Metro vs. Bus
 
Efficiency
 
 
 
 
Cost
Rs. 40 Cr. – 100 Cr. / km.  Rs. 60 Cr. – 160 Cr. / km.  Rs. 160 Cr. – 240 Cr. / km.  Rs. 200 Cr. – 400 Cr. / km.  Rs. 200 Cr. – 1200 Cr. / km.  Rs. 2 Cr. – 60 Cr. / km.
 
 
 
Time to build
 
 
 
Flexibility
Bogota, Columbia
42 stations closed in London underground Reasons Built too near stations to be useful Too little used to justify keeping them open Lines are rerouted
Aesthetics
 
Metro vs. bus in some cities
 
 
 
 
Bus transport – how it has evolved
 
Namma Metro – the problems
 
Kolkata metro – the verdict Chaturvedi, Chief Operations Manager, Kolkata Metro Railway. Has this to say in 2005. “ Where the gross annual income of the Metro is roughly Rs.48 crores, its maintenance cost is a whopping Rs.125 crores.” “ The Metro was designed to decongest the city's roads. I am afraid it has not been able to do that.” “ Even during peak periods, the capacity utilisation of the trains has been around 70 per cent, and only 40 per cent in the early mornings.” “ Unfortunately for the Metro, it has to compete with cheaper modes of public transport such as buses and trams. “
Delhi metro – the present Capacity 20 Lakh people per day. Actually carrying 6 Lakh. Cost Rs. 10,500 Cr. for 70 km. Rs. 175 Cr / km. 2004-5 loss : Rs. 76 Cr. 2005-6 : Rs. 296 from property leasing, Rs. 113 Cr. from train operation. 2006-7 : Revenue Rs. 542 Cr. Profit Rs. 23.5 C. mainly from lease rentals and property development. Get subsidized or free land, make money on property development.
Connectivity Why would anyone travel 5 km. to get to  a Metro station ?
Time Planned for Phase 1: 2011.  Actual : 2015 ? Cost Rs. 6400 Cr. for 33 km.   Elevated : Rs. 160 Cr. / km. Underground : Rs. 350 Cr. / km. Includes property acquisition, excalation, interest during constrctuin, etc. Indore BRT : 2010 Indore BRT : Rs. 870 Cr. for 120 km. by 2010
MG Road, 2007 MG Road, 2011 Artist’s impression of Metro station at same location.  Courtesy Deccan Herald. Businesses on MG Rd. and any other road on which the Metro travels will be ruined.
Population : 77 Lakh Area : 1570 sq. km. London vs. Bangalore Metro Underground 400 km. 11 lines 268 stations Began operation 1863 London and Bangalore Same area, same population London has 400 km. of lines We hope to achieve the same thing with 33 km. of lines
Bangalore is comparable to Bogota in size and population Bogota opted for the BRT. It has proven to be very successful. Even though Bogota’s per capita income is 4 times Bangalore’s, they felt that the Metro was costly for them. Bogota Per capita income Rs. 1.7 Lakh. Population : 82 Lakhs Area : 740 sq. km. Bangalore Per capita income Rs. 49,000 Population : 77 Lakhs Area : 1600 sq. km.
The Metro is a bad decision It has not worked in Delhi and Kolkata It is a failure in many cities around the world. While it is getting done in Bangalore Some of the key roads are going to be blocked. Traffic is going to be hell. It is supposed to take 3 more years. We can safely assume that it will take 6 more years. After it is done The traffic jams and pollution will remain. The city’s aesthetics will be ruined. Commuting will still be a nightmare. Just like in Delhi and Kolkata. A good bus system is a better option.
Who are the losers ? The public Still battling traffic jams, breathing polluted air, living with higher temperatures The tourism industry Tourist traffic drops. Hotels Tourist and business traffic drops. Industries Productivity remains low. Shops and businesses Tourist and business traffic drops. Police Still working killing hours, inhaling polluted air Government Subsidizing a useless white-elephant transport system.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Objections The Metro is too far advanced. It cannot be stopped at this stage. Much larger projects have been stopped. Nothing much has been done anyway on Metro project. If the public is convinced that it is useless, the government will have to look at alternatives. It will delay the solution to the traffic problem Bus system can be implemented much faster. Will get fully done in 2 years. Bus system is in phases. You can see improvements every month. Metro will involve total disruption of city for 7 more years, then sudden benefit (?). E.g., each month add 500 buses, will displace 30000 cars / 2 wheelers

Weitere ähnliche Inhalte

Was ist angesagt?

Lake Privatisation
Lake PrivatisationLake Privatisation
Lake Privatisation
Bhargavi Rao
 
Part 2 : History of Sewa Nagar Pilot Project
Part 2 : History of Sewa Nagar Pilot ProjectPart 2 : History of Sewa Nagar Pilot Project
Part 2 : History of Sewa Nagar Pilot Project
ManushiIndia
 
Revision of parking code for IRC
Revision of parking code for IRCRevision of parking code for IRC
Revision of parking code for IRC
Akanksha Chopra
 

Was ist angesagt? (20)

The Grand Trunk Road
The Grand Trunk RoadThe Grand Trunk Road
The Grand Trunk Road
 
Traffic Congestion
Traffic CongestionTraffic Congestion
Traffic Congestion
 
Latur water supply project
Latur water supply projectLatur water supply project
Latur water supply project
 
Transport System in Bangladesh
Transport System in Bangladesh Transport System in Bangladesh
Transport System in Bangladesh
 
Bangladesh studies presentation slide
Bangladesh studies presentation slideBangladesh studies presentation slide
Bangladesh studies presentation slide
 
Lake Privatisation
Lake PrivatisationLake Privatisation
Lake Privatisation
 
A study report on Kutch-Bhuj
A study report on Kutch-BhujA study report on Kutch-Bhuj
A study report on Kutch-Bhuj
 
Transportation problem with relevance to indian cities
Transportation problem with relevance to indian citiesTransportation problem with relevance to indian cities
Transportation problem with relevance to indian cities
 
Town planning of chittaranjan township
Town planning of chittaranjan township Town planning of chittaranjan township
Town planning of chittaranjan township
 
Part 2 : History of Sewa Nagar Pilot Project
Part 2 : History of Sewa Nagar Pilot ProjectPart 2 : History of Sewa Nagar Pilot Project
Part 2 : History of Sewa Nagar Pilot Project
 
City Level Issues and its Managements
City Level Issues and its Managements City Level Issues and its Managements
City Level Issues and its Managements
 
History of Madras water Supply
History of Madras water  SupplyHistory of Madras water  Supply
History of Madras water Supply
 
RAJASTHAN DISTRICT FACTBOOK : UDAIPUR DISTRICT
RAJASTHAN DISTRICT FACTBOOK : UDAIPUR DISTRICTRAJASTHAN DISTRICT FACTBOOK : UDAIPUR DISTRICT
RAJASTHAN DISTRICT FACTBOOK : UDAIPUR DISTRICT
 
Revision of parking code for IRC
Revision of parking code for IRCRevision of parking code for IRC
Revision of parking code for IRC
 
A peep into karachi’s transport issues
A peep into karachi’s transport issuesA peep into karachi’s transport issues
A peep into karachi’s transport issues
 
Varanasi Riverfront Development
Varanasi Riverfront DevelopmentVaranasi Riverfront Development
Varanasi Riverfront Development
 
Public Transport Systems, Intermediate Public Transport Systems and their Cha...
Public Transport Systems, Intermediate Public Transport Systems and their Cha...Public Transport Systems, Intermediate Public Transport Systems and their Cha...
Public Transport Systems, Intermediate Public Transport Systems and their Cha...
 
Sabarmati Riverfront development project
Sabarmati Riverfront development projectSabarmati Riverfront development project
Sabarmati Riverfront development project
 
SMART CITIES CHALLENGES IN INDIA -CASE STUDY OF CHENNAI CITY
SMART CITIES CHALLENGES IN INDIA -CASE STUDY OF CHENNAI CITYSMART CITIES CHALLENGES IN INDIA -CASE STUDY OF CHENNAI CITY
SMART CITIES CHALLENGES IN INDIA -CASE STUDY OF CHENNAI CITY
 
Bandipur1
Bandipur1Bandipur1
Bandipur1
 

Andere mochten auch

KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Report
armada7000
 
Leisure marketing: Transportation
Leisure marketing: TransportationLeisure marketing: Transportation
Leisure marketing: Transportation
natashabonu
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
ruoting
 
Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...
Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...
Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...
Institute for Transport Studies (ITS)
 

Andere mochten auch (20)

Brts
BrtsBrts
Brts
 
Bus Rapid Transit (BRT) in Gauteng, S.A.
Bus Rapid Transit (BRT) in Gauteng, S.A.Bus Rapid Transit (BRT) in Gauteng, S.A.
Bus Rapid Transit (BRT) in Gauteng, S.A.
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Report
 
The Current Transport Policy Environment
The Current Transport Policy Environment The Current Transport Policy Environment
The Current Transport Policy Environment
 
Trek au Népal à travers l'oeil de nos enfants
Trek au Népal à travers l'oeil de nos enfantsTrek au Népal à travers l'oeil de nos enfants
Trek au Népal à travers l'oeil de nos enfants
 
Leisure marketing: Transportation
Leisure marketing: TransportationLeisure marketing: Transportation
Leisure marketing: Transportation
 
Ganga Sagar Mela
Ganga Sagar MelaGanga Sagar Mela
Ganga Sagar Mela
 
SA Taxi market context
SA Taxi market contextSA Taxi market context
SA Taxi market context
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
 
Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...
Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...
Urban mobility, livelihoods and transport in Dar Es Salaam City: exploring ch...
 
2011 City of Buenos Aires Achievements: Sustainable Mobility Plan
2011 City of Buenos Aires Achievements: Sustainable Mobility Plan2011 City of Buenos Aires Achievements: Sustainable Mobility Plan
2011 City of Buenos Aires Achievements: Sustainable Mobility Plan
 
Bangalore - Metro is not the solution
Bangalore - Metro is not the solutionBangalore - Metro is not the solution
Bangalore - Metro is not the solution
 
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORTCUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
 
Etude IFOP "Mobilités des français : pratiques et prespectives"
Etude IFOP "Mobilités des français : pratiques et prespectives"Etude IFOP "Mobilités des français : pratiques et prespectives"
Etude IFOP "Mobilités des français : pratiques et prespectives"
 
Means Of Transport
Means Of TransportMeans Of Transport
Means Of Transport
 
Dubai - City of Emirates
Dubai - City of EmiratesDubai - City of Emirates
Dubai - City of Emirates
 
Transport Or Transportation
Transport Or TransportationTransport Or Transportation
Transport Or Transportation
 
OUR WONDERFUL WORLD/ CONTENT 2 Means of-transport
OUR WONDERFUL WORLD/ CONTENT 2 Means of-transportOUR WONDERFUL WORLD/ CONTENT 2 Means of-transport
OUR WONDERFUL WORLD/ CONTENT 2 Means of-transport
 
Muet Workshop Writing
Muet   Workshop WritingMuet   Workshop Writing
Muet Workshop Writing
 
The importance of Value of Time studies - a Dutch perspective
The importance of Value of Time studies - a Dutch perspectiveThe importance of Value of Time studies - a Dutch perspective
The importance of Value of Time studies - a Dutch perspective
 

Ähnlich wie Metro vs. Bus

Road Widening In Bangalore
Road Widening In BangaloreRoad Widening In Bangalore
Road Widening In Bangalore
guest9ab0ac5
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
Pramod Kumar
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
Sourav Paul
 
Public Transport For Smart Cities
Public Transport For Smart CitiesPublic Transport For Smart Cities
Public Transport For Smart Cities
IPPAI
 

Ähnlich wie Metro vs. Bus (20)

Metro And Bangalore
Metro And BangaloreMetro And Bangalore
Metro And Bangalore
 
Road Widening In Bangalore
Road Widening In BangaloreRoad Widening In Bangalore
Road Widening In Bangalore
 
Bangalore traffic - Solution
Bangalore traffic - SolutionBangalore traffic - Solution
Bangalore traffic - Solution
 
Indian Road Network1
Indian Road Network1Indian Road Network1
Indian Road Network1
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
Role of metro for traffic in kolkata
Role of metro for traffic in kolkataRole of metro for traffic in kolkata
Role of metro for traffic in kolkata
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
Analysis of new transportation mode in India.pptx
Analysis of new transportation mode in India.pptxAnalysis of new transportation mode in India.pptx
Analysis of new transportation mode in India.pptx
 
Bullet train feasibility
Bullet train feasibilityBullet train feasibility
Bullet train feasibility
 
Public Transport For Smart Cities
Public Transport For Smart CitiesPublic Transport For Smart Cities
Public Transport For Smart Cities
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and Mumbai
 
Metro Rail and the City
Metro Rail and the CityMetro Rail and the City
Metro Rail and the City
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Jaipur Metro Project
Jaipur Metro ProjectJaipur Metro Project
Jaipur Metro Project
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Case study of feasibility study of mrts
Case study of feasibility study of mrtsCase study of feasibility study of mrts
Case study of feasibility study of mrts
 
Effective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtsEffective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brts
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in india
 
traffic problems in bangalore
traffic problems in bangaloretraffic problems in bangalore
traffic problems in bangalore
 
Introduction to metro system (1).pptx
Introduction to metro system (1).pptxIntroduction to metro system (1).pptx
Introduction to metro system (1).pptx
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 

Metro vs. Bus

  • 2.  
  • 4.  
  • 5.  
  • 6.  
  • 7.  
  • 9. Rs. 40 Cr. – 100 Cr. / km. Rs. 60 Cr. – 160 Cr. / km. Rs. 160 Cr. – 240 Cr. / km. Rs. 200 Cr. – 400 Cr. / km. Rs. 200 Cr. – 1200 Cr. / km. Rs. 2 Cr. – 60 Cr. / km.
  • 10.  
  • 11.  
  • 12.  
  • 14.  
  • 15.  
  • 16.  
  • 19. 42 stations closed in London underground Reasons Built too near stations to be useful Too little used to justify keeping them open Lines are rerouted
  • 21.  
  • 22. Metro vs. bus in some cities
  • 23.  
  • 24.  
  • 25.  
  • 26.  
  • 27. Bus transport – how it has evolved
  • 28.  
  • 29. Namma Metro – the problems
  • 30.  
  • 31. Kolkata metro – the verdict Chaturvedi, Chief Operations Manager, Kolkata Metro Railway. Has this to say in 2005. “ Where the gross annual income of the Metro is roughly Rs.48 crores, its maintenance cost is a whopping Rs.125 crores.” “ The Metro was designed to decongest the city's roads. I am afraid it has not been able to do that.” “ Even during peak periods, the capacity utilisation of the trains has been around 70 per cent, and only 40 per cent in the early mornings.” “ Unfortunately for the Metro, it has to compete with cheaper modes of public transport such as buses and trams. “
  • 32. Delhi metro – the present Capacity 20 Lakh people per day. Actually carrying 6 Lakh. Cost Rs. 10,500 Cr. for 70 km. Rs. 175 Cr / km. 2004-5 loss : Rs. 76 Cr. 2005-6 : Rs. 296 from property leasing, Rs. 113 Cr. from train operation. 2006-7 : Revenue Rs. 542 Cr. Profit Rs. 23.5 C. mainly from lease rentals and property development. Get subsidized or free land, make money on property development.
  • 33. Connectivity Why would anyone travel 5 km. to get to a Metro station ?
  • 34. Time Planned for Phase 1: 2011. Actual : 2015 ? Cost Rs. 6400 Cr. for 33 km. Elevated : Rs. 160 Cr. / km. Underground : Rs. 350 Cr. / km. Includes property acquisition, excalation, interest during constrctuin, etc. Indore BRT : 2010 Indore BRT : Rs. 870 Cr. for 120 km. by 2010
  • 35. MG Road, 2007 MG Road, 2011 Artist’s impression of Metro station at same location. Courtesy Deccan Herald. Businesses on MG Rd. and any other road on which the Metro travels will be ruined.
  • 36. Population : 77 Lakh Area : 1570 sq. km. London vs. Bangalore Metro Underground 400 km. 11 lines 268 stations Began operation 1863 London and Bangalore Same area, same population London has 400 km. of lines We hope to achieve the same thing with 33 km. of lines
  • 37. Bangalore is comparable to Bogota in size and population Bogota opted for the BRT. It has proven to be very successful. Even though Bogota’s per capita income is 4 times Bangalore’s, they felt that the Metro was costly for them. Bogota Per capita income Rs. 1.7 Lakh. Population : 82 Lakhs Area : 740 sq. km. Bangalore Per capita income Rs. 49,000 Population : 77 Lakhs Area : 1600 sq. km.
  • 38. The Metro is a bad decision It has not worked in Delhi and Kolkata It is a failure in many cities around the world. While it is getting done in Bangalore Some of the key roads are going to be blocked. Traffic is going to be hell. It is supposed to take 3 more years. We can safely assume that it will take 6 more years. After it is done The traffic jams and pollution will remain. The city’s aesthetics will be ruined. Commuting will still be a nightmare. Just like in Delhi and Kolkata. A good bus system is a better option.
  • 39. Who are the losers ? The public Still battling traffic jams, breathing polluted air, living with higher temperatures The tourism industry Tourist traffic drops. Hotels Tourist and business traffic drops. Industries Productivity remains low. Shops and businesses Tourist and business traffic drops. Police Still working killing hours, inhaling polluted air Government Subsidizing a useless white-elephant transport system.
  • 40.
  • 41. Objections The Metro is too far advanced. It cannot be stopped at this stage. Much larger projects have been stopped. Nothing much has been done anyway on Metro project. If the public is convinced that it is useless, the government will have to look at alternatives. It will delay the solution to the traffic problem Bus system can be implemented much faster. Will get fully done in 2 years. Bus system is in phases. You can see improvements every month. Metro will involve total disruption of city for 7 more years, then sudden benefit (?). E.g., each month add 500 buses, will displace 30000 cars / 2 wheelers