Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Kazakistan ing referasn albümü hg
1. GÖNKA
GÖNKA A.S. Azerbaijan References
The High Court Of Presidency Building-astana- 2004
2. The High Court Of Presidency Building Astana
PRIME MINISTRY HIGH JUDGEMENT COURT Employer : Administration Works for Presidential of the Republic of
BUILDING- Astana/KAZAKHSTAN Kazakhstan
GÖNKA provided complete line of HVAC products and The Main Contractor : TOO Ceylan Limited
made the whole mechanical installations of the
building by himself. Air Handling Units, water chiller, The Construction Area : 17.100 m²
chamber and roof type extract fans, vapor humidifiers
have been provided by us.
GÖNKA .... The Scope of the Work : The rough construction works
! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes
operating room. transparent air distributor's being pulled down. from operation part due to laminar flow.
Operating theatre lighting system made up of airproof
! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require
especially high level sterilization in accordance with
such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946.
distributor through operating table prevents turbulent
! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection
air flow in conventional air systems and offers a high
transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing.
operating table lighting connection. during the operati
! Easy installation to all kinds of ceilings.
2004
36/37
4. 36/37
2004 The High Court Of Presidency Building Astana
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
5. Air cooled liquid chiller
GONKA Screw compressor air cooled water cooling Evaporator; Shell- tube evaporator whose cooling liquid Low noise level.
groups, with its models in the range of high efficiency and side and water side have one-circuit, multiple transitional, Multiple compressor, multiple cyclical, high efficiency.
high capacity, are ideal for cooling operations related to two mirrored construction. %25-%100 continuous modulating capacity control in
Refrigerating Circuit;Cooling Circuit; Cooling circuit and every compressor.
comfort and industrial purposes.
circuit elements entirely independent for every compressor. Hardconstruction and long life.
R22 , R134a or R407c options. Easy handling, installation and service.
Electrical Screen and Control Board; board including
Compressors; Half hermetic screw compressors. Effortless service.
switch and micro-processor controlled module and control
Compressors changing between 1 and 4 according to Compatible with available BMS systems.
cards as well as elements such as systemic control Meeting consumer requirements in the most suitable way
cooling capacity.
elements and fuse, thermic magnetic switch and relay. through broad accessory and option alternatives.
Condenser; Highly efficient, original condenser situated in V
Micro-processor based Control System; Full control over all Newly improved use of screw compressor with high COP
type and condensation provided through 900 cyclical and the cooling circuits. Connections on board through value.
low sound level axial fans situated in the open edge of the simplified device failure follow-up and easily recognized Trouble-proof operations under high temperatures.
condenser. electrical diagram. Rational control.
6. Embassy Of Kazakhistan- Ankara
-EMBASSY OF KAZAKHISTAN- ANKARA-2002
GÖNKA ....
2002
36/37
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
12. CCC Business Center Building Astana
-ccc Business Center Building- Kazakhistan -astana - 2004
CCC BUSINESS CENTER KAZAKHSTAN
Ceated from the 20 floor office building and 2 floor shopping center in Kazakistan,Astana “Astana CCC
Business Center” the mechanic installation was made by GONKA Klima A.S. with a turnkey delivery.
Air Handling units,
Air Cooled Liguid Chillers,
centrifugal roof extracts and fan coil units was made with our company brand.
Contractors firm is Ceylan Insaat A.S. The area on field is about 25 000 m2.
Employer : Consolidated Construction Company
The Main Contractor : TOO Ceylan Limited
The Construction Area : 13.185 m2, 13-floor Business Center and 2-floor Shopping
GÖNKA .... Center building construction in Astana New City
The Scope of the Work : The rough construction works
The Project Pictures
Click on the pictures to make larger view.
2004
36/37
13.
14. CCC Business Center Building Astana
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
2004
36/37
16. President Hotel Astana Kazakhistan
-PRESIDENT HOTEL ASTANA/KAZAKHISTAN- 2005
Specifications
Architect:
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Erdal Tusavul, Aytekin Gultekin
Client:
GÖNKA .... International Hotel Group Ltd.
Location:
Astana/KZK
Size:
27.600 m2
Schedule:
01.10.2004 06.06.2005
First hotel in the international market, Rixos President Hotel Astana
is a business hotel opened in June 10th 2005 in the centre of Astana,
the capital of Kazakhstan. This business hotel is a meeting point of
many royalties, presidents and prime ministers, governmental
officials, and business people in general.
2005
36/37
17. Rixos President Hotel Astana
The Rixos President Hotel Astana is beautiful located at the new administrative center of Astana, the capital of Kazakhstan, 12 km to Astana
International Airport. The unique Rixos President Hotel Astana is the youngest member of Rixos Hotel chain with its ultimate executive architectural
scale, elegant interior design and unrivaled service. The guests will be experiencing memorable Astana stays in this sophisticated state of the art hotel.
The hotel is not only a place of accommodation but also a place where distinguished businessmen and the city's elite come together to share and
exchange current ideas and recreation. Furthermore, the hotel offers unique conference and meeting facilities to the city's intellectual life
Very much acclaimed restaurants, bars, SPA and wellness centres all complete the luxury service that the hotel serves. Lobby Lounge
and Bar is a place in which you can listen to light classical music in a relaxed ambience while having your favorite coctails and beverages,
and ideal for tea times. The hospitable staff will serve you at any time you wish while you are there.
Rooms: Rixos President Hotel Astana offers luxurious guestrooms and suites, providing comfort in every room with individually controlled
air conditioning, Sat-TV, Radio via TV, telephone (room and bathroom), minibar, safe box, hair dryer, Internet access, 24 hours room
service.
Conference halls: The Rixos President Hotel Astana the executive conference center combines formal and informal meeting areas
including the comfortable business lounge. The hotel has a 500-capacity Ball Room, a Spherical Meeting Hall and fully equipped 2
Meeting Rooms. Meeting and Conference Facilities are hosting International Seminar or Board Meeting, Intimate Dinner or Wedding.
SPA & Wellness: SPA, Heated Indoor Pool, Turkish Bath, Sauna, Steam Bath, Fitness Centre, Thai Massage, Beauty Parlor, Hairdresser, Doctor,
Deckchair, towels, mattress, shower and changing rooms available.
Air cooled liquid chiller
GONKA Screw compressor air cooled water cooling Evaporator; Shell- tube evaporator whose cooling liquid Low noise level.
groups, with its models in the range of high efficiency and side and water side have one-circuit, multiple transitional, Multiple compressor, multiple cyclical, high efficiency.
high capacity, are ideal for cooling operations related to two mirrored construction. %25-%100 continuous modulating capacity control in
Refrigerating Circuit;Cooling Circuit; Cooling circuit and every compressor.
comfort and industrial purposes.
circuit elements entirely independent for every compressor. Hardconstruction and long life.
R22 , R134a or R407c options. Easy handling, installation and service.
Electrical Screen and Control Board; board including
Compressors; Half hermetic screw compressors. Effortless service.
switch and micro-processor controlled module and control
Compressors changing between 1 and 4 according to Compatible with available BMS systems.
cards as well as elements such as systemic control Meeting consumer requirements in the most suitable way
cooling capacity.
elements and fuse, thermic magnetic switch and relay. through broad accessory and option alternatives.
Condenser; Highly efficient, original condenser situated in V
Micro-processor based Control System; Full control over all Newly improved use of screw compressor with high COP
type and condensation provided through 900 cyclical and the cooling circuits. Connections on board through value.
low sound level axial fans situated in the open edge of the simplified device failure follow-up and easily recognized Trouble-proof operations under high temperatures.
condenser. electrical diagram. Rational control.
26. 2002 -baganasil Language Cultural Center - Kazakhistan - 2
-baganasil Language Cultural Center - Kazakhistan - 2005
GÖNKA ....
36/37
27.
28. 2002 -kazÝno - Almaata - Kazakhistan -2005
-kazÝno - Almaata - Kazakhistan -2005
GOVERNMENT CULTURE AND
ENTERTAINMENT CENTER
Almaty/KAZAKHSTAN
Water chillers, AHU units, fan coils have been
provided by our company for this project in
Almaty/Kazakhstan.
GÖNKA ....
36/37
32. Gulvirabuild Almaty Kazakhistan
et’ket
GULVIRA BUILD HOTEL
Almaty/KAZAKHSTAN
The whole HVAC equipments and their installations
including water chillers, AHU units, fan coils have
been provided for this project in Almaty/Kazakhstan.
GÖNKA .... GÖNKA ....
! HEPA filters which clean filtrated air before going into
operating room.
2005
! Mounting situated in ceiling of the operating theatre in
such a way that it should locate over operating table.
! Stainless steel air distribution box, Hepa filters,
transparent air distributor (laminarizator) and pendant
36/37 operating table lighting connection.
34. 2002 KAZAKHISTAN HAY UNIVERSITY- KAZAKHISTAN - 2006
KAZAKHISTAN HAY UNIVERSITY- KAZAKHISTAN - 2006
GÖNKA ....
36/37
35. Sincan Organize Sanayi Bölgesi
Göktürk Caddesi No : 6
Sincan / ANKARA / TURKEY
Tel :+90 312 267 09 90(pbx)
Fax:+90 312 267 09 93
http://www.gonka.com.tr
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA e-mail: gonka@turk.net
CUSTOMER AKNUR END. MALZ. SAN. ve TÝC. LTD. ÞTÝ.
JOB NAME KAZAKHSTAN HAY UNIVERSITY
UNIT TYPE VAPOR HUMIDIFIER
MODEL GOR 30 SERIAL NO 06/1002
VAPOR CAPACITY 21.11 kg/h
POWER CONSUMPTION 22.8 kW
CURRENT CONSUMPTION 37 Amper
OPERATING VOLTAGE 380V/50 Hz
PRODUCTION DATE JULY 2006
QUALITY CONTROL DATE JULY 2006
TSEK
37. Sincan Organize Sanayi Bölgesi
Göktürk Caddesi No : 6
Sincan / ANKARA / TURKEY
Tel :+90 312 267 09 90(pbx)
Fax:+90 312 267 09 93
http://www.gonka.com.tr
e-mail: gonka@turk.net
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
MÜÞ. ADI TOO CEYLAN
ÝÞÝN ADI KAZAKÝSTAN CUMHURBAÞKANLIÐI KÖÞKÜ
CÝHAZ ADI KLÝMA SANTRALI
MODEL GKS 28 SERÝ NO 06/1028
3
VANTÝLATÖR DEBÝSÝ 5.200 m /h
VANTÝLATÖR TOP. BASINCI 74 mmSS
MOTOR GÜCÜ 2.2 kW
ISITMA K APASÝTESÝ 50.000 kcal/h
SOÐUTMA KAPASÝTESÝ 50.000 kcal/h
3
ASPÝRATÖR DEBÝSÝ 5.200 m /h
ASP. TOPLAM BASINCI 50 mmSS
KAZAKÝSTAN CUMHURBAÞKANLIÐI KÖÞKÜ
MOTOR GÜCÜ 1.5 kW
CÝHAZ ADI KANAL TÝPÝ ELEKTRÝKLÝ ISITICI
ELEKTRÝK BESLEME 380V / 50Hz
NÝSAN 2006
NÝSAN 2006
06/1010
30 kW
ÝMAL TARÝHÝ NÝSAN 2006
Sincan Organize Sanayi Bölgesi
KALÝTE KONTROL TARÝHÝ NÝSAN 2006
Sincan / ANKARA / TURKEY
Tel :+90 312 267 09 90(pbx)
http://www.gonka.com.tr
e-mail: gonka@turk.net
Göktürk Caddesi No : 6
Fax:+90 312 267 09 93
TSEK
KALÝTE KONTROL TARÝHÝ
KAZAKHSTAN
TOO CEYLAN
Sincan Organize Sanayi Bölgesi
Göktürk Caddesi No : 6
ÝMAL TARÝHÝ
Sincan / ANKARA / TURKEY
KAPASÝTE
MÜÞ. ADI
Tel :+90 312 267 09 90(pbx)
SERÝ NO
ÝÞÝN ADI
Fax:+90 312 267 09 93
http://www.gonka.com.tr
e-mail: gonka@turk.net
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
CUSTOMER TOO CEYLAN
JOB NAME KAZAKHSTAN PRESIDENTIAL PALACE
EQUIP.NAME AIR COOLED LIQUID CHILLER
MODEL GHSC 1 V 1 SERÝ NO 06/1007
COMPRESSOR 1 adet
CAPACITY 50.000 kcal/h
EVAPORATOR WATER
12/7 ° C
INLET/OUTLET TEMP.
EVAPORATOR WATER FLOW RATE 10 m³/h
OUTER AIR TEMP. 32 °C
REFRIGERANT R 407 C
MAX. COMP. CURRENT 44 A
OPERATING VOLTAGE 380V/50 Hz
PRODUCTION DATE NÝSAN 2006
QUALITY CONTROL DATE NÝSAN 2006
TSEK
KAZAKHSTAN
38. -dÝplomat Hotel - Kazakhistan - 2006
2002 -dÝplomat Hotel - Kazakhistan - 2006
GÖNKA ....
36/37
39.
40. 2002 -kazakhistan Mineral Water Factory- Kazakhistan -1999
-kazakhistan Mineral Water Factory- Kazakhistan -1999
GÖNKA ....
36/37
41.
42. GÖNKA Kazakhistan References
- Hövsan Olympic Training Complex
- Baku Turkish Anatolian High School
- Göyçay Olympic Training Complex
- Serin Hotel Baku
- Balaken Olympic Structure
- BÝlesuvar Olympic Structure
- Baku Administration Of The National
Archive Building
- Hb Clinique Baku
- Azerbaijan Baku Endos. Hospital
- Azerbaijan Military Hospital 300 Bed
- Karwan Mtk Azerbaijan
- Ata Okul Azerbaijan
- Serin Hospital Azerbaijan
- Baku Ministry Of Health Topçubaþov
Hospital
- Baku State University Kitchen And
Restaurant
FACTORY and MAIN OFFICE AZERBAIJAN BRANCH OFFICE GEORGIA BRANCH OFFICE
Sincan Organize Sanayi Nasimi Rayonu, .
Bölgesi G öktürk C ad. N o:6 Suleyman Rustem Mah., 7,
Sincan / ANKARA Az1014 BAKÜ / AZERBAYCAN
Tel :0 312 267 09 90 (pbx) Tel : (00 994) 12 493 19 29
Fax:0 312 267 09 93 Fax: (00 994) 12 493 19 29