SlideShare ist ein Scribd-Unternehmen logo
1 von 20
Downloaden Sie, um offline zu lesen
freewaysand urbanroads




w w w. m e i n h a rd t g ro u p . c o m
TaBLEof ConTEnTs



                                 Company profile ................................................................1

                                 ToTally inTegraTed soluTions ......................................2

                                 1.     Transport .......................................................................3

                                 2.     freeways & urban roads .............................................4
                                 2.1    Relevant Project Experience ............................................................. 5
                                 2.2    Developer Funded Works .................................................................. 18




| freeways and urban roads CapabiliTy sTaTemenT |
CoMPanYprofile
                                                              1. aviaTion


                                                              Established in Australia in 1955 and              ProPErTY
                                                              now operating in fourteen countries               >      Urban / Land development
                                                              across four continents, Meinhardt is
                                                              recognised as a leading global provider           >      Leisure and recreation
                                                              of planning, engineering, management,             >      Town Planning
                                                              sustainability and technology
                                                                                                                >      Commercial / retail / Industrial
                                                              consulting services.
                                                                                                                >      Multi-storey Buildings
                                                              We focus is the following key market
                                                              sectors:                                          >      Esd and sustainability
                                                                                                                EnVIronMEnT
                                                                                                                >      Hydrogeology
                                                                                                                >      Water Quality
                                                                                                                >      Contaminated soil
                                                                                                                >      Waste Management
                                                                                                                >      alternative Waste Treatment
                                                                                                                >      Environmental Planning
                                                                                                                TransPorT
                                                                                                                >      Freeways
                                                                                                                >      aviation
                                                                                                                >      Heavy and Light rail
  London
                                                  Beijing                                                       >      Public Transport
                                                                                                           Miami >     Ports and maritime
                                                       Shanghai                                   Dallas
                                                 Shenzhen
                                                              Hong Kong
                       Islamabad
                                                  Macao
                                                                                                                our service offering includes
                                    Lahore    Hanoi
            Bahrain     New Delhi
                                             Bangkok
                                                                                                                conceptualization, feasibility, master
              Qatar                                      Da Nang Manila
           Abu Dhabi    Dubai Karachi                                                                           planning, total project management,
                          Chennai
                                     Kuala Lumpur
                                                         Ho Chi Minh
                                                                                                                investigation and reporting, stakeholder
                                             Singapore                                                          consultation, planning and environmental
                                                                                                                approvals, Esd rating and energy audits,
                                                 Jakarta
                                                                                                                EEs, detailed design, documentation,
                                                                                                                construction quality assurance,
                                                                                       Brisbane                 commissioning and asset management.
                                                                          Adelaide    Sydney
                                                                          Melbourne                             These core services are available
                                                                                                                throughout australia, asia, Middle East,
                                                                                                                United Kingdom and the Us.

| freeways and urban roads CapabiliTy sTaTemenT p. 1 |
ToTaLLYinTegraTed soLUTIons
                                  1. aviaTion


                                  Meinhardt is one of the few australian        our philosophy is simple: our clients’
                                  truly multi-disciplinary consulting firms     needs are paramount. Yet determining
                                  operating on a global basis.                  those needs is rarely a simple task. In
                                                                                order to exceed your expectations, we
                                  our team operates within a highly
                                                                                take the time to understand our clients’
                                  integrated environment developed in
                                                                                perspective and relevant drivers. The
                                  response to the often complex interfacing
                                                                                outcome must be a flexible solution
                                  requirements between internally
                                                                                providing value add opportunities beyond
                                  disciplines and externally.
                                                                                delivering on key project objectives.
                                  This integration provides demonstrable
                                                                                Further information regarding our people,
                                  benefit to our clients who appreciate our
                                                                                services, projects and a host of other
                                  design solutions are fully coordinated and
                                                                                relevant information can be found at our
                                  holistic and program milestones are driven
                                                                                website: www.meinhardtgroup.com.
                                  internally.
                                  as a multi-disciplinary practice we provide
                                  a total solutions and a collegiate team
                                  approach to all aspects of a project.
                                  The Meinhardt Group maintains a
                                  centralised knowledge and technology
                                  base providing ready access to specialist
                                  skills and knowledge, key personnel and
                                  communication across disciplines and
                                  geographical areas.
                                  our systems and structure enable us to
                                  readily undertake complex national and
                                  international projects within a multiple
                                  project office platform.




| freeways and urban roads CapabiliTy sTaTemenT p. 2 |
1.          TransporT


Specific areas in which Meinhardt offers    Heavy and Light Rail                      Environmental Impact
Transportation Engineering services to
private and government bodies are:          >     Station upgrades, fit out DDA       >      Environmental effects statement
                                                  access                              >      Contaminated land assessment
>      Freeways
                                            >     Tunnelling and design of subway     >      EMP (water quality, Flora, fauna &
>      aviation                                   systems                                    cultural heritage)
>      Heavy and Light rail                 >     Track, sidings, stabling and wash   >      due diligence, auditing and
>      Public Transport                           down facilities                            strategic advice
>      Tunneling                            >     Inter-modal freight connectivity
                                                                                      Meinhardt takes pride in delivering
>      Environmental impact                 Public Transport                          a “commercial” approach to project
                                                                                      implementation, to add value and build
Freeways                                    >     Planning, route selection and       upon your key objectives. our services
                                                  feasibility                         and exposure spans across a number
>      Preconstruction services and
       preliminary design                   >     Concept and detailed engineering    of regions and market sectors, which
                                                  design                              enables us to bring the latest new
>      Freeway road geometry and
                                                                                      technologies and ideas to your project.
       drainage design                      >     Inter-modal connectivity and dda
                                                  access                              Meinhardt is not a listed company. We
>      Bridges, barriers, noise walls and
                                            >     Local area traffic management       value our brand. We are flexible, driven by
       complex structures
                                                                                      relationships and tailor our service offering
>      Project governance and financing     Tunneling                                 to best address your business needs.
Aviation                                    >     Concept design and value
                                                  engineering studies
>      Terminal planning and detailed
       engineering design                   >     Multi-disciplinary engineering
                                                  design
>      runway, taxiway and apron
       geometry and services                >     soft ground & rock tunneling

>      aircraft hangars and maintenance     >     Ventilation systems
       facilities
>      Project management and
       construction quality control




| freeways and urban roads CapabiliTy sTaTemenT p. 3 |
2.         freewaysand
                                             urbanroads


                                  Freeway networks remain a cornerstone           Meinhardt provides expert services in:
                                  of our integrated transport systems and         >      Preliminary design and
                                  play a major role driving our economy                  preconstruction services
                                  through the movement of people and
                                  freight.                                        >      Freeways and urban road design

                                  designing modern freeway networks               >      Bridges and complex structural
                                  requires a delicate balance between                    design
                                  the often competing demands of safety,          >      Hydrology and hydraulic design
                                  accessibility, pricing, and efficiency within
                                                                                  >      soft ground and rock tunneling
                                  the complex framework of economics,
                                  social behaviour, cultural heritage and the     >      Traffic control and ITS systems
                                  environment.                                    >      road lighting and electrical design
                                  To build and maintain a network which           >      specialist pavement design
                                  best serves the needs of business and
                                                                                  >      Project management
                                  our community we rely on accurate
                                  strategic planning, environmental and           >      site investigation and service
                                  planning controls, best practice detailed              relocations
                                  designs, the use of new technologies,           >      Town and land use planning
                                  state of the art construction techniques
                                  and procurement methods which promote           >      Environmental science
                                  value adding opportunity.                       >      Water quality
                                                                                  >      Flora and fauna
                                                                                  >      Cultural heritage
                                                                                  >      Contract administration
                                                                                  >      Construction supervision
                                                                                  >      Financial review and assessment
                                                                                  Meinhardt has the capability and
                                                                                  balance sheet to participate in major
                                                                                  project alliances, PPP, d&C and other
                                                                                  procurement alternatives in addition to
                                                                                  the delivery of conventional consulting
                                                                                  services.
                                                                                  Whether participating in a major freeway
                                                                                  alliance or resolving access requirements
                                                                                  for the creation of an exciting new
                                                                                  residential community, Meinhardt delivers
                                                                                  simple and effective solutions within often
                                                                                  complex environments.
| freeways and urban roads CapabiliTy sTaTemenT p. 4 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                                  | freeways& urbanroads |




Cragieburn Bypass                                                                             The Peninsula Link

The Craigieburn bridge and sound walls        The Pedestrian Bridge is the climax of          The Peninsula Link is a 25 kilometre
are located on the new 23km Craigieburn       the Curtain Wall, and the whole gateway         four-lane freeway connecting EastLink
Bypass which links the Hume Highway           experience. Carefully sited at the point        at Carrum downs to the Mornington
with the Melbourne ring road, north of        where the motorist first sees the City of       Peninsula Freeway at Mount Martha. It
Melbourne, Victoria.                          Melbourne spread out on the horizon,            includes nine interchanges at EastLink,
                                              it is developed as a curtain that lifts to      dandenong- Frankston rd, skye rd,
Vicroads engaged Taylor and Cullity           frame that glittering first view to the city.   Cranbourne-Frankston rd, Golf Links
Lethlean along with Meinhardt at the          similarly on leaving, it frames a view of the   rd, Frankston-Flinders rd, Bungower
tender development stage to provide           extended grasslands – the beginning of          rd, Mornington-Tyabb road and the
an exciting group of elements along the       the great australian landscape.                 Mornington Peninsula Freeway in Mount
freeway. These features set this road apart                                                   Martha. at its Frankston end, Peninsula
but also provide function in protecting       This innovative project was the winner of
                                                                                              Link is expected to carry more than
neighbouring properties from road             the 2006 asI (australian steel Institute)
                                                                                              60,000 vehicles each day, while up to
generated noise.                              Creative Innovations steel design award
                                                                                              45,000 vehicles each day are expected
                                              for the Bridge and soundwalls.
The three elements developed for the                                                          south of Baxter. The project includes
Craigieburn Bypass are orchestrated           Melbourne, Australia                            the construction of a new shared use
as a cohesive project with the freeway                                                        path connecting to the EastLink Trail for
itself and its bridges and earthworks. The                                                    pedestrians and cyclists to enjoy.
Curtain Wall is designed to be a travelling                                                   Linking Melbourne authority (previously
companion for a significant part of the                                                       sEITa) will deliver the project as a Public
journey. Its height set by noise control                                                      Private Partnership (PPP) to build, own,
parameters, it is a fluid form; dynamic                                                       operate and ultimately transfer road
and experiential. Composed a ribbon of                                                        infrastructure to the state. Meinhardt are
fabricated sheets of weathered steel, 1/3rd                                                   engaged by Linking Melbourne authority
lifted off the ground. It is a lightweight                                                    to assist in the technical assessment of
screen, a land form and ultimately a                                                          the tender submission.
pedestrian bridge but also a transforming
edge, merging into different forms and                                                        Melbourne, Victoria
functions along its route as it meets
various bounding conditions.




| freeways and urban roads CapabiliTy sTaTemenT p. 5 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                                   | freeways& urbanroads |




Melbourne M80 Ring Road Upgrade –              Western Freeway Realignment – Melton        Essendon Fields - Northern Access
Preconstruction (Business Case)                to Bacchus Marsh (Anthony’s Cutting)        Essendon Airport
                                               Preconstruction (Risk Band Estimate)        (Design and Project Management)
The $2.25 billion M80 ring road Upgrade
project will upgrade and widen the             The $200 million realignment of the         The northern access road project
Western ring road and Metropolitan ring        Western Freeway between Melton and          provides a critical transport link to the
road in Melbourne for its full extent from     Bacchus Marsh will create a new divided     Tullamarine Freeway and surrounding
altona to Greensborough, a distance of         section of freeway to by-pass the steep     road network for the new Essendon Fields
38kms.                                         anthony’s Cutting section of the Western    Commercial & retail precinct at Essendon
                                               Freeway between Melbourne and Ballarat.     airport.
Meinhardt was engaged by Vicroads
to provide pre-construction project            Meinhardt was engaged by Vicroads           Meinhardt Infrastructure & Environment
management services for the development        Major Projects for the development of the   (MIE) provided provided Functional road
of the project Business Case.                  risk adjusted project cost estimate.        design, design Management, Community
Work included defining the project scope,      This involved preparation of conceptual     and stakeholder Consultation, Town
evaluating and prioritising project options,   designs for interchanges, ramps, bridges    Planning, Procurement and Contract
involvement in assessment and selection        and other freeway elements in order to      Management, Project Management and
of delivery mechanisms, preparation            determine quantities and develop cost       Construction supervision services.
of the risk adjusted cost estimate, and        estimates from Vicroads’ unit rates.        Works included the construction of a
preparation of internal PrC report and                                                     new dual span concrete bridge across
                                               Meinhardt prepared the risk-adjusted cost
doT Business Case report.                                                                  the Tullamarine Freeway connecting
                                               estimate using a Monte Carlo analysis of
Melbourne, Australia                           best and worst case scenarios to develop    Essendon airport to the suburb of airport
                                               the project Total Estimated Cost for        West, with new freeway ramps and an
                                               development of BCr’s and inclusion in the   internal road connection to Essendon
                                               project business case.                      Fields.

                                               Victoria, Australia                          The dual span concrete bridge features
                                                                                           ten pre-cast ‘T roff’ pre-stressed girders,
                                                                                           each up to 40 metres in length and 100
                                                                                           tonnes in weight, with beam erection
                                                                                           carried out over four nights using three
                                                                                           cranes of up to 350T capacity and,
                                                                                           following considerable planning with the
                                                                                           road authority Vicroads, closure of the
                                                                                           Tullamarine Freeway, a major freeway
                                                                                           artery and direct link to Melbourne’s
                                                                                           International airport.
                                                                                           Melbourne, Australia




| freeways and urban roads CapabiliTy sTaTemenT p. 6 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                                | freeways& urbanroads |
                                                            urbanroads|




Yarra Glen Truck Bypass                     Fitzgerald Road                               City Link
D&C Tender Design                           D&C Tender Design
                                                                                          The $1.8 Billion City Link Project consists
Meinhardt assisted akron roads by           Meinhardt assisted akron roads by             of approximately 22km of freeway
providing a preliminary design in support   providing a tender design for roadworks       cutting through the heart of Melbourne.
of akron’s tender submission for the        and drainage associated with the planned      The project joins three of Melbourne’s
design and Construction of a bypass         duplication of Fitzgerald rd between          largest arterial freeways consisting of two
around the Yarra Glen township between      Leakes rd and doherty’s rd in                 tunnels and numerous bridges and many
Healeville – Yarra Glen rd and the Melba    Laverton north.                               kilometers of elevated freeway.
Highway at old Healesvill road.                                                           services provided by Meinhardt included:
                                            The project involved the duplication of
Critical to the design was the staged       approximately 1.8 km of dual carriageway      >    Environmental auditing of
availability of land and therefore the      and significant (roundabout) intersections         construction sites.
ultimate geometry to both meet Vicroads     within an industrial area of Melbourne.       >    Preparation and review of site
strict design guidelines and balance        Particular consideration was given to              Environmental action Plans (EaP)
earthworks and access.                      significant drainage crossings and multiple        and Environmental Management
                                            critical underground services.                     Plans (EMP).
approximate project value $8-10million.
                                            Victoria, Australia                           >    Monitoring of wastewater disposal
Victoria, Australia
                                                                                               from site including groundwater and
                                                                                               stormwater runoff.
                                                                                          >    Establishment and implementation
                                                                                               of environmental work practices and
                                                                                               procedures.
                                                                                          >    Monitoring of environmentally
                                                                                               sensitive issues on site and the
                                                                                               co-ordination of approvals from
                                                                                               authorities.
                                                                                          The City Link Project remained in the
                                                                                          public spotlight throughout all stages from
                                                                                          design to construction to commissioning.
                                                                                          as a result Meinhardt assisted the lead
                                                                                          contractor in providing a state of the
                                                                                          art environmental management system
                                                                                          throughout the projects construction.
                                                                                          the 2006 asI (australian steel Institute)
                                                                                          Creative Innovations steel design award
                                                                                          for the Bridge and soundwalls.
                                                                                          Melbourne, Australia


| freeways and urban roads CapabiliTy sTaTemenT p. 7 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                               | freeways& urbanroads |




Thompson Road – D&C Tender and             Kings Road / Calder Highway,                  Sydney Cross City Tunnel Project
Detailed Design                            Duplication and Interchange –
                                           Preconstruction                               Meinhardt have been engaged by downer
Meinhardt provided detailed design                                                       Engineering (the lead Engineering
services to support BMd in the design      Meinhardt assisted Vicroads Western           Consultant for the project) to provide
and construction of the duplication of     Projects office during the preconstruction    engineering review for the new City East/
Thompson road between Eastlink and the     phase, associated with planned                West Underground Freeway ventilation
Mornington Peninsula Freeway.              improvement (duplication) works and           system, the secondary steel structure and
                                           extension of Kings road form the Melton       the design and documentation of building
VicRoads pre-qualification requirements
                                           Highway to the Western Highway.               services for the control building.
included roads design and Hydraulic /
Hydrologic design.                         The scope of our involvement is to review     The Cross City Tunnel has been designed
                                           the status of the project, consideration of   to improve east/west travel across the
The project consists of the design and
                                           design alternatives and update                sydney central business district. It will run
construction of a 3 lane duplication of
Thompsons road between Eastlink            Critical information for further              under the city between darling Harbour
and the Mornington Peninsula Freeway       consideration by Vicroads PrC and ErC.        and Kings Cross, linking the Western
and a construct only section providing 3   approximate project value $30+million.        distributor to new south Head road and
additional lanes between Eastlink and                                                    connecting to the Eastern distributor and
                                           Victoria, Australia                           domain Tunnel.
dandenong – Frankston road and 3
wlane roundabout.
                                                                                         Sydney, Australia
Victoria, Australia




| freeways and urban roads CapabiliTy sTaTemenT p. 8 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                                  | freeways& urbanroads |




Tuen Mun –Chek Lap Kok Link                   Hiram’s Highway Improvement Further          Tung Chung Road – EIA and
                                              Environmental Studies and Stage II           Independent Environmental Checker
MIEL are undertaking the EIa for
this strategic road link comprising           MIEL is undertaking the dualling between     MIEL carried out detailed investigation
reclamations, a sub-marine tunnel and         Clear Water Bay road and Marina Cove         including EIa studies. To avoid affecting
elevated marine vaiduct. Full EIa of the      and Improvement to Local access to Ho        important species, 12 month terrestrial
link road being undertaken including          Chung – Further study to update the          and aquatic flora and faunal surveys were
marine and terrestrial impacts on water       previous study. We are now studying          conducted and baseline established.
quality, ecology, cultural heritage, visual   the stage 2 of the project for the section   alignments avoiding major ecological
impact, noise and air quality. Impacts        between Marina Cove and sai Kung Town.       receivers and effective ecological
to marine ecology, especially the             Road traffic noise (including extensive      mitigation measures were recommended.
rare Chinese White dolphin, are key.          noise barriers) and air quality were         The project is now under construction and
Comprehensive water quality modelling         identified as key issues along with          Meinhardt was also appointed as the IEC
exercise undertaken.                          cultural heritage.                           for the first phase of the construction.
Chek Lap Kok, Hong Kong                       Nam Wai, Hong Kong                           Lantau Island, Hong Kong




| freeways and urban roads CapabiliTy sTaTemenT p. 9 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                             | freeways& urbanroads |




Castle Peak Road Imporvements.           Footbridge D, Olympic Station.                  Cherry Street Underpass at
                                                                                         Olympic Station.
Gammon skanska have been recently        Full geotechnical, civil and structural
been awarded the design and build        services for this 150m long, 6m wide            Full geotechnical, civil and structural
section for the improvements to Castle   footbridge. The twin cable-stayed               services for this 320m long vehicle
Peak road between Ka Loon Tsuen          structure, built over the MTr Tung Chung        underpass below the West Kowloon
and siu Lam. Meinhardt are providing     and airport Express Lines and the West          expressway and olympic station
engineering design services for all      Kowloon Expressway incorporated a steed         entrusted from Highways department.
highway alignment, drainage, slope,      framed pylon above deck with rC pier            The underpass was designed as ground
reclaimation and seawalls.               below to resist both lateral and longitudinal   bearing within the West Kowloon
                                         loading. This aesthetic engineered              reclamation. sleeving the olympic
New Territories West, Hong Kong          solution addressed the combination of pier      station and Footbridge piles prevented
                                         height, wind loading and long spans and         horizontal loads being transferred into the
                                         gained early support from the aCaBas            underpass and the adjacent drainage box
                                         Committee.                                      culverts.

                                         [Meinhardt, in joint venture with Works         [Meinhardt, in joint venture with Works
                                         Consultancy and robert Benaim asia.]            Consultancy and robert Benaim asia.]

                                         West Kowloon, Hong Kong                         West Kowloon, Hong Kong




| freeways and urban roads CapabiliTy sTaTemenT p. 10 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                                   | HigHways |




Central Kowloon Route                          HK-Zhuhai-Macao Bridge (HZMB):                Western Coastal Road -
                                               Hong Kong Section and North Lantau            Tunnel Alignment
Meinhardt in JV with other consultants is      Highway, Ecological Baseline Survey,
the managing consultant for this politically                                                 Meinhardt was commissioned by Territory
sensitive and engineering challenging          The Highways department (Hyd) of the          development department, to identify and
project. CKr is a 4.7km long, dual 3-lane      HKsar commissioned Meinhardt to               develop alignment options for the Western
strategic highways comprises elevated          undertake the ecological baseline surveys     Coast road, a proposed 4km strategic
structures, deep tunnel and immersed           for the Hong Kong–Zhuhai–Macao Bridge         highway between Kowloon and Tseung
tube tunnel where Meinhardt are                (HZMB). The proposed HZMB comprises           Kwan o.
responsible for the highway design of the      a dual-3 lane trestle bridge structure that
                                                                                             The investigation had to take account
entire scheme through what is amongst          links Hong Kong to the western Pearl
                                                                                             of constraints such as the existing
the most densely populated urban area in       river region. The Hong Kong section
                                                                                             Mass Transit railway tunnels, housing
the world. Meinhardt is also responsible       of the HZMB in the coastal waters is
                                                                                             developments at each end of the
for the detailed structural design of the      approximately 5km long. a 5km highway
                                                                                             alignment and engineering aspects for a
intersections at each of the scheme            (the North Lantau Highway Connection;
                                                                                             possible tunnel option.
as well as the replacement of existing         nLHC) predominantly located to the south
flyover columns. Additionally, during          of the airport is also required to link the   Tseung Kwan O, Hong Kong
the construction phase of the scheme,          HZMB from its landing point to the north
Meinhardt supplied 50% of the site staff.      Lantau Highway. The ecological baseline
                                               survey that Meinhardt has undertaken
Kowloon, Hong Kong
                                               was to provide an up-to-date and accurate
                                               ecological data for the identification,
                                               prediction and evaluation of potential
                                               ecological impacts that may arise due
                                               to the construction and operation of
                                               the HZMB. The survey, which lasts for
                                               9 months, covers both the wet and dry
                                               seasons. Meinhardt has to establish an
                                               ecological profile (both flora and fauna)
                                               and description of each habitat present,
                                               data assessment and to investigate
                                               the existing wildlife uses of the various
                                               habitats.
                                               Hong Kong




| freeways and urban roads CapabiliTy sTaTemenT p. 11 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                                  | freeways& urbanroads |




Lantau North South Link Environmental         Preliminary Project Feasibility Study        Link Options between Tuen Mun and
Impact Assessment Study.                      (PPFS) Lantau N-S Route Link Between         Lantau – Feasibility Study
                                              Tai Ho Wan & Mui Wo, Lantau Detailed
The Highways department (Hyd) of the                                                       MIEL was responsible for the
                                              Feasibility Study and Preliminary
HKsar appointed Meinhardt to undertake                                                     environmental assessment and inputs
                                              Design for 6km Highway
the preliminary engineering design and                                                     for this Feasibility study to determine
Environmental Impact assessment               a new 6km long road will connect             the optimum alignment for the road link
(EIa) for the Lantau north-south road         the north Lantau Highway at Tai Ho           between Tuen Mun and Lantau. a full
Link between Tai Ho Wan and Mui Wo            Interchange to south Lantau road in Mui      assessment of the key environmental
Investigation assignment. a planned           Wo. The new road will provide a safe         issues and constraints and also
up-to-standard single carriageway road        alternative route to the sub-standard Tung   sustainability assessment using the
was required to replace the sub-standard      Chung road.                                  CasET model has been undertaken. a
Tung Chung road. a comprehensive                                                           more detailed Preliminary Environmental
                                              The brief required Meinhardt to develop      review (PEr) was conducted for the
environmental impact assessment
                                              and assess a number of alignment             preferred alignment.
was carried out and the investigation
                                              options, including tunnel options, within
assignment included investigations into                                                    Lantau, Hong Kong
                                              a broad corridor between Ta Ho Wan
the potential air, noise, water quality,
                                              and Mui Wo, to recommend a preferred
freshwater and terrestrial ecological
                                              alignment option, and to carry out a
impacts, landscape and visual impacts of
                                              detailed environmental impact assessment
the proposed road link. This EIa contained
                                              and preliminary design for the preferred
one of the most comprehensive ecological
                                              option.
impact assessments undertaken to date
in Hong Kong. Meinhardt designed and          Meinhardt recommended an overland
executed the comprehensive ecological         route furthest away from the sssI at Tai
studies on such key habitats as mudflats,     Ho stream. To minimise the environmental
mangroves, marshland, rivers and              impacts, the alignment of the road and use
mature woodlands. Key faunal groups           of structures were optimised to eliminate
including butterflies, dragonflies, fish,     or minimise the size of cuttings. Elevated
reptiles, amphibians and ammals were          structures were also used to traverse each
also quantitatively surveyed. The complex     stream course and local habitat.
ecology and unspoilt nature of the location
                                              Lantau, Hong Kong
required special expertise to assess and
mitigate the predicted impacts.
Lantau, Hong Kong




| freeways and urban roads CapabiliTy sTaTemenT p. 12 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                                 | freeways& urbanroads |




Ayer Rajah Expressway -                      Vehicular Link Bridge across Ayer           Central Expressway, Oxley Rise
Phases IIC & IID                             Rajah Expressway to connect The Kent
                                                                                         Meinhardt were the design & build
                                             Ridge Campus to The NUS University
The Projects incorporated the turnkey                                                    contractor for CTE-II project and
                                             Town At Warren
design of a 280m long dual 3 lane                                                        carried out the detail design, design
carriageway flyover (Stage IID) and a 5      Meinhardt Infrastructure is providing the   documentation and construction phase
span dual 3 lane carriageway interchange     accredited checking for the Proposed        supervision for this project comprising a
structure.                                   Construction of a Vehicular Link Bridge     7-span 3-lane flyover forming a part of
                                             across ayer rajah Expressway to connect     Central Expressway Project.
services Provided by the Meinhardt
                                             to The Kent ridge Campus to The nUs         Oxley Rise, Singapore
Group included alignment design, civil
                                             University Town at Warren which involves
engineering pavement, drainage and bulk
                                             primarily the construction of:
earthworks design and total structural
bridge engineering.                          >      an approximately 290m long of
                                                    vehicular bridge across AYE;
Features of the projects included two 45m
spans, four 30m spans and a central span     >      a vehicular deck on the University
of 70m for Phase IId. The central span              Town at Warren;
of the Phase IId structure was designed      >      Three numbers of vehicular ramps
to have 17m insitu cantilevers from either          on the University Town at warren;
side with a 41m drop-in span to enable              and
uninterrupted traffic access across the
                                             >      a pedestrian ramp on the Kent
existing road during construction. The
                                                    Ridge Campus;
Phase IIC car ridgeway featured 5 varying
length spans between 30m and 40m             >      other miscellaneous pedestrian
together with ingress and egress slip               facilities & ancillary structures.
roads to and from the expressway.
                                             The main bridge is approximately
Singapore                                    18.45m wide with specific provisions
                                             for pedestrians, cyclists and a dual
                                             carriageway vehicular path.
                                             Kent Ridge, Singapore




| freeways and urban roads CapabiliTy sTaTemenT p. 13 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                                | freeways& urbanroads |




Third National Highways India               Marina Bayfront Bridge                       Upgrading of Woodsville Interchange,
                                                                                         Singapore
Meinhardt (singapore) has been              Meinhardt Infrastructure is providing the
appointed by national Highways authority    accredited checking for the singapore        Meinhardt Infrastructure is providing the
of India through World Bank competitive     Marina Bayfront bridge. The Marina           accredited checking for the Contract
bid system to undertake the construction    Bayfront Bridge development consists of a    Er198 Upgrading of Woodsville
supervision for the four laning and         pedestrian and adjoining vehicular bridge    Interchange in singapore. The Works
strengthening of the existing two lane      which span across the singapore river        under Contract Er198 comprise the
sections from km. 115 to km. 158 and from   immediately downstream of Marina Bay.        design, construction and completion of
km. 245 to km. 317 on nH-2 (Construction    Both bridges will link the Bayfront area     vehicular tunnels, flyovers, associated
Packages III-a & III-C).                    and the integrated resort on the south       roadworks to the adjacent connecting
                                            of the bay to the redeveloped Marina         roads, commuter facilities and other
India, India
                                            Centre on the north side of the bay. The     ancillary works at the Woodsville
                                            pedestrian bridge will also complete a       Interchange.
                                            walking loop that will eventually encircle
                                                                                         Briefly it covers vehicular tunnels between
                                            Marina Bay once the Bayfront promenade
                                                                                         serangoon road/Benderneer road
                                            is completed in front of the Integrated
                                                                                         and Upper serangoon road and from
                                            resort development. The pedestrian
                                                                                         MabPherson road to Bendemeer road,
                                            and vehicular bridges will be designed
                                                                                         flyover structure across Woodsville
                                            concurrently and pedestrians will be able
                                                                                         junction, pedestrian overhead bridge
                                            to move between the two bridges by
                                                                                         (PoB), re-construction of the former
                                            means of a specially constructed
                                                                                         serangoon Fire station with the
                                            Marina Bay, Singpore                         preservation of the façade outlook for
                                                                                         conversion to facility building use, partial
                                                                                         demolition of Jackson Centre building,
                                                                                         bus shelters and bay, re-configuration of
                                                                                         the at-grade road system, sewer system,
                                                                                         drainage system, traffic and pedestrian
                                                                                         facilities and electrical and mechanical
                                                                                         (E&M) works for tunnels, facility building,
                                                                                         PoB and bus shelte
                                                                                         Potong Pasir, Singapore




| freeways and urban roads CapabiliTy sTaTemenT p. 14 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                                   | freeways& urbanroads |




Marina Coastal Expressway                      Kallang / Paya Lebar Expressway
                                               Contract 421-424
Meinhardt Infrastructure is providing QP
(supervision) services and engineering         Meinhardt Infrastructure is providing QP      Contract 424 comprises the design,
review and advisory services for MCE           (supervision) services and independent        construction and completion of a 2.60km
Contract 485. The Marina Coastal               checking of temporary works design            stretch of the KPE from Ubi road 2 to
Expressway (MCE) is a dual-five lane           for KPE Contract 421- 424. Contract           defu Lane 3. It includes the construction
expressway which provides a new                421 comprises the design, construction        of approximately 2.60km long main
strategic underground east-west transport      and completion of 1.51 km stretch of          vehicular tunnel, the KPE/Bartley road
link between the Kallang-Paya Lebar            KPE tunnel starting from East Coast           Extension Interchange, slip tunnels at-
Expressway (KPE) and the East Coast            Parkway (ECP) to nicoll Highway. The          grade roads, pedestrian overhead bridge,
Parkway (ECP) in the east and the ayer         Contract also includes the construction       bus shelters, covered linkways, sewage
rajah Expressway (aYE) in the west, with       of an interchange at the ECP, slip            lift station, link sewers and Ventilation
direct connections to the Marina south         tunnels, a ventilation building (know as      Buildings “E” and “F”. Contract 424 will
and straits View areas.                        “Ventilation Building a”), at-grade roads     connect to Contract 423 at the southern
                                               and a vehicular bridge spanning across        end (Chainage 5900m) and Contract 425
The MCE has a total route length of            the Geylang river. Contract 421 will          at the northern end (Chainage 8500m).
approximately 5km, of which about 3.6km        connect to Contract 422 at the northern       The tunnels are constructed by cut &
is in tunnel, with two ventilation buildings   end (Chainage 1300). The tunnels are          cover method.
and approx 13.1 ha of land reclamation.        constructed by cut & cover method.
It continues from the southern end of the                                                    Singapore
KPE and traverses the Marina East area         Contract 423 comprises the design,
in a southerly direction adjacent to the       construction and completion of a 2.96km
Marina Bay golf course before turning          stretch of the KPE from the Pan Island
southwest and crossing the Marina Bay          Expressway (PIE) to Ubi road 2. The
Channel south of the Marina Barrage. The       Contract includes the construction of
MCE continues through the Marina south         the 2.96km long main vehicular tunnel,
coastal area, with a diamond interchange       the KPE/Upper Paya Lebar road
connecting to and from Marina Boulevard        interchange, slip tunnels, at-grade roads,
and Central Boulevard in the Marina south      pedestrian overhead bridges, covered
area.                                          linkways and Ventilation Buildings “C”
                                               and “d”. Pelton canal will be diverted and
Contract 485 comprises the design,             reconstructed. a link sewer will also be
construction and completion of                 constructed. The control centre for the
approximately 700m of dual-carriageway         KPE will be located at Ventilation Building
twin-cell box vehicular tunnel structure,      “d”. Contract 423 will connect to Contract
of which approximately 420m is below           422 at the southern end (chainage
the Marina Bay Crossing. It includes the       2940) and Contract 424 at the northern
construction of sewers with associated         end (chainage 5900). The tunnels are
manholes.                                      constructed by cut & cover method.
Marina Bay, Singapore

| freeways and urban roads CapabiliTy sTaTemenT p. 15 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                                  | freeways& urbanroads |




Feasibility Study and DPR for                 4/6-Laning of Patna - Bakhtiyarpu            Delhi - Hapur Section of National
Kottakatta to Kurnool                                                                      Highway - 24
                                              Meinhardt has been appointed by national
The project stretch is part of the north-     Highways authority of India for providing    Meinhardt has been appointed by
south corridor of national Highways           Consultancy services for Preparation of      national Highways authority of India
development Programme (nHdP)                  Feasibility-Cum-Preliminary design for       for undertaking Feasibility study and
and starts at Km 133 near the village         4/6-Laning of Patna - Bakhtiyarpur section   preparation of preliminary design for
Kottakatta in south India and ends at         of national Highway 30 in the state of       widening the existing 4-lane delhi-Hapur
Km 211 on Kurnool bypass near Kurnool         Bihar to be executed as BoT (Toll) Project   section of nH-24 (60 kms), to a 6 lane
town. The stretch passes through plain/       on dBFo Pattern under nHdP Phase III.        configuration. The project is proposed to
rolling terrain with major outcrops at many                                                be developed as BoT (Toll) project on
                                              description of services to be provided:      dBFo pattern.
places with large masses of granite rocks
and boulders. There are 4 major bridges,      >    Feasibility cum Preliminary Project
                                                   report(FCPPr)                           Meinhardt’s scope of services shall
40 minor bridges, 1 rail over bridge,                                                      include topographic survey, geotechnical
1 underpass and 150 cross drainage            >    Traffic Survey                          investigations, environment and social
structures. The bridge across river Krishna   >    road Condition survey                   impact assessment studies, public
is 940.87m long and that across river                                                      consultation, traffic studies, condition
                                              >    Preliminary design of Pavements &
Thungabhadra is 620.80m long.                                                              assessment, preliminary design of
                                                   overlay
The project encompasses 5 major                                                            highway alignment, pavements, bridges/
                                              >    Preliminary design of Bridges,
district road requiring construction of                                                    flyovers, CD structures, toll plazas, road
                                                   Flyovers, roB etc.
grade separators and one state highway                                                     furniture and preparation of preliminary
                                              >    Preliminary design of Toll Plazas       cost estimates.
requiring an interchange.
                                              >    Land Plan schedules
Kottakatta, India                                                                          The report prepared by Meinhardt will form
                                              >    Utility relocation Plans                the basis on which a financial consultant
                                              >    Environmental Impact assessment         and a legal consultant, appointed
                                                   (EIa)                                   separately by the Client, will prepare the
                                              >    social Impact assessment (sIa)          documents for inviting bids from private
                                                                                           entrepreneurs to award a BoT (Toll)
                                              Bihar, India                                 concession.
                                                                                           Delhi, India




| freeways and urban roads CapabiliTy sTaTemenT p. 16 |
2.1 rELEVanTproJeCT EXPErIEnCE
                                      | freeways& urbanroads |




                                  Madhya Pradesh Rural Roads

                                  The Madhya Pradesh rural road                The scope of work further includes
                                  development authority has appointed          assistance to MPrrda in procurement
                                  Meinhardt as the lead consultant, in         of civil works contracts in four batches
                                  joint venture with artefact Projects, and    through a bid process; evaluation of bids;
                                  in association with VKs Infratech, to        and preparing summary evaluation reports
                                  provide project management consultancy       to be submitted to the Ia.
                                  services for a 1830 km rural road
                                  length in four batches covering 11 PIUs      Meinhardt will also ensure the
                                  including Jabalpur, Katni, Balaghat,         implementation of civil works by approving
                                  seoni, narsinghpur, sidhi, shahdol,          and scrutinising the contractors detailed
                                  Umaria, Mandla, dindori, Chhatarpur,         work programme and suggesting
                                  Tikamgarh, damoh, Panna, rewa, satna         modifications, if any; supervision of
                                  and Chhindwara. This is a part of the adB    project implementation activities to ensure
                                  funded Madhya Pradesh rural roads            complete compliance with approved
                                  sector I Project (adB Loan no.2018-          drawings and technical specifications;
                                  India).                                      obtaining and approving quality assurance
                                                                               system; review of tests / certificates of all
                                  Meinhardt, in association with artefact,     construction materials and/or sources of
                                  will be responsible for Preparation of       materials and so on. Finally, Meinhardt
                                  the Detailed Project Report (DPR);           will assist MPrrda in monitoring and
                                  Preparation of Bidding Documents;            evaluating the project performance to
                                  Construction supervision and Project         be carried out under systematic project
                                  performance Monitoring and Preparation       performance monitoring (PPM).
                                  of Project Completion report.
                                                                               Madhya Pradesh, India
                                  The dPr includes economic feasibility
                                  studies in accordance with adB
                                  requirements, topographic survey,
                                  soil investigation, material survey for
                                  pavement design, traffic analysis and
                                  forecast for the next 10 years including
                                  estimated maintenance cost, road safety
                                  audit and conducting initial environmental
                                  examination for preparation of an
                                  environmental management plan.




| freeways and urban roads CapabiliTy sTaTemenT p. 17 |
2.2 developerFUndEd worKs




                                  Meinhardt’s Urban development Group            other developer funded interface works
                                  assists our clients in creating exciting and   include:
                                  new communities.                               >    Greenvale Lakes Estate: Planning,
                                  Whether integrated into complex existing            design and part Construction of the
                                  environments, sculpted around ancillary             E14 to consider ultimate duplication,
                                  uses eg golf courses or woven into a                adjacent development, coordination
                                  mixed use commercial development                    with detailed design of the extension
                                  each requires careful consideration of              to somerton road and impact of
                                  transport and pedestrian access and traffic         adjacent Greenvale reservoir.
                                  management often associated with an            >    Wallangarra Estate: Modified Type
                                  authority arterial road or major council            C intersection with Leakes road,
                                  road.                                               Truganina.
                                  Interface works require planning and           >    skyline: Hatchlands ave signalised
                                  consultation with authorities eg Vicroads           intersection with robinsons rd and
                                  to minimise impact on the existing                  drainage outfall across Foley rd,
                                  transport network and detailed design and           deer Park.
                                  construction in accordance with authority      >    Epping Plaza and northern Hospital:
                                  standards                                           Modifications to Cooper Street –
                                                                                      High street intersection and two
                                  Projects such as new Quay and
                                                                                      new signalised entries from Cooper
                                  Waterfront City within Melbourne
                                                                                      street, Epping
                                  docklands create vital transport and
                                  pedestrian linkages with docklands             >    shell service station developments:
                                  Highway (Footscray road) and harbour                Hume Highway, donnybrook road
                                  Esplanade.                                          and Eastlink.

                                  similarly the silverwoods development          road Planning for new development
                                  relies on a critical interface and the         proposals requiring access to:
                                  creation of an access (type C intersection)    >    south Gippsland Hwy, Berwick
                                  from the Murray-Valley Highway.                     Cranbourne rd and narre Warren
                                                                                      Cranbourne rd, Cranbourne East.
                                                                                 >    sayers rd, Palmers rd, Forsyth rd,
                                                                                      Truganinia.




| freeways and urban roads CapabiliTy sTaTemenT p. 18 |

Weitere ähnliche Inhalte

Andere mochten auch

08. Planning Capability Statement
08. Planning Capability Statement08. Planning Capability Statement
08. Planning Capability Statementhamadagkhater
 
01. Aviation Capability Rev 2
01. Aviation Capability   Rev 201. Aviation Capability   Rev 2
01. Aviation Capability Rev 2hamadagkhater
 
05. Mena Healthcare Capability Rev 2
05. Mena Healthcare Capability Rev  205. Mena Healthcare Capability Rev  2
05. Mena Healthcare Capability Rev 2hamadagkhater
 
Environmental Sustainable Design Capability
Environmental Sustainable Design CapabilityEnvironmental Sustainable Design Capability
Environmental Sustainable Design Capabilityhamadagkhater
 
Transportation Freeways & Urban Roads Capability Statement
Transportation   Freeways & Urban Roads Capability StatementTransportation   Freeways & Urban Roads Capability Statement
Transportation Freeways & Urban Roads Capability Statementhamadagkhater
 
Earthquake resistant structure
Earthquake resistant structureEarthquake resistant structure
Earthquake resistant structurevikskyn
 

Andere mochten auch (7)

08. Planning Capability Statement
08. Planning Capability Statement08. Planning Capability Statement
08. Planning Capability Statement
 
01. Aviation Capability Rev 2
01. Aviation Capability   Rev 201. Aviation Capability   Rev 2
01. Aviation Capability Rev 2
 
05. Mena Healthcare Capability Rev 2
05. Mena Healthcare Capability Rev  205. Mena Healthcare Capability Rev  2
05. Mena Healthcare Capability Rev 2
 
Environmental Sustainable Design Capability
Environmental Sustainable Design CapabilityEnvironmental Sustainable Design Capability
Environmental Sustainable Design Capability
 
Webinar: Oncology Care Model - Payer Participation
Webinar: Oncology Care Model - Payer ParticipationWebinar: Oncology Care Model - Payer Participation
Webinar: Oncology Care Model - Payer Participation
 
Transportation Freeways & Urban Roads Capability Statement
Transportation   Freeways & Urban Roads Capability StatementTransportation   Freeways & Urban Roads Capability Statement
Transportation Freeways & Urban Roads Capability Statement
 
Earthquake resistant structure
Earthquake resistant structureEarthquake resistant structure
Earthquake resistant structure
 

09. Transportation Freeways & Urban Roads Capability Statement

  • 1. freewaysand urbanroads w w w. m e i n h a rd t g ro u p . c o m
  • 2. TaBLEof ConTEnTs Company profile ................................................................1 ToTally inTegraTed soluTions ......................................2 1. Transport .......................................................................3 2. freeways & urban roads .............................................4 2.1 Relevant Project Experience ............................................................. 5 2.2 Developer Funded Works .................................................................. 18 | freeways and urban roads CapabiliTy sTaTemenT |
  • 3. CoMPanYprofile 1. aviaTion Established in Australia in 1955 and ProPErTY now operating in fourteen countries > Urban / Land development across four continents, Meinhardt is recognised as a leading global provider > Leisure and recreation of planning, engineering, management, > Town Planning sustainability and technology > Commercial / retail / Industrial consulting services. > Multi-storey Buildings We focus is the following key market sectors: > Esd and sustainability EnVIronMEnT > Hydrogeology > Water Quality > Contaminated soil > Waste Management > alternative Waste Treatment > Environmental Planning TransPorT > Freeways > aviation > Heavy and Light rail London Beijing > Public Transport Miami > Ports and maritime Shanghai Dallas Shenzhen Hong Kong Islamabad Macao our service offering includes Lahore Hanoi Bahrain New Delhi Bangkok conceptualization, feasibility, master Qatar Da Nang Manila Abu Dhabi Dubai Karachi planning, total project management, Chennai Kuala Lumpur Ho Chi Minh investigation and reporting, stakeholder Singapore consultation, planning and environmental approvals, Esd rating and energy audits, Jakarta EEs, detailed design, documentation, construction quality assurance, Brisbane commissioning and asset management. Adelaide Sydney Melbourne These core services are available throughout australia, asia, Middle East, United Kingdom and the Us. | freeways and urban roads CapabiliTy sTaTemenT p. 1 |
  • 4. ToTaLLYinTegraTed soLUTIons 1. aviaTion Meinhardt is one of the few australian our philosophy is simple: our clients’ truly multi-disciplinary consulting firms needs are paramount. Yet determining operating on a global basis. those needs is rarely a simple task. In order to exceed your expectations, we our team operates within a highly take the time to understand our clients’ integrated environment developed in perspective and relevant drivers. The response to the often complex interfacing outcome must be a flexible solution requirements between internally providing value add opportunities beyond disciplines and externally. delivering on key project objectives. This integration provides demonstrable Further information regarding our people, benefit to our clients who appreciate our services, projects and a host of other design solutions are fully coordinated and relevant information can be found at our holistic and program milestones are driven website: www.meinhardtgroup.com. internally. as a multi-disciplinary practice we provide a total solutions and a collegiate team approach to all aspects of a project. The Meinhardt Group maintains a centralised knowledge and technology base providing ready access to specialist skills and knowledge, key personnel and communication across disciplines and geographical areas. our systems and structure enable us to readily undertake complex national and international projects within a multiple project office platform. | freeways and urban roads CapabiliTy sTaTemenT p. 2 |
  • 5. 1. TransporT Specific areas in which Meinhardt offers Heavy and Light Rail Environmental Impact Transportation Engineering services to private and government bodies are: > Station upgrades, fit out DDA > Environmental effects statement access > Contaminated land assessment > Freeways > Tunnelling and design of subway > EMP (water quality, Flora, fauna & > aviation systems cultural heritage) > Heavy and Light rail > Track, sidings, stabling and wash > due diligence, auditing and > Public Transport down facilities strategic advice > Tunneling > Inter-modal freight connectivity Meinhardt takes pride in delivering > Environmental impact Public Transport a “commercial” approach to project implementation, to add value and build Freeways > Planning, route selection and upon your key objectives. our services feasibility and exposure spans across a number > Preconstruction services and preliminary design > Concept and detailed engineering of regions and market sectors, which design enables us to bring the latest new > Freeway road geometry and technologies and ideas to your project. drainage design > Inter-modal connectivity and dda access Meinhardt is not a listed company. We > Bridges, barriers, noise walls and > Local area traffic management value our brand. We are flexible, driven by complex structures relationships and tailor our service offering > Project governance and financing Tunneling to best address your business needs. Aviation > Concept design and value engineering studies > Terminal planning and detailed engineering design > Multi-disciplinary engineering design > runway, taxiway and apron geometry and services > soft ground & rock tunneling > aircraft hangars and maintenance > Ventilation systems facilities > Project management and construction quality control | freeways and urban roads CapabiliTy sTaTemenT p. 3 |
  • 6. 2. freewaysand urbanroads Freeway networks remain a cornerstone Meinhardt provides expert services in: of our integrated transport systems and > Preliminary design and play a major role driving our economy preconstruction services through the movement of people and freight. > Freeways and urban road design designing modern freeway networks > Bridges and complex structural requires a delicate balance between design the often competing demands of safety, > Hydrology and hydraulic design accessibility, pricing, and efficiency within > soft ground and rock tunneling the complex framework of economics, social behaviour, cultural heritage and the > Traffic control and ITS systems environment. > road lighting and electrical design To build and maintain a network which > specialist pavement design best serves the needs of business and > Project management our community we rely on accurate strategic planning, environmental and > site investigation and service planning controls, best practice detailed relocations designs, the use of new technologies, > Town and land use planning state of the art construction techniques and procurement methods which promote > Environmental science value adding opportunity. > Water quality > Flora and fauna > Cultural heritage > Contract administration > Construction supervision > Financial review and assessment Meinhardt has the capability and balance sheet to participate in major project alliances, PPP, d&C and other procurement alternatives in addition to the delivery of conventional consulting services. Whether participating in a major freeway alliance or resolving access requirements for the creation of an exciting new residential community, Meinhardt delivers simple and effective solutions within often complex environments. | freeways and urban roads CapabiliTy sTaTemenT p. 4 |
  • 7. 2.1 rELEVanTproJeCT EXPErIEnCE | freeways& urbanroads | Cragieburn Bypass The Peninsula Link The Craigieburn bridge and sound walls The Pedestrian Bridge is the climax of The Peninsula Link is a 25 kilometre are located on the new 23km Craigieburn the Curtain Wall, and the whole gateway four-lane freeway connecting EastLink Bypass which links the Hume Highway experience. Carefully sited at the point at Carrum downs to the Mornington with the Melbourne ring road, north of where the motorist first sees the City of Peninsula Freeway at Mount Martha. It Melbourne, Victoria. Melbourne spread out on the horizon, includes nine interchanges at EastLink, it is developed as a curtain that lifts to dandenong- Frankston rd, skye rd, Vicroads engaged Taylor and Cullity frame that glittering first view to the city. Cranbourne-Frankston rd, Golf Links Lethlean along with Meinhardt at the similarly on leaving, it frames a view of the rd, Frankston-Flinders rd, Bungower tender development stage to provide extended grasslands – the beginning of rd, Mornington-Tyabb road and the an exciting group of elements along the the great australian landscape. Mornington Peninsula Freeway in Mount freeway. These features set this road apart Martha. at its Frankston end, Peninsula but also provide function in protecting This innovative project was the winner of Link is expected to carry more than neighbouring properties from road the 2006 asI (australian steel Institute) 60,000 vehicles each day, while up to generated noise. Creative Innovations steel design award 45,000 vehicles each day are expected for the Bridge and soundwalls. The three elements developed for the south of Baxter. The project includes Craigieburn Bypass are orchestrated Melbourne, Australia the construction of a new shared use as a cohesive project with the freeway path connecting to the EastLink Trail for itself and its bridges and earthworks. The pedestrians and cyclists to enjoy. Curtain Wall is designed to be a travelling Linking Melbourne authority (previously companion for a significant part of the sEITa) will deliver the project as a Public journey. Its height set by noise control Private Partnership (PPP) to build, own, parameters, it is a fluid form; dynamic operate and ultimately transfer road and experiential. Composed a ribbon of infrastructure to the state. Meinhardt are fabricated sheets of weathered steel, 1/3rd engaged by Linking Melbourne authority lifted off the ground. It is a lightweight to assist in the technical assessment of screen, a land form and ultimately a the tender submission. pedestrian bridge but also a transforming edge, merging into different forms and Melbourne, Victoria functions along its route as it meets various bounding conditions. | freeways and urban roads CapabiliTy sTaTemenT p. 5 |
  • 8. 2.1 rELEVanTproJeCT EXPErIEnCE | freeways& urbanroads | Melbourne M80 Ring Road Upgrade – Western Freeway Realignment – Melton Essendon Fields - Northern Access Preconstruction (Business Case) to Bacchus Marsh (Anthony’s Cutting) Essendon Airport Preconstruction (Risk Band Estimate) (Design and Project Management) The $2.25 billion M80 ring road Upgrade project will upgrade and widen the The $200 million realignment of the The northern access road project Western ring road and Metropolitan ring Western Freeway between Melton and provides a critical transport link to the road in Melbourne for its full extent from Bacchus Marsh will create a new divided Tullamarine Freeway and surrounding altona to Greensborough, a distance of section of freeway to by-pass the steep road network for the new Essendon Fields 38kms. anthony’s Cutting section of the Western Commercial & retail precinct at Essendon Freeway between Melbourne and Ballarat. airport. Meinhardt was engaged by Vicroads to provide pre-construction project Meinhardt was engaged by Vicroads Meinhardt Infrastructure & Environment management services for the development Major Projects for the development of the (MIE) provided provided Functional road of the project Business Case. risk adjusted project cost estimate. design, design Management, Community Work included defining the project scope, This involved preparation of conceptual and stakeholder Consultation, Town evaluating and prioritising project options, designs for interchanges, ramps, bridges Planning, Procurement and Contract involvement in assessment and selection and other freeway elements in order to Management, Project Management and of delivery mechanisms, preparation determine quantities and develop cost Construction supervision services. of the risk adjusted cost estimate, and estimates from Vicroads’ unit rates. Works included the construction of a preparation of internal PrC report and new dual span concrete bridge across Meinhardt prepared the risk-adjusted cost doT Business Case report. the Tullamarine Freeway connecting estimate using a Monte Carlo analysis of Melbourne, Australia best and worst case scenarios to develop Essendon airport to the suburb of airport the project Total Estimated Cost for West, with new freeway ramps and an development of BCr’s and inclusion in the internal road connection to Essendon project business case. Fields. Victoria, Australia The dual span concrete bridge features ten pre-cast ‘T roff’ pre-stressed girders, each up to 40 metres in length and 100 tonnes in weight, with beam erection carried out over four nights using three cranes of up to 350T capacity and, following considerable planning with the road authority Vicroads, closure of the Tullamarine Freeway, a major freeway artery and direct link to Melbourne’s International airport. Melbourne, Australia | freeways and urban roads CapabiliTy sTaTemenT p. 6 |
  • 9. 2.1 rELEVanTproJeCT EXPErIEnCE | freeways& urbanroads | urbanroads| Yarra Glen Truck Bypass Fitzgerald Road City Link D&C Tender Design D&C Tender Design The $1.8 Billion City Link Project consists Meinhardt assisted akron roads by Meinhardt assisted akron roads by of approximately 22km of freeway providing a preliminary design in support providing a tender design for roadworks cutting through the heart of Melbourne. of akron’s tender submission for the and drainage associated with the planned The project joins three of Melbourne’s design and Construction of a bypass duplication of Fitzgerald rd between largest arterial freeways consisting of two around the Yarra Glen township between Leakes rd and doherty’s rd in tunnels and numerous bridges and many Healeville – Yarra Glen rd and the Melba Laverton north. kilometers of elevated freeway. Highway at old Healesvill road. services provided by Meinhardt included: The project involved the duplication of Critical to the design was the staged approximately 1.8 km of dual carriageway > Environmental auditing of availability of land and therefore the and significant (roundabout) intersections construction sites. ultimate geometry to both meet Vicroads within an industrial area of Melbourne. > Preparation and review of site strict design guidelines and balance Particular consideration was given to Environmental action Plans (EaP) earthworks and access. significant drainage crossings and multiple and Environmental Management critical underground services. Plans (EMP). approximate project value $8-10million. Victoria, Australia > Monitoring of wastewater disposal Victoria, Australia from site including groundwater and stormwater runoff. > Establishment and implementation of environmental work practices and procedures. > Monitoring of environmentally sensitive issues on site and the co-ordination of approvals from authorities. The City Link Project remained in the public spotlight throughout all stages from design to construction to commissioning. as a result Meinhardt assisted the lead contractor in providing a state of the art environmental management system throughout the projects construction. the 2006 asI (australian steel Institute) Creative Innovations steel design award for the Bridge and soundwalls. Melbourne, Australia | freeways and urban roads CapabiliTy sTaTemenT p. 7 |
  • 10. 2.1 rELEVanTproJeCT EXPErIEnCE | freeways& urbanroads | Thompson Road – D&C Tender and Kings Road / Calder Highway, Sydney Cross City Tunnel Project Detailed Design Duplication and Interchange – Preconstruction Meinhardt have been engaged by downer Meinhardt provided detailed design Engineering (the lead Engineering services to support BMd in the design Meinhardt assisted Vicroads Western Consultant for the project) to provide and construction of the duplication of Projects office during the preconstruction engineering review for the new City East/ Thompson road between Eastlink and the phase, associated with planned West Underground Freeway ventilation Mornington Peninsula Freeway. improvement (duplication) works and system, the secondary steel structure and extension of Kings road form the Melton the design and documentation of building VicRoads pre-qualification requirements Highway to the Western Highway. services for the control building. included roads design and Hydraulic / Hydrologic design. The scope of our involvement is to review The Cross City Tunnel has been designed the status of the project, consideration of to improve east/west travel across the The project consists of the design and design alternatives and update sydney central business district. It will run construction of a 3 lane duplication of Thompsons road between Eastlink Critical information for further under the city between darling Harbour and the Mornington Peninsula Freeway consideration by Vicroads PrC and ErC. and Kings Cross, linking the Western and a construct only section providing 3 approximate project value $30+million. distributor to new south Head road and additional lanes between Eastlink and connecting to the Eastern distributor and Victoria, Australia domain Tunnel. dandenong – Frankston road and 3 wlane roundabout. Sydney, Australia Victoria, Australia | freeways and urban roads CapabiliTy sTaTemenT p. 8 |
  • 11. 2.1 rELEVanTproJeCT EXPErIEnCE | freeways& urbanroads | Tuen Mun –Chek Lap Kok Link Hiram’s Highway Improvement Further Tung Chung Road – EIA and Environmental Studies and Stage II Independent Environmental Checker MIEL are undertaking the EIa for this strategic road link comprising MIEL is undertaking the dualling between MIEL carried out detailed investigation reclamations, a sub-marine tunnel and Clear Water Bay road and Marina Cove including EIa studies. To avoid affecting elevated marine vaiduct. Full EIa of the and Improvement to Local access to Ho important species, 12 month terrestrial link road being undertaken including Chung – Further study to update the and aquatic flora and faunal surveys were marine and terrestrial impacts on water previous study. We are now studying conducted and baseline established. quality, ecology, cultural heritage, visual the stage 2 of the project for the section alignments avoiding major ecological impact, noise and air quality. Impacts between Marina Cove and sai Kung Town. receivers and effective ecological to marine ecology, especially the Road traffic noise (including extensive mitigation measures were recommended. rare Chinese White dolphin, are key. noise barriers) and air quality were The project is now under construction and Comprehensive water quality modelling identified as key issues along with Meinhardt was also appointed as the IEC exercise undertaken. cultural heritage. for the first phase of the construction. Chek Lap Kok, Hong Kong Nam Wai, Hong Kong Lantau Island, Hong Kong | freeways and urban roads CapabiliTy sTaTemenT p. 9 |
  • 12. 2.1 rELEVanTproJeCT EXPErIEnCE | freeways& urbanroads | Castle Peak Road Imporvements. Footbridge D, Olympic Station. Cherry Street Underpass at Olympic Station. Gammon skanska have been recently Full geotechnical, civil and structural been awarded the design and build services for this 150m long, 6m wide Full geotechnical, civil and structural section for the improvements to Castle footbridge. The twin cable-stayed services for this 320m long vehicle Peak road between Ka Loon Tsuen structure, built over the MTr Tung Chung underpass below the West Kowloon and siu Lam. Meinhardt are providing and airport Express Lines and the West expressway and olympic station engineering design services for all Kowloon Expressway incorporated a steed entrusted from Highways department. highway alignment, drainage, slope, framed pylon above deck with rC pier The underpass was designed as ground reclaimation and seawalls. below to resist both lateral and longitudinal bearing within the West Kowloon loading. This aesthetic engineered reclamation. sleeving the olympic New Territories West, Hong Kong solution addressed the combination of pier station and Footbridge piles prevented height, wind loading and long spans and horizontal loads being transferred into the gained early support from the aCaBas underpass and the adjacent drainage box Committee. culverts. [Meinhardt, in joint venture with Works [Meinhardt, in joint venture with Works Consultancy and robert Benaim asia.] Consultancy and robert Benaim asia.] West Kowloon, Hong Kong West Kowloon, Hong Kong | freeways and urban roads CapabiliTy sTaTemenT p. 10 |
  • 13. 2.1 rELEVanTproJeCT EXPErIEnCE | HigHways | Central Kowloon Route HK-Zhuhai-Macao Bridge (HZMB): Western Coastal Road - Hong Kong Section and North Lantau Tunnel Alignment Meinhardt in JV with other consultants is Highway, Ecological Baseline Survey, the managing consultant for this politically Meinhardt was commissioned by Territory sensitive and engineering challenging The Highways department (Hyd) of the development department, to identify and project. CKr is a 4.7km long, dual 3-lane HKsar commissioned Meinhardt to develop alignment options for the Western strategic highways comprises elevated undertake the ecological baseline surveys Coast road, a proposed 4km strategic structures, deep tunnel and immersed for the Hong Kong–Zhuhai–Macao Bridge highway between Kowloon and Tseung tube tunnel where Meinhardt are (HZMB). The proposed HZMB comprises Kwan o. responsible for the highway design of the a dual-3 lane trestle bridge structure that The investigation had to take account entire scheme through what is amongst links Hong Kong to the western Pearl of constraints such as the existing the most densely populated urban area in river region. The Hong Kong section Mass Transit railway tunnels, housing the world. Meinhardt is also responsible of the HZMB in the coastal waters is developments at each end of the for the detailed structural design of the approximately 5km long. a 5km highway alignment and engineering aspects for a intersections at each of the scheme (the North Lantau Highway Connection; possible tunnel option. as well as the replacement of existing nLHC) predominantly located to the south flyover columns. Additionally, during of the airport is also required to link the Tseung Kwan O, Hong Kong the construction phase of the scheme, HZMB from its landing point to the north Meinhardt supplied 50% of the site staff. Lantau Highway. The ecological baseline survey that Meinhardt has undertaken Kowloon, Hong Kong was to provide an up-to-date and accurate ecological data for the identification, prediction and evaluation of potential ecological impacts that may arise due to the construction and operation of the HZMB. The survey, which lasts for 9 months, covers both the wet and dry seasons. Meinhardt has to establish an ecological profile (both flora and fauna) and description of each habitat present, data assessment and to investigate the existing wildlife uses of the various habitats. Hong Kong | freeways and urban roads CapabiliTy sTaTemenT p. 11 |
  • 14. 2.1 rELEVanTproJeCT EXPErIEnCE | freeways& urbanroads | Lantau North South Link Environmental Preliminary Project Feasibility Study Link Options between Tuen Mun and Impact Assessment Study. (PPFS) Lantau N-S Route Link Between Lantau – Feasibility Study Tai Ho Wan & Mui Wo, Lantau Detailed The Highways department (Hyd) of the MIEL was responsible for the Feasibility Study and Preliminary HKsar appointed Meinhardt to undertake environmental assessment and inputs Design for 6km Highway the preliminary engineering design and for this Feasibility study to determine Environmental Impact assessment a new 6km long road will connect the optimum alignment for the road link (EIa) for the Lantau north-south road the north Lantau Highway at Tai Ho between Tuen Mun and Lantau. a full Link between Tai Ho Wan and Mui Wo Interchange to south Lantau road in Mui assessment of the key environmental Investigation assignment. a planned Wo. The new road will provide a safe issues and constraints and also up-to-standard single carriageway road alternative route to the sub-standard Tung sustainability assessment using the was required to replace the sub-standard Chung road. CasET model has been undertaken. a Tung Chung road. a comprehensive more detailed Preliminary Environmental The brief required Meinhardt to develop review (PEr) was conducted for the environmental impact assessment and assess a number of alignment preferred alignment. was carried out and the investigation options, including tunnel options, within assignment included investigations into Lantau, Hong Kong a broad corridor between Ta Ho Wan the potential air, noise, water quality, and Mui Wo, to recommend a preferred freshwater and terrestrial ecological alignment option, and to carry out a impacts, landscape and visual impacts of detailed environmental impact assessment the proposed road link. This EIa contained and preliminary design for the preferred one of the most comprehensive ecological option. impact assessments undertaken to date in Hong Kong. Meinhardt designed and Meinhardt recommended an overland executed the comprehensive ecological route furthest away from the sssI at Tai studies on such key habitats as mudflats, Ho stream. To minimise the environmental mangroves, marshland, rivers and impacts, the alignment of the road and use mature woodlands. Key faunal groups of structures were optimised to eliminate including butterflies, dragonflies, fish, or minimise the size of cuttings. Elevated reptiles, amphibians and ammals were structures were also used to traverse each also quantitatively surveyed. The complex stream course and local habitat. ecology and unspoilt nature of the location Lantau, Hong Kong required special expertise to assess and mitigate the predicted impacts. Lantau, Hong Kong | freeways and urban roads CapabiliTy sTaTemenT p. 12 |
  • 15. 2.1 rELEVanTproJeCT EXPErIEnCE | freeways& urbanroads | Ayer Rajah Expressway - Vehicular Link Bridge across Ayer Central Expressway, Oxley Rise Phases IIC & IID Rajah Expressway to connect The Kent Meinhardt were the design & build Ridge Campus to The NUS University The Projects incorporated the turnkey contractor for CTE-II project and Town At Warren design of a 280m long dual 3 lane carried out the detail design, design carriageway flyover (Stage IID) and a 5 Meinhardt Infrastructure is providing the documentation and construction phase span dual 3 lane carriageway interchange accredited checking for the Proposed supervision for this project comprising a structure. Construction of a Vehicular Link Bridge 7-span 3-lane flyover forming a part of across ayer rajah Expressway to connect Central Expressway Project. services Provided by the Meinhardt to The Kent ridge Campus to The nUs Oxley Rise, Singapore Group included alignment design, civil University Town at Warren which involves engineering pavement, drainage and bulk primarily the construction of: earthworks design and total structural bridge engineering. > an approximately 290m long of vehicular bridge across AYE; Features of the projects included two 45m spans, four 30m spans and a central span > a vehicular deck on the University of 70m for Phase IId. The central span Town at Warren; of the Phase IId structure was designed > Three numbers of vehicular ramps to have 17m insitu cantilevers from either on the University Town at warren; side with a 41m drop-in span to enable and uninterrupted traffic access across the > a pedestrian ramp on the Kent existing road during construction. The Ridge Campus; Phase IIC car ridgeway featured 5 varying length spans between 30m and 40m > other miscellaneous pedestrian together with ingress and egress slip facilities & ancillary structures. roads to and from the expressway. The main bridge is approximately Singapore 18.45m wide with specific provisions for pedestrians, cyclists and a dual carriageway vehicular path. Kent Ridge, Singapore | freeways and urban roads CapabiliTy sTaTemenT p. 13 |
  • 16. 2.1 rELEVanTproJeCT EXPErIEnCE | freeways& urbanroads | Third National Highways India Marina Bayfront Bridge Upgrading of Woodsville Interchange, Singapore Meinhardt (singapore) has been Meinhardt Infrastructure is providing the appointed by national Highways authority accredited checking for the singapore Meinhardt Infrastructure is providing the of India through World Bank competitive Marina Bayfront bridge. The Marina accredited checking for the Contract bid system to undertake the construction Bayfront Bridge development consists of a Er198 Upgrading of Woodsville supervision for the four laning and pedestrian and adjoining vehicular bridge Interchange in singapore. The Works strengthening of the existing two lane which span across the singapore river under Contract Er198 comprise the sections from km. 115 to km. 158 and from immediately downstream of Marina Bay. design, construction and completion of km. 245 to km. 317 on nH-2 (Construction Both bridges will link the Bayfront area vehicular tunnels, flyovers, associated Packages III-a & III-C). and the integrated resort on the south roadworks to the adjacent connecting of the bay to the redeveloped Marina roads, commuter facilities and other India, India Centre on the north side of the bay. The ancillary works at the Woodsville pedestrian bridge will also complete a Interchange. walking loop that will eventually encircle Briefly it covers vehicular tunnels between Marina Bay once the Bayfront promenade serangoon road/Benderneer road is completed in front of the Integrated and Upper serangoon road and from resort development. The pedestrian MabPherson road to Bendemeer road, and vehicular bridges will be designed flyover structure across Woodsville concurrently and pedestrians will be able junction, pedestrian overhead bridge to move between the two bridges by (PoB), re-construction of the former means of a specially constructed serangoon Fire station with the Marina Bay, Singpore preservation of the façade outlook for conversion to facility building use, partial demolition of Jackson Centre building, bus shelters and bay, re-configuration of the at-grade road system, sewer system, drainage system, traffic and pedestrian facilities and electrical and mechanical (E&M) works for tunnels, facility building, PoB and bus shelte Potong Pasir, Singapore | freeways and urban roads CapabiliTy sTaTemenT p. 14 |
  • 17. 2.1 rELEVanTproJeCT EXPErIEnCE | freeways& urbanroads | Marina Coastal Expressway Kallang / Paya Lebar Expressway Contract 421-424 Meinhardt Infrastructure is providing QP (supervision) services and engineering Meinhardt Infrastructure is providing QP Contract 424 comprises the design, review and advisory services for MCE (supervision) services and independent construction and completion of a 2.60km Contract 485. The Marina Coastal checking of temporary works design stretch of the KPE from Ubi road 2 to Expressway (MCE) is a dual-five lane for KPE Contract 421- 424. Contract defu Lane 3. It includes the construction expressway which provides a new 421 comprises the design, construction of approximately 2.60km long main strategic underground east-west transport and completion of 1.51 km stretch of vehicular tunnel, the KPE/Bartley road link between the Kallang-Paya Lebar KPE tunnel starting from East Coast Extension Interchange, slip tunnels at- Expressway (KPE) and the East Coast Parkway (ECP) to nicoll Highway. The grade roads, pedestrian overhead bridge, Parkway (ECP) in the east and the ayer Contract also includes the construction bus shelters, covered linkways, sewage rajah Expressway (aYE) in the west, with of an interchange at the ECP, slip lift station, link sewers and Ventilation direct connections to the Marina south tunnels, a ventilation building (know as Buildings “E” and “F”. Contract 424 will and straits View areas. “Ventilation Building a”), at-grade roads connect to Contract 423 at the southern and a vehicular bridge spanning across end (Chainage 5900m) and Contract 425 The MCE has a total route length of the Geylang river. Contract 421 will at the northern end (Chainage 8500m). approximately 5km, of which about 3.6km connect to Contract 422 at the northern The tunnels are constructed by cut & is in tunnel, with two ventilation buildings end (Chainage 1300). The tunnels are cover method. and approx 13.1 ha of land reclamation. constructed by cut & cover method. It continues from the southern end of the Singapore KPE and traverses the Marina East area Contract 423 comprises the design, in a southerly direction adjacent to the construction and completion of a 2.96km Marina Bay golf course before turning stretch of the KPE from the Pan Island southwest and crossing the Marina Bay Expressway (PIE) to Ubi road 2. The Channel south of the Marina Barrage. The Contract includes the construction of MCE continues through the Marina south the 2.96km long main vehicular tunnel, coastal area, with a diamond interchange the KPE/Upper Paya Lebar road connecting to and from Marina Boulevard interchange, slip tunnels, at-grade roads, and Central Boulevard in the Marina south pedestrian overhead bridges, covered area. linkways and Ventilation Buildings “C” and “d”. Pelton canal will be diverted and Contract 485 comprises the design, reconstructed. a link sewer will also be construction and completion of constructed. The control centre for the approximately 700m of dual-carriageway KPE will be located at Ventilation Building twin-cell box vehicular tunnel structure, “d”. Contract 423 will connect to Contract of which approximately 420m is below 422 at the southern end (chainage the Marina Bay Crossing. It includes the 2940) and Contract 424 at the northern construction of sewers with associated end (chainage 5900). The tunnels are manholes. constructed by cut & cover method. Marina Bay, Singapore | freeways and urban roads CapabiliTy sTaTemenT p. 15 |
  • 18. 2.1 rELEVanTproJeCT EXPErIEnCE | freeways& urbanroads | Feasibility Study and DPR for 4/6-Laning of Patna - Bakhtiyarpu Delhi - Hapur Section of National Kottakatta to Kurnool Highway - 24 Meinhardt has been appointed by national The project stretch is part of the north- Highways authority of India for providing Meinhardt has been appointed by south corridor of national Highways Consultancy services for Preparation of national Highways authority of India development Programme (nHdP) Feasibility-Cum-Preliminary design for for undertaking Feasibility study and and starts at Km 133 near the village 4/6-Laning of Patna - Bakhtiyarpur section preparation of preliminary design for Kottakatta in south India and ends at of national Highway 30 in the state of widening the existing 4-lane delhi-Hapur Km 211 on Kurnool bypass near Kurnool Bihar to be executed as BoT (Toll) Project section of nH-24 (60 kms), to a 6 lane town. The stretch passes through plain/ on dBFo Pattern under nHdP Phase III. configuration. The project is proposed to rolling terrain with major outcrops at many be developed as BoT (Toll) project on description of services to be provided: dBFo pattern. places with large masses of granite rocks and boulders. There are 4 major bridges, > Feasibility cum Preliminary Project report(FCPPr) Meinhardt’s scope of services shall 40 minor bridges, 1 rail over bridge, include topographic survey, geotechnical 1 underpass and 150 cross drainage > Traffic Survey investigations, environment and social structures. The bridge across river Krishna > road Condition survey impact assessment studies, public is 940.87m long and that across river consultation, traffic studies, condition > Preliminary design of Pavements & Thungabhadra is 620.80m long. assessment, preliminary design of overlay The project encompasses 5 major highway alignment, pavements, bridges/ > Preliminary design of Bridges, district road requiring construction of flyovers, CD structures, toll plazas, road Flyovers, roB etc. grade separators and one state highway furniture and preparation of preliminary > Preliminary design of Toll Plazas cost estimates. requiring an interchange. > Land Plan schedules Kottakatta, India The report prepared by Meinhardt will form > Utility relocation Plans the basis on which a financial consultant > Environmental Impact assessment and a legal consultant, appointed (EIa) separately by the Client, will prepare the > social Impact assessment (sIa) documents for inviting bids from private entrepreneurs to award a BoT (Toll) Bihar, India concession. Delhi, India | freeways and urban roads CapabiliTy sTaTemenT p. 16 |
  • 19. 2.1 rELEVanTproJeCT EXPErIEnCE | freeways& urbanroads | Madhya Pradesh Rural Roads The Madhya Pradesh rural road The scope of work further includes development authority has appointed assistance to MPrrda in procurement Meinhardt as the lead consultant, in of civil works contracts in four batches joint venture with artefact Projects, and through a bid process; evaluation of bids; in association with VKs Infratech, to and preparing summary evaluation reports provide project management consultancy to be submitted to the Ia. services for a 1830 km rural road length in four batches covering 11 PIUs Meinhardt will also ensure the including Jabalpur, Katni, Balaghat, implementation of civil works by approving seoni, narsinghpur, sidhi, shahdol, and scrutinising the contractors detailed Umaria, Mandla, dindori, Chhatarpur, work programme and suggesting Tikamgarh, damoh, Panna, rewa, satna modifications, if any; supervision of and Chhindwara. This is a part of the adB project implementation activities to ensure funded Madhya Pradesh rural roads complete compliance with approved sector I Project (adB Loan no.2018- drawings and technical specifications; India). obtaining and approving quality assurance system; review of tests / certificates of all Meinhardt, in association with artefact, construction materials and/or sources of will be responsible for Preparation of materials and so on. Finally, Meinhardt the Detailed Project Report (DPR); will assist MPrrda in monitoring and Preparation of Bidding Documents; evaluating the project performance to Construction supervision and Project be carried out under systematic project performance Monitoring and Preparation performance monitoring (PPM). of Project Completion report. Madhya Pradesh, India The dPr includes economic feasibility studies in accordance with adB requirements, topographic survey, soil investigation, material survey for pavement design, traffic analysis and forecast for the next 10 years including estimated maintenance cost, road safety audit and conducting initial environmental examination for preparation of an environmental management plan. | freeways and urban roads CapabiliTy sTaTemenT p. 17 |
  • 20. 2.2 developerFUndEd worKs Meinhardt’s Urban development Group other developer funded interface works assists our clients in creating exciting and include: new communities. > Greenvale Lakes Estate: Planning, Whether integrated into complex existing design and part Construction of the environments, sculpted around ancillary E14 to consider ultimate duplication, uses eg golf courses or woven into a adjacent development, coordination mixed use commercial development with detailed design of the extension each requires careful consideration of to somerton road and impact of transport and pedestrian access and traffic adjacent Greenvale reservoir. management often associated with an > Wallangarra Estate: Modified Type authority arterial road or major council C intersection with Leakes road, road. Truganina. Interface works require planning and > skyline: Hatchlands ave signalised consultation with authorities eg Vicroads intersection with robinsons rd and to minimise impact on the existing drainage outfall across Foley rd, transport network and detailed design and deer Park. construction in accordance with authority > Epping Plaza and northern Hospital: standards Modifications to Cooper Street – High street intersection and two Projects such as new Quay and new signalised entries from Cooper Waterfront City within Melbourne street, Epping docklands create vital transport and pedestrian linkages with docklands > shell service station developments: Highway (Footscray road) and harbour Hume Highway, donnybrook road Esplanade. and Eastlink. similarly the silverwoods development road Planning for new development relies on a critical interface and the proposals requiring access to: creation of an access (type C intersection) > south Gippsland Hwy, Berwick from the Murray-Valley Highway. Cranbourne rd and narre Warren Cranbourne rd, Cranbourne East. > sayers rd, Palmers rd, Forsyth rd, Truganinia. | freeways and urban roads CapabiliTy sTaTemenT p. 18 |