BÝlesuvar Olympic Training Complex
GÖNKA A.S. Azerbaijan References




GÖNKA
BÝlesuvar Olympic Training Complex




                                     Bilesuvar Olympic Training Complex




                                                                          !   The Whole Mechanical Job ; piping, duct work, heating
                                                                              system, boiler house, cooling system, were made by
                                                                              GÖNKA A.S. With the equipment produced by GÖNKA
                                                                          !   Swimming pool, & whole olympic training facilities are
                                                                              existing in the complex the whole job is finished at 2002


                                                                              Chiller Air Cooled
                                                                              Fan Coils Ceiling & Wall Type
                                                                              Air Handling Units
                                                                              Boiler Systems
2002




                                                                              Are used in complex




      2/3
Baku Turkish Anatolian High School
  2008




         4/5
                                     ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Baku Turkish Anatolian High School




Baku Turkish Anatolian High School T.C. Ministry of Education   From time to time school teacher who has visited or invited   A school in Physics, Biology and Chemistry-A has a Computer
and Azerbaijan Respublikasý Study on Nazir February 28, 1992    guests or conferences for students in this hall is carried    Laboratory. In all three laboratories are in a position to
according to the memorandum of understanding signed on          out.Understanding of technical systems in conference rooms    respond to needs in terms of materials. Physics, Chemistry
24.01.1994 was opened.
                                                                with a modern arrangement was.Every moment ready              and Biology teachers try in this laboratory, as well as have the
School, celebration of certain days and weeks, panel,           sound system, computer and projection equipment are           ability to make the computer-aided instruction.
debate and cinema shows a conference room of 200
                                                                available.
people can be made available.
Göyçay Olympic Training Complex




                                  Göyçay Olympic Training Complex



                                  !   The Whole Mechanical Job ; piping, duct work, heating
                                      system, boiler house, cooling system, were made by
                                      GÖNKA A.S. With the equipment produced by GÖNKA
                                  !   Swimming pool, & whole olympic training facilities are
  2008




                                      existing in the complex the whole job is finished at 2002




        6/7
                                                                                                  ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Boiler house, pump station and piping whole mechanical job   Ductwork




Chiller Air Cooled
Fan Coils Ceeling & Wall Type
Air Handling Units
Boiler Systems
Are used in complex
Hövsan Olympic Training Complex




                                  Hövsan Olympic Training Complex

                                  !   The Whole Mechanical Job ; piping, duct work, heating
                                      system, boiler house, cooling system, were made by
                                      GÖNKA A.S. With the equipment produced by GÖNKA
                                  !   Swimming pool, & whole olympic training facilities are
                                      existing in the complex the whole job is finished at 2002

                                      Chiller Air Cooled
                                      Fan Coils Ceeling & Wall Type
                                      Air Handling Units
                                      Boiler Systems
                                      Are used in complex
  2008




        8/9
Air cooled liquid chiller
GONKA Screw compressor air cooled water cooling                 Evaporator; Shell- tube evaporator whose cooling liquid        Low noise level.
groups, with its models in the range of high efficiency and     side and water side have one-circuit, multiple transitional,   Multiple compressor, multiple cyclical, high efficiency.
high capacity, are ideal for cooling operations related to      two mirrored construction.                                     %25-%100 continuous modulating capacity control in
                                                                Refrigerating Circuit;Cooling Circuit; Cooling circuit and     every compressor.
comfort and industrial purposes.
                                                                circuit elements entirely independent for every compressor.    Hardconstruction and long life.
R22 , R134a or R407c options.                                                                                                  Easy handling, installation and service.
                                                                Electrical Screen and Control Board; board including
Compressors; Half hermetic screw compressors.                                                                                  Effortless service.
                                                                switch and micro-processor controlled module and control
Compressors changing between 1 and 4 according to                                                                              Compatible with available BMS systems.
                                                                cards as well as elements such as systemic control             Meeting consumer requirements in the most suitable way
cooling capacity.
                                                                elements and fuse, thermic magnetic switch and relay.          through broad accessory and option alternatives.
Condenser; Highly efficient, original condenser situated in V
                                                                Micro-processor based Control System; Full control over all    Newly improved use of screw compressor with high COP
type and condensation provided through 900 cyclical and         the cooling circuits. Connections on board through             value.
low sound level axial fans situated in the open edge of the     simplified device failure follow-up and easily recognized      Trouble-proof operations under high temperatures.
condenser.                                                      electrical diagram.                                            Rational control.
Serin Hotel Baku
2006




 10/11

                   ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Air cooled liquid chiller


GONKA Screw compressor air cooled water cooling                 GONKA Screw compressor air cooled water cooling                 GONKA Screw compressor air cooled water cooling
groups, with its models in the range of high efficiency and     groups, with its models in the range of high efficiency and     groups, with its models in the range of high efficiency and
high capacity, are ideal for cooling operations related to      high capacity, are ideal for cooling operations related to      high capacity, are ideal for cooling operations related to
comfort and industrial purposes.                                comfort and industrial purposes.                                comfort and industrial purposes.
R22 , R134a or R407c options.                                   R22 , R134a or R407c options.                                   R22 , R134a or R407c options.
Compressors; Half hermetic screw compressors.                   Compressors; Half hermetic screw compressors.                   Compressors; Half hermetic screw compressors.
Compressors changing between 1 and 4 according to               Compressors changing between 1 and 4 according to               Compressors changing between 1 and 4 according to
cooling capacity.                                               cooling capacity.                                               cooling capacity.
Condenser; Highly efficient, original condenser situated in V   Condenser; Highly efficient, original condenser situated in V   Condenser; Highly efficient, original condenser situated in V
type and condensation provided through 900 cyclical and         type and condensation provided through 900 cyclical and         type and condensation provided through 900 cyclical and
low sound level axial fans situated in the open edge of the     low sound level axial fans situated in the open edge of the     low sound level axial fans situated in the open edge of the
condenser.                                                      condenser.                                                      condenser.
Balaken Olympic Training Complex




                                   Balaken Olympic Training Complex



                                   !   The Whole Mechanical Job ; piping, duct work, heating
                                       system, boiler house, cooling system, were made by
                                       GÖNKA A.S. With the equipment produced by GÖNKA
                                   !   Swimming pool, & whole olympic training facilities are
                                       existing in the complex the whole job is finished at 2002
  2002




                                       Chiller Air Cooled
                                       Fan Coils Ceiling & Wall Type
                                       Air Handling Units
                                       Boiler Systems
     12/13                             Are used in complex
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
14/15
                                                  2002Baku Administration Of The National Archive Building




ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Air handling unit
    Standard Accessories;                                           Standard Series                                            Optional Accessories;
!   Filter Chambers; Chamber design which provides easy             Application Area: business centers, schools,           !   GONKA vapor humidifier, standard vapor cylinder,
    mounting and de-mounting in filters and filters with            hospitals, factories, hotels and restaurants.              immersion electrodes, stainless vapor distributor and
    different productivity levels on demand.                                                                                   microprocessor control unit.
                                                                !   8 different models which provide required humidity
!   Heating and Cooling Coils; Seamless cooper tubes. In            and temperature by conditioning air volume in the      !   Mufflers which are made up of coulisses to provide
    heating coils, 4 options: warm water, vapor, hot water,                                                                    required sound holding capacity.
                                                                    range of 3000m³/h and 100.000 m³/h.
    electrically heated; in cooling coils, 2 options: chilled
    water and DX (direct expansion).                            !   The framework which is formed by combination of        !   Plate heat exchanger or Heat recovery wheel for
!   Dampers; Rigid aluminum frame in multi airfoil                  aluminum frames, which are connected specially, with       recovery of the heat emitted with exhaust air.
    structure which is the least resistant against airflow.         plastic and aluminum comers.                           !   Electrical board.
    Rubber gaskets which reduce air leakage through
    blades to the minimum level.                                !   Boards which are made up of double skilled             !   Frequency Converter
                                                                    galvanized iron in a standard way.
!   Fans; Statically and dynamically balanced aspirators
    and ventilators in double inlet belt driven centrifugal     !   Polyurethane insulated panels, which are 30 mm in
    type. Forward curved fans in systems with low, medium           thickness, for thermal and acoustic insulation in a
    and high duct pressures,.                                       standard way.
Hb Clinique Baku
2002




 16/17

                   ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Packaged hygienic air conditioner Laminar flow air system
!   Highly efficient filtration of supply and extract air.         !   HEPA filters which clean filtrated air before going into
!   Maximum function control: room temperature and                     operating room.
    relative humidity control throughout the year.
                                                                   !   Mounting situated in ceiling of the operating theatre in
!   Meeting fresh air that surgical operations require
                                                                       such a way that it should locate over operating table.
!   Quiet and non-vibrating operation that operating
    theatres require.                                              !   Stainless steel air distribution box, Hepa filters,
!   An independent system which is under direct control of             transparent air distributor (laminarizator) and pendant
    authorized health staff.
                                                                       operating table lighting connection.
!   Pressure control in aseptic and septic surgical
    operations.                                                    !   Easy maintenance and disinfection because of
!   Continuous control of room temperature and humidity.               transparent air distributor's being pulled down.
!   Quiet and non-vibrating operation.                                 Operating theatre lighting system made up of airproof
!   Replacing the old installation in available places and             construction.
    generally, because their sizes are small, occupying less       !   A laminar, vertical air flow from transparent air
    room than any time before, however available air
                                                                       distributor through operating table prevents turbulent
    canal and water installation could be, easy erection in
    any type of health institutions.                                   air flow in conventional air systems and offers a high
                                                                       level cleanliness class around the operating table
!   In fan part, one or two directly actuated highly static
                                                                       during the operati
    pressurized fans to provide required air volumetric flow
    rate even when filters are choked.                             !   The system which remove particulates and microbes
!   Fans with inverter; St316 stainless steel fans which are           from operation part due to laminar flow.
    used as a higher standard in respect to epoxy dyed
                                                                   !   Special design for operation theatres which require
    standard fans in terms of hygiene and endurance.
    With a view to achieving continuous speed control,                 especially high level sterilization in accordance with
    inverter equipment in supply and extract fans.                     DIN 1946.
!   Air Filters; F5 class filter in fresh air input and F9 class   !   Differential pressure sensors. Easy connection
    filters on the extract side.
                                                                       differential pressure sensors and leakage testing.
!   Dx battery;
                                                                   !   Easy installation to all kinds of ceilings.
!   Vapor humidifiers; Standard steam cylinder, dipping
    electrodes, stainless steam distributor and micro-
    process control.
!   Compressor; 1 or 2 Scroll Compressors according to
    the capacity.
!   Electrical Board; All of the elements required for the
    trouble-proof operation of master switch and device.
!   Micro-processor; AC micro-processor control of
    temperature and relative humidity over all of the
    operation and safety functions integrally (I) or rational-
    integrally (PI).
!   PCO2 micro-processor of device control and
    adjustment system which provides remote control
    terminal with erection inside the clean room.
Baku Ministry Of Health Topçubaþov Hospital




                                              Laminar flow air system




                                              !   HEPA filters which clean filtrated air before going into   !   Easy maintenance and disinfection because of             !   The system which remove particulates and microbes
                                                  operating room.                                                transparent air distributor's being pulled down.             from operation part due to laminar flow.
    2008




                                                                                                                 Operating theatre lighting system made up of airproof
                                              !   Mounting situated in ceiling of the operating theatre in       construction.                                            !   Special design for operation theatres which require
                                                                                                                                                                              especially high level sterilization in accordance with
                                                  such a way that it should locate over operating table.     !   A laminar, vertical air flow from transparent air            DIN 1946.
                                                                                                                 distributor through operating table prevents turbulent
                                              !   Stainless steel air distribution box, Hepa filters,                                                                     !   Differential pressure sensors. Easy connection
                                                                                                                 air flow in conventional air systems and offers a high
                                                  transparent air distributor (laminarizator) and pendant        level cleanliness class around the operating table           differential pressure sensors and leakage testing.
       18/19                                      operating table lighting connection.                           during the operati
                                                                                                                                                                          !   Easy installation to all kinds of ceilings.
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Serin Hospital Azerbaijan
2008




  20/21

                            ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Serin Hospital Azerbaijan




                            Packaged hygienic air conditioner
                            !   Highly efficient filtration of supply and extract air.   !   Replacing the old installation in available places and         !   Dx battery;
                                                                                             generally, because their sizes are small, occupying less           Vapor humidifiers; Standard steam cylinder, dipping
                            !   Maximum function control: room temperature and                                                                              !
                                                                                             room than any time before, however available air                   electrodes, stainless steam distributor and micro-
                                relative humidity control throughout the year.
                                                                                             canal and water installation could be, easy erection in            process control.
                            !   Meeting fresh air that surgical operations require           any type of health institutions.
                                                                                                                                                            !   Compressor; 1 or 2 Scroll Compressors according to
                            !   Quiet and non-vibrating operation that operating         !   In fan part, one or two directly actuated highly static            the capacity.
                                theatres require.                                            pressurized fans to provide required air volumetric flow
                                                                                             rate even when filters are choked.                             !   Electrical Board; All of the elements required for the
                            !   An independent system which is under direct control of                                                                          trouble-proof operation of master switch and device.
2008




                                authorized health staff.                                 !   Fans with inverter; St316 stainless steel fans which are
                                                                                             used as a higher standard in respect to epoxy dyed             !   Micro-processor; AC micro-processor control of
                            !   Pressure control in aseptic and septic surgical                                                                                 temperature and relative humidity over all of the
                                operations.                                                  standard fans in terms of hygiene and endurance.
                                                                                                                                                                operation and safety functions integrally (I) or rational-
                                                                                             With a view to achieving continuous speed control,
                            !   Continuous control of room temperature and humidity.                                                                            integrally (PI).
                                                                                             inverter equipment in supply and extract fans.
                            !   Quiet and non-vibrating operation.                                                                                          !   PCO2 micro-processor of device control and
                                                                                         !   Air Filters; F5 class filter in fresh air input and F9 class       adjustment system which provides remote control
 22/23                                                                                       filters on the extract side.                                       terminal with erection inside the clean room.
Azerbaijan Military Hospital 300 Bed




                                       Laminar flow air system




                                       !   HEPA filters which clean filtrated air before going into   !   Easy maintenance and disinfection because of             !   The system which remove particulates and microbes
                                           operating room.                                                transparent air distributor's being pulled down.             from operation part due to laminar flow.
  2007




                                                                                                          Operating theatre lighting system made up of airproof
                                       !   Mounting situated in ceiling of the operating theatre in       construction.                                            !   Special design for operation theatres which require
                                                                                                                                                                       especially high level sterilization in accordance with
                                           such a way that it should locate over operating table.     !   A laminar, vertical air flow from transparent air            DIN 1946.
                                                                                                          distributor through operating table prevents turbulent
                                       !   Stainless steel air distribution box, Hepa filters,                                                                     !   Differential pressure sensors. Easy connection
                                                                                                          air flow in conventional air systems and offers a high
                                           transparent air distributor (laminarizator) and pendant        level cleanliness class around the operating table           differential pressure sensors and leakage testing.
     24/25                                 operating table lighting connection.                           during the operati
                                                                                                                                                                   !   Easy installation to all kinds of ceilings.
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Sincan Organize Sanayi Bölgesi
                                                                        Sincan Organize Sanayi Bölgesi                                                              Göktürk Caddesi No : 6
                                                                        Göktürk Caddesi No : 6
Karwan Mtk Azerbaijan
                                                                        Sincan / ANKARA / TURKEY
                                                                                                                                                                    Sincan / ANKARA / TURKEY
                                                                        Tel :+90 312 267 09 90(pbx)                                                                 Tel :+90 312 267 09 90(pbx)
                                                                        Fax:+90 312 267 09 93                                                                       Fax:+90 312 267 09 93
                                                                        http://www.gonka.com.tr                                                                     http://www.gonka.com.tr
                              ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
                                                                        e-mail: gonka@turk.net                            ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA   e-mail: gonka@turk.net

                        CUSTOMER                  KARVAN MTK                                                      CUSTOMER KARVAN MTK
                        JOB NAME                  KARVAN RESIDANS - BAKU                                          JOB NAME KARVAN RESIDANS - BAKU
                        UNIT TYPE                 AIR COOLED LIQUID CHILLER                                       UNIT TYPE HIDDEN CEILING TYPE FAN COIL UNIT
                        MODEL                     GHSC 1V10s    SERIAL NO                               08/1005                         FLOOR      PIPE
                                                                                                                                GFC                               LEFT
                        COMPRESSOR TYPE                                         1 Screw compressor                TYPE                  WALL       CONNECTION
                                                                                                                                400                               RIGHT
                        CAPACITY                                                640.4 kW                                                CEILING    DIRECTION
                        EVAPORATOR WATER                                                                          PROD. DATE     FEBRUARY / 2008 SERIAL NO         08/1467
                                                                                12/7 ° C
                        INLET/OUTLET TEMP.
                        EVAPORATOR WATER FLOW RATE                              110 m³/h                          HEATING CAPACITY                         9.350 W
                        OUTSIDE AIR TEMP.                                       34 °C                             COOLING CAPACITY SENSIBLE                3.110 W
                        REFRIGERANT                                             R407C                                                  TOTAL               4.320 W
                        MAX. COMP. CURRENT                                      440 A                             AIR FLOW RATE                              800 m³/h
                        OPERATING VOLTAGE                                       380V/50 Hz                        VOLTAGE     220 V MONOPHASE POWER           65 W
                        PRODUCTION DATE                                         FEBRUARY / 2008                                    HEATING               COOLING
                        QUALITY CONTROL DATE                                    APRIL / 2008
                                                                                                                  OPERATING HOT WATER 80/60 °C     WATER TEMP. 6/10°C
                                                                                                                  CONDITIONS SUPERHEATED 130/90 °C WATER TEMP. 7/12°C
                                                                        TSEK                                                 WATER
                                                                                                                             STEAM 0,1 ATÜ
                                                                                           KAZAKHSTAN
                                                                                                                     QUALITY CONTROL DATE               APRIL / 2008
2002




 26/27
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Central Bank of Azerbaijan Republic




                                      ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
2009




  28/29
Azerbaijan Mc Donald’s




                         Azerbaijan Mc Donald’s
                         Centrifugal roof extracts


                         Technical specification The manufactured centrifugal roof         Body It is designed according to the bat environment           Fan has dense fimed, low sound level and
                         extract unit has been designed for the effective exhaust. it is   conditions Galvanized stell frame, aluminium upper cover       highperformance.It is easy to open the fan and clean the fin
                         possible to montage in the desired angle with the small           are used. Moto-fan group Cenrifugal ventilatör is statically   at shot notice. By the help aof special protection cover, itwork
                         sound Ievel it may be used in for the industrial applications     and dynamically balanced.Motor serves 380V/50 Hz 900-          many years without any problem. Centrifugal roof extract
                         and kitchens. It has been designed for Iong service Iife          1400d/d as astandard and directly coupled with d-phase         units designed as direct extraction or combined with a duct
                         without maintenance. The manufacturing range 500-12.000           electirical motor.By this way, it works quitely and without    type.
                         m³/h air and 0-50 mmSS pressure.                                  vibration.
2002




  30/31
                                                                                                                                                                              ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
32/33
        2008   Ata Okul Azerbaijan
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
34/35
                                                  2008   Baku State University Kitchen And Restaurant




ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
Laminar flow air system




!   HEPA filters which clean filtrated air before going into   !   Easy maintenance and disinfection because of             !   The system which remove particulates and microbes
    operating room.                                                transparent air distributor's being pulled down.             from operation part due to laminar flow.
                                                                   Operating theatre lighting system made up of airproof
!   Mounting situated in ceiling of the operating theatre in       construction.                                            !   Special design for operation theatres which require
                                                                                                                                especially high level sterilization in accordance with
    such a way that it should locate over operating table.     !   A laminar, vertical air flow from transparent air            DIN 1946.
                                                                   distributor through operating table prevents turbulent
!   Stainless steel air distribution box, Hepa filters,                                                                     !   Differential pressure sensors. Easy connection
                                                                   air flow in conventional air systems and offers a high
    transparent air distributor (laminarizator) and pendant        level cleanliness class around the operating table           differential pressure sensors and leakage testing.
    operating table lighting connection.                           during the operati
                                                                                                                            !   Easy installation to all kinds of ceilings.
Azerbaijan Gönka Shops and Office
  2002




     36/37

                                    ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
GÖNKA ....




!   HEPA filters which clean filtrated air before going into   !   Easy maintenance and disinfection because of             !   The system which remove particulates and microbes
    operating room.                                                transparent air distributor's being pulled down.             from operation part due to laminar flow.
                                                                   Operating theatre lighting system made up of airproof
!   Mounting situated in ceiling of the operating theatre in       construction.                                            !   Special design for operation theatres which require
                                                                                                                                especially high level sterilization in accordance with
    such a way that it should locate over operating table.     !   A laminar, vertical air flow from transparent air            DIN 1946.
                                                                   distributor through operating table prevents turbulent
!   Stainless steel air distribution box, Hepa filters,                                                                     !   Differential pressure sensors. Easy connection
                                                                   air flow in conventional air systems and offers a high
    transparent air distributor (laminarizator) and pendant        level cleanliness class around the operating table           differential pressure sensors and leakage testing.
    operating table lighting connection.                           during the operati
                                                                                                                            !   Easy installation to all kinds of ceilings.
Azerbaijan Baku Endos. Hospital




                                  TOROSLAR DAÐ TURÝZM LTD. ÞTÝ.- AZERBAYCAN -2002
                                  AZERBAYCAN BAKÜ ENDOS. HASTANESÝ
                                  Klima santrallarý, Egzost aspiratör, Fan-Coil cihazlarý, Otomatik kontrol malzemeleri



                                  LAZERÝN HASTANESÝ ?
  2002




    38/39
GÖNKA Azerbaijan References


                                                                                     - Hövsan Olympic Training Complex
                                                                                     - Baku Turkish Anatolian High School
                                                                                     - Göyçay Olympic Training Complex
                                                                                     - Serin Hotel Baku
                                                                                     - Balaken Olympic Structure
                                                                                     - BÝlesuvar Olympic Structure
                                                                                     - Baku Administration Of The National
                                                                                      Archive Building
                                                                                     - Hb Clinique Baku
                                                                                     - Azerbaijan Baku Endos. Hospital
                                                                                     - Azerbaijan Military Hospital 300 Bed
                                                                                     - Karwan Mtk Azerbaijan
                                                                                     - Ata Okul Azerbaijan
                                                                                     - Serin Hospital Azerbaijan
                                                                                     - Baku Ministry Of Health Topçubaþov
                                                                                      Hospital
                                                                                     - Baku State University Kitchen And
                                                                                      Restaurant




FACTORY and MAIN OFFICE        AZERBAIJAN BRANCH OFFICE      GEORGIA BRANCH OFFICE


Sincan Organize Sanayi         Nasimi Rayonu,                .
Bölgesi G öktürk C ad. N o:6   Suleyman Rustem Mah., 7,
Sincan / ANKARA                Az1014 BAKÜ / AZERBAYCAN
Tel :0 312 267 09 90 (pbx)     Tel : (00 994) 12 493 19 29
Fax:0 312 267 09 93            Fax: (00 994) 12 493 19 29

Weitere ähnliche Inhalte

Was ist angesagt?

2013 en sg_light
2013 en sg_light2013 en sg_light
2013 en sg_lightmilos639
 
Atd boilers unit 4 ppt
Atd boilers unit 4 pptAtd boilers unit 4 ppt
Atd boilers unit 4 pptMadhu Mahesh
 
package/compact substation
package/compact substationpackage/compact substation
package/compact substationnehakardam
 
Marine incinerator-tb-ab-aqua-datasheet
Marine incinerator-tb-ab-aqua-datasheetMarine incinerator-tb-ab-aqua-datasheet
Marine incinerator-tb-ab-aqua-datasheetaddfield
 
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...Thorne & Derrick International
 
A Prototype Design for a Portable Fire Hall
A Prototype Design for a Portable Fire HallA Prototype Design for a Portable Fire Hall
A Prototype Design for a Portable Fire HallPatrick Veer
 
NGCP for upload
NGCP for uploadNGCP for upload
NGCP for uploadballerette
 
Available Services for CFD Projects
Available Services for CFD ProjectsAvailable Services for CFD Projects
Available Services for CFD ProjectsMahdi Karami
 
Performances of distribution transformer installed in metallic enclosures
Performances of  distribution transformer installed in metallic enclosuresPerformances of  distribution transformer installed in metallic enclosures
Performances of distribution transformer installed in metallic enclosuresnehakardam
 
7200 rev1 plumbing
7200 rev1 plumbing7200 rev1 plumbing
7200 rev1 plumbingbhattbhai
 
J jones professional resume
J jones professional resumeJ jones professional resume
J jones professional resumeJoe Jones
 

Was ist angesagt? (18)

2013 en sg_light
2013 en sg_light2013 en sg_light
2013 en sg_light
 
Atd boilers unit 4 ppt
Atd boilers unit 4 pptAtd boilers unit 4 ppt
Atd boilers unit 4 ppt
 
Raypak
RaypakRaypak
Raypak
 
package/compact substation
package/compact substationpackage/compact substation
package/compact substation
 
Marine incinerator-tb-ab-aqua-datasheet
Marine incinerator-tb-ab-aqua-datasheetMarine incinerator-tb-ab-aqua-datasheet
Marine incinerator-tb-ab-aqua-datasheet
 
Gürcistan references
Gürcistan referencesGürcistan references
Gürcistan references
 
S. Inc. Basic
S. Inc. BasicS. Inc. Basic
S. Inc. Basic
 
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
 
A Prototype Design for a Portable Fire Hall
A Prototype Design for a Portable Fire HallA Prototype Design for a Portable Fire Hall
A Prototype Design for a Portable Fire Hall
 
NGCP for upload
NGCP for uploadNGCP for upload
NGCP for upload
 
Available Services for CFD Projects
Available Services for CFD ProjectsAvailable Services for CFD Projects
Available Services for CFD Projects
 
Performances of distribution transformer installed in metallic enclosures
Performances of  distribution transformer installed in metallic enclosuresPerformances of  distribution transformer installed in metallic enclosures
Performances of distribution transformer installed in metallic enclosures
 
Ank y na60_00
Ank y na60_00Ank y na60_00
Ank y na60_00
 
7200 rev1 plumbing
7200 rev1 plumbing7200 rev1 plumbing
7200 rev1 plumbing
 
CSA B44 & NFPA 101
CSA B44 & NFPA 101CSA B44 & NFPA 101
CSA B44 & NFPA 101
 
J jones professional resume
J jones professional resumeJ jones professional resume
J jones professional resume
 
R y un50_00
R y un50_00R y un50_00
R y un50_00
 
Gangschottung gb
Gangschottung gbGangschottung gb
Gangschottung gb
 

Andere mochten auch

Sebart Wind S 110e assembly manual
Sebart Wind S 110e assembly manualSebart Wind S 110e assembly manual
Sebart Wind S 110e assembly manualSri Annas Karuniawan
 
Gürcistan ing referasn albümü hg
Gürcistan ing referasn albümü hgGürcistan ing referasn albümü hg
Gürcistan ing referasn albümü hgguestb585ef
 
Startup Legal Issues
Startup Legal IssuesStartup Legal Issues
Startup Legal IssuesJim Chester
 
An Update on Employment Contract Basics: We Told You So!!!
An Update on Employment Contract Basics: We Told You So!!!An Update on Employment Contract Basics: We Told You So!!!
An Update on Employment Contract Basics: We Told You So!!!This account is closed
 
Social Media: Legal & Business Issues
Social Media: Legal & Business IssuesSocial Media: Legal & Business Issues
Social Media: Legal & Business IssuesJeff Johnson
 

Andere mochten auch (7)

Sebart Wind S 110e assembly manual
Sebart Wind S 110e assembly manualSebart Wind S 110e assembly manual
Sebart Wind S 110e assembly manual
 
Gürcistan ing referasn albümü hg
Gürcistan ing referasn albümü hgGürcistan ing referasn albümü hg
Gürcistan ing referasn albümü hg
 
SC4_Vol_F3_Aerobatics_14_Rev_1
SC4_Vol_F3_Aerobatics_14_Rev_1SC4_Vol_F3_Aerobatics_14_Rev_1
SC4_Vol_F3_Aerobatics_14_Rev_1
 
Biarritz
BiarritzBiarritz
Biarritz
 
Startup Legal Issues
Startup Legal IssuesStartup Legal Issues
Startup Legal Issues
 
An Update on Employment Contract Basics: We Told You So!!!
An Update on Employment Contract Basics: We Told You So!!!An Update on Employment Contract Basics: We Told You So!!!
An Update on Employment Contract Basics: We Told You So!!!
 
Social Media: Legal & Business Issues
Social Media: Legal & Business IssuesSocial Media: Legal & Business Issues
Social Media: Legal & Business Issues
 

Ähnlich wie Azerbaycan ing referasn albümü hg

Rusya ing referasn albümü hg
Rusya ing referasn albümü hgRusya ing referasn albümü hg
Rusya ing referasn albümü hgguestb585ef
 
Rusya ing referasn albümü hg
Rusya ing referasn albümü hgRusya ing referasn albümü hg
Rusya ing referasn albümü hgguestb585ef
 
Updated Summary Lincoln Power Point Presentation
Updated Summary Lincoln Power Point PresentationUpdated Summary Lincoln Power Point Presentation
Updated Summary Lincoln Power Point PresentationDavid Page
 
"Replacement of vapor compression system of domestic refrigerator by an eject...
"Replacement of vapor compression system of domestic refrigerator by an eject..."Replacement of vapor compression system of domestic refrigerator by an eject...
"Replacement of vapor compression system of domestic refrigerator by an eject...IRJET Journal
 
Combi Cooler Tech Detail Gb 8733
Combi Cooler Tech Detail Gb 8733Combi Cooler Tech Detail Gb 8733
Combi Cooler Tech Detail Gb 8733Bartosz Pijawski
 
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)PALANIVEL SUBBIAH
 
Evapco alcoil corporate_brochure
Evapco alcoil corporate_brochureEvapco alcoil corporate_brochure
Evapco alcoil corporate_brochureYury Naumov
 
Kazakistan ing referasn albümü hg
Kazakistan ing referasn albümü hgKazakistan ing referasn albümü hg
Kazakistan ing referasn albümü hgguestb585ef
 
How to use CFD for Water Cooled Electronics
How to use CFD for Water Cooled ElectronicsHow to use CFD for Water Cooled Electronics
How to use CFD for Water Cooled ElectronicsSimScale
 
St module1 1 jan2008
St module1  1 jan2008St module1  1 jan2008
St module1 1 jan2008kjmughal
 
C:\fakepath\fossil power basics
C:\fakepath\fossil power basicsC:\fakepath\fossil power basics
C:\fakepath\fossil power basicsguest6a2ec4
 
Sb ls scroll-uc_ver.3.0_en
Sb ls scroll-uc_ver.3.0_enSb ls scroll-uc_ver.3.0_en
Sb ls scroll-uc_ver.3.0_enYury Naumov
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]Amardeep Jadeja
 
Sb ls scroll-uc-ii_ver.1.0_en
Sb ls scroll-uc-ii_ver.1.0_enSb ls scroll-uc-ii_ver.1.0_en
Sb ls scroll-uc-ii_ver.1.0_enYury Naumov
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Kamran Saeed
 

Ähnlich wie Azerbaycan ing referasn albümü hg (20)

Rusya ing referasn albümü hg
Rusya ing referasn albümü hgRusya ing referasn albümü hg
Rusya ing referasn albümü hg
 
Rusya ing referasn albümü hg
Rusya ing referasn albümü hgRusya ing referasn albümü hg
Rusya ing referasn albümü hg
 
Rusya references
Rusya referencesRusya references
Rusya references
 
Kazakistan references
Kazakistan referencesKazakistan references
Kazakistan references
 
Gürcistan references
Gürcistan referencesGürcistan references
Gürcistan references
 
Gürcistan references
Gürcistan referencesGürcistan references
Gürcistan references
 
Sudan references
Sudan references   Sudan references
Sudan references
 
Updated Summary Lincoln Power Point Presentation
Updated Summary Lincoln Power Point PresentationUpdated Summary Lincoln Power Point Presentation
Updated Summary Lincoln Power Point Presentation
 
"Replacement of vapor compression system of domestic refrigerator by an eject...
"Replacement of vapor compression system of domestic refrigerator by an eject..."Replacement of vapor compression system of domestic refrigerator by an eject...
"Replacement of vapor compression system of domestic refrigerator by an eject...
 
Combi Cooler Tech Detail Gb 8733
Combi Cooler Tech Detail Gb 8733Combi Cooler Tech Detail Gb 8733
Combi Cooler Tech Detail Gb 8733
 
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)
 
Evapco alcoil corporate_brochure
Evapco alcoil corporate_brochureEvapco alcoil corporate_brochure
Evapco alcoil corporate_brochure
 
Kazakistan ing referasn albümü hg
Kazakistan ing referasn albümü hgKazakistan ing referasn albümü hg
Kazakistan ing referasn albümü hg
 
How to use CFD for Water Cooled Electronics
How to use CFD for Water Cooled ElectronicsHow to use CFD for Water Cooled Electronics
How to use CFD for Water Cooled Electronics
 
St module1 1 jan2008
St module1  1 jan2008St module1  1 jan2008
St module1 1 jan2008
 
C:\fakepath\fossil power basics
C:\fakepath\fossil power basicsC:\fakepath\fossil power basics
C:\fakepath\fossil power basics
 
Sb ls scroll-uc_ver.3.0_en
Sb ls scroll-uc_ver.3.0_enSb ls scroll-uc_ver.3.0_en
Sb ls scroll-uc_ver.3.0_en
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
Sb ls scroll-uc-ii_ver.1.0_en
Sb ls scroll-uc-ii_ver.1.0_enSb ls scroll-uc-ii_ver.1.0_en
Sb ls scroll-uc-ii_ver.1.0_en
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
 

Kürzlich hochgeladen

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 

Kürzlich hochgeladen (20)

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 

Azerbaycan ing referasn albümü hg

  • 1. BÝlesuvar Olympic Training Complex GÖNKA A.S. Azerbaijan References GÖNKA
  • 2. BÝlesuvar Olympic Training Complex Bilesuvar Olympic Training Complex ! The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA ! Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2002 Chiller Air Cooled Fan Coils Ceiling & Wall Type Air Handling Units Boiler Systems 2002 Are used in complex 2/3
  • 3.
  • 4. Baku Turkish Anatolian High School 2008 4/5 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 5. Baku Turkish Anatolian High School Baku Turkish Anatolian High School T.C. Ministry of Education From time to time school teacher who has visited or invited A school in Physics, Biology and Chemistry-A has a Computer and Azerbaijan Respublikasý Study on Nazir February 28, 1992 guests or conferences for students in this hall is carried Laboratory. In all three laboratories are in a position to according to the memorandum of understanding signed on out.Understanding of technical systems in conference rooms respond to needs in terms of materials. Physics, Chemistry 24.01.1994 was opened. with a modern arrangement was.Every moment ready and Biology teachers try in this laboratory, as well as have the School, celebration of certain days and weeks, panel, sound system, computer and projection equipment are ability to make the computer-aided instruction. debate and cinema shows a conference room of 200 available. people can be made available.
  • 6. Göyçay Olympic Training Complex Göyçay Olympic Training Complex ! The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA ! Swimming pool, & whole olympic training facilities are 2008 existing in the complex the whole job is finished at 2002 6/7 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 7. Boiler house, pump station and piping whole mechanical job Ductwork Chiller Air Cooled Fan Coils Ceeling & Wall Type Air Handling Units Boiler Systems Are used in complex
  • 8. Hövsan Olympic Training Complex Hövsan Olympic Training Complex ! The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA ! Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2002 Chiller Air Cooled Fan Coils Ceeling & Wall Type Air Handling Units Boiler Systems Are used in complex 2008 8/9
  • 9. Air cooled liquid chiller GONKA Screw compressor air cooled water cooling Evaporator; Shell- tube evaporator whose cooling liquid Low noise level. groups, with its models in the range of high efficiency and side and water side have one-circuit, multiple transitional, Multiple compressor, multiple cyclical, high efficiency. high capacity, are ideal for cooling operations related to two mirrored construction. %25-%100 continuous modulating capacity control in Refrigerating Circuit;Cooling Circuit; Cooling circuit and every compressor. comfort and industrial purposes. circuit elements entirely independent for every compressor. Hardconstruction and long life. R22 , R134a or R407c options. Easy handling, installation and service. Electrical Screen and Control Board; board including Compressors; Half hermetic screw compressors. Effortless service. switch and micro-processor controlled module and control Compressors changing between 1 and 4 according to Compatible with available BMS systems. cards as well as elements such as systemic control Meeting consumer requirements in the most suitable way cooling capacity. elements and fuse, thermic magnetic switch and relay. through broad accessory and option alternatives. Condenser; Highly efficient, original condenser situated in V Micro-processor based Control System; Full control over all Newly improved use of screw compressor with high COP type and condensation provided through 900 cyclical and the cooling circuits. Connections on board through value. low sound level axial fans situated in the open edge of the simplified device failure follow-up and easily recognized Trouble-proof operations under high temperatures. condenser. electrical diagram. Rational control.
  • 10. Serin Hotel Baku 2006 10/11 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 11. Air cooled liquid chiller GONKA Screw compressor air cooled water cooling GONKA Screw compressor air cooled water cooling GONKA Screw compressor air cooled water cooling groups, with its models in the range of high efficiency and groups, with its models in the range of high efficiency and groups, with its models in the range of high efficiency and high capacity, are ideal for cooling operations related to high capacity, are ideal for cooling operations related to high capacity, are ideal for cooling operations related to comfort and industrial purposes. comfort and industrial purposes. comfort and industrial purposes. R22 , R134a or R407c options. R22 , R134a or R407c options. R22 , R134a or R407c options. Compressors; Half hermetic screw compressors. Compressors; Half hermetic screw compressors. Compressors; Half hermetic screw compressors. Compressors changing between 1 and 4 according to Compressors changing between 1 and 4 according to Compressors changing between 1 and 4 according to cooling capacity. cooling capacity. cooling capacity. Condenser; Highly efficient, original condenser situated in V Condenser; Highly efficient, original condenser situated in V Condenser; Highly efficient, original condenser situated in V type and condensation provided through 900 cyclical and type and condensation provided through 900 cyclical and type and condensation provided through 900 cyclical and low sound level axial fans situated in the open edge of the low sound level axial fans situated in the open edge of the low sound level axial fans situated in the open edge of the condenser. condenser. condenser.
  • 12. Balaken Olympic Training Complex Balaken Olympic Training Complex ! The Whole Mechanical Job ; piping, duct work, heating system, boiler house, cooling system, were made by GÖNKA A.S. With the equipment produced by GÖNKA ! Swimming pool, & whole olympic training facilities are existing in the complex the whole job is finished at 2002 2002 Chiller Air Cooled Fan Coils Ceiling & Wall Type Air Handling Units Boiler Systems 12/13 Are used in complex
  • 13. ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 14. 14/15 2002Baku Administration Of The National Archive Building ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 15. Air handling unit Standard Accessories; Standard Series Optional Accessories; ! Filter Chambers; Chamber design which provides easy Application Area: business centers, schools, ! GONKA vapor humidifier, standard vapor cylinder, mounting and de-mounting in filters and filters with hospitals, factories, hotels and restaurants. immersion electrodes, stainless vapor distributor and different productivity levels on demand. microprocessor control unit. ! 8 different models which provide required humidity ! Heating and Cooling Coils; Seamless cooper tubes. In and temperature by conditioning air volume in the ! Mufflers which are made up of coulisses to provide heating coils, 4 options: warm water, vapor, hot water, required sound holding capacity. range of 3000m³/h and 100.000 m³/h. electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion). ! The framework which is formed by combination of ! Plate heat exchanger or Heat recovery wheel for ! Dampers; Rigid aluminum frame in multi airfoil aluminum frames, which are connected specially, with recovery of the heat emitted with exhaust air. structure which is the least resistant against airflow. plastic and aluminum comers. ! Electrical board. Rubber gaskets which reduce air leakage through blades to the minimum level. ! Boards which are made up of double skilled ! Frequency Converter galvanized iron in a standard way. ! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal ! Polyurethane insulated panels, which are 30 mm in type. Forward curved fans in systems with low, medium thickness, for thermal and acoustic insulation in a and high duct pressures,. standard way.
  • 16. Hb Clinique Baku 2002 16/17 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 17. Packaged hygienic air conditioner Laminar flow air system ! Highly efficient filtration of supply and extract air. ! HEPA filters which clean filtrated air before going into ! Maximum function control: room temperature and operating room. relative humidity control throughout the year. ! Mounting situated in ceiling of the operating theatre in ! Meeting fresh air that surgical operations require such a way that it should locate over operating table. ! Quiet and non-vibrating operation that operating theatres require. ! Stainless steel air distribution box, Hepa filters, ! An independent system which is under direct control of transparent air distributor (laminarizator) and pendant authorized health staff. operating table lighting connection. ! Pressure control in aseptic and septic surgical operations. ! Easy maintenance and disinfection because of ! Continuous control of room temperature and humidity. transparent air distributor's being pulled down. ! Quiet and non-vibrating operation. Operating theatre lighting system made up of airproof ! Replacing the old installation in available places and construction. generally, because their sizes are small, occupying less ! A laminar, vertical air flow from transparent air room than any time before, however available air distributor through operating table prevents turbulent canal and water installation could be, easy erection in any type of health institutions. air flow in conventional air systems and offers a high level cleanliness class around the operating table ! In fan part, one or two directly actuated highly static during the operati pressurized fans to provide required air volumetric flow rate even when filters are choked. ! The system which remove particulates and microbes ! Fans with inverter; St316 stainless steel fans which are from operation part due to laminar flow. used as a higher standard in respect to epoxy dyed ! Special design for operation theatres which require standard fans in terms of hygiene and endurance. With a view to achieving continuous speed control, especially high level sterilization in accordance with inverter equipment in supply and extract fans. DIN 1946. ! Air Filters; F5 class filter in fresh air input and F9 class ! Differential pressure sensors. Easy connection filters on the extract side. differential pressure sensors and leakage testing. ! Dx battery; ! Easy installation to all kinds of ceilings. ! Vapor humidifiers; Standard steam cylinder, dipping electrodes, stainless steam distributor and micro- process control. ! Compressor; 1 or 2 Scroll Compressors according to the capacity. ! Electrical Board; All of the elements required for the trouble-proof operation of master switch and device. ! Micro-processor; AC micro-processor control of temperature and relative humidity over all of the operation and safety functions integrally (I) or rational- integrally (PI). ! PCO2 micro-processor of device control and adjustment system which provides remote control terminal with erection inside the clean room.
  • 18. Baku Ministry Of Health Topçubaþov Hospital Laminar flow air system ! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes operating room. transparent air distributor's being pulled down. from operation part due to laminar flow. 2008 Operating theatre lighting system made up of airproof ! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require especially high level sterilization in accordance with such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946. distributor through operating table prevents turbulent ! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection air flow in conventional air systems and offers a high transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing. 18/19 operating table lighting connection. during the operati ! Easy installation to all kinds of ceilings.
  • 19. ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 20. Serin Hospital Azerbaijan 2008 20/21 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 21.
  • 22. Serin Hospital Azerbaijan Packaged hygienic air conditioner ! Highly efficient filtration of supply and extract air. ! Replacing the old installation in available places and ! Dx battery; generally, because their sizes are small, occupying less Vapor humidifiers; Standard steam cylinder, dipping ! Maximum function control: room temperature and ! room than any time before, however available air electrodes, stainless steam distributor and micro- relative humidity control throughout the year. canal and water installation could be, easy erection in process control. ! Meeting fresh air that surgical operations require any type of health institutions. ! Compressor; 1 or 2 Scroll Compressors according to ! Quiet and non-vibrating operation that operating ! In fan part, one or two directly actuated highly static the capacity. theatres require. pressurized fans to provide required air volumetric flow rate even when filters are choked. ! Electrical Board; All of the elements required for the ! An independent system which is under direct control of trouble-proof operation of master switch and device. 2008 authorized health staff. ! Fans with inverter; St316 stainless steel fans which are used as a higher standard in respect to epoxy dyed ! Micro-processor; AC micro-processor control of ! Pressure control in aseptic and septic surgical temperature and relative humidity over all of the operations. standard fans in terms of hygiene and endurance. operation and safety functions integrally (I) or rational- With a view to achieving continuous speed control, ! Continuous control of room temperature and humidity. integrally (PI). inverter equipment in supply and extract fans. ! Quiet and non-vibrating operation. ! PCO2 micro-processor of device control and ! Air Filters; F5 class filter in fresh air input and F9 class adjustment system which provides remote control 22/23 filters on the extract side. terminal with erection inside the clean room.
  • 23.
  • 24. Azerbaijan Military Hospital 300 Bed Laminar flow air system ! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes operating room. transparent air distributor's being pulled down. from operation part due to laminar flow. 2007 Operating theatre lighting system made up of airproof ! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require especially high level sterilization in accordance with such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946. distributor through operating table prevents turbulent ! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection air flow in conventional air systems and offers a high transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing. 24/25 operating table lighting connection. during the operati ! Easy installation to all kinds of ceilings.
  • 25. ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 26. Sincan Organize Sanayi Bölgesi Sincan Organize Sanayi Bölgesi Göktürk Caddesi No : 6 Göktürk Caddesi No : 6 Karwan Mtk Azerbaijan Sincan / ANKARA / TURKEY Sincan / ANKARA / TURKEY Tel :+90 312 267 09 90(pbx) Tel :+90 312 267 09 90(pbx) Fax:+90 312 267 09 93 Fax:+90 312 267 09 93 http://www.gonka.com.tr http://www.gonka.com.tr ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA e-mail: gonka@turk.net ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA e-mail: gonka@turk.net CUSTOMER KARVAN MTK CUSTOMER KARVAN MTK JOB NAME KARVAN RESIDANS - BAKU JOB NAME KARVAN RESIDANS - BAKU UNIT TYPE AIR COOLED LIQUID CHILLER UNIT TYPE HIDDEN CEILING TYPE FAN COIL UNIT MODEL GHSC 1V10s SERIAL NO 08/1005 FLOOR PIPE GFC LEFT COMPRESSOR TYPE 1 Screw compressor TYPE WALL CONNECTION 400 RIGHT CAPACITY 640.4 kW CEILING DIRECTION EVAPORATOR WATER PROD. DATE FEBRUARY / 2008 SERIAL NO 08/1467 12/7 ° C INLET/OUTLET TEMP. EVAPORATOR WATER FLOW RATE 110 m³/h HEATING CAPACITY 9.350 W OUTSIDE AIR TEMP. 34 °C COOLING CAPACITY SENSIBLE 3.110 W REFRIGERANT R407C TOTAL 4.320 W MAX. COMP. CURRENT 440 A AIR FLOW RATE 800 m³/h OPERATING VOLTAGE 380V/50 Hz VOLTAGE 220 V MONOPHASE POWER 65 W PRODUCTION DATE FEBRUARY / 2008 HEATING COOLING QUALITY CONTROL DATE APRIL / 2008 OPERATING HOT WATER 80/60 °C WATER TEMP. 6/10°C CONDITIONS SUPERHEATED 130/90 °C WATER TEMP. 7/12°C TSEK WATER STEAM 0,1 ATÜ KAZAKHSTAN QUALITY CONTROL DATE APRIL / 2008 2002 26/27
  • 27. ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 28. Central Bank of Azerbaijan Republic ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA 2009 28/29
  • 29.
  • 30. Azerbaijan Mc Donald’s Azerbaijan Mc Donald’s Centrifugal roof extracts Technical specification The manufactured centrifugal roof Body It is designed according to the bat environment Fan has dense fimed, low sound level and extract unit has been designed for the effective exhaust. it is conditions Galvanized stell frame, aluminium upper cover highperformance.It is easy to open the fan and clean the fin possible to montage in the desired angle with the small are used. Moto-fan group Cenrifugal ventilatör is statically at shot notice. By the help aof special protection cover, itwork sound Ievel it may be used in for the industrial applications and dynamically balanced.Motor serves 380V/50 Hz 900- many years without any problem. Centrifugal roof extract and kitchens. It has been designed for Iong service Iife 1400d/d as astandard and directly coupled with d-phase units designed as direct extraction or combined with a duct without maintenance. The manufacturing range 500-12.000 electirical motor.By this way, it works quitely and without type. m³/h air and 0-50 mmSS pressure. vibration. 2002 30/31 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 31.
  • 32. 32/33 2008 Ata Okul Azerbaijan
  • 33. ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 34. 34/35 2008 Baku State University Kitchen And Restaurant ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 35. Laminar flow air system ! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes operating room. transparent air distributor's being pulled down. from operation part due to laminar flow. Operating theatre lighting system made up of airproof ! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require especially high level sterilization in accordance with such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946. distributor through operating table prevents turbulent ! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection air flow in conventional air systems and offers a high transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing. operating table lighting connection. during the operati ! Easy installation to all kinds of ceilings.
  • 36. Azerbaijan Gönka Shops and Office 2002 36/37 ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
  • 37. GÖNKA .... ! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes operating room. transparent air distributor's being pulled down. from operation part due to laminar flow. Operating theatre lighting system made up of airproof ! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require especially high level sterilization in accordance with such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946. distributor through operating table prevents turbulent ! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection air flow in conventional air systems and offers a high transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing. operating table lighting connection. during the operati ! Easy installation to all kinds of ceilings.
  • 38. Azerbaijan Baku Endos. Hospital TOROSLAR DAÐ TURÝZM LTD. ÞTÝ.- AZERBAYCAN -2002 AZERBAYCAN BAKÜ ENDOS. HASTANESÝ Klima santrallarý, Egzost aspiratör, Fan-Coil cihazlarý, Otomatik kontrol malzemeleri LAZERÝN HASTANESÝ ? 2002 38/39
  • 39.
  • 40. GÖNKA Azerbaijan References - Hövsan Olympic Training Complex - Baku Turkish Anatolian High School - Göyçay Olympic Training Complex - Serin Hotel Baku - Balaken Olympic Structure - BÝlesuvar Olympic Structure - Baku Administration Of The National Archive Building - Hb Clinique Baku - Azerbaijan Baku Endos. Hospital - Azerbaijan Military Hospital 300 Bed - Karwan Mtk Azerbaijan - Ata Okul Azerbaijan - Serin Hospital Azerbaijan - Baku Ministry Of Health Topçubaþov Hospital - Baku State University Kitchen And Restaurant FACTORY and MAIN OFFICE AZERBAIJAN BRANCH OFFICE GEORGIA BRANCH OFFICE Sincan Organize Sanayi Nasimi Rayonu, . Bölgesi G öktürk C ad. N o:6 Suleyman Rustem Mah., 7, Sincan / ANKARA Az1014 BAKÜ / AZERBAYCAN Tel :0 312 267 09 90 (pbx) Tel : (00 994) 12 493 19 29 Fax:0 312 267 09 93 Fax: (00 994) 12 493 19 29