SlideShare ist ein Scribd-Unternehmen logo
1 von 24
Downloaden Sie, um offline zu lesen
Presented by TiHonMumMim
TiHonMumMim©   2
Development Process
Development Model




               TiHonMumMim©   3
Inception      Elaboration        Construction   Transition


Inception
  Review the initial system request,
  Do feasibility study
  Define the V&S, and the initial project plan.
Elaboration
  Will pay attention on detail plan
  Capture & analyze most of requirements
Construction
  Executing, monitoring, and controlling phase
Transition
  Complete and improve the system

                           TiHonMumMim©                          4
[Use-case driven]
                                       Design
                                       Model
                                                                    Test
      Use case        Analysis                     Implementation
                                                                    Model
       Model           Model                           Model
                                      Deployment
                                        Model




Use case model
Analysis Model
Design Model
Deployment Model
Implementation Model
Test Model

                                 TiHonMumMim©                               5
TiHonMumMim©   6
TiHonMumMim©   7
Resource list

 Human Resource
 Tools
  Software
  Hardware




                  TiHonMumMim©   8
Outline




          TiHonMumMim©   9
This section presents about our
estimation on every aspects during the
project
As long with the detail schedule




                  TiHonMumMim©           10
TiHonMumMim©   11
This is the plan of our team to deal with
specific risks. In this plan we have many
phase
 Identify the risks
 Calculate the probability
 Measure the impact
 Indicate the priority
 Resolve each risk



                    TiHonMumMim©            12
Risk                   Prob.   Impact    Priority                   Actions


Components developed
separately cannot be
                                                             Reserve time to integrated and
integrated easily,          4           4        16
                                                             rework for integration in schedule.
requiring redesign and
rework.

No substitution if any
team member cannot                                           Add more tasks for remaining
                            4           3        12
continue to contribute to                                    members, add more time to work
the project.


                                                             Each team member will write a draft
Detail reporting could
                                                             version of report on what he does
take more development       4           3        12
                                                             before documenter of team writes it
time.
                                                             again.




                                            TiHonMumMim©                                           13
All team members need                              Work on weekends, set schedule
preparation time for                               with time for exam; define meetings
                            3   3        9
midterm, final exam, and                           in each week in suitable time for all
other subjects.                                    people.




Lack of experiences in
software project                                   Assign 2 members working on each
management, especially                             test. Risk and changes
in testing, verification,                          management tasks will have a long
                            3   3        9
validation, risks                                  duration to finish. Support others
management and                                     people about what we already
changes management                                 known.
exists in the Team




                                    TiHonMumMim©                                           14
Low motivation and                                 Operate some relax actions to
                            2   3        6
moral reduce productivity                          recharge team spirit


                                                   Make clear about techniques we
Team member needs
                                                   used, if some new techniques are
extra time to learn
                                                   needed, assign a member read them
                            2   2        4
unfamiliar Tools or
                                                   and talk to other members about
techniques.
                                                   them.



                                                   PM has to control conflicts in team,
Conflicts among team
                                                   assure everybody thoughts are
members’ ideas results in
                                                   respected, make assumptions when
poor performances, more     2   2        4
                                                   we have conflicts, record any
meeting, and extra
                                                   conflicts to change if we are in wrong
rework.
                                                   way




                                    TiHonMumMim©                                            15
TiHonMumMim©   16
Current problems
 Paper – based system is obsolete and
 inconvenient
 Take times and effort
Proposal solution
 Web – based system
System context and Scope
 OURS is a part of university management
 system. It can interact with other sub-
 system
                    TiHonMumMim©           17
Online university
  registration
     system




   University
    System




                    TiHonMumMim©   18
Log in and Log out
Manage Department
Manage student
Manage lecturer
Manage course offering
Manage financial activities
View academic history
Register course

                   TiHonMumMim©   19
TiHonMumMim©   20
Student




                 University                          Schedule

   Credit

                                      Curriculum   Course Offering
               Course Catalog
    Fee


Prerequisite
               Department               Faculty



                 Lecturer

                                TiHonMumMim©                         21
TiHonMumMim©   22
Check the defects existing in the
document and fixed by the team
Reference in the document




                  TiHonMumMim©      23
TiHonMumMim©   24

Weitere ähnliche Inhalte

Andere mochten auch

In Memoriam
In MemoriamIn Memoriam
In Memoriamantso
 
Curriculum alignment and consistency
Curriculum alignment and consistencyCurriculum alignment and consistency
Curriculum alignment and consistencySaxion
 
Hn pa berritzekoprozesua2013_laburtua
Hn pa berritzekoprozesua2013_laburtuaHn pa berritzekoprozesua2013_laburtua
Hn pa berritzekoprozesua2013_laburtuahnoiratzualdea
 
Twitter Micro Blogging
Twitter  Micro  BloggingTwitter  Micro  Blogging
Twitter Micro Bloggingmmti2008
 
Diagnostikoaz hitz egiten hasteko 13
Diagnostikoaz hitz egiten hasteko 13Diagnostikoaz hitz egiten hasteko 13
Diagnostikoaz hitz egiten hasteko 13hnoiratzualdea
 
Hnp Berritu Behar Zuzendariei Aurkezpena
Hnp Berritu Behar Zuzendariei AurkezpenaHnp Berritu Behar Zuzendariei Aurkezpena
Hnp Berritu Behar Zuzendariei Aurkezpenahnoiratzualdea
 
Fakey Shakey Parts
Fakey Shakey PartsFakey Shakey Parts
Fakey Shakey Partsmrbusbridge
 
Strijker, A. (2004 04 05). Knowledgemanagement Reuse Of Learningmaterial
Strijker, A. (2004 04 05). Knowledgemanagement Reuse Of LearningmaterialStrijker, A. (2004 04 05). Knowledgemanagement Reuse Of Learningmaterial
Strijker, A. (2004 04 05). Knowledgemanagement Reuse Of LearningmaterialSaxion
 
Breakthrough Negotiating
Breakthrough NegotiatingBreakthrough Negotiating
Breakthrough Negotiatingkgreene
 
Strijker, A. (2001). Using Metadata For Reusing Material And Providing User S...
Strijker, A. (2001). Using Metadata For Reusing Material And Providing User S...Strijker, A. (2001). Using Metadata For Reusing Material And Providing User S...
Strijker, A. (2001). Using Metadata For Reusing Material And Providing User S...Saxion
 
Liesbeth De Winter (FOV) over het nieuwe decreet op lokaal cultuurbeleid
Liesbeth De Winter (FOV) over het nieuwe decreet op lokaal cultuurbeleidLiesbeth De Winter (FOV) over het nieuwe decreet op lokaal cultuurbeleid
Liesbeth De Winter (FOV) over het nieuwe decreet op lokaal cultuurbeleidAvansa Kempen
 
Philosophy of trainingRev2015
Philosophy of trainingRev2015Philosophy of trainingRev2015
Philosophy of trainingRev2015Paul Arnold
 
150210 Stilteplatform Oud-Turnhout
150210 Stilteplatform Oud-Turnhout150210 Stilteplatform Oud-Turnhout
150210 Stilteplatform Oud-TurnhoutAvansa Kempen
 
Cielo e infierno
Cielo e infiernoCielo e infierno
Cielo e infiernoantso
 
HNPberritzekoLanakMintegietanAurkezteko
HNPberritzekoLanakMintegietanAurkeztekoHNPberritzekoLanakMintegietanAurkezteko
HNPberritzekoLanakMintegietanAurkeztekohnoiratzualdea
 

Andere mochten auch (20)

In Memoriam
In MemoriamIn Memoriam
In Memoriam
 
Ejemplo
EjemploEjemplo
Ejemplo
 
Curriculum alignment and consistency
Curriculum alignment and consistencyCurriculum alignment and consistency
Curriculum alignment and consistency
 
Hn pa berritzekoprozesua2013_laburtua
Hn pa berritzekoprozesua2013_laburtuaHn pa berritzekoprozesua2013_laburtua
Hn pa berritzekoprozesua2013_laburtua
 
Zorionak09
Zorionak09Zorionak09
Zorionak09
 
Twitter Micro Blogging
Twitter  Micro  BloggingTwitter  Micro  Blogging
Twitter Micro Blogging
 
Diagnostikoaz hitz egiten hasteko 13
Diagnostikoaz hitz egiten hasteko 13Diagnostikoaz hitz egiten hasteko 13
Diagnostikoaz hitz egiten hasteko 13
 
Lezo Arindua
Lezo ArinduaLezo Arindua
Lezo Arindua
 
Hnp Berritu Behar Zuzendariei Aurkezpena
Hnp Berritu Behar Zuzendariei AurkezpenaHnp Berritu Behar Zuzendariei Aurkezpena
Hnp Berritu Behar Zuzendariei Aurkezpena
 
Fakey Shakey Parts
Fakey Shakey PartsFakey Shakey Parts
Fakey Shakey Parts
 
Strijker, A. (2004 04 05). Knowledgemanagement Reuse Of Learningmaterial
Strijker, A. (2004 04 05). Knowledgemanagement Reuse Of LearningmaterialStrijker, A. (2004 04 05). Knowledgemanagement Reuse Of Learningmaterial
Strijker, A. (2004 04 05). Knowledgemanagement Reuse Of Learningmaterial
 
Breakthrough Negotiating
Breakthrough NegotiatingBreakthrough Negotiating
Breakthrough Negotiating
 
Strijker, A. (2001). Using Metadata For Reusing Material And Providing User S...
Strijker, A. (2001). Using Metadata For Reusing Material And Providing User S...Strijker, A. (2001). Using Metadata For Reusing Material And Providing User S...
Strijker, A. (2001). Using Metadata For Reusing Material And Providing User S...
 
Liesbeth De Winter (FOV) over het nieuwe decreet op lokaal cultuurbeleid
Liesbeth De Winter (FOV) over het nieuwe decreet op lokaal cultuurbeleidLiesbeth De Winter (FOV) over het nieuwe decreet op lokaal cultuurbeleid
Liesbeth De Winter (FOV) over het nieuwe decreet op lokaal cultuurbeleid
 
Philosophy of trainingRev2015
Philosophy of trainingRev2015Philosophy of trainingRev2015
Philosophy of trainingRev2015
 
Cloning
CloningCloning
Cloning
 
150210 Stilteplatform Oud-Turnhout
150210 Stilteplatform Oud-Turnhout150210 Stilteplatform Oud-Turnhout
150210 Stilteplatform Oud-Turnhout
 
Cielo e infierno
Cielo e infiernoCielo e infierno
Cielo e infierno
 
HNPberritzekoLanakMintegietanAurkezteko
HNPberritzekoLanakMintegietanAurkeztekoHNPberritzekoLanakMintegietanAurkezteko
HNPberritzekoLanakMintegietanAurkezteko
 
Vormingplus Kempen
Vormingplus KempenVormingplus Kempen
Vormingplus Kempen
 

Ähnlich wie Business Plan

Scrum in Large Companies public edition
Scrum in Large Companies public editionScrum in Large Companies public edition
Scrum in Large Companies public editionDina Dąbrowska
 
Scrum referencecard
Scrum referencecardScrum referencecard
Scrum referencecardSuresh Kumar
 
THE IMPACT OF TEAM CLIMATE ON FAILURE AND SUCCESS OF SCRUM ADOPTION
THE IMPACT OF TEAM CLIMATE ON FAILURE AND SUCCESS OF SCRUM ADOPTION THE IMPACT OF TEAM CLIMATE ON FAILURE AND SUCCESS OF SCRUM ADOPTION
THE IMPACT OF TEAM CLIMATE ON FAILURE AND SUCCESS OF SCRUM ADOPTION ijseajournal
 
Chapter1 Advanced Software Engineering overview
Chapter1 Advanced Software Engineering overviewChapter1 Advanced Software Engineering overview
Chapter1 Advanced Software Engineering overviewBule Hora University
 
Chapter 2 Time boxing & agile models
Chapter 2   Time boxing & agile modelsChapter 2   Time boxing & agile models
Chapter 2 Time boxing & agile modelsGolda Margret Sheeba J
 
Development Frameworks and Methods Coursework (DFM CW)
Development Frameworks and Methods Coursework (DFM CW)Development Frameworks and Methods Coursework (DFM CW)
Development Frameworks and Methods Coursework (DFM CW)Aung Hein Htet
 
Software Engineering Agile methodology SCRUM
Software Engineering  Agile methodology SCRUM Software Engineering  Agile methodology SCRUM
Software Engineering Agile methodology SCRUM Hamza7777
 
Lean as Agile methodology – A Study
Lean as Agile methodology – A StudyLean as Agile methodology – A Study
Lean as Agile methodology – A StudyEswar Publications
 
Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions SA
 
[AgileCMMI] Practical Experience Report: Application of Project Management ar...
[AgileCMMI] Practical Experience Report: Application of Project Management ar...[AgileCMMI] Practical Experience Report: Application of Project Management ar...
[AgileCMMI] Practical Experience Report: Application of Project Management ar...davidobama
 
Aula 1 - Project Management Concepts by Roger Pressman
Aula 1 - Project Management Concepts by Roger PressmanAula 1 - Project Management Concepts by Roger Pressman
Aula 1 - Project Management Concepts by Roger PressmanRogerio P C do Nascimento
 
Agile process (Scrum Framework)
Agile process (Scrum Framework)Agile process (Scrum Framework)
Agile process (Scrum Framework)Jakir Hosen Khan
 
Подборка о рисках ИТ-проектов
Подборка о рисках ИТ-проектовПодборка о рисках ИТ-проектов
Подборка о рисках ИТ-проектовAlexey Ivasyuk
 
DFM Coursework | COMP1648 | BIT
DFM Coursework | COMP1648 | BITDFM Coursework | COMP1648 | BIT
DFM Coursework | COMP1648 | BITAung San Kyaw
 
Webinar 3 ways to increase team collaboration bh-ad-fnl
Webinar   3 ways to increase team collaboration bh-ad-fnlWebinar   3 ways to increase team collaboration bh-ad-fnl
Webinar 3 ways to increase team collaboration bh-ad-fnlPerforce
 
SE18_Lec 05_Agile Software Development
SE18_Lec 05_Agile Software DevelopmentSE18_Lec 05_Agile Software Development
SE18_Lec 05_Agile Software DevelopmentAmr E. Mohamed
 
Enterprise Project Management and the US Armed Forces - EPC Group
Enterprise Project Management and the US Armed Forces - EPC GroupEnterprise Project Management and the US Armed Forces - EPC Group
Enterprise Project Management and the US Armed Forces - EPC GroupEPC Group
 
Unleash IT Casestudy
Unleash IT CasestudyUnleash IT Casestudy
Unleash IT Casestudymaghamsameera
 

Ähnlich wie Business Plan (20)

Scrum in Large Companies public edition
Scrum in Large Companies public editionScrum in Large Companies public edition
Scrum in Large Companies public edition
 
Scrum referencecard
Scrum referencecardScrum referencecard
Scrum referencecard
 
THE IMPACT OF TEAM CLIMATE ON FAILURE AND SUCCESS OF SCRUM ADOPTION
THE IMPACT OF TEAM CLIMATE ON FAILURE AND SUCCESS OF SCRUM ADOPTION THE IMPACT OF TEAM CLIMATE ON FAILURE AND SUCCESS OF SCRUM ADOPTION
THE IMPACT OF TEAM CLIMATE ON FAILURE AND SUCCESS OF SCRUM ADOPTION
 
Chapter1 Advanced Software Engineering overview
Chapter1 Advanced Software Engineering overviewChapter1 Advanced Software Engineering overview
Chapter1 Advanced Software Engineering overview
 
Online exa-syste
Online exa-systeOnline exa-syste
Online exa-syste
 
Chapter 2 Time boxing & agile models
Chapter 2   Time boxing & agile modelsChapter 2   Time boxing & agile models
Chapter 2 Time boxing & agile models
 
Development Frameworks and Methods Coursework (DFM CW)
Development Frameworks and Methods Coursework (DFM CW)Development Frameworks and Methods Coursework (DFM CW)
Development Frameworks and Methods Coursework (DFM CW)
 
Software Engineering Agile methodology SCRUM
Software Engineering  Agile methodology SCRUM Software Engineering  Agile methodology SCRUM
Software Engineering Agile methodology SCRUM
 
Lean as Agile methodology – A Study
Lean as Agile methodology – A StudyLean as Agile methodology – A Study
Lean as Agile methodology – A Study
 
Planning for DevOps
Planning for DevOpsPlanning for DevOps
Planning for DevOps
 
Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)
 
[AgileCMMI] Practical Experience Report: Application of Project Management ar...
[AgileCMMI] Practical Experience Report: Application of Project Management ar...[AgileCMMI] Practical Experience Report: Application of Project Management ar...
[AgileCMMI] Practical Experience Report: Application of Project Management ar...
 
Aula 1 - Project Management Concepts by Roger Pressman
Aula 1 - Project Management Concepts by Roger PressmanAula 1 - Project Management Concepts by Roger Pressman
Aula 1 - Project Management Concepts by Roger Pressman
 
Agile process (Scrum Framework)
Agile process (Scrum Framework)Agile process (Scrum Framework)
Agile process (Scrum Framework)
 
Подборка о рисках ИТ-проектов
Подборка о рисках ИТ-проектовПодборка о рисках ИТ-проектов
Подборка о рисках ИТ-проектов
 
DFM Coursework | COMP1648 | BIT
DFM Coursework | COMP1648 | BITDFM Coursework | COMP1648 | BIT
DFM Coursework | COMP1648 | BIT
 
Webinar 3 ways to increase team collaboration bh-ad-fnl
Webinar   3 ways to increase team collaboration bh-ad-fnlWebinar   3 ways to increase team collaboration bh-ad-fnl
Webinar 3 ways to increase team collaboration bh-ad-fnl
 
SE18_Lec 05_Agile Software Development
SE18_Lec 05_Agile Software DevelopmentSE18_Lec 05_Agile Software Development
SE18_Lec 05_Agile Software Development
 
Enterprise Project Management and the US Armed Forces - EPC Group
Enterprise Project Management and the US Armed Forces - EPC GroupEnterprise Project Management and the US Armed Forces - EPC Group
Enterprise Project Management and the US Armed Forces - EPC Group
 
Unleash IT Casestudy
Unleash IT CasestudyUnleash IT Casestudy
Unleash IT Casestudy
 

Kürzlich hochgeladen

Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 

Kürzlich hochgeladen (20)

Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 

Business Plan

  • 4. Inception Elaboration Construction Transition Inception Review the initial system request, Do feasibility study Define the V&S, and the initial project plan. Elaboration Will pay attention on detail plan Capture & analyze most of requirements Construction Executing, monitoring, and controlling phase Transition Complete and improve the system TiHonMumMim© 4
  • 5. [Use-case driven] Design Model Test Use case Analysis Implementation Model Model Model Model Deployment Model Use case model Analysis Model Design Model Deployment Model Implementation Model Test Model TiHonMumMim© 5
  • 8. Resource list Human Resource Tools Software Hardware TiHonMumMim© 8
  • 9. Outline TiHonMumMim© 9
  • 10. This section presents about our estimation on every aspects during the project As long with the detail schedule TiHonMumMim© 10
  • 12. This is the plan of our team to deal with specific risks. In this plan we have many phase Identify the risks Calculate the probability Measure the impact Indicate the priority Resolve each risk TiHonMumMim© 12
  • 13. Risk Prob. Impact Priority Actions Components developed separately cannot be Reserve time to integrated and integrated easily, 4 4 16 rework for integration in schedule. requiring redesign and rework. No substitution if any team member cannot Add more tasks for remaining 4 3 12 continue to contribute to members, add more time to work the project. Each team member will write a draft Detail reporting could version of report on what he does take more development 4 3 12 before documenter of team writes it time. again. TiHonMumMim© 13
  • 14. All team members need Work on weekends, set schedule preparation time for with time for exam; define meetings 3 3 9 midterm, final exam, and in each week in suitable time for all other subjects. people. Lack of experiences in software project Assign 2 members working on each management, especially test. Risk and changes in testing, verification, management tasks will have a long 3 3 9 validation, risks duration to finish. Support others management and people about what we already changes management known. exists in the Team TiHonMumMim© 14
  • 15. Low motivation and Operate some relax actions to 2 3 6 moral reduce productivity recharge team spirit Make clear about techniques we Team member needs used, if some new techniques are extra time to learn needed, assign a member read them 2 2 4 unfamiliar Tools or and talk to other members about techniques. them. PM has to control conflicts in team, Conflicts among team assure everybody thoughts are members’ ideas results in respected, make assumptions when poor performances, more 2 2 4 we have conflicts, record any meeting, and extra conflicts to change if we are in wrong rework. way TiHonMumMim© 15
  • 17. Current problems Paper – based system is obsolete and inconvenient Take times and effort Proposal solution Web – based system System context and Scope OURS is a part of university management system. It can interact with other sub- system TiHonMumMim© 17
  • 18. Online university registration system University System TiHonMumMim© 18
  • 19. Log in and Log out Manage Department Manage student Manage lecturer Manage course offering Manage financial activities View academic history Register course TiHonMumMim© 19
  • 21. Student University Schedule Credit Curriculum Course Offering Course Catalog Fee Prerequisite Department Faculty Lecturer TiHonMumMim© 21
  • 23. Check the defects existing in the document and fixed by the team Reference in the document TiHonMumMim© 23