SlideShare ist ein Scribd-Unternehmen logo
1 von 21
Downloaden Sie, um offline zu lesen
Serco – Transit Operations and Maintenance Capabilities
Defining Operator Involvement in major transit projects;
World Class Experience in Operations and Maintenance
2
The
Custome
r
The
Customer
Prioritize
customer
requirements
Design & Build Operate & Maintain
Establish operations/service
delivery philosophy & strategy
Define & apply
‘lessons learned’ as a
design inputs
Identify who the
customer/s is/are
Define customer
requirements
Identify value
added design
features
Establish
‘core’ design
precepts &
performance
requirements
Provide initial
design
Create a ‘customer &
stakeholders’ D&B Phase
Establish programme
delivery
Review design against
customer requirements –
sense check
Create a ‘customer &
stakeholders’ O&M Phase
Identify & map full
journey experience
Define
customer
experience
Establish clear Primary &
Secondary KPI’s
Establish internal
customer map
Establish integrated
O&M structure for
delivery
Define management
model to track
delivery
Design & apply
continual
improvement cycle
Apply lessons
learned
Review KPI’s and
improve performance
VALUE
FOR
MONEY
VALUE
FOR
MONEY
Early Operator Involvement – Design & Planning
Start by focusing design upon the ultimate objective
The benefits of this approach are:
Service input results in designs that are fit for purpose longer
– Delivery is about how services will work in years from
now, not how an asset looks at completion
– Reduce risk of changes and costs associated once operator on board
Early input of the service provider results in better designs
– Design solutions that enable better functionality with more
efficient and effective provision of services
– Focuses on integration of the design with other transport modes
Early Operator Involvement – Design &
Planning
Why is it Important – What is the Value
4
Early Operator Integrated Design
Review
Design opportunities which may be explored include, for example:
– Staged procurement of key assets and phased introduction into operational
service;
– Balancing Capex and Opex costs when considering system and
infrastructure design characteristics e.g. effects of reducing overall width of
viaduct central walkways;
– Elevated stations founded with the viaduct to prevent differential settlement;
– Optimized station-box size;
– Pits and conduits integrated into the track form and/or into the walkway,
slab-track vs. ballasted track at grade;
– Accessible station canopies for cleaning and maintenance;
– Efficient man-machine interfaces in control rooms;
– Track layouts that provide operational train service flexibility with short turn-
backs and pocket tracks for stabling ‘hot-spares’ and ‘defective’ trains.
5
Shadow Operator Involvement – Defining
‘3Ps’
6
Example Policy or Strategy Documents
 Procurement
 IT
 Communication
 HR
 HSSQE
 Rolling stock and Asset Management
 Asset Management Plan
 Asset Maintenance Plan
 Renewal strategy
 Rolling stock maintenance strategy
 Rolling Stock yearly plan
 Rolling Stock yearly budget
 Operations
 Operations strategy
 Operations yearly plan
 Operations yearly budget
 Business Management
 Licensing and Regulation
7
Customer Experience
Example List of Processes
8
Normal Station Operations
Degraded station Operations
Emergency station Operations
Managing station Equipment Failures; Lifts, Escalators
Management of a Station Evacuation
Train on Fire on a Train Passenger
Train on Fire on a Freight
Guidance for Granting a Railway Premises Storage
Signalling and Communication system failure
Permit to work on Railway Premises
Failed Train
Unauthorized vehicles / people on the track
Passengers carried into a Depot or siding
Failed Recovery
Degraded Train Operations
Emergency Train Operations
Event and Seasonal Train Operations
Evacuating the OCC
Retrieving items from the track
Emergency Evacuation of a train (immediate threat to life)
Suspected incident involving gas or biological or chemical
substance (Incident)
Prepare WI: Evacuation of a train (no immediate threat to life)
Controlling access to Yards, Stations and premises
Automatic Fare Collection system failures
Prepare WI: Safety Critical Communications
Prepare WI: Safety critical error made by Operating Staff
Activation of emergency equipment ?
Identifying and Managing Accident, Incidents & Emergencies
Security Alert
Fire on a Railway Premises
Flooding
Managing Lost Property
Vandalism or graffiti on Railway Premises and Vehicles
Mobile Phone Policy
Weather
Example List of Procedures
Accident & Incident Reporting and Investigation Procedure
Fire Safety Procedure
Verbal Safety Communication Procedure
Operations Procedure
External Communications Procedure
Performance Management Procedure
Procurement Procedure
Control of Records Procedure
Control of Test Equipment Procedure
Crisis Management Procedure
Document Control Procedure
First Aid at Work Procedure
Identification, Investigation & Management of Non
Conformance
First Aid at Work Procedure
HSE Communications & Consultation Procedure
Management Review Procedure
Incident Management Procedure
Management of Operational Performance Data Procedure
Drugs and Alcohol Procedure
Extreme Weather Precautions and Emergency Response Procedure
Management of Test Cases and Demonstration Procedure
Induction Procedure
Internal Communications Procedure
Management of Legislative and External Procedure
Personal Protective Equipment Procedure
Roster & Allocation Parameters for Operational Staff Procedure
Leadership Tour Procedure
Recruitment & Selection Procedure
Training & Development Procedure
Management of Special Events Procedure
Management of Emergency Replacement Bus Services Procedure
Management of Customer Communication Procedure
System Risk Assessment Procedure
Timetable Planning Procedure
Introduction to Arabia
Depot Workshop Management Procedure
Fatigue Management Procedure
Failure Management Procedure
Performance Management & Reporting Procedure
Permit to Work Procedure
Railway Protection Procedure
9
Operations & Maintenance
Linking Requirements to the Customer
10
 Click to edit Master text styles
 Second level
– Third level
 Fourth level
» Fifth level
Linking The Strategic requirements, Policy, Process and Procedures to the
clients requirements and to the end user – The Customers
The 3Ps preparations are the backbone to Operating and Maintaining a world class
transportation network with interchange functionality
that will become the platform to launch;
Experience in Preparing for Operations
& Maintenance
Dubai Metro Shadow Operator
Snapshot of deliverables;
 Design review
 114 plans,
 91 procedures
 1,181 work instructions
 225 training manuals
 141 training courses
 Recruitment & Mobilization of 2,500 people
 30 Nationalities
 Testing & Commissioning
 Trial and Start Up Operations
Currently Mobilizing
1. Shadow Operator for Qatar Metro
PH 1
2. Shadow Operator for Qatar Lusail
Tram
3. Shadow and Operator for Al Soufah
Tram system Dubai
11
Serco in Confidence
Organisation
Indicative Key Personnel:
Operations specialists
Accessibility
Timetable Planner
Resource Planner
HSQE Support Specialist
Trains
Stations
OCC
Fares/ Ticketing
Maintenance Specialists
Signalling
Rolling Stock
Power
Track
AFC
Buildings
Serco in Confidence
Summary and Observation
Service and operator led projects allow more
attention to designs and better
construction with a view to optimization of
life cycle cost of the project
It is important to think about what success
looks like 5, 10, 15 years after
commissioning – not just the shiny system
when built
Service delivery excellence is not something
that just happens – it needs to be
designed in, and
13
Serco in Confidence
Summary – Serco’s metro experience
Pre Operations and / or O&M on 11
metro or urban rail systems
Long term operations & maintenance
 Docklands Light Railway since 1997
 Manchester Metrolink 1997 - 2007
 Copenhagen Metro 1999 - 2007
 Merseyrail since 2003
 Northern Rail since 2004
 Dubai Metro since 2007
 Palm Jumeirah Monorail since 2010
Pre Operations in UK, Europe, Middle
East, India and North America
Click to edit Master text styles
Second level
Third level
Fourth level
Fifth level
Click to edit Master text styles
Second level
Third level
Fourth level
Fifth level
Tram Dubai Al Sufouh
to edit Master text styles
d level
level
urth level
» Fifth level
 Awarded 2013
 Early operator
involvement commenced
 Currently in Mobilization
 14KM, 11 Stations in
Phase 1, 2 Interchanges
with Dubai Metro and 1
interchange with Palm
Jumeirah Monorail
 Providing transport
integration in Dubai
15
Metro; Al Mashaaer Al Mugaddassah, Rail Consultancy
–
Makkah, Kingdom of Saudi Arabia
 Advising on all aspects of operation &
maintenance for 18.7 km metro
 Supporting CRCC and MOMRA
preparations for Hajj pilgrimage
 Support in the management of
recruitment and training programme for
frontline staff
 Development of operational rules,
procedures & processes
– Train operations
– Customer service
– Development of rules & procedures
– Station operations
– Training & Competency
– Emergency planning
– Testing strategy
Metro; Operations & Maintenance –
Dubai Metro, UAE
 Appointed by Dubai Government (RTA)
to provide full O&M services
 Early Operator Engagement from June
2007 onwards and 10-year O&M
concession
 99.99% Availability (8 months at 100%)
99.93% Punctuality (2 months at 100%)
 Recruitment & mobilisation over
2,500 staff – 30 countries
 9/9/9 successful service launch
 Integrated management and
stewardship of this USD 7B asset
Copenhagen Metro - pre operations
 Delivered O&M pre operations input
prior through the 3 phase opening
 As in Dubai
 Review of system and asset designs and
subsequent RAMS proposals
 Review and make recommendations upon
the detailed E&M procedures and work
instructions
 Established full O&M management system
and procedures
 Mobilised O&M organisation over two
years including recruitment and training
 Obtained the first metro operating
safety certificate in Denmark
 Project managed the opening of both
phases 2 & 3
Click to edit Master text styles
Second level
Third level
Fourth level
Fifth level
Click to edit Master text styles
Second level
Third level
Fourth level
Fifth level
Monorail; Operations & Maintenance – Palm Jumeirah
Monorail,
Dubai UAE
 Appointed by Nakheel to provide
Operations & Maintenance services for
Palm Jumeirah Monorail – the first
driverless monorail in the middle-east
region
 5 year concession from July 2010
 Maintenance, security, control centre,
facilities management, customer
services, procurement and supply
chain management
 99.8% Punctuality – 99.9% Availability
Advise | Design | Integrate |
Deliver
Automated People Mover T3; Operations & Maintenance –
Dubai Airport, UAE
20
 Operations & Maintenance
 APM connects terminal 3 to the
new A380 terminal
 4 trains in service
 24/7 operations
 High capacity system – 99.63% reliability in
first month of operations
 Train every 150 seconds
 Up to 6,050 pphpd
 Integral to the overall operations of the airport
Light Rail; Docklands Light Railway, Operations &
Maintenance – DLR UK
 High performance achieved
– 98.25% Availability – 98.44% Punctuality (Serco improved
on 2011 results even though ridership figures doubled
over the summer during the 2012 Olympics)
– 97.08% customer satisfaction
 System enhancements
– Commissioned 47 new rolling stock vehicles
– Served the Olympics with distinction
– Opened 3 extensions including Woolwich Extension early
– Extended fleet from two to three twin-cars with station
platform modifications while maintaining service
– Ridership growth from 17m per year
to over 93m.
– RoSPA Gold safety certification and over 15 national and
local awards
21

Weitere ähnliche Inhalte

Was ist angesagt?

Documentation for air cargo
Documentation for air cargoDocumentation for air cargo
Documentation for air cargoAbhilash Patwal
 
sunif Landside Presentation
sunif Landside Presentationsunif Landside Presentation
sunif Landside PresentationAiDY
 
Introduction to the aviation industry
Introduction to the aviation industryIntroduction to the aviation industry
Introduction to the aviation industryushmashah20
 
Airport presentation 5th unit
Airport presentation 5th unitAirport presentation 5th unit
Airport presentation 5th unitT.Naga Anusha
 
International Civil Aviation Organisation
International Civil Aviation OrganisationInternational Civil Aviation Organisation
International Civil Aviation Organisationdilipkumar patil
 
History of Aviation by Robert Andrei
History of Aviation by Robert Andrei History of Aviation by Robert Andrei
History of Aviation by Robert Andrei andreimonica76
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railwayKhusro_khan
 
Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1Hasan Gunes
 
Glossary of Port and Shipping Terms
Glossary of Port and Shipping TermsGlossary of Port and Shipping Terms
Glossary of Port and Shipping TermsSam Thai Aladeen
 
Summer Training in DMRC
Summer Training in DMRCSummer Training in DMRC
Summer Training in DMRCAsim Ghatak
 
airport authority of india ppt
airport authority of india pptairport authority of india ppt
airport authority of india pptatul verma
 
Civil aviation presentation
Civil aviation presentationCivil aviation presentation
Civil aviation presentationPalgupta
 

Was ist angesagt? (20)

Documentation for air cargo
Documentation for air cargoDocumentation for air cargo
Documentation for air cargo
 
sunif Landside Presentation
sunif Landside Presentationsunif Landside Presentation
sunif Landside Presentation
 
Introduction to the aviation industry
Introduction to the aviation industryIntroduction to the aviation industry
Introduction to the aviation industry
 
Airport presentation 5th unit
Airport presentation 5th unitAirport presentation 5th unit
Airport presentation 5th unit
 
Airports presentation
Airports presentationAirports presentation
Airports presentation
 
Service Brand study on Emirates
Service Brand study on EmiratesService Brand study on Emirates
Service Brand study on Emirates
 
International Civil Aviation Organisation
International Civil Aviation OrganisationInternational Civil Aviation Organisation
International Civil Aviation Organisation
 
History of Aviation by Robert Andrei
History of Aviation by Robert Andrei History of Aviation by Robert Andrei
History of Aviation by Robert Andrei
 
ICAO
ICAOICAO
ICAO
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railway
 
Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1
 
Airports
AirportsAirports
Airports
 
Airport.handling
Airport.handlingAirport.handling
Airport.handling
 
Airport
AirportAirport
Airport
 
Glossary of Port and Shipping Terms
Glossary of Port and Shipping TermsGlossary of Port and Shipping Terms
Glossary of Port and Shipping Terms
 
Transportation ppt
Transportation pptTransportation ppt
Transportation ppt
 
Summer Training in DMRC
Summer Training in DMRCSummer Training in DMRC
Summer Training in DMRC
 
airport authority of india ppt
airport authority of india pptairport authority of india ppt
airport authority of india ppt
 
Civil aviation presentation
Civil aviation presentationCivil aviation presentation
Civil aviation presentation
 
Airport facilities
Airport facilitiesAirport facilities
Airport facilities
 

Ähnlich wie Transit Operations and Maintenance Capabilities

AITPM Risk and Governance
AITPM Risk and GovernanceAITPM Risk and Governance
AITPM Risk and GovernanceJumpingJaq
 
Gagnant company limited our operations
Gagnant company limited our operationsGagnant company limited our operations
Gagnant company limited our operationsEdun Adebare
 
Roadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platformRoadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platformSheetal Kale
 
Roadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platformRoadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platformSheetal Kale
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfrinkumandaljis
 
AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar
 AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar
AUTOMATION: LESSONS LEARNT FROM SESAR by Michael StandarALIAS Network
 
Resume Vijai Nair
Resume Vijai NairResume Vijai Nair
Resume Vijai NairVijai Nair
 
Kevin King Resume
Kevin King ResumeKevin King Resume
Kevin King ResumeKevin King
 
Flour Presentation MEED MENA 2014
Flour Presentation MEED MENA 2014Flour Presentation MEED MENA 2014
Flour Presentation MEED MENA 2014Ibrahim Al-Hudhaif
 
Oakmont Consultancy Capabilties
Oakmont Consultancy CapabiltiesOakmont Consultancy Capabilties
Oakmont Consultancy CapabiltiesMurray Croft
 
Vinay_Chandwalker[1]_25032015
Vinay_Chandwalker[1]_25032015Vinay_Chandwalker[1]_25032015
Vinay_Chandwalker[1]_25032015vinay chandwalker
 
G Log Transportation Mgmt V5.7
G Log Transportation Mgmt V5.7G Log Transportation Mgmt V5.7
G Log Transportation Mgmt V5.7K P Siva Prasad
 
11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenancessusereb347d
 

Ähnlich wie Transit Operations and Maintenance Capabilities (20)

AITPM Risk and Governance
AITPM Risk and GovernanceAITPM Risk and Governance
AITPM Risk and Governance
 
Cv jacques kouadio cv
Cv jacques  kouadio   cvCv jacques  kouadio   cv
Cv jacques kouadio cv
 
Gagnant company limited our operations
Gagnant company limited our operationsGagnant company limited our operations
Gagnant company limited our operations
 
Roadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platformRoadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platform
 
Roadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platformRoadmap 101 of the ServiceNow business platform
Roadmap 101 of the ServiceNow business platform
 
Mohamed Alyeldin CV v4
Mohamed Alyeldin CV v4Mohamed Alyeldin CV v4
Mohamed Alyeldin CV v4
 
Vipin_CV
Vipin_CVVipin_CV
Vipin_CV
 
JYOTI SHARMA
JYOTI SHARMAJYOTI SHARMA
JYOTI SHARMA
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdf
 
AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar
 AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar
AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar
 
Resume Vijai Nair
Resume Vijai NairResume Vijai Nair
Resume Vijai Nair
 
Kevin King Resume
Kevin King ResumeKevin King Resume
Kevin King Resume
 
Ashutosh Gupta
Ashutosh GuptaAshutosh Gupta
Ashutosh Gupta
 
Flour Presentation MEED MENA 2014
Flour Presentation MEED MENA 2014Flour Presentation MEED MENA 2014
Flour Presentation MEED MENA 2014
 
Resume-arunangshu 2
Resume-arunangshu 2Resume-arunangshu 2
Resume-arunangshu 2
 
Oakmont Consultancy Capabilties
Oakmont Consultancy CapabiltiesOakmont Consultancy Capabilties
Oakmont Consultancy Capabilties
 
Vinay_Chandwalker[1]_25032015
Vinay_Chandwalker[1]_25032015Vinay_Chandwalker[1]_25032015
Vinay_Chandwalker[1]_25032015
 
G Log Transportation Mgmt V5.7
G Log Transportation Mgmt V5.7G Log Transportation Mgmt V5.7
G Log Transportation Mgmt V5.7
 
M. Abdelrahman CV
M. Abdelrahman CVM. Abdelrahman CV
M. Abdelrahman CV
 
11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance11. Process: ocp cfops maintenance
11. Process: ocp cfops maintenance
 

Mehr von Ibrahim Al-Hudhaif

Total contract control for rail projects mounir boemond
Total contract control for rail projects   mounir boemondTotal contract control for rail projects   mounir boemond
Total contract control for rail projects mounir boemondIbrahim Al-Hudhaif
 
Understanding the digital commuter etienne chevreau
Understanding the digital commuter   etienne chevreauUnderstanding the digital commuter   etienne chevreau
Understanding the digital commuter etienne chevreauIbrahim Al-Hudhaif
 
Performance based contracts in railways ibraheem sheerah
Performance based contracts in railways   ibraheem sheerahPerformance based contracts in railways   ibraheem sheerah
Performance based contracts in railways ibraheem sheerahIbrahim Al-Hudhaif
 
Saudi arabia construction report feb. 2016
Saudi arabia construction report   feb. 2016Saudi arabia construction report   feb. 2016
Saudi arabia construction report feb. 2016Ibrahim Al-Hudhaif
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsIbrahim Al-Hudhaif
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings Ibrahim Al-Hudhaif
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings CodesIbrahim Al-Hudhaif
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...Ibrahim Al-Hudhaif
 
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views Ibrahim Al-Hudhaif
 
Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Ibrahim Al-Hudhaif
 
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesCurrent and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesIbrahim Al-Hudhaif
 
Trimble Advanced Route Optimization Technology - QUANTM
Trimble Advanced Route Optimization  Technology - QUANTM Trimble Advanced Route Optimization  Technology - QUANTM
Trimble Advanced Route Optimization Technology - QUANTM Ibrahim Al-Hudhaif
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYIbrahim Al-Hudhaif
 
Video analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiVideo analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiIbrahim Al-Hudhaif
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramIbrahim Al-Hudhaif
 
MENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseMENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseIbrahim Al-Hudhaif
 
Oman Rail - in-country value strategic approach
Oman Rail -  in-country value strategic approachOman Rail -  in-country value strategic approach
Oman Rail - in-country value strategic approachIbrahim Al-Hudhaif
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail Ibrahim Al-Hudhaif
 

Mehr von Ibrahim Al-Hudhaif (20)

Total contract control for rail projects mounir boemond
Total contract control for rail projects   mounir boemondTotal contract control for rail projects   mounir boemond
Total contract control for rail projects mounir boemond
 
Understanding the digital commuter etienne chevreau
Understanding the digital commuter   etienne chevreauUnderstanding the digital commuter   etienne chevreau
Understanding the digital commuter etienne chevreau
 
Performance based contracts in railways ibraheem sheerah
Performance based contracts in railways   ibraheem sheerahPerformance based contracts in railways   ibraheem sheerah
Performance based contracts in railways ibraheem sheerah
 
Saudi arabia construction report feb. 2016
Saudi arabia construction report   feb. 2016Saudi arabia construction report   feb. 2016
Saudi arabia construction report feb. 2016
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega Projects
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings Codes
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...
 
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
 
Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power
 
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesCurrent and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
 
Saudi Talent in Mega Projects
Saudi Talent in Mega ProjectsSaudi Talent in Mega Projects
Saudi Talent in Mega Projects
 
Trimble Advanced Route Optimization Technology - QUANTM
Trimble Advanced Route Optimization  Technology - QUANTM Trimble Advanced Route Optimization  Technology - QUANTM
Trimble Advanced Route Optimization Technology - QUANTM
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EY
 
Video analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiVideo analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - Hitachi
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise Optram
 
MENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseMENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative Showcase
 
Oman Rail - in-country value strategic approach
Oman Rail -  in-country value strategic approachOman Rail -  in-country value strategic approach
Oman Rail - in-country value strategic approach
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail
 
Kuwait PPP Transport Projects
Kuwait PPP Transport ProjectsKuwait PPP Transport Projects
Kuwait PPP Transport Projects
 

Kürzlich hochgeladen

Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextP&CO
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...PRnews2
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
71368-80-4.pdf Fast delivery good quality
71368-80-4.pdf Fast delivery  good quality71368-80-4.pdf Fast delivery  good quality
71368-80-4.pdf Fast delivery good qualitycathy664059
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Implementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxImplementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxRich Reba
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 

Kürzlich hochgeladen (20)

Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider context
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
 
Authentically Social - presented by Corey Perlman
Authentically Social - presented by Corey PerlmanAuthentically Social - presented by Corey Perlman
Authentically Social - presented by Corey Perlman
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
71368-80-4.pdf Fast delivery good quality
71368-80-4.pdf Fast delivery  good quality71368-80-4.pdf Fast delivery  good quality
71368-80-4.pdf Fast delivery good quality
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Implementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxImplementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptx
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 

Transit Operations and Maintenance Capabilities

  • 1. Serco – Transit Operations and Maintenance Capabilities Defining Operator Involvement in major transit projects; World Class Experience in Operations and Maintenance
  • 2. 2 The Custome r The Customer Prioritize customer requirements Design & Build Operate & Maintain Establish operations/service delivery philosophy & strategy Define & apply ‘lessons learned’ as a design inputs Identify who the customer/s is/are Define customer requirements Identify value added design features Establish ‘core’ design precepts & performance requirements Provide initial design Create a ‘customer & stakeholders’ D&B Phase Establish programme delivery Review design against customer requirements – sense check Create a ‘customer & stakeholders’ O&M Phase Identify & map full journey experience Define customer experience Establish clear Primary & Secondary KPI’s Establish internal customer map Establish integrated O&M structure for delivery Define management model to track delivery Design & apply continual improvement cycle Apply lessons learned Review KPI’s and improve performance VALUE FOR MONEY VALUE FOR MONEY Early Operator Involvement – Design & Planning Start by focusing design upon the ultimate objective
  • 3. The benefits of this approach are: Service input results in designs that are fit for purpose longer – Delivery is about how services will work in years from now, not how an asset looks at completion – Reduce risk of changes and costs associated once operator on board Early input of the service provider results in better designs – Design solutions that enable better functionality with more efficient and effective provision of services – Focuses on integration of the design with other transport modes Early Operator Involvement – Design & Planning
  • 4. Why is it Important – What is the Value 4
  • 5. Early Operator Integrated Design Review Design opportunities which may be explored include, for example: – Staged procurement of key assets and phased introduction into operational service; – Balancing Capex and Opex costs when considering system and infrastructure design characteristics e.g. effects of reducing overall width of viaduct central walkways; – Elevated stations founded with the viaduct to prevent differential settlement; – Optimized station-box size; – Pits and conduits integrated into the track form and/or into the walkway, slab-track vs. ballasted track at grade; – Accessible station canopies for cleaning and maintenance; – Efficient man-machine interfaces in control rooms; – Track layouts that provide operational train service flexibility with short turn- backs and pocket tracks for stabling ‘hot-spares’ and ‘defective’ trains. 5
  • 6. Shadow Operator Involvement – Defining ‘3Ps’ 6
  • 7. Example Policy or Strategy Documents  Procurement  IT  Communication  HR  HSSQE  Rolling stock and Asset Management  Asset Management Plan  Asset Maintenance Plan  Renewal strategy  Rolling stock maintenance strategy  Rolling Stock yearly plan  Rolling Stock yearly budget  Operations  Operations strategy  Operations yearly plan  Operations yearly budget  Business Management  Licensing and Regulation 7 Customer Experience
  • 8. Example List of Processes 8 Normal Station Operations Degraded station Operations Emergency station Operations Managing station Equipment Failures; Lifts, Escalators Management of a Station Evacuation Train on Fire on a Train Passenger Train on Fire on a Freight Guidance for Granting a Railway Premises Storage Signalling and Communication system failure Permit to work on Railway Premises Failed Train Unauthorized vehicles / people on the track Passengers carried into a Depot or siding Failed Recovery Degraded Train Operations Emergency Train Operations Event and Seasonal Train Operations Evacuating the OCC Retrieving items from the track Emergency Evacuation of a train (immediate threat to life) Suspected incident involving gas or biological or chemical substance (Incident) Prepare WI: Evacuation of a train (no immediate threat to life) Controlling access to Yards, Stations and premises Automatic Fare Collection system failures Prepare WI: Safety Critical Communications Prepare WI: Safety critical error made by Operating Staff Activation of emergency equipment ? Identifying and Managing Accident, Incidents & Emergencies Security Alert Fire on a Railway Premises Flooding Managing Lost Property Vandalism or graffiti on Railway Premises and Vehicles Mobile Phone Policy Weather
  • 9. Example List of Procedures Accident & Incident Reporting and Investigation Procedure Fire Safety Procedure Verbal Safety Communication Procedure Operations Procedure External Communications Procedure Performance Management Procedure Procurement Procedure Control of Records Procedure Control of Test Equipment Procedure Crisis Management Procedure Document Control Procedure First Aid at Work Procedure Identification, Investigation & Management of Non Conformance First Aid at Work Procedure HSE Communications & Consultation Procedure Management Review Procedure Incident Management Procedure Management of Operational Performance Data Procedure Drugs and Alcohol Procedure Extreme Weather Precautions and Emergency Response Procedure Management of Test Cases and Demonstration Procedure Induction Procedure Internal Communications Procedure Management of Legislative and External Procedure Personal Protective Equipment Procedure Roster & Allocation Parameters for Operational Staff Procedure Leadership Tour Procedure Recruitment & Selection Procedure Training & Development Procedure Management of Special Events Procedure Management of Emergency Replacement Bus Services Procedure Management of Customer Communication Procedure System Risk Assessment Procedure Timetable Planning Procedure Introduction to Arabia Depot Workshop Management Procedure Fatigue Management Procedure Failure Management Procedure Performance Management & Reporting Procedure Permit to Work Procedure Railway Protection Procedure 9
  • 10. Operations & Maintenance Linking Requirements to the Customer 10  Click to edit Master text styles  Second level – Third level  Fourth level » Fifth level Linking The Strategic requirements, Policy, Process and Procedures to the clients requirements and to the end user – The Customers The 3Ps preparations are the backbone to Operating and Maintaining a world class transportation network with interchange functionality that will become the platform to launch;
  • 11. Experience in Preparing for Operations & Maintenance Dubai Metro Shadow Operator Snapshot of deliverables;  Design review  114 plans,  91 procedures  1,181 work instructions  225 training manuals  141 training courses  Recruitment & Mobilization of 2,500 people  30 Nationalities  Testing & Commissioning  Trial and Start Up Operations Currently Mobilizing 1. Shadow Operator for Qatar Metro PH 1 2. Shadow Operator for Qatar Lusail Tram 3. Shadow and Operator for Al Soufah Tram system Dubai 11
  • 12. Serco in Confidence Organisation Indicative Key Personnel: Operations specialists Accessibility Timetable Planner Resource Planner HSQE Support Specialist Trains Stations OCC Fares/ Ticketing Maintenance Specialists Signalling Rolling Stock Power Track AFC Buildings
  • 13. Serco in Confidence Summary and Observation Service and operator led projects allow more attention to designs and better construction with a view to optimization of life cycle cost of the project It is important to think about what success looks like 5, 10, 15 years after commissioning – not just the shiny system when built Service delivery excellence is not something that just happens – it needs to be designed in, and 13
  • 14. Serco in Confidence Summary – Serco’s metro experience Pre Operations and / or O&M on 11 metro or urban rail systems Long term operations & maintenance  Docklands Light Railway since 1997  Manchester Metrolink 1997 - 2007  Copenhagen Metro 1999 - 2007  Merseyrail since 2003  Northern Rail since 2004  Dubai Metro since 2007  Palm Jumeirah Monorail since 2010 Pre Operations in UK, Europe, Middle East, India and North America Click to edit Master text styles Second level Third level Fourth level Fifth level Click to edit Master text styles Second level Third level Fourth level Fifth level
  • 15. Tram Dubai Al Sufouh to edit Master text styles d level level urth level » Fifth level  Awarded 2013  Early operator involvement commenced  Currently in Mobilization  14KM, 11 Stations in Phase 1, 2 Interchanges with Dubai Metro and 1 interchange with Palm Jumeirah Monorail  Providing transport integration in Dubai 15
  • 16. Metro; Al Mashaaer Al Mugaddassah, Rail Consultancy – Makkah, Kingdom of Saudi Arabia  Advising on all aspects of operation & maintenance for 18.7 km metro  Supporting CRCC and MOMRA preparations for Hajj pilgrimage  Support in the management of recruitment and training programme for frontline staff  Development of operational rules, procedures & processes – Train operations – Customer service – Development of rules & procedures – Station operations – Training & Competency – Emergency planning – Testing strategy
  • 17. Metro; Operations & Maintenance – Dubai Metro, UAE  Appointed by Dubai Government (RTA) to provide full O&M services  Early Operator Engagement from June 2007 onwards and 10-year O&M concession  99.99% Availability (8 months at 100%) 99.93% Punctuality (2 months at 100%)  Recruitment & mobilisation over 2,500 staff – 30 countries  9/9/9 successful service launch  Integrated management and stewardship of this USD 7B asset
  • 18. Copenhagen Metro - pre operations  Delivered O&M pre operations input prior through the 3 phase opening  As in Dubai  Review of system and asset designs and subsequent RAMS proposals  Review and make recommendations upon the detailed E&M procedures and work instructions  Established full O&M management system and procedures  Mobilised O&M organisation over two years including recruitment and training  Obtained the first metro operating safety certificate in Denmark  Project managed the opening of both phases 2 & 3 Click to edit Master text styles Second level Third level Fourth level Fifth level Click to edit Master text styles Second level Third level Fourth level Fifth level
  • 19. Monorail; Operations & Maintenance – Palm Jumeirah Monorail, Dubai UAE  Appointed by Nakheel to provide Operations & Maintenance services for Palm Jumeirah Monorail – the first driverless monorail in the middle-east region  5 year concession from July 2010  Maintenance, security, control centre, facilities management, customer services, procurement and supply chain management  99.8% Punctuality – 99.9% Availability Advise | Design | Integrate | Deliver
  • 20. Automated People Mover T3; Operations & Maintenance – Dubai Airport, UAE 20  Operations & Maintenance  APM connects terminal 3 to the new A380 terminal  4 trains in service  24/7 operations  High capacity system – 99.63% reliability in first month of operations  Train every 150 seconds  Up to 6,050 pphpd  Integral to the overall operations of the airport
  • 21. Light Rail; Docklands Light Railway, Operations & Maintenance – DLR UK  High performance achieved – 98.25% Availability – 98.44% Punctuality (Serco improved on 2011 results even though ridership figures doubled over the summer during the 2012 Olympics) – 97.08% customer satisfaction  System enhancements – Commissioned 47 new rolling stock vehicles – Served the Olympics with distinction – Opened 3 extensions including Woolwich Extension early – Extended fleet from two to three twin-cars with station platform modifications while maintaining service – Ridership growth from 17m per year to over 93m. – RoSPA Gold safety certification and over 15 national and local awards 21