The document discusses several mechanical projects completed by GÖNKA A.S. including:
1. The BÝlesuvar Olympic Training Complex mechanical work completed in 2008.
2. Mechanical work for the Baku Turkish Anatolian High School completed in 2008.
3. Mechanical work for several Olympic training complexes completed between 2008-2009.
2. BÝlesuvar Olympic Training Complex
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Bilesuvar Olympic Training Complex
The Whole Mechanical Job ; piping, duct work, heating
system, boiler house, cooling system, were made by
GÖNKA A.S. With the equipment produced by GÖNKA
Swimming pool, & whole olympic training facilities are
existing in the complex the whole job is finished at 2008
Chiller Air Cooled
Fan Coils Ceiling & Wall Type
Air Handling Units
Boiler Systems
2008
Are used in complex
2/3
3.
4. Baku Turkish Anatolian High School
Baku Turkish Anatolian High School
2008
4/5
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
5. Baku Turkish Anatolian High School
Baku Turkish Anatolian High School T.C. Ministry of Education From time to time school teacher who has visited or invited A school in Physics, Biology and Chemistry-A has a Computer
and Azerbaijan Respublikasý Study on Nazir February 28, 1992 guests or conferences for students in this hall is carried Laboratory. In all three laboratories are in a position to
according to the memorandum of understanding signed on out.Understanding of technical systems in conference rooms respond to needs in terms of materials. Physics, Chemistry
24.01.1994 was opened.
with a modern arrangement was.Every moment ready and Biology teachers try in this laboratory, as well as have the
School, celebration of certain days and weeks, panel, sound system, computer and projection equipment are ability to make the computer-aided instruction.
debate and cinema shows a conference room of 200
available.
people can be made available.
6. Göyçay Olympic Training Complex
Göyçay Olympic Training Complex
The Whole Mechanical Job ; piping, duct work, heating
system, boiler house, cooling system, were made by
GÖNKA A.S. With the equipment produced by GÖNKA
Swimming pool, & whole olympic training facilities are
existing in the complex the whole job is finished at 2009
2009
6/7
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
7. Boiler house, pump station and piping whole mechanical job Ductwork
Chiller Air Cooled
Fan Coils Ceiling & Wall Type
Air Handling Units
Boiler Systems
Are used in complex
8. Hövsan Olympic Training Complex
Hövsan Olympic Training Complex
The Whole Mechanical Job ; piping, duct work, heating
system, boiler house, cooling system, were made by
GÖNKA A.S. With the equipment produced by GÖNKA
Swimming pool, & whole olympic training facilities are
existing in the complex the whole job is finished at 2009
Chiller Air Cooled
Fan Coils Ceeling & Wall Type
Air Handling Units
Boiler Systems
Are used in complex
2009
8/9
9. Air cooled liquid chiller
GONKA Screw compressor air cooled water cooling Evaporator; Shell- tube evaporator whose cooling liquid Low noise level.
groups, with its models in the range of high efficiency and side and water side have one-circuit, multiple transitional, Multiple compressor, multiple cyclical, high efficiency.
high capacity, are ideal for cooling operations related to two mirrored construction. %25-%100 continuous modulating capacity control in
Refrigerating Circuit;Cooling Circuit; Cooling circuit and every compressor.
comfort and industrial purposes.
circuit elements entirely independent for every compressor. Hardconstruction and long life.
R22 , R134a or R407c options. Easy handling, installation and service.
Electrical Screen and Control Board; board including
Compressors; Half hermetic screw compressors. Effortless service.
switch and micro-processor controlled module and control
Compressors changing between 1 and 4 according to Compatible with available BMS systems.
cards as well as elements such as systemic control Meeting consumer requirements in the most suitable way
cooling capacity.
elements and fuse, thermic magnetic switch and relay. through broad accessory and option alternatives.
Condenser; Highly efficient, original condenser situated in V
Micro-processor based Control System; Full control over all Newly improved use of screw compressor with high COP
type and condensation provided through 900 cyclical and the cooling circuits. Connections on board through value.
low sound level axial fans situated in the open edge of the simplified device failure follow-up and easily recognized Trouble-proof operations under high temperatures.
condenser. electrical diagram. Rational control.
10. Serin Hotel Baku
Serin Hotel Baku
2006
10/11
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
11. Air cooled liquid chiller
GONKA Screw compressor air cooled water cooling GONKA Screw compressor air cooled water cooling GONKA Screw compressor air cooled water cooling
groups, with its models in the range of high efficiency and groups, with its models in the range of high efficiency and groups, with its models in the range of high efficiency and
high capacity, are ideal for cooling operations related to high capacity, are ideal for cooling operations related to high capacity, are ideal for cooling operations related to
comfort and industrial purposes. comfort and industrial purposes. comfort and industrial purposes.
R22 , R134a or R407c options. R22 , R134a or R407c options. R22 , R134a or R407c options.
Compressors; Half hermetic screw compressors. Compressors; Half hermetic screw compressors. Compressors; Half hermetic screw compressors.
Compressors changing between 1 and 4 according to Compressors changing between 1 and 4 according to Compressors changing between 1 and 4 according to
cooling capacity. cooling capacity. cooling capacity.
Condenser; Highly efficient, original condenser situated in V Condenser; Highly efficient, original condenser situated in V Condenser; Highly efficient, original condenser situated in V
type and condensation provided through 900 cyclical and type and condensation provided through 900 cyclical and type and condensation provided through 900 cyclical and
low sound level axial fans situated in the open edge of the low sound level axial fans situated in the open edge of the low sound level axial fans situated in the open edge of the
condenser. condenser. condenser.
12. Balaken Olympic Training Complex
Balaken Olympic Training Complex
The Whole Mechanical Job ; piping, duct work, heating
system, boiler house, cooling system, were made by
GÖNKA A.S. With the equipment produced by GÖNKA
Swimming pool, & whole olympic training facilities are
existing in the complex the whole job is finished at 2009
2009
Chiller Air Cooled
Fan Coils Ceiling & Wall Type
Air Handling Units
Boiler Systems
Are used in complex
12/13
14. Baku Administration Of The National Archive Building
Baku Administration Of The National
Archive Building
2008
14/15
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
15. Air handling unit
Standard Accessories; Standard Series Optional Accessories;
! Filter Chambers; Chamber design which provides easy Application Area: business centers, schools, ! GONKA vapor humidifier, standard vapor cylinder,
mounting and de-mounting in filters and filters with hospitals, factories, hotels and restaurants. immersion electrodes, stainless vapor distributor and
different productivity levels on demand. microprocessor control unit.
! 8 different models which provide required humidity
! Heating and Cooling Coils; Seamless cooper tubes. In and temperature by conditioning air volume in the ! Mufflers which are made up of coulisses to provide
heating coils, 4 options: warm water, vapor, hot water, required sound holding capacity.
range of 3000m³/h and 100.000 m³/h.
electrically heated; in cooling coils, 2 options: chilled
water and DX (direct expansion). ! The framework which is formed by combination of ! Plate heat exchanger or Heat recovery wheel for
! Dampers; Rigid aluminum frame in multi airfoil aluminum frames, which are connected specially, with recovery of the heat emitted with exhaust air.
structure which is the least resistant against airflow. plastic and aluminum comers. ! Electrical board.
Rubber gaskets which reduce air leakage through
blades to the minimum level. ! Boards which are made up of double skilled ! Frequency Converter
galvanized iron in a standard way.
! Fans; Statically and dynamically balanced aspirators
and ventilators in double inlet belt driven centrifugal ! Polyurethane insulated panels, which are 30 mm in
type. Forward curved fans in systems with low, medium thickness, for thermal and acoustic insulation in a
and high duct pressures,. standard way.
16. Hb Clinique Baku
Hb Clinique Baku
2007
16/17
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
17. Packaged hygienic air conditioner Laminar flow air system
! Highly efficient filtration of supply and extract air. ! HEPA filters which clean filtrated air before going into
! Maximum function control: room temperature and operating room.
relative humidity control throughout the year.
! Mounting situated in ceiling of the operating theatre in
! Meeting fresh air that surgical operations require
such a way that it should locate over operating table.
! Quiet and non-vibrating operation that operating
theatres require. ! Stainless steel air distribution box, Hepa filters,
! An independent system which is under direct control of transparent air distributor (laminarizator) and pendant
authorized health staff.
operating table lighting connection.
! Pressure control in aseptic and septic surgical
operations. ! Easy maintenance and disinfection because of
! Continuous control of room temperature and humidity. transparent air distributor's being pulled down.
! Quiet and non-vibrating operation. Operating theatre lighting system made up of airproof
! Replacing the old installation in available places and construction.
generally, because their sizes are small, occupying less ! A laminar, vertical air flow from transparent air
room than any time before, however available air
distributor through operating table prevents turbulent
canal and water installation could be, easy erection in
any type of health institutions. air flow in conventional air systems and offers a high
level cleanliness class around the operating table
! In fan part, one or two directly actuated highly static
during the operati
pressurized fans to provide required air volumetric flow
rate even when filters are choked. ! The system which remove particulates and microbes
! Fans with inverter; St316 stainless steel fans which are from operation part due to laminar flow.
used as a higher standard in respect to epoxy dyed
! Special design for operation theatres which require
standard fans in terms of hygiene and endurance.
With a view to achieving continuous speed control, especially high level sterilization in accordance with
inverter equipment in supply and extract fans. DIN 1946.
! Air Filters; F5 class filter in fresh air input and F9 class ! Differential pressure sensors. Easy connection
filters on the extract side.
differential pressure sensors and leakage testing.
! Dx battery;
! Easy installation to all kinds of ceilings.
! Vapor humidifiers; Standard steam cylinder, dipping
electrodes, stainless steam distributor and micro-
process control.
! Compressor; 1 or 2 Scroll Compressors according to
the capacity.
! Electrical Board; All of the elements required for the
trouble-proof operation of master switch and device.
! Micro-processor; AC micro-processor control of
temperature and relative humidity over all of the
operation and safety functions integrally (I) or rational-
integrally (PI).
! PCO2 micro-processor of device control and
adjustment system which provides remote control
terminal with erection inside the clean room.
18. Baku Ministry Of Health Topçubaþov Hospital
Baku Ministry Of Health Topçubaþov Hospital
Laminar flow air system
! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes
operating room. transparent air distributor's being pulled down. from operation part due to laminar flow.
2008
Operating theatre lighting system made up of airproof
! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require
especially high level sterilization in accordance with
such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946.
distributor through operating table prevents turbulent
! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection
air flow in conventional air systems and offers a high
transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing.
18/19 operating table lighting connection. during the operati
! Easy installation to all kinds of ceilings.
22. Serin Hospital Azerbaijan
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Packaged hygienic air conditioner
! Highly efficient filtration of supply and extract air. ! Replacing the old installation in available places and ! Dx battery;
generally, because their sizes are small, occupying less Vapor humidifiers; Standard steam cylinder, dipping
! Maximum function control: room temperature and !
room than any time before, however available air electrodes, stainless steam distributor and micro-
relative humidity control throughout the year.
canal and water installation could be, easy erection in process control.
! Meeting fresh air that surgical operations require any type of health institutions.
! Compressor; 1 or 2 Scroll Compressors according to
! Quiet and non-vibrating operation that operating ! In fan part, one or two directly actuated highly static the capacity.
theatres require. pressurized fans to provide required air volumetric flow
rate even when filters are choked. ! Electrical Board; All of the elements required for the
! An independent system which is under direct control of trouble-proof operation of master switch and device.
2008
authorized health staff. ! Fans with inverter; St316 stainless steel fans which are
used as a higher standard in respect to epoxy dyed ! Micro-processor; AC micro-processor control of
! Pressure control in aseptic and septic surgical temperature and relative humidity over all of the
operations. standard fans in terms of hygiene and endurance.
operation and safety functions integrally (I) or rational-
With a view to achieving continuous speed control,
! Continuous control of room temperature and humidity. integrally (PI).
inverter equipment in supply and extract fans.
! Quiet and non-vibrating operation. ! PCO2 micro-processor of device control and
! Air Filters; F5 class filter in fresh air input and F9 class adjustment system which provides remote control
22/23 filters on the extract side. terminal with erection inside the clean room.
26. Azerbaijan Military Hospital 300 Bed
Azerbaijan Military Hospital 300 Bed
Laminar flow air system
! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes
operating room. transparent air distributor's being pulled down. from operation part due to laminar flow.
2007
Operating theatre lighting system made up of airproof
! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require
especially high level sterilization in accordance with
such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946.
distributor through operating table prevents turbulent
! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection
air flow in conventional air systems and offers a high
transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing.
26/27 operating table lighting connection. during the operati
! Easy installation to all kinds of ceilings.
27. !Hvac equipments for operating theatres are supplied by
GONKA
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
28. Central Bank of Azerbaijan Republic
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Central Bank of Azerbaijan Republic
Hvac equipments periodic maintenance are being
provided bye GONKA
2009
28/29
30. Azerbaijan Mc Donald’s
Azerbaijan Mc Donald’s
Centrifugal roof extracts
Technical specification The manufactured centrifugal roof Body It is designed according to the bat environment Fan has dense fimed, low sound level and
extract unit has been designed for the effective exhaust. it is conditions Galvanized stell frame, aluminium upper cover highperformance.It is easy to open the fan and clean the fin
possible to montage in the desired angle with the small are used. Moto-fan group Cenrifugal ventilatör is statically at shot notice. By the help aof special protection cover, itwork
sound Ievel it may be used in for the industrial applications and dynamically balanced.Motor serves 380V/50 Hz 900- many years without any problem. Centrifugal roof extract
and kitchens. It has been designed for Iong service Iife 1400d/d as astandard and directly coupled with d-phase units designed as direct extraction or combined with a duct
without maintenance. The manufacturing range 500-12.000 electirical motor.By this way, it works quitely and without type.
m³/h air and 0-50 mmSS pressure. vibration.
2002
30/31
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
31.
32. Baku State University Kitchen And Restaurant
Baku State University Kitchen And Restaurant
2008
32/33
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
33. Air handling unit
Standard Accessories; Standard Series
! Filter Chambers; Chamber design which provides easy Application Area: business centers, schools,
mounting and de-mounting in filters and filters with hospitals, factories, hotels and restaurants.
different productivity levels on demand.
! 8 different models which provide required humidity
! Heating and Cooling Coils; Seamless cooper tubes. In Optional Accessories;
and temperature by conditioning air volume in the
heating coils, 4 options: warm water, vapor, hot water, ! GONKA vapor humidifier, standard vapor cylinder,
range of 3000m³/h and 100.000 m³/h.
electrically heated; in cooling coils, 2 options: chilled immersion electrodes, stainless vapor distributor and
water and DX (direct expansion). ! The framework which is formed by combination of microprocessor control unit.
! Dampers; Rigid aluminum frame in multi airfoil aluminum frames, which are connected specially, with
! Mufflers which are made up of coulisses to provide
structure which is the least resistant against airflow. plastic and aluminum comers.
Rubber gaskets which reduce air leakage through required sound holding capacity.
blades to the minimum level. ! Boards which are made up of double skilled
! Plate heat exchanger or Heat recovery wheel for
galvanized iron in a standard way. recovery of the heat emitted with exhaust air.
! Fans; Statically and dynamically balanced aspirators
and ventilators in double inlet belt driven centrifugal ! Polyurethane insulated panels, which are 30 mm in ! Electrical board.
type. Forward curved fans in systems with low, medium thickness, for thermal and acoustic insulation in a
and high duct pressures,. ! Frequency Converter
standard way.
34. Azerbaijan Gönka Shops and Office
Azerbaijan Gönka Shops and Office
2009
34/35
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
35. Fan coil units
! The most important feature of decorative type Fan-Coil ! Low sound level; quality is high level for providing quiet ! Internal frame; Mounting upon originally designed
units is their use both with casing and without casing study environment. framework made from galvanized steel together with
! Ideal acoustic and thermal insulation.
(concealed) in every position. While ceiling cabinet and battery, fan, motor group, dried pan and dropper.
! Functional remote control.
cabinet floor types are mounted inside the room,
! 2 or 3-way On/ Off or rational control. ! Battery; Copper pipe, aluminum fins.
concealed types are mounted within ceilings or walls.
! Outer casing; It is made from DKP sheet steel, outside ! Fan and engine group; 1 or 2 fans to provide required
Unit models which operate both heating and cooling or
and inside of the unit are painted with electrostatic
capacity in devices in accordance with capacity table.
only heating are available. powder paint against rust and external effects.
39. Unit heaters with radial fan
GÖNKA GDA series unit heaters are designed to meet the Technical specification Casing Manufactured from In case fresh air intake is necessary, a mixing box is mounted
heating requirements of workshops, warehouses, factories, phosphatized steel sheets finished with oven baked on the air inlet to provide the required air mixture.Air
stores, garages, sporting halls etc. They are manufactured so discharge louvers In order to direct the airflow to desired
electrostatic paint. Centrifugal fan-motor group As a
direction adjustable discharge louvers, consisting of parallel
as to be connected either to hot water, superheated water or standard the centrifugal fans are directly coupled to three-
moving flaps and frames, are used. Coil connections
steam lines. There are 13 models in order to handle heating phase electric motor, which has high starting torque. The fans Connection of the coils to the hot water or steam lines is done
capacities between 4.000-60.000Kcal/h and they are are statically and dynamically balanced to ensure vibration easily via coil union stems, manufactured to fit standard
available in two types; wall mounted and ceiling. and noise free operation. Air mixing box pipes
40. GÖNKA Azerbaijan References
- Hövsan Olympic Training Complex
- Baku Turkish Anatolian High School
- Göyçay Olympic Training Complex
- Serin Hotel Baku
- Balaken Olympic Structure
- BÝlesuvar Olympic Structure
- Baku Administration Of The National
Archive Building
- Hb Clinique Baku
- Azerbaijan Baku Endos. Hospital
- Azerbaijan Military Hospital 300 Bed
- Karwan Mtk Azerbaijan
- Ata Okul Azerbaijan
- Serin Hospital Azerbaijan
- Baku Ministry Of Health Topçubaþov
Hospital
- Baku State University Kitchen And
Restaurant
FACTORY and MAIN OFFICE AZERBAIJAN BRANCH OFFICE GEORGIA BRANCH OFFICE
Sincan Organize Sanayi Nasimi Rayonu, .
Bölgesi G öktürk C ad. N o:6 Suleyman Rustem Mah., 7,
Sincan / ANKARA Az1014 BAKÜ / AZERBAYCAN
Tel :0 312 267 09 90 (pbx) Tel : (00 994) 12 493 19 29
Fax:0 312 267 09 93 Fax: (00 994) 12 493 19 29
41. Sincan Organize Sanayi Bölgesi
Sincan Organize Sanayi Bölgesi Göktürk Caddesi No : 6
Göktürk Caddesi No : 6
Karwan Mtk Azerbaijan
Sincan / ANKARA / TURKEY
Sincan / ANKARA / TURKEY
Tel :+90 312 267 09 90(pbx) Tel :+90 312 267 09 90(pbx)
Fax:+90 312 267 09 93 Fax:+90 312 267 09 93
http://www.gonka.com.tr http://www.gonka.com.tr
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
e-mail: gonka@turk.net ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA e-mail: gonka@turk.net
CUSTOMER KARVAN MTK CUSTOMER KARVAN MTK
JOB NAME KARVAN RESIDANS - BAKU JOB NAME KARVAN RESIDANS - BAKU
UNIT TYPE AIR COOLED LIQUID CHILLER UNIT TYPE HIDDEN CEILING TYPE FAN COIL UNIT
MODEL GHSC 1V10s SERIAL NO 08/1005 FLOOR PIPE
GFC LEFT
COMPRESSOR TYPE 1 Screw compressor TYPE WALL CONNECTION
400 RIGHT
CAPACITY 640.4 kW CEILING DIRECTION
EVAPORATOR WATER PROD. DATE FEBRUARY / 2008 SERIAL NO 08/1467
12/7 ° C
INLET/OUTLET TEMP.
EVAPORATOR WATER FLOW RATE 110 m³/h HEATING CAPACITY 9.350 W
OUTSIDE AIR TEMP. 34 °C COOLING CAPACITY SENSIBLE 3.110 W
REFRIGERANT R407C TOTAL 4.320 W
MAX. COMP. CURRENT 440 A AIR FLOW RATE 800 m³/h
OPERATING VOLTAGE 380V/50 Hz VOLTAGE 220 V MONOPHASE POWER 65 W
PRODUCTION DATE FEBRUARY / 2008 HEATING COOLING
QUALITY CONTROL DATE APRIL / 2008
OPERATING HOT WATER 80/60 °C WATER TEMP. 6/10°C
CONDITIONS SUPERHEATED 130/90 °C WATER TEMP. 7/12°C
TSEK WATER
STEAM 0,1 ATÜ
KAZAKHSTAN
QUALITY CONTROL DATE APRIL / 2008
2002
26/27
43. Azerbaijan Baku Endos. Hospital
TOROSLAR DAÐ TURÝZM LTD. ÞTÝ.- AZERBAYCAN -2002
AZERBAYCAN BAKÜ ENDOS. HASTANESÝ
Klima santrallarý, Egzost aspiratör, Fan-Coil cihazlarý, Otomatik kontrol malzemeleri
LAZERÝN HASTANESÝ ?
2002
38/39
44.
45. -RUSYA UFO BUILDING SITE- RUSSIA -1996
Sincan Organize Sanayi Bölgesi
Göktürk Caddesi No : 6 -AMERICAN EMBASSY IN MOLDOVA- MOLDOVA -1996
Sincan / ANKARA / TURKEY
Tel :+90 312 267 09 90(pbx) -IRAQ - AL-ROHAA COMPANY- IRAQ -1998
Fax:+90 312 267 09 93
-RUSSIA SAMARA PEPSI-COLA FACTORY- RUSSIA -1999
http://www.gonka.com.tr
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
e-mail: gonka@turk.net -RUSSIA EKATERINBURG COCA-COLA FACTORY - RUSSIA -1999
.
MÜÞ. ADI ELXAN MEHDÝYEV -RUSSIA VOLGAGRAD COCA-COLA FACTORY.- RUSSIA-1999
ÝÞÝN ADI BAKÜ DEVLET ÜNÝVERSÝTESÝ YEMEKHANESÝ Sincan Organize Sanayi Bölgesi -KAZAKHISTAN MINERAL WATER FACTOR KAZAKHISTAN -1999
Y-
CÝHAZ ADI PAKET KLÝMA CÝHAZI Göktürk Caddesi No : 6
Sincan / ANKARA / TURKEY - INTERNATIOANL CYPRUS UNIVERSITY- CYPRUS -2000
TÝP GHP 210 SERÝ NO 07/1007 Tel :+90 312 267 09 90(pbx)
Fax:+90 312 267 09 93 - MC DONALD'S -GEORGIA -2000
VANTÝLATÖR DEBÝSÝ 8.300 m³/h
http://www.gonka.com.tr - CINCINATY EXTRUSION JORDAN -2002
VANTÝLATÖR TOPLAM BASINCI 1.300 Pa e-mail: gonka@turk.net
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
MOTOR GÜCÜ 2x3 kW -AZERBAIJAN BAKU ENDOS. HOSPITAL- AZERBAIJAN -2002
MÜÞ. ADI ELXAN MEHDÝYEV
ISITMA KAPASÝTESÝ 62+4 kW -BAKU TIFLIS AIRPORT- BAKU -2002
ÝÞÝN ADI BAKÜ DEVLET ÜNÝVERSÝTESÝ YEMEKHANESÝ
SOÐUTMA KAPASÝTESÝ 85 kW -EAST MEDITERRANEAN UNIVERSITY/ FOREIGN LANGUAGES DEPARTMENT- CYPRUS -2002
ASPÝRATÖR DEBÝSÝ CÝHAZ ADI KONDANSER ÜNÝTESÝ
7.500 m³/h -EAST MEDITERRANEAN UNIVERSITY ACTIVITY CENTER- CYPRUS -2002
TÝP GHP 210 SERÝ NO 07/1007
ASPÝRATÖR TOPLAM BASINCI 500 Pa
-EFES PÝLSEN FACTORY - ALMAATA/KAZAKHISTAN-2002
MOTOR GÜCÜ 3 kW FAN GÜCÜ 3x1.5 kW
-EMBASSY OF KAZAKHISTAN- ANKARA-2002
ELEKTRÝK BESLEME 380V/50 Hz FAN MARKASI YONGAN MHP-800
- BÜLENT ECEVÝT REHABILITATION CENTER- CYPRUS -2002
ÝMAL TARÝHÝ EYLÜL 2007 ELEKTRÝK BESLEME 380V/3Ph/50 Hz
KALÝTE KONTROL TARÝHÝ EKÝM 2007 -GEORGIA LÝLO- GEORGIA -2003
ÝMAL TARÝHÝ EYLÜL 2007
-SUDAN AFRA MZK SHOPPING CENTER- SUDAN -2003
KALÝTE KONTROL TARÝHÝ EKÝM 2007
TSEK - ALMAATA STA GUESTHOUSE- KAZAKHISTAN -2003
TE
KAZAKHSTAN
TSEK - EAST MEDITERRANEAN UNIVERSITY - CYPRUS -2003
KAZAKHSTAN - ATATÜRK CUL
TURAL CENTER CYPRUS-2003
- YAKINDOÐU UNIVERSITY- CYPRUS -2004
- THE HIGH COURT OF PRESIDENCY BUILDING-ASTANA- 2004
-TROY CONSTRUCTION- RUSSIA-2004
-AMERICAN EMBASSY IN TIFLIS- TIFLIS -2004
-BALAD ANACONDA - IRAQ-2004
-CCC BUSINESS CENTER BUILDING- KAZAKHISTAN -ASTANA - 2004
-PRESIDENT HOTEL ASTANA/KAZAKHISTAN- 2005
-KAZAKHISTAN ALMAATA COCA-COLAFACTORY - 2005
-KRÝSTAL GRASNODAR SHOPPING CENTER - RUSSIA - 2005
-UNITECH INTERNATIONAL PVT. - PAKIST - 2005
AN
-NEP ENGINEERING MILITARY HOSPITAL - AZERBAIJAN - 2005
-BREEZE SERVICE - KAZAKHISTAN - 2005
-LVOV HOTEL UKRAINE -2005
-AMSTER BEWERRY EFES PÝLSEN FACTORY - RUSSIA - 2005
-GRAND HOTEL TIEN-SHAN - ALMAATA- KAZAKHISTAN -2005
-AINA BULAK HOTEL - ALMAATA - KAZAKHIST -2005
AN
-BAGANASIL LANGUAGE CULTURAL CENTER - KAZAKHISTAN - 2005
-KAZÝNO - ALMAATA - KAZAKHISTAN -2005
-SEMEY - ALMAATA - KAZAKHISTAN -2005
-ANA BRIGADE CONSTRUCTION PROJECT COM. BUILDING - AFGANISTAN - 2005
-HALEEB FOODS - LAHOR - PAKISTAN -2005
-SUDAN AFRA SHOPPING CENTER - SUDAN - 2005
-POWER PLANT WORKSHOPS-I - PAKÝSTAN- 2006
-SURGERY ROOM - AZERBAIJAN - 2006-2007
-PROCREDIT BANK - GEORGIA- 2006
-KAZAKHISTAN HAY UNIVERSITY- KAZAKHISTAN - 2006
-AFGANISTAN KABÝL MAIN MILITARY HOSPITAL -AFGANISTAN - 2006
-TIFLIS AVM - GEORGIA - 2006
-KAZAKHISTAN PRESIDENCY - KAZAKHISTAN - 2006
BALAKEN OLYMPIC STRUCTURE / BALAKEN
-DÝPLOMAT HOTEL - KAZAKHISTAN - 2006
-ARGONAUT - EGYPT - 2006
-METÝÞ - LIBYA - 2006
AZERBAIJAN BAKU ENDOS. HOSPITAL- AZERBAIJAN -2002
-SERÝN HOTEL I - AZERBAIJAN - 2006
-POWER PLANT WORKSHOPS-II - PAKÝSTAN- 2007
-MINISTRY OF FINANCE - GEORGIA - 2007
SURGERY ROOM - AZERBAIJAN - 2006-2007
-THE ISLAMIC HOSPITAL - JORDAN - 2007
-U.S. ARMY CORPS. - AFGANISTAN - 2007
-DASCO - KUWAIT - 2007
- CONTRACTE INTL.-AFGANISTAN-2008
KARWAN MTK-AZERBAIJAN-2008 - KARWAN MTK-AZERBAIJAN-2008
- BILAL MENZIL TIKINTI COOPERATIVE-AZERBAIJAN-2008
- AZVEN LTD.-AZERBAIJAN-2008
BILAL MENZIL TIKINTI COOPERATIVE-AZERBAIJAN-2008 - ATA YAPI-AZERBAIJAN-2008
- ÇAÐ TEACHING MANAGEMENT-AZERBAIJAN-2008
- CROSSFOLD CAPITAL-AZERBAIJAN-2008
AZVEN LTD.-AZERBAIJAN-2008 - SERIN COMPANY-AZERBAIJAN-2008
- ZAFER CONSTRUCTION-AFGANISTAN-2008
- SERIN HOSPITAL-AZERBAIJAN-2008
ATA OKULU -AZERBAIJAN-2008 - M/S PROGRESSIVE BUS.ENTR.-PAKISTAN-2008
- UNITECH-PEPSI CO-PAKISTAN-2008
- UNITECH-NESTLE-PAKISTAN-2008
SERIN HOSPITAL-AZERBAIJAN-2008
TOPÇUBAÞOV HASTANESÝ AZER. SAÐ. BAKANLIÐI 2008