Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 1
Session 11
Effort Perspective: Critical Chain
Multi Project Management
Dr. Thomas Lechler Babbio Center 416
Phone: (201) 216-8174 FAX: (201) 216-5385
email: tlechler@stevens.edu
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 2
Session 11: Course Pointer
Shareholder
Value
Output
Value
Stakeholder
Value
Effort
Value
Critical
Chain
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 3
Session 11: Evidence
1. How to solve resource conflicts in a multi project
environment?
2. What is the leverage to raise the efficiency in a multi project
environment?
3. How to control projects with CC?
4. How to manage risks with CC?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 4
Topics and Objectives
• Analyzing Critical Chain Multi Project Management
• Understanding perceptions of effort which influence
the project portfolio’s value
• Understanding the portfolio as a time-dependent,
throughput-constrained chain of value
• Scheduling effort in a project portfolio as a time-
dependent chain of value
• Integrating changes to effort without destroying the
project portfolio’s structural integrity
• Risk Management with Buffers
• Improving effort value
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 5
Session 11: Agenda
• Introduction
• Basic Problems
• Multi-Project Management
• Critical Chain Multi-Project Management
• CC Summary
• CC Buffer Management
• CC Risk Management
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 6
Basic Problem: Multi-Project Context
Samples: USA: 172 Projects (112 succ., 50 fail.)
GER: 448 Projects (257 succ., 191 fail.)
Correlation Coefficients Resource Conflicts
Success Criteria GER USA
Efficiency -.20 -.26
Effectiveness -.15 -.19
Customer Satisfaction -.21 -.21
Business Results -.20 -.19
MEANS 4.4 4.1
• Many projects suffer under resource conflicts
• Resource conflicts have negative impact
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 7
Basic Problems: Projects Systems
• A collection
– links in isolation
• how tasks and projects
are viewed traditionally
• A system
– Links interacting
• A constraint
– Limits system
performance
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 8
Basic Problems: Project Management Practice
• What is the worst thing we can do as a project
manager? As a manager of project managers?
• What causes more harm, more delay, to our
projects than any other project practice? (A
practice so evil our competitors should bribe us
to do it…)
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 9
Basic Problem: The “Evils” of Multitasking
Multitasking:
• The practice of assigning one person
concurrently to two or more tasks, and expecting
them to make progress on all of them!
• Resources will be fully utilized!
– Everyone busy all the time
• Is this an effective way to manage projects?
– Is there an alternative?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 10
Multi-Project Mgt.: Typical Environment
2
1
2|01|0
a e hdc
3
0|0
20 daysb f i
a cb
a cb
ed f
ed f
h i
h i
20 days
20 days
g
g
g
j
j
j
•3 projects, 10 tasks, and 3 resources…
•How long will it take?
•When will we get some benefits?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 11
Multi-Project Mgt.: Multitasking
1
2
2|0 4|0 6|01|0 5|0
a e hdc
3
3|00|0
48 days
50 days
52 days
b f i
a cb
a cb
ed f
ed f
h i
h i
g
g
g
j
j
j
• Constraint:
• Limited Resources
• Lead-time of all projects take at least 48 days
• No benefits until when?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 12
Multi-Project Mgt.: No Multitasking
1
2
2|01|0
a e hdc
3
3|00|0
20 days
28 days
36 days
b f i
a cb
a cb
ed f
ed f
h i
h i
g
g
g
j
j
j
4|0
• Constraint:
• Limited Resources
• No Multitasking
• All projects finish sooner
• Benefit stream arrives earlier
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 13
Multi-Project Mgt.: The Cost of Multitasking
1
2
2|01|0
a e hdc
3
3|00|0
20 days
28 days
36 days
b f i
a cb
a cb
ed f
ed f
h i
h i
g
g
g
j
j
j
4 44 daysa cb ed f h ig j
4|0 5|0
5 52 daysa cb ed f h ig j
• Would you rather have three projects,
or five projects — for no additional cost?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 14
Multi-Project Mgt.: Basic Conflict of Multitasking
We have limited
resources
A
Deliver the
maximum value
from projects
B
Start work on a new
project
C
Complete work on my
current project
D'
Don't switch to
new project task
D
Switch to new
project task
To make progress, a
project must have
resources
Interrupting work
causes it to take
longer
Project don't deliver
value until they
finish
"We'll get more
done if we maximize
the amount of work
being done"
"We'll get more
done if we maximize
the rate that work is
finished"
Adding or removing
one person from a
project makes no
apparent difference...
To focus, we have to
prioritize projects...
and postpone some
© 2000 ZULTNER & COMPANY
In order to be
successful
we must...
A resource can
only work on one
task at a time
long-term
short-term
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 15
CC: The Required Paradigm Shift
• We must change from
– A local view of productivity
• Any resource working is productive
– “If they aren’t working, get them work to do!”
• The productivity of the organization is just the sum of the
productivity of the resources
• Therefore, ask everyone to work all the time, and judge them
accordingly
– To a global (holistic) view of productivity
• Judge the performance of the system
– How many projects did we deliver this year?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 16
CC: Applying Lean Production
• Lean production uses the same paradigm:
– Choke the release of materials to the floor
– Only work when you have an order
• Otherwise, sit idle
– Do not work to produce inventory, or increase
“efficiencies”
– Concentrate on rapid product throughput
• Now, time to apply the lean paradigm…
in Multi-Project Environments
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 17
CC: Maximizing Project Throughput
1
2
2|01|0
a e hdc
3
3|00|0
20 days
28 days
36 days
b f i
a cb
a cb
ed f
ed f
h i
h i
g
g
g
j
j
j
4 44 daysa cb ed f h ig j
4|0 5|0
5 52 daysa cb ed f h ig j
wait
wait
16 days
8 days
24 days
32 days
wait
wait
•Projects must WAIT
•Because we have a system…
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 18
CC: Drum Buffer Concept
•Five resources, that can work at the rate indicated
– Which resource determines the throughput of the system?
• Which is the constraint?
– How much should the other resources produce?
• Why? You don’t want them to sit idle do you?
14 13 10 15 12
a b c d e
Production chain example:
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 19
CC: Drum Buffer Concept
• In any system, there is a limiting factor: the constraint
• How can we make sure the constraint always has work?
14 13 10 15 12
bottleneck
a b c d e
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 20
CC: Drum Buffer Concept
•If the constraint (limiting resource) is idle,
throughput is lost for the entire system
•All non-constraint resources have excess capacity,
and this excess capacity is required for maximum
throughput: it is protective or sprint capacity
14 13 10 15 12
buffer
bottleneck
a b c d e
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 21
CC: The Drum-Buffer-Rope
• In a production system, the maximum throughput is achieved by
managing the constraint
• The Theory of Constraints’ solution for production is “drum-buffer-
rope” (a style of lean production)
14 13 10 15 12
buffergate
rope
a b c d e
bottleneck
drum
Drum-Buffer-Rope
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 22
CC: The Drum Resource Schedule
gate
drum
x y z 1
x y z 2
drum buffer
x y z 3
drum buffer
project
queue
project pipeline
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 23
CC Summary: How does Critical Chain work?
• 1. Elimination of multi-tasking
– The #1 enemy of productivity causes delays of at
least 15-25% between all projects in an organization
 Critical Chain Multi-project management
• 2. Better management of variation (risk)
– The invisible waste of safety within every project is at
least 15-25%
 Critical Chain Single project management
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 24
CC Summary: Critical Chain PM
• Critical Chain Project Management
– Builds upon traditional project management methods
• Builds upon WBS and uses network techniques differently
– Provides a systems approach for managing multiple projects
sharing a set of resources
• Improved system throughput (more projects out in a year without
adding more resources)
– Provides a simple, visible, and powerful way to manage
priorities of multiple projects
• A superior base for solving priority conflicts
– Explicitly takes variation (risk) into account
• Efficiency! (reduces time-to-market)
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 25
CC Summary: Critical Chain basic elements
• Project Planning:: rigorous network building
and resource placement
• Project Synchronization: drum schedule and
staggered release of new projects
• Project Scheduling: critical chain and
aggregated buffers (pooled safety)
• Resource Behavior: aggressive task times
and instant starts (relay runner)
• Project Control: buffer management
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 26
Causes of Schedule Risk #1 : Multitasking
16
5
A
5
6
FB14
B
7
12
9
FB6
C
PB
8
10
PB
8
5
PB
3
FB5
2|04|06|0 5|0 3|0 1|0 0|0
3
shared
resource
delay!
delay!
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 27
CC Summary: Critical Chain PM
• There are two components to implement:
– On an individual project
(independently)
• SINGLE PROJECT implementation
– On the entire set of projects in your organization
(sharing a set of resources)
• MULTI-PROJECT implementation
• You should do both,
as the benefits are additive
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 28
CC Summary: Critical Chain Benefits
• You can shorten the duration of all projects in your
portfolio:
– minimum 15-25% reduction
• 15% on small projects, 25% on large projects
– no added resources (and less overtime!), no sacrifice
of value or features, no increase in risk, no cutting of
quality
• And dramatically increase the likelihood of delivery on or
before the committed end date
• And increase your project throughput (deliver more
projects with a given set of resources)
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 29
CC Planning vs. Execution
A major break from the past:
– Traditionally, the way you plan a project is also
how you execute and control the project: by the
schedule
– In Critical Chain, you plan the project with a
resource-constrained critical chain with buffers,
according to a drum schedule
– But the execution and control is done with
buffer management
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 30
CC Buffer Management
How do we monitor and control Critical Chain
projects?
• Buffer Management
– Buffers revisited
– Using the buffers
– Buffer status
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 31
CC Buffer Management: How are we doing?
At points 1, 2, and 3, will we make our deadline?
5 16START
2|04|06|07|0 5|0 3|0 1|0 0|0
Copyright ?2000 by Richard Zultner
5 5 5 5 5 5 5 5 5
14
11
9
8 tasks
to go 5 5 5 5 5 5 5
5 5 5 5 5
5 5 5
5 tasks
3 tasks
5
2
1
3
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 32
CC Buffer Management: What about 3 Zones?
Can we divide the original buffer into thirds, and use
the red, yellow, and green zones to help?
5 16START
2|04|06|07|0 5|0 3|0 1|0 0|0
Copyright ?2000 by Richard Zultner
5 5 5 5 5 5 5 5 5
14
11
9
8 tasks
to go 5 5 5 5 5 5 5
5 5 5 5 5
5 5 5
5 tasks
3 tasks
5
2
1
3
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 33
CC Buffer Management: Do 3 Zones work?
The last task, in two
cases:
– 10 days is required,
far more than 2/3s
• False OK signal
– 1 day is required, far
less than 1/3
• False danger
signal
So when does the 3 Zone
rule fail?
10 10.5
10 10.0
10 two-day tasks
project
start
project buffer
1 111111111
1 twenty-
day task
10 10.5
10 two-day
tasks project buffer
1 111111111
1 twenty-day task
1
last task
last task
project
start
A
B
1
2|04|0 3|0 1|0 0|0
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 34
CC Buffer Management: Goldratt’s Measures
• Judging the status of the project
– Percent of the critical chain complete
• “60% on critical chain completed”
– Ratio of the critical chain completed
to the consumption of the completion buffer
• “60% of CC complete, 30% of buffer consumed”
– Rate of consumption of the buffer
• “We did 21 days of work this month, and only
consumed 6 days of the buffer”
• What do each of these tell you?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 35
CC Buffer Management: Buffers Status directly?
• How much do we have?
• How much do we need?
• What if your project [re-]started now?
• What buffer would you calculate you need?
2|03|0 1|0 0|0
95 5 5
-1 day
buffer
deposits/
withdrawls
© 2000 ZULTNER & COMPANY
6 5 85
3 105 +2 days
510 -5 days
finished!
2
1
3
2|03|0 1|0 0|0
8.6
7.1
5.0
5 5 5
55
5
3 tasks
2 tasks
1 task
© 2000 ZULTNER & COMPANY
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 36
CC Buffer Management: Minimum Buffer Size
5 15.810
tasks
2|04|06|07|0 5|0 3|0 1|0 0|0
5 5 5 5 5 5 5 5 5
59 tasks 5 5 5 5 5 5 5 5 15.0
14.1
13.2
12.2
11.2
10.0
8.6
7.1
5.0
8 tasks 5 5 5 5 5 5 5
7 tasks 5 5 5 5 5 5
6 tasks 5 5 5 5 5
5 5 5 5 5
5 5 5 5
5 5 5
55
5
5 tasks
4 tasks
3 tasks
2 tasks
1 task
5
5
5
The buffer you
need for where
you are now, to
the end, is your
minimum buffer
required
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 37
CC Buffer Management: The Voice of the Buffer
13
17
12
16
7 tasks
left
3 tasks
left 30 days
30 days
32 days
6 tasks
left
4 tasks
left
35 days 6
15
18
18
actual
MBR
2
1
3
4
If we have more than we need, we are more likely to
make the deadline than when we started the project…
If we have less than we need, we know how many
days we would like to regain…
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 38
CC Buffer Management: Buffer Reporting
2|02|5 1|0 |0
9
5 5 5
-1 day
minimum buffer required
?2000 ZULTNER & COMPANY
6 5 8
5
3 10
5
+2 days
5
10
-5 days
finished!
2
1
3
1|5 |53|0
8.6
7.1
5.0
actual buffer
+1 buffer-days
+5 buffer-days
+5 buffer-days
BUFFER STATUS
So…
– How many
buffer-days
are you “plus”
what is your
need?
Or “minus”?
– How can we
manufacture
that amount
of good luck?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 39
CC Buffer Management: Monitoring Buffers
FB
C
2 no delay
8
10 15
10
delay!
early!
FB2
Feeding Buffers protect the critical chain
– Monitor the consumption of all feeding buffers:
is there sufficient protection left?
– Which task is causing the consumption?
– Project completion buffers have priority
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 40
CC Buffer Management: Monitoring Resources
Relay Runner resources
– Are activities starting as
soon as possible—
not when the schedule
says?
• Are the resource
buffers too big? Too
small?
– What does the resource
need to start? To
prepare?
• Can we reduce this?
3
10
A
B
Resource
Buffer
7
start!
10
current task next task
3
10
2
1
three days to go
two days to go
one day to go
good luck strikes—early finish
the plan
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 41
CC Buffer Management: Traditional artifacts
• Traditional schedule-based methods may need
revising. What about:
– Milestones?
– stage gates?
– phase-end reviews?
– Earned Value?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 42
CC Buffer Management: Milestones
13.9
4|08|0 6|0 2|0 0|0
462
1 milestone
A
B
C
44444444444
8.0472
3 milestones
44444444444
5.7484
6 milestones
44444444444
8.0 8.0
5.75.75.75.75.7
© 2000 ZULTNER & COMPANY
1|00
buffer
buffer
buffer
Milestones delay projects!
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 43
Summary: Project Status
With Critical Chain and buffer management project
status reporting is:
• More accurate
– We know better when we will deliver, despite Murphy,
and how the project stands
• Simpler
– Less time is spent reporting, so more time can be
spent constructively on problems
• Enables shorter projects with no trade-offs
– Schedule-based approaches force local safety
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 44
Summary: Revisions
• Float milestones, do not tie to dates
– Do not judge project progress by intermediate dates
– Use buffer management to judge progress
• Educate customers at Customer Reviews
– Leverage your superiority in project management
– Seek better customers
• Earned Value Analysis
– Can they accept EVA-like reporting? It is possible to
report in an EVA-like way…
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 45
• Plan for variation (and the real world)
– Project tasks will vary from any plan, so
• do not give task-dates-with-certainty,
• give task-windows
– Do not track progress against the calendar
(scheduled dates)
• look at what remains to be done
• look at the status of the buffer(s)
– Will we still make our deadline?
Summary: Project Status
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 46
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 47
Project Risk Management: Quantifying Risks
• Most risks are judged in terms of impact on the project
schedule
– “Big” risk, big impact
• Not all risks are task related
– Only task-related risks included in task estimates
– How to accommodate the rest? Simply?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 48
Project Risk Management: Traditional Risk PM
Methods of identifying risks
• Objective Sources:
– Recorded experience from the past projects and the
current project as it proceeds:
– Lessons learned files
– Program documentation evaluations
– Current performance data
• Subjective sources: Experiences based upon
– knowledgeable experts:
– Interviews and other data from subject matter experts
– Expert Judgment, Brainstorming
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 49
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 50
Project Risk Management: Traditional Monitoring
Kerzner, 2001, pp.937
• Methods for monitoring risks:
– Earned value method
– Program metrics
– Schedule performance monitoring
– Technical performance measurement
• The monitoring process systematically tracks
and evaluates the effectiveness of risk handling
actions against established metrics.
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 51
Project Risk Management: Traditional Risk PM
• Why are existing risk management methods not used in
your organization?
– Ignorance? (Why?)
– No time (They ADD more time to a project that is
already TOO LONG!)
• But with Critical Chain, we have time
– To do risk management, and any other “we know we
should do that, but we do not have time” methods…
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 52
Traditional Risk Management: Traditional PM
• Why are existing risk management methods not used in
your organization?
– Ignorance? (Why?)
– No time (They ADD more time to a project that is
already TOO LONG!)
• But with Critical Chain, we have time
– To do risk management, and any other “we know we
should do that, but we do not have time” methods…
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 53
Project Risk Management: Causes of Risks
• Identify non-task related risks (project risks)
– Can they be prevented? Where?
• Add effort
– Can they be detected early? Where?
• Add checks (inspections)
– Can they be minimized by a rapid response?
• What response? How much effort?
• Add into project completion buffer
• Filling the gap between the 1/3 rule of thumb and the
calculated minimum buffer required
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 54
CC Risk Management: Extending the Buffer
565
1|02|03|0 2|5 1|5 |5 0|0
duration
8.66
50% 90%
variation
extra-
task risk
intra-task risk
2 3
prevention actions protection time
project buffer
Risk Management
• After risk identification the project could be protected by
extending the buffer size.
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 55
CC Risk Management: Avoiding Multitasking
• De-implementing multitasking is hard work
– Not everyone will buy in right away
– All our reporting systems support it
– We have gotten accustomed to doing it
• And some of us like the excitement…
– It is a habit (“we do it without thinking”)
• Hard work and constant vigilance is needed

Weitere ähnliche Inhalte

Was ist angesagt?

Achieving Maximum Retention: More Brain-Based Principles
Achieving Maximum Retention: More Brain-Based PrinciplesAchieving Maximum Retention: More Brain-Based Principles
Achieving Maximum Retention: More Brain-Based PrinciplesCynthia Clay
 
Startup Challenge Tour
Startup Challenge TourStartup Challenge Tour
Startup Challenge Tour100%Open
 
Jo Jolly & Donnie Mac Nicol: The Race to Net Zero - are you on track with you...
Jo Jolly & Donnie Mac Nicol: The Race to Net Zero - are you on track with you...Jo Jolly & Donnie Mac Nicol: The Race to Net Zero - are you on track with you...
Jo Jolly & Donnie Mac Nicol: The Race to Net Zero - are you on track with you...PMIUKChapter
 
Achieving Maximum Retention: More Brain-Based Principles
Achieving Maximum Retention: More Brain-Based PrinciplesAchieving Maximum Retention: More Brain-Based Principles
Achieving Maximum Retention: More Brain-Based PrinciplesCynthia Clay
 
Brain-based Learning in the Virtual Classroom
Brain-based Learning in the Virtual ClassroomBrain-based Learning in the Virtual Classroom
Brain-based Learning in the Virtual ClassroomCynthia Clay
 
LEAN & GREEN projects in Canada
LEAN & GREEN projects in CanadaLEAN & GREEN projects in Canada
LEAN & GREEN projects in CanadaMurray Guy
 

Was ist angesagt? (6)

Achieving Maximum Retention: More Brain-Based Principles
Achieving Maximum Retention: More Brain-Based PrinciplesAchieving Maximum Retention: More Brain-Based Principles
Achieving Maximum Retention: More Brain-Based Principles
 
Startup Challenge Tour
Startup Challenge TourStartup Challenge Tour
Startup Challenge Tour
 
Jo Jolly & Donnie Mac Nicol: The Race to Net Zero - are you on track with you...
Jo Jolly & Donnie Mac Nicol: The Race to Net Zero - are you on track with you...Jo Jolly & Donnie Mac Nicol: The Race to Net Zero - are you on track with you...
Jo Jolly & Donnie Mac Nicol: The Race to Net Zero - are you on track with you...
 
Achieving Maximum Retention: More Brain-Based Principles
Achieving Maximum Retention: More Brain-Based PrinciplesAchieving Maximum Retention: More Brain-Based Principles
Achieving Maximum Retention: More Brain-Based Principles
 
Brain-based Learning in the Virtual Classroom
Brain-based Learning in the Virtual ClassroomBrain-based Learning in the Virtual Classroom
Brain-based Learning in the Virtual Classroom
 
LEAN & GREEN projects in Canada
LEAN & GREEN projects in CanadaLEAN & GREEN projects in Canada
LEAN & GREEN projects in Canada
 

Andere mochten auch

Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1henry KKK
 
Yiheng deng hw2
Yiheng deng hw2Yiheng deng hw2
Yiheng deng hw2henry KKK
 
Lecture04 slides
Lecture04 slidesLecture04 slides
Lecture04 slideshenry KKK
 
Week08 slides
Week08 slidesWeek08 slides
Week08 slideshenry KKK
 
Yiheng deng hw3
Yiheng deng hw3Yiheng deng hw3
Yiheng deng hw3henry KKK
 
Yiheng deng hw1
Yiheng deng hw1Yiheng deng hw1
Yiheng deng hw1henry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slideshenry KKK
 
Week12 slides
Week12 slidesWeek12 slides
Week12 slideshenry KKK
 
Reading week08 saaty_ahp_prediction
Reading week08 saaty_ahp_predictionReading week08 saaty_ahp_prediction
Reading week08 saaty_ahp_predictionhenry KKK
 
Examples of smart_objective_attributes
Examples of smart_objective_attributesExamples of smart_objective_attributes
Examples of smart_objective_attributeshenry KKK
 

Andere mochten auch (10)

Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1
 
Yiheng deng hw2
Yiheng deng hw2Yiheng deng hw2
Yiheng deng hw2
 
Lecture04 slides
Lecture04 slidesLecture04 slides
Lecture04 slides
 
Week08 slides
Week08 slidesWeek08 slides
Week08 slides
 
Yiheng deng hw3
Yiheng deng hw3Yiheng deng hw3
Yiheng deng hw3
 
Yiheng deng hw1
Yiheng deng hw1Yiheng deng hw1
Yiheng deng hw1
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Week12 slides
Week12 slidesWeek12 slides
Week12 slides
 
Reading week08 saaty_ahp_prediction
Reading week08 saaty_ahp_predictionReading week08 saaty_ahp_prediction
Reading week08 saaty_ahp_prediction
 
Examples of smart_objective_attributes
Examples of smart_objective_attributesExamples of smart_objective_attributes
Examples of smart_objective_attributes
 

Ähnlich wie Week11 slides

Week01 slides spring_2013
Week01 slides spring_2013Week01 slides spring_2013
Week01 slides spring_2013henry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slideshenry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slideshenry KKK
 
Week05 slides
Week05 slidesWeek05 slides
Week05 slideshenry KKK
 
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxAssignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxsherni1
 
Week06 slides
Week06 slidesWeek06 slides
Week06 slideshenry KKK
 
Week02 slides spring_2013
Week02 slides spring_2013Week02 slides spring_2013
Week02 slides spring_2013henry KKK
 
Lecture07 vo customer
Lecture07 vo customerLecture07 vo customer
Lecture07 vo customertoushi0616
 
Week07 slides 2013_s
Week07 slides 2013_sWeek07 slides 2013_s
Week07 slides 2013_shenry KKK
 
Chapter 01 - Introduction to Software Project Management
Chapter 01 - Introduction to Software Project ManagementChapter 01 - Introduction to Software Project Management
Chapter 01 - Introduction to Software Project ManagementRohanMistry15
 
Lecture04 p vscorecard
Lecture04 p vscorecardLecture04 p vscorecard
Lecture04 p vscorecardtoushi0616
 
Week03 slides spring_2013
Week03 slides spring_2013Week03 slides spring_2013
Week03 slides spring_2013henry KKK
 
Effective Program Management
Effective Program ManagementEffective Program Management
Effective Program ManagementKaushik Shah
 
202project Feasibility
202project Feasibility202project Feasibility
202project Feasibilitybtecexpert
 
Need-driven-design-Bulut V2
Need-driven-design-Bulut V2Need-driven-design-Bulut V2
Need-driven-design-Bulut V2Bulut Nesim
 
Sustainable Knowledge Management
Sustainable Knowledge ManagementSustainable Knowledge Management
Sustainable Knowledge ManagementAndrew Gent
 
Navigating a Project to Product Shift - Walsh FiveWhyz LLC
Navigating a Project to Product Shift - Walsh FiveWhyz LLCNavigating a Project to Product Shift - Walsh FiveWhyz LLC
Navigating a Project to Product Shift - Walsh FiveWhyz LLCDaniel Walsh
 
Project Management Lecture Introduction1
Project Management Lecture Introduction1Project Management Lecture Introduction1
Project Management Lecture Introduction1SaifulIslam435311
 

Ähnlich wie Week11 slides (20)

Week01 slides spring_2013
Week01 slides spring_2013Week01 slides spring_2013
Week01 slides spring_2013
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Project management for the supply management professional rev. 5 13-13
Project management for the supply management professional rev. 5 13-13Project management for the supply management professional rev. 5 13-13
Project management for the supply management professional rev. 5 13-13
 
Week05 slides
Week05 slidesWeek05 slides
Week05 slides
 
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxAssignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
 
Saving time with CCPM
Saving time with CCPMSaving time with CCPM
Saving time with CCPM
 
Week06 slides
Week06 slidesWeek06 slides
Week06 slides
 
Week02 slides spring_2013
Week02 slides spring_2013Week02 slides spring_2013
Week02 slides spring_2013
 
Lecture07 vo customer
Lecture07 vo customerLecture07 vo customer
Lecture07 vo customer
 
Week07 slides 2013_s
Week07 slides 2013_sWeek07 slides 2013_s
Week07 slides 2013_s
 
Chapter 01 - Introduction to Software Project Management
Chapter 01 - Introduction to Software Project ManagementChapter 01 - Introduction to Software Project Management
Chapter 01 - Introduction to Software Project Management
 
Lecture04 p vscorecard
Lecture04 p vscorecardLecture04 p vscorecard
Lecture04 p vscorecard
 
Week03 slides spring_2013
Week03 slides spring_2013Week03 slides spring_2013
Week03 slides spring_2013
 
Effective Program Management
Effective Program ManagementEffective Program Management
Effective Program Management
 
202project Feasibility
202project Feasibility202project Feasibility
202project Feasibility
 
Need-driven-design-Bulut V2
Need-driven-design-Bulut V2Need-driven-design-Bulut V2
Need-driven-design-Bulut V2
 
Sustainable Knowledge Management
Sustainable Knowledge ManagementSustainable Knowledge Management
Sustainable Knowledge Management
 
Navigating a Project to Product Shift - Walsh FiveWhyz LLC
Navigating a Project to Product Shift - Walsh FiveWhyz LLCNavigating a Project to Product Shift - Walsh FiveWhyz LLC
Navigating a Project to Product Shift - Walsh FiveWhyz LLC
 
Project Management Lecture Introduction1
Project Management Lecture Introduction1Project Management Lecture Introduction1
Project Management Lecture Introduction1
 

Mehr von henry KKK

Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1henry KKK
 
Week05 spc single_case
Week05 spc single_caseWeek05 spc single_case
Week05 spc single_casehenry KKK
 
Week05 reading
Week05 readingWeek05 reading
Week05 readinghenry KKK
 
Week05 exercise
Week05 exerciseWeek05 exercise
Week05 exercisehenry KKK
 
Week03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsetWeek03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsethenry KKK
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changinghenry KKK
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloudhenry KKK
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloudhenry KKK
 
Syllabus mgt610 2013_s
Syllabus mgt610 2013_sSyllabus mgt610 2013_s
Syllabus mgt610 2013_shenry KKK
 
Reading week09 lechler_cc
Reading week09 lechler_ccReading week09 lechler_cc
Reading week09 lechler_cchenry KKK
 
Reading week08 shah_ahp_case
Reading week08 shah_ahp_caseReading week08 shah_ahp_case
Reading week08 shah_ahp_casehenry KKK
 
Reading week08 shah_ahp_case
Reading week08 shah_ahp_caseReading week08 shah_ahp_case
Reading week08 shah_ahp_casehenry KKK
 
Reading week08 saaty_sevenpillars_ahp
Reading week08 saaty_sevenpillars_ahpReading week08 saaty_sevenpillars_ahp
Reading week08 saaty_sevenpillars_ahphenry KKK
 

Mehr von henry KKK (13)

Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1
 
Week05 spc single_case
Week05 spc single_caseWeek05 spc single_case
Week05 spc single_case
 
Week05 reading
Week05 readingWeek05 reading
Week05 reading
 
Week05 exercise
Week05 exerciseWeek05 exercise
Week05 exercise
 
Week03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsetWeek03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindset
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changing
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloud
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloud
 
Syllabus mgt610 2013_s
Syllabus mgt610 2013_sSyllabus mgt610 2013_s
Syllabus mgt610 2013_s
 
Reading week09 lechler_cc
Reading week09 lechler_ccReading week09 lechler_cc
Reading week09 lechler_cc
 
Reading week08 shah_ahp_case
Reading week08 shah_ahp_caseReading week08 shah_ahp_case
Reading week08 shah_ahp_case
 
Reading week08 shah_ahp_case
Reading week08 shah_ahp_caseReading week08 shah_ahp_case
Reading week08 shah_ahp_case
 
Reading week08 saaty_sevenpillars_ahp
Reading week08 saaty_sevenpillars_ahpReading week08 saaty_sevenpillars_ahp
Reading week08 saaty_sevenpillars_ahp
 

Kürzlich hochgeladen

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 

Kürzlich hochgeladen (20)

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 

Week11 slides

  • 1. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 1 Session 11 Effort Perspective: Critical Chain Multi Project Management Dr. Thomas Lechler Babbio Center 416 Phone: (201) 216-8174 FAX: (201) 216-5385 email: tlechler@stevens.edu
  • 2. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 2 Session 11: Course Pointer Shareholder Value Output Value Stakeholder Value Effort Value Critical Chain
  • 3. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 3 Session 11: Evidence 1. How to solve resource conflicts in a multi project environment? 2. What is the leverage to raise the efficiency in a multi project environment? 3. How to control projects with CC? 4. How to manage risks with CC?
  • 4. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 4 Topics and Objectives • Analyzing Critical Chain Multi Project Management • Understanding perceptions of effort which influence the project portfolio’s value • Understanding the portfolio as a time-dependent, throughput-constrained chain of value • Scheduling effort in a project portfolio as a time- dependent chain of value • Integrating changes to effort without destroying the project portfolio’s structural integrity • Risk Management with Buffers • Improving effort value
  • 5. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 5 Session 11: Agenda • Introduction • Basic Problems • Multi-Project Management • Critical Chain Multi-Project Management • CC Summary • CC Buffer Management • CC Risk Management
  • 6. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 6 Basic Problem: Multi-Project Context Samples: USA: 172 Projects (112 succ., 50 fail.) GER: 448 Projects (257 succ., 191 fail.) Correlation Coefficients Resource Conflicts Success Criteria GER USA Efficiency -.20 -.26 Effectiveness -.15 -.19 Customer Satisfaction -.21 -.21 Business Results -.20 -.19 MEANS 4.4 4.1 • Many projects suffer under resource conflicts • Resource conflicts have negative impact
  • 7. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 7 Basic Problems: Projects Systems • A collection – links in isolation • how tasks and projects are viewed traditionally • A system – Links interacting • A constraint – Limits system performance
  • 8. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 8 Basic Problems: Project Management Practice • What is the worst thing we can do as a project manager? As a manager of project managers? • What causes more harm, more delay, to our projects than any other project practice? (A practice so evil our competitors should bribe us to do it…)
  • 9. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 9 Basic Problem: The “Evils” of Multitasking Multitasking: • The practice of assigning one person concurrently to two or more tasks, and expecting them to make progress on all of them! • Resources will be fully utilized! – Everyone busy all the time • Is this an effective way to manage projects? – Is there an alternative?
  • 10. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 10 Multi-Project Mgt.: Typical Environment 2 1 2|01|0 a e hdc 3 0|0 20 daysb f i a cb a cb ed f ed f h i h i 20 days 20 days g g g j j j •3 projects, 10 tasks, and 3 resources… •How long will it take? •When will we get some benefits?
  • 11. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 11 Multi-Project Mgt.: Multitasking 1 2 2|0 4|0 6|01|0 5|0 a e hdc 3 3|00|0 48 days 50 days 52 days b f i a cb a cb ed f ed f h i h i g g g j j j • Constraint: • Limited Resources • Lead-time of all projects take at least 48 days • No benefits until when?
  • 12. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 12 Multi-Project Mgt.: No Multitasking 1 2 2|01|0 a e hdc 3 3|00|0 20 days 28 days 36 days b f i a cb a cb ed f ed f h i h i g g g j j j 4|0 • Constraint: • Limited Resources • No Multitasking • All projects finish sooner • Benefit stream arrives earlier
  • 13. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 13 Multi-Project Mgt.: The Cost of Multitasking 1 2 2|01|0 a e hdc 3 3|00|0 20 days 28 days 36 days b f i a cb a cb ed f ed f h i h i g g g j j j 4 44 daysa cb ed f h ig j 4|0 5|0 5 52 daysa cb ed f h ig j • Would you rather have three projects, or five projects — for no additional cost?
  • 14. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 14 Multi-Project Mgt.: Basic Conflict of Multitasking We have limited resources A Deliver the maximum value from projects B Start work on a new project C Complete work on my current project D' Don't switch to new project task D Switch to new project task To make progress, a project must have resources Interrupting work causes it to take longer Project don't deliver value until they finish "We'll get more done if we maximize the amount of work being done" "We'll get more done if we maximize the rate that work is finished" Adding or removing one person from a project makes no apparent difference... To focus, we have to prioritize projects... and postpone some © 2000 ZULTNER & COMPANY In order to be successful we must... A resource can only work on one task at a time long-term short-term
  • 15. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 15 CC: The Required Paradigm Shift • We must change from – A local view of productivity • Any resource working is productive – “If they aren’t working, get them work to do!” • The productivity of the organization is just the sum of the productivity of the resources • Therefore, ask everyone to work all the time, and judge them accordingly – To a global (holistic) view of productivity • Judge the performance of the system – How many projects did we deliver this year?
  • 16. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 16 CC: Applying Lean Production • Lean production uses the same paradigm: – Choke the release of materials to the floor – Only work when you have an order • Otherwise, sit idle – Do not work to produce inventory, or increase “efficiencies” – Concentrate on rapid product throughput • Now, time to apply the lean paradigm… in Multi-Project Environments
  • 17. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 17 CC: Maximizing Project Throughput 1 2 2|01|0 a e hdc 3 3|00|0 20 days 28 days 36 days b f i a cb a cb ed f ed f h i h i g g g j j j 4 44 daysa cb ed f h ig j 4|0 5|0 5 52 daysa cb ed f h ig j wait wait 16 days 8 days 24 days 32 days wait wait •Projects must WAIT •Because we have a system…
  • 18. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 18 CC: Drum Buffer Concept •Five resources, that can work at the rate indicated – Which resource determines the throughput of the system? • Which is the constraint? – How much should the other resources produce? • Why? You don’t want them to sit idle do you? 14 13 10 15 12 a b c d e Production chain example:
  • 19. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 19 CC: Drum Buffer Concept • In any system, there is a limiting factor: the constraint • How can we make sure the constraint always has work? 14 13 10 15 12 bottleneck a b c d e
  • 20. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 20 CC: Drum Buffer Concept •If the constraint (limiting resource) is idle, throughput is lost for the entire system •All non-constraint resources have excess capacity, and this excess capacity is required for maximum throughput: it is protective or sprint capacity 14 13 10 15 12 buffer bottleneck a b c d e
  • 21. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 21 CC: The Drum-Buffer-Rope • In a production system, the maximum throughput is achieved by managing the constraint • The Theory of Constraints’ solution for production is “drum-buffer- rope” (a style of lean production) 14 13 10 15 12 buffergate rope a b c d e bottleneck drum Drum-Buffer-Rope
  • 22. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 22 CC: The Drum Resource Schedule gate drum x y z 1 x y z 2 drum buffer x y z 3 drum buffer project queue project pipeline
  • 23. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 23 CC Summary: How does Critical Chain work? • 1. Elimination of multi-tasking – The #1 enemy of productivity causes delays of at least 15-25% between all projects in an organization  Critical Chain Multi-project management • 2. Better management of variation (risk) – The invisible waste of safety within every project is at least 15-25%  Critical Chain Single project management
  • 24. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 24 CC Summary: Critical Chain PM • Critical Chain Project Management – Builds upon traditional project management methods • Builds upon WBS and uses network techniques differently – Provides a systems approach for managing multiple projects sharing a set of resources • Improved system throughput (more projects out in a year without adding more resources) – Provides a simple, visible, and powerful way to manage priorities of multiple projects • A superior base for solving priority conflicts – Explicitly takes variation (risk) into account • Efficiency! (reduces time-to-market)
  • 25. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 25 CC Summary: Critical Chain basic elements • Project Planning:: rigorous network building and resource placement • Project Synchronization: drum schedule and staggered release of new projects • Project Scheduling: critical chain and aggregated buffers (pooled safety) • Resource Behavior: aggressive task times and instant starts (relay runner) • Project Control: buffer management
  • 26. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 26 Causes of Schedule Risk #1 : Multitasking 16 5 A 5 6 FB14 B 7 12 9 FB6 C PB 8 10 PB 8 5 PB 3 FB5 2|04|06|0 5|0 3|0 1|0 0|0 3 shared resource delay! delay!
  • 27. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 27 CC Summary: Critical Chain PM • There are two components to implement: – On an individual project (independently) • SINGLE PROJECT implementation – On the entire set of projects in your organization (sharing a set of resources) • MULTI-PROJECT implementation • You should do both, as the benefits are additive
  • 28. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 28 CC Summary: Critical Chain Benefits • You can shorten the duration of all projects in your portfolio: – minimum 15-25% reduction • 15% on small projects, 25% on large projects – no added resources (and less overtime!), no sacrifice of value or features, no increase in risk, no cutting of quality • And dramatically increase the likelihood of delivery on or before the committed end date • And increase your project throughput (deliver more projects with a given set of resources)
  • 29. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 29 CC Planning vs. Execution A major break from the past: – Traditionally, the way you plan a project is also how you execute and control the project: by the schedule – In Critical Chain, you plan the project with a resource-constrained critical chain with buffers, according to a drum schedule – But the execution and control is done with buffer management
  • 30. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 30 CC Buffer Management How do we monitor and control Critical Chain projects? • Buffer Management – Buffers revisited – Using the buffers – Buffer status
  • 31. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 31 CC Buffer Management: How are we doing? At points 1, 2, and 3, will we make our deadline? 5 16START 2|04|06|07|0 5|0 3|0 1|0 0|0 Copyright ?2000 by Richard Zultner 5 5 5 5 5 5 5 5 5 14 11 9 8 tasks to go 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 tasks 3 tasks 5 2 1 3
  • 32. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 32 CC Buffer Management: What about 3 Zones? Can we divide the original buffer into thirds, and use the red, yellow, and green zones to help? 5 16START 2|04|06|07|0 5|0 3|0 1|0 0|0 Copyright ?2000 by Richard Zultner 5 5 5 5 5 5 5 5 5 14 11 9 8 tasks to go 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 tasks 3 tasks 5 2 1 3
  • 33. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 33 CC Buffer Management: Do 3 Zones work? The last task, in two cases: – 10 days is required, far more than 2/3s • False OK signal – 1 day is required, far less than 1/3 • False danger signal So when does the 3 Zone rule fail? 10 10.5 10 10.0 10 two-day tasks project start project buffer 1 111111111 1 twenty- day task 10 10.5 10 two-day tasks project buffer 1 111111111 1 twenty-day task 1 last task last task project start A B 1 2|04|0 3|0 1|0 0|0
  • 34. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 34 CC Buffer Management: Goldratt’s Measures • Judging the status of the project – Percent of the critical chain complete • “60% on critical chain completed” – Ratio of the critical chain completed to the consumption of the completion buffer • “60% of CC complete, 30% of buffer consumed” – Rate of consumption of the buffer • “We did 21 days of work this month, and only consumed 6 days of the buffer” • What do each of these tell you?
  • 35. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 35 CC Buffer Management: Buffers Status directly? • How much do we have? • How much do we need? • What if your project [re-]started now? • What buffer would you calculate you need? 2|03|0 1|0 0|0 95 5 5 -1 day buffer deposits/ withdrawls © 2000 ZULTNER & COMPANY 6 5 85 3 105 +2 days 510 -5 days finished! 2 1 3 2|03|0 1|0 0|0 8.6 7.1 5.0 5 5 5 55 5 3 tasks 2 tasks 1 task © 2000 ZULTNER & COMPANY
  • 36. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 36 CC Buffer Management: Minimum Buffer Size 5 15.810 tasks 2|04|06|07|0 5|0 3|0 1|0 0|0 5 5 5 5 5 5 5 5 5 59 tasks 5 5 5 5 5 5 5 5 15.0 14.1 13.2 12.2 11.2 10.0 8.6 7.1 5.0 8 tasks 5 5 5 5 5 5 5 7 tasks 5 5 5 5 5 5 6 tasks 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 55 5 5 tasks 4 tasks 3 tasks 2 tasks 1 task 5 5 5 The buffer you need for where you are now, to the end, is your minimum buffer required
  • 37. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 37 CC Buffer Management: The Voice of the Buffer 13 17 12 16 7 tasks left 3 tasks left 30 days 30 days 32 days 6 tasks left 4 tasks left 35 days 6 15 18 18 actual MBR 2 1 3 4 If we have more than we need, we are more likely to make the deadline than when we started the project… If we have less than we need, we know how many days we would like to regain…
  • 38. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 38 CC Buffer Management: Buffer Reporting 2|02|5 1|0 |0 9 5 5 5 -1 day minimum buffer required ?2000 ZULTNER & COMPANY 6 5 8 5 3 10 5 +2 days 5 10 -5 days finished! 2 1 3 1|5 |53|0 8.6 7.1 5.0 actual buffer +1 buffer-days +5 buffer-days +5 buffer-days BUFFER STATUS So… – How many buffer-days are you “plus” what is your need? Or “minus”? – How can we manufacture that amount of good luck?
  • 39. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 39 CC Buffer Management: Monitoring Buffers FB C 2 no delay 8 10 15 10 delay! early! FB2 Feeding Buffers protect the critical chain – Monitor the consumption of all feeding buffers: is there sufficient protection left? – Which task is causing the consumption? – Project completion buffers have priority
  • 40. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 40 CC Buffer Management: Monitoring Resources Relay Runner resources – Are activities starting as soon as possible— not when the schedule says? • Are the resource buffers too big? Too small? – What does the resource need to start? To prepare? • Can we reduce this? 3 10 A B Resource Buffer 7 start! 10 current task next task 3 10 2 1 three days to go two days to go one day to go good luck strikes—early finish the plan
  • 41. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 41 CC Buffer Management: Traditional artifacts • Traditional schedule-based methods may need revising. What about: – Milestones? – stage gates? – phase-end reviews? – Earned Value?
  • 42. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 42 CC Buffer Management: Milestones 13.9 4|08|0 6|0 2|0 0|0 462 1 milestone A B C 44444444444 8.0472 3 milestones 44444444444 5.7484 6 milestones 44444444444 8.0 8.0 5.75.75.75.75.7 © 2000 ZULTNER & COMPANY 1|00 buffer buffer buffer Milestones delay projects!
  • 43. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 43 Summary: Project Status With Critical Chain and buffer management project status reporting is: • More accurate – We know better when we will deliver, despite Murphy, and how the project stands • Simpler – Less time is spent reporting, so more time can be spent constructively on problems • Enables shorter projects with no trade-offs – Schedule-based approaches force local safety
  • 44. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 44 Summary: Revisions • Float milestones, do not tie to dates – Do not judge project progress by intermediate dates – Use buffer management to judge progress • Educate customers at Customer Reviews – Leverage your superiority in project management – Seek better customers • Earned Value Analysis – Can they accept EVA-like reporting? It is possible to report in an EVA-like way…
  • 45. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 45 • Plan for variation (and the real world) – Project tasks will vary from any plan, so • do not give task-dates-with-certainty, • give task-windows – Do not track progress against the calendar (scheduled dates) • look at what remains to be done • look at the status of the buffer(s) – Will we still make our deadline? Summary: Project Status
  • 46. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 46
  • 47. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 47 Project Risk Management: Quantifying Risks • Most risks are judged in terms of impact on the project schedule – “Big” risk, big impact • Not all risks are task related – Only task-related risks included in task estimates – How to accommodate the rest? Simply?
  • 48. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 48 Project Risk Management: Traditional Risk PM Methods of identifying risks • Objective Sources: – Recorded experience from the past projects and the current project as it proceeds: – Lessons learned files – Program documentation evaluations – Current performance data • Subjective sources: Experiences based upon – knowledgeable experts: – Interviews and other data from subject matter experts – Expert Judgment, Brainstorming
  • 49. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 49
  • 50. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 50 Project Risk Management: Traditional Monitoring Kerzner, 2001, pp.937 • Methods for monitoring risks: – Earned value method – Program metrics – Schedule performance monitoring – Technical performance measurement • The monitoring process systematically tracks and evaluates the effectiveness of risk handling actions against established metrics.
  • 51. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 51 Project Risk Management: Traditional Risk PM • Why are existing risk management methods not used in your organization? – Ignorance? (Why?) – No time (They ADD more time to a project that is already TOO LONG!) • But with Critical Chain, we have time – To do risk management, and any other “we know we should do that, but we do not have time” methods…
  • 52. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 52 Traditional Risk Management: Traditional PM • Why are existing risk management methods not used in your organization? – Ignorance? (Why?) – No time (They ADD more time to a project that is already TOO LONG!) • But with Critical Chain, we have time – To do risk management, and any other “we know we should do that, but we do not have time” methods…
  • 53. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 53 Project Risk Management: Causes of Risks • Identify non-task related risks (project risks) – Can they be prevented? Where? • Add effort – Can they be detected early? Where? • Add checks (inspections) – Can they be minimized by a rapid response? • What response? How much effort? • Add into project completion buffer • Filling the gap between the 1/3 rule of thumb and the calculated minimum buffer required
  • 54. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 54 CC Risk Management: Extending the Buffer 565 1|02|03|0 2|5 1|5 |5 0|0 duration 8.66 50% 90% variation extra- task risk intra-task risk 2 3 prevention actions protection time project buffer Risk Management • After risk identification the project could be protected by extending the buffer size.
  • 55. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 55 CC Risk Management: Avoiding Multitasking • De-implementing multitasking is hard work – Not everyone will buy in right away – All our reporting systems support it – We have gotten accustomed to doing it • And some of us like the excitement… – It is a habit (“we do it without thinking”) • Hard work and constant vigilance is needed