SlideShare ist ein Scribd-Unternehmen logo
1 von 47
This project study some cities in Malaysia
in terms of public transport system and its
properties, the disadvantages and the
benefits, as well as try to propose solutions
to improve the transport system and
increase its efficiency.
We are going to discuss:
the urban transportation facilities like :
 project review
 Urban transportation study
 Urban Public transportation
 Solutions of urban transportation problems
 ITS
 Financial analysis.
Nilai3
Nilai 3 is a town located in Negeri Sembilan,
 Malaysia. Due to its proximity,
and connection through
 the KTM to Kuala Lumpur, Putrajaya,
and Kuala Lumpur International Airport,
it is a rapidly growing town,
 development projects can
be seen as one drives around Nilai.
Area of Nilai reach
 to (165ha) which represents the country’s largest wholesale center
Absence of bus
 stations and Taxi
 Terminal .
Bus stop Condition.

the lack of parking
 places for the public
 near UKM Komuter.
Kajang city

  1-Kajang was made the capital of one of
Selangor's districts, Hulu Langat in the 1800s
 because of it being in the district's center
2. It is located 21 kilometers (13 mi) from of
               Malaysia's capital
Transportation in kajang :

• Kajang is well connected with many major
  highway and expressway like Kajang Dispersal
  Link Expressway as a ring road of kajang …etc
• to the City’s local and national profile . In
  Kajang, there are two stations.
• 1-Kajang train station or KTM Kajang which is
  located in jalan Bukit
• 2- bus station in Pusat Hentian Kajang
ktm station in kajang :

• The Kajang railway station is a Malaysian
  railway station located near the town of
  Kajang, Selangor. The station is situated 1 km
  south from Kajang's town centre.
•   KTM STATION
Kajang bus stop:
Putujaya city
Putrajaya is a planned city, located
  25km south of Kuala Lumpur, that
 serves as the federal administrative
   centre of Malaysia. The seat of
government was shifted in 1999 from
Kuala Lumpur to Putrajaya, due to the
 overcrowding and congestion in the
         Kuala Lumpur areas.
• Is one of the most beautiful mosques in Malaysia. Located on Lake
  Putra Jaya in Kuala Lumpur synthetic and can accommodate more than
  15 thousand worshipers, has been completed in the year 1999.
•
Transportation in putujaya

• Putrajaya Sentral is the main public
  tranportation hub of Putrajaya. It is a smaller
  version of Puduraya Station in Kuala Lumpur.
  Located at the west side of Putrajaya, this is
  the place where public transportation from
  other parts of Selangor stop. The Express Rail
  Link that links KLIA to KL Sentral has a station
  here.
Major highways in Putrajaya

•   Persiaran Persekutuan
•   Persiaran Sultan Salahuddin Abdul Aziz Shah
•   Persiaran Utara
•   Lebuh Sentosa
•   Persiaran Barat
•   Persiaran Selatan
•   Persiaran Timur
•   Persiaran Perdana
Generally, public transportation is one of the
most important part of urban transportation
division that are available now in Malaysia.
the existing public transport services consist
of two main parts:
1.Buses
2.Trains
.
Estimate Trip Production and Attraction as Future Demand in 2020 :

                           Zone          Production      Attraction


               1          kajang          294,742         309,018


               2           Bangi          309,018         79,787


               3         Putrajaya        22,500          26,663


               4         Seri putra       79,787          33,402


               5           Nilai3         10,120           6,819


                           SUM            716,167         455,689


                         Average         585927.75
Production         Attraction

  Zome       Corr. Production   Corr. Attraction


 kajang          241,141            397,338
  Bangi          252,821            102,591

Putrajaya         18,408            34,283

Seri putra        65,277            42,949

  Nilai3          8,280              8,768
  SUM            585,928            585,928
O-D MATRIX
                                  attraction
             zone             1            2         3        4        5       sum
                              397,338      102,591   34,238   42,949   8,768   585,928
Production

             1      241,141   163,526      42,222    14,109   17,676   3608    241,141


             2      252,821   171,447      44,267    14,793   18,532   3783    252,821


             3      18,408    12,483       3223      1077     1349     275     18,408
             4      65,277    44,267       11,429    3819     4785     977     65,277
             5      8,280     5615         1450      484      607      124     8,280
             sum    585,928   397,338      102,591   34283    42,949   8768    585,928
Proposals for the development of transport system in the study area:
Due to the estimated production and attraction for future demand in
2020 we suggest apply some strategies like:

 Dissuasion:

Although automobile circulation is permitted, it is impeded by regulations
and physical planning. For instance, parking space can be severely limited
and speed bumps placed to force speed reduction this is also an attempt to
encourage public transport and reduce accidents.
Prohibition of downtown circulation : Automobile
 circulation is forbidden in the downtown area during
 most of the day but deliveries are permitted during the
 night.
 Provide an efficient Toll gate to provide a smooth traffic flow and
  avoids traffic jam at Toll Gate.
 Also we suggest construct HOV lanes. High Occupancy Vehicle
  (HOV) lanes insure that vehicles with more than 3 passengers
  (buses, vans, carpool, etc.) Have a lane of its own that can reduce
  congested lane, particularly during peak hours.
 constructing new LRT system as follows
LRT System :

Speed – up to 40 km/hr.
2 – 6 couches per train.
Capacity – up to 40,000 passengers /hr /direction.
 Acceleration / deceleration 1.2 m/s 2.
 Rail – 1000 or 1435mm gauge.
Headway 120 s.
Suitable for radial movement.
For high density and high plot ratio area.
Feeder bus service is required.
Power supply: 750 V dc.
Sub-station: 3 – 5 km spacing.
 Guide way utilization factor = 0.75
 Load factor = 0.9.

To calculate possible range of head way (h) for LRT:
Since:



Where:
Cp = Theoretical passenger line capacity
assume= (27040) passengers/hr.
α = guide way utilization factor (0.6)

  = load factor (0.9)

n = vehicle per train

S = Maximum passenger per vehicle

h = headway in second.
So:   h=22.47*(n)
      N             h
      1             22.47
      2             44.94
      3             67.41
      4             89.88
      5             112.35
      6             134.82
      7             157.29
      8             179.76
 We suggest making new Bus Rapid Transit system as
 follows:
Finally We suggest take heavy vehicles out of CBD area to
 reduce the traffic and this can be done by applying the
 following strategies:

1. Enforce existing laws on heavy vehicle restrictions and
bus lanes.
2. Transport terminals: Gombak ITT revival, intermodal
terminals and city hubs for bus-rail linkages.
Urban presentation

Weitere ähnliche Inhalte

Was ist angesagt?

Training report on JMRC
Training report on JMRCTraining report on JMRC
Training report on JMRCtushar garg
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityPramod Kumar
 
Analysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land UseAnalysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land UseAnirban Mahajan
 
Jaipur metro rail project
Jaipur metro rail projectJaipur metro rail project
Jaipur metro rail projectDocumentStory
 
jaipur metro rail presentation
jaipur metro rail presentationjaipur metro rail presentation
jaipur metro rail presentationtushar garg
 
Role of metro for traffic in kolkata
Role of metro for traffic in kolkataRole of metro for traffic in kolkata
Role of metro for traffic in kolkataPiter Biswas
 
Appraising kolkata metro rail project case
Appraising kolkata metro rail project caseAppraising kolkata metro rail project case
Appraising kolkata metro rail project caseRahul Pagaria
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)Gurjit Kaur Kaler
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Prashant Inamdar
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1OmkarRasal
 
MUMBAI METRO TRAIN
MUMBAI METRO TRAINMUMBAI METRO TRAIN
MUMBAI METRO TRAINNithy Anand
 
Rail transport
Rail transportRail transport
Rail transportNiren Gada
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 

Was ist angesagt? (20)

Training report on JMRC
Training report on JMRCTraining report on JMRC
Training report on JMRC
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
Metro ppt - copy
Metro ppt - copyMetro ppt - copy
Metro ppt - copy
 
Bangalore Metro Project
Bangalore Metro ProjectBangalore Metro Project
Bangalore Metro Project
 
Analysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land UseAnalysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land Use
 
Jaipur metro rail project
Jaipur metro rail projectJaipur metro rail project
Jaipur metro rail project
 
jaipur metro rail presentation
jaipur metro rail presentationjaipur metro rail presentation
jaipur metro rail presentation
 
Role of metro for traffic in kolkata
Role of metro for traffic in kolkataRole of metro for traffic in kolkata
Role of metro for traffic in kolkata
 
Railway
RailwayRailway
Railway
 
Appraising kolkata metro rail project case
Appraising kolkata metro rail project caseAppraising kolkata metro rail project case
Appraising kolkata metro rail project case
 
JMRC PRESENTATION
JMRC PRESENTATIONJMRC PRESENTATION
JMRC PRESENTATION
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
 
JMRC TRAINING FINAL REPORT
JMRC TRAINING FINAL   REPORT JMRC TRAINING FINAL   REPORT
JMRC TRAINING FINAL REPORT
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1
 
lucknow metro ppt
lucknow metro pptlucknow metro ppt
lucknow metro ppt
 
MUMBAI METRO TRAIN
MUMBAI METRO TRAINMUMBAI METRO TRAIN
MUMBAI METRO TRAIN
 
BMRCL In-Plant Training Report
BMRCL In-Plant Training ReportBMRCL In-Plant Training Report
BMRCL In-Plant Training Report
 
Rail transport
Rail transportRail transport
Rail transport
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 

Andere mochten auch

Faktor mempengaruhi spb
Faktor mempengaruhi spbFaktor mempengaruhi spb
Faktor mempengaruhi spbFaudziah Rasad
 
Intelligen assignment 1
Intelligen assignment  1 Intelligen assignment  1
Intelligen assignment 1 Haider Al Kaisy
 
Sustainable urban trans. in hannover
Sustainable urban trans. in hannoverSustainable urban trans. in hannover
Sustainable urban trans. in hannoverHaider Al Kaisy
 
Faktor mempengaruhi spb
Faktor mempengaruhi spbFaktor mempengaruhi spb
Faktor mempengaruhi spbFaudziah Rasad
 
Kkka 6414 sustainability for my hometown
Kkka  6414  sustainability for my hometownKkka  6414  sustainability for my hometown
Kkka 6414 sustainability for my hometownHaider Al Kaisy
 
Joliesse franchising eylul 2012 (1)
Joliesse franchising eylul 2012 (1)Joliesse franchising eylul 2012 (1)
Joliesse franchising eylul 2012 (1)semihok88
 
Marketing stratergy of samsung galaxy
Marketing stratergy of samsung galaxyMarketing stratergy of samsung galaxy
Marketing stratergy of samsung galaxyRashmi Alag
 
Dan seracu-auto-control-pentru-avansati
Dan seracu-auto-control-pentru-avansatiDan seracu-auto-control-pentru-avansati
Dan seracu-auto-control-pentru-avansatikarina_bc
 
Diapositivas mamposteria
Diapositivas mamposteriaDiapositivas mamposteria
Diapositivas mamposteriaLidayaz01
 

Andere mochten auch (19)

Faktor mempengaruhi spb
Faktor mempengaruhi spbFaktor mempengaruhi spb
Faktor mempengaruhi spb
 
Moving dna
Moving dnaMoving dna
Moving dna
 
Orquideas 2012
Orquideas 2012Orquideas 2012
Orquideas 2012
 
Intelligen assignment 1
Intelligen assignment  1 Intelligen assignment  1
Intelligen assignment 1
 
Sustainable urban trans. in hannover
Sustainable urban trans. in hannoverSustainable urban trans. in hannover
Sustainable urban trans. in hannover
 
MARIA LUISA DIAZ
MARIA LUISA DIAZMARIA LUISA DIAZ
MARIA LUISA DIAZ
 
Faktor mempengaruhi spb
Faktor mempengaruhi spbFaktor mempengaruhi spb
Faktor mempengaruhi spb
 
Kkka 6414 sustainability for my hometown
Kkka  6414  sustainability for my hometownKkka  6414  sustainability for my hometown
Kkka 6414 sustainability for my hometown
 
Presentation 4
Presentation 4Presentation 4
Presentation 4
 
Joliesse franchising eylul 2012 (1)
Joliesse franchising eylul 2012 (1)Joliesse franchising eylul 2012 (1)
Joliesse franchising eylul 2012 (1)
 
Presentation 4
Presentation 4Presentation 4
Presentation 4
 
No poo (Català)
No poo (Català)No poo (Català)
No poo (Català)
 
Marketing stratergy of samsung galaxy
Marketing stratergy of samsung galaxyMarketing stratergy of samsung galaxy
Marketing stratergy of samsung galaxy
 
6.1 digestion
6.1 digestion6.1 digestion
6.1 digestion
 
Dan seracu-auto-control-pentru-avansati
Dan seracu-auto-control-pentru-avansatiDan seracu-auto-control-pentru-avansati
Dan seracu-auto-control-pentru-avansati
 
Science quotes
Science quotesScience quotes
Science quotes
 
17375239 tipo-de-estrategia
17375239 tipo-de-estrategia17375239 tipo-de-estrategia
17375239 tipo-de-estrategia
 
Science jobs
Science jobsScience jobs
Science jobs
 
Diapositivas mamposteria
Diapositivas mamposteriaDiapositivas mamposteria
Diapositivas mamposteria
 

Ähnlich wie Urban presentation

[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)shrdcinfo
 
Urban presentation
Urban presentationUrban presentation
Urban presentationsarah_hazim
 
Active mobility sharing in malaysia deployment of bike ebike escooter shari...
Active mobility sharing in malaysia   deployment of bike ebike escooter shari...Active mobility sharing in malaysia   deployment of bike ebike escooter shari...
Active mobility sharing in malaysia deployment of bike ebike escooter shari...Johan Sammy
 
UKM-Urban final presentation
UKM-Urban final presentationUKM-Urban final presentation
UKM-Urban final presentationMalek Algadi
 
INTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEMINTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEMAmar Patel
 
KAJANG URBAN TRANSPORT STUDY
KAJANG URBAN TRANSPORT STUDYKAJANG URBAN TRANSPORT STUDY
KAJANG URBAN TRANSPORT STUDYsyafiqahbahrin
 
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdfJPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdfSaidrashedHosayni
 
MBPJ_GKLKV_Nov2013_SPAD_Part1
MBPJ_GKLKV_Nov2013_SPAD_Part1MBPJ_GKLKV_Nov2013_SPAD_Part1
MBPJ_GKLKV_Nov2013_SPAD_Part1Norma Nun
 
94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-convertedPARASMONGIA2
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Reportarmada7000
 
MRT TRANSPORTATION
MRT TRANSPORTATION MRT TRANSPORTATION
MRT TRANSPORTATION Shadina Shah
 
Esriuk_track3_bruce mc-daniel - highways england
Esriuk_track3_bruce mc-daniel - highways englandEsriuk_track3_bruce mc-daniel - highways england
Esriuk_track3_bruce mc-daniel - highways englandEsri UK
 

Ähnlich wie Urban presentation (20)

URBAN TRANSPORT DEVELOPMENT PLANNING
URBAN TRANSPORT DEVELOPMENT PLANNINGURBAN TRANSPORT DEVELOPMENT PLANNING
URBAN TRANSPORT DEVELOPMENT PLANNING
 
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : Batam(Indonesia)
 
Improvement of urban transport system
Improvement of urban transport systemImprovement of urban transport system
Improvement of urban transport system
 
UKM-Urban presentation
UKM-Urban presentationUKM-Urban presentation
UKM-Urban presentation
 
Urban presentation
Urban presentationUrban presentation
Urban presentation
 
Active mobility sharing in malaysia deployment of bike ebike escooter shari...
Active mobility sharing in malaysia   deployment of bike ebike escooter shari...Active mobility sharing in malaysia   deployment of bike ebike escooter shari...
Active mobility sharing in malaysia deployment of bike ebike escooter shari...
 
UKM-Urban final presentation
UKM-Urban final presentationUKM-Urban final presentation
UKM-Urban final presentation
 
Greater Jakarta Transport - on the way to transformation
Greater Jakarta Transport - on the way to transformationGreater Jakarta Transport - on the way to transformation
Greater Jakarta Transport - on the way to transformation
 
Urban transportation
Urban transportationUrban transportation
Urban transportation
 
Urban transport
Urban transportUrban transport
Urban transport
 
Advancing Rail Transit Excellence in OBOR Countries
Advancing Rail Transit Excellence in OBOR CountriesAdvancing Rail Transit Excellence in OBOR Countries
Advancing Rail Transit Excellence in OBOR Countries
 
INTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEMINTELLIGENT TRANSPORTATION SYSTEM
INTELLIGENT TRANSPORTATION SYSTEM
 
KAJANG URBAN TRANSPORT STUDY
KAJANG URBAN TRANSPORT STUDYKAJANG URBAN TRANSPORT STUDY
KAJANG URBAN TRANSPORT STUDY
 
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdfJPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
 
MBPJ_GKLKV_Nov2013_SPAD_Part1
MBPJ_GKLKV_Nov2013_SPAD_Part1MBPJ_GKLKV_Nov2013_SPAD_Part1
MBPJ_GKLKV_Nov2013_SPAD_Part1
 
94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Report
 
MRT TRANSPORTATION
MRT TRANSPORTATION MRT TRANSPORTATION
MRT TRANSPORTATION
 
Esriuk_track3_bruce mc-daniel - highways england
Esriuk_track3_bruce mc-daniel - highways englandEsriuk_track3_bruce mc-daniel - highways england
Esriuk_track3_bruce mc-daniel - highways england
 
land transport master plan.pptx
land transport master plan.pptxland transport master plan.pptx
land transport master plan.pptx
 

Urban presentation

  • 1.
  • 2.
  • 3. This project study some cities in Malaysia in terms of public transport system and its properties, the disadvantages and the benefits, as well as try to propose solutions to improve the transport system and increase its efficiency.
  • 4. We are going to discuss: the urban transportation facilities like :  project review  Urban transportation study  Urban Public transportation  Solutions of urban transportation problems  ITS  Financial analysis.
  • 5.
  • 6.
  • 7. Nilai3 Nilai 3 is a town located in Negeri Sembilan, Malaysia. Due to its proximity, and connection through the KTM to Kuala Lumpur, Putrajaya, and Kuala Lumpur International Airport, it is a rapidly growing town, development projects can be seen as one drives around Nilai. Area of Nilai reach to (165ha) which represents the country’s largest wholesale center
  • 8.
  • 9.
  • 10.
  • 11. Absence of bus stations and Taxi Terminal . Bus stop Condition. the lack of parking places for the public near UKM Komuter.
  • 12. Kajang city 1-Kajang was made the capital of one of Selangor's districts, Hulu Langat in the 1800s because of it being in the district's center 2. It is located 21 kilometers (13 mi) from of Malaysia's capital
  • 13.
  • 14. Transportation in kajang : • Kajang is well connected with many major highway and expressway like Kajang Dispersal Link Expressway as a ring road of kajang …etc • to the City’s local and national profile . In Kajang, there are two stations. • 1-Kajang train station or KTM Kajang which is located in jalan Bukit • 2- bus station in Pusat Hentian Kajang
  • 15. ktm station in kajang : • The Kajang railway station is a Malaysian railway station located near the town of Kajang, Selangor. The station is situated 1 km south from Kajang's town centre.
  • 16. KTM STATION
  • 19. Putrajaya is a planned city, located 25km south of Kuala Lumpur, that serves as the federal administrative centre of Malaysia. The seat of government was shifted in 1999 from Kuala Lumpur to Putrajaya, due to the overcrowding and congestion in the Kuala Lumpur areas.
  • 20. • Is one of the most beautiful mosques in Malaysia. Located on Lake Putra Jaya in Kuala Lumpur synthetic and can accommodate more than 15 thousand worshipers, has been completed in the year 1999. •
  • 21. Transportation in putujaya • Putrajaya Sentral is the main public tranportation hub of Putrajaya. It is a smaller version of Puduraya Station in Kuala Lumpur. Located at the west side of Putrajaya, this is the place where public transportation from other parts of Selangor stop. The Express Rail Link that links KLIA to KL Sentral has a station here.
  • 22. Major highways in Putrajaya • Persiaran Persekutuan • Persiaran Sultan Salahuddin Abdul Aziz Shah • Persiaran Utara • Lebuh Sentosa • Persiaran Barat • Persiaran Selatan • Persiaran Timur • Persiaran Perdana
  • 23. Generally, public transportation is one of the most important part of urban transportation division that are available now in Malaysia. the existing public transport services consist of two main parts: 1.Buses 2.Trains
  • 24.
  • 25. .
  • 26. Estimate Trip Production and Attraction as Future Demand in 2020 : Zone Production Attraction 1 kajang 294,742 309,018 2 Bangi 309,018 79,787 3 Putrajaya 22,500 26,663 4 Seri putra 79,787 33,402 5 Nilai3 10,120 6,819 SUM 716,167 455,689 Average 585927.75
  • 27. Production Attraction Zome Corr. Production Corr. Attraction kajang 241,141 397,338 Bangi 252,821 102,591 Putrajaya 18,408 34,283 Seri putra 65,277 42,949 Nilai3 8,280 8,768 SUM 585,928 585,928
  • 28. O-D MATRIX attraction zone 1 2 3 4 5 sum 397,338 102,591 34,238 42,949 8,768 585,928 Production 1 241,141 163,526 42,222 14,109 17,676 3608 241,141 2 252,821 171,447 44,267 14,793 18,532 3783 252,821 3 18,408 12,483 3223 1077 1349 275 18,408 4 65,277 44,267 11,429 3819 4785 977 65,277 5 8,280 5615 1450 484 607 124 8,280 sum 585,928 397,338 102,591 34283 42,949 8768 585,928
  • 29. Proposals for the development of transport system in the study area: Due to the estimated production and attraction for future demand in 2020 we suggest apply some strategies like:  Dissuasion: Although automobile circulation is permitted, it is impeded by regulations and physical planning. For instance, parking space can be severely limited and speed bumps placed to force speed reduction this is also an attempt to encourage public transport and reduce accidents.
  • 30. Prohibition of downtown circulation : Automobile circulation is forbidden in the downtown area during most of the day but deliveries are permitted during the night.
  • 31.  Provide an efficient Toll gate to provide a smooth traffic flow and avoids traffic jam at Toll Gate.
  • 32.  Also we suggest construct HOV lanes. High Occupancy Vehicle (HOV) lanes insure that vehicles with more than 3 passengers (buses, vans, carpool, etc.) Have a lane of its own that can reduce congested lane, particularly during peak hours.
  • 33.  constructing new LRT system as follows
  • 34. LRT System : Speed – up to 40 km/hr. 2 – 6 couches per train. Capacity – up to 40,000 passengers /hr /direction.  Acceleration / deceleration 1.2 m/s 2.  Rail – 1000 or 1435mm gauge. Headway 120 s. Suitable for radial movement. For high density and high plot ratio area. Feeder bus service is required. Power supply: 750 V dc. Sub-station: 3 – 5 km spacing.
  • 35.  Guide way utilization factor = 0.75  Load factor = 0.9. To calculate possible range of head way (h) for LRT: Since: Where: Cp = Theoretical passenger line capacity assume= (27040) passengers/hr. α = guide way utilization factor (0.6) = load factor (0.9) n = vehicle per train S = Maximum passenger per vehicle h = headway in second.
  • 36. So: h=22.47*(n) N h 1 22.47 2 44.94 3 67.41 4 89.88 5 112.35 6 134.82 7 157.29 8 179.76
  • 37.
  • 38.
  • 39.  We suggest making new Bus Rapid Transit system as follows:
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46. Finally We suggest take heavy vehicles out of CBD area to reduce the traffic and this can be done by applying the following strategies: 1. Enforce existing laws on heavy vehicle restrictions and bus lanes. 2. Transport terminals: Gombak ITT revival, intermodal terminals and city hubs for bus-rail linkages.