TRANSPORTATION PROBLEM
       Transportation problem is one of the subclasses of LPP’s in which the objective is to
transport various quantities of a single homogeneous commodity, that are initially stored at
various origins to different destinations in such a way that the total transportation cost is
minimum. To achieve this objective we must know the amount and location of available
supplies and the quantities demanded. In addition, we must know the costs that result from
transporting one unit of commodity from various origins to various destinations.

Mathematical Formulation of the Transportation Problem
A transportation problem can be stated mathematically as a Linear Programming Problem as
below:
Minimize Z =
subject to the constraints

         = ai , i = 1, 2,…..,m
         = bj , j = 1, 2,…..,m

    xij ≥ 0 for all i and j
Where, ai = quantity of commodity available at origin i
      bj= quantity of commodity demanded at destination j
      cij= cost of transporting one unit of commodity from ith origin to jth
           destination
      xij = quantity transported from ith origin to jth destination


Tabular form of the Transportation Problem

    To      D1             D2          …….          Dn           Supply
From
    O1       c11           c12        …….           c1n              a1

    O2       c21           c22        …….           c2n              a2

.           .              .          …….           .            .
.           .              .                        .            .
.           .              .                        .            .
    Om       cm1           cm2        …….           cmn               am

Demand          b1         b2         …….               bn
NORTH - WEST CORNER RULE
Step1:Identify the cell at North-West corner of the transportation        matrix.
Step2:Allocate as many units as possible to that cell without      exceeding      supply or
demand; then cross out the row       or column that is exhausted by this assignment
Step3:Reduce the amount of corresponding supply or          demand which is more by allocated
amount.
Step4:Again identify the North-West corner cell of reduced         transportation matrix.
Step5:Repeat Step2 and Step3 until all the rim       requirements are satisfied.

Vogel’s Approximation Method (VAM)

Step-I: Compute the penalty values for each row and each column. The penalty will be
        equal to the difference between the two smallest shipping costs in the row or column.
Step-II: Identify the row or column with the largest penalty. Find the first basic variable which
        has the smallest shipping cost in that row or        column. Then assign the highest
possible        value to that variable, and cross-out the row       or column which is
exhausted.
Step-III: Compute new penalties and repeat the        same procedure until all the rim
        requirements are satisfied.


An example for Vogel’s Method
Find the IBFS of the following transportation problem by using Penalty Method.

                                      D1                 D2                 D3
                                                                                      Supply


                                                                                         10
                                 6                  7                  8


                                                                                         15
                                 15                 80                 78

                                      15                 5                   5


Step 1: Compute the penalties in each row and                               each column .
                                                                                   Supply     Row Penalty


                                                                                    10              7-6=1
                            6                  7                  8


                                                                            Supply 15     78-15=63
                                                                                    Row Penalty
                            15                 80                 78

      Demand                     15                 5                  5      10            7-6=1
Step 2: Identify the largest penalty and choose least cost cell to corresponding this penalty
                   6            7           8
      Column Penalty        15-6=9             80-7=73            78-8=70
                                                                              15         78-15=63
                  15                  80                 78

Demand                 15                  5                  5

Column Penalty     15-6=9              80-7=73            78-8=70
Step-3: Allocate the amount 5 which is minimum of corresponding row supply and column
demand and then cross out column2
                                                                                       Supply        Row Penalty

                                                       5
                                                                                          10            7-6=1
                           6                  7                     8


                                                                                          15          78-15=63
                           15              80                       78

  Demand                        15                 5                     5

  Column Penalty            15-6=9            80-7=73               78-8=70


Step-4: Recalculate the penalties
                                                                             Supply   Row Penalty
                                                   5
                                                                               5         8-6=2
                                6         7                8

                                                                              15       78-15=63
                                15        80               78

          Demand                     15        X                5

          Column Penalty        15-6=9                     78-8=70




                                                                                      Supply        Row Penalty

                                                       5
                                                                                         5             8-6=2
Step-5: Identify the6largest penalty and choose least cost cell to corresponding this penalty
                                7           8


                                                                                        15           78-15=63
                      15                  80                    78

 Demand                        15                 X                      5

 Column Penalty            15-6=9                                   78-8=70
Step-6: Allocate the amount 5 which is minimum of corresponding row supply and column
demand, then cross out column3
                                                                             Supply       Row Penalty

                                                     5                  5
                                                                                 5           8-6=2
                       6                   7                  8


                                                                                 15        78-15=63
                       15                  80                 78

     Demand                 15                  X                  X

     Column Penalty    15-6=9


Step-7: Finally allocate the values 0 and 15 to corresponding cells and cross out column 1

                                 D1                  D2                 D3        Supply

                                      0                   5                  5
                                                                                      X
                  O1        6                   7                  8

                                      15
                                                                                      X
                  O2        15                  80                 78

        Demand                   X                   X                  X



Solution of the problem
Now the Initial Basic Feasible Solution of the transportation problem is
X11=0, X12=5, X13=5, and X21=15 and
Total transportation cost = (0x6)+(5x7)+(5x8)+(15x15)
                        = 0+35+40+225
                        = 300.

Weitere ähnliche Inhalte

Was ist angesagt?

Transportation Problem
Transportation ProblemTransportation Problem
Transportation ProblemAlvin Niere
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation Problemitsvineeth209
 
decision making criterion
decision making criteriondecision making criterion
decision making criterionGaurav Sonkar
 
The nature of the economic problem
The nature of the economic problemThe nature of the economic problem
The nature of the economic problemAshina Fathima
 
Duality in Linear Programming
Duality in Linear ProgrammingDuality in Linear Programming
Duality in Linear Programmingjyothimonc
 
LINEAR PROGRAMMING
LINEAR PROGRAMMINGLINEAR PROGRAMMING
LINEAR PROGRAMMINGrashi9
 
Optimal Solution by MODI Method
Optimal Solution by MODI MethodOptimal Solution by MODI Method
Optimal Solution by MODI MethodDrDeepaChauhan
 
Formulation Lpp
Formulation  LppFormulation  Lpp
Formulation LppSachin MK
 
North west corner method
North west corner method North west corner method
North west corner method Akash Jadhav
 
Linear Programming 1
Linear Programming 1Linear Programming 1
Linear Programming 1irsa javed
 
Deepika(14 mba5012) transportation ppt
Deepika(14 mba5012)  transportation pptDeepika(14 mba5012)  transportation ppt
Deepika(14 mba5012) transportation pptDeepika Bansal
 
Least Cost Method - operation research
Least Cost Method - operation researchLeast Cost Method - operation research
Least Cost Method - operation researchsajan gohel
 
transportation-model.ppt
transportation-model.ppttransportation-model.ppt
transportation-model.pptanubhuti18
 
Transportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsTransportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsKrupesh Shah
 
Amortized Analysis of Algorithms
Amortized Analysis of Algorithms Amortized Analysis of Algorithms
Amortized Analysis of Algorithms sathish sak
 

Was ist angesagt? (20)

LEAST COST METHOD
LEAST COST METHOD LEAST COST METHOD
LEAST COST METHOD
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation Problem
 
4-The Simplex Method.ppt
4-The Simplex Method.ppt4-The Simplex Method.ppt
4-The Simplex Method.ppt
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation Problem
 
decision making criterion
decision making criteriondecision making criterion
decision making criterion
 
Big m method
Big m methodBig m method
Big m method
 
The nature of the economic problem
The nature of the economic problemThe nature of the economic problem
The nature of the economic problem
 
Duality in Linear Programming
Duality in Linear ProgrammingDuality in Linear Programming
Duality in Linear Programming
 
LINEAR PROGRAMMING
LINEAR PROGRAMMINGLINEAR PROGRAMMING
LINEAR PROGRAMMING
 
Assignment Problem
Assignment ProblemAssignment Problem
Assignment Problem
 
Optimal Solution by MODI Method
Optimal Solution by MODI MethodOptimal Solution by MODI Method
Optimal Solution by MODI Method
 
Formulation Lpp
Formulation  LppFormulation  Lpp
Formulation Lpp
 
North west corner method
North west corner method North west corner method
North west corner method
 
Linear Programming 1
Linear Programming 1Linear Programming 1
Linear Programming 1
 
Deepika(14 mba5012) transportation ppt
Deepika(14 mba5012)  transportation pptDeepika(14 mba5012)  transportation ppt
Deepika(14 mba5012) transportation ppt
 
Least Cost Method - operation research
Least Cost Method - operation researchLeast Cost Method - operation research
Least Cost Method - operation research
 
transportation-model.ppt
transportation-model.ppttransportation-model.ppt
transportation-model.ppt
 
Transportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsTransportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete Maths
 
Amortized Analysis of Algorithms
Amortized Analysis of Algorithms Amortized Analysis of Algorithms
Amortized Analysis of Algorithms
 
Transportation problem
Transportation problemTransportation problem
Transportation problem
 

Andere mochten auch

Andere mochten auch (12)

Transportation model
Transportation modelTransportation model
Transportation model
 
Uses of Project Status field
Uses of  Project Status field Uses of  Project Status field
Uses of Project Status field
 
layout planning
layout planninglayout planning
layout planning
 
Om problems facility layout
Om problems   facility layoutOm problems   facility layout
Om problems facility layout
 
Ch09
Ch09Ch09
Ch09
 
Location models
Location modelsLocation models
Location models
 
Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing Method
 
Assembly systems & line balance
Assembly systems & line balanceAssembly systems & line balance
Assembly systems & line balance
 
Assembly Line Balancing -Example
Assembly Line Balancing -ExampleAssembly Line Balancing -Example
Assembly Line Balancing -Example
 
Line balancing ppt By Wakil Kumar
Line balancing ppt By Wakil KumarLine balancing ppt By Wakil Kumar
Line balancing ppt By Wakil Kumar
 
assembly line balancing
assembly line balancingassembly line balancing
assembly line balancing
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 

Mehr von itsvineeth209

Evolution,Drivers Of Indian Retail
Evolution,Drivers Of Indian RetailEvolution,Drivers Of Indian Retail
Evolution,Drivers Of Indian Retailitsvineeth209
 
Intro To Tretailing 6.2.09
Intro To Tretailing 6.2.09Intro To Tretailing 6.2.09
Intro To Tretailing 6.2.09itsvineeth209
 
Indian Retail Sector
Indian Retail SectorIndian Retail Sector
Indian Retail Sectoritsvineeth209
 
Rm 10 Report Writing 2
Rm   10   Report Writing 2Rm   10   Report Writing 2
Rm 10 Report Writing 2itsvineeth209
 
Rm 6 Sampling Design
Rm   6   Sampling DesignRm   6   Sampling Design
Rm 6 Sampling Designitsvineeth209
 
Rm 1 Intro Types Research Process
Rm   1   Intro Types   Research ProcessRm   1   Intro Types   Research Process
Rm 1 Intro Types Research Processitsvineeth209
 
Rm 5 Methods Of Data Collection
Rm   5   Methods Of Data CollectionRm   5   Methods Of Data Collection
Rm 5 Methods Of Data Collectionitsvineeth209
 
Rm 4 Research Design
Rm   4   Research DesignRm   4   Research Design
Rm 4 Research Designitsvineeth209
 
Rm 2 Problem Identification
Rm   2   Problem IdentificationRm   2   Problem Identification
Rm 2 Problem Identificationitsvineeth209
 
Procedure Of Simplex Method
Procedure Of Simplex MethodProcedure Of Simplex Method
Procedure Of Simplex Methoditsvineeth209
 
North West Corner Rule
North   West Corner RuleNorth   West Corner Rule
North West Corner Ruleitsvineeth209
 
Artificial Variable Technique –
Artificial Variable Technique –Artificial Variable Technique –
Artificial Variable Technique –itsvineeth209
 

Mehr von itsvineeth209 (20)

Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Evolution,Drivers Of Indian Retail
Evolution,Drivers Of Indian RetailEvolution,Drivers Of Indian Retail
Evolution,Drivers Of Indian Retail
 
Intro To Tretailing 6.2.09
Intro To Tretailing 6.2.09Intro To Tretailing 6.2.09
Intro To Tretailing 6.2.09
 
Indian Retail Sector
Indian Retail SectorIndian Retail Sector
Indian Retail Sector
 
Sampling Design
Sampling DesignSampling Design
Sampling Design
 
Sampling Design
Sampling DesignSampling Design
Sampling Design
 
Rm 10 Report Writing 2
Rm   10   Report Writing 2Rm   10   Report Writing 2
Rm 10 Report Writing 2
 
Rm 6 Sampling Design
Rm   6   Sampling DesignRm   6   Sampling Design
Rm 6 Sampling Design
 
Rm 1 Intro Types Research Process
Rm   1   Intro Types   Research ProcessRm   1   Intro Types   Research Process
Rm 1 Intro Types Research Process
 
Rm 5 Methods Of Data Collection
Rm   5   Methods Of Data CollectionRm   5   Methods Of Data Collection
Rm 5 Methods Of Data Collection
 
Rm 3 Hypothesis
Rm   3   HypothesisRm   3   Hypothesis
Rm 3 Hypothesis
 
Research Design
Research DesignResearch Design
Research Design
 
Rm 4 Research Design
Rm   4   Research DesignRm   4   Research Design
Rm 4 Research Design
 
Rm 2 Problem Identification
Rm   2   Problem IdentificationRm   2   Problem Identification
Rm 2 Problem Identification
 
Vam
VamVam
Vam
 
Simplex Method
Simplex MethodSimplex Method
Simplex Method
 
Procedure Of Simplex Method
Procedure Of Simplex MethodProcedure Of Simplex Method
Procedure Of Simplex Method
 
North West Corner Rule
North   West Corner RuleNorth   West Corner Rule
North West Corner Rule
 
Artificial Variable Technique –
Artificial Variable Technique –Artificial Variable Technique –
Artificial Variable Technique –
 
Combined
CombinedCombined
Combined
 

Kürzlich hochgeladen

Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 

Kürzlich hochgeladen (20)

Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 

Transportation Problem

  • 1. TRANSPORTATION PROBLEM Transportation problem is one of the subclasses of LPP’s in which the objective is to transport various quantities of a single homogeneous commodity, that are initially stored at various origins to different destinations in such a way that the total transportation cost is minimum. To achieve this objective we must know the amount and location of available supplies and the quantities demanded. In addition, we must know the costs that result from transporting one unit of commodity from various origins to various destinations. Mathematical Formulation of the Transportation Problem A transportation problem can be stated mathematically as a Linear Programming Problem as below: Minimize Z = subject to the constraints = ai , i = 1, 2,…..,m = bj , j = 1, 2,…..,m xij ≥ 0 for all i and j Where, ai = quantity of commodity available at origin i bj= quantity of commodity demanded at destination j cij= cost of transporting one unit of commodity from ith origin to jth destination xij = quantity transported from ith origin to jth destination Tabular form of the Transportation Problem To D1 D2 ……. Dn Supply From O1 c11 c12 ……. c1n a1 O2 c21 c22 ……. c2n a2 . . . ……. . . . . . . . . . . . . Om cm1 cm2 ……. cmn am Demand b1 b2 ……. bn NORTH - WEST CORNER RULE
  • 2. Step1:Identify the cell at North-West corner of the transportation matrix. Step2:Allocate as many units as possible to that cell without exceeding supply or demand; then cross out the row or column that is exhausted by this assignment Step3:Reduce the amount of corresponding supply or demand which is more by allocated amount. Step4:Again identify the North-West corner cell of reduced transportation matrix. Step5:Repeat Step2 and Step3 until all the rim requirements are satisfied. Vogel’s Approximation Method (VAM) Step-I: Compute the penalty values for each row and each column. The penalty will be equal to the difference between the two smallest shipping costs in the row or column. Step-II: Identify the row or column with the largest penalty. Find the first basic variable which has the smallest shipping cost in that row or column. Then assign the highest possible value to that variable, and cross-out the row or column which is exhausted. Step-III: Compute new penalties and repeat the same procedure until all the rim requirements are satisfied. An example for Vogel’s Method Find the IBFS of the following transportation problem by using Penalty Method. D1 D2 D3 Supply 10 6 7 8 15 15 80 78 15 5 5 Step 1: Compute the penalties in each row and each column . Supply Row Penalty 10 7-6=1 6 7 8 Supply 15 78-15=63 Row Penalty 15 80 78 Demand 15 5 5 10 7-6=1 Step 2: Identify the largest penalty and choose least cost cell to corresponding this penalty 6 7 8 Column Penalty 15-6=9 80-7=73 78-8=70 15 78-15=63 15 80 78 Demand 15 5 5 Column Penalty 15-6=9 80-7=73 78-8=70
  • 3. Step-3: Allocate the amount 5 which is minimum of corresponding row supply and column demand and then cross out column2 Supply Row Penalty 5 10 7-6=1 6 7 8 15 78-15=63 15 80 78 Demand 15 5 5 Column Penalty 15-6=9 80-7=73 78-8=70 Step-4: Recalculate the penalties Supply Row Penalty 5 5 8-6=2 6 7 8 15 78-15=63 15 80 78 Demand 15 X 5 Column Penalty 15-6=9 78-8=70 Supply Row Penalty 5 5 8-6=2 Step-5: Identify the6largest penalty and choose least cost cell to corresponding this penalty 7 8 15 78-15=63 15 80 78 Demand 15 X 5 Column Penalty 15-6=9 78-8=70
  • 4. Step-6: Allocate the amount 5 which is minimum of corresponding row supply and column demand, then cross out column3 Supply Row Penalty 5 5 5 8-6=2 6 7 8 15 78-15=63 15 80 78 Demand 15 X X Column Penalty 15-6=9 Step-7: Finally allocate the values 0 and 15 to corresponding cells and cross out column 1 D1 D2 D3 Supply 0 5 5 X O1 6 7 8 15 X O2 15 80 78 Demand X X X Solution of the problem Now the Initial Basic Feasible Solution of the transportation problem is X11=0, X12=5, X13=5, and X21=15 and Total transportation cost = (0x6)+(5x7)+(5x8)+(15x15) = 0+35+40+225 = 300.