1. CERAMIC FUEL CELL 1 KW System
System description:
Gas supply max 0.2Nm3/h NG (2kW)
Electric power DC 1.24kW
AC 1kW
Heat recovery up to 500W (depends on coolant temperature)
Efficiency (on NG) Electrical 50% net
Overall 70% typical
Technology Stack Ceramic Fuel Cell (planar, not
pressurized, internal steam-reforming)
System Ceramic Fuel Cell
References (field trials) Powerco, Szencorp and EWE
State of art Product development
Future market Residential / small commercial up to 20kW
Chris Wilcox
Business Development Manager
CFC Europe Ltd
chrisw@cfcl.com.au
TECHNICAL ADVICE
Technology
Advantages:
- Large experience
- High electrical efficiency (better energy quality)
- Steam-reforming before stack (in the case of biogas can work as a fuse in electrical circuits, and
protect the stack, the most expensive part of the SOFC system)
- "non-binding" letter of intent showing the customer (or one of the partners) intends to make a
business out of using our units for biogas (or other) applications
- Factory in Europe, although they still look for collaboration with other companies
Disadvantages:
- Planar geometry, worse performance under thermal stresses
- Cost per kW high
- System development for system up to 5 kW, never over 20kW
Experience SOFC systems
4 units delivered to the field (Powerco, Szencorp and EWE), 10 for EWE in 2007
Experience with biogas
They can run a known composition through a test station
System suitable for demo yes
ITEM COST / TIME INCLUDED NOT INCLUDED
DELIVERY COST EVALUATION
System 70.000€
“out-of-pocket”
expenses (including
travel, accommodation
and living expenses)
incurred in providing the
Products or Services.
Freight rate CFCL will arrange and
pay for freight and
CFCL will on-charge
customs duties and
2. transit insurance to the
Site
taxes to Customer
Insurances
Delivery Time
Net~Gen system test
(without stack) Q3 2007
Stack Q4 2007
Terms of payment
Little negotiable (significant percentage up front)
Typical (from the total of €140 000): pay around 33% on contract, 33% on
hand-over and 34% at the end
OPERATION COSTS EVALUATION
Start-up yes
Monitoring yes
Operation costs
Training a technician
Telephone and e-mail
support
Insure the Net~Gen unit
against loss or damage
to the value of €70 000
Maintenance
Repair or replace any
part of the NetGen unit
which fails to perform
according to the
Technical Specification
under normal conditions
If the unit fails
repeatedly such that it is
not commercially viable
for CFCL to continue to
repair or replace it, both
parties will discuss and
in good faith attempt to
agree an appropriate
alternative
Warranty 70.000€
1 year support package
Unlimited replacement
stacks, installation,
commissioning and
manuals in spanish
Additional costs
(including delay) due to
customer’s delay or
failure to comply with its
obligations, or events
outside the CFCL
Party’s reasonable
control
After-sales service
(logistics)
£500 per day plus taxes