raise or become more important. • Split Product Backlog Items (PBI) into smaller items • Merge Product Backlog Items (PBI) into larger items • Estimate Product Backlog
  • 13. Scrum Framework Artifacts 2. SPRINT (ITERATION) PLANNING i. Selection – What can be done • PO & Development Team discuss PBI • Development Team determines how much work can be done according to the historical data for velocity • NO ONE can push more work to the Development Team • Focus on WHAT 2 hours/ Week Time Box
  • 14. Scrum Framework Artifacts 2. SPRINT (ITERATION) PLANNING ii. Planning – How to get it done? • Developing Team decides how to produce the committed increments according to the DoD • JIT (Just IN Time) Design is to conduct Decompose larger items to smaller ones; in the format of Features or Tasks • Focus on HOW 15 Minutes Time Box
  • 15. Scrum Framework Artifacts 3. DAILY SCRUM / STAND-UP • Daily, Stand-up; Same time same place • BROADCAST individual updates to everyone • Not a status check-up meeting; team member making COMMITMENTS in front of peers • NO PROBLEM SOLVING during the meeting • Everyone is invited but ONY SCRUM ROLES can speak • 3 Questions to be answered • What did I get DONE yesterday? • What will I get DONE today? • Any impediments blocking me? 15 Minutes Time Box
  • 16. Scrum Framework Artifacts 4. SPRINT REVIEW • Team presents what is accomplished (DONE) during the sprint • It typically take the form of a demo of new features or underlying architecture • Informal : 2 – hour preparation time rule – NO SLIDES • All Stakeholders and interested parties are invited 1 Hour/ Week Time Box
  • 17. Scrum Framework Artifacts 5. SPRINT RETROSPECTIVE • Continues improvements • Every Sprint; right after the Sprint Review • Whole team participates • Other interested parties are welcome but only team speaks. • 3-Question Format: • What shall we start doing ? • What shall we stop doing ? • What shall we keep doing ? 1 Hour/ Week Time Box
  • 18. Scrum Framework Artifacts THE DEVELOPMENT TEAM CHARACTERISTICS • 5-9 People • Cross Functional • Business Analysis • UX/UE • Programmer • Tester • Deployment • Self-Managed • No Management Title • Team Accountability • Team takes most of the project management Task MISSION • Delivery Product Increment • Managed Spring Backlog • Track Progress • Decide the best way to work • Collaborated as a Team • Make continuous self-improvements
  • 19. Scrum Framework Artifacts PRODUCT OWNER CHARACTERISTICS • One person playing the role • Authorized to make decisions • Drives product success • Represents project to the stakeholders • Represents stakeholders to the project • Collaborates with everyone MISSION • Creates Product Vision • Defines the feature of the product • Responsible for ROI (Return of Investments) • Prioritize feature per market value • Adjust Features/ priority according to the market feedback • Ensure the readiness of sprint input • Accept / Rejects work result
  • 20. Scrum Framework Artifacts SCRUM MASTER CHARACTERISTICS • Represents team to the management • Represents management to the team • No Management Title • Authorized “sheep-dog” • Functions as a coach rather than being a player • Change Agent • Listen rather than tell • A servant Leader MISSION • Responsible for enacting Scrum values and principles • Remove impediments • Serves the Product Owner and the team • Protect the team • Facilitates team collaboration / productivity
  • 21. Scrum Artifacts 1. PRODUCT BACKLOG • A DYNAMIC list of functionalities the product MIGHT include • Other work providing value to the users • A health Product Backlog must be DEEP: • Detailed Appropriately • Estimated • Emerged • Prioritized/ Ordered • Open to all but ultimately groomed by the Product Owner • Focus on WHAT brings the biggest value 2. SPRINT BACKLOG • A Subset of Product Backlog – PBI’s team believes fit into one sprint • Product Backlog items (PBI) are broken down into smaller pieces • Technical tasks, including JIT (Just In Time) design, are also included • Focus on HOW the team gets the work done and deliver the value in one sprint • Emergent – Sprint Backlog Items (SBI) can be added, edited or deleted by the team. • The development team owns this asset 3. INCREMENT • The sum of all the PBIs completed during a Sprint and ALL PREVIOUS Sprint • Potentially shippable and meet the Definition of Done • Must be in useable condition regardless whether or not PO decides to release it. • Measurement of Burn-down chart and Task board.
  • 22. 5 Core Values SPRINT • All work need to be DONE deliver working software every sprint • Is NOT a mini-waterfall • Sprint length DOES NOT CHANGE • NOT REQUIREMENT CHANGE inside one Sprint • Cancelling a sprint – rarely happens 1 -4 Weeks Time Box
  • 23. Agile Requirement Management & User Story • What is User Story? • Card • Conversation • Confirmation As a [User Role], I want to [accomplish a result], So that [I can get some business value]. • Independent • Negotiable • Valued • Estimated • Sized Appropriately • Testable• Vertical Slices • A Small PSPI* instead of task • Definition of DONE • Exit Criteria f how PO accepts work from the Development Team • Definition of Ready • Entry Criteria of when the work is ready for the Development Team to commit • *PSPI – Potentially Shippable Product Increment
  • 24. Acceptance Criteria & Backlog Refinement • A very important and Common element in DoR • Define WHAT, not HOW – Different from Functional Tests • Given / When / Then Format • Given: [ a pre-condition] • When: [ user inputs] • Then: [user gets expected results] • Useful tool during Product Backlog Refinements Write AC EPIC EPIC EPIC Theme EPIC EPIC Story Write AC
  • 25. Test Driven Work • Create tests, then create the work to pass the tests • Acceptance Test Driven Development • Test Driven Development • Test provide a safety net for future work • Test imply and drive design – Testing is a design activity
  • 27. Relative Estimation • Absolute estimates: a precise measurement with a ‘unit’, e.g. KG, KM, Hours, etc.. • Relative estimates: a comparison(multiplier) between two items, or grouping of items with equivalent difficult In Agile, relative estimation is a distinct flavor because: • It avoids seeking unnecessary prevision: estimate is never precise • Estimates differs from commitments: when producing a product, the effort needed has nothing to do with the time spent on it • It avoids the “evil undone work” : 50% of planned time spent doesn’t lead to 50% completion – we track ‘Done’ only. • It helps to find the appropriate granularity when breaking down the work : the more granular the items are the easier to estimate
  • 28. Agile Planning & Tracking • Release level planning & Tracking • Who/What/When: • Product Owner & Team/Product backlog refinement activity/ decides when to release what • How: • (Re)estimates the entire Product Backlog • Find the historical date for VELOCITY • # of sprints needed = Product backlog size / velocity • Tool / Technology • Feature Burn-up Chart • Tracking: • Release content and priority will be adjusted EVERY SPRINT according to the market feedback and team velocity
  • 29. Agile Planning & Tracking • Sprint Level Planning & Tracking • Tool / Technology • Planning Poker • Tracking • Sprint backlog will be adjusted EVERYDAY according to the team work result, and their impediments/ dependencies identified during the sprint • Daily Planning & Tracking • Daily scrum is a daily re-planning activity • Team member track their work in REAL TIME by updating their work on the task board.