SlideShare ist ein Scribd-Unternehmen logo
1 von 7
Downloaden Sie, um offline zu lesen
Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and
Applications (IJERA) ISSN: 2248-9622 www.ijera.com
Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971
1965 | P a g e
QUALITY MANAGEMENT OF WATER SUPPLIES UNDER
24x7 SCHEMES, AT SECTOR NO. 21, PCMC, PUNE
Ms. Namrata B Patil*, Dr. W N Deulkar**
*(Department of Civil Engineering, Pune University, Pune
** (Department of Civil Engineering, Pune University, Pune
ABSTRACT
Drinking water is not only a basic need of
life but its supply is also important for achieving
the goal of health for all. The primary aim of
Pimpri Chinchwad Municipal Corporation
(PCMC), Pune is to provide water to the
consumer for 24x7 hours by framing the
legislation on regulation of drinking water
through a scheme which is named as 24x7 water
supply scheme.
In continuous water supply, PCMC takes
the efforts to provide quality and its continuous
supply to the consumer. Hence before provision of
continuous water supply, we have considered
‘leakages’ in the distributaries as it is the most
responsible factor for water contamination. For
detecting leakages and to provide safe qualities of
water, a sample of water from consumer water tap
was analyzed for chlorine and turbidity test.
Helium gas was used to detect leakages in the
water mains. It is seen that, this technique is safe,
easy to operate and have accurate results to find
leakages in water mains.
Keywords – water leak detection, pipe lines, Helium
gas leak detector, water quality management,
successful implementation.
I. INTRODUCTION
Generally, in India Intermittent Water
Supply System is used to supply drinking water to
people by the Local bodies. In this system water is
supplied to users for less than 24 hour in a day for
specified hours i.e. in the morning or evening or as
per available time. Water is supplied to the
consumers usually at the peak hours of the water
usage i.e. morning 6 am to 9 am and evening 5 pm to
8 pm. In this system, consumers have to store the
water in between supply hours. The needs of the
study are as follows:
1. 24 x 7 system reduces contamination level as the
pipes are under positive pressure and entry of
contaminants into the pipes is restricted.
2. Due to steady pressure in the pipe increase the
life of pipe distribution network. No fatigue for
pipes.
3. A better demand management is possible due to
elaborate metering and effective leakage control.
It is also easy & just to calculate water charges
based on consumed volume.
4. Reduction in consumption due to change in habit
from storing of water to non storing, also it
generate excellent customer satisfaction
5. People can manage their time effectively, they
can allot more time for rewarding activities.
6. Due to fully metered system easy to carry out
water.
II. METHODOLOGY
Helium Mass Spectrometer (MS) Leak Detection
Method
This method was first used in Manhattan,
New York by the Uranium Enrichment Plant for
„Manhattan Project‟. This method is used for the first
time in India and for the second time in the world. In
India it is been used for the project, „24x7 Water
Supply System‟ in sector 21, PCMC. Helium gas is
used for leak detection because it is Non-toxic, Inert
and non-condensable, not present in the atmosphere
at more than trace amounts, relatively inexpensive,
readily passes through leaks due to its small atomic
size, Non-flammable, Available in various size
cylinders, and Available in purities appropriate for
medical usage. This gas belongs to zero group (Noble
gases) in periodic table having atomic mass 4.002202
2.1 Procedure for Helium Gas Leak Detection
Leakage on the pipe line was finding out by
carrying three steps.
1) Helium Injection
2) Pipe & Cable Detection
3) Leakage Detection
The details of the above steps are given
below
1. Helium Injection
 Initially, a cylinder of Helium gas is fixed to the
outlet of the ESR
 The injecting pressure of the Helium gas was
maintained such that 30% of the Helium gas in
the cylinder has to be injected in 30 minutes. For
this criterion, the pressure was to be maintained
at 9.5 kg/cm2
. (Fig.2.1)
 The pressure was checked at an interval of 15
mins.
 A Pressure-meter to measure the pressure of the
water in the pipe was attached to the pipe.
Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and
Applications (IJERA) ISSN: 2248-9622 www.ijera.com
Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971
1966 | P a g e
Figure 2.1 Pressure meter with helium gas cylinder
2. Pipe & Cable Detection
 With the help of Pipe & Cable Detector, the
underground pipes and cables are detected.
Fig.2.2(a)
 The Locator is having the receiver and
transmitter; receiver is divided in two parts –
Antenna & Receiver. Fig.2.2(b)
 The Receiver receives reflected waves from the
cables and indicates the location and the depth of
cables. After detecting the cable, a hole is drilled
at every 2 m. to 3 m. apart from the point where
the cable is detected so as to avoid drilling in the
cable. The depth of the hole is 40 cm. Fig.2.2(c)
(a) (b)
(c) (d)
Figure 2.2 Leak detection
3. Leakage Detection
 Above the drilled holes, a vacuum pipe is placed
that is connected to the Spectrometer Fig.2.2 (d).
There is a filter in between the vacuum pipe and
spectrometer which filters the moisture and soil
particles coming from the vacuum pipe, if any.
Only air is carried away further.
 Next to the filter there are two jars containing
silica gel (Blue color). A sniffing probe is
connected to one of the jars.
 The silica gel filters the moisture if any after
filtering and hence protects the spectrometer.
 The filtered air finally enters in the spectrometer.
The spectrometer then shows the amount of the
Helium gas. The saturated concentration of
helium is 3.5x10-6
Kg/cm2
in the atmosphere but
if the spectrometer reading is exceeding 7x10-6
kg/cm2
then there is a possibility of leakage. At
such case, few more holes are drilled along the
radius of the detected hole, if the reading is
increasing or up to 7x10-6
Kg/cm2
then surely
there is a leakage.Fig.2.2(e)
(e)
Figure 2.2 Pictures durring leak detection
2.2 Leakage Repair Work
After detecting leakages on pipeline in
sector 21, following types of connection repair is
done
1. Ferrule Connection: ferrule is used when at end
of pipe leak is found. Following Fig. 2.3shows
the ferrule connection.
Figure 2.3 ferrule connection
1. Sluice Valve:
A Sluice Valve is often used on larger
diameter mains (2” or greater) mainly for industrial
and commercial feeds. This works covers or
maintenance and renewals of any type of Sluice
Valve including, chamber frame and cover rebuilds,
repacking glands, is spindles, repairs to bolts and
flange plates and full replacement of valves with
main work. Figure 2.4 shows the sluice valve repair
Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and
Applications (IJERA) ISSN: 2248-9622 www.ijera.com
Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971
1967 | P a g e
Figure 2.4 sluice valve repair
2. Mains Repair
This covers all repairs and maintenance of
all water mains and supply pipes greater than 1” in
diameter. There are many different types of materials
that have been used in the installation of water mains
from Asbestos Cement, PVC, Medium Density
Polyethylene (MDPE), copper, galvanized iron to the
more common ductile and cast-iron. With this there
are many fittings to adopt and maintain these
different materials for use in repairs to water mains,
new connections for supplies to properties and
general preservations, refer the Fig. 2.5 below.
Figure 2.5 mains repaired connection at sector 21
III. RESULTS AND DISCUSSION
While detecting leakages on pipeline, we
studied 31 leak spots out of 31 leaks, 5 do not have
any leakage and 26 were having leakages which were
repaired. The position of various leak points is shown
in the figure 3.1 which are marked by star ( ).The
number followed by star ( ) indicates Helium
concentration obtained and the numbers mentioned in
the bracket with red colour indicates the serial
number of leak.
Figure 3.1 Details of pipe with leak spot and Helium
concentration
IV. FIGURES AND TABLES
4.1 Leakage Detection Information:
Having detected all leakages, their repairing
was done on the site with immediate action so that
the accidents could not be taken place by the
excavated trenches and also to avoid the water loss at
the leak point. The detail information about leak
point and its repairing is mentioned in the table 4.1.
Table 4.1 Information about the leakage area and
type of leakages:
Lea
k
Nu
m-
ber
He
liu
m
Perf
or-
man
ce
date
Leak
location
Di
a
m-
ete
r
of
pi
pe
Ty
pe
of
cr
ac
k
Meth
od of
repair
ing
1 24 14-
1-
2012
Near
Chicken
Chowk,
Opposite
of Kaveri
Housing
Soc,
Scheme
No 12,
Building
25
0
Hou
s
e
Con
n
e
c
t
i
o
Small
pipe
piece
&ferr
ule
replac
ed
Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and
Applications (IJERA) ISSN: 2248-9622 www.ijera.com
Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971
1968 | P a g e
No 14. n
&
F
e
r
r
u
l
e
Cra
c
k
2 7 14-
1-
2012
Near
Chicken
Chowk,
Opposite
of
Sharayu
Housing
Soc.,
Scheme
No 12,
Building
No 12
25
0
N
o
Le
ak
-
3 12 14-
1-
2012
Opposite
of
Yamuna
Nagar
Shopping
Complex
(Ratna
Hospital)
25
0
T-
joi
nt
Cr
ac
k
Lead
wool
used
4 8.
2
14-
1-
2012
Near
Hanuman
Sweets,
Opposite
of
Kunj
Vihar(1)
20
0
Fe
rru
le
Cr
ac
k
Ferrul
e
replac
ed
5 14 14-
1-
2012
Opposite
Of
Swatantry
a Veer
V.D.
Sawarkar
Chowk,
Near
Nandan
Bungalow
Plot
No.89
20
0
T-
joi
nt
Cr
ac
k
Lead
wool
used
6 14 14-
1-
2012
Opposite
of Shiv
Sankalp
Bungalow
, Plot No
466,
Yamuna
15
0
N
o
lea
k
-
Nagar
7 10 14-
1-
2012
Near
Mohak
Bungalow
, Plot No
370,
Sector No
21.
15
0
Fe
rru
le
Cr
ac
k
Ferrul
e
replac
ed
8 10 14-
1-
2012
Bajaj
road,
opposite
of
venkatesh
bungalow
nigadi.
15
0
H
ou
se
Co
nn
ect
io
n
&
Fe
rru
le
Cr
ac
k
Hous
e
conne
ction
and
ferrul
e
replac
ed
9 15 17-
1-
2012
Bajaj
road,
opposite
of
Venkatesh
bungalow
Nigadi.
20
0
M
ai
n
lin
e
Cr
ac
k
Repla
ced
pipe
piece
10 24 18-
1-
2012
Near
Rajnigand
ha
building,s
ch no 10,
Peth no
21,
Yamuna
nagar.
15
0
Fe
rru
le
Cr
ac
k
ferrul
e
replac
ed
11 34 18-
1-
2012
Near
Rajnigand
ha
building,s
ch no 10,
Peth no
21,
Yamuna
nagar.
15
0
Fe
rru
le
Cr
ac
k
ferrul
e
replac
ed
12 8 18-
1-
2012
Opposite
of Jay
Tulja
Bhavani
Mitra
Mandal,
Kranti
Chowk,
15
0
Fe
rru
le
Cr
ac
k
ferrul
e
replac
ed
Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and
Applications (IJERA) ISSN: 2248-9622 www.ijera.com
Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971
1969 | P a g e
Sec No
21.
13 18 18-
1-
2012
opposite
of scheme
no 6,
building
no 32-
36(near
Neeta
Beauty
Parlour)
10
0
H
ou
se
co
nn
ect
io
n
cr
ac
k
Repla
ced
pipe
piece
14 22 19-
1-
2012
Opposite
of Sch No
6,
Building
No 25-27,
Trimurti
Society
15
0
H
ou
se
co
nn
ect
io
n
cr
ac
k
PVC
house
conne
ction
replac
ed
15 7.
2
21-
2-
2012
Near
swapnali
housing
soc. (opp
of
Gracious
building
no 23),
sch no 11,
builidng
no 31.
20
0
Fe
rru
le
cr
ac
k
Ferrul
e
replac
ed
16 11 21-
2-
2012
Near
Mauli
housing
soc,sch no
11,
building
no 29(opp
of Mata
Vaishnavi
Pratishtha
n ground)
20
0
cr
ac
k
on
20
0
m
m
lin
e
used
clamp
on
crack
piece
17 42 23-
2-
2012
Near
Shree
Radhakris
hna
bunglow,
Bajaj
Road,
house no
39, Leak
between
17 & 18
15
0
H
ou
se
&
fer
rul
e
Cr
ac
k
Hous
e
conne
ction
and
ferrul
e
replac
ed
18 50 23-
2-
2012
Near
Shree
Radhakris
hna
Bunglow,
Bajaj
Road,
House No
40
15
0
H
ou
se
&
fer
rul
e
Cr
ac
k
Hous
e
conne
ction
and
ferrul
e
replac
ed
19 23 23-
2-
2012
Near
Shantavi
Bunglow,
Bajaj
Road.
15
0
H
ou
se
co
nn
ect
io
n
cr
ac
k
(L
ea
ck
ag
e
at
4
po
int
s)
tempo
rary
replac
ed by
rubbe
r tube
20 29 24-
2-
2012
Near
Krushna
Nivas
Bunglow(
Venkatesh
Classes),
Bajaj
Road
15
0
N
o
lea
k
-
21 55 24-
2-
2012
In front of
Pravin
Seat
Cover(
Near Om
Bungalow
) Plot No
401,
Sector No
21
15
0
N
o
lea
k
-
22 55 25-
2-
2012
In front of
Mr
Barshetti,
plot no
399,
Sector No
21.
15
0
H
ol
e
on
H
ou
se
co
nn
replac
ed
house
conne
ction
Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and
Applications (IJERA) ISSN: 2248-9622 www.ijera.com
Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971
1970 | P a g e
ect
io
n
23 17 25-
2-
2012
Near to
Triveni
Nagar
Water
Tank,
Opposite
to Infant
Jesus
Chuch,
Sector No
21.
10
0
Joi
nt
lea
k
Lead
wool
used
24 23 25-
2-
2012
Near to
Triveni
Nagar
Water
Tank,
Opposite
to Infant
Jesus
Chuch,
Sector No
21.
20
0
Joi
nt
lea
k
Lead
wool
used
25 24 25-
2-
2012
snehaband
ha
housing
soc, sector
no 21,
scheme no
11,
building
no 44,
near sia
baba
mandir
20
0
Fe
rru
le
Cr
ac
k
Ferrul
e
replac
ed
26 13 25-
2-
2012
At
chicken
chowk,
sector no
21,
yamuna
nagar.
10
0
Joi
nt
lea
k
Lead
wool
used
27 7.
5
02/3/
12
Next to
datta
mandir,
sector no
21, chal
no 9,
parlour
10
0
Fe
rru
le
Cr
ac
k
Ferrul
e
replac
ed
28 7.
9
02/3/
12
In front
guru
krupa
building,
opposite
of amber
housing
society(
building
no 19,
scheme no
10)
10
0
Fe
rru
le
Cr
ac
k
Ferrul
e
replac
ed
29 10 02/3/
12
Opposite
of Ameya
Housing
Soc,
Building
No 23,
Scheme
No 10
10
0
N
o
lea
k
-
30 7.
2
02/0
3/12
Near plot
no 01,
Jevandhar
a socity,
near sai
baba
mandir
10
0
Fe
rru
le
cr
ac
k
Ferrul
e
replac
ed
31 14 02/0
3/12
Near
krushna
nivas
bunglow(
venkatesh
classes),
bajaj road
15
0
Fe
rru
le
cr
ac
k
Ferrul
e
replac
ed
V. CONCLUSION
1. The leaks were found very accurately by using
recent techniques. A total of 31 spots were
studied, out of that,
5 have no leakage and 26 have the leakages
which were repaired.
2. Pilot project of 24x7 water supply scheme is
studied at sector no. 21.
3. A new system for locating pipe leaks is
introduced. The system incorporates several new
developments like recycling of waste water for
gardening etc.
4. This helps to reorganize and restructure the
wards as per increase of people in area.
5. The main water supply pipe lines were checked
for its thickness, diameter, pressure, flow and
quality of the pipe material. It was concluded
that there is no need to change/replace the
pipelines.
6. The water provided by PCMC to all people of
sector 21 is of standard quality and passes the
safe permissible limit.
Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and
Applications (IJERA) ISSN: 2248-9622 www.ijera.com
Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971
1971 | P a g e
References
[1] Mohamed Fahmy and Osama Moselhi,
“Automated Detection and Location of
Leaks in Water Mains Using Infrared
Photography”, Journal of Performance of
Constructed Facilities, 24(3), 2010, ASCE.
[2] Yuzhe and Xiaoling Zhang, “Key
Assessment Indicators for the
Sustainability of Infrastructure
Projects”, Journal of Construction
Engineering and Management, 137(6),
2010, ASCE.
[3] Yeou-Koung Tung, Huan - Feng Duan,
Pedro J. Lee and Mohamed, “System
Response Function Based Leak Detection in
Viscoelastic Pipelines”, Journal of
Hydraulic Engineering, 2011, ASCE.
[4] Jamie Montague Fischer and Adjo
Amekudzi, “Quality of Life,
Sustainable Civil Infrastructure, and
Sustainable Development:
Strategically Expanding Choice”,
Journal of Urban Planning and
Development, 137(1), 2011, ASCE.

Weitere ähnliche Inhalte

Andere mochten auch (7)

Contexto de Formación - Servicio Nacional de Aprendizaje - SENA
Contexto de Formación - Servicio Nacional de Aprendizaje - SENAContexto de Formación - Servicio Nacional de Aprendizaje - SENA
Contexto de Formación - Servicio Nacional de Aprendizaje - SENA
 
Matprim
Matprim   Matprim
Matprim
 
La historia de las cosas
La historia de las cosasLa historia de las cosas
La historia de las cosas
 
Las artesanías
Las artesanías Las artesanías
Las artesanías
 
O reino do_faz_de_conta
O reino do_faz_de_contaO reino do_faz_de_conta
O reino do_faz_de_conta
 
Encerramento
EncerramentoEncerramento
Encerramento
 
Unidad3 mmm
Unidad3 mmmUnidad3 mmm
Unidad3 mmm
 

Ähnlich wie Ky3419651971

Transient analysis and fatigue life prediction of tubesheet
Transient analysis and fatigue life prediction of tubesheetTransient analysis and fatigue life prediction of tubesheet
Transient analysis and fatigue life prediction of tubesheet
eSAT Publishing House
 
2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx
2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx
2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx
eugeniadean34240
 
Unit 5 final
Unit 5 finalUnit 5 final
Unit 5 final
iampichu
 
Iisrt siddharth prabhu (electrical)
Iisrt siddharth prabhu (electrical)Iisrt siddharth prabhu (electrical)
Iisrt siddharth prabhu (electrical)
IISRT
 

Ähnlich wie Ky3419651971 (20)

S3 SANITARY PIPE WORK ASSIGNMENT
S3 SANITARY PIPE WORK ASSIGNMENTS3 SANITARY PIPE WORK ASSIGNMENT
S3 SANITARY PIPE WORK ASSIGNMENT
 
Transient analysis and fatigue life prediction of tubesheet
Transient analysis and fatigue life prediction of tubesheetTransient analysis and fatigue life prediction of tubesheet
Transient analysis and fatigue life prediction of tubesheet
 
Water distribution system design report
Water distribution system design reportWater distribution system design report
Water distribution system design report
 
Iaetsd automated dam monitering system
Iaetsd automated dam monitering systemIaetsd automated dam monitering system
Iaetsd automated dam monitering system
 
IRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment PlantIRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment Plant
 
2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx
2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx
2015-2016 MechanicalCivil Undergraduate Senior DesignWa.docx
 
bro.pptx
bro.pptxbro.pptx
bro.pptx
 
IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...
IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...
IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...
 
Hand book onplumbing installation for building
Hand book onplumbing installation for buildingHand book onplumbing installation for building
Hand book onplumbing installation for building
 
Calibration of venturi and orifice meters
Calibration of venturi and orifice metersCalibration of venturi and orifice meters
Calibration of venturi and orifice meters
 
Unit 5 final
Unit 5 finalUnit 5 final
Unit 5 final
 
E sewage
E  sewageE  sewage
E sewage
 
Urea reactor liner leakage(a case study)
Urea reactor liner leakage(a case study)Urea reactor liner leakage(a case study)
Urea reactor liner leakage(a case study)
 
Iisrt siddharth prabhu (electrical)
Iisrt siddharth prabhu (electrical)Iisrt siddharth prabhu (electrical)
Iisrt siddharth prabhu (electrical)
 
Design of concentric solar water distillator.
Design of concentric solar water distillator.Design of concentric solar water distillator.
Design of concentric solar water distillator.
 
Journal with Drawings
Journal with DrawingsJournal with Drawings
Journal with Drawings
 
Piping design sheets
Piping design sheetsPiping design sheets
Piping design sheets
 
Intelligent Automatic Plant Irrigation System Without Microcontroller.
Intelligent Automatic Plant Irrigation System Without Microcontroller.Intelligent Automatic Plant Irrigation System Without Microcontroller.
Intelligent Automatic Plant Irrigation System Without Microcontroller.
 
Wastewater and Solid waste management.pdf
Wastewater and Solid waste management.pdfWastewater and Solid waste management.pdf
Wastewater and Solid waste management.pdf
 
venturi_meter ppt(2)
venturi_meter ppt(2)venturi_meter ppt(2)
venturi_meter ppt(2)
 

Kürzlich hochgeladen

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 

Kürzlich hochgeladen (20)

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 

Ky3419651971

  • 1. Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971 1965 | P a g e QUALITY MANAGEMENT OF WATER SUPPLIES UNDER 24x7 SCHEMES, AT SECTOR NO. 21, PCMC, PUNE Ms. Namrata B Patil*, Dr. W N Deulkar** *(Department of Civil Engineering, Pune University, Pune ** (Department of Civil Engineering, Pune University, Pune ABSTRACT Drinking water is not only a basic need of life but its supply is also important for achieving the goal of health for all. The primary aim of Pimpri Chinchwad Municipal Corporation (PCMC), Pune is to provide water to the consumer for 24x7 hours by framing the legislation on regulation of drinking water through a scheme which is named as 24x7 water supply scheme. In continuous water supply, PCMC takes the efforts to provide quality and its continuous supply to the consumer. Hence before provision of continuous water supply, we have considered ‘leakages’ in the distributaries as it is the most responsible factor for water contamination. For detecting leakages and to provide safe qualities of water, a sample of water from consumer water tap was analyzed for chlorine and turbidity test. Helium gas was used to detect leakages in the water mains. It is seen that, this technique is safe, easy to operate and have accurate results to find leakages in water mains. Keywords – water leak detection, pipe lines, Helium gas leak detector, water quality management, successful implementation. I. INTRODUCTION Generally, in India Intermittent Water Supply System is used to supply drinking water to people by the Local bodies. In this system water is supplied to users for less than 24 hour in a day for specified hours i.e. in the morning or evening or as per available time. Water is supplied to the consumers usually at the peak hours of the water usage i.e. morning 6 am to 9 am and evening 5 pm to 8 pm. In this system, consumers have to store the water in between supply hours. The needs of the study are as follows: 1. 24 x 7 system reduces contamination level as the pipes are under positive pressure and entry of contaminants into the pipes is restricted. 2. Due to steady pressure in the pipe increase the life of pipe distribution network. No fatigue for pipes. 3. A better demand management is possible due to elaborate metering and effective leakage control. It is also easy & just to calculate water charges based on consumed volume. 4. Reduction in consumption due to change in habit from storing of water to non storing, also it generate excellent customer satisfaction 5. People can manage their time effectively, they can allot more time for rewarding activities. 6. Due to fully metered system easy to carry out water. II. METHODOLOGY Helium Mass Spectrometer (MS) Leak Detection Method This method was first used in Manhattan, New York by the Uranium Enrichment Plant for „Manhattan Project‟. This method is used for the first time in India and for the second time in the world. In India it is been used for the project, „24x7 Water Supply System‟ in sector 21, PCMC. Helium gas is used for leak detection because it is Non-toxic, Inert and non-condensable, not present in the atmosphere at more than trace amounts, relatively inexpensive, readily passes through leaks due to its small atomic size, Non-flammable, Available in various size cylinders, and Available in purities appropriate for medical usage. This gas belongs to zero group (Noble gases) in periodic table having atomic mass 4.002202 2.1 Procedure for Helium Gas Leak Detection Leakage on the pipe line was finding out by carrying three steps. 1) Helium Injection 2) Pipe & Cable Detection 3) Leakage Detection The details of the above steps are given below 1. Helium Injection  Initially, a cylinder of Helium gas is fixed to the outlet of the ESR  The injecting pressure of the Helium gas was maintained such that 30% of the Helium gas in the cylinder has to be injected in 30 minutes. For this criterion, the pressure was to be maintained at 9.5 kg/cm2 . (Fig.2.1)  The pressure was checked at an interval of 15 mins.  A Pressure-meter to measure the pressure of the water in the pipe was attached to the pipe.
  • 2. Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971 1966 | P a g e Figure 2.1 Pressure meter with helium gas cylinder 2. Pipe & Cable Detection  With the help of Pipe & Cable Detector, the underground pipes and cables are detected. Fig.2.2(a)  The Locator is having the receiver and transmitter; receiver is divided in two parts – Antenna & Receiver. Fig.2.2(b)  The Receiver receives reflected waves from the cables and indicates the location and the depth of cables. After detecting the cable, a hole is drilled at every 2 m. to 3 m. apart from the point where the cable is detected so as to avoid drilling in the cable. The depth of the hole is 40 cm. Fig.2.2(c) (a) (b) (c) (d) Figure 2.2 Leak detection 3. Leakage Detection  Above the drilled holes, a vacuum pipe is placed that is connected to the Spectrometer Fig.2.2 (d). There is a filter in between the vacuum pipe and spectrometer which filters the moisture and soil particles coming from the vacuum pipe, if any. Only air is carried away further.  Next to the filter there are two jars containing silica gel (Blue color). A sniffing probe is connected to one of the jars.  The silica gel filters the moisture if any after filtering and hence protects the spectrometer.  The filtered air finally enters in the spectrometer. The spectrometer then shows the amount of the Helium gas. The saturated concentration of helium is 3.5x10-6 Kg/cm2 in the atmosphere but if the spectrometer reading is exceeding 7x10-6 kg/cm2 then there is a possibility of leakage. At such case, few more holes are drilled along the radius of the detected hole, if the reading is increasing or up to 7x10-6 Kg/cm2 then surely there is a leakage.Fig.2.2(e) (e) Figure 2.2 Pictures durring leak detection 2.2 Leakage Repair Work After detecting leakages on pipeline in sector 21, following types of connection repair is done 1. Ferrule Connection: ferrule is used when at end of pipe leak is found. Following Fig. 2.3shows the ferrule connection. Figure 2.3 ferrule connection 1. Sluice Valve: A Sluice Valve is often used on larger diameter mains (2” or greater) mainly for industrial and commercial feeds. This works covers or maintenance and renewals of any type of Sluice Valve including, chamber frame and cover rebuilds, repacking glands, is spindles, repairs to bolts and flange plates and full replacement of valves with main work. Figure 2.4 shows the sluice valve repair
  • 3. Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971 1967 | P a g e Figure 2.4 sluice valve repair 2. Mains Repair This covers all repairs and maintenance of all water mains and supply pipes greater than 1” in diameter. There are many different types of materials that have been used in the installation of water mains from Asbestos Cement, PVC, Medium Density Polyethylene (MDPE), copper, galvanized iron to the more common ductile and cast-iron. With this there are many fittings to adopt and maintain these different materials for use in repairs to water mains, new connections for supplies to properties and general preservations, refer the Fig. 2.5 below. Figure 2.5 mains repaired connection at sector 21 III. RESULTS AND DISCUSSION While detecting leakages on pipeline, we studied 31 leak spots out of 31 leaks, 5 do not have any leakage and 26 were having leakages which were repaired. The position of various leak points is shown in the figure 3.1 which are marked by star ( ).The number followed by star ( ) indicates Helium concentration obtained and the numbers mentioned in the bracket with red colour indicates the serial number of leak. Figure 3.1 Details of pipe with leak spot and Helium concentration IV. FIGURES AND TABLES 4.1 Leakage Detection Information: Having detected all leakages, their repairing was done on the site with immediate action so that the accidents could not be taken place by the excavated trenches and also to avoid the water loss at the leak point. The detail information about leak point and its repairing is mentioned in the table 4.1. Table 4.1 Information about the leakage area and type of leakages: Lea k Nu m- ber He liu m Perf or- man ce date Leak location Di a m- ete r of pi pe Ty pe of cr ac k Meth od of repair ing 1 24 14- 1- 2012 Near Chicken Chowk, Opposite of Kaveri Housing Soc, Scheme No 12, Building 25 0 Hou s e Con n e c t i o Small pipe piece &ferr ule replac ed
  • 4. Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971 1968 | P a g e No 14. n & F e r r u l e Cra c k 2 7 14- 1- 2012 Near Chicken Chowk, Opposite of Sharayu Housing Soc., Scheme No 12, Building No 12 25 0 N o Le ak - 3 12 14- 1- 2012 Opposite of Yamuna Nagar Shopping Complex (Ratna Hospital) 25 0 T- joi nt Cr ac k Lead wool used 4 8. 2 14- 1- 2012 Near Hanuman Sweets, Opposite of Kunj Vihar(1) 20 0 Fe rru le Cr ac k Ferrul e replac ed 5 14 14- 1- 2012 Opposite Of Swatantry a Veer V.D. Sawarkar Chowk, Near Nandan Bungalow Plot No.89 20 0 T- joi nt Cr ac k Lead wool used 6 14 14- 1- 2012 Opposite of Shiv Sankalp Bungalow , Plot No 466, Yamuna 15 0 N o lea k - Nagar 7 10 14- 1- 2012 Near Mohak Bungalow , Plot No 370, Sector No 21. 15 0 Fe rru le Cr ac k Ferrul e replac ed 8 10 14- 1- 2012 Bajaj road, opposite of venkatesh bungalow nigadi. 15 0 H ou se Co nn ect io n & Fe rru le Cr ac k Hous e conne ction and ferrul e replac ed 9 15 17- 1- 2012 Bajaj road, opposite of Venkatesh bungalow Nigadi. 20 0 M ai n lin e Cr ac k Repla ced pipe piece 10 24 18- 1- 2012 Near Rajnigand ha building,s ch no 10, Peth no 21, Yamuna nagar. 15 0 Fe rru le Cr ac k ferrul e replac ed 11 34 18- 1- 2012 Near Rajnigand ha building,s ch no 10, Peth no 21, Yamuna nagar. 15 0 Fe rru le Cr ac k ferrul e replac ed 12 8 18- 1- 2012 Opposite of Jay Tulja Bhavani Mitra Mandal, Kranti Chowk, 15 0 Fe rru le Cr ac k ferrul e replac ed
  • 5. Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971 1969 | P a g e Sec No 21. 13 18 18- 1- 2012 opposite of scheme no 6, building no 32- 36(near Neeta Beauty Parlour) 10 0 H ou se co nn ect io n cr ac k Repla ced pipe piece 14 22 19- 1- 2012 Opposite of Sch No 6, Building No 25-27, Trimurti Society 15 0 H ou se co nn ect io n cr ac k PVC house conne ction replac ed 15 7. 2 21- 2- 2012 Near swapnali housing soc. (opp of Gracious building no 23), sch no 11, builidng no 31. 20 0 Fe rru le cr ac k Ferrul e replac ed 16 11 21- 2- 2012 Near Mauli housing soc,sch no 11, building no 29(opp of Mata Vaishnavi Pratishtha n ground) 20 0 cr ac k on 20 0 m m lin e used clamp on crack piece 17 42 23- 2- 2012 Near Shree Radhakris hna bunglow, Bajaj Road, house no 39, Leak between 17 & 18 15 0 H ou se & fer rul e Cr ac k Hous e conne ction and ferrul e replac ed 18 50 23- 2- 2012 Near Shree Radhakris hna Bunglow, Bajaj Road, House No 40 15 0 H ou se & fer rul e Cr ac k Hous e conne ction and ferrul e replac ed 19 23 23- 2- 2012 Near Shantavi Bunglow, Bajaj Road. 15 0 H ou se co nn ect io n cr ac k (L ea ck ag e at 4 po int s) tempo rary replac ed by rubbe r tube 20 29 24- 2- 2012 Near Krushna Nivas Bunglow( Venkatesh Classes), Bajaj Road 15 0 N o lea k - 21 55 24- 2- 2012 In front of Pravin Seat Cover( Near Om Bungalow ) Plot No 401, Sector No 21 15 0 N o lea k - 22 55 25- 2- 2012 In front of Mr Barshetti, plot no 399, Sector No 21. 15 0 H ol e on H ou se co nn replac ed house conne ction
  • 6. Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971 1970 | P a g e ect io n 23 17 25- 2- 2012 Near to Triveni Nagar Water Tank, Opposite to Infant Jesus Chuch, Sector No 21. 10 0 Joi nt lea k Lead wool used 24 23 25- 2- 2012 Near to Triveni Nagar Water Tank, Opposite to Infant Jesus Chuch, Sector No 21. 20 0 Joi nt lea k Lead wool used 25 24 25- 2- 2012 snehaband ha housing soc, sector no 21, scheme no 11, building no 44, near sia baba mandir 20 0 Fe rru le Cr ac k Ferrul e replac ed 26 13 25- 2- 2012 At chicken chowk, sector no 21, yamuna nagar. 10 0 Joi nt lea k Lead wool used 27 7. 5 02/3/ 12 Next to datta mandir, sector no 21, chal no 9, parlour 10 0 Fe rru le Cr ac k Ferrul e replac ed 28 7. 9 02/3/ 12 In front guru krupa building, opposite of amber housing society( building no 19, scheme no 10) 10 0 Fe rru le Cr ac k Ferrul e replac ed 29 10 02/3/ 12 Opposite of Ameya Housing Soc, Building No 23, Scheme No 10 10 0 N o lea k - 30 7. 2 02/0 3/12 Near plot no 01, Jevandhar a socity, near sai baba mandir 10 0 Fe rru le cr ac k Ferrul e replac ed 31 14 02/0 3/12 Near krushna nivas bunglow( venkatesh classes), bajaj road 15 0 Fe rru le cr ac k Ferrul e replac ed V. CONCLUSION 1. The leaks were found very accurately by using recent techniques. A total of 31 spots were studied, out of that, 5 have no leakage and 26 have the leakages which were repaired. 2. Pilot project of 24x7 water supply scheme is studied at sector no. 21. 3. A new system for locating pipe leaks is introduced. The system incorporates several new developments like recycling of waste water for gardening etc. 4. This helps to reorganize and restructure the wards as per increase of people in area. 5. The main water supply pipe lines were checked for its thickness, diameter, pressure, flow and quality of the pipe material. It was concluded that there is no need to change/replace the pipelines. 6. The water provided by PCMC to all people of sector 21 is of standard quality and passes the safe permissible limit.
  • 7. Ms. Namrata B Patil, Dr. W N Deulkar / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 3, Issue 4, Jul-Aug 2013, pp.1965-1971 1971 | P a g e References [1] Mohamed Fahmy and Osama Moselhi, “Automated Detection and Location of Leaks in Water Mains Using Infrared Photography”, Journal of Performance of Constructed Facilities, 24(3), 2010, ASCE. [2] Yuzhe and Xiaoling Zhang, “Key Assessment Indicators for the Sustainability of Infrastructure Projects”, Journal of Construction Engineering and Management, 137(6), 2010, ASCE. [3] Yeou-Koung Tung, Huan - Feng Duan, Pedro J. Lee and Mohamed, “System Response Function Based Leak Detection in Viscoelastic Pipelines”, Journal of Hydraulic Engineering, 2011, ASCE. [4] Jamie Montague Fischer and Adjo Amekudzi, “Quality of Life, Sustainable Civil Infrastructure, and Sustainable Development: Strategically Expanding Choice”, Journal of Urban Planning and Development, 137(1), 2011, ASCE.