POINTS OF DISCUSSION
 SUB CRITICAL & SUPER CRITICAL BOILER
 SIPAT BOILER DESIGN
 BOILER DESIGN PARAMETERS
 CHEMICAL TREATMENT SYSTEM
 OPERATION
 FEED WATER SYSTEM
 BOILER CONTROL
 BOILER LIGHT UP
 START UP CURVES
 To Reduce emission for each Kwh of electricity generated : Superior Environmental
1% rise in efficiency reduce the CO2 emission by 2-3%
 The Most Economical way to enhance efficiency
 To Achieve Fuel cost saving : Economical
 Operating Flexibility
 Reduces the Boiler size / MW
 To Reduce Start-Up Time
WHY SUPER CRITICAL TECHNOLOGY
 Water when heated to sub critical pressure, Temperature increases until it
starts boiling
 This temperature remain constant till all the water converted to steam
 When all liquid converted to steam than again temperature starts rising.
 Sub critical boiler typically have a mean ( Boiler Drum) to separate Steam And
Water
 The mass of this boiler drum, which limits the rate at which the sub critical
boiler responds to the load changes
 Too great a firing rate will result in high thermal stresses in the boiler drum
UNDERSTANDING SUB CRITICAL TECHNOLOGY
Role of SG in Rankine Cycle
Perform Using Natural resources of energy …….
 When Water is heated at constant pressure above the critical pressure, its
temperature will never be constant
 No distinction between the Liquid and Gas, the mass density of the two
phases remain same
 No Stage where the water exist as two phases and require separation : No
Drum
 The actual location of the transition from liquid to steam in a once through
super critical boiler is free to move with different condition : Sliding Pressure
Operation
 For changing boiler loads and pressure, the process is able to optimize the
amount of liquid and gas regions for effective heat transfer.
UNDERSTANDING SUPER CRITICAL TECHNOLOGY
Circulation Vs Once Through
No Religious Attitude
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
HPT
IPTLPT
C
O
N
D
E
N
S
E
R
FEED WATER
FRS
S
T
O
R
A
G
E
T
A
N
K
SEPARATOR
BWRP
MS LINE
HRH LINE
VERTICAL WW
ECO I/L
ECO
JUNCTION
HDR
ECO HGR
O/L HDR
FUR LOWER HDR
FUR ROOF
I/L HDR
DIV PANELS SH PLATEN
SH
FINAL
RH
FINAL SH
LTRH
ECONOMISER
290°C, 302 KSC
411°C,
277Ksc
411°C,
275 Ksc
492°C, 260 Ksc
540°C, 255 Ksc
305°C,49Ksc
457°C, 49 Ksc
568°C, 47
Ksc
G
LPT
Boiling process in Tubular Geometries
Heat Input
HeatInput
Water
Water
Water
Steam
Steam
Partial Steam Generation
Complete or Once-through
Generation
SEPARATOR TANK
Separator (F31) Storage Tank (F33)
Back pass Roof i/l hdr
1st pass top hdrs
1st pass top hdrs
Div. Pan. I/L hdrs
(S20)
Div. Pan. O/L hdrs (S24)
Platen I/L hdr (S28)
Platen O/L hdr (S30)
RH O/L hdr (R12)
RH I/L hdr (R10)
SH final I/L hdr (S34) SH final O/L hdr (S36)
Back pass Roof o/l hdr (S5)
LTRH O/L hdr (R8)
Eco. O/L hdr (E7)
2nd pass top hdrs (S11)
PENTHOUSE
S2
F8
F28
F28
F19
SIPAT SUPER CRITICAL BOILER
 BOILER DESIGN PARAMETER
 DRUM LESS BOILER : START-UP SYSTEM
 TYPE OF TUBE
 Vertical
 Spiral
 SPIRAL WATER WALL TUBING
 Advantage
 Disadvantage over Vertical water wall
Vertical Tube Furnace
 To provide sufficient flow per tube, constant pressure furnaces
employ vertically oriented tubes.
 Tubes are appropriately sized and arranged in multiple passes in
the lower furnace where the burners are located and the heat input
is high.
 By passing the flow twice through the lower furnace periphery
(two passes), the mass flow per tube can be kept high enough to
ensure sufficient cooling.
 In addition, the fluid is mixed between passes to reduce the upset
fluid temperature.
Spiral Tube Furnace
 The spiral design, on the other hand, utilizes fewer tubes to obtain
the desired flow per tube by wrapping them around the furnace to
create the enclosure.
 This also has the benefit of passing all tubes through all heat
zones to maintain a nearly even fluid temperature at the outlet of
the lower portion of the furnace.
 Because the tubes are “wrapped” around the furnace to form the
enclosure, fabrication and erection are considerably more
complicated and costly.
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
SPIRAL WATER WALL
ADVANTAGE
 Benefits from averaging of heat absorption variation : Less tube leakages
 Simplified inlet header arrangement
 Use of smooth bore tubing
 No individual tube orifice
 Reduced Number of evaporator wall tubes & Ensures minimum water flow
 Minimizes Peak Tube Metal Temperature
 Minimizes Tube to Tube Metal Temperature difference
DISADVANTAGE
 Complex wind-box opening
 Complex water wall support system
 tube leakage identification : a tough task
 More the water wall pressure drop : increases Boiler Feed Pump Power
 Adherence of Ash on the shelf of tube fin
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
BOILER OPERATING PARAMETER
FD FAN 2 No‟S ( AXIAL ) 11 kv / 1950 KW 228 mmwc
1732 T / Hr
PA FAN 2 No‟s ( AXIAL) 11 KV / 3920 KW 884 mmwc
947 T / Hr
ID FAN 2 No‟s ( AXIAL) 11 KV / 5820 KW 3020 T / Hr
TOTAL AIR 2535 T / Hr
SH OUT LET PRESSURE / TEMPERATURE /
FLOW
256 Ksc / 540 C
2225 T / Hr
RH OUTLET PRESSURE/ TEMPERATURE /
FLOW
46 Ksc / 568 C
1742 T / Hr
SEPARATOR OUT LET PRESSURE/
TEMPERATURE
277 Ksc / 412 C
ECONOMISER INLET 304 Ksc / 270 C
MILL OPERATION 7 / 10
COAL REQUIREMENT 471 T / Hr
SH / RH SPRAY 89 / 0.0 T / Hr
BOILER EFFICIENCY 87 %
1. High erosion
potential for
pulverizer and
backpass tube is
expected due to
high ash content.
2. Combustibility
Index is relatively
low but
combustion
characteristic is
good owing to
high volatile
content.
Parameter Unit
Design
Coal
Worst
Coal
Best
Coal
Young Hung
#1,2(800MW)
Tangjin
#5,6(500MW)
High Heating Value kcal/kg 3,300 3,000 3,750 6,020 6,080
Total Moisture % 12.0 15.0 11.0 10.0 10.0
Volatile Matter % 21.0 20.0 24.0 23.20 26.53
Fixed Carbon % 24.0 20.0 29.0 52.89 49.26
Proximate
Analysis
Ash % 43.0 45.0 36.0 13.92 14.21
Fuel Ratio (FC/VM) - 1.14 1.00 1.21 2.28 1.86
Combustibility Index - 2,067 2,353 2,476 2,781 3,492
Carbon % 39.53 31.35 40.24 63.03 62.15
Hydrogen % 2.43 2.30 2.68 3.60 3.87
Nitrogen % 0.69 0.60 0.83 1.53 1.29
Oxygen % 6.64 5.35 8.65 7.20 7.80
Sulfur % 0.45 0.40 0.60 0.72 0.68
Ash % 43.00 45.00 36.00 13.92 14.21
Ultimate
Analysis
Moisture % 12.00 15.00 11.00 10.00 10.00
Grindability HGI 50 47 52 45 48
ASTM Coal Classification -
Hi–Vol. „C‟
Bituminous
Hi–Vol. „C‟
Bituminous
Hi–Vol. „C‟
Bituminous
Midium Vol.
Bituminous
Hi–Vol. „C‟
Bituminous
Coal Analysis
1. Lower
slagging
potential is
expected due
to low ash
fusion temp.
and low basic
/ acid ratio.
2. Lower fouling
potential is
expected due
to low Na2O
and CaO
content.
Parameter Unit
Design
Coal
Worst
Coal
Best
Coal
Young Hung
#1,2(800MW)
Tangjin
#5,6(500MW)
SiO2 % 61.85 62.40 61.20 57.40 57.40
Al2O3 % 27.36 27.31 27.32 29.20 29.20
Fe2O3 % 5.18 4.96 5.40 4.40 4.40
CaO % 1.47 1.42 1.52 2.70 2.70
MgO % 1.00 1.03 0.97 0.90 0.90
Na2O % 0.08 0.08 0.08 0.30 0.30
K2O % 0.63 0.32 1.22 0.70 0.70
TiO2 % 1.84 1.88 1.80 1.30 1.30
P2O5 % 0.54 0.55 0.44 - -
SO3 % 0.05 0.05 0.05 - -
Ash
Analysis
Others % - - - 3.10 3.10
Initial Deformation o
C 1150 1100 1250 1200 1200
Softening o
C - - -
Hemispheric o
C 1400 1280 1400
Ash Fusion
Temp. (o
C)
(Reducing
Atmos.) Flow o
C 1400 1280 1400
Ash Content kg/Gcal 130.3 150.0 96.0 23.12 23.37
Basic / Acid B/A 0.09 0.09 0.10 1.63 1.63
Ash Analysis
AIR AND FLUE GAS SYSTEM
AIR PATH : Similar as 500 MW Unit
FLUE GAS PATH:
No Of ESP Passes : 6 Pass
No Of Fields / Pass : 18
No Of Hopper / Pass : 36
Flue Gas Flow / Pass : 1058 T/ Hr
1-7 fields  70 KV.
8&9 field  90 KV
RHS WIND BOX
BACK PASS
FURNACE
M
M
M
M
M
M M
M
M M
M
M M
M
M M
M
M
M
M
PAPH # A
SAPH # A
PAPH # B
SAPH # B
M AIR MOTOR
M AIR MOTOR
M AIR MOTOR
M AIR MOTOR
M
HOT PRIMARY AIR DUCT
HOT PRIMARY AIR DUCT
TO PULVERISER SYSTEM
TO PULVERISER SYSTEM
M
M
M
M
M
MM
DIVISIONALPANEL
PLATENCOILS
FINALREHEATER
FINALSUPERHEATER
LTRH
ECONOMISER
LHS WIND BOX
PA FAN # A
FD FAN # A
FD FAN # B
PA FAN # B
AIR PATH
FUEL OIL SYSTEM
Type Of Oil : LDO / HFO
Boiler Load Attainable With All Oil Burner In Service : 30 %
Oil Consumption / Burner : 2123 Kg / Hr
Capacity Of HFO / Coal : 42.1 %
Capacity Of LDO / Coal : 52.5 %
HFO Temperature : 192 C
All Data Are At 30 % BMCR
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
DESIGN BASIS FOR SAFETY VALVES :
1. Minimum Discharge Capacities.
Safety valves on Separator and SH Combined capacity 105%BMCR
(excluding power operated impulse safety valve)
Safety valves on RH system Combined capacity 105% of Reheat
flow at BMCR
(excluding power operated impulse safety valve)
Power operated impulse safety valve 40%BMCR at super-heater outlet
60% of Reheat flow at BMCR at RH
outlet
2. Blow down 4% (max.)b
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
BOILER FILL WATER REQUIREMENT
Main Feed Water Pipe ( FW Shut Off Valve to ECO I/L HDR) 28.8 m3
Economizer 253.2 m3
Furnace ( Eco Check Valve to Separator Link) 41.5 m3
Separators & Link 13.8 m3
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
39
OXYGENATED TREATMENT OF FEED WATER
Dosing of oxygen(O2) or Hydrogen peroxide (H2O2)
in to feed water system.
Concentration in the range of 50 to 300 µg/L.
Formation of a thin, tightly adherent ferric oxide
(FeOOH) hydrate layer.
This layer is much more dense and tight than that of
Magnetite layer.
“WATER CHEMISTRY CONTROL MAINTAINS PLANT HEALTH.”
40
All Volatile
Treatment
Oxygenated
Water
Treatment
41
DOSING POINTS
42
“AVT” Dosing Auto Control
43
“OWT” Dosing Auto Control
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
BACK PASS ECO I/L HDR
BACK PASS ECO O/L HDR
FUR ROOF I/L HDR
1 2 1 2 1 2 1 2
BRP
TO DRAIN HDR
FROM FEED WATER
BLR FILL PUMP
N2 FILL LINE
VENT HDR
DRAIN HDR
DRAIN HDR
VENT HDR
VENT HDR
N2 FILL LINE
SAMPLE COOLER SAMPLE COOLER
N2 FILL LINE
VENT HDR
VENT HDR
ECO MIXING LINKECO JUNCTION HDR
FUR BOTTOM RING HDR
FUR INTERMITTENT HDR
FUR WW HDR
SEPRATOR #1 SEPRATOR #2
STORAGE TANK
MIXING PIECE
FLASH TANK
WR ZR
WATER LINE
N2 FILLING LINE
VENT LINE
DRAIN LINE
SAMPLE COOLER LINE
WATER CIRCULATION SYSTEM
U # 1
MODES OF OPERATION
1. BOILER FILLING
2. CLEAN UP CYCLE
3. WET MODE OPERATION (LOAD < 30 % )
4. DRY MODE OPERATION (LOAD > 30 %)
5. DRY TO WET MODE OPERATION ( WHEN START UP SYSTEM NOT AVAILABLE)
FEED WATER SYSTEM
 If the water system of the boiler is empty (economizer, furnace walls, separators),
then the system is filled with approximately 10% TMCR ( 223 T/Hr) feed water flow.
 When the level in the separator reaches set-point, the WR valve will begin to open.
 When the WR valve reaches >30% open for approximately one minute, then
increase feed water flow set-point to 30% TMCR ( approx 660 T/Hr).
 As the flow increases, WR valve will reach full open and ZR valve will begin to
open.
 The water system is considered full when:
 The separator water level remains stable for two(2) minutes
and
 The WR valve is fully opened and ZR valve is >15% open for two(2)
minutes
After completion of Filling, the feed water flow is again adjusted to 10 % TMCR for
Clean up cycle operation
BOILER FILLING LOGIC
 The boiler circulating pump is started following the start of a feed water
pump and the final clean-up cycle.
 This pump circulates feed water from the evaporator outlet back to the
economizer inlet.
 Located at the outlet of this pump is the UG valve which controls
economizer inlet flow during the start-up phase of operation.
 Demand for this recirculation, control valve is established based on
measured economizer inlet flow compared to a minimum boiler flow set
point.
BOILER INITIAL WATER LEVEL CONTROL (UG VALVE)
Boiler Clean-up
When the feedwater quality at the outlet of deaerator and separator is not
within the specified limits, a feedwater clean-up recirculation via the boiler is
necessary.
During this time, constant feedwater flow of 10% TMCR ( 223 T/Hr) or more
is maintained.
Water flows through the economizer and evaporator, and discharges the
boiler through the WR valve to the flash tank and via connecting pipe to the
condenser.
From the condenser, the water flows through the condensate polishing
plant, which is in service to remove impurities ( Like Iron & its Oxide, Silica,
Sodium and its salts ), then returns to the feed water tank.
The recirculation is continued until the water quality is within the specified
limits.
FEED WATER QUALITY PARAMETER FOR START UP
MODE OF OPERATION
WET MODE :
 Initial Operation Of Boiler Light Up. When Economizer Flow is maintained by
BCP.
 Boiler Will Operate till 30 % TMCR on Wet Mode.
DRY MODE :
 At 30 % TMCR Separator water level will become disappear and Boiler
Operation mode will change to Dry
 BCP Will shut at this load
 Warm Up system for Boiler Start Up System will get armed
 Boiler will turn to once through Boiler
 ECO Water flow will be controlled by Feed Water Pump in service
1. Flow Control Valve ( 30 % Control Valve )
 Ensures minimum pressure fluctuation in Feed Water Header
 It measures Flow at BFP Booster Pump Discharge and compare it with a calculated flow
from its downstream pressure via a function and maintains the difference “ 0 “
2. 100 % Flow Valve To Boiler
 Remains Closed
3. BFP Recirculation Valve
 It Measures Flow at BFP Booster Pump Discharge
 Ensures minimum Flow through BFP Booster Pump
 Closes when Flow through BFP Booster Pump discharge > 2.1 Cum
 Open When Flow through BFP Booster Pump Discharge < 1.05 Cum
( Minimum Flow will be determined by BFP Speed via BFP Set limitation Curve)
4. BFP Scoop
 It measures value from Storage tank level Transmitter
 Maintain Separator Storage Tank Level
SYSTEM DESCRIPTION ( WET MODE OPERATION)
5. UG Valve
 Maintain Minimum Economizer Inlet Flow ( 30 % TMCR = Approx 660 T/Hr)
 Maintain DP across the BRP ( Approx 4.0 Ksc)
 It Measures Flow Value from Economizer Inlet Flow Transmitter
6. WR / ZR Valve
 Maintains Separator Storage Tank Level
 It Measures value from the Storage tank Level
7. Storage Tank Level
 3 No‟s Level Transmitter has been provided for Storage tank level measurement
 1 No HH Level Transmitter has been provided
 At 17.9 Mtr level it will trip all FW Pumps also MFT will act
 1 No LL Level Transmitter has been provided
 At 1.1 Mtr level MFT will Act
SYSTEM DESCRIPTION ( DRY MODE OPERATION)
1. Following System will be isolated during Dry Mode Operation
 FCV ( 30 % )
 Start Up System Of Boiler
 WR / ZR Valve
 Storage Tank
 BRP
 BRP Recirculation System
 BFP Recirculation Valve
2. Following System will be in service
 UG Valve ( Full Open)
 100 % FW Valve ( Full Open)
 Platen / Final Super-heater spray control
 Start Up System Warming Lines
 Separator Storage Tank Wet Leg Level Control
SYSTEM OPERATION ( DRY MODE OPERATION)
1. START UP SYSTEM
 In Dry Mode Start Up System Of Boiler will become isolated
 Warming System for Boiler Start Up system will be charged
 Separator Storage Tank level will be monitored by Separator storage tank wet leg level
control valve ( 3 Mtr)
2. TRANSITION PHASE :- Changeover of FW Control valve (30 % to 100 % Control )
 100 % FW Flow valve will wide open
 During the transition phase system pressure fluctuates
 The system pressure fluctuation will be controlled by 30 % FW Valve. After stabilization of
system 30 % CV Will become Full Close
3. FEED WATER CONTROL
 It will be controlled in three steps
 Feed Water demand to maintain Unit Load
 Maintain Separator O/L Temperature
 Maintain acceptable Platen Spray Control Range
FEED WATER DEMAND ( DRY MODE OPERATION)
1. FINAL SUPER HEATER SPRAY CONTROL
 Maintain the Final Steam Outlet Temperature ( 540 C)
2. PLATEN SUPER HEATER SPRAY CONTROL
 Primary purpose is to keep the final super heaer spray control valve in the desired
operating range
 Measures the final spray control station differential temperature
 It Compares this difference with Load dependent differential temperature setpoint
 Output of this is the required temperature entering the Platen Super Heater Section
(Approx 450 C)
3. FEED WATER DEMAND
1. FEED FORWARD DEMAND
 It is established by Boiler Master Demand.
 This Demand goes through Boiler Transfer Function where it is matched with the actual
Evaporator Heat Transfer to minimize the temperature fluctuations
2. FEED BACK DEMAND
 Work With two controller in cascade mode
2. FEED BACK DEMAND
 Work With two controller in cascade mode
 FIRST CONTROLLER
 One Controller acts on Load dependent average platen spray differential
temperature
 Its Output represents the desired heat transfer / steam generation to maintain
the desired steam parameters and Flue gas parameters entering the Platen
section
 SECOND CONTROLLER
 Second Controller acts on the load dependent Separator Outlet Temperature
adjusted by Platen spray differential temperature
 This controller adjust the feed water in response to firing disturbances to
achieve the separator O/L Temperature
THE RESULTING DEMAND FROM THE COMBINED FEEDFORWARD AND FEEDBACK
DEMANDSIGNAL DETERMINED THE SETPOINT TO THE FEED WATER MASTER CONTROL
SETPOINT
FEED WATER DEMAND ( DRY MODE OPERATION)
DRY TO WET MODE OPERATION ( START UP SYSTEM NOT AVAILABLE)
1. The combined Feed Forward and Feed back demand ( as calculated in dry mode operation)
will be compared with minimum Economizer Flow
This ensures the minimum flow through Economizer during the period when start up system
is unavailable
2. Output of the first controller is subjected to the second controller which monitors the
Separator Storage tank level ( Since the system is in Wet Mode now)
3. The output of the second controller is the set point of Feed water master controller.
4. The Feed back to this controller is the minimum value measured before the start up system
and Economizer inlet.
BLR PATH ( WHEN WET MODE)
Separator - Backpass Wall & Extended Wall - SH Division - Platen SH - Final SH -
HP By-pass - Cold R/H Line - Primary R/H (Lower Temp R/H) - Final R/H - LP By-
pass - Condenser
BLR Path (When Dry Mode)
Primary Eco - Secondary Eco - Ring HDR - Spiral W/W - W/W Intermediate HDR -
Vertical W/W - Separator - Backpass Wall & Extended Wall - SH Division - Platen
SH - Final SH - HP TBN - Cold R/H Line - Primary R/H (Lower Temp R/H)- Final R/H
- IP and LP TBN - Condenser
WATER & STEAM PATH
Wet Mode and Dry Mode of Operation
406 451 440 486 480 540
DSH1 DSH2
15% 3%
PLATEN SH FINAL SHDIV SH
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Constant Pressure Control
 Above 90% TMCR The MS Pressure remains constant at rated pressure
 The Load is controlled by throttling the steam flow
 Below 30% TMCR the MS Pressure remains constant at minimum
Pressure
Sliding Pressure Control
 Boiler Operate at Sliding pressure between 30% and 90% TMCR
 The Steam Pressure And Flow rate is controlled by the load directly
BOILER LOAD CONDITION
 Valve throttling losses occur because the boiler operates at constant pressure while the
turbine doesn't.
 The most obvious way to avoid throttling losses therefore is to stop operating the boiler at
constant pressure!
 Instead, try to match the stop valve pressure to that existing inside the turbine at any given
load.
 Since the turbine internal pressure varies linearly with load, this means that the boiler
pressure must vary with load similarly.
 This is called .sliding pressure operation..
 If the boiler pressure is matched to the pressure inside the turbine, then there are no valve
throttling losses to worry about!
 While sliding pressure is beneficial for the turbine, it can cause difficulties for the boiler.
ADVERSE AFFECT
 As the pressure falls, the boiling temperature (boiling point) changes. The boiler is divided
into zones in which the fluid is expected to be entirely water, mixed steam / water or dry
steam. A change in the boiling point can change the conditions in each zone.
 The heat transfer coefficient in each zone depends upon the pressure. As the pressure
falls, the heat transfer coefficient reduces. This means that the steam may not reach the
correct temperature. Also, if heat is not carried away by the steam, the boiler tubes will run
hotter and may suffer damage.
CONSTANT PRESSURE VS SLIDING PRESSURE
CHALLANGES
 The heat transfer coefficient also depends upon the velocity of the steam in the boiler
tubes.
 Any change in pressure causes a change in steam density and so alters the steam
velocities and heat transfer rate in each zone.
 Pressure and temperature cause the boiler tubes to expand. If conditions change, the
tubes will move. The tube supports must be capable of accommodating this movement.
 The expansion movements must not lead to adverse stresses.
 The ability to use sliding pressure operation is determined by the boiler
Boilers can be designed to accommodate sliding pressure.
 When it is used, coal fired boilers in the 500 to 1000 MW class normally restrict sliding
pressure to a limited load range, typically 70% to 100% load, to minimize the design
challenge. Below this range, the boiler is operated at a fixed pressure.
 This achieves an acceptable result because large units are normally operated at high load
for economic reasons.
 In contrast, when sliding pressure is used in combined cycle plant, the steam pressure is
varied over a wider load range, typically 50% to 100% load or more
 As stated, in coal-fired plant, sliding pressure is normally restricted to a limited load
range to reduce design difficulties.
 In this range, the boiler pressure is held at a value 5% to 10% above the turbine
internal pressure. Consequently, the governor valves throttle slightly.
 The offset is provided so that the unit can respond quickly to a sudden increase in
load demand simply by pulling the valves wide open.
 This produces a faster load response than raising the boiler firing rate alone.The
step in load which can be achieved equals the specified margin ie 5% to 10%.
 The throttling margin is agreed during the tendering phase and then fixed.
 A margin of 5% to 10% is usually satisfactory because most customers rely upon
gas turbines, hydroelectric or pumped storage units to meet large peak loads.
 The throttling margin means that the full potential gain of sliding pressure is not
achieved.
 Nevertheless, most of the throttling losses which would otherwise occur are
recovered.
ADVANTAGES
 Temperature changes occur in the boiler and in the turbine during load changes.
These can cause thermal stresses in thick walled components.
 These are especially high in the turbine during constant-pressure operation. They
therefore limit the maximum load transient for the unit.
 By contrast, in sliding pressure operation, the temperature changes are in the
evaporator section. However, the resulting thermal stresses are not limiting in the
Once through boiler due to its thermo elastic design.
In fixed pressure operation , temperature change in the turbine when load
changes, while in sliding-pressure operation ,they change in the boiler
 The enthalpy increase in the boiler for preheating, evaporation and superheating
changes with pressure.
 However, pressure is proportional to output in sliding pressure operation
 In a uniformly heated tube, the transitions from preheat to evaporation and from
evaporation to superheat shift automatically with load such that the main steam
temperature always remains constant.
 At loads over 25% of rated load, the water fed by a feed-water pump flows through
the high pressure feed-water heater, economizer ,furnace water wall, steam-water
separator, rear-wall tubes at the ceiling, and super heaters, The super heaters steam
produced is supplied to the turbine.
 At rated and relatively high loads the boiler is operated as a purely once through
type. At partial loads, however, the boiler is operated by sliding the pressure as a
function of load.
0
5
10
15
20
25
0 25 50 75 100
Turbine load (%)
TurbineinletpressureMpa
24.1 Mpa
9.0 Mpa
Sliding Pressure
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
+1
0
-1
-2
-3
-4
20 40 60 80 100EfficiencyChange%
Boiler Load %
Variable Pressure
CONSTANT PRESSURE Vs VARIABLE PRESSURE BOILER CHARACTERSTIC
Benefits Of Sliding Pressure Operation ( S.P.O)
 Able to maintain constant first stage turbine temperature
 Reducing the thermal stresses on the component : Low Maintenance & Higher
Availability
 No additional pressure loss between boiler and turbine.
 low Boiler Pr. at low loads.
WHY NOT S.P.O. IN NATURAL/CONTROL CIRCULATION BOILERS
 Circulation Problem : instabilities in circulation system due to steam formation in
down comers.
 Drum Level Control : water surface in drum disturbed.
 Drum : (most critical thick walled component) under highest thermal stresses
The Basis of Boiler Start-up Mode
Mode Basis Restart Hot Warm Cold
Stopped time 2Hr Within 6~12Hr 56Hr Within 96Hr Above
SH Outlet Temp 465℃ above 300℃ above 100℃ above 100℃ below
Separator Tank pr 120~200㎏/㎠ 30~120㎏/㎠ 30㎏/㎠ below 0㎏/㎠
Starting Time
Startup Mode
Light off →TBN
Rolling(minutes)
Light off →
Full Load(minutes)
Cold 120 420 Except Rotor and Chest Warming Time
Warm 90 180 "
Hot - - ․
Restart 30 90 ․
STARTING TIME
PURGE CONDITIONS
 No Boiler Trip Condition Exists
 All System Power Supply Available
 Unit Air Flow > 30 % BMCR
 Nozzle Tilt Horizontal and Air Flow < 40 %
 Both PA Fans Off
 The Following Condition Exist At Oil Firing System
 The HOTV / LOTV Should Be Closed
 All Oil Nozzle Valve Closed
 The Following Condition Exists at Coal Firing System
 All Pulverisers are Off
 All Feeders are Off
 All Hot Air Gates Of Pulverisers are closed
 All Flame Scanner on all elevation shows no Flame
 Aux Air Damper At All Elevation should be modulating
After Purging Boiler Light Up activites are same as in 500 MW plant
MFT CONDITIONS
 Both ID Fans Off
 Both FD Fans Off
 Unit Air Flow < 30 % TMCR
 All Feed Water Pumps Are Off For More Than 40 Sec
 2 / 3 Pressure Transmitter indicate the furnace pressure High / Low for more than 8 sec ( 150
mmwc / -180 mmwc))
 2 / 3 Pressure Transmitter indicate the furnace pressure High – High / Low - Low ( 250 mmwc
/ - 250 mmwc)
 Loss Of Re-heater Protection
 EPB Pressed
 All SAPH Off
 Economizer Inlet Flow Low For More Than 10 Sec (223 T/Hr)
 Furnace Vertical Wall Temperature High For more than 3 Sec (479 C)
 SH Pressure High On Both Side (314 KSc)
 SH Temperature High For More Than 20 Sec ( 590 C)
 RH O/L Temperature High For More Than 20 Sec ( 590 C)
 Separator Level Low-Low During Wet Mode ( 1.1 M)
 Separator Level High-High During Wet Mode ( 17.7 M)
 MFT Relay Tripped
 Loss Of Fuel Trip : It Arms when any oil burner proven.
it occurs when all of the following satisfied
 All Feeders Are Off
 HOTV Not Open or all HONV Closed
 LOTV Not Open or all LONV Closed
 Unit Flame Failure Trip : It Arms when any Feeder Proves
it occurs when all 11 scanner elevation indicates flame failure as listed below ( Example is
for only elevation A)
 Feeder A & Feeder B is Off with in 2 Sec Time Delay
 following condition satisfied
 Any oil valve not closed on AB Elevation
 3 /4 valves not proven on AB Elevation
 Less Than 2 / 4 Scanner Shows Flame
 Both Of The Following Condition Satisfied
 Less Than 2 / 4 Scanner Flame Shows Flame
 2 / 4 Oil Valves not open at AB Elevation
Boiler Light Up Steps
 Start the Secondary Air Preheater
 Start one ID fan, then the corresponding FD fan and adjust air flow to a min. of
30% TMCR
 Start the scanner air fan.
 Adjust fan and SADC to permit a purge air flow of atleast 30% of TMCR and
furnace draft of approx. -12.7 mmWC.
 When fans are started, SADC should modulate the aux. air dampers to maintain
WB to furnace DP at 102 mmWC(g).
 Check that all other purge permissives are satisfied.
 Place FTPs in service.
 Check The MFT Conditions
 For First Time Boiler Light Up do the Oil Leak Test
 Initiate a furnace purge.
SYSTEM / EQUIPMENT REQUIRED FOR BOILER LIGHT UP
FURNACE READINESS
 PRESSURE PARTS
 SCANNER AIR FAN
 BOTTOM ASH HOPPER READINESS
 FUEL FIRING SYSTEM
 START UP SYSTEM
SEC AIR PATH READINESS
 FD FAN
 SAPH
 WIND BOX / SADC
FLUE GAS SYSTEM
 ESP PASS A , B
 ID FAN
SYSTEM / EQUIPMENT REQUIRED FOR BOILER LIGHT UP
CONDENSATE SYSTEM
 CONDENSER
 CEP
 CPU
FEED WATER SYSTEM
 D/A
 MDBFP # A
VACCUME SYSTEM
SEAL STEAM SYSTEM
TURBINE ON BARRING
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Evaporator – heat absorption
Reduced number of evaporator wall tubes.
 Ensures minimum water wall flow.
SPIRAL WALL ARRAMGEMENT AT BURNER BLOCK AREA :
Support System for Evaporator Wall
• Spiral wall  Horizontal and vertical buck stay with tension strip
• Vertical wall  Horizontal buck stay
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i

Weitere ähnliche Inhalte

Was ist angesagt?

Turbine cycle heat rate calculation
Turbine  cycle heat rate calculationTurbine  cycle heat rate calculation
Turbine cycle heat rate calculationSHIVAJI CHOUDHURY
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTRajashekar Gurrala
 
210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat BalanceManohar Tatwawadi
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boilerKongkiert Tankayura
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsSHIVAJI CHOUDHURY
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heaterSHIVAJI CHOUDHURY
 
Boiler Drum And Its Internals
Boiler Drum And Its InternalsBoiler Drum And Its Internals
Boiler Drum And Its InternalsAshrant Dass
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boilerMilap Desai
 
A technical overview of thermal power plant
A technical overview of thermal power plantA technical overview of thermal power plant
A technical overview of thermal power plantMirdul Amin Sarkar
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGSURAJ KUMAR
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineRAVI PAL SINGH
 
Supercritical boiler ntpc sipat
Supercritical boiler ntpc sipatSupercritical boiler ntpc sipat
Supercritical boiler ntpc sipatpratikguptateddy
 
500 mw utility boiler ppt
500 mw utility boiler ppt500 mw utility boiler ppt
500 mw utility boiler pptandyappan1
 

Was ist angesagt? (20)

Turbine cycle heat rate calculation
Turbine  cycle heat rate calculationTurbine  cycle heat rate calculation
Turbine cycle heat rate calculation
 
Presentation on CFBC Boilers
Presentation on CFBC BoilersPresentation on CFBC Boilers
Presentation on CFBC Boilers
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
 
210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heater
 
Unit protection scheme
Unit protection schemeUnit protection scheme
Unit protection scheme
 
Cooling water (CW) system
Cooling water (CW) system Cooling water (CW) system
Cooling water (CW) system
 
Boiler Drum And Its Internals
Boiler Drum And Its InternalsBoiler Drum And Its Internals
Boiler Drum And Its Internals
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
A technical overview of thermal power plant
A technical overview of thermal power plantA technical overview of thermal power plant
A technical overview of thermal power plant
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam Turbine
 
Heat rate of coal fired power plant
Heat rate of coal fired power plantHeat rate of coal fired power plant
Heat rate of coal fired power plant
 
Supercritical boiler ntpc sipat
Supercritical boiler ntpc sipatSupercritical boiler ntpc sipat
Supercritical boiler ntpc sipat
 
Boiler -Emergency Handling
 Boiler -Emergency Handling Boiler -Emergency Handling
Boiler -Emergency Handling
 
500 mw utility boiler ppt
500 mw utility boiler ppt500 mw utility boiler ppt
500 mw utility boiler ppt
 

Andere mochten auch

Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station workingRonak Thakare
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plantRashmi Nimje
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)Baibhav Saha
 

Andere mochten auch (8)

Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Ppt on boilers
Ppt on boilersPpt on boilers
Ppt on boilers
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Go Kart Project
Go Kart ProjectGo Kart Project
Go Kart Project
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plant
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 

Ähnlich wie Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i

Super-Critical Boiler.ppt
Super-Critical Boiler.pptSuper-Critical Boiler.ppt
Super-Critical Boiler.pptMarcWorld
 
SUPER CRITICAL BOILER.pdf
SUPER CRITICAL BOILER.pdfSUPER CRITICAL BOILER.pdf
SUPER CRITICAL BOILER.pdfVivaanRavi
 
BOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfBOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfPrasadKandukuri4
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]Amardeep Jadeja
 
Thermal Power Plants
Thermal Power PlantsThermal Power Plants
Thermal Power Plantspeeyush95
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesVaibhav Paydelwar
 
Steam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdfSteam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdfGaluhAjeng26
 
Energy efficiency in Refrigeration Systems
Energy efficiency in Refrigeration SystemsEnergy efficiency in Refrigeration Systems
Energy efficiency in Refrigeration Systemseecfncci
 
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...Radha Krishna Sahoo
 
Hvac - presentation (Air conditioning presentation)
Hvac - presentation (Air conditioning presentation) Hvac - presentation (Air conditioning presentation)
Hvac - presentation (Air conditioning presentation) SYED KHURSHID ALAM ARZOO
 
IRJET-Case Study of Supercritical Boiler Technology
IRJET-Case Study of Supercritical Boiler TechnologyIRJET-Case Study of Supercritical Boiler Technology
IRJET-Case Study of Supercritical Boiler TechnologyIRJET Journal
 
Boiler efficiency & safety
Boiler efficiency & safetyBoiler efficiency & safety
Boiler efficiency & safetyRakeshBhowmick1
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plantSHIVAJI CHOUDHURY
 
Aph operation and emergency handling
Aph operation and emergency handlingAph operation and emergency handling
Aph operation and emergency handlingParag Agrawal
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC RamagunadamAbhinay Angari
 
Ammonia Synthesis Flowsheet - Operator training
Ammonia Synthesis Flowsheet - Operator trainingAmmonia Synthesis Flowsheet - Operator training
Ammonia Synthesis Flowsheet - Operator trainingGerard B. Hawkins
 
Bhushan powers and steels thalkuli,regali
Bhushan powers and steels thalkuli,regaliBhushan powers and steels thalkuli,regali
Bhushan powers and steels thalkuli,regaliBaroda
 

Ähnlich wie Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i (20)

Super-Critical Boiler.ppt
Super-Critical Boiler.pptSuper-Critical Boiler.ppt
Super-Critical Boiler.ppt
 
SUPER CRITICAL BOILER.pdf
SUPER CRITICAL BOILER.pdfSUPER CRITICAL BOILER.pdf
SUPER CRITICAL BOILER.pdf
 
BOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfBOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdf
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
Thermal Power Plants
Thermal Power PlantsThermal Power Plants
Thermal Power Plants
 
Article - 2012 PTQ Q1
Article - 2012 PTQ Q1Article - 2012 PTQ Q1
Article - 2012 PTQ Q1
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
Steam turbine deaerating condenser perforamace improvement
Steam turbine deaerating condenser perforamace improvementSteam turbine deaerating condenser perforamace improvement
Steam turbine deaerating condenser perforamace improvement
 
Steam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdfSteam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdf
 
Energy efficiency in Refrigeration Systems
Energy efficiency in Refrigeration SystemsEnergy efficiency in Refrigeration Systems
Energy efficiency in Refrigeration Systems
 
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...Husk based power plant 6 t 32 kg fbc with single stage turbine   for finance,...
Husk based power plant 6 t 32 kg fbc with single stage turbine for finance,...
 
Hvac - presentation (Air conditioning presentation)
Hvac - presentation (Air conditioning presentation) Hvac - presentation (Air conditioning presentation)
Hvac - presentation (Air conditioning presentation)
 
IRJET-Case Study of Supercritical Boiler Technology
IRJET-Case Study of Supercritical Boiler TechnologyIRJET-Case Study of Supercritical Boiler Technology
IRJET-Case Study of Supercritical Boiler Technology
 
Boiler efficiency & safety
Boiler efficiency & safetyBoiler efficiency & safety
Boiler efficiency & safety
 
heating-cooling units
heating-cooling unitsheating-cooling units
heating-cooling units
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plant
 
Aph operation and emergency handling
Aph operation and emergency handlingAph operation and emergency handling
Aph operation and emergency handling
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
Ammonia Synthesis Flowsheet - Operator training
Ammonia Synthesis Flowsheet - Operator trainingAmmonia Synthesis Flowsheet - Operator training
Ammonia Synthesis Flowsheet - Operator training
 
Bhushan powers and steels thalkuli,regali
Bhushan powers and steels thalkuli,regaliBhushan powers and steels thalkuli,regali
Bhushan powers and steels thalkuli,regali
 

Mehr von haxxo24

Wagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~iWagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~ihaxxo24
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...haxxo24
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...haxxo24
 
South east central railway (secr) bilaspur mechanical vocational training pre...
South east central railway (secr) bilaspur mechanical vocational training pre...South east central railway (secr) bilaspur mechanical vocational training pre...
South east central railway (secr) bilaspur mechanical vocational training pre...haxxo24
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...haxxo24
 
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...haxxo24
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~ihaxxo24
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~ihaxxo24
 
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...haxxo24
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...haxxo24
 
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...haxxo24
 

Mehr von haxxo24 (14)

Wagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~iWagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~i
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
South east central railway (secr) bilaspur mechanical vocational training pre...
South east central railway (secr) bilaspur mechanical vocational training pre...South east central railway (secr) bilaspur mechanical vocational training pre...
South east central railway (secr) bilaspur mechanical vocational training pre...
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...
 
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~i
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~i
 
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
 
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
 

Kürzlich hochgeladen

Diploma in Nursing Admission Test Question Solution 2023.pdf
Diploma in Nursing Admission Test Question Solution 2023.pdfDiploma in Nursing Admission Test Question Solution 2023.pdf
Diploma in Nursing Admission Test Question Solution 2023.pdfMohonDas
 
What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?TechSoup
 
3.21.24 The Origins of Black Power.pptx
3.21.24  The Origins of Black Power.pptx3.21.24  The Origins of Black Power.pptx
3.21.24 The Origins of Black Power.pptxmary850239
 
Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.EnglishCEIPdeSigeiro
 
How to Make a Field read-only in Odoo 17
How to Make a Field read-only in Odoo 17How to Make a Field read-only in Odoo 17
How to Make a Field read-only in Odoo 17Celine George
 
AUDIENCE THEORY -- FANDOM -- JENKINS.pptx
AUDIENCE THEORY -- FANDOM -- JENKINS.pptxAUDIENCE THEORY -- FANDOM -- JENKINS.pptx
AUDIENCE THEORY -- FANDOM -- JENKINS.pptxiammrhaywood
 
Practical Research 1: Lesson 8 Writing the Thesis Statement.pptx
Practical Research 1: Lesson 8 Writing the Thesis Statement.pptxPractical Research 1: Lesson 8 Writing the Thesis Statement.pptx
Practical Research 1: Lesson 8 Writing the Thesis Statement.pptxKatherine Villaluna
 
The basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxThe basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxheathfieldcps1
 
General views of Histopathology and step
General views of Histopathology and stepGeneral views of Histopathology and step
General views of Histopathology and stepobaje godwin sunday
 
Practical Research 1 Lesson 9 Scope and delimitation.pptx
Practical Research 1 Lesson 9 Scope and delimitation.pptxPractical Research 1 Lesson 9 Scope and delimitation.pptx
Practical Research 1 Lesson 9 Scope and delimitation.pptxKatherine Villaluna
 
Benefits & Challenges of Inclusive Education
Benefits & Challenges of Inclusive EducationBenefits & Challenges of Inclusive Education
Benefits & Challenges of Inclusive EducationMJDuyan
 
Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...raviapr7
 
How to Use api.constrains ( ) in Odoo 17
How to Use api.constrains ( ) in Odoo 17How to Use api.constrains ( ) in Odoo 17
How to Use api.constrains ( ) in Odoo 17Celine George
 
Prescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptxPrescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptxraviapr7
 
HED Office Sohayok Exam Question Solution 2023.pdf
HED Office Sohayok Exam Question Solution 2023.pdfHED Office Sohayok Exam Question Solution 2023.pdf
HED Office Sohayok Exam Question Solution 2023.pdfMohonDas
 
How to Add a New Field in Existing Kanban View in Odoo 17
How to Add a New Field in Existing Kanban View in Odoo 17How to Add a New Field in Existing Kanban View in Odoo 17
How to Add a New Field in Existing Kanban View in Odoo 17Celine George
 
How to Add a many2many Relational Field in Odoo 17
How to Add a many2many Relational Field in Odoo 17How to Add a many2many Relational Field in Odoo 17
How to Add a many2many Relational Field in Odoo 17Celine George
 
CAULIFLOWER BREEDING 1 Parmar pptx
CAULIFLOWER BREEDING 1 Parmar pptxCAULIFLOWER BREEDING 1 Parmar pptx
CAULIFLOWER BREEDING 1 Parmar pptxSaurabhParmar42
 
How to Manage Cross-Selling in Odoo 17 Sales
How to Manage Cross-Selling in Odoo 17 SalesHow to Manage Cross-Selling in Odoo 17 Sales
How to Manage Cross-Selling in Odoo 17 SalesCeline George
 

Kürzlich hochgeladen (20)

Diploma in Nursing Admission Test Question Solution 2023.pdf
Diploma in Nursing Admission Test Question Solution 2023.pdfDiploma in Nursing Admission Test Question Solution 2023.pdf
Diploma in Nursing Admission Test Question Solution 2023.pdf
 
What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?
 
3.21.24 The Origins of Black Power.pptx
3.21.24  The Origins of Black Power.pptx3.21.24  The Origins of Black Power.pptx
3.21.24 The Origins of Black Power.pptx
 
Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.
 
How to Make a Field read-only in Odoo 17
How to Make a Field read-only in Odoo 17How to Make a Field read-only in Odoo 17
How to Make a Field read-only in Odoo 17
 
AUDIENCE THEORY -- FANDOM -- JENKINS.pptx
AUDIENCE THEORY -- FANDOM -- JENKINS.pptxAUDIENCE THEORY -- FANDOM -- JENKINS.pptx
AUDIENCE THEORY -- FANDOM -- JENKINS.pptx
 
Practical Research 1: Lesson 8 Writing the Thesis Statement.pptx
Practical Research 1: Lesson 8 Writing the Thesis Statement.pptxPractical Research 1: Lesson 8 Writing the Thesis Statement.pptx
Practical Research 1: Lesson 8 Writing the Thesis Statement.pptx
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 
The basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxThe basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptx
 
General views of Histopathology and step
General views of Histopathology and stepGeneral views of Histopathology and step
General views of Histopathology and step
 
Practical Research 1 Lesson 9 Scope and delimitation.pptx
Practical Research 1 Lesson 9 Scope and delimitation.pptxPractical Research 1 Lesson 9 Scope and delimitation.pptx
Practical Research 1 Lesson 9 Scope and delimitation.pptx
 
Benefits & Challenges of Inclusive Education
Benefits & Challenges of Inclusive EducationBenefits & Challenges of Inclusive Education
Benefits & Challenges of Inclusive Education
 
Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...
 
How to Use api.constrains ( ) in Odoo 17
How to Use api.constrains ( ) in Odoo 17How to Use api.constrains ( ) in Odoo 17
How to Use api.constrains ( ) in Odoo 17
 
Prescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptxPrescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptx
 
HED Office Sohayok Exam Question Solution 2023.pdf
HED Office Sohayok Exam Question Solution 2023.pdfHED Office Sohayok Exam Question Solution 2023.pdf
HED Office Sohayok Exam Question Solution 2023.pdf
 
How to Add a New Field in Existing Kanban View in Odoo 17
How to Add a New Field in Existing Kanban View in Odoo 17How to Add a New Field in Existing Kanban View in Odoo 17
How to Add a New Field in Existing Kanban View in Odoo 17
 
How to Add a many2many Relational Field in Odoo 17
How to Add a many2many Relational Field in Odoo 17How to Add a many2many Relational Field in Odoo 17
How to Add a many2many Relational Field in Odoo 17
 
CAULIFLOWER BREEDING 1 Parmar pptx
CAULIFLOWER BREEDING 1 Parmar pptxCAULIFLOWER BREEDING 1 Parmar pptx
CAULIFLOWER BREEDING 1 Parmar pptx
 
How to Manage Cross-Selling in Odoo 17 Sales
How to Manage Cross-Selling in Odoo 17 SalesHow to Manage Cross-Selling in Odoo 17 Sales
How to Manage Cross-Selling in Odoo 17 Sales
 

Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i

  • 2. POINTS OF DISCUSSION  SUB CRITICAL & SUPER CRITICAL BOILER  SIPAT BOILER DESIGN  BOILER DESIGN PARAMETERS  CHEMICAL TREATMENT SYSTEM  OPERATION  FEED WATER SYSTEM  BOILER CONTROL  BOILER LIGHT UP  START UP CURVES
  • 3.  To Reduce emission for each Kwh of electricity generated : Superior Environmental 1% rise in efficiency reduce the CO2 emission by 2-3%  The Most Economical way to enhance efficiency  To Achieve Fuel cost saving : Economical  Operating Flexibility  Reduces the Boiler size / MW  To Reduce Start-Up Time WHY SUPER CRITICAL TECHNOLOGY
  • 4.  Water when heated to sub critical pressure, Temperature increases until it starts boiling  This temperature remain constant till all the water converted to steam  When all liquid converted to steam than again temperature starts rising.  Sub critical boiler typically have a mean ( Boiler Drum) to separate Steam And Water  The mass of this boiler drum, which limits the rate at which the sub critical boiler responds to the load changes  Too great a firing rate will result in high thermal stresses in the boiler drum UNDERSTANDING SUB CRITICAL TECHNOLOGY
  • 5. Role of SG in Rankine Cycle Perform Using Natural resources of energy …….
  • 6.  When Water is heated at constant pressure above the critical pressure, its temperature will never be constant  No distinction between the Liquid and Gas, the mass density of the two phases remain same  No Stage where the water exist as two phases and require separation : No Drum  The actual location of the transition from liquid to steam in a once through super critical boiler is free to move with different condition : Sliding Pressure Operation  For changing boiler loads and pressure, the process is able to optimize the amount of liquid and gas regions for effective heat transfer. UNDERSTANDING SUPER CRITICAL TECHNOLOGY
  • 10. HPT IPTLPT C O N D E N S E R FEED WATER FRS S T O R A G E T A N K SEPARATOR BWRP MS LINE HRH LINE VERTICAL WW ECO I/L ECO JUNCTION HDR ECO HGR O/L HDR FUR LOWER HDR FUR ROOF I/L HDR DIV PANELS SH PLATEN SH FINAL RH FINAL SH LTRH ECONOMISER 290°C, 302 KSC 411°C, 277Ksc 411°C, 275 Ksc 492°C, 260 Ksc 540°C, 255 Ksc 305°C,49Ksc 457°C, 49 Ksc 568°C, 47 Ksc G LPT
  • 11. Boiling process in Tubular Geometries Heat Input HeatInput Water Water Water Steam Steam Partial Steam Generation Complete or Once-through Generation
  • 13. Separator (F31) Storage Tank (F33) Back pass Roof i/l hdr 1st pass top hdrs 1st pass top hdrs Div. Pan. I/L hdrs (S20) Div. Pan. O/L hdrs (S24) Platen I/L hdr (S28) Platen O/L hdr (S30) RH O/L hdr (R12) RH I/L hdr (R10) SH final I/L hdr (S34) SH final O/L hdr (S36) Back pass Roof o/l hdr (S5) LTRH O/L hdr (R8) Eco. O/L hdr (E7) 2nd pass top hdrs (S11) PENTHOUSE S2 F8 F28 F28 F19
  • 14. SIPAT SUPER CRITICAL BOILER  BOILER DESIGN PARAMETER  DRUM LESS BOILER : START-UP SYSTEM  TYPE OF TUBE  Vertical  Spiral  SPIRAL WATER WALL TUBING  Advantage  Disadvantage over Vertical water wall
  • 15. Vertical Tube Furnace  To provide sufficient flow per tube, constant pressure furnaces employ vertically oriented tubes.  Tubes are appropriately sized and arranged in multiple passes in the lower furnace where the burners are located and the heat input is high.  By passing the flow twice through the lower furnace periphery (two passes), the mass flow per tube can be kept high enough to ensure sufficient cooling.  In addition, the fluid is mixed between passes to reduce the upset fluid temperature.
  • 16. Spiral Tube Furnace  The spiral design, on the other hand, utilizes fewer tubes to obtain the desired flow per tube by wrapping them around the furnace to create the enclosure.  This also has the benefit of passing all tubes through all heat zones to maintain a nearly even fluid temperature at the outlet of the lower portion of the furnace.  Because the tubes are “wrapped” around the furnace to form the enclosure, fabrication and erection are considerably more complicated and costly.
  • 18. SPIRAL WATER WALL ADVANTAGE  Benefits from averaging of heat absorption variation : Less tube leakages  Simplified inlet header arrangement  Use of smooth bore tubing  No individual tube orifice  Reduced Number of evaporator wall tubes & Ensures minimum water flow  Minimizes Peak Tube Metal Temperature  Minimizes Tube to Tube Metal Temperature difference DISADVANTAGE  Complex wind-box opening  Complex water wall support system  tube leakage identification : a tough task  More the water wall pressure drop : increases Boiler Feed Pump Power  Adherence of Ash on the shelf of tube fin
  • 20. BOILER OPERATING PARAMETER FD FAN 2 No‟S ( AXIAL ) 11 kv / 1950 KW 228 mmwc 1732 T / Hr PA FAN 2 No‟s ( AXIAL) 11 KV / 3920 KW 884 mmwc 947 T / Hr ID FAN 2 No‟s ( AXIAL) 11 KV / 5820 KW 3020 T / Hr TOTAL AIR 2535 T / Hr SH OUT LET PRESSURE / TEMPERATURE / FLOW 256 Ksc / 540 C 2225 T / Hr RH OUTLET PRESSURE/ TEMPERATURE / FLOW 46 Ksc / 568 C 1742 T / Hr SEPARATOR OUT LET PRESSURE/ TEMPERATURE 277 Ksc / 412 C ECONOMISER INLET 304 Ksc / 270 C MILL OPERATION 7 / 10 COAL REQUIREMENT 471 T / Hr SH / RH SPRAY 89 / 0.0 T / Hr BOILER EFFICIENCY 87 %
  • 21. 1. High erosion potential for pulverizer and backpass tube is expected due to high ash content. 2. Combustibility Index is relatively low but combustion characteristic is good owing to high volatile content. Parameter Unit Design Coal Worst Coal Best Coal Young Hung #1,2(800MW) Tangjin #5,6(500MW) High Heating Value kcal/kg 3,300 3,000 3,750 6,020 6,080 Total Moisture % 12.0 15.0 11.0 10.0 10.0 Volatile Matter % 21.0 20.0 24.0 23.20 26.53 Fixed Carbon % 24.0 20.0 29.0 52.89 49.26 Proximate Analysis Ash % 43.0 45.0 36.0 13.92 14.21 Fuel Ratio (FC/VM) - 1.14 1.00 1.21 2.28 1.86 Combustibility Index - 2,067 2,353 2,476 2,781 3,492 Carbon % 39.53 31.35 40.24 63.03 62.15 Hydrogen % 2.43 2.30 2.68 3.60 3.87 Nitrogen % 0.69 0.60 0.83 1.53 1.29 Oxygen % 6.64 5.35 8.65 7.20 7.80 Sulfur % 0.45 0.40 0.60 0.72 0.68 Ash % 43.00 45.00 36.00 13.92 14.21 Ultimate Analysis Moisture % 12.00 15.00 11.00 10.00 10.00 Grindability HGI 50 47 52 45 48 ASTM Coal Classification - Hi–Vol. „C‟ Bituminous Hi–Vol. „C‟ Bituminous Hi–Vol. „C‟ Bituminous Midium Vol. Bituminous Hi–Vol. „C‟ Bituminous Coal Analysis
  • 22. 1. Lower slagging potential is expected due to low ash fusion temp. and low basic / acid ratio. 2. Lower fouling potential is expected due to low Na2O and CaO content. Parameter Unit Design Coal Worst Coal Best Coal Young Hung #1,2(800MW) Tangjin #5,6(500MW) SiO2 % 61.85 62.40 61.20 57.40 57.40 Al2O3 % 27.36 27.31 27.32 29.20 29.20 Fe2O3 % 5.18 4.96 5.40 4.40 4.40 CaO % 1.47 1.42 1.52 2.70 2.70 MgO % 1.00 1.03 0.97 0.90 0.90 Na2O % 0.08 0.08 0.08 0.30 0.30 K2O % 0.63 0.32 1.22 0.70 0.70 TiO2 % 1.84 1.88 1.80 1.30 1.30 P2O5 % 0.54 0.55 0.44 - - SO3 % 0.05 0.05 0.05 - - Ash Analysis Others % - - - 3.10 3.10 Initial Deformation o C 1150 1100 1250 1200 1200 Softening o C - - - Hemispheric o C 1400 1280 1400 Ash Fusion Temp. (o C) (Reducing Atmos.) Flow o C 1400 1280 1400 Ash Content kg/Gcal 130.3 150.0 96.0 23.12 23.37 Basic / Acid B/A 0.09 0.09 0.10 1.63 1.63 Ash Analysis
  • 23. AIR AND FLUE GAS SYSTEM AIR PATH : Similar as 500 MW Unit FLUE GAS PATH: No Of ESP Passes : 6 Pass No Of Fields / Pass : 18 No Of Hopper / Pass : 36 Flue Gas Flow / Pass : 1058 T/ Hr 1-7 fields  70 KV. 8&9 field  90 KV
  • 24. RHS WIND BOX BACK PASS FURNACE M M M M M M M M M M M M M M M M M M M M PAPH # A SAPH # A PAPH # B SAPH # B M AIR MOTOR M AIR MOTOR M AIR MOTOR M AIR MOTOR M HOT PRIMARY AIR DUCT HOT PRIMARY AIR DUCT TO PULVERISER SYSTEM TO PULVERISER SYSTEM M M M M M MM DIVISIONALPANEL PLATENCOILS FINALREHEATER FINALSUPERHEATER LTRH ECONOMISER LHS WIND BOX PA FAN # A FD FAN # A FD FAN # B PA FAN # B AIR PATH
  • 25. FUEL OIL SYSTEM Type Of Oil : LDO / HFO Boiler Load Attainable With All Oil Burner In Service : 30 % Oil Consumption / Burner : 2123 Kg / Hr Capacity Of HFO / Coal : 42.1 % Capacity Of LDO / Coal : 52.5 % HFO Temperature : 192 C All Data Are At 30 % BMCR
  • 30. DESIGN BASIS FOR SAFETY VALVES : 1. Minimum Discharge Capacities. Safety valves on Separator and SH Combined capacity 105%BMCR (excluding power operated impulse safety valve) Safety valves on RH system Combined capacity 105% of Reheat flow at BMCR (excluding power operated impulse safety valve) Power operated impulse safety valve 40%BMCR at super-heater outlet 60% of Reheat flow at BMCR at RH outlet 2. Blow down 4% (max.)b
  • 37. BOILER FILL WATER REQUIREMENT Main Feed Water Pipe ( FW Shut Off Valve to ECO I/L HDR) 28.8 m3 Economizer 253.2 m3 Furnace ( Eco Check Valve to Separator Link) 41.5 m3 Separators & Link 13.8 m3
  • 39. 39 OXYGENATED TREATMENT OF FEED WATER Dosing of oxygen(O2) or Hydrogen peroxide (H2O2) in to feed water system. Concentration in the range of 50 to 300 µg/L. Formation of a thin, tightly adherent ferric oxide (FeOOH) hydrate layer. This layer is much more dense and tight than that of Magnetite layer. “WATER CHEMISTRY CONTROL MAINTAINS PLANT HEALTH.”
  • 46. BACK PASS ECO I/L HDR BACK PASS ECO O/L HDR FUR ROOF I/L HDR 1 2 1 2 1 2 1 2 BRP TO DRAIN HDR FROM FEED WATER BLR FILL PUMP N2 FILL LINE VENT HDR DRAIN HDR DRAIN HDR VENT HDR VENT HDR N2 FILL LINE SAMPLE COOLER SAMPLE COOLER N2 FILL LINE VENT HDR VENT HDR ECO MIXING LINKECO JUNCTION HDR FUR BOTTOM RING HDR FUR INTERMITTENT HDR FUR WW HDR SEPRATOR #1 SEPRATOR #2 STORAGE TANK MIXING PIECE FLASH TANK WR ZR WATER LINE N2 FILLING LINE VENT LINE DRAIN LINE SAMPLE COOLER LINE WATER CIRCULATION SYSTEM U # 1
  • 47. MODES OF OPERATION 1. BOILER FILLING 2. CLEAN UP CYCLE 3. WET MODE OPERATION (LOAD < 30 % ) 4. DRY MODE OPERATION (LOAD > 30 %) 5. DRY TO WET MODE OPERATION ( WHEN START UP SYSTEM NOT AVAILABLE) FEED WATER SYSTEM
  • 48.  If the water system of the boiler is empty (economizer, furnace walls, separators), then the system is filled with approximately 10% TMCR ( 223 T/Hr) feed water flow.  When the level in the separator reaches set-point, the WR valve will begin to open.  When the WR valve reaches >30% open for approximately one minute, then increase feed water flow set-point to 30% TMCR ( approx 660 T/Hr).  As the flow increases, WR valve will reach full open and ZR valve will begin to open.  The water system is considered full when:  The separator water level remains stable for two(2) minutes and  The WR valve is fully opened and ZR valve is >15% open for two(2) minutes After completion of Filling, the feed water flow is again adjusted to 10 % TMCR for Clean up cycle operation BOILER FILLING LOGIC
  • 49.  The boiler circulating pump is started following the start of a feed water pump and the final clean-up cycle.  This pump circulates feed water from the evaporator outlet back to the economizer inlet.  Located at the outlet of this pump is the UG valve which controls economizer inlet flow during the start-up phase of operation.  Demand for this recirculation, control valve is established based on measured economizer inlet flow compared to a minimum boiler flow set point. BOILER INITIAL WATER LEVEL CONTROL (UG VALVE)
  • 50. Boiler Clean-up When the feedwater quality at the outlet of deaerator and separator is not within the specified limits, a feedwater clean-up recirculation via the boiler is necessary. During this time, constant feedwater flow of 10% TMCR ( 223 T/Hr) or more is maintained. Water flows through the economizer and evaporator, and discharges the boiler through the WR valve to the flash tank and via connecting pipe to the condenser. From the condenser, the water flows through the condensate polishing plant, which is in service to remove impurities ( Like Iron & its Oxide, Silica, Sodium and its salts ), then returns to the feed water tank. The recirculation is continued until the water quality is within the specified limits.
  • 51. FEED WATER QUALITY PARAMETER FOR START UP
  • 52. MODE OF OPERATION WET MODE :  Initial Operation Of Boiler Light Up. When Economizer Flow is maintained by BCP.  Boiler Will Operate till 30 % TMCR on Wet Mode. DRY MODE :  At 30 % TMCR Separator water level will become disappear and Boiler Operation mode will change to Dry  BCP Will shut at this load  Warm Up system for Boiler Start Up System will get armed  Boiler will turn to once through Boiler  ECO Water flow will be controlled by Feed Water Pump in service
  • 53. 1. Flow Control Valve ( 30 % Control Valve )  Ensures minimum pressure fluctuation in Feed Water Header  It measures Flow at BFP Booster Pump Discharge and compare it with a calculated flow from its downstream pressure via a function and maintains the difference “ 0 “ 2. 100 % Flow Valve To Boiler  Remains Closed 3. BFP Recirculation Valve  It Measures Flow at BFP Booster Pump Discharge  Ensures minimum Flow through BFP Booster Pump  Closes when Flow through BFP Booster Pump discharge > 2.1 Cum  Open When Flow through BFP Booster Pump Discharge < 1.05 Cum ( Minimum Flow will be determined by BFP Speed via BFP Set limitation Curve) 4. BFP Scoop  It measures value from Storage tank level Transmitter  Maintain Separator Storage Tank Level SYSTEM DESCRIPTION ( WET MODE OPERATION)
  • 54. 5. UG Valve  Maintain Minimum Economizer Inlet Flow ( 30 % TMCR = Approx 660 T/Hr)  Maintain DP across the BRP ( Approx 4.0 Ksc)  It Measures Flow Value from Economizer Inlet Flow Transmitter 6. WR / ZR Valve  Maintains Separator Storage Tank Level  It Measures value from the Storage tank Level 7. Storage Tank Level  3 No‟s Level Transmitter has been provided for Storage tank level measurement  1 No HH Level Transmitter has been provided  At 17.9 Mtr level it will trip all FW Pumps also MFT will act  1 No LL Level Transmitter has been provided  At 1.1 Mtr level MFT will Act
  • 55. SYSTEM DESCRIPTION ( DRY MODE OPERATION) 1. Following System will be isolated during Dry Mode Operation  FCV ( 30 % )  Start Up System Of Boiler  WR / ZR Valve  Storage Tank  BRP  BRP Recirculation System  BFP Recirculation Valve 2. Following System will be in service  UG Valve ( Full Open)  100 % FW Valve ( Full Open)  Platen / Final Super-heater spray control  Start Up System Warming Lines  Separator Storage Tank Wet Leg Level Control
  • 56. SYSTEM OPERATION ( DRY MODE OPERATION) 1. START UP SYSTEM  In Dry Mode Start Up System Of Boiler will become isolated  Warming System for Boiler Start Up system will be charged  Separator Storage Tank level will be monitored by Separator storage tank wet leg level control valve ( 3 Mtr) 2. TRANSITION PHASE :- Changeover of FW Control valve (30 % to 100 % Control )  100 % FW Flow valve will wide open  During the transition phase system pressure fluctuates  The system pressure fluctuation will be controlled by 30 % FW Valve. After stabilization of system 30 % CV Will become Full Close 3. FEED WATER CONTROL  It will be controlled in three steps  Feed Water demand to maintain Unit Load  Maintain Separator O/L Temperature  Maintain acceptable Platen Spray Control Range
  • 57. FEED WATER DEMAND ( DRY MODE OPERATION) 1. FINAL SUPER HEATER SPRAY CONTROL  Maintain the Final Steam Outlet Temperature ( 540 C) 2. PLATEN SUPER HEATER SPRAY CONTROL  Primary purpose is to keep the final super heaer spray control valve in the desired operating range  Measures the final spray control station differential temperature  It Compares this difference with Load dependent differential temperature setpoint  Output of this is the required temperature entering the Platen Super Heater Section (Approx 450 C) 3. FEED WATER DEMAND 1. FEED FORWARD DEMAND  It is established by Boiler Master Demand.  This Demand goes through Boiler Transfer Function where it is matched with the actual Evaporator Heat Transfer to minimize the temperature fluctuations 2. FEED BACK DEMAND  Work With two controller in cascade mode
  • 58. 2. FEED BACK DEMAND  Work With two controller in cascade mode  FIRST CONTROLLER  One Controller acts on Load dependent average platen spray differential temperature  Its Output represents the desired heat transfer / steam generation to maintain the desired steam parameters and Flue gas parameters entering the Platen section  SECOND CONTROLLER  Second Controller acts on the load dependent Separator Outlet Temperature adjusted by Platen spray differential temperature  This controller adjust the feed water in response to firing disturbances to achieve the separator O/L Temperature THE RESULTING DEMAND FROM THE COMBINED FEEDFORWARD AND FEEDBACK DEMANDSIGNAL DETERMINED THE SETPOINT TO THE FEED WATER MASTER CONTROL SETPOINT FEED WATER DEMAND ( DRY MODE OPERATION)
  • 59. DRY TO WET MODE OPERATION ( START UP SYSTEM NOT AVAILABLE) 1. The combined Feed Forward and Feed back demand ( as calculated in dry mode operation) will be compared with minimum Economizer Flow This ensures the minimum flow through Economizer during the period when start up system is unavailable 2. Output of the first controller is subjected to the second controller which monitors the Separator Storage tank level ( Since the system is in Wet Mode now) 3. The output of the second controller is the set point of Feed water master controller. 4. The Feed back to this controller is the minimum value measured before the start up system and Economizer inlet.
  • 60. BLR PATH ( WHEN WET MODE) Separator - Backpass Wall & Extended Wall - SH Division - Platen SH - Final SH - HP By-pass - Cold R/H Line - Primary R/H (Lower Temp R/H) - Final R/H - LP By- pass - Condenser BLR Path (When Dry Mode) Primary Eco - Secondary Eco - Ring HDR - Spiral W/W - W/W Intermediate HDR - Vertical W/W - Separator - Backpass Wall & Extended Wall - SH Division - Platen SH - Final SH - HP TBN - Cold R/H Line - Primary R/H (Lower Temp R/H)- Final R/H - IP and LP TBN - Condenser WATER & STEAM PATH
  • 61. Wet Mode and Dry Mode of Operation
  • 62. 406 451 440 486 480 540 DSH1 DSH2 15% 3% PLATEN SH FINAL SHDIV SH
  • 64. Constant Pressure Control  Above 90% TMCR The MS Pressure remains constant at rated pressure  The Load is controlled by throttling the steam flow  Below 30% TMCR the MS Pressure remains constant at minimum Pressure Sliding Pressure Control  Boiler Operate at Sliding pressure between 30% and 90% TMCR  The Steam Pressure And Flow rate is controlled by the load directly BOILER LOAD CONDITION
  • 65.  Valve throttling losses occur because the boiler operates at constant pressure while the turbine doesn't.  The most obvious way to avoid throttling losses therefore is to stop operating the boiler at constant pressure!  Instead, try to match the stop valve pressure to that existing inside the turbine at any given load.  Since the turbine internal pressure varies linearly with load, this means that the boiler pressure must vary with load similarly.  This is called .sliding pressure operation..  If the boiler pressure is matched to the pressure inside the turbine, then there are no valve throttling losses to worry about!  While sliding pressure is beneficial for the turbine, it can cause difficulties for the boiler. ADVERSE AFFECT  As the pressure falls, the boiling temperature (boiling point) changes. The boiler is divided into zones in which the fluid is expected to be entirely water, mixed steam / water or dry steam. A change in the boiling point can change the conditions in each zone.  The heat transfer coefficient in each zone depends upon the pressure. As the pressure falls, the heat transfer coefficient reduces. This means that the steam may not reach the correct temperature. Also, if heat is not carried away by the steam, the boiler tubes will run hotter and may suffer damage. CONSTANT PRESSURE VS SLIDING PRESSURE
  • 66. CHALLANGES  The heat transfer coefficient also depends upon the velocity of the steam in the boiler tubes.  Any change in pressure causes a change in steam density and so alters the steam velocities and heat transfer rate in each zone.  Pressure and temperature cause the boiler tubes to expand. If conditions change, the tubes will move. The tube supports must be capable of accommodating this movement.  The expansion movements must not lead to adverse stresses.  The ability to use sliding pressure operation is determined by the boiler Boilers can be designed to accommodate sliding pressure.  When it is used, coal fired boilers in the 500 to 1000 MW class normally restrict sliding pressure to a limited load range, typically 70% to 100% load, to minimize the design challenge. Below this range, the boiler is operated at a fixed pressure.  This achieves an acceptable result because large units are normally operated at high load for economic reasons.  In contrast, when sliding pressure is used in combined cycle plant, the steam pressure is varied over a wider load range, typically 50% to 100% load or more
  • 67.  As stated, in coal-fired plant, sliding pressure is normally restricted to a limited load range to reduce design difficulties.  In this range, the boiler pressure is held at a value 5% to 10% above the turbine internal pressure. Consequently, the governor valves throttle slightly.  The offset is provided so that the unit can respond quickly to a sudden increase in load demand simply by pulling the valves wide open.  This produces a faster load response than raising the boiler firing rate alone.The step in load which can be achieved equals the specified margin ie 5% to 10%.  The throttling margin is agreed during the tendering phase and then fixed.  A margin of 5% to 10% is usually satisfactory because most customers rely upon gas turbines, hydroelectric or pumped storage units to meet large peak loads.  The throttling margin means that the full potential gain of sliding pressure is not achieved.  Nevertheless, most of the throttling losses which would otherwise occur are recovered.
  • 68. ADVANTAGES  Temperature changes occur in the boiler and in the turbine during load changes. These can cause thermal stresses in thick walled components.  These are especially high in the turbine during constant-pressure operation. They therefore limit the maximum load transient for the unit.  By contrast, in sliding pressure operation, the temperature changes are in the evaporator section. However, the resulting thermal stresses are not limiting in the Once through boiler due to its thermo elastic design. In fixed pressure operation , temperature change in the turbine when load changes, while in sliding-pressure operation ,they change in the boiler
  • 69.  The enthalpy increase in the boiler for preheating, evaporation and superheating changes with pressure.  However, pressure is proportional to output in sliding pressure operation  In a uniformly heated tube, the transitions from preheat to evaporation and from evaporation to superheat shift automatically with load such that the main steam temperature always remains constant.
  • 70.  At loads over 25% of rated load, the water fed by a feed-water pump flows through the high pressure feed-water heater, economizer ,furnace water wall, steam-water separator, rear-wall tubes at the ceiling, and super heaters, The super heaters steam produced is supplied to the turbine.  At rated and relatively high loads the boiler is operated as a purely once through type. At partial loads, however, the boiler is operated by sliding the pressure as a function of load. 0 5 10 15 20 25 0 25 50 75 100 Turbine load (%) TurbineinletpressureMpa 24.1 Mpa 9.0 Mpa Sliding Pressure
  • 72. +1 0 -1 -2 -3 -4 20 40 60 80 100EfficiencyChange% Boiler Load % Variable Pressure CONSTANT PRESSURE Vs VARIABLE PRESSURE BOILER CHARACTERSTIC
  • 73. Benefits Of Sliding Pressure Operation ( S.P.O)  Able to maintain constant first stage turbine temperature  Reducing the thermal stresses on the component : Low Maintenance & Higher Availability  No additional pressure loss between boiler and turbine.  low Boiler Pr. at low loads. WHY NOT S.P.O. IN NATURAL/CONTROL CIRCULATION BOILERS  Circulation Problem : instabilities in circulation system due to steam formation in down comers.  Drum Level Control : water surface in drum disturbed.  Drum : (most critical thick walled component) under highest thermal stresses
  • 74. The Basis of Boiler Start-up Mode Mode Basis Restart Hot Warm Cold Stopped time 2Hr Within 6~12Hr 56Hr Within 96Hr Above SH Outlet Temp 465℃ above 300℃ above 100℃ above 100℃ below Separator Tank pr 120~200㎏/㎠ 30~120㎏/㎠ 30㎏/㎠ below 0㎏/㎠ Starting Time Startup Mode Light off →TBN Rolling(minutes) Light off → Full Load(minutes) Cold 120 420 Except Rotor and Chest Warming Time Warm 90 180 " Hot - - ․ Restart 30 90 ․ STARTING TIME
  • 75. PURGE CONDITIONS  No Boiler Trip Condition Exists  All System Power Supply Available  Unit Air Flow > 30 % BMCR  Nozzle Tilt Horizontal and Air Flow < 40 %  Both PA Fans Off  The Following Condition Exist At Oil Firing System  The HOTV / LOTV Should Be Closed  All Oil Nozzle Valve Closed  The Following Condition Exists at Coal Firing System  All Pulverisers are Off  All Feeders are Off  All Hot Air Gates Of Pulverisers are closed  All Flame Scanner on all elevation shows no Flame  Aux Air Damper At All Elevation should be modulating After Purging Boiler Light Up activites are same as in 500 MW plant
  • 76. MFT CONDITIONS  Both ID Fans Off  Both FD Fans Off  Unit Air Flow < 30 % TMCR  All Feed Water Pumps Are Off For More Than 40 Sec  2 / 3 Pressure Transmitter indicate the furnace pressure High / Low for more than 8 sec ( 150 mmwc / -180 mmwc))  2 / 3 Pressure Transmitter indicate the furnace pressure High – High / Low - Low ( 250 mmwc / - 250 mmwc)  Loss Of Re-heater Protection  EPB Pressed  All SAPH Off  Economizer Inlet Flow Low For More Than 10 Sec (223 T/Hr)  Furnace Vertical Wall Temperature High For more than 3 Sec (479 C)  SH Pressure High On Both Side (314 KSc)  SH Temperature High For More Than 20 Sec ( 590 C)  RH O/L Temperature High For More Than 20 Sec ( 590 C)  Separator Level Low-Low During Wet Mode ( 1.1 M)  Separator Level High-High During Wet Mode ( 17.7 M)
  • 77.  MFT Relay Tripped  Loss Of Fuel Trip : It Arms when any oil burner proven. it occurs when all of the following satisfied  All Feeders Are Off  HOTV Not Open or all HONV Closed  LOTV Not Open or all LONV Closed  Unit Flame Failure Trip : It Arms when any Feeder Proves it occurs when all 11 scanner elevation indicates flame failure as listed below ( Example is for only elevation A)  Feeder A & Feeder B is Off with in 2 Sec Time Delay  following condition satisfied  Any oil valve not closed on AB Elevation  3 /4 valves not proven on AB Elevation  Less Than 2 / 4 Scanner Shows Flame  Both Of The Following Condition Satisfied  Less Than 2 / 4 Scanner Flame Shows Flame  2 / 4 Oil Valves not open at AB Elevation
  • 78. Boiler Light Up Steps  Start the Secondary Air Preheater  Start one ID fan, then the corresponding FD fan and adjust air flow to a min. of 30% TMCR  Start the scanner air fan.  Adjust fan and SADC to permit a purge air flow of atleast 30% of TMCR and furnace draft of approx. -12.7 mmWC.  When fans are started, SADC should modulate the aux. air dampers to maintain WB to furnace DP at 102 mmWC(g).  Check that all other purge permissives are satisfied.  Place FTPs in service.  Check The MFT Conditions  For First Time Boiler Light Up do the Oil Leak Test  Initiate a furnace purge.
  • 79. SYSTEM / EQUIPMENT REQUIRED FOR BOILER LIGHT UP FURNACE READINESS  PRESSURE PARTS  SCANNER AIR FAN  BOTTOM ASH HOPPER READINESS  FUEL FIRING SYSTEM  START UP SYSTEM SEC AIR PATH READINESS  FD FAN  SAPH  WIND BOX / SADC FLUE GAS SYSTEM  ESP PASS A , B  ID FAN
  • 80. SYSTEM / EQUIPMENT REQUIRED FOR BOILER LIGHT UP CONDENSATE SYSTEM  CONDENSER  CEP  CPU FEED WATER SYSTEM  D/A  MDBFP # A VACCUME SYSTEM SEAL STEAM SYSTEM TURBINE ON BARRING
  • 83. Evaporator – heat absorption
  • 84. Reduced number of evaporator wall tubes.  Ensures minimum water wall flow.
  • 85. SPIRAL WALL ARRAMGEMENT AT BURNER BLOCK AREA :
  • 86. Support System for Evaporator Wall • Spiral wall  Horizontal and vertical buck stay with tension strip • Vertical wall  Horizontal buck stay