130.7                                   ARTICLE 130



(9) Selection of Personal Protective Equipment When
Required for Various Tasks. Where selected in lieu of the
ffi                analysis   of 130.3(ffi)(1), Table 130.7(C)(9)
shall be used to determine the hazardlrisk category              ffi
                                                     The assumed
maximum short-circuit current capacities and maximum
fault clearing times for various tasks are listed in the notes




                                                                           FPN No. 3:   ffi                                circuit parts
                                                                           that operate at less than 50 volts w             to be de-
                                                                           energized to satisfy an "electrically safe work condition."
                                                                           Consideration should be given to the capacity of the source,
                                                                           any overcurTent protection between the energy source and
                                                                           the worker, and whether the work task related to the source
                                                                           operating at less than 50 volts increases exposure to elec-
                                                                           trical burns or to explosion from an electric arc.




Thble 130.7(C)(9) Hazard/Risk Categorf- Crrsdficatbm and Us€ of Rubber Insulating Gloves and Insulated
and Insulating Hand Tools

                                                                       Hazard/Risk         Rubber Insulating          Insulated and
          Tasks Performed on Energiz.ed F4uipment                       Category                Gloves           Insulating Hand Tools
Panelboards or Other Equipment Rated 240 V and Below
    Note L
  -
Perform infrared thermography and other non-contact
 inspections outside the restricted approach boundary

Circuit breaker (CB) or fused switch operation with covers on               0                      N                        N
CB or fused switch operation with covers off                                0                      N                        N
Work on energized electrical conductors and circuit parts,                  I                      Y                        Y
 including voltage testing

Remove/install CBs or fused switches                                        1                      Y                        Y
Removal ofbolted covers (to expose bare, energized electrical               I                      N                        N
 conductors and circuit parts)

Opening hinged covers (to expose bare, energized electrical                 0                      N                        N
 conductors and circuit parts)

Work on energized electrical conductors and circuit parts of
 utilization equipment fed directly by a branch circuit of the
  panelboard

Panelboards or Switchboards Rated >240 V and up to
 600 V (wi0r molded case or insulated case circuit breakers)
    Note 1
 -
Perform infrared thermography and other non-contact inspections                                    N                        N
  outside the restricted approach boundary

CB or fused switch operation with covers on                                                        N                        N




70E-30                                                                               ELECTRICAL SAFETY IN THE   WORKPLACE       2OO9   Edition
ARTICLE 130                                                                      r30.7




Table 130.7(CX9) Continued

                                                                     HazardlRisk   Rubber Insulating      Insulated and
           Tasks Performed on Energized Equipment                     Category          Gloves         Insulating Hand Tools
CB or fused switch operation with covers off                              I               Y                     N
Work on energized electrical conductors and circuit parts,                2*              Y                     Y
 including voltage testing
Work on energized electrical conductors and circuit parts of              2*              Y                     Y
 utilization equipment fed directly by a branch circuit of the
 panelboard or switchboard

600 V Class Motor Control Centers (MCCs)                Note 2
  (except as indicated)                             -
Perform infrared thermography and other non-contact                       I
 inspections outside the restricted approach boundary

CB or fused switch or starter operation with enclosure doors              0
  closed

Reading a panel meter while operating a meter switch                      0

CB or fused switch or starter operation with enclosure doors open         1


Work on energized electrical conductors and circuit parts,
 including voltage testing

Work on control circuits with energized electrical conductors and         0
 circuit parts 120 V or below, exposed
                                                                          .,,*
Work on control circuits with energized electrical conductors and
 circuit parts >120 Y exposed

Insertion or removal of individual starter "buckets" from MCC             1



  Note 3
                                                                 -
Application of safety grounds, after voltage test                         ')*

Removal ofbolted covers (to expose bare, energized electrical             +
 conductors and circuit parts)  Note 3
                                -
Opening hinged covers (to expose bare, energized elecffical               I
 conductors and circuit parts)  Note 3
                                -
Work on energized elecfrical conductors and circuit parts of              2*
 utilization equipment fed directly by a branch cfucuit of the
 motor contol center

6fi) V Class Switchgear (with power circuit breakers or fused
  switches)       Note 4
              -
Perform infrared thermography and other non-contact inspections           2
  outside the restricted approach boundary

CB or fused switch operation with enclosure doors closed                  0

Reading a panel meter while operating a meter switch                      0

CB or fused switch operation with enclosure doors open                    I
Work on energized electrical conductors and circuit parts,
 including voltage testing

Work on control circuits with energized electical conductors and          0
 circuit pars 120 V or below, exposed

Work on control circuits with energized electrical conductors and         2*
 circuit parts >120 V exposed

                                                                                                                    (continues)



2OO9   Edition    ELECTRICAL SAFETY IN THE WORKPLACE                                                                   70E-31
130.7                                  ARTICLE     I3O-



Table 130.7(C)(9) Continued

                                                                  Hazard/Risk     Rubber Insulating         Insulated and
          Tasks Performed on Energized Equipment                   Category             Gloves           Insulating Hand Tools
Insertion or removal (racking) of CBs from cubicles, doors             +
  open or closed

Application of safety grounds, after voltage test
Removal of bolted covers (to expose bare, energized electrical         4
 conductors and circuit parts)

Opening hinged covers (to expose bare, energized electrical
 conductors and circuit parts)

Other 600 Y Class (277 V through 6fi) V, nominal)
 Equipment     Note 2 (except as indicated)
               -
Lighting or small power transformers (600 V, maximum)
  Removal of bolted covers (to expose bare, energized electri-         2*
   cal conductors and circuit parts)
  Opening hinged covers (to expose bare, energized electrical          1
   conductors and circuit parts)

  Work on energized electrical conductors and circuit parts,
   including voltage testing
  Application of safety grounds, after voltage test                   2*
Revenue meters (kW-hour, at primar,v voltage and current) In-         2*
 sertion or removal

Cable trough or tray cover removal or installation                     1


Miscellaneous equipment cover removal or installation                  I
Work on energized electrical conductors and circuit parts, in-        2*
 cluding voltage testing
Application of safety grounds, after voltage test                     2>k


Insertion or removal of plug-in devices into or from busways          2*
NEMA E2 (fused contactor) Motor Starters, 2.3 kV
 Through 7.2kY
Perform infrared thermography and other non-contact inspec-
 tions outside the restricted approach boundary
Contactor operation with enclosure doors closed                       0
Reading a panel meter while operating a meter switch                  0
Contactor operation with enclosure doors open

Work on energized, electrical conductors and circuit parts, in-       4
 cluding voltage testing
Work on control circuits with energized electrical conductors         0
 and circuit parts 120 V or below, exposed

Work on control circuits with energized electrical conductors         J
 and circuit parts >120 V, exposed

Insertion or removal (racking) of starters from cubicles, doors
  open or closed

Application of safety grounds, after voltage test




708-32                                                                      ELECTRICAL SAFETY IN THE   WORKPLACE   2OO9   Edition
ARTICLE l3O
                                                    -


Table 130.7(CX9) Continued

                                                                llazard./Risk   Rubber Insulating       Insulated and
           Tasks Performed on Energized Equipment                  Category          Gloves         Insulating Hand Tools
Removal of bolted covers (to expose bare, energized                   4                N                     N
 electrical conductors and circuit parts)
Opening hinged covers (to expose bare, energized electrical           J                N                     N
 conductors and circuit parts)
Insertion or removal (racking) of starters from cubicles of           0                N                     N
  arc-resistant construction, tested in accordance with IEEE
  C37.20.7, doors closed only
Metal Clad Switchgear, 1 kV Through 38 kV
Perform infrared thermography and other non-contact
 inspections outside the restricted approach boundary
CB operation with enclosure doors closed
Reading a panel meter while operating a meter switch
CB operation with enclosure doors open
Work on energized electrical conductors and circuit parts,
 including voltage testing
Work on control circuits with energized electrical conductors
 and circuit parts 120 V or below, exposed

Work on control circuits with energized electrical conductors
 and circuit parts >120 V, exposed

Insertion or removal (racking) of CBs from cubicles, doors
  open or closed

Application of safety grounds, after voltage test
Removal of bolted covers (to expose bare, energized
 electrical conductors and circuit parts)
Opening hinged covers (to expose bare, energized electrical
 conductors and circuit parts)
Opening voltage transformer or control power transformer
  compartments

Arc-Resistant Switchgear TVpe 1 or 2 (for clearing times
 of <0.5 sec with a perspective fault current not to
 exceed the arc resistant rating of the equipment)

CB operation with enclosure door closed
Insertion or removal (racking) of CBs from cubicles, doors
  closed

Insertion or removal of CBs from cubicles with door open
Work on control circuits with energized electrical conductors
 and circuit parts 120 V or below, exposed

Insertion or removal (racking) of ground and test device
  with door closed
Insertion or removal (racking) of voltage transformers on or
  off the bus door closed

                                                                                                                 (continues)




2OO9   Edition   ELECTzuCAL SAFETY IN THE WORKPLACE                                                                 708-33
130.7                                     ARTICLEl3o-Wffi#


Tabfe 130.7(CX9) Continued

                                                                            Hazard./Risk          Rubber Insulating          Insulated and
           Tasks Performed on Energized Equipment                            Category                    Gloves         lnsulating Hand Tools
Other Equipment      I   kV Through 38 kY
Metal-enclosed intemrpter switchgear, fused or unfused

  Switch operation of arc-resistant-type construction, tested in                                                                   N
   accordance with IEEE C37.20.7, doors closed only

  Switch operation, doors closed                                                                                                   N
 Work on energized electrical conductors and circuit parts,                                                                        Y
  including voltage testing
 Removal of bolted covers (to expose bare, energized                                                        N
  electrical conductors and circuit parts)

 Opening hinged covers (to expose bare, energized electrical                                                N                      N
  conductors and circuit parts)

Outdoor disconnect switch operation (hookstick operated)                           3                        Y                      Y
Outdoor disconnect switch operation (gang-operated, from                           2                        Y                      N
  grade)

Insulated cable examination, in manhole o1 6ther confined space                    4                        Y                      N
hsulated cable examination, in open area                                           2                        Y                      N

General Notes (applicable to the entire table):
(a) Rubber insulating gloves are gloves rated for the maximum line-to-line voltage upon which work will be
done.
(b) Insulated and insulating hand tools are tools rated and tested for the marimum line-to-line voltage uporl
which work will be done. and are manufactured and tested in accordance gith ASTM F 1505, Standard
Specification for Insulated and Insulating Hand Tools.
(c) Y = yes (required), N = no (not required).
(d) For systems rated less than 1000 volts. the fault currents aad upstream protective device clearing times
are based on an 18 in. working distance.
(e) For systems rated 1 kV and greater, the Hazard/Risk Categories are based on a 36 in. working distance.
(f) For equipment protected by upstream current limiting fuses with arcing fault current in their current
limiting range (Vz cycle fault clearing time or less), the hazard,/risk category required may be reduced by one
number.
Specific Notes (as referenced in the table):
1. Maximum of 25 kA short circuit current available; maximum of 0.03 sec (2 cycle) fault clearing time.
2. Maximum of 65 kA short circuit current available; maximum of 0.03 sec (2 cycle) fault clearing time.
3. Maximum of 42kA short circuit current available; maximum of 0.33 sec (20 cycle) fault clearing time.
4. Maximum of 35 kA short circuit current available; maximum of up to 0.5 sec (30 cycle) fault clearing
tlme.



(10) Protective Clothing and Personal Protective                                  FPN No. 1: See Annex H for a suggested simplified ap-
Equipment Matrix. Once the HazardlRisk Category has                               proach to ensure adequate PPE for electrical workers within
                                                                                  facilities with large and diverse electrical systems.
been identified #$Btr* Table 130.7(CX9)          ffiffiffi,"Ii                    FPN No. 2: The PPE requirements of this section are in-
                                                    Tubl"
                                                                                  tended to protect a person from arc flash and shock hazards.
 130.7(CX10) shall be used to determine the required PPE
                                                                                  While some situations could result in burns to the skin,
for the task. Table 130.7(CX10) lists the requirements for                        even with the protection described in Table 130.7(C)(10),
protective clothing and other protective equipment based                          burn injury should be reduced and survivable. Due to the
on HazardlRisk Category numbers 0 through 4. This cloth-                          explosive effect of some arc events, physical trauma inju-
                                                                                  ries could occur. The PPE requirements of this section do
ing and equipment shall be used when working within the                           not address protection against physical trauma other than
Arc Flash Protection Boundary.                                                    exposure to the thermal effects of an arc flash.




708-34                                                                                     ELECTRICAL SAFETY IN THE   WORKPLACE        2OO9   Edition

Weitere ähnliche Inhalte

Was ist angesagt?

ABB Low Voltage LV Surge Arresters - ABB LOVOS 5 and LOVOS 10 Surge Arresters
ABB Low Voltage LV Surge Arresters - ABB LOVOS 5 and LOVOS 10 Surge ArrestersABB Low Voltage LV Surge Arresters - ABB LOVOS 5 and LOVOS 10 Surge Arresters
ABB Low Voltage LV Surge Arresters - ABB LOVOS 5 and LOVOS 10 Surge ArrestersThorne & Derrick International
 
9114 toshiba 19_a26_manual_de_servicio
9114 toshiba 19_a26_manual_de_servicio9114 toshiba 19_a26_manual_de_servicio
9114 toshiba 19_a26_manual_de_servicioDomingo Cordova
 
01. superswitch switch disconnector fuse and din bs fuses
01. superswitch switch disconnector fuse and din bs fuses01. superswitch switch disconnector fuse and din bs fuses
01. superswitch switch disconnector fuse and din bs fusesangelochintu
 
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DBchangwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DBSheikh Imran
 
ABB LOVOS Low Voltage Surge Arresters Presentation - Surge Arresters, Plugs &...
ABB LOVOS Low Voltage Surge Arresters Presentation - Surge Arresters, Plugs &...ABB LOVOS Low Voltage Surge Arresters Presentation - Surge Arresters, Plugs &...
ABB LOVOS Low Voltage Surge Arresters Presentation - Surge Arresters, Plugs &...Thorne & Derrick International
 
G.r.s. 02 04-01-12
G.r.s. 02 04-01-12G.r.s. 02 04-01-12
G.r.s. 02 04-01-12angeloneha
 
Contactor thermal relay catalogue
Contactor thermal relay catalogueContactor thermal relay catalogue
Contactor thermal relay catalogueJohnson lim
 
Behavioral studies of surge protection components
Behavioral studies of surge protection componentsBehavioral studies of surge protection components
Behavioral studies of surge protection componentsjournalBEEI
 
ABB Medium Voltage MV Indoor Voltage Transformers VT'S - 3.3kV to 40.5kV - A...
ABB Medium Voltage MV Indoor Voltage Transformers VT'S -  3.3kV to 40.5kV - A...ABB Medium Voltage MV Indoor Voltage Transformers VT'S -  3.3kV to 40.5kV - A...
ABB Medium Voltage MV Indoor Voltage Transformers VT'S - 3.3kV to 40.5kV - A...Thorne & Derrick International
 
Mcb price list_electrical_installations_a_to_z_w.e.f_1st_sep_2016
Mcb price list_electrical_installations_a_to_z_w.e.f_1st_sep_2016Mcb price list_electrical_installations_a_to_z_w.e.f_1st_sep_2016
Mcb price list_electrical_installations_a_to_z_w.e.f_1st_sep_2016Maxpromotion
 
LM324 Low Power Quad Op Amps
LM324 Low Power Quad Op AmpsLM324 Low Power Quad Op Amps
LM324 Low Power Quad Op AmpsYong Heui Cho
 

Was ist angesagt? (19)

ABB Low Voltage LV Surge Arresters - ABB LOVOS 5 and LOVOS 10 Surge Arresters
ABB Low Voltage LV Surge Arresters - ABB LOVOS 5 and LOVOS 10 Surge ArrestersABB Low Voltage LV Surge Arresters - ABB LOVOS 5 and LOVOS 10 Surge Arresters
ABB Low Voltage LV Surge Arresters - ABB LOVOS 5 and LOVOS 10 Surge Arresters
 
9114 toshiba 19_a26_manual_de_servicio
9114 toshiba 19_a26_manual_de_servicio9114 toshiba 19_a26_manual_de_servicio
9114 toshiba 19_a26_manual_de_servicio
 
Sicop datasheet
Sicop datasheetSicop datasheet
Sicop datasheet
 
01. superswitch switch disconnector fuse and din bs fuses
01. superswitch switch disconnector fuse and din bs fuses01. superswitch switch disconnector fuse and din bs fuses
01. superswitch switch disconnector fuse and din bs fuses
 
Mccb catalogue
Mccb catalogueMccb catalogue
Mccb catalogue
 
Mean welll rs-35
Mean welll   rs-35Mean welll   rs-35
Mean welll rs-35
 
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DBchangwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
 
9730 datasheet
9730 datasheet9730 datasheet
9730 datasheet
 
ABB LOVOS Low Voltage Surge Arresters Presentation - Surge Arresters, Plugs &...
ABB LOVOS Low Voltage Surge Arresters Presentation - Surge Arresters, Plugs &...ABB LOVOS Low Voltage Surge Arresters Presentation - Surge Arresters, Plugs &...
ABB LOVOS Low Voltage Surge Arresters Presentation - Surge Arresters, Plugs &...
 
G.r.s. 02 04-01-12
G.r.s. 02 04-01-12G.r.s. 02 04-01-12
G.r.s. 02 04-01-12
 
Solar junction boxes jmv lps ltd
Solar junction boxes   jmv lps ltdSolar junction boxes   jmv lps ltd
Solar junction boxes jmv lps ltd
 
Contactor thermal relay catalogue
Contactor thermal relay catalogueContactor thermal relay catalogue
Contactor thermal relay catalogue
 
Behavioral studies of surge protection components
Behavioral studies of surge protection componentsBehavioral studies of surge protection components
Behavioral studies of surge protection components
 
Acb2
Acb2Acb2
Acb2
 
Mean well d-30 dual out
Mean well   d-30 dual outMean well   d-30 dual out
Mean well d-30 dual out
 
ABB Medium Voltage MV Indoor Voltage Transformers VT'S - 3.3kV to 40.5kV - A...
ABB Medium Voltage MV Indoor Voltage Transformers VT'S -  3.3kV to 40.5kV - A...ABB Medium Voltage MV Indoor Voltage Transformers VT'S -  3.3kV to 40.5kV - A...
ABB Medium Voltage MV Indoor Voltage Transformers VT'S - 3.3kV to 40.5kV - A...
 
Uci274 k
Uci274 kUci274 k
Uci274 k
 
Mcb price list_electrical_installations_a_to_z_w.e.f_1st_sep_2016
Mcb price list_electrical_installations_a_to_z_w.e.f_1st_sep_2016Mcb price list_electrical_installations_a_to_z_w.e.f_1st_sep_2016
Mcb price list_electrical_installations_a_to_z_w.e.f_1st_sep_2016
 
LM324 Low Power Quad Op Amps
LM324 Low Power Quad Op AmpsLM324 Low Power Quad Op Amps
LM324 Low Power Quad Op Amps
 

Andere mochten auch

PSC Flammable Storage Safety Cabinets
PSC Flammable Storage Safety CabinetsPSC Flammable Storage Safety Cabinets
PSC Flammable Storage Safety CabinetsProject Sales Corp
 
Table for separation distances and containment requirements for tanks nfpa 30...
Table for separation distances and containment requirements for tanks nfpa 30...Table for separation distances and containment requirements for tanks nfpa 30...
Table for separation distances and containment requirements for tanks nfpa 30...zaheer sajid
 
Api practice questions
Api practice questions  Api practice questions
Api practice questions Hamza Khamkar
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design141jdf
 
143137557 storage-tanks
143137557 storage-tanks143137557 storage-tanks
143137557 storage-tanksbernard347
 
Chris brooks storage tanks inspection, maintenance and failure
Chris brooks   storage tanks inspection, maintenance and failureChris brooks   storage tanks inspection, maintenance and failure
Chris brooks storage tanks inspection, maintenance and failureSreekumar K S
 
Introduction to Storage Tanks
Introduction to Storage TanksIntroduction to Storage Tanks
Introduction to Storage TanksAnkur Sharma
 
Tank design - powerpoint slides
Tank design - powerpoint slidesTank design - powerpoint slides
Tank design - powerpoint slidesmoamen mohamed
 
Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)ledzung
 

Andere mochten auch (15)

PSC Flammable Storage Safety Cabinets
PSC Flammable Storage Safety CabinetsPSC Flammable Storage Safety Cabinets
PSC Flammable Storage Safety Cabinets
 
Table for separation distances and containment requirements for tanks nfpa 30...
Table for separation distances and containment requirements for tanks nfpa 30...Table for separation distances and containment requirements for tanks nfpa 30...
Table for separation distances and containment requirements for tanks nfpa 30...
 
Api practice questions
Api practice questions  Api practice questions
Api practice questions
 
Tank Training
Tank TrainingTank Training
Tank Training
 
Api 510 study plan
Api 510 study planApi 510 study plan
Api 510 study plan
 
Ppt
PptPpt
Ppt
 
Api 510 study questions
Api 510 study questionsApi 510 study questions
Api 510 study questions
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design
 
143137557 storage-tanks
143137557 storage-tanks143137557 storage-tanks
143137557 storage-tanks
 
Chris brooks storage tanks inspection, maintenance and failure
Chris brooks   storage tanks inspection, maintenance and failureChris brooks   storage tanks inspection, maintenance and failure
Chris brooks storage tanks inspection, maintenance and failure
 
Tank design - word
Tank design - wordTank design - word
Tank design - word
 
Introduction to Storage Tanks
Introduction to Storage TanksIntroduction to Storage Tanks
Introduction to Storage Tanks
 
Tank design - powerpoint slides
Tank design - powerpoint slidesTank design - powerpoint slides
Tank design - powerpoint slides
 
2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE
2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE
2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE
 
Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)
 

Ähnlich wie Nfpa scan pgs 30 34

Schneider Technical Guide - Medium Voltage Equipment Designers
Schneider Technical Guide - Medium Voltage Equipment DesignersSchneider Technical Guide - Medium Voltage Equipment Designers
Schneider Technical Guide - Medium Voltage Equipment DesignersThorne & Derrick International
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...Ali Sepehri
 
J V C X M P X50 W T
J V C  X M  P X50 W TJ V C  X M  P X50 W T
J V C X M P X50 W Tguest7c2681
 
Metal clad switchgear 33k v
Metal clad switchgear 33k v Metal clad switchgear 33k v
Metal clad switchgear 33k v JoeChueng
 
General Or Gc Electrical Safety
General Or Gc Electrical SafetyGeneral Or Gc Electrical Safety
General Or Gc Electrical Safetyjboullemet
 
SUBSTATION DESIGN powerpoint presentation.pptx
SUBSTATION DESIGN powerpoint presentation.pptxSUBSTATION DESIGN powerpoint presentation.pptx
SUBSTATION DESIGN powerpoint presentation.pptxHimanshuShrivastava74
 
Siemens catalog tong hop safety
Siemens catalog tong hop safetySiemens catalog tong hop safety
Siemens catalog tong hop safetyDien Ha The
 
Live Line Maintenance
Live Line MaintenanceLive Line Maintenance
Live Line MaintenanceGAURAV KUMAR
 
live-linemaintenance-161014210715 (4).pdf
live-linemaintenance-161014210715 (4).pdflive-linemaintenance-161014210715 (4).pdf
live-linemaintenance-161014210715 (4).pdfAshaLatha456489
 
Data Teknis Gossen Metrawatt Insulation Tester METRISO PRO
Data Teknis Gossen Metrawatt Insulation Tester METRISO PROData Teknis Gossen Metrawatt Insulation Tester METRISO PRO
Data Teknis Gossen Metrawatt Insulation Tester METRISO PROPT. Siwali Swantika
 
NFPA 70E Electrical Safety in the Workplace by Hortica
NFPA 70E  Electrical Safety in the Workplace by HorticaNFPA 70E  Electrical Safety in the Workplace by Hortica
NFPA 70E Electrical Safety in the Workplace by HorticaAtlantic Training, LLC.
 
70 e ppt short 2012
70 e ppt short 201270 e ppt short 2012
70 e ppt short 2012dalerj
 
Contatores af400 750
Contatores af400 750Contatores af400 750
Contatores af400 750itamar2019
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushingNovia Putri
 
Electrical Saftey.pptx
Electrical Saftey.pptxElectrical Saftey.pptx
Electrical Saftey.pptxabell37
 
Fire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC ConsiderationsFire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC ConsiderationsJames S Nasby
 

Ähnlich wie Nfpa scan pgs 30 34 (20)

130.7 (c)15 (a)
130.7 (c)15 (a)130.7 (c)15 (a)
130.7 (c)15 (a)
 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
 
Sharp 32 pulg 32c24
Sharp 32 pulg 32c24Sharp 32 pulg 32c24
Sharp 32 pulg 32c24
 
Schneider Technical Guide - Medium Voltage Equipment Designers
Schneider Technical Guide - Medium Voltage Equipment DesignersSchneider Technical Guide - Medium Voltage Equipment Designers
Schneider Technical Guide - Medium Voltage Equipment Designers
 
L.v tech presentation 2
L.v tech presentation 2L.v tech presentation 2
L.v tech presentation 2
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
 
J V C X M P X50 W T
J V C  X M  P X50 W TJ V C  X M  P X50 W T
J V C X M P X50 W T
 
Metal clad switchgear 33k v
Metal clad switchgear 33k v Metal clad switchgear 33k v
Metal clad switchgear 33k v
 
General Or Gc Electrical Safety
General Or Gc Electrical SafetyGeneral Or Gc Electrical Safety
General Or Gc Electrical Safety
 
SUBSTATION DESIGN powerpoint presentation.pptx
SUBSTATION DESIGN powerpoint presentation.pptxSUBSTATION DESIGN powerpoint presentation.pptx
SUBSTATION DESIGN powerpoint presentation.pptx
 
Siemens catalog tong hop safety
Siemens catalog tong hop safetySiemens catalog tong hop safety
Siemens catalog tong hop safety
 
Live Line Maintenance
Live Line MaintenanceLive Line Maintenance
Live Line Maintenance
 
live-linemaintenance-161014210715 (4).pdf
live-linemaintenance-161014210715 (4).pdflive-linemaintenance-161014210715 (4).pdf
live-linemaintenance-161014210715 (4).pdf
 
Data Teknis Gossen Metrawatt Insulation Tester METRISO PRO
Data Teknis Gossen Metrawatt Insulation Tester METRISO PROData Teknis Gossen Metrawatt Insulation Tester METRISO PRO
Data Teknis Gossen Metrawatt Insulation Tester METRISO PRO
 
NFPA 70E Electrical Safety in the Workplace by Hortica
NFPA 70E  Electrical Safety in the Workplace by HorticaNFPA 70E  Electrical Safety in the Workplace by Hortica
NFPA 70E Electrical Safety in the Workplace by Hortica
 
70 e ppt short 2012
70 e ppt short 201270 e ppt short 2012
70 e ppt short 2012
 
Contatores af400 750
Contatores af400 750Contatores af400 750
Contatores af400 750
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
Electrical Saftey.pptx
Electrical Saftey.pptxElectrical Saftey.pptx
Electrical Saftey.pptx
 
Fire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC ConsiderationsFire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC Considerations
 

Kürzlich hochgeladen

INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEaurabinda banchhor
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxElton John Embodo
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 

Kürzlich hochgeladen (20)

Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSE
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docx
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 

Nfpa scan pgs 30 34

  • 1. 130.7 ARTICLE 130 (9) Selection of Personal Protective Equipment When Required for Various Tasks. Where selected in lieu of the ffi analysis of 130.3(ffi)(1), Table 130.7(C)(9) shall be used to determine the hazardlrisk category ffi The assumed maximum short-circuit current capacities and maximum fault clearing times for various tasks are listed in the notes FPN No. 3: ffi circuit parts that operate at less than 50 volts w to be de- energized to satisfy an "electrically safe work condition." Consideration should be given to the capacity of the source, any overcurTent protection between the energy source and the worker, and whether the work task related to the source operating at less than 50 volts increases exposure to elec- trical burns or to explosion from an electric arc. Thble 130.7(C)(9) Hazard/Risk Categorf- Crrsdficatbm and Us€ of Rubber Insulating Gloves and Insulated and Insulating Hand Tools Hazard/Risk Rubber Insulating Insulated and Tasks Performed on Energiz.ed F4uipment Category Gloves Insulating Hand Tools Panelboards or Other Equipment Rated 240 V and Below Note L - Perform infrared thermography and other non-contact inspections outside the restricted approach boundary Circuit breaker (CB) or fused switch operation with covers on 0 N N CB or fused switch operation with covers off 0 N N Work on energized electrical conductors and circuit parts, I Y Y including voltage testing Remove/install CBs or fused switches 1 Y Y Removal ofbolted covers (to expose bare, energized electrical I N N conductors and circuit parts) Opening hinged covers (to expose bare, energized electrical 0 N N conductors and circuit parts) Work on energized electrical conductors and circuit parts of utilization equipment fed directly by a branch circuit of the panelboard Panelboards or Switchboards Rated >240 V and up to 600 V (wi0r molded case or insulated case circuit breakers) Note 1 - Perform infrared thermography and other non-contact inspections N N outside the restricted approach boundary CB or fused switch operation with covers on N N 70E-30 ELECTRICAL SAFETY IN THE WORKPLACE 2OO9 Edition
  • 2. ARTICLE 130 r30.7 Table 130.7(CX9) Continued HazardlRisk Rubber Insulating Insulated and Tasks Performed on Energized Equipment Category Gloves Insulating Hand Tools CB or fused switch operation with covers off I Y N Work on energized electrical conductors and circuit parts, 2* Y Y including voltage testing Work on energized electrical conductors and circuit parts of 2* Y Y utilization equipment fed directly by a branch circuit of the panelboard or switchboard 600 V Class Motor Control Centers (MCCs) Note 2 (except as indicated) - Perform infrared thermography and other non-contact I inspections outside the restricted approach boundary CB or fused switch or starter operation with enclosure doors 0 closed Reading a panel meter while operating a meter switch 0 CB or fused switch or starter operation with enclosure doors open 1 Work on energized electrical conductors and circuit parts, including voltage testing Work on control circuits with energized electrical conductors and 0 circuit parts 120 V or below, exposed .,,* Work on control circuits with energized electrical conductors and circuit parts >120 Y exposed Insertion or removal of individual starter "buckets" from MCC 1 Note 3 - Application of safety grounds, after voltage test ')* Removal ofbolted covers (to expose bare, energized electrical + conductors and circuit parts) Note 3 - Opening hinged covers (to expose bare, energized elecffical I conductors and circuit parts) Note 3 - Work on energized elecfrical conductors and circuit parts of 2* utilization equipment fed directly by a branch cfucuit of the motor contol center 6fi) V Class Switchgear (with power circuit breakers or fused switches) Note 4 - Perform infrared thermography and other non-contact inspections 2 outside the restricted approach boundary CB or fused switch operation with enclosure doors closed 0 Reading a panel meter while operating a meter switch 0 CB or fused switch operation with enclosure doors open I Work on energized electrical conductors and circuit parts, including voltage testing Work on control circuits with energized electical conductors and 0 circuit pars 120 V or below, exposed Work on control circuits with energized electrical conductors and 2* circuit parts >120 V exposed (continues) 2OO9 Edition ELECTRICAL SAFETY IN THE WORKPLACE 70E-31
  • 3. 130.7 ARTICLE I3O- Table 130.7(C)(9) Continued Hazard/Risk Rubber Insulating Insulated and Tasks Performed on Energized Equipment Category Gloves Insulating Hand Tools Insertion or removal (racking) of CBs from cubicles, doors + open or closed Application of safety grounds, after voltage test Removal of bolted covers (to expose bare, energized electrical 4 conductors and circuit parts) Opening hinged covers (to expose bare, energized electrical conductors and circuit parts) Other 600 Y Class (277 V through 6fi) V, nominal) Equipment Note 2 (except as indicated) - Lighting or small power transformers (600 V, maximum) Removal of bolted covers (to expose bare, energized electri- 2* cal conductors and circuit parts) Opening hinged covers (to expose bare, energized electrical 1 conductors and circuit parts) Work on energized electrical conductors and circuit parts, including voltage testing Application of safety grounds, after voltage test 2* Revenue meters (kW-hour, at primar,v voltage and current) In- 2* sertion or removal Cable trough or tray cover removal or installation 1 Miscellaneous equipment cover removal or installation I Work on energized electrical conductors and circuit parts, in- 2* cluding voltage testing Application of safety grounds, after voltage test 2>k Insertion or removal of plug-in devices into or from busways 2* NEMA E2 (fused contactor) Motor Starters, 2.3 kV Through 7.2kY Perform infrared thermography and other non-contact inspec- tions outside the restricted approach boundary Contactor operation with enclosure doors closed 0 Reading a panel meter while operating a meter switch 0 Contactor operation with enclosure doors open Work on energized, electrical conductors and circuit parts, in- 4 cluding voltage testing Work on control circuits with energized electrical conductors 0 and circuit parts 120 V or below, exposed Work on control circuits with energized electrical conductors J and circuit parts >120 V, exposed Insertion or removal (racking) of starters from cubicles, doors open or closed Application of safety grounds, after voltage test 708-32 ELECTRICAL SAFETY IN THE WORKPLACE 2OO9 Edition
  • 4. ARTICLE l3O - Table 130.7(CX9) Continued llazard./Risk Rubber Insulating Insulated and Tasks Performed on Energized Equipment Category Gloves Insulating Hand Tools Removal of bolted covers (to expose bare, energized 4 N N electrical conductors and circuit parts) Opening hinged covers (to expose bare, energized electrical J N N conductors and circuit parts) Insertion or removal (racking) of starters from cubicles of 0 N N arc-resistant construction, tested in accordance with IEEE C37.20.7, doors closed only Metal Clad Switchgear, 1 kV Through 38 kV Perform infrared thermography and other non-contact inspections outside the restricted approach boundary CB operation with enclosure doors closed Reading a panel meter while operating a meter switch CB operation with enclosure doors open Work on energized electrical conductors and circuit parts, including voltage testing Work on control circuits with energized electrical conductors and circuit parts 120 V or below, exposed Work on control circuits with energized electrical conductors and circuit parts >120 V, exposed Insertion or removal (racking) of CBs from cubicles, doors open or closed Application of safety grounds, after voltage test Removal of bolted covers (to expose bare, energized electrical conductors and circuit parts) Opening hinged covers (to expose bare, energized electrical conductors and circuit parts) Opening voltage transformer or control power transformer compartments Arc-Resistant Switchgear TVpe 1 or 2 (for clearing times of <0.5 sec with a perspective fault current not to exceed the arc resistant rating of the equipment) CB operation with enclosure door closed Insertion or removal (racking) of CBs from cubicles, doors closed Insertion or removal of CBs from cubicles with door open Work on control circuits with energized electrical conductors and circuit parts 120 V or below, exposed Insertion or removal (racking) of ground and test device with door closed Insertion or removal (racking) of voltage transformers on or off the bus door closed (continues) 2OO9 Edition ELECTzuCAL SAFETY IN THE WORKPLACE 708-33
  • 5. 130.7 ARTICLEl3o-Wffi# Tabfe 130.7(CX9) Continued Hazard./Risk Rubber Insulating Insulated and Tasks Performed on Energized Equipment Category Gloves lnsulating Hand Tools Other Equipment I kV Through 38 kY Metal-enclosed intemrpter switchgear, fused or unfused Switch operation of arc-resistant-type construction, tested in N accordance with IEEE C37.20.7, doors closed only Switch operation, doors closed N Work on energized electrical conductors and circuit parts, Y including voltage testing Removal of bolted covers (to expose bare, energized N electrical conductors and circuit parts) Opening hinged covers (to expose bare, energized electrical N N conductors and circuit parts) Outdoor disconnect switch operation (hookstick operated) 3 Y Y Outdoor disconnect switch operation (gang-operated, from 2 Y N grade) Insulated cable examination, in manhole o1 6ther confined space 4 Y N hsulated cable examination, in open area 2 Y N General Notes (applicable to the entire table): (a) Rubber insulating gloves are gloves rated for the maximum line-to-line voltage upon which work will be done. (b) Insulated and insulating hand tools are tools rated and tested for the marimum line-to-line voltage uporl which work will be done. and are manufactured and tested in accordance gith ASTM F 1505, Standard Specification for Insulated and Insulating Hand Tools. (c) Y = yes (required), N = no (not required). (d) For systems rated less than 1000 volts. the fault currents aad upstream protective device clearing times are based on an 18 in. working distance. (e) For systems rated 1 kV and greater, the Hazard/Risk Categories are based on a 36 in. working distance. (f) For equipment protected by upstream current limiting fuses with arcing fault current in their current limiting range (Vz cycle fault clearing time or less), the hazard,/risk category required may be reduced by one number. Specific Notes (as referenced in the table): 1. Maximum of 25 kA short circuit current available; maximum of 0.03 sec (2 cycle) fault clearing time. 2. Maximum of 65 kA short circuit current available; maximum of 0.03 sec (2 cycle) fault clearing time. 3. Maximum of 42kA short circuit current available; maximum of 0.33 sec (20 cycle) fault clearing time. 4. Maximum of 35 kA short circuit current available; maximum of up to 0.5 sec (30 cycle) fault clearing tlme. (10) Protective Clothing and Personal Protective FPN No. 1: See Annex H for a suggested simplified ap- Equipment Matrix. Once the HazardlRisk Category has proach to ensure adequate PPE for electrical workers within facilities with large and diverse electrical systems. been identified #$Btr* Table 130.7(CX9) ffiffiffi,"Ii FPN No. 2: The PPE requirements of this section are in- Tubl" tended to protect a person from arc flash and shock hazards. 130.7(CX10) shall be used to determine the required PPE While some situations could result in burns to the skin, for the task. Table 130.7(CX10) lists the requirements for even with the protection described in Table 130.7(C)(10), protective clothing and other protective equipment based burn injury should be reduced and survivable. Due to the on HazardlRisk Category numbers 0 through 4. This cloth- explosive effect of some arc events, physical trauma inju- ries could occur. The PPE requirements of this section do ing and equipment shall be used when working within the not address protection against physical trauma other than Arc Flash Protection Boundary. exposure to the thermal effects of an arc flash. 708-34 ELECTRICAL SAFETY IN THE WORKPLACE 2OO9 Edition