SlideShare ist ein Scribd-Unternehmen logo
1 von 41
Chapter 5:Chapter 5:
Project Scope ManagementProject Scope Management
Information TechnologyInformation Technology
Project Management,Project Management,
Fifth EditionFifth Edition
For the PHASE TEST
Learn to use Calender
You will be asked to create a Brunei Calender
and apply it to the whole project
Learning Objectives
 Understand the elements that make good project
scope management important
 Explain the scope planning process and describe
the contents of a scope management plan
 Describe the process for developing a project
scope statement using the project charter and
preliminary scope statement
 Discuss the scope definition process and work
involved in constructing a work breakdown
structure using the analogy, top-down, bottom-up,
and mind-mapping approaches
Information Technology Project Management, Fifth Edition, Copyright 2007
3
Learning Objectives (continued)
 Explain the importance of scope verification
and how it relates to scope definition and
control
 Understand the importance of scope control
and approaches for preventing scope-related
problems on information technology projects
 Describe how software can assist in project
scope management
Information Technology Project Management, Fifth Edition, Copyright 2007
4
What is Project Scope Management?
Scope refers to all the work involved in creating
the products of the project and the processes
used to create them
 A deliverable is a product produced as part of a
project, such as hardware or software, planning
documents, or meeting minutes
Project scope management includes the
processes involved in defining and controlling
what work is or is not included in a project
Information Technology Project Management, Fifth Edition, Copyright 2007
5
Project Scope Management
Processes
 Scope planning: deciding how the scope will be
defined, verified, and controlled
 Scope definition: reviewing the project charter and
preliminary scope statement and adding more
information as requirements are developed and change
requests are approved
 Creating the WBS: subdividing the major project
deliverables into smaller, more manageable components
 Scope verification: formalizing acceptance of the
project scope
 Scope control: controlling changes to project scope
Information Technology Project Management, Fifth Edition, Copyright 2007
6
Figure 5-1: Project Scope
Management Summary
Information Technology Project Management, Fifth Edition, Copyright 2007
7
Scope Planning and the Scope
Management Plan
The scope management plan is a document that
includes descriptions of how the team will prepare
the project scope statement, create the WBS,
verify completion of the project deliverables, and
control requests for changes to the project scope
Key inputs include the project charter, preliminary
scope statement, and project management plan
Information Technology Project Management, Fifth Edition, Copyright 2007
8
What Went Right?
Many financial service companies use customer
relationship management (CRM) systems to improve their
understanding of and responsiveness to customers
A senior management team at the Canadian money
management company Dynamic Mutual Funds (DMF)
launched an enterprise-wide, national program to build
and manage its customer relationships
They needed a faster and more organized, highly
participative approach, so they proposed a new seven-
step concept called project scope design
DMF won an eCustomer World Golden Award for world-
class innovation
Information Technology Project Management, Fifth Edition, Copyright 2007
9
Table 5-1:
Sample
Scope
Management
Plan
Information Technology Project Management, Fifth Edition, Copyright 2007
10
Table 5-2:
Sample
Project
Charter
Information Technology Project Management, Fifth Edition, Copyright 2007
11
Scope Definition and the
Project Scope Statement
The preliminary scope statement, project charter,
organizational process assets, and approved
change requests provide a basis for creating the
project scope statement
As time progresses, the scope of a project should
become more clear and specific
Information Technology Project Management, Fifth Edition, Copyright 2007
12
Table 5-3: Further Defining
Project Scope
Information Technology Project Management, Fifth Edition, Copyright 200713
Project Scope Statement
A project scope statement is an important
document for developing and confirming a
common understanding of the project scope.
It describes in detail the work to be
accomplished on the project
It is an important tool for ensuring customer
satisfaction and preventing scope creep.
Project Scope Statement
Project Title:
Date: Prepared by:
Project Justification: .
Product Characteristics and Requirements:
1…
2…
Summary of Project Deliverables
Project management-related deliverables: business case, charter,
team contract, scope statement, WBS, schedule, cost baseline, status
reports, final project presentation, final project report, lessons-learned
report, and any other documents required to manage the project.
Product-related deliverables: research reports, design documents,
software code, hardware, etc.
1. ..
2…
Project Success Criteria:
Media Snapshot
Many people enjoy watching television shows like Changing Rooms
or Trading Spaces, where participants have two days and $1,000 to
update a room in their neighbor’s house. Since the time and cost are set,
it’s the scope that has the most flexibility. Designers on these shows often
have to change initial scope goals due to budget or time constraints.
Although most homeowners are very happy with work done on the
show, some are obviously disappointed. Unlike most projects where the
project team works closely with the customer, homeowners have little say
in what gets done and cannot inspect the work along the way… What
happens when the homeowners don’t like the work that’s been done? The
FAQ section of tlc.com says, “Everyone on our show is told upfront that
there’s a chance they won’t like the final design of the room. Each
applicant signs a release acknowledging that the show is not responsible
for redecorating a room that isn’t to the owner’s taste.”
Too bad you can’t get sponsors for most projects to sign a similar
release form. It would make project scope management much easier!
Information Technology Project Management, Fifth Edition, Copyright 2007
16
Creating the Work Breakdown
Structure (WBS)
A WBS is a deliverable-oriented grouping of the
work involved in a project that defines the total
scope of the project
WBS is a foundation document that provides the
basis for planning and managing project
schedules, costs, resources, and changes
Decomposition is subdividing project
deliverables into smaller pieces
A work package is a task at the lowest level of
the WBS
Information Technology Project Management, Fifth Edition, Copyright 2007
17
Often, the project team organizes the WBS
around project products, project phases or the
project management processes
Figure 5-2: Sample Intranet WBS
Organized by Product
Information Technology Project Management, Fifth Edition, Copyright 2007
19
Figure 5-3: Sample Intranet WBS
Organized by Project Phase
Information Technology Project Management, Fifth Edition, Copyright 2007
20
Table 5-4: Intranet WBS in Tabular
Form
1.0 Concept
1.1 Evaluate current systems
1.2 Define Requirements
1.2.1 Define user requirements
1.2.2 Define content requirements
1.2.3 Define system requirements
1.2.4 Define server owner requirements
1.3 Define specific functionality
1.4 Define risks and risk management approach
1.5 Develop project plan
1.6 Brief Web development team
2.0 Web Site Design
3.0 Web Site Development
4.0 Roll Out
5.0 Support
Information Technology Project Management, Fifth Edition, Copyright 2007
21
Figure 5-4: Intranet WBS and Gantt
Chart in Microsoft Project
Information Technology Project Management, Fifth Edition, Copyright 2007
22
Figure 5-5: Intranet Gantt Chart
Organized by Project Management
Process Groups
Information Technology Project Management, Fifth Edition, Copyright 2007
23
Table 5-5: Executing Tasks for
JWD Consulting’s WBS
Information Technology Project Management, Fifth Edition, Copyright 2007
24
Approaches to Developing WBSs
Using guidelines: some organizations, like the
DOD, provide guidelines for preparing WBSs
The analogy approach: review WBSs of similar
projects and tailor to your project
The top-down approach: start with the largest
items of the project and break them down
The bottom-up approach: start with the specific
tasks and roll them up
Mind-mapping approach: mind mapping is a
technique that uses branches radiating out from a
core idea to structure thoughts and ideas
Information Technology Project Management, Fifth Edition, Copyright 2007
25
Figure 5-6: Sample Mind-Mapping
Approach for Creating a WBS
Information Technology Project Management, Fifth Edition, Copyright 2007
26
Figure 5-7: Resulting WBS in
Chart Form
Information Technology Project Management, Fifth Edition, Copyright 2007
27
The WBS Dictionary and Scope
Baseline
Many WBS tasks are vague and must be
explained more so people know what to do and
can estimate how long it will take and what it will
cost to do the work
A WBS dictionary is a document that describes
detailed information about each WBS item
The approved project scope statement and its
WBS and WBS dictionary form the scope
baseline, which is used to measure performance
in meeting project scope goals
Information Technology Project Management, Fifth Edition, Copyright 2007
28
Advice for Creating a WBS and WBS
Dictionary*
Skip
*Cleland, David I. Project Management: Strategic Design and Implementation, 1994
Information Technology Project Management, Fifth Edition, Copyright 2007
29
What Went Wrong?
A project scope that is too broad and grandiose
can cause severe problems
Scope creep and an overemphasis on technology for
technology’s sake resulted in the bankruptcy of a large
pharmaceutical firm, Texas-based FoxMeyer Drug
In 2001, McDonald’s fast-food chain initiated a project
to create an intranet that would connect its
headquarters with all of its restaurants to provide
detailed operational information in real time; after
spending $170 million on consultants and initial
implementation planning, McDonald’s realized that the
project was too much to handle and terminated it
Information Technology Project Management, Fifth Edition, Copyright 2007
30
Scope Verification
It is very difficult to create a good scope statement
and WBS for a project
It is even more difficult to verify project scope and
minimize scope changes
Scope verification involves formal acceptance of
the completed project scope by the stakeholders
Acceptance is often achieved by a customer
inspection and then sign-off on key deliverables
Information Technology Project Management, Fifth Edition, Copyright 2007
31
Scope creep is the tendency for project scope
to keep getting bigger and bigger.
This is analogous to never finishing a race. Every
time you are near to the finish line, it moves
further.
IT projects have failed due to scope problems
such as scope creep.
To prevent scope creep, it is important to define
the project scope well, verify the project scope
and develop a process for controlling scope
changes.
Scope Control
Scope control involves controlling changes to
the project scope
Goals of scope control are to:
Influence the factors that cause scope changes
Assure changes are processed according to
procedures developed as part of integrated change
control
Manage changes when they occur
Variance is the difference between planned and
actual performance
Information Technology Project Management, Fifth Edition, Copyright 2007
33
The main input to scope control is the project
scope statement, the project scope management
plan, WBS, WBS dictionary, performance reports,
work performance information and approved
change requests.
As described in Project Integration Management,
to control scope changes, use tools such as a
change control system and configuration
management.
Another tool to use is to perform variance
analysis, the difference between planned and
actual performance.
Best Practices for Avoiding Scope
Problems
1. Keep the scope realistic: Don’t make projects so large that
they can’t be completed; break large projects down into a
series of smaller ones
2. Involve users in project scope management: Assign key
users to the project team and give them ownership of
requirements definition and scope verification
3. Use off-the-shelf hardware and software whenever
possible: Many IT people enjoy using the latest and greatest
technology, but business needs, not technology trends,
must take priority
4. Follow good project management processes: As described
in this chapter and others, there are well-defined processes
for managing project scope and others aspects of projects
Information Technology Project Management, Fifth Edition, Copyright 2007
35
User input..
The user perspective is crucial to define a
good project scope. Often the lack of user
input leads to problems with managing scope
creep and controlling change.
Suggestions for Improving User Input
Develop a good project selection process and
insist that sponsors are from the user
organization
Have users on the project team in important roles
Have regular meetings with defined agendas,
and have users sign off on key deliverables
presented at meetings
Deliver something to users and sponsors on a
regular basis
Don’t promise to deliver when you know you can’t
Co-locate users with developers
Information Technology Project Management, Fifth Edition, Copyright 2007
37
Suggestions for Reducing
Incomplete and Changing
Requirements
Develop and follow a requirements management
process
Use techniques such as prototyping, use case
modeling, and JAD to get more user involvement
Put requirements in writing and keep them current
Create a requirements management database for
documenting and controlling requirements
Information Technology Project Management, Fifth Edition, Copyright 2007
38
Suggestions for Reducing
Incomplete and Changing
Requirements (continued)
Provide adequate testing and conduct testing
throughout the project life cycle
Review changes from a systems perspective
Emphasize completion dates to help focus on
what’s most important
Allocate resources specifically for handling
change requests/enhancements like NWA did
with ResNet
Information Technology Project Management, Fifth Edition, Copyright 2007
39
Using Software to Assist in Project
Scope Management
Word-processing software helps create several
scope-related documents
Spreadsheets help to perform financial
calculations and weighed scoring models, and
develop charts and graphs
Communication software like e-mail and the Web
help clarify and communicate scope information
Project management software helps in creating a
WBS, the basis for tasks on a Gantt chart
Specialized software is available to assist in
project scope management
Information Technology Project Management, Fifth Edition, Copyright 2007
40
Chapter Summary
Project scope management includes the
processes required to ensure that the project
addresses all the work required, and only the
work required, to complete the project
successfully
Main processes include:
Scope planning
Scope definition
Creating the WBS
Scope verification
Scope control
Information Technology Project Management, Fifth Edition, Copyright 2007
41

Weitere ähnliche Inhalte

Was ist angesagt?

Рынок труда
Рынок трудаРынок труда
Рынок трудаEvgeniya
 
Information Technology Project Management
Information Technology Project ManagementInformation Technology Project Management
Information Technology Project ManagementGoutama Bachtiar
 
Project management part 3
Project management part 3Project management part 3
Project management part 3hkbhadraa
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project ReportRISHABHSIINGH
 
Chap03 the project management process groups
Chap03 the project management process groupsChap03 the project management process groups
Chap03 the project management process groupsDhani Ahmad
 
Project management and information technology context
Project management and information technology contextProject management and information technology context
Project management and information technology contextDhani Ahmad
 
Project management process groups case study
Project management process groups case studyProject management process groups case study
Project management process groups case studyDhani Ahmad
 
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3:The Project Management Process Groups: A Case StudyChapter 3:The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case StudyShahid Riaz
 
A Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project ManagementA Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project ManagementWorkfront
 
چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه m.saboor nesar
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Templatedmdk12
 
Project charterexample (1) (1)
Project charterexample (1) (1)Project charterexample (1) (1)
Project charterexample (1) (1)owaishazara
 
Role of Functional Organization in Large Engineering and Construction Programs
Role of Functional Organization in Large Engineering and Construction ProgramsRole of Functional Organization in Large Engineering and Construction Programs
Role of Functional Organization in Large Engineering and Construction ProgramsBob Prieto
 
Chap01 introduction to project management
Chap01 introduction to project managementChap01 introduction to project management
Chap01 introduction to project managementDhani Ahmad
 
Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12Dreams Design
 
The project management process groups a case study
The project management process groups a case studyThe project management process groups a case study
The project management process groups a case studyAfdalArifAmandaPutra
 

Was ist angesagt? (18)

Chapter 3
Chapter 3Chapter 3
Chapter 3
 
Рынок труда
Рынок трудаРынок труда
Рынок труда
 
Information Technology Project Management
Information Technology Project ManagementInformation Technology Project Management
Information Technology Project Management
 
Project management part 3
Project management part 3Project management part 3
Project management part 3
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project Report
 
Chap03 the project management process groups
Chap03 the project management process groupsChap03 the project management process groups
Chap03 the project management process groups
 
Project management and information technology context
Project management and information technology contextProject management and information technology context
Project management and information technology context
 
Project management process groups case study
Project management process groups case studyProject management process groups case study
Project management process groups case study
 
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3:The Project Management Process Groups: A Case StudyChapter 3:The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case Study
 
A Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project ManagementA Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project Management
 
چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
 
Project charterexample (1) (1)
Project charterexample (1) (1)Project charterexample (1) (1)
Project charterexample (1) (1)
 
Role of Functional Organization in Large Engineering and Construction Programs
Role of Functional Organization in Large Engineering and Construction ProgramsRole of Functional Organization in Large Engineering and Construction Programs
Role of Functional Organization in Large Engineering and Construction Programs
 
Chap01 introduction to project management
Chap01 introduction to project managementChap01 introduction to project management
Chap01 introduction to project management
 
Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12
 
P&msp2010 04 wbs-and-estimation
P&msp2010 04 wbs-and-estimationP&msp2010 04 wbs-and-estimation
P&msp2010 04 wbs-and-estimation
 
The project management process groups a case study
The project management process groups a case studyThe project management process groups a case study
The project management process groups a case study
 

Andere mochten auch

Vestido0
Vestido0Vestido0
Vestido0ITZEL95
 
HTML
HTML HTML
HTML BDBT
 
Медиакит gorodche 2016
Медиакит gorodche 2016Медиакит gorodche 2016
Медиакит gorodche 2016gorodche
 
16 feladatok
16 feladatok16 feladatok
16 feladatokK_A
 
Finmeccanica takes part at the Dubai Airshow: high-tech partnership with the ...
Finmeccanica takes part at the Dubai Airshow: high-tech partnership with the ...Finmeccanica takes part at the Dubai Airshow: high-tech partnership with the ...
Finmeccanica takes part at the Dubai Airshow: high-tech partnership with the ...Leonardo
 
Chapter 7 new and mobile media technologies, innovation and investment
Chapter 7  new and mobile media technologies, innovation and investmentChapter 7  new and mobile media technologies, innovation and investment
Chapter 7 new and mobile media technologies, innovation and investmentJulian Arias
 
Practica de la pila casera
Practica de la pila caseraPractica de la pila casera
Practica de la pila caseradiegorey24
 
EXPERIMENTO PILA CASERA
EXPERIMENTO PILA CASERAEXPERIMENTO PILA CASERA
EXPERIMENTO PILA CASERAyohancas
 

Andere mochten auch (15)

god is calling
god is callinggod is calling
god is calling
 
Dsc 0575
Dsc 0575Dsc 0575
Dsc 0575
 
i would not have you ignorant
i would not have you ignoranti would not have you ignorant
i would not have you ignorant
 
Vestido0
Vestido0Vestido0
Vestido0
 
HTML
HTML HTML
HTML
 
Carta de Curitiba
Carta de CuritibaCarta de Curitiba
Carta de Curitiba
 
Медиакит gorodche 2016
Медиакит gorodche 2016Медиакит gorodche 2016
Медиакит gorodche 2016
 
Phl8112
Phl8112Phl8112
Phl8112
 
16 feladatok
16 feladatok16 feladatok
16 feladatok
 
Finmeccanica takes part at the Dubai Airshow: high-tech partnership with the ...
Finmeccanica takes part at the Dubai Airshow: high-tech partnership with the ...Finmeccanica takes part at the Dubai Airshow: high-tech partnership with the ...
Finmeccanica takes part at the Dubai Airshow: high-tech partnership with the ...
 
Chapter 7 new and mobile media technologies, innovation and investment
Chapter 7  new and mobile media technologies, innovation and investmentChapter 7  new and mobile media technologies, innovation and investment
Chapter 7 new and mobile media technologies, innovation and investment
 
Pila casera
Pila caseraPila casera
Pila casera
 
Practica de la pila casera
Practica de la pila caseraPractica de la pila casera
Practica de la pila casera
 
EXPERIMENTO PILA CASERA
EXPERIMENTO PILA CASERAEXPERIMENTO PILA CASERA
EXPERIMENTO PILA CASERA
 
Final ppt
Final pptFinal ppt
Final ppt
 

Ähnlich wie 5 pmit

Project scope management
Project scope managementProject scope management
Project scope managementDhani Ahmad
 
Information Technology Project Management - part 05
Information Technology Project Management - part 05Information Technology Project Management - part 05
Information Technology Project Management - part 05Rizwan Khurram
 
5 - Project Scope Management.pptx
5 - Project Scope Management.pptx5 - Project Scope Management.pptx
5 - Project Scope Management.pptxMuhammadNazim63
 
Ch5 Project Scope Management xxxxxxxxx.pptx
Ch5 Project Scope Management xxxxxxxxx.pptxCh5 Project Scope Management xxxxxxxxx.pptx
Ch5 Project Scope Management xxxxxxxxx.pptxChereLemma2
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management - dyaksa hanindito
 
Scope project management in information system
Scope project management in information systemScope project management in information system
Scope project management in information systemLuqmanArief10
 
SOFTWARE PROJECT SCOPE VERIFICATION THROUGH DELIVERABLE-ORIENTED WORK BREAKDO...
SOFTWARE PROJECT SCOPE VERIFICATION THROUGH DELIVERABLE-ORIENTED WORK BREAKDO...SOFTWARE PROJECT SCOPE VERIFICATION THROUGH DELIVERABLE-ORIENTED WORK BREAKDO...
SOFTWARE PROJECT SCOPE VERIFICATION THROUGH DELIVERABLE-ORIENTED WORK BREAKDO...cscpconf
 
Software project scope verification through deliverable oriented work breakdo...
Software project scope verification through deliverable oriented work breakdo...Software project scope verification through deliverable oriented work breakdo...
Software project scope verification through deliverable oriented work breakdo...csandit
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxjessiehampson
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overviewcford1973
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course reviewAsa Chan
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 
Project management by hamidun
Project management by hamidunProject management by hamidun
Project management by hamidunDr Hamidun Jaafar
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementNathanielAddoQuaye1
 

Ähnlich wie 5 pmit (20)

Project scope management
Project scope managementProject scope management
Project scope management
 
Information Technology Project Management - part 05
Information Technology Project Management - part 05Information Technology Project Management - part 05
Information Technology Project Management - part 05
 
5 - Project Scope Management.pptx
5 - Project Scope Management.pptx5 - Project Scope Management.pptx
5 - Project Scope Management.pptx
 
Ch5 Project Scope Management xxxxxxxxx.pptx
Ch5 Project Scope Management xxxxxxxxx.pptxCh5 Project Scope Management xxxxxxxxx.pptx
Ch5 Project Scope Management xxxxxxxxx.pptx
 
Ch05
Ch05Ch05
Ch05
 
chapter-05.pptx
chapter-05.pptxchapter-05.pptx
chapter-05.pptx
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
 
Scope project management in information system
Scope project management in information systemScope project management in information system
Scope project management in information system
 
Scope.pdf
Scope.pdfScope.pdf
Scope.pdf
 
ch04.ppt
ch04.pptch04.ppt
ch04.ppt
 
SOFTWARE PROJECT SCOPE VERIFICATION THROUGH DELIVERABLE-ORIENTED WORK BREAKDO...
SOFTWARE PROJECT SCOPE VERIFICATION THROUGH DELIVERABLE-ORIENTED WORK BREAKDO...SOFTWARE PROJECT SCOPE VERIFICATION THROUGH DELIVERABLE-ORIENTED WORK BREAKDO...
SOFTWARE PROJECT SCOPE VERIFICATION THROUGH DELIVERABLE-ORIENTED WORK BREAKDO...
 
Software project scope verification through deliverable oriented work breakdo...
Software project scope verification through deliverable oriented work breakdo...Software project scope verification through deliverable oriented work breakdo...
Software project scope verification through deliverable oriented work breakdo...
 
Ch04
Ch04Ch04
Ch04
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
 
Day 2 scope
Day 2 scopeDay 2 scope
Day 2 scope
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Project management by hamidun
Project management by hamidunProject management by hamidun
Project management by hamidun
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 

Kürzlich hochgeladen

Networking in the Penumbra presented by Geoff Huston at NZNOG
Networking in the Penumbra presented by Geoff Huston at NZNOGNetworking in the Penumbra presented by Geoff Huston at NZNOG
Networking in the Penumbra presented by Geoff Huston at NZNOGAPNIC
 
DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024
DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024
DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024APNIC
 
VIP Kolkata Call Girl Kestopur 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kestopur 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kestopur 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kestopur 👉 8250192130 Available With Roomdivyansh0kumar0
 
FULL ENJOY Call Girls In Mayur Vihar Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mayur Vihar Delhi Contact Us 8377087607FULL ENJOY Call Girls In Mayur Vihar Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mayur Vihar Delhi Contact Us 8377087607dollysharma2066
 
Chennai Call Girls Porur Phone 🍆 8250192130 👅 celebrity escorts service
Chennai Call Girls Porur Phone 🍆 8250192130 👅 celebrity escorts serviceChennai Call Girls Porur Phone 🍆 8250192130 👅 celebrity escorts service
Chennai Call Girls Porur Phone 🍆 8250192130 👅 celebrity escorts servicesonalikaur4
 
Russian Call girls in Dubai +971563133746 Dubai Call girls
Russian  Call girls in Dubai +971563133746 Dubai  Call girlsRussian  Call girls in Dubai +971563133746 Dubai  Call girls
Russian Call girls in Dubai +971563133746 Dubai Call girlsstephieert
 
Russian Call girl in Ajman +971563133746 Ajman Call girl Service
Russian Call girl in Ajman +971563133746 Ajman Call girl ServiceRussian Call girl in Ajman +971563133746 Ajman Call girl Service
Russian Call girl in Ajman +971563133746 Ajman Call girl Servicegwenoracqe6
 
Russian Call Girls in Kolkata Ishita 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Ishita 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Ishita 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Ishita 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Russian Call Girls in Kolkata Samaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Samaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Samaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Samaira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP Kolkata Call Girl Salt Lake 👉 8250192130 Available With Room
VIP Kolkata Call Girl Salt Lake 👉 8250192130  Available With RoomVIP Kolkata Call Girl Salt Lake 👉 8250192130  Available With Room
VIP Kolkata Call Girl Salt Lake 👉 8250192130 Available With Roomishabajaj13
 
Radiant Call girls in Dubai O56338O268 Dubai Call girls
Radiant Call girls in Dubai O56338O268 Dubai Call girlsRadiant Call girls in Dubai O56338O268 Dubai Call girls
Radiant Call girls in Dubai O56338O268 Dubai Call girlsstephieert
 
Gram Darshan PPT cyber rural in villages of india
Gram Darshan PPT cyber rural  in villages of indiaGram Darshan PPT cyber rural  in villages of india
Gram Darshan PPT cyber rural in villages of indiaimessage0108
 
VIP Call Girls Kolkata Ananya 🤌 8250192130 🚀 Vip Call Girls Kolkata
VIP Call Girls Kolkata Ananya 🤌  8250192130 🚀 Vip Call Girls KolkataVIP Call Girls Kolkata Ananya 🤌  8250192130 🚀 Vip Call Girls Kolkata
VIP Call Girls Kolkata Ananya 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
AlbaniaDreamin24 - How to easily use an API with Flows
AlbaniaDreamin24 - How to easily use an API with FlowsAlbaniaDreamin24 - How to easily use an API with Flows
AlbaniaDreamin24 - How to easily use an API with FlowsThierry TROUIN ☁
 
VIP 7001035870 Find & Meet Hyderabad Call Girls LB Nagar high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls LB Nagar high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls LB Nagar high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls LB Nagar high-profile Call Girladitipandeya
 
VIP Kolkata Call Girl Dum Dum 👉 8250192130 Available With Room
VIP Kolkata Call Girl Dum Dum 👉 8250192130  Available With RoomVIP Kolkata Call Girl Dum Dum 👉 8250192130  Available With Room
VIP Kolkata Call Girl Dum Dum 👉 8250192130 Available With Roomdivyansh0kumar0
 

Kürzlich hochgeladen (20)

Networking in the Penumbra presented by Geoff Huston at NZNOG
Networking in the Penumbra presented by Geoff Huston at NZNOGNetworking in the Penumbra presented by Geoff Huston at NZNOG
Networking in the Penumbra presented by Geoff Huston at NZNOG
 
Rohini Sector 6 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 6 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 6 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 6 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024
DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024
DDoS In Oceania and the Pacific, presented by Dave Phelan at NZNOG 2024
 
Dwarka Sector 26 Call Girls | Delhi | 9999965857 🫦 Vanshika Verma More Our Se...
Dwarka Sector 26 Call Girls | Delhi | 9999965857 🫦 Vanshika Verma More Our Se...Dwarka Sector 26 Call Girls | Delhi | 9999965857 🫦 Vanshika Verma More Our Se...
Dwarka Sector 26 Call Girls | Delhi | 9999965857 🫦 Vanshika Verma More Our Se...
 
VIP Kolkata Call Girl Kestopur 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kestopur 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kestopur 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kestopur 👉 8250192130 Available With Room
 
FULL ENJOY Call Girls In Mayur Vihar Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mayur Vihar Delhi Contact Us 8377087607FULL ENJOY Call Girls In Mayur Vihar Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mayur Vihar Delhi Contact Us 8377087607
 
Chennai Call Girls Porur Phone 🍆 8250192130 👅 celebrity escorts service
Chennai Call Girls Porur Phone 🍆 8250192130 👅 celebrity escorts serviceChennai Call Girls Porur Phone 🍆 8250192130 👅 celebrity escorts service
Chennai Call Girls Porur Phone 🍆 8250192130 👅 celebrity escorts service
 
Russian Call girls in Dubai +971563133746 Dubai Call girls
Russian  Call girls in Dubai +971563133746 Dubai  Call girlsRussian  Call girls in Dubai +971563133746 Dubai  Call girls
Russian Call girls in Dubai +971563133746 Dubai Call girls
 
Rohini Sector 22 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 22 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 22 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 22 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Russian Call girl in Ajman +971563133746 Ajman Call girl Service
Russian Call girl in Ajman +971563133746 Ajman Call girl ServiceRussian Call girl in Ajman +971563133746 Ajman Call girl Service
Russian Call girl in Ajman +971563133746 Ajman Call girl Service
 
Russian Call Girls in Kolkata Ishita 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Ishita 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Ishita 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Ishita 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Russian Call Girls in Kolkata Samaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Samaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Samaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Samaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
VIP Kolkata Call Girl Salt Lake 👉 8250192130 Available With Room
VIP Kolkata Call Girl Salt Lake 👉 8250192130  Available With RoomVIP Kolkata Call Girl Salt Lake 👉 8250192130  Available With Room
VIP Kolkata Call Girl Salt Lake 👉 8250192130 Available With Room
 
Radiant Call girls in Dubai O56338O268 Dubai Call girls
Radiant Call girls in Dubai O56338O268 Dubai Call girlsRadiant Call girls in Dubai O56338O268 Dubai Call girls
Radiant Call girls in Dubai O56338O268 Dubai Call girls
 
Gram Darshan PPT cyber rural in villages of india
Gram Darshan PPT cyber rural  in villages of indiaGram Darshan PPT cyber rural  in villages of india
Gram Darshan PPT cyber rural in villages of india
 
VIP Call Girls Kolkata Ananya 🤌 8250192130 🚀 Vip Call Girls Kolkata
VIP Call Girls Kolkata Ananya 🤌  8250192130 🚀 Vip Call Girls KolkataVIP Call Girls Kolkata Ananya 🤌  8250192130 🚀 Vip Call Girls Kolkata
VIP Call Girls Kolkata Ananya 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
AlbaniaDreamin24 - How to easily use an API with Flows
AlbaniaDreamin24 - How to easily use an API with FlowsAlbaniaDreamin24 - How to easily use an API with Flows
AlbaniaDreamin24 - How to easily use an API with Flows
 
VIP 7001035870 Find & Meet Hyderabad Call Girls LB Nagar high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls LB Nagar high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls LB Nagar high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls LB Nagar high-profile Call Girl
 
Call Girls In South Ex 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Ex 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In South Ex 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Ex 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
VIP Kolkata Call Girl Dum Dum 👉 8250192130 Available With Room
VIP Kolkata Call Girl Dum Dum 👉 8250192130  Available With RoomVIP Kolkata Call Girl Dum Dum 👉 8250192130  Available With Room
VIP Kolkata Call Girl Dum Dum 👉 8250192130 Available With Room
 

5 pmit

  • 1. Chapter 5:Chapter 5: Project Scope ManagementProject Scope Management Information TechnologyInformation Technology Project Management,Project Management, Fifth EditionFifth Edition
  • 2. For the PHASE TEST Learn to use Calender You will be asked to create a Brunei Calender and apply it to the whole project
  • 3. Learning Objectives  Understand the elements that make good project scope management important  Explain the scope planning process and describe the contents of a scope management plan  Describe the process for developing a project scope statement using the project charter and preliminary scope statement  Discuss the scope definition process and work involved in constructing a work breakdown structure using the analogy, top-down, bottom-up, and mind-mapping approaches Information Technology Project Management, Fifth Edition, Copyright 2007 3
  • 4. Learning Objectives (continued)  Explain the importance of scope verification and how it relates to scope definition and control  Understand the importance of scope control and approaches for preventing scope-related problems on information technology projects  Describe how software can assist in project scope management Information Technology Project Management, Fifth Edition, Copyright 2007 4
  • 5. What is Project Scope Management? Scope refers to all the work involved in creating the products of the project and the processes used to create them  A deliverable is a product produced as part of a project, such as hardware or software, planning documents, or meeting minutes Project scope management includes the processes involved in defining and controlling what work is or is not included in a project Information Technology Project Management, Fifth Edition, Copyright 2007 5
  • 6. Project Scope Management Processes  Scope planning: deciding how the scope will be defined, verified, and controlled  Scope definition: reviewing the project charter and preliminary scope statement and adding more information as requirements are developed and change requests are approved  Creating the WBS: subdividing the major project deliverables into smaller, more manageable components  Scope verification: formalizing acceptance of the project scope  Scope control: controlling changes to project scope Information Technology Project Management, Fifth Edition, Copyright 2007 6
  • 7. Figure 5-1: Project Scope Management Summary Information Technology Project Management, Fifth Edition, Copyright 2007 7
  • 8. Scope Planning and the Scope Management Plan The scope management plan is a document that includes descriptions of how the team will prepare the project scope statement, create the WBS, verify completion of the project deliverables, and control requests for changes to the project scope Key inputs include the project charter, preliminary scope statement, and project management plan Information Technology Project Management, Fifth Edition, Copyright 2007 8
  • 9. What Went Right? Many financial service companies use customer relationship management (CRM) systems to improve their understanding of and responsiveness to customers A senior management team at the Canadian money management company Dynamic Mutual Funds (DMF) launched an enterprise-wide, national program to build and manage its customer relationships They needed a faster and more organized, highly participative approach, so they proposed a new seven- step concept called project scope design DMF won an eCustomer World Golden Award for world- class innovation Information Technology Project Management, Fifth Edition, Copyright 2007 9
  • 10. Table 5-1: Sample Scope Management Plan Information Technology Project Management, Fifth Edition, Copyright 2007 10
  • 11. Table 5-2: Sample Project Charter Information Technology Project Management, Fifth Edition, Copyright 2007 11
  • 12. Scope Definition and the Project Scope Statement The preliminary scope statement, project charter, organizational process assets, and approved change requests provide a basis for creating the project scope statement As time progresses, the scope of a project should become more clear and specific Information Technology Project Management, Fifth Edition, Copyright 2007 12
  • 13. Table 5-3: Further Defining Project Scope Information Technology Project Management, Fifth Edition, Copyright 200713
  • 14. Project Scope Statement A project scope statement is an important document for developing and confirming a common understanding of the project scope. It describes in detail the work to be accomplished on the project It is an important tool for ensuring customer satisfaction and preventing scope creep.
  • 15. Project Scope Statement Project Title: Date: Prepared by: Project Justification: . Product Characteristics and Requirements: 1… 2… Summary of Project Deliverables Project management-related deliverables: business case, charter, team contract, scope statement, WBS, schedule, cost baseline, status reports, final project presentation, final project report, lessons-learned report, and any other documents required to manage the project. Product-related deliverables: research reports, design documents, software code, hardware, etc. 1. .. 2… Project Success Criteria:
  • 16. Media Snapshot Many people enjoy watching television shows like Changing Rooms or Trading Spaces, where participants have two days and $1,000 to update a room in their neighbor’s house. Since the time and cost are set, it’s the scope that has the most flexibility. Designers on these shows often have to change initial scope goals due to budget or time constraints. Although most homeowners are very happy with work done on the show, some are obviously disappointed. Unlike most projects where the project team works closely with the customer, homeowners have little say in what gets done and cannot inspect the work along the way… What happens when the homeowners don’t like the work that’s been done? The FAQ section of tlc.com says, “Everyone on our show is told upfront that there’s a chance they won’t like the final design of the room. Each applicant signs a release acknowledging that the show is not responsible for redecorating a room that isn’t to the owner’s taste.” Too bad you can’t get sponsors for most projects to sign a similar release form. It would make project scope management much easier! Information Technology Project Management, Fifth Edition, Copyright 2007 16
  • 17. Creating the Work Breakdown Structure (WBS) A WBS is a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project WBS is a foundation document that provides the basis for planning and managing project schedules, costs, resources, and changes Decomposition is subdividing project deliverables into smaller pieces A work package is a task at the lowest level of the WBS Information Technology Project Management, Fifth Edition, Copyright 2007 17
  • 18. Often, the project team organizes the WBS around project products, project phases or the project management processes
  • 19. Figure 5-2: Sample Intranet WBS Organized by Product Information Technology Project Management, Fifth Edition, Copyright 2007 19
  • 20. Figure 5-3: Sample Intranet WBS Organized by Project Phase Information Technology Project Management, Fifth Edition, Copyright 2007 20
  • 21. Table 5-4: Intranet WBS in Tabular Form 1.0 Concept 1.1 Evaluate current systems 1.2 Define Requirements 1.2.1 Define user requirements 1.2.2 Define content requirements 1.2.3 Define system requirements 1.2.4 Define server owner requirements 1.3 Define specific functionality 1.4 Define risks and risk management approach 1.5 Develop project plan 1.6 Brief Web development team 2.0 Web Site Design 3.0 Web Site Development 4.0 Roll Out 5.0 Support Information Technology Project Management, Fifth Edition, Copyright 2007 21
  • 22. Figure 5-4: Intranet WBS and Gantt Chart in Microsoft Project Information Technology Project Management, Fifth Edition, Copyright 2007 22
  • 23. Figure 5-5: Intranet Gantt Chart Organized by Project Management Process Groups Information Technology Project Management, Fifth Edition, Copyright 2007 23
  • 24. Table 5-5: Executing Tasks for JWD Consulting’s WBS Information Technology Project Management, Fifth Edition, Copyright 2007 24
  • 25. Approaches to Developing WBSs Using guidelines: some organizations, like the DOD, provide guidelines for preparing WBSs The analogy approach: review WBSs of similar projects and tailor to your project The top-down approach: start with the largest items of the project and break them down The bottom-up approach: start with the specific tasks and roll them up Mind-mapping approach: mind mapping is a technique that uses branches radiating out from a core idea to structure thoughts and ideas Information Technology Project Management, Fifth Edition, Copyright 2007 25
  • 26. Figure 5-6: Sample Mind-Mapping Approach for Creating a WBS Information Technology Project Management, Fifth Edition, Copyright 2007 26
  • 27. Figure 5-7: Resulting WBS in Chart Form Information Technology Project Management, Fifth Edition, Copyright 2007 27
  • 28. The WBS Dictionary and Scope Baseline Many WBS tasks are vague and must be explained more so people know what to do and can estimate how long it will take and what it will cost to do the work A WBS dictionary is a document that describes detailed information about each WBS item The approved project scope statement and its WBS and WBS dictionary form the scope baseline, which is used to measure performance in meeting project scope goals Information Technology Project Management, Fifth Edition, Copyright 2007 28
  • 29. Advice for Creating a WBS and WBS Dictionary* Skip *Cleland, David I. Project Management: Strategic Design and Implementation, 1994 Information Technology Project Management, Fifth Edition, Copyright 2007 29
  • 30. What Went Wrong? A project scope that is too broad and grandiose can cause severe problems Scope creep and an overemphasis on technology for technology’s sake resulted in the bankruptcy of a large pharmaceutical firm, Texas-based FoxMeyer Drug In 2001, McDonald’s fast-food chain initiated a project to create an intranet that would connect its headquarters with all of its restaurants to provide detailed operational information in real time; after spending $170 million on consultants and initial implementation planning, McDonald’s realized that the project was too much to handle and terminated it Information Technology Project Management, Fifth Edition, Copyright 2007 30
  • 31. Scope Verification It is very difficult to create a good scope statement and WBS for a project It is even more difficult to verify project scope and minimize scope changes Scope verification involves formal acceptance of the completed project scope by the stakeholders Acceptance is often achieved by a customer inspection and then sign-off on key deliverables Information Technology Project Management, Fifth Edition, Copyright 2007 31
  • 32. Scope creep is the tendency for project scope to keep getting bigger and bigger. This is analogous to never finishing a race. Every time you are near to the finish line, it moves further. IT projects have failed due to scope problems such as scope creep. To prevent scope creep, it is important to define the project scope well, verify the project scope and develop a process for controlling scope changes.
  • 33. Scope Control Scope control involves controlling changes to the project scope Goals of scope control are to: Influence the factors that cause scope changes Assure changes are processed according to procedures developed as part of integrated change control Manage changes when they occur Variance is the difference between planned and actual performance Information Technology Project Management, Fifth Edition, Copyright 2007 33
  • 34. The main input to scope control is the project scope statement, the project scope management plan, WBS, WBS dictionary, performance reports, work performance information and approved change requests. As described in Project Integration Management, to control scope changes, use tools such as a change control system and configuration management. Another tool to use is to perform variance analysis, the difference between planned and actual performance.
  • 35. Best Practices for Avoiding Scope Problems 1. Keep the scope realistic: Don’t make projects so large that they can’t be completed; break large projects down into a series of smaller ones 2. Involve users in project scope management: Assign key users to the project team and give them ownership of requirements definition and scope verification 3. Use off-the-shelf hardware and software whenever possible: Many IT people enjoy using the latest and greatest technology, but business needs, not technology trends, must take priority 4. Follow good project management processes: As described in this chapter and others, there are well-defined processes for managing project scope and others aspects of projects Information Technology Project Management, Fifth Edition, Copyright 2007 35
  • 36. User input.. The user perspective is crucial to define a good project scope. Often the lack of user input leads to problems with managing scope creep and controlling change.
  • 37. Suggestions for Improving User Input Develop a good project selection process and insist that sponsors are from the user organization Have users on the project team in important roles Have regular meetings with defined agendas, and have users sign off on key deliverables presented at meetings Deliver something to users and sponsors on a regular basis Don’t promise to deliver when you know you can’t Co-locate users with developers Information Technology Project Management, Fifth Edition, Copyright 2007 37
  • 38. Suggestions for Reducing Incomplete and Changing Requirements Develop and follow a requirements management process Use techniques such as prototyping, use case modeling, and JAD to get more user involvement Put requirements in writing and keep them current Create a requirements management database for documenting and controlling requirements Information Technology Project Management, Fifth Edition, Copyright 2007 38
  • 39. Suggestions for Reducing Incomplete and Changing Requirements (continued) Provide adequate testing and conduct testing throughout the project life cycle Review changes from a systems perspective Emphasize completion dates to help focus on what’s most important Allocate resources specifically for handling change requests/enhancements like NWA did with ResNet Information Technology Project Management, Fifth Edition, Copyright 2007 39
  • 40. Using Software to Assist in Project Scope Management Word-processing software helps create several scope-related documents Spreadsheets help to perform financial calculations and weighed scoring models, and develop charts and graphs Communication software like e-mail and the Web help clarify and communicate scope information Project management software helps in creating a WBS, the basis for tasks on a Gantt chart Specialized software is available to assist in project scope management Information Technology Project Management, Fifth Edition, Copyright 2007 40
  • 41. Chapter Summary Project scope management includes the processes required to ensure that the project addresses all the work required, and only the work required, to complete the project successfully Main processes include: Scope planning Scope definition Creating the WBS Scope verification Scope control Information Technology Project Management, Fifth Edition, Copyright 2007 41