L3 CMP Games Design – Group 2
SIMS Concept Schedule


           Monday                               Tuesday                            Wednesday                     Thursday  Friday          Saturday
           AM   PM              EVE             AM              PM             EVE AM PM            EVE          AM PM EVE AM       PM EVE AM PM EVE
w/b             LightBot                        LightBot                                            Update
30.01.12        Tutorial 3-4                    Tutorial 5 to     Foyer and                         production
                                     HA4 –      7                Front                              log.
                                    Task 1                       Entrance
                                    Walkabout                    HA4 – Task
                                    and                          1 Begin
                                    choose                       schedule.
                                    areas.

                                .
w/b              LightBot                       LightBot                               Update       Update
06.02.12         Tutorial       HA4 – Task 2    Tutorial 08                            Production   Production
                 08             Foyer and                                              log.         log.
                                Front                           HA4 – Task 2
                                Entrance –                      Foyer and
                                Measured                        Front
                                diagrams                        Entrance –
                                                                Measured
                                                                diagrams
w/b             LightBot                        LightBot
13.02.12        Tutorial 09                     Tutorial 09       Update
                                                                 production
                  HA4 – Task                     HA4 - Task      log.
                 3                               3
                 Scale                           Build basic
                 template                        shell for
                 footprints                      both
                 and check                       areas.
                 proportions.                    Update
                 Update                          production
                 production                      log.
                 log.
w/b
20.02.12
H/T
w/b                                                                    Update                        HA4 – Task    HA4 – Task 2                       HA4 – Task 2
27.02.12               HA4 – Task      HA4 – Task 4       HA4 –        production                    3             Foyer –                            Front
                      3               Begin              Task 3        log.                          Additional    Begin                              Entrance –
                      Foyer and       evaluation.        Foyer and                                   measuring     measuring                          Begin
                      Front           Review             Front                                       and           and                                measuring
                      Entrance        production         Entrance                                    diagrams.     photography                        and
                      detail          log.               detail                                                                                       photography
                      added –                            added –
                      furniture,                         furniture,
                      plants,                            plants,
                      mouldings                          mouldings
                                                         etc.
w/b                                                                    Update                                      HA4 – Task 3                                      DL
                                                                                                                                                                     01
05.03.12               HA4 – Task                         HA4 –        production                                  Screenshots
                      3                                  Task 3        log.                                        of work to
                      Foyer and                          Foyer and                                                 date. Email
                      Front                              Front                                                     home.
                      Entrance                           Entrance                                                  Update
                      models                             models                                                    production
                      rendered                           rendered                                                  log.

                                                                                                                   Update
                                                                                                                   production
                                                                                                                   log.

      Harry’s Sessions

      Self-Directed

      Other Sessions

Task 1 - Outline
Choose and commit to model two areas
Produce Schedule – include LightBot overrun and new Deadline.
List any problems you might have that you need to take into account – Modeller skills, time management etc.
Start production log.

Task 2 - Plan
Shoot reference imagery and textures, make measurements and draw diagrams – Include this in your production log – either directly blogged or within a PowerPoint presentation / Word
document.
Schedule in review sessions.

Task3 - Respond
Build the two objects in stages – be careful not to focus on just one or parts of one.
Plan out the production carefully – break it up into chunks.

Task 4 - Review
Write an evaluation of your project. Leave enough time for this before the deadline.
You can’t fully evaluate the work until the project is finished and presented.




          Monday                                  Tuesday                            Wednesday               Thursday      Friday             Saturday      Sunday
          A   PM                 EVE              AM             PM            EV    A   PM       EVE        A   P    EV   AM       PM   EV   A    P   EV   A   P    EV
          M                                                                    E     M                       M M E                       E    M M E         M M      E
w/b              LightBot                         LightBot                                        Update
30.01.           Tutorial 3-4                     Tutorial 5       Foyer                          producti
12                                     HA4 –      to 7            and                             on log.
                                      Task 1                      Front
                                      Walkab                      Entranc
                                      out and                     e
                                      choose                      HA4 –
                                      areas.                      Task 1
                                                                  Begin
                                  .                               schedul
                                                                  e.
w/b               LightBo                         LightBot                               Update
06.02.    t            HA4 –         Tutorial 08                Producti
12        Tutoria      Task 2                                   on log.
          l 08         Foyer and                   Update
                       Front                       production
                       Entrance –                  log
                       Measured
                       diagrams
w/b      LightBot                    LightBot
13.02.   Tutorial 09                 Tutorial 09    Update
12                                                  producti
           HA4 –                      HA4 -         on log.
          Task 3                      Task 3
          Scale                       Build
          template                    basic
          footprints                  shell for
          and check                   both
          proportio                   areas.
          ns.                         Update
          Update                      producti
          productio                   on log.
          n log.
w/b
20.02.
12 H/T
w/b                                                Update       HA4 –
27.02.     HA4 –        HA4 –          HA4 –       production   Task 3
12        Task 3       Task 4         Task 3       log.         Addition
          Foyer and    Begin          Foyer                     al
          Front        evaluation.    and                       measuri
          Entrance     Review         Front                     ng and
          detail       production     Entranc                   diagram
          added –      log.           e detail                  s.
          furniture,                  added –
          plants,                     furnitur
          moulding                    e,
          s                           plants,
                                      mouldin
                                      gs etc.
w/b                                                Update                  HA4 –      DL 01
05.03.    HA4 –                       HA4 –        production              Task 3
12        Task 3                      Task 3       log.                    Screensh
          Foyer and                   Foyer                                ots of
          Front                       and                                  work to
Entrance                     Front                    date.
               models                       Entranc                  Email
               rendered                     e                        home.
                                            models                   Update
                                            rendere                  producti
                                            d                        on log.

                                                                     Update
                                                                     producti
                                                                     on log.

w/b          LightBot                      LightBot                  HA4 –      HA4 –      HA4 –
12.03.       Tutorial 3-4                  Tutorial 5    HA –        Task 3     Task 3     Task 3
12                           .             to 7          Task 3      Addition   Foyer      Foyer
                                                         Foyer       al         and        and
                                                         and         measurin   Front      Front
                                                         Front       g and      Entranc    Entranc
                                                         Entranc     diagrams   e          e detail
                                                         e           .          models     added –
                                                                     Update     rendere    furnitur
                                                                     producti   d          e,
                                                                     on log.    through    plants,
                                                                                Layout.    mouldi
                                                                                           ngs etc.
                                                                                           HA4 –

w/b          HA4 – Task 3   Task 4                      HA4 – Task              Update
19.03.       Foyer and      Evaluation.                 3                       producti
12           Front          Upload                      Additional              on log.
             Entrance       production                  measuring
             detail added   log to blog.                and
             – furniture,                               diagrams.
             plants,        Update                      Update
             mouldings      production                  production
             etc.           log.                        log.

w/b                                                                                        DL 02
26.03.
12

     Harry’s Sessions
Self-Directed

     Other Sessions




         Monday                            Tuesday                         Wednesday                 Thursday      Friday             Saturday      Sunday
         A   PM              EVE           AM            PM           EV   A   PM         EVE        A   P    EV   AM       PM   EV   A    P   EV   A   P    EV
         M                                                            E    M                         M M E                       E    M M E         M M      E
w/b           LightBot                     LightBot                                       Update
30.01.        Tutorial 3-4                 Tutorial 5      Foyer                          producti
12                                HA4 –    to 7           and                             on log.
                                 Task 1                   Front
                                 Walkab                   Entranc
                                 out and                  e
                                 choose                   HA4 –
                                 areas.                   Task 1
                                                          Begin
                             .                            schedul
                                                          e.
w/b            LightBo                     LightBot                            Update
06.02.         t             HA4 –         Tutorial 08                         Producti
12             Tutoria       Task 2                                            on log.
               l 08          Foyer and                   Update
                             Front                       production
                             Entrance –                  log
                             Measured
                             diagrams
w/b           LightBot                     LightBot
13.02.        Tutorial 09                  Tutorial 09    Update
12                                                        producti
                HA4 –                       HA4 -         on log.
               Task 3                       Task 3
               Scale                        Build
               template                     basic
               footprints                   shell for
               and check                    both
               proportio                    areas.
               ns.                          Update
               Update                       producti
productio                  on log.
         n log.



w/b
20.02.
12 H/T
w/b                                            Update       HA4 –
27.02.    HA4 –        HA4 –         HA4 –     production   Task 3
12       Task 3       Task 4        Task 3     log.         Addition
         Foyer and    Begin         Foyer                   al
         Front        evaluation.   and                     measuri
         Entrance     Review        Front                   ng and
         detail       production    Entranc                 diagram
         added –      log.          e detail                s.
         furniture,                 added –
         plants,                    furnitur
         moulding                   e,
         s                          plants,
                                    mouldin
                                    gs etc.
w/b                                            Update                  HA4 –      DL 01
05.03.    HA4 –                      HA4 –     production              Task 3
12       Task 3                     Task 3     log.                    Screensh
         Foyer and                  Foyer                              ots of
         Front                      and                                work to
         Entrance                   Front                              date.
         models                     Entranc                            Email
         rendered                   e                                  home.
                                    models                             Update
                                    rendere                            producti
                                    d                                  on log.

                                                                       Update
                                                                       producti
                                                                       on log.
w/b           LightBot                      LightBot                  HA4 –      HA4 –      HA4 –
12.03.        Tutorial 3-4                  Tutorial 5    HA –        Task 3     Task 3     Task 3
12                            .             to 7          Task 3      Addition   Foyer      Foyer
                                                          Foyer       al         and        and
                                                          and         measurin   Front      Front
                                                          Front       g and      Entranc    Entranc
                                                          Entranc     diagrams   e          e detail
                                                          e           .          models     added –
                                                                      Update     rendere    furnitur
                                                                      producti   d          e,
                                                                      on log.    through    plants,
                                                                                 Layout.    mouldi
                                                                                            ngs etc.
                                                                                            HA4 –

w/b           HA4 – Task 3   Task 4                      HA4 – Task              Update
19.03.        Foyer and      Evaluation.                 3                       producti
12            Front          Upload                      Additional              on log.
              Entrance       production                  measuring
              detail added   log to blog.                and
              – furniture,                               diagrams.
              plants,        Update                      Update
              mouldings      production                  production
              etc.           log.                        log.

w/b                                                                                         DL 02
26.03.
12


w/b
16.04.
12
w/b                                                                                         DL 03
23.04.
12

     Harry’s Sessions

     Self-Directed
Other Sessions

Weitere ähnliche Inhalte

Was ist angesagt? (7)

Schedule 200312
Schedule 200312Schedule 200312
Schedule 200312
 
Sims schedule
Sims scheduleSims schedule
Sims schedule
 
Sims schedule_sample group1_13/03/12
Sims schedule_sample group1_13/03/12Sims schedule_sample group1_13/03/12
Sims schedule_sample group1_13/03/12
 
SIMS Modelling Project Schedule
SIMS Modelling Project ScheduleSIMS Modelling Project Schedule
SIMS Modelling Project Schedule
 
Assumption University Of Thailand ACT1600 PPT 2009 CH04
Assumption University Of Thailand  ACT1600 PPT 2009 CH04Assumption University Of Thailand  ACT1600 PPT 2009 CH04
Assumption University Of Thailand ACT1600 PPT 2009 CH04
 
Scalable Website C12009 1
Scalable Website C12009 1Scalable Website C12009 1
Scalable Website C12009 1
 
Map Reduce An Introduction
Map Reduce An IntroductionMap Reduce An Introduction
Map Reduce An Introduction
 

Andere mochten auch

Trailer analysis
Trailer analysisTrailer analysis
Trailer analysis
juzzybusta
 
Pex week2012final
Pex week2012finalPex week2012final
Pex week2012final
Ambanectar1
 
Production log - Student Area D
Production log - Student Area DProduction log - Student Area D
Production log - Student Area D
hamza_123456
 
HA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The Basics
HA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The BasicsHA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The Basics
HA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The Basics
hamza_123456
 
HA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The Basics
HA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The BasicsHA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The Basics
HA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The Basics
hamza_123456
 
Project 4 robert ppt
Project 4  robert pptProject 4  robert ppt
Project 4 robert ppt
tchang31128
 
2011 riverview opening reception
2011 riverview opening reception2011 riverview opening reception
2011 riverview opening reception
Ti-tanic
 
Taco[1][2]
Taco[1][2]Taco[1][2]
Taco[1][2]
czjudy
 

Andere mochten auch (19)

Trailer analysis
Trailer analysisTrailer analysis
Trailer analysis
 
Pex week2012final
Pex week2012finalPex week2012final
Pex week2012final
 
Job choices
Job choicesJob choices
Job choices
 
A Lovely Day
A Lovely DayA Lovely Day
A Lovely Day
 
Little Dude
Little DudeLittle Dude
Little Dude
 
Production log
Production log  Production log
Production log
 
Production log - Student Area D
Production log - Student Area DProduction log - Student Area D
Production log - Student Area D
 
HA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The Basics
HA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The BasicsHA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The Basics
HA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The Basics
 
Game review
Game reviewGame review
Game review
 
HA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The Basics
HA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The BasicsHA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The Basics
HA5 – COMPUTER ARTS BLOG ARTICLE – 3D: The Basics
 
Games design
Games designGames design
Games design
 
Games design
Games designGames design
Games design
 
Spanish 6
Spanish 6Spanish 6
Spanish 6
 
Project 4 robert ppt
Project 4  robert pptProject 4  robert ppt
Project 4 robert ppt
 
2011 riverview opening reception
2011 riverview opening reception2011 riverview opening reception
2011 riverview opening reception
 
Task 1 outline
Task 1  outlineTask 1  outline
Task 1 outline
 
Ideas generation
Ideas generationIdeas generation
Ideas generation
 
3D - The Basics
3D - The Basics 3D - The Basics
3D - The Basics
 
Taco[1][2]
Taco[1][2]Taco[1][2]
Taco[1][2]
 

Ähnlich wie Sims schedule

John Forrest's Sims project schedule
John Forrest's Sims project schedule John Forrest's Sims project schedule
John Forrest's Sims project schedule
WildOakForrest
 
Sims schedule sample_completedgroup2_130312
Sims schedule sample_completedgroup2_130312Sims schedule sample_completedgroup2_130312
Sims schedule sample_completedgroup2_130312
davidsharples11
 
Sims schedule_group1_13.03.12
Sims schedule_group1_13.03.12Sims schedule_group1_13.03.12
Sims schedule_group1_13.03.12
cassie_coyne
 
Sims schedule 190312
Sims schedule 190312Sims schedule 190312
Sims schedule 190312
j45a45ck
 
Sims schedule 190312
Sims schedule 190312Sims schedule 190312
Sims schedule 190312
j45a45ck
 
Sims schedule
Sims scheduleSims schedule
Sims schedule
Dom9533
 

Ähnlich wie Sims schedule (7)

John Forrest's Sims project schedule
John Forrest's Sims project schedule John Forrest's Sims project schedule
John Forrest's Sims project schedule
 
Sims schedule sample_completedgroup2_130312
Sims schedule sample_completedgroup2_130312Sims schedule sample_completedgroup2_130312
Sims schedule sample_completedgroup2_130312
 
Sims schedule_group1_13.03.12
Sims schedule_group1_13.03.12Sims schedule_group1_13.03.12
Sims schedule_group1_13.03.12
 
Schedule
ScheduleSchedule
Schedule
 
Sims schedule 190312
Sims schedule 190312Sims schedule 190312
Sims schedule 190312
 
Sims schedule 190312
Sims schedule 190312Sims schedule 190312
Sims schedule 190312
 
Sims schedule
Sims scheduleSims schedule
Sims schedule
 

Mehr von hamza_123456

Finacnial issues and market trends
Finacnial issues and market trendsFinacnial issues and market trends
Finacnial issues and market trends
hamza_123456
 
Programming sounds
Programming soundsProgramming sounds
Programming sounds
hamza_123456
 
The strongest app idea
The strongest app ideaThe strongest app idea
The strongest app idea
hamza_123456
 
Questionnaire results
Questionnaire resultsQuestionnaire results
Questionnaire results
hamza_123456
 
App concept schedule
App concept scheduleApp concept schedule
App concept schedule
hamza_123456
 
App concept schedule
App concept scheduleApp concept schedule
App concept schedule
hamza_123456
 
Questionairre Result
Questionairre ResultQuestionairre Result
Questionairre Result
hamza_123456
 
Task 4 - Analysis of a Game
Task 4 - Analysis of a GameTask 4 - Analysis of a Game
Task 4 - Analysis of a Game
hamza_123456
 
Creating Sample Library Assignment Brief
Creating Sample Library Assignment BriefCreating Sample Library Assignment Brief
Creating Sample Library Assignment Brief
hamza_123456
 

Mehr von hamza_123456 (17)

To do list
To do listTo do list
To do list
 
Finacnial issues and market trends
Finacnial issues and market trendsFinacnial issues and market trends
Finacnial issues and market trends
 
Programming sounds
Programming soundsProgramming sounds
Programming sounds
 
The strongest app idea
The strongest app ideaThe strongest app idea
The strongest app idea
 
Questionnaire results
Questionnaire resultsQuestionnaire results
Questionnaire results
 
Development Plan
Development PlanDevelopment Plan
Development Plan
 
App concept schedule
App concept scheduleApp concept schedule
App concept schedule
 
App concept schedule
App concept scheduleApp concept schedule
App concept schedule
 
Skyrim Review
Skyrim ReviewSkyrim Review
Skyrim Review
 
Questionairre Result
Questionairre ResultQuestionairre Result
Questionairre Result
 
Review
ReviewReview
Review
 
Production log
Production logProduction log
Production log
 
Task 1 - Outline
Task 1 - OutlineTask 1 - Outline
Task 1 - Outline
 
Task 4 - Analysis of a Game
Task 4 - Analysis of a GameTask 4 - Analysis of a Game
Task 4 - Analysis of a Game
 
Task 2 - Plan
Task 2 - PlanTask 2 - Plan
Task 2 - Plan
 
Creating Sample Library Assignment Brief
Creating Sample Library Assignment BriefCreating Sample Library Assignment Brief
Creating Sample Library Assignment Brief
 
Job roles
Job rolesJob roles
Job roles
 

Kürzlich hochgeladen

Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
mriyagarg453
 
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
rajveermohali2022
 
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
amitlee9823
 
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Kürzlich hochgeladen (20)

Hotel And Home Service Available Kolkata Call Girls Diamond Harbour ✔ 6297143...
Hotel And Home Service Available Kolkata Call Girls Diamond Harbour ✔ 6297143...Hotel And Home Service Available Kolkata Call Girls Diamond Harbour ✔ 6297143...
Hotel And Home Service Available Kolkata Call Girls Diamond Harbour ✔ 6297143...
 
Model Call Girls In Velappanchavadi WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Velappanchavadi WhatsApp Booking 7427069034 call girl ser...Model Call Girls In Velappanchavadi WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Velappanchavadi WhatsApp Booking 7427069034 call girl ser...
 
Top Rated Kolkata Call Girls Dum Dum ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated Kolkata Call Girls Dum Dum ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...Top Rated Kolkata Call Girls Dum Dum ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated Kolkata Call Girls Dum Dum ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
 
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
Navsari Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girl...
 
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service AvailableCall Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
 
Top Rated Kolkata Call Girls Khardah ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated Kolkata Call Girls Khardah ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...Top Rated Kolkata Call Girls Khardah ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated Kolkata Call Girls Khardah ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
 
(TOP CLASS) Call Girls In Nungambakkam Phone 7427069034 Call Girls Model With...
(TOP CLASS) Call Girls In Nungambakkam Phone 7427069034 Call Girls Model With...(TOP CLASS) Call Girls In Nungambakkam Phone 7427069034 Call Girls Model With...
(TOP CLASS) Call Girls In Nungambakkam Phone 7427069034 Call Girls Model With...
 
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
 
Dum Dum ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready...
Dum Dum ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready...Dum Dum ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready...
Dum Dum ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready...
 
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
 
VIP Model Call Girls Vijayawada ( Pune ) Call ON 8005736733 Starting From 5K ...
VIP Model Call Girls Vijayawada ( Pune ) Call ON 8005736733 Starting From 5K ...VIP Model Call Girls Vijayawada ( Pune ) Call ON 8005736733 Starting From 5K ...
VIP Model Call Girls Vijayawada ( Pune ) Call ON 8005736733 Starting From 5K ...
 
Borum Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Borum Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceBorum Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Borum Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Call Girls Bellandur ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
Hire 💕 8617697112 North Sikkim Call Girls Service Call Girls Agency
Hire 💕 8617697112 North Sikkim Call Girls Service Call Girls AgencyHire 💕 8617697112 North Sikkim Call Girls Service Call Girls Agency
Hire 💕 8617697112 North Sikkim Call Girls Service Call Girls Agency
 
VIP Model Call Girls Koregaon Park ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Koregaon Park ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Koregaon Park ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Koregaon Park ( Pune ) Call ON 8005736733 Starting From ...
 
Hotel And Home Service Available Kolkata Call Girls Howrah ✔ 6297143586 ✔Call...
Hotel And Home Service Available Kolkata Call Girls Howrah ✔ 6297143586 ✔Call...Hotel And Home Service Available Kolkata Call Girls Howrah ✔ 6297143586 ✔Call...
Hotel And Home Service Available Kolkata Call Girls Howrah ✔ 6297143586 ✔Call...
 
Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...
Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...
Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...
 
𓀤Call On 6297143586 𓀤 Sonagachi Call Girls In All Kolkata 24/7 Provide Call W...
𓀤Call On 6297143586 𓀤 Sonagachi Call Girls In All Kolkata 24/7 Provide Call W...𓀤Call On 6297143586 𓀤 Sonagachi Call Girls In All Kolkata 24/7 Provide Call W...
𓀤Call On 6297143586 𓀤 Sonagachi Call Girls In All Kolkata 24/7 Provide Call W...
 
Hotel And Home Service Available Kolkata Call Girls Dum Dum ✔ 6297143586 ✔Cal...
Hotel And Home Service Available Kolkata Call Girls Dum Dum ✔ 6297143586 ✔Cal...Hotel And Home Service Available Kolkata Call Girls Dum Dum ✔ 6297143586 ✔Cal...
Hotel And Home Service Available Kolkata Call Girls Dum Dum ✔ 6297143586 ✔Cal...
 

Sims schedule

  • 1. L3 CMP Games Design – Group 2 SIMS Concept Schedule Monday Tuesday Wednesday Thursday Friday Saturday AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE w/b LightBot LightBot Update 30.01.12 Tutorial 3-4 Tutorial 5 to Foyer and production HA4 – 7 Front log. Task 1 Entrance Walkabout HA4 – Task and 1 Begin choose schedule. areas. . w/b LightBot LightBot Update Update 06.02.12 Tutorial HA4 – Task 2 Tutorial 08 Production Production 08 Foyer and log. log. Front HA4 – Task 2 Entrance – Foyer and Measured Front diagrams Entrance – Measured diagrams w/b LightBot LightBot 13.02.12 Tutorial 09 Tutorial 09 Update production HA4 – Task HA4 - Task log. 3 3 Scale Build basic template shell for footprints both and check areas. proportions. Update Update production production log. log. w/b 20.02.12 H/T
  • 2. w/b Update HA4 – Task HA4 – Task 2 HA4 – Task 2 27.02.12 HA4 – Task HA4 – Task 4 HA4 – production 3 Foyer – Front 3 Begin Task 3 log. Additional Begin Entrance – Foyer and evaluation. Foyer and measuring measuring Begin Front Review Front and and measuring Entrance production Entrance diagrams. photography and detail log. detail photography added – added – furniture, furniture, plants, plants, mouldings mouldings etc. w/b Update HA4 – Task 3 DL 01 05.03.12 HA4 – Task HA4 – production Screenshots 3 Task 3 log. of work to Foyer and Foyer and date. Email Front Front home. Entrance Entrance Update models models production rendered rendered log. Update production log. Harry’s Sessions Self-Directed Other Sessions Task 1 - Outline Choose and commit to model two areas Produce Schedule – include LightBot overrun and new Deadline. List any problems you might have that you need to take into account – Modeller skills, time management etc. Start production log. Task 2 - Plan Shoot reference imagery and textures, make measurements and draw diagrams – Include this in your production log – either directly blogged or within a PowerPoint presentation / Word document. Schedule in review sessions. Task3 - Respond
  • 3. Build the two objects in stages – be careful not to focus on just one or parts of one. Plan out the production carefully – break it up into chunks. Task 4 - Review Write an evaluation of your project. Leave enough time for this before the deadline. You can’t fully evaluate the work until the project is finished and presented. Monday Tuesday Wednesday Thursday Friday Saturday Sunday A PM EVE AM PM EV A PM EVE A P EV AM PM EV A P EV A P EV M E M M M E E M M E M M E w/b LightBot LightBot Update 30.01. Tutorial 3-4 Tutorial 5 Foyer producti 12 HA4 – to 7 and on log. Task 1 Front Walkab Entranc out and e choose HA4 – areas. Task 1 Begin . schedul e. w/b LightBo LightBot Update
  • 4. 06.02. t HA4 – Tutorial 08 Producti 12 Tutoria Task 2 on log. l 08 Foyer and Update Front production Entrance – log Measured diagrams w/b LightBot LightBot 13.02. Tutorial 09 Tutorial 09 Update 12 producti HA4 – HA4 - on log. Task 3 Task 3 Scale Build template basic footprints shell for and check both proportio areas. ns. Update Update producti productio on log. n log. w/b 20.02. 12 H/T w/b Update HA4 – 27.02. HA4 – HA4 – HA4 – production Task 3 12 Task 3 Task 4 Task 3 log. Addition Foyer and Begin Foyer al Front evaluation. and measuri Entrance Review Front ng and detail production Entranc diagram added – log. e detail s. furniture, added – plants, furnitur moulding e, s plants, mouldin gs etc. w/b Update HA4 – DL 01 05.03. HA4 – HA4 – production Task 3 12 Task 3 Task 3 log. Screensh Foyer and Foyer ots of Front and work to
  • 5. Entrance Front date. models Entranc Email rendered e home. models Update rendere producti d on log. Update producti on log. w/b LightBot LightBot HA4 – HA4 – HA4 – 12.03. Tutorial 3-4 Tutorial 5 HA – Task 3 Task 3 Task 3 12 . to 7 Task 3 Addition Foyer Foyer Foyer al and and and measurin Front Front Front g and Entranc Entranc Entranc diagrams e e detail e . models added – Update rendere furnitur producti d e, on log. through plants, Layout. mouldi ngs etc. HA4 – w/b HA4 – Task 3 Task 4 HA4 – Task Update 19.03. Foyer and Evaluation. 3 producti 12 Front Upload Additional on log. Entrance production measuring detail added log to blog. and – furniture, diagrams. plants, Update Update mouldings production production etc. log. log. w/b DL 02 26.03. 12 Harry’s Sessions
  • 6. Self-Directed Other Sessions Monday Tuesday Wednesday Thursday Friday Saturday Sunday A PM EVE AM PM EV A PM EVE A P EV AM PM EV A P EV A P EV M E M M M E E M M E M M E w/b LightBot LightBot Update 30.01. Tutorial 3-4 Tutorial 5 Foyer producti 12 HA4 – to 7 and on log. Task 1 Front Walkab Entranc out and e choose HA4 – areas. Task 1 Begin . schedul e. w/b LightBo LightBot Update 06.02. t HA4 – Tutorial 08 Producti 12 Tutoria Task 2 on log. l 08 Foyer and Update Front production Entrance – log Measured diagrams w/b LightBot LightBot 13.02. Tutorial 09 Tutorial 09 Update 12 producti HA4 – HA4 - on log. Task 3 Task 3 Scale Build template basic footprints shell for and check both proportio areas. ns. Update Update producti
  • 7. productio on log. n log. w/b 20.02. 12 H/T w/b Update HA4 – 27.02. HA4 – HA4 – HA4 – production Task 3 12 Task 3 Task 4 Task 3 log. Addition Foyer and Begin Foyer al Front evaluation. and measuri Entrance Review Front ng and detail production Entranc diagram added – log. e detail s. furniture, added – plants, furnitur moulding e, s plants, mouldin gs etc. w/b Update HA4 – DL 01 05.03. HA4 – HA4 – production Task 3 12 Task 3 Task 3 log. Screensh Foyer and Foyer ots of Front and work to Entrance Front date. models Entranc Email rendered e home. models Update rendere producti d on log. Update producti on log.
  • 8. w/b LightBot LightBot HA4 – HA4 – HA4 – 12.03. Tutorial 3-4 Tutorial 5 HA – Task 3 Task 3 Task 3 12 . to 7 Task 3 Addition Foyer Foyer Foyer al and and and measurin Front Front Front g and Entranc Entranc Entranc diagrams e e detail e . models added – Update rendere furnitur producti d e, on log. through plants, Layout. mouldi ngs etc. HA4 – w/b HA4 – Task 3 Task 4 HA4 – Task Update 19.03. Foyer and Evaluation. 3 producti 12 Front Upload Additional on log. Entrance production measuring detail added log to blog. and – furniture, diagrams. plants, Update Update mouldings production production etc. log. log. w/b DL 02 26.03. 12 w/b 16.04. 12 w/b DL 03 23.04. 12 Harry’s Sessions Self-Directed