Benefits of FMIS-So You Agree

n Full integration of budget and budget execution data
     allowing greater financial control
n    Close monitoring of outstanding bills, cash in bank
     accounts and improved cash planning
n    Provision of timely and accurate data for
     management and budget decision making
n    Assistance in preparation of financial reports and
     statements
n    Backbone for additional modules-HR, Debt, Audit
n    Foundation of PBB/M&E and broader governance
     reform on corruption, transparency, e-government
12/5/2007                                                  2
But Getting From A to B--Not So Easy


n Success not assured. Failure, waste, missed potential.
     Repair harder than new projects
n    Not an IT or accounting reform operation. Technological
     changes, though the most capital intensive, should be in
     support of comprehensive functional (BPR) reforms
n    Institutional and political economy issues are more
     difficult and can take more time than technical issues
n    Senior level understanding/commitment is vital
n    Sequencing (core first), team structures, communications,
     change management, and allies count
n Take the time for a conceptual framework, strategy, cost
     estimates, and initial training. More sweat now less blood later.

12/5/2007                                                                3
Planning -- Look Before You Leap

n Understand the scope of an FMIS effort
n Gather information and assess the current situation,
     including other e-government initiatives, financing
n    Find champions and allies
n    Management matters – project teams and oversight
     structure
n    Anticipate change management
n    Expect to train, a lot
n    Assure adequate legal framework
n    Maintain a strategic vision

12/5/2007                                                  4
Indicative Implementation Schedule
Legal and Institutional Framework

Functional Design, Budget Classification, CoA, Procedures and Manuals

 Conceptual Systems Design and Technical Architecture

                   Systems Procurement


                               Gap Analysis, S/W Parameterization
                               /Customization/, Testing


                              Change Management & End User Training


                                     Pilot Systems Implementation

                                                     Systems Replication

  12/5/2007                                                         5

12-18 months         12-18 months                 24-48 months
ECA Treasury/PFMS Projects
ECA Treasury / PFMS Projects                                           1995                      2000                              2005              Oct’07         2010                               2015
                                                                                                                          AH                                   Avg. completion time 7.1 yrs
Hungary                 P043446 PFMP (TS)      1996                                      10.4 (7.3+3.1)
                                                                                                                                                               Avg. implementation 5.7 yrs
Kazakhstan              P037960 TMP (TS)       1994                                 17.7 (15.7+2.0)                         AH
Türkiye*                P035759 say2000i (TS+) 1927                                             15.9 (0+15.9)               AH
Ukraine                 P049174 TSP (TS)       1996                                                26.9 (16.5+10.4)                      AH

Albania                 P069939 PARP (TS)                      1993                                DR            9.0 (8.5+0.5)                          CD
Armenia**               P081668 IDF (GFMIS)                    1996                                                                                CD                                 Completed
Slovak Rep** P069864 PFMP (TS)                                 1992                                                  DR           5.5 (4.9+0.6)

Russia                  P064508 TDP (TS)                       1992                           AH                                 613 (231+382)                            AH, CD
                                                                                                                                                                            Avg. compl. 7.2 yrs
Azerbaijan              P066100 TIMS (TS)                      1998                           AH                            13.4 (9.5+3.9)                   CD
                                                                                                                                                                              Avg. impl. 5.1 yrs
Kyrgyz Rep              P071063 TMIS (TS)                      1994                                                DR                  10.2 (6.7+3.5)                     CD
Moldova                 P082916 PFMP (PFMS)                    1993                                                                                15.3 (8.5+6.8)               CD
                                                                                                                                                                                      In Progress
Georgia       P063081 FMIS (PFMS)                              1998                                                                                  15.0 (3.0+12.0)             CD
Uzbekistan*** P070084 PFMRP (TS)                               1999                                                         DR                                 37.4 (20.7+16.7)        CD

Ukraine                 P090389 PFMP (PFMS) 1996                           Avg. compl. 6.5 yrs                                                                      65.0 (50+15)              CD
                                                                          Avg. implem. 4.5 yrs            Preparation
Tajikistan              P099840 PFMP (PFMS) 1997                                                                                                                     10.0 (5.0+5.0)           CD

Turkmenistan P034092 IBTA (TS)                                 1992                                                               DR
Croatia      P050718 PFMP (TS)                                 1992        AH                                 Dropped
                                                                                    Note: Total project budget (World Bank funding + Gov contribution; in USD million) is shown on the bars

                                    Treasury established in •                           • Google         • Blogs         • Skype • YouTube
    Prep.>Appr.>Effect.                                                         • Web TV                            • Wireless
                                                                        • World Wide Web
    Implementation              WB Informatics Specialists involved:
                                AH Ali Hashim
                                                                          Browsers                          eGov                                                                eGov recovery
    Extension                   DR Dominique de Roquefeuil
                                                                          Java                          projects stall
                                CD Cem Dener

* The Bank funded the ICT consultant/prj coord only.                                eGov starts          eEurope
** The Bank funded the TA activities only.
*** Project reactivated with ADB funding in 2007.
                 12/5/2007                                                                                                                                                                         6
Understanding the Scope
                      Typical Project Activities-1
       n    Assuring the Legal and Institutional framework
       n    Specification of Functional Processes,
            Organizational Arrangements, Budget
            Classification Structures, CoA,
       n    Development of an overall conceptual systems
            design
       n    Development of the technology design and
            architecture
       n    Procurement/ Development of Application Software
       n    Parameterization customization of S/W
       n    Testing application S/W for functionality
       n    Development of operational procedures and
            manuals
12/5/2007                                                  7
Understanding the Scope
                Typical Project Activities - 2
n Systems Implementation at Pilot sites


       n    Procure and Install hardware at pilot sites
       n    Institute change management procedures
       n    Train end user and technical staff
       n    Implement systems

n Systems Replication across all sites




12/5/2007                                                 8
12/5/2007   9
Some World Bank Treasury Projects in Europe and Central Asia
Name and Country                         No of Main   Cost: Total= (Govt.     Status/       Remarks
                                           Sites        + Bank Loan)        Completion
                                                          U.S. $ mil.          Time
Ukraine Treasury Systems Project (TS)       700        26.9 (16.5+10.4)       7.0 yrs       Custom S/W
Kazakhstan Treasury Modernization           250         17.7(15.7+2.0)        8.9 yrs       Oracle
Project (TS)                                                                                Financials
Hungary Public Finance Management            20          10.4(7.3+3.1)        7.1 yrs       Custom S/W
Project (TS)
Turkey PFMP (TS)                            1500        15.9(15.9 + 0.0)      8.5 yrs       Custom S/W
Albania (TS)                                 35          9.0(8.5+0.5)         6.8 yrs       Oracle
                                                                                            Financials
Russia Treasury Development Project         2200       613(231.0+382.)       Ongoing        Oracle
(TS)                                                                                        Financials
Moldova PFMP (IFMS)                          35          15.3(8.5+6.8)       Ongoing        Bidding for
                                                                                            COTS
Kyrgyz Republic (TS+HRMIS)                   65          10.2(6.7+3.5)       Ongoing        Bidding for
                                                                                            COTS
Azerbaijan (TS)                              90          13.4(9.5+3.9)       Ongoing        SAP
Georgia (IFMS)                               30         15.0(3.0+12.0        Ongoing        COTS planned
Second Ukraine PFMP (IFMS)                  700          65.0(50+15)           Under        COTS planned
                                                                            Preparation
Tajikistan (IFMS)                            75          10.0(5.0+5.0)         Under        COTS planned
                                                                            Preparation
Team: Ali Hashim (1995-2004); Dominique de Roquefeul (2000-2004); Cem Dener (2004-todate)
     12/5/2007                                                                                            10
Get the Facts

       n    Critical need to understand present situation
             n Status of budget/treasury functions

             n Roles and responsibilities

             n IT adequacy, management, experience

             n Chart of Accounts—international standards?

             n Public contracting

             n Data reliability and integration

             n Horror stories or foregone savings

       n    Public Expenditure Financial Accountability (PEFA)
       n    Various other external assessments/internal reviews

12/5/2007                                                         11
Find Champions and Allies

n Strong Government and MOF Commitment have
     been a key factor for the success of Reform Projects
       n    Can be better achieved if projects are framed as public
            expenditure management (PEM) systems reform
            initiatives rather than just accounting/IT systems reform
       n    Senior level policy makers in MOF and donor
            organizations understand and can sell/defend
       n    Use videos, observational trips, PEMPAL, etc. to
            reinforce vision and reform commitment
       n    Collaborate with line ministries already implementing
            their own systems
n If possible reach out to press, NGOs, private sector

12/5/2007                                                          12
Management Matters

       n    Project Manager – Senior official from FUNCTIONAL SIDE
            with stature within bureaucracy, adequate financial and
            administrative powers.

       n    Core Team –
             n   Group of trained professionals from core functions, who can act
                 as change agents.
             n   Representatives of major stake holders need to be represented
                 on the team to manage the interface with their agencies.

       n    Project Secretariat - should have specialist staff with
            experience in the installation of large scale IT systems and
            IT procurement
             n   Familiarity with IT projects is an advantage


12/5/2007                                                                     13
Train and Train Again

n Large numbers - can appear overwhelming.
   n However, most Governments have training institutions
     which could be used to impart training.
n Program needs to be structured to requirements.
   n Most staff need to know only specific features of the
     system
n Should be coordinated closely with implementation
     plans
       n    focused to specific requirements of a given site
       n    should be imparted just before site implementation;
       n    help desk,
       n    hand holding clinics

12/5/2007                                                         14
Manage the Change

n Need to overcome opposition from vested
     interests who see reform as a threat
       n Despite advantages of new system opposition
         should be expected
       n Perception of the system being a threat can be
         reduced through communication, retraining,
         participation, focus on quick wins, managed
         expectations
       n Identify win-win examples for civil servants


12/5/2007                                             15
Get A Lawyer (if you must)

n Development of a comprehensive budget
     management law for management of public funds
     and property
       n    Specifies the roles and responsibilities of the Treasury,
            the MOF and Line Agencies
       n    Specifies the authorities and responsibilities for:
              n Receipt and custody of public funds

              n Public expenditure management control processes

              n Management of public debt

              n Accounting, Financial Reporting and Audit

       n    But if the current framework works, fix it later.

12/5/2007                                                           16
Finally, the Plan

n Based on a conceptual model, a strategic plan laying out goals,
     methods, timeframes, costs, benchmarks, etc.
n    Review by stakeholders for buy-in
n    Approval of plan by highest appropriate body
n    Clear mandate/structure for plan implementation
n    Adhere to plan and benchmarks, but flexibility, with approval by
     project governance structure, for adjustments
n    Periodic reviews of project and plan
n    Importance of maintaining capacity for strategic visioning to
     sustain reform impulse, financing, integrity of integration of
     systems, etc.




12/5/2007                                                               17

Weitere ähnliche Inhalte

Mehr von icgfmconference

2015 closing remarks winter_conference_icgfm_maykoski_en
2015 closing remarks winter_conference_icgfm_maykoski_en2015 closing remarks winter_conference_icgfm_maykoski_en
2015 closing remarks winter_conference_icgfm_maykoski_enicgfmconference
 
Day3 sp4 chemonics-icgfm_dec2015_fr
Day3 sp4 chemonics-icgfm_dec2015_frDay3 sp4 chemonics-icgfm_dec2015_fr
Day3 sp4 chemonics-icgfm_dec2015_fricgfmconference
 
Day3 sp4 chemonics-icgfm_dec2015_sp
Day3 sp4 chemonics-icgfm_dec2015_spDay3 sp4 chemonics-icgfm_dec2015_sp
Day3 sp4 chemonics-icgfm_dec2015_spicgfmconference
 
Day3 sp4 chemonics-icgfm_dec2015_en
Day3 sp4 chemonics-icgfm_dec2015_enDay3 sp4 chemonics-icgfm_dec2015_en
Day3 sp4 chemonics-icgfm_dec2015_enicgfmconference
 
Day3 sp3-3 georgetown-panelandreamurta_en
Day3 sp3-3 georgetown-panelandreamurta_enDay3 sp3-3 georgetown-panelandreamurta_en
Day3 sp3-3 georgetown-panelandreamurta_enicgfmconference
 
Day3 sp3-4 georgetown-panelyonatonmorse_en
Day3 sp3-4 georgetown-panelyonatonmorse_enDay3 sp3-4 georgetown-panelyonatonmorse_en
Day3 sp3-4 georgetown-panelyonatonmorse_enicgfmconference
 
Day3 sp3-2 georgetown-paneltomcardamone_en
Day3 sp3-2 georgetown-paneltomcardamone_enDay3 sp3-2 georgetown-paneltomcardamone_en
Day3 sp3-2 georgetown-paneltomcardamone_enicgfmconference
 
Day3 sp3-1 georgetown-paneljodivittori_en
Day3 sp3-1 georgetown-paneljodivittori_enDay3 sp3-1 georgetown-paneljodivittori_en
Day3 sp3-1 georgetown-paneljodivittori_enicgfmconference
 
Day3 sp2 nov 6 draft icgfm-wuertz_fr
Day3 sp2 nov 6 draft icgfm-wuertz_frDay3 sp2 nov 6 draft icgfm-wuertz_fr
Day3 sp2 nov 6 draft icgfm-wuertz_fricgfmconference
 
Day3 sp2 nov 6 draft icgfm-wuertz_sp
Day3 sp2 nov 6 draft icgfm-wuertz_spDay3 sp2 nov 6 draft icgfm-wuertz_sp
Day3 sp2 nov 6 draft icgfm-wuertz_spicgfmconference
 
Day3 sp2 nov 6 draft icgfm-wuertz_en
Day3 sp2 nov 6 draft icgfm-wuertz_enDay3 sp2 nov 6 draft icgfm-wuertz_en
Day3 sp2 nov 6 draft icgfm-wuertz_enicgfmconference
 
Day3 sp1 wright-membership_benefits_dec2015_fr
Day3 sp1 wright-membership_benefits_dec2015_frDay3 sp1 wright-membership_benefits_dec2015_fr
Day3 sp1 wright-membership_benefits_dec2015_fricgfmconference
 
Day3 sp1 wright-membership_benefits_dec2015_sp
Day3 sp1 wright-membership_benefits_dec2015_spDay3 sp1 wright-membership_benefits_dec2015_sp
Day3 sp1 wright-membership_benefits_dec2015_spicgfmconference
 
Day3 sp1 wright-membership_benefits_dec2015_en
Day3 sp1 wright-membership_benefits_dec2015_enDay3 sp1 wright-membership_benefits_dec2015_en
Day3 sp1 wright-membership_benefits_dec2015_enicgfmconference
 
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...icgfmconference
 
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...icgfmconference
 
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...icgfmconference
 
Day2 sp4 pres-washington_elettore_en
Day2 sp4 pres-washington_elettore_enDay2 sp4 pres-washington_elettore_en
Day2 sp4 pres-washington_elettore_enicgfmconference
 
Day2 sp4 pres-washington_elettore_fr
Day2 sp4 pres-washington_elettore_frDay2 sp4 pres-washington_elettore_fr
Day2 sp4 pres-washington_elettore_fricgfmconference
 
Day2 sp4 presentación-fmi_elettore_sp
Day2 sp4 presentación-fmi_elettore_spDay2 sp4 presentación-fmi_elettore_sp
Day2 sp4 presentación-fmi_elettore_spicgfmconference
 

Mehr von icgfmconference (20)

2015 closing remarks winter_conference_icgfm_maykoski_en
2015 closing remarks winter_conference_icgfm_maykoski_en2015 closing remarks winter_conference_icgfm_maykoski_en
2015 closing remarks winter_conference_icgfm_maykoski_en
 
Day3 sp4 chemonics-icgfm_dec2015_fr
Day3 sp4 chemonics-icgfm_dec2015_frDay3 sp4 chemonics-icgfm_dec2015_fr
Day3 sp4 chemonics-icgfm_dec2015_fr
 
Day3 sp4 chemonics-icgfm_dec2015_sp
Day3 sp4 chemonics-icgfm_dec2015_spDay3 sp4 chemonics-icgfm_dec2015_sp
Day3 sp4 chemonics-icgfm_dec2015_sp
 
Day3 sp4 chemonics-icgfm_dec2015_en
Day3 sp4 chemonics-icgfm_dec2015_enDay3 sp4 chemonics-icgfm_dec2015_en
Day3 sp4 chemonics-icgfm_dec2015_en
 
Day3 sp3-3 georgetown-panelandreamurta_en
Day3 sp3-3 georgetown-panelandreamurta_enDay3 sp3-3 georgetown-panelandreamurta_en
Day3 sp3-3 georgetown-panelandreamurta_en
 
Day3 sp3-4 georgetown-panelyonatonmorse_en
Day3 sp3-4 georgetown-panelyonatonmorse_enDay3 sp3-4 georgetown-panelyonatonmorse_en
Day3 sp3-4 georgetown-panelyonatonmorse_en
 
Day3 sp3-2 georgetown-paneltomcardamone_en
Day3 sp3-2 georgetown-paneltomcardamone_enDay3 sp3-2 georgetown-paneltomcardamone_en
Day3 sp3-2 georgetown-paneltomcardamone_en
 
Day3 sp3-1 georgetown-paneljodivittori_en
Day3 sp3-1 georgetown-paneljodivittori_enDay3 sp3-1 georgetown-paneljodivittori_en
Day3 sp3-1 georgetown-paneljodivittori_en
 
Day3 sp2 nov 6 draft icgfm-wuertz_fr
Day3 sp2 nov 6 draft icgfm-wuertz_frDay3 sp2 nov 6 draft icgfm-wuertz_fr
Day3 sp2 nov 6 draft icgfm-wuertz_fr
 
Day3 sp2 nov 6 draft icgfm-wuertz_sp
Day3 sp2 nov 6 draft icgfm-wuertz_spDay3 sp2 nov 6 draft icgfm-wuertz_sp
Day3 sp2 nov 6 draft icgfm-wuertz_sp
 
Day3 sp2 nov 6 draft icgfm-wuertz_en
Day3 sp2 nov 6 draft icgfm-wuertz_enDay3 sp2 nov 6 draft icgfm-wuertz_en
Day3 sp2 nov 6 draft icgfm-wuertz_en
 
Day3 sp1 wright-membership_benefits_dec2015_fr
Day3 sp1 wright-membership_benefits_dec2015_frDay3 sp1 wright-membership_benefits_dec2015_fr
Day3 sp1 wright-membership_benefits_dec2015_fr
 
Day3 sp1 wright-membership_benefits_dec2015_sp
Day3 sp1 wright-membership_benefits_dec2015_spDay3 sp1 wright-membership_benefits_dec2015_sp
Day3 sp1 wright-membership_benefits_dec2015_sp
 
Day3 sp1 wright-membership_benefits_dec2015_en
Day3 sp1 wright-membership_benefits_dec2015_enDay3 sp1 wright-membership_benefits_dec2015_en
Day3 sp1 wright-membership_benefits_dec2015_en
 
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
 
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
 
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
 
Day2 sp4 pres-washington_elettore_en
Day2 sp4 pres-washington_elettore_enDay2 sp4 pres-washington_elettore_en
Day2 sp4 pres-washington_elettore_en
 
Day2 sp4 pres-washington_elettore_fr
Day2 sp4 pres-washington_elettore_frDay2 sp4 pres-washington_elettore_fr
Day2 sp4 pres-washington_elettore_fr
 
Day2 sp4 presentación-fmi_elettore_sp
Day2 sp4 presentación-fmi_elettore_spDay2 sp4 presentación-fmi_elettore_sp
Day2 sp4 presentación-fmi_elettore_sp
 

Kürzlich hochgeladen

This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 

Kürzlich hochgeladen (20)

This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 

IFMIS Planning

  • 1. FMIS Planning for Success Ronald Myers Ali Hashim World Bank ICGFM Conference December, 3-4 2007 12/5/2007 1
  • 2. Benefits of FMIS-So You Agree n Full integration of budget and budget execution data allowing greater financial control n Close monitoring of outstanding bills, cash in bank accounts and improved cash planning n Provision of timely and accurate data for management and budget decision making n Assistance in preparation of financial reports and statements n Backbone for additional modules-HR, Debt, Audit n Foundation of PBB/M&E and broader governance reform on corruption, transparency, e-government 12/5/2007 2
  • 3. But Getting From A to B--Not So Easy n Success not assured. Failure, waste, missed potential. Repair harder than new projects n Not an IT or accounting reform operation. Technological changes, though the most capital intensive, should be in support of comprehensive functional (BPR) reforms n Institutional and political economy issues are more difficult and can take more time than technical issues n Senior level understanding/commitment is vital n Sequencing (core first), team structures, communications, change management, and allies count n Take the time for a conceptual framework, strategy, cost estimates, and initial training. More sweat now less blood later. 12/5/2007 3
  • 4. Planning -- Look Before You Leap n Understand the scope of an FMIS effort n Gather information and assess the current situation, including other e-government initiatives, financing n Find champions and allies n Management matters – project teams and oversight structure n Anticipate change management n Expect to train, a lot n Assure adequate legal framework n Maintain a strategic vision 12/5/2007 4
  • 5. Indicative Implementation Schedule Legal and Institutional Framework Functional Design, Budget Classification, CoA, Procedures and Manuals Conceptual Systems Design and Technical Architecture Systems Procurement Gap Analysis, S/W Parameterization /Customization/, Testing Change Management & End User Training Pilot Systems Implementation Systems Replication 12/5/2007 5 12-18 months 12-18 months 24-48 months
  • 6. ECA Treasury/PFMS Projects ECA Treasury / PFMS Projects 1995 2000 2005 Oct’07 2010 2015 AH Avg. completion time 7.1 yrs Hungary P043446 PFMP (TS) 1996 10.4 (7.3+3.1) Avg. implementation 5.7 yrs Kazakhstan P037960 TMP (TS) 1994 17.7 (15.7+2.0) AH Türkiye* P035759 say2000i (TS+) 1927 15.9 (0+15.9) AH Ukraine P049174 TSP (TS) 1996 26.9 (16.5+10.4) AH Albania P069939 PARP (TS) 1993 DR 9.0 (8.5+0.5) CD Armenia** P081668 IDF (GFMIS) 1996 CD Completed Slovak Rep** P069864 PFMP (TS) 1992 DR 5.5 (4.9+0.6) Russia P064508 TDP (TS) 1992 AH 613 (231+382) AH, CD Avg. compl. 7.2 yrs Azerbaijan P066100 TIMS (TS) 1998 AH 13.4 (9.5+3.9) CD Avg. impl. 5.1 yrs Kyrgyz Rep P071063 TMIS (TS) 1994 DR 10.2 (6.7+3.5) CD Moldova P082916 PFMP (PFMS) 1993 15.3 (8.5+6.8) CD In Progress Georgia P063081 FMIS (PFMS) 1998 15.0 (3.0+12.0) CD Uzbekistan*** P070084 PFMRP (TS) 1999 DR 37.4 (20.7+16.7) CD Ukraine P090389 PFMP (PFMS) 1996 Avg. compl. 6.5 yrs 65.0 (50+15) CD Avg. implem. 4.5 yrs Preparation Tajikistan P099840 PFMP (PFMS) 1997 10.0 (5.0+5.0) CD Turkmenistan P034092 IBTA (TS) 1992 DR Croatia P050718 PFMP (TS) 1992 AH Dropped Note: Total project budget (World Bank funding + Gov contribution; in USD million) is shown on the bars Treasury established in • • Google • Blogs • Skype • YouTube Prep.>Appr.>Effect. • Web TV • Wireless • World Wide Web Implementation WB Informatics Specialists involved: AH Ali Hashim Browsers eGov eGov recovery Extension DR Dominique de Roquefeuil Java projects stall CD Cem Dener * The Bank funded the ICT consultant/prj coord only. eGov starts eEurope ** The Bank funded the TA activities only. *** Project reactivated with ADB funding in 2007. 12/5/2007 6
  • 7. Understanding the Scope Typical Project Activities-1 n Assuring the Legal and Institutional framework n Specification of Functional Processes, Organizational Arrangements, Budget Classification Structures, CoA, n Development of an overall conceptual systems design n Development of the technology design and architecture n Procurement/ Development of Application Software n Parameterization customization of S/W n Testing application S/W for functionality n Development of operational procedures and manuals 12/5/2007 7
  • 8. Understanding the Scope Typical Project Activities - 2 n Systems Implementation at Pilot sites n Procure and Install hardware at pilot sites n Institute change management procedures n Train end user and technical staff n Implement systems n Systems Replication across all sites 12/5/2007 8
  • 10. Some World Bank Treasury Projects in Europe and Central Asia Name and Country No of Main Cost: Total= (Govt. Status/ Remarks Sites + Bank Loan) Completion U.S. $ mil. Time Ukraine Treasury Systems Project (TS) 700 26.9 (16.5+10.4) 7.0 yrs Custom S/W Kazakhstan Treasury Modernization 250 17.7(15.7+2.0) 8.9 yrs Oracle Project (TS) Financials Hungary Public Finance Management 20 10.4(7.3+3.1) 7.1 yrs Custom S/W Project (TS) Turkey PFMP (TS) 1500 15.9(15.9 + 0.0) 8.5 yrs Custom S/W Albania (TS) 35 9.0(8.5+0.5) 6.8 yrs Oracle Financials Russia Treasury Development Project 2200 613(231.0+382.) Ongoing Oracle (TS) Financials Moldova PFMP (IFMS) 35 15.3(8.5+6.8) Ongoing Bidding for COTS Kyrgyz Republic (TS+HRMIS) 65 10.2(6.7+3.5) Ongoing Bidding for COTS Azerbaijan (TS) 90 13.4(9.5+3.9) Ongoing SAP Georgia (IFMS) 30 15.0(3.0+12.0 Ongoing COTS planned Second Ukraine PFMP (IFMS) 700 65.0(50+15) Under COTS planned Preparation Tajikistan (IFMS) 75 10.0(5.0+5.0) Under COTS planned Preparation Team: Ali Hashim (1995-2004); Dominique de Roquefeul (2000-2004); Cem Dener (2004-todate) 12/5/2007 10
  • 11. Get the Facts n Critical need to understand present situation n Status of budget/treasury functions n Roles and responsibilities n IT adequacy, management, experience n Chart of Accounts—international standards? n Public contracting n Data reliability and integration n Horror stories or foregone savings n Public Expenditure Financial Accountability (PEFA) n Various other external assessments/internal reviews 12/5/2007 11
  • 12. Find Champions and Allies n Strong Government and MOF Commitment have been a key factor for the success of Reform Projects n Can be better achieved if projects are framed as public expenditure management (PEM) systems reform initiatives rather than just accounting/IT systems reform n Senior level policy makers in MOF and donor organizations understand and can sell/defend n Use videos, observational trips, PEMPAL, etc. to reinforce vision and reform commitment n Collaborate with line ministries already implementing their own systems n If possible reach out to press, NGOs, private sector 12/5/2007 12
  • 13. Management Matters n Project Manager – Senior official from FUNCTIONAL SIDE with stature within bureaucracy, adequate financial and administrative powers. n Core Team – n Group of trained professionals from core functions, who can act as change agents. n Representatives of major stake holders need to be represented on the team to manage the interface with their agencies. n Project Secretariat - should have specialist staff with experience in the installation of large scale IT systems and IT procurement n Familiarity with IT projects is an advantage 12/5/2007 13
  • 14. Train and Train Again n Large numbers - can appear overwhelming. n However, most Governments have training institutions which could be used to impart training. n Program needs to be structured to requirements. n Most staff need to know only specific features of the system n Should be coordinated closely with implementation plans n focused to specific requirements of a given site n should be imparted just before site implementation; n help desk, n hand holding clinics 12/5/2007 14
  • 15. Manage the Change n Need to overcome opposition from vested interests who see reform as a threat n Despite advantages of new system opposition should be expected n Perception of the system being a threat can be reduced through communication, retraining, participation, focus on quick wins, managed expectations n Identify win-win examples for civil servants 12/5/2007 15
  • 16. Get A Lawyer (if you must) n Development of a comprehensive budget management law for management of public funds and property n Specifies the roles and responsibilities of the Treasury, the MOF and Line Agencies n Specifies the authorities and responsibilities for: n Receipt and custody of public funds n Public expenditure management control processes n Management of public debt n Accounting, Financial Reporting and Audit n But if the current framework works, fix it later. 12/5/2007 16
  • 17. Finally, the Plan n Based on a conceptual model, a strategic plan laying out goals, methods, timeframes, costs, benchmarks, etc. n Review by stakeholders for buy-in n Approval of plan by highest appropriate body n Clear mandate/structure for plan implementation n Adhere to plan and benchmarks, but flexibility, with approval by project governance structure, for adjustments n Periodic reviews of project and plan n Importance of maintaining capacity for strategic visioning to sustain reform impulse, financing, integrity of integration of systems, etc. 12/5/2007 17