Introduction to 5S
technique of Workplace
Management

Trainers: Priyank Tewari and Shashank Sharma

2

What is Workplace Management?
• A Systematic and Rational approach to a
clutter free, safe workplace with the objective
of reducing waste and preparing the ground
for further improvement

©

1
08-01-2014

3

What problems do you commonly
encounter at your workplace?
1.
2.
3.
4.
5.

High Absenteeism
High Turnover (movement)
De-motivated Employees
Disordered/Cluttered Environment
Mistakes/Errors
5S is the answer to all these problems!
©

4

What is 5S?
1. 5S is a house-keeping technique which is applied to
enhance productivity and safety in any enterprise
2. Developed by the Japanese
3. Helps Create a Better Working Environment and a
Consistently High Quality Process
4. It is usually the first Lean Management technique
implemented in any enterprise

©

2
08-01-2014

5

5S - Background
• Since the early 80’s Japanese industries widely
practiced 5S as a powerful technique to improve
productivity and quality
• Today, 5 S is used worldwide to prepare the ground
for improvement

©

6

Discovery of 5S
• In the 1980’s, researchers started studying the secret
of success of Japanese manufacturing companies
• 5S turned out to be the most impressive "secret"
• The factories were so well organized that abnormal
situations were readily apparent
• Equipments were so clean and well maintained that
any problem such as a loose bolt or leaking oil could
be easily seen
• This passion of cleanliness and orderliness became a
hallmark of Japanese organizations
©

3
08-01-2014

7

Idea behind 5S
In order to achieve high levels
of
Quality,
Safety
and
Productivity, workers must
have a conducive working
environment
©

8

Advantages of 5S
• If tools and materials are conveniently located in
uncluttered work areas:
▫ Operators spend less time looking for items
▫ Higher workstation efficiency, a fundamental goal in
mass production
• A clean and tidy workplace leads to greater well being
and increased motivation
• Company image improves
©

4
08-01-2014

9

Advantages of 5S
• Health and Safety is ensured
• Machine maintenance
• Quality
• Productivity
• Lean Manufacturing
©

10

Advantages of 5S
• Results in a place easier to manage
• Smooth working

No Obstruction

• N0 deviation or problem arises because everyone knows
where the things are supposed to be

©

5
08-01-2014

11

Advantages of 5S
• Time saving
• Quick retrieval
• Accidents and mistakes minimized
• Increases Space
• Creates workplace ownership
©

12

Advantages of 5S
• Foundation of all QC tools
▫ Continuous Quality improvement
▫ Enables Lean Manufacturing
▫ Kindergarten of Quality tools and techniques

• Enables Visual Management
▫ In a clean and tidy working environment it is easier to
spot problems
©

6
08-01-2014

13

Kindergarten of all QC tools
• 5S is the starting point of all the QC tools
• Could be said as the pre-requisite of all QC tools
▫ If an enterprise is embarking on the Lean Management
journey to improve the quality of production or
process, it must definitely have 5S implemented

©

14

Why do 5S?

©

7
08-01-2014

15

Levels of workplace organization
• Following the 5 S principles and reducing waste
• Extending the 5 S concept to include ergonomics –
interaction of workers with their environment
• Extending the 5 S concept to include aesthetics
– how to maintain the look and feel of the working
place
• Educating others
©

16

Elements of 5S
• 5S comprises of 5 Simple steps:
1. SEIRI ------------- Sorting out
2. SEITON ---------- Setting in Order, Systematic
Arrangement
3. SEISO ------------ Shining, Spic and Span
4. SEIKETSU ------- Standardization
5. SHITSUKE ------- Sustain, Self Discipline

©

8
08-01-2014

17

Step 1 – SORTING (SEIRI)
• Objective: Saving and Recovering Space
• What do we intend to do?
▫ Segregate necessary from un-necessary and throw
away what is not required at all
▫ Decide on a frequency of sorting

©

18

Step 1 - SORTING (SEIRI)
1. Decide what you need
2. Remove unnecessary clutter
3. All tools, gauges, materials, classified and then
stored
4. Remove items which are broken, unusable or only
occasionally used
©

9
08-01-2014

19

Red-tag technique
1. Give staff Red Labels
2. Ask staff to go through every item in the workplace
3. Ask if needed and those that are needed, in what
quantity
4. If not needed, then RED TAG it
5. Store in the RED TAG area

©

20

Red-tag technique
For the suspected/not-sure items:
6. Place the suspected items in the RED TAG area for
one week
7. Allow the staff to re-evaluate the needed items
8. At the end of week, those items that are needed and
frequently used should be returned
©

10
08-01-2014

21

©

22

Prioritization technique
Priority
Low

Frequency of Use
How to Use
• Less than once per year • Throw away
• Once per year
• Store away from the
workplace

Average

• Once per month
• Once per week
• Once per day

High

• Store together but
offline
• Locate at the workplace

©

11
08-01-2014

23

5S Sorting Algorithm
Sorting

Not in
working order

Scrap

Reworkable

Rework

Rejected

Discard

Usable

In working
order

Necessary

Reparable

Repair

Un-necessary

Un-reparable

Discard

Usable

No Potential
use

Potentially
useful
Move to
required
location

Discard

Usable

Usable

Require
Special
Disposal
Arrange
Disposal

Discard

©

24

Before Sorting

After Sorting

©

12
08-01-2014

25

Step 2 – Setting in Order (SEITON)
• Objective: Minimize search time and errors
• What do we intend to do?
▫ Analyze why getting things out and putting them back
takes so long
▫ Put things in ORDER

©

26

Step 2 – Setting in Order (SEITON)
•

A rational, orderly and methodical arrangement of all
items we use, re-work or write off

•

Once all un-needed items have been eliminated, it is
needed to manage the remaining useful items

•

Organise layout of tools and equipment
1. Mark Designated locations
2. Use tapes and labels
3. Ensure everything is available as it is needed and at
the “point of use”
©

13
08-01-2014

27

Step 2 – Setting in Order (SEITON)
Workplace Checkpoints
1. Positions of aisles and storage places clearly marked?
2. Tools classified and stored by frequency of use?
3. Pallets stacked correctly?
4. Safety equipment easily accessible?
5. Floors in good condition?

©

28

The SEITON Mantra!

A place for everything and
everything in its place!

©

14
08-01-2014

29

Review each item
No. Step
1) Name of Item

2)

Retrieval

3)

Search

4)

Carrying the item

Probable problems
a) Do not know what it is called
a) No pre-fixed location
b) Storage in far away location
c) Storage locations are scattered
d) Too many repeat trips
e) Hard to get out
f) Too big to carry
g) Need to set or assemble
a) Difficult to find because a lot of things are there
b) Not labelled
c) Not there but not clear if someone is using it
a) No way of transport
©

30

Before systemizing

After systemizing

©

15
08-01-2014

31

Step 3 – Shine (SEISO)
• Objective: Make it easier to inspect for problems and
take faster corrective action
• What do we intend to do?
▫ Understand how to prevent things from getting dirty
▫ Ensuring tip-top condition

©

32

Step 3 – Shine (SEISO)
SEISO aims to:
1. Create a spotless workplace
2. Identify and eliminate causes of dirt and grime –
remove the need to clean
3. Sweep, dust, polish and paint
©

16
08-01-2014

33

Step 3 – Shine (SEISO)
Steps to be followed during or after major
housekeeping :
1.
2.
3.
4.
5.

Do a survey of the origins of grime & leakage
Set priorities for cleaning where grime is most
study why things are dirty
study possible plan of action
Decide on action steps/ responsibility/ timeframe

©

34

Step 3 – Shine (SEISO)
SEISO golden rules:

• If there’s Lesser number of items, there is
lesser to clean
• One is best (office example)
▫
▫
▫
▫

One page memo
One day processing
One location files
One copy filing
©

17
08-01-2014

35

SEISO checklist
No. Type of Grime in office
1)

Dirt

3)

Source

Dust

2)

Tick if applicable

Water

4)

Fittings

5)

Litter

6)

Temperature

7)

Other
©

36

Before systemizing

After systemizing

©

18
08-01-2014

37

Step 4 – Standardize (SEIKETSU)
• Objective: Achieving higher productivity and better
quality through higher employee morale
• What do we intend to do?
▫ Ensure conducive and safe working environment
▫ Make cleanliness standard across the enterprise

©

38

Step 4 – Standardize (SEIKETSU)
• Following of earlier 3 S’s, standardized work
procedures, maintaining safe & hygienic conditions
in work place contribute to a serene atmosphere
• Define standards for:
▫ My Job – Product and Processes
▫ My Machine
▫ My Working areas

©

19
08-01-2014

39

Step 4 – Standardize (SEIKETSU)
Specific objectives of SEIKETSU:
1. A five-minute daily clean up habit
2. Keeping a balance between personal cleanliness
and the cleanliness of the environment / work
place
3. Avoiding littering. Learning to pick-up tiny pieces
of waste around
4. Regularly audit using checklists and measures of
housekeeping
©

40

Step 4 – Standardize (SEIKETSU)
Guidelines for implementing SEIKETSU:
1. Generate a maintenance system for the first three
S’s
2. Develop procedures, schedules, practices
3. Continue to assess the use and disposal of items
4. Regularly audit using checklists and measures of
housekeeping
5. Real challenge is to keep it clean

©

20
08-01-2014

41

Step 5 – Self-Discipline (SHITSUKE)
• Objective: Achieving constancy of purpose. Making it
a way of life.
• What do we intend to do?
▫ Training
▫ Evaluation
▫ Follow-up

©

42

Step 5 – Self-Discipline (SHITSUKE)
•
•
•
•
•

Driving force behind all 5S
Make it a way of life
Part of health and safety
Involve the whole workforce
Develop and keep good habits

©

21
08-01-2014

43

Step 5 – Self-Discipline (SHITSUKE)
Specific objectives of SHITSUKE:
• Instilling the ability of doing things the way they are
supposed to be done
• Becoming a role model by treating your work place
as your second home
• Influencing others to join in keeping a wellmaintained work place.
• Aiming for constant improvement

©

44

Self-Discipline Checklist
• Introduce 3 min 5 S activity system
▫ How often

• Introduce 5 S Activity Evaluation system
• Train Evaluators
• Train Implementers on
▫ Problem solving steps
▫ What defects to look for
▫ Preparing and using implementation checklist

©

22
08-01-2014

45

5S Evaluation

©

46

5S Evaluation
• An activity or related activities to determine whether
there is an existence of a system & the system is in
operation as per established norms
• It also verifies whether the system & results are
taking the organization towards the desired
objectives.

©

23
08-01-2014

47

5S Evaluation
How to evaluate the benefits of 5S?
1. Visible benefits:
1. Photographic evidence
2. Employee movement tracking

2. Audit:
1. Internal audits of processes
2. External audits through consultants

3. Ratings:
1. Employee feedback
2. Binary responses and % ratings
©

48

Visible benefits
1. Photographic evidence

©

24
08-01-2014

49

Visible benefits
2. Employee movement tracking

©

50

Audits
No.

Category

Topic

Workplace 5S Audit Sheet
Description & Score
1
2
3

Audit Questions

4

1

Sort

0% - 20%

21% - 40%

41% - 60%

61% - 80%

81% - 100%

Removal of Unnecessary items

does not
exist

exists but is
not known

known but
not used

often used

0% - 20%

21% - 40%

41% - 60%

61% - 80%

Improvement Points
3
2

81% - 100%

of the audit
area

3

Set in Order
Proper condition of
items

A process for setting items in order

Workplace condition

Free of trash, scrap, soil, leaks, dust etc.
within

0% - 20%

21% - 40%

41% - 60%

61% - 80%

81% - 100%

Cleaning to inspect

3

of the audit
area

always used

A process for removing un-necessary items

Workplace condition Necessary items are at point of use for

2

_/5

5

Workplace condition Un-necessary items are removed from

A process for daily cleaning to inspect the
workplace condition

does not
exist

exists but is
not known

known but
not used

often used

always used

Shine

does not
exist

exists but is
not known

known but
not used

often used

always used

4
of the audit
area

3

1
Standards exist for markings, colors, item

Workplace condition locations, signage etc. at

4

Standardise

A process to review, revise and update

Revision of standards standards

0% - 20%

21% - 40%

41% - 60%

61% - 80%

81% - 100%

does not
exist

exists but is
not known

known but
not used

often used

of the audit
area

always used

3

1
The current high score for 5s is maintained

Workplace condition by

5

Sustain
Auditing 5S

Auditor name:

A process for auditing and checking 5S
condition and processes

Audit Date:

0% - 20%

21% - 40%

41% - 60%

61% - 80%

81% - 100%

does not
exist

exists but is
not known

known but
not used

often used

of the audit
area

always used

Total score for this audit out of 100

1

Conduct another red tag activity
Refresh training for all supervisers and
operators in red tagging procedure
Arrangement of items at point of use is
good overall but clearly there are more
tools than needed for the job
There are standards for point of use tool
storage
We need a better way to catch fabric
scraps on the floor
Cleaning is ad-hoc and up to individual recommend making time at start and end
of shift to tidy up
Some areas have excellent visuals
(cutting area) while others none
A process for revision of standards is
needed - currntly revision only occurs
because of customer complaints
There is no tracking of 5S scores

Management does not audit 5S regularly

1
44%

©

25
08-01-2014

51

Ratings
An example of how 5S implementation can be evaluated
using Binary and % ratings*
Evaluating Seiri (Sort) stage:
1. Material availability Give 1 mark if material is fully available or
give 0 marks if material is not fully available
2. Defective goods If there are X items which contains Y items as
defective Then the marks will be Fraction of fine goods = [1{Y/X}]
3. Operating condition Give 1 mark if operating condition is under
control and give 0 marks if operating condition is not under
control.
©

52

Ratings
An example of how 5S implementation can be evaluated
using Binary and % ratings*
Evaluating Seiri (Sort) stage:
4. Relative information about working condition, process
guidelines, tools information, material information etc., is also
important for Seiri rating. Give 1 mark for full information and
give 0 marks for partial information.
5. Elimination of waste Let total N no of wast are listed but only M
were eliminated the marks of elimination process will be
Fraction of waste elimination = [1- {M/N}]
©

26
08-01-2014

53

Ratings
An example of how 5S implementation can be evaluated
using Binary and % ratings*
Evaluating Seiri (Sort) stage:
• Now add all five marks and get total rating of Seiri out of 5. If the
Seiri system will get less than 3 marks then do the arrangement
again
• Do this for all the stages and calculate the average 5S rating
* Based on a paper on Performance Improvement through 5S in Small Scale Industry: A case study by P. M. Rojasra, M. N.
Qureshi, International Journal of Modern Engineering Research (IJMER) Vol. 3, Issue. 3, May - June 2013 pp-1654-1660

©

54

Attributes of an evaluator
•
•
•
•

One who believes in 5 S
Strict, Fair and Tactful
Must be able to do it in an competent manner
Willing to go to the workplace, offer advice and point
out problems when necessary
• Should be able to comment on successes and
shortcomings clearly

©

27
08-01-2014

55

Group Activity
We will work on a hypothetical scenario to implement 5S
1. Divide in groups of 6 each.
2. Think of any activity which you engage in regularly. For
example: Working in Office, Working in kitchen, Working
on your computer, Running a plant etc.
3. Discuss how you can implement 5S in these activities (Use
flip charts)
4. Also mention how you will evaluate the improvements after
using the 5S technique
5. Present to the gathering

©

56

Absence of 5S leads to 5D
1.
2.
3.
4.
5.

Delays
Defects
Dissatisfied customers
Declining profits
Demoralized employees

©

28
08-01-2014

57

Litmus test for 5S
• 30 second rule
• One must locate any item within 30 seconds if 5S is
properly implemented
• Ex: Electronic records retrieval from your
desktop/laptop

©

58

How can 5S help you?
1.
2.
3.
4.
5.
6.

Neat and Clean Workplace
Smooth working
No Obstruction
Safety increases
Productivity improves
Quality improves

©

29
08-01-2014

59

How can 5S help you?
7.
8.
9.
10.
11.

Wastage decreases
Machine maintenance becomes easy
Visual Control become possible
Motivated employees
Spacious workstations

©

60

Visual Management

©

30
08-01-2014

61

What is Visual Management
A technique where control of an activity or process is made
easier or more effective by deliberate use of visual signals.
They give feedback to an operator about how a process is working and
can alert the operator to act
Usually used in 5S, but can be implemented with any process
improvement initiative
Visual Controls can also include audible signals
The 3 beeps from your microwave once your food has finished cooking

©

62

Goals of Visual Management
The goal of visual controls is to make a process:
Self-explaining
Scoreboard at a baseball game
Self-ordering
RO system
Self-regulating
Traffic lights
Self-improving
Facilitate corrections in MS Word or email
©

31
08-01-2014

63

The idea behind Visual Management
When someone walks into the workplace they should
be able to determine:
▫
▫
▫
▫

What the process is,
Who the customers and suppliers are,
What the deliverables are,
Where and what resources are being used in the
process,
▫ The health of the process,
▫ That there is an effective measurement system in place.

©

64

Examples of Visual Management
The red light on your DVR indicating a movie is
recording
Different colored clothing for different cricket teams
Painted lines on the highway
The red and green lights outside of an operation theatre
Traffic lights

©

32
08-01-2014

Visual Control tools
1. Takt boards
2. Issue boards
3. 5S boards
4. KANBAN cards

©

1. Takt board
Part number specific

Process summary

Number of parts in a process

Jobs in process

Quantity of WIP

Value of WIP

Daily Takt rate for each part

Daily Takt rate for process

Daily summary information

Daily summary information

Takt

Productivity

Actual output

Actual output

WIP

WIP

Cycle time

Cycle time

©

33
08-01-2014

1. Takt board

©

2. Performance/Productivity board
Production/process related issues
“Can-do” items can be resolved by the team
“Need help” need external assistance from management team, engineer,
maintenance to resolve
Dashboard metrics
Productivity
First pass yield (scrap, repair, rework)
Rolled throughput yield
Timeliness
On-time delivery
Weekly Takt rate average
Equipment uptime/downtime
(unscheduled maintenance)
Quality
Process capability and stability indices
Financial
Cross-training matrices
©

34
08-01-2014

3. 5S Board Information
Used to maintain 5S
Set in order maps
Standardize checklists
5S audit results (checklist)
5S audit results (spider graph)
Action plan for improvement
Before/after photos
©

4. Kanbans
Visual signal to:
Replenish materials
consumed in the
production process over
time
Trigger action

©

35
08-01-2014

71

Cellular layout

©

Cellular Layout
Linking of manual and machine operations into the most
efficient combination to maximize value-added content
while minimizing waste.
Punch
De-burr

Cut to size

Package

Form
Sand
©

36
08-01-2014

73

Benefits of Cellular layout
• Simplified scheduling and communication
• Minimal inventory needed between processes
• Increased visibility
• provide quick feedback and problem resolution
• Development of increased product knowledge
• workers are trained to understand the total process
• Shorter lead times
• Small lots and one piece flow
• to match customer demand
©

74

5 step cellular design process
1.
2.
3.
4.
5.

Group Products
Establish Takt Time
Review the Work Sequence
Balance the Process
Design the Cell Layout

©

37
08-01-2014

75

1. Group Products
Product grouping considerations
Group products with similar:

• Process/Resource Requirements
• Changeover/Set-up Times
• Process Time Variation
• Demand vs. Capacity

©

76

2. Establish Takt time
• Takt time can change
• What can you change to match takt time?
▫ Number of people
▫ Number of cells (requires investment in
machinery)

©

38
08-01-2014

77

3. Review the work sequence
1. Observe and document the tasks each worker performs
▫
▫

Observe, don’t just ask
The steps are defined by the designer
2. Break operations into observable segments
3. Study machine capacity, cycle times, and changeover times
4. Look for value-added and non-value-added elements

©

78

4. Balance the process
Before

After

60

60
50

Seconds

Seconds

50
40
30
20
10

40
30
20
10
0

0
1

2

3

4

Operation Work Content

5

1

2

3

4

Operation Work Content

©

39
08-01-2014

79

4. Design the cellular layout
Design the work to:

•
•
•
•
•

Minimize motion
Avoid unnatural postures and movements
Avoid sharp turns in motion
Make moves easy to perform without much concentration
Use hands and forearms instead of upper arms and shoulders
for light work
Minimize lifting

•
• Follow a rhythm

©

40

Weitere ähnliche Inhalte

Was ist angesagt? (20)

5S Training
5S Training5S Training
5S Training
 
5S
5S5S
5S
 
Visual management
Visual managementVisual management
Visual management
 
Visual Management
Visual Management Visual Management
Visual Management
 
Revised initial presentation j & k 14.01.2022
Revised initial presentation   j & k 14.01.2022Revised initial presentation   j & k 14.01.2022
Revised initial presentation j & k 14.01.2022
 
Workplace management : 5S / Visual Control
Workplace management :  5S / Visual ControlWorkplace management :  5S / Visual Control
Workplace management : 5S / Visual Control
 
Lean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleLean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training Module
 
5 s checklist practice - kaizenvietnam, inc
5 s  checklist practice - kaizenvietnam, inc5 s  checklist practice - kaizenvietnam, inc
5 s checklist practice - kaizenvietnam, inc
 
5S & Safety
5S & Safety5S & Safety
5S & Safety
 
Visual Mangement & Safety in the Workplace
Visual Mangement & Safety in the WorkplaceVisual Mangement & Safety in the Workplace
Visual Mangement & Safety in the Workplace
 
5S Audit Checklists for Manufacturing & Office
5S Audit Checklists for Manufacturing & Office5S Audit Checklists for Manufacturing & Office
5S Audit Checklists for Manufacturing & Office
 
Visual Factory
Visual FactoryVisual Factory
Visual Factory
 
5s
5s5s
5s
 
Office_5S_sample
Office_5S_sampleOffice_5S_sample
Office_5S_sample
 
[Partial Preview:] Waste-finding Checklists for Manufacturing Companies
[Partial Preview:] Waste-finding Checklists for Manufacturing Companies[Partial Preview:] Waste-finding Checklists for Manufacturing Companies
[Partial Preview:] Waste-finding Checklists for Manufacturing Companies
 
5s of Production
5s of Production 5s of Production
5s of Production
 
5S Auditing Sheet
5S Auditing Sheet5S Auditing Sheet
5S Auditing Sheet
 
5 s
5 s5 s
5 s
 
Visual Control and Management : Manufacturing Management
Visual Control and Management : Manufacturing ManagementVisual Control and Management : Manufacturing Management
Visual Control and Management : Manufacturing Management
 
5 S Sample
5 S Sample5 S Sample
5 S Sample
 

Andere mochten auch

การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)
การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)
การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)Narong Chokwatana
 
สงครามแย่งชิงประชาชน
สงครามแย่งชิงประชาชนสงครามแย่งชิงประชาชน
สงครามแย่งชิงประชาชนNarong Chokwatana
 
Reforming Thailand: Thailand's 81 Years in Masking Deictatorship
Reforming Thailand: Thailand's 81 Years in Masking DeictatorshipReforming Thailand: Thailand's 81 Years in Masking Deictatorship
Reforming Thailand: Thailand's 81 Years in Masking DeictatorshipNarong Chokwatana
 
6 key steps to a successful wellness program
6 key steps to a successful wellness program6 key steps to a successful wellness program
6 key steps to a successful wellness programwellsource10789
 
ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...
ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...
ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...Narong Chokwatana
 
Perubahan Fisiologi dan Psikologi pada Masa Nifas
Perubahan Fisiologi dan Psikologi pada Masa NifasPerubahan Fisiologi dan Psikologi pada Masa Nifas
Perubahan Fisiologi dan Psikologi pada Masa NifasNurul Amalia
 

Andere mochten auch (17)

Session 1 2
Session 1 2Session 1 2
Session 1 2
 
การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)
การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)
การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)
 
Session 4
Session 4Session 4
Session 4
 
สงครามแย่งชิงประชาชน
สงครามแย่งชิงประชาชนสงครามแย่งชิงประชาชน
สงครามแย่งชิงประชาชน
 
Reforming Thailand: Thailand's 81 Years in Masking Deictatorship
Reforming Thailand: Thailand's 81 Years in Masking DeictatorshipReforming Thailand: Thailand's 81 Years in Masking Deictatorship
Reforming Thailand: Thailand's 81 Years in Masking Deictatorship
 
6 key steps to a successful wellness program
6 key steps to a successful wellness program6 key steps to a successful wellness program
6 key steps to a successful wellness program
 
ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...
ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...
ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...
 
Session 5
Session 5Session 5
Session 5
 
Chapters 21 23 ecology
Chapters 21 23 ecology Chapters 21 23 ecology
Chapters 21 23 ecology
 
Chapter 6 7 ecology
Chapter 6 7 ecologyChapter 6 7 ecology
Chapter 6 7 ecology
 
Chapters 17 20 ecology
Chapters 17 20 ecologyChapters 17 20 ecology
Chapters 17 20 ecology
 
Chapters 8 11 ecology
Chapters 8 11 ecologyChapters 8 11 ecology
Chapters 8 11 ecology
 
Inorganic nutrients
Inorganic nutrientsInorganic nutrients
Inorganic nutrients
 
Applications of biotechnology in cancer
Applications of biotechnology in cancerApplications of biotechnology in cancer
Applications of biotechnology in cancer
 
Perubahan Fisiologi dan Psikologi pada Masa Nifas
Perubahan Fisiologi dan Psikologi pada Masa NifasPerubahan Fisiologi dan Psikologi pada Masa Nifas
Perubahan Fisiologi dan Psikologi pada Masa Nifas
 
Dissolved oxygen
Dissolved oxygenDissolved oxygen
Dissolved oxygen
 
Dictatorship gets out
Dictatorship gets outDictatorship gets out
Dictatorship gets out
 

Ähnlich wie Session 3

Kaizen and 5S technique Case study
Kaizen and 5S technique Case studyKaizen and 5S technique Case study
Kaizen and 5S technique Case studyArun Singh
 
5 s methodology
5 s methodology5 s methodology
5 s methodologyAbhinav Kp
 
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semGuddu Ali
 
INTRODUCTION TO 5S / INITIATION TO 3S.pptx
INTRODUCTION TO 5S / INITIATION TO 3S.pptxINTRODUCTION TO 5S / INITIATION TO 3S.pptx
INTRODUCTION TO 5S / INITIATION TO 3S.pptxinnocent561398
 
5s's housekeeping 1995
5s's housekeeping 19955s's housekeeping 1995
5s's housekeeping 1995Sigreenwood
 
5 S introduction and case study
5 S introduction and case study5 S introduction and case study
5 S introduction and case studyIpshita Patra
 
5S: Awareness & Implementation
5S: Awareness & Implementation5S: Awareness & Implementation
5S: Awareness & ImplementationMira Anuar
 
Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)
Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)
Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)Captn1993
 
Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)
Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)
Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)Captn1993
 
5S & Visual Management in Office & Service Environments
5S & Visual Management in Office & Service Environments 5S & Visual Management in Office & Service Environments
5S & Visual Management in Office & Service Environments TKMG, Inc.
 
How the 5 S system can make a workplace more efficient - Root out waste and s...
How the 5 S system can make a workplace more efficient - Root out waste and s...How the 5 S system can make a workplace more efficient - Root out waste and s...
How the 5 S system can make a workplace more efficient - Root out waste and s...The Pathway Group
 

Ähnlich wie Session 3 (20)

5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting
 
Kaizen and 5S technique Case study
Kaizen and 5S technique Case studyKaizen and 5S technique Case study
Kaizen and 5S technique Case study
 
5 s methodology
5 s methodology5 s methodology
5 s methodology
 
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th sem
 
5S.pptx
5S.pptx5S.pptx
5S.pptx
 
INTRODUCTION TO 5S / INITIATION TO 3S.pptx
INTRODUCTION TO 5S / INITIATION TO 3S.pptxINTRODUCTION TO 5S / INITIATION TO 3S.pptx
INTRODUCTION TO 5S / INITIATION TO 3S.pptx
 
5s's housekeeping 1995
5s's housekeeping 19955s's housekeeping 1995
5s's housekeeping 1995
 
5 S introduction and case study
5 S introduction and case study5 S introduction and case study
5 S introduction and case study
 
5S: Awareness & Implementation
5S: Awareness & Implementation5S: Awareness & Implementation
5S: Awareness & Implementation
 
Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)
Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)
Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)
 
Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)
Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)
Qcl 15-v4 [5 s model]-[scmld]_[ketan, parag,simranjit)
 
5S & Visual Management in Office & Service Environments
5S & Visual Management in Office & Service Environments 5S & Visual Management in Office & Service Environments
5S & Visual Management in Office & Service Environments
 
5 s
5 s5 s
5 s
 
5 s
5 s5 s
5 s
 
5 s
5 s5 s
5 s
 
5 s
5 s5 s
5 s
 
5S For The Office by Operational Excellence Consulting
5S For The Office by Operational Excellence Consulting5S For The Office by Operational Excellence Consulting
5S For The Office by Operational Excellence Consulting
 
5 s ppt by me
5 s ppt by me5 s ppt by me
5 s ppt by me
 
Sri Lanka Government Productivity Day 2 - 5S
Sri Lanka Government Productivity Day 2 - 5SSri Lanka Government Productivity Day 2 - 5S
Sri Lanka Government Productivity Day 2 - 5S
 
How the 5 S system can make a workplace more efficient - Root out waste and s...
How the 5 S system can make a workplace more efficient - Root out waste and s...How the 5 S system can make a workplace more efficient - Root out waste and s...
How the 5 S system can make a workplace more efficient - Root out waste and s...
 

Kürzlich hochgeladen

4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 

Kürzlich hochgeladen (20)

4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 

Session 3

  • 1. 08-01-2014 1 Introduction to 5S technique of Workplace Management Trainers: Priyank Tewari and Shashank Sharma 2 What is Workplace Management? • A Systematic and Rational approach to a clutter free, safe workplace with the objective of reducing waste and preparing the ground for further improvement © 1
  • 2. 08-01-2014 3 What problems do you commonly encounter at your workplace? 1. 2. 3. 4. 5. High Absenteeism High Turnover (movement) De-motivated Employees Disordered/Cluttered Environment Mistakes/Errors 5S is the answer to all these problems! © 4 What is 5S? 1. 5S is a house-keeping technique which is applied to enhance productivity and safety in any enterprise 2. Developed by the Japanese 3. Helps Create a Better Working Environment and a Consistently High Quality Process 4. It is usually the first Lean Management technique implemented in any enterprise © 2
  • 3. 08-01-2014 5 5S - Background • Since the early 80’s Japanese industries widely practiced 5S as a powerful technique to improve productivity and quality • Today, 5 S is used worldwide to prepare the ground for improvement © 6 Discovery of 5S • In the 1980’s, researchers started studying the secret of success of Japanese manufacturing companies • 5S turned out to be the most impressive "secret" • The factories were so well organized that abnormal situations were readily apparent • Equipments were so clean and well maintained that any problem such as a loose bolt or leaking oil could be easily seen • This passion of cleanliness and orderliness became a hallmark of Japanese organizations © 3
  • 4. 08-01-2014 7 Idea behind 5S In order to achieve high levels of Quality, Safety and Productivity, workers must have a conducive working environment © 8 Advantages of 5S • If tools and materials are conveniently located in uncluttered work areas: ▫ Operators spend less time looking for items ▫ Higher workstation efficiency, a fundamental goal in mass production • A clean and tidy workplace leads to greater well being and increased motivation • Company image improves © 4
  • 5. 08-01-2014 9 Advantages of 5S • Health and Safety is ensured • Machine maintenance • Quality • Productivity • Lean Manufacturing © 10 Advantages of 5S • Results in a place easier to manage • Smooth working No Obstruction • N0 deviation or problem arises because everyone knows where the things are supposed to be © 5
  • 6. 08-01-2014 11 Advantages of 5S • Time saving • Quick retrieval • Accidents and mistakes minimized • Increases Space • Creates workplace ownership © 12 Advantages of 5S • Foundation of all QC tools ▫ Continuous Quality improvement ▫ Enables Lean Manufacturing ▫ Kindergarten of Quality tools and techniques • Enables Visual Management ▫ In a clean and tidy working environment it is easier to spot problems © 6
  • 7. 08-01-2014 13 Kindergarten of all QC tools • 5S is the starting point of all the QC tools • Could be said as the pre-requisite of all QC tools ▫ If an enterprise is embarking on the Lean Management journey to improve the quality of production or process, it must definitely have 5S implemented © 14 Why do 5S? © 7
  • 8. 08-01-2014 15 Levels of workplace organization • Following the 5 S principles and reducing waste • Extending the 5 S concept to include ergonomics – interaction of workers with their environment • Extending the 5 S concept to include aesthetics – how to maintain the look and feel of the working place • Educating others © 16 Elements of 5S • 5S comprises of 5 Simple steps: 1. SEIRI ------------- Sorting out 2. SEITON ---------- Setting in Order, Systematic Arrangement 3. SEISO ------------ Shining, Spic and Span 4. SEIKETSU ------- Standardization 5. SHITSUKE ------- Sustain, Self Discipline © 8
  • 9. 08-01-2014 17 Step 1 – SORTING (SEIRI) • Objective: Saving and Recovering Space • What do we intend to do? ▫ Segregate necessary from un-necessary and throw away what is not required at all ▫ Decide on a frequency of sorting © 18 Step 1 - SORTING (SEIRI) 1. Decide what you need 2. Remove unnecessary clutter 3. All tools, gauges, materials, classified and then stored 4. Remove items which are broken, unusable or only occasionally used © 9
  • 10. 08-01-2014 19 Red-tag technique 1. Give staff Red Labels 2. Ask staff to go through every item in the workplace 3. Ask if needed and those that are needed, in what quantity 4. If not needed, then RED TAG it 5. Store in the RED TAG area © 20 Red-tag technique For the suspected/not-sure items: 6. Place the suspected items in the RED TAG area for one week 7. Allow the staff to re-evaluate the needed items 8. At the end of week, those items that are needed and frequently used should be returned © 10
  • 11. 08-01-2014 21 © 22 Prioritization technique Priority Low Frequency of Use How to Use • Less than once per year • Throw away • Once per year • Store away from the workplace Average • Once per month • Once per week • Once per day High • Store together but offline • Locate at the workplace © 11
  • 12. 08-01-2014 23 5S Sorting Algorithm Sorting Not in working order Scrap Reworkable Rework Rejected Discard Usable In working order Necessary Reparable Repair Un-necessary Un-reparable Discard Usable No Potential use Potentially useful Move to required location Discard Usable Usable Require Special Disposal Arrange Disposal Discard © 24 Before Sorting After Sorting © 12
  • 13. 08-01-2014 25 Step 2 – Setting in Order (SEITON) • Objective: Minimize search time and errors • What do we intend to do? ▫ Analyze why getting things out and putting them back takes so long ▫ Put things in ORDER © 26 Step 2 – Setting in Order (SEITON) • A rational, orderly and methodical arrangement of all items we use, re-work or write off • Once all un-needed items have been eliminated, it is needed to manage the remaining useful items • Organise layout of tools and equipment 1. Mark Designated locations 2. Use tapes and labels 3. Ensure everything is available as it is needed and at the “point of use” © 13
  • 14. 08-01-2014 27 Step 2 – Setting in Order (SEITON) Workplace Checkpoints 1. Positions of aisles and storage places clearly marked? 2. Tools classified and stored by frequency of use? 3. Pallets stacked correctly? 4. Safety equipment easily accessible? 5. Floors in good condition? © 28 The SEITON Mantra! A place for everything and everything in its place! © 14
  • 15. 08-01-2014 29 Review each item No. Step 1) Name of Item 2) Retrieval 3) Search 4) Carrying the item Probable problems a) Do not know what it is called a) No pre-fixed location b) Storage in far away location c) Storage locations are scattered d) Too many repeat trips e) Hard to get out f) Too big to carry g) Need to set or assemble a) Difficult to find because a lot of things are there b) Not labelled c) Not there but not clear if someone is using it a) No way of transport © 30 Before systemizing After systemizing © 15
  • 16. 08-01-2014 31 Step 3 – Shine (SEISO) • Objective: Make it easier to inspect for problems and take faster corrective action • What do we intend to do? ▫ Understand how to prevent things from getting dirty ▫ Ensuring tip-top condition © 32 Step 3 – Shine (SEISO) SEISO aims to: 1. Create a spotless workplace 2. Identify and eliminate causes of dirt and grime – remove the need to clean 3. Sweep, dust, polish and paint © 16
  • 17. 08-01-2014 33 Step 3 – Shine (SEISO) Steps to be followed during or after major housekeeping : 1. 2. 3. 4. 5. Do a survey of the origins of grime & leakage Set priorities for cleaning where grime is most study why things are dirty study possible plan of action Decide on action steps/ responsibility/ timeframe © 34 Step 3 – Shine (SEISO) SEISO golden rules: • If there’s Lesser number of items, there is lesser to clean • One is best (office example) ▫ ▫ ▫ ▫ One page memo One day processing One location files One copy filing © 17
  • 18. 08-01-2014 35 SEISO checklist No. Type of Grime in office 1) Dirt 3) Source Dust 2) Tick if applicable Water 4) Fittings 5) Litter 6) Temperature 7) Other © 36 Before systemizing After systemizing © 18
  • 19. 08-01-2014 37 Step 4 – Standardize (SEIKETSU) • Objective: Achieving higher productivity and better quality through higher employee morale • What do we intend to do? ▫ Ensure conducive and safe working environment ▫ Make cleanliness standard across the enterprise © 38 Step 4 – Standardize (SEIKETSU) • Following of earlier 3 S’s, standardized work procedures, maintaining safe & hygienic conditions in work place contribute to a serene atmosphere • Define standards for: ▫ My Job – Product and Processes ▫ My Machine ▫ My Working areas © 19
  • 20. 08-01-2014 39 Step 4 – Standardize (SEIKETSU) Specific objectives of SEIKETSU: 1. A five-minute daily clean up habit 2. Keeping a balance between personal cleanliness and the cleanliness of the environment / work place 3. Avoiding littering. Learning to pick-up tiny pieces of waste around 4. Regularly audit using checklists and measures of housekeeping © 40 Step 4 – Standardize (SEIKETSU) Guidelines for implementing SEIKETSU: 1. Generate a maintenance system for the first three S’s 2. Develop procedures, schedules, practices 3. Continue to assess the use and disposal of items 4. Regularly audit using checklists and measures of housekeeping 5. Real challenge is to keep it clean © 20
  • 21. 08-01-2014 41 Step 5 – Self-Discipline (SHITSUKE) • Objective: Achieving constancy of purpose. Making it a way of life. • What do we intend to do? ▫ Training ▫ Evaluation ▫ Follow-up © 42 Step 5 – Self-Discipline (SHITSUKE) • • • • • Driving force behind all 5S Make it a way of life Part of health and safety Involve the whole workforce Develop and keep good habits © 21
  • 22. 08-01-2014 43 Step 5 – Self-Discipline (SHITSUKE) Specific objectives of SHITSUKE: • Instilling the ability of doing things the way they are supposed to be done • Becoming a role model by treating your work place as your second home • Influencing others to join in keeping a wellmaintained work place. • Aiming for constant improvement © 44 Self-Discipline Checklist • Introduce 3 min 5 S activity system ▫ How often • Introduce 5 S Activity Evaluation system • Train Evaluators • Train Implementers on ▫ Problem solving steps ▫ What defects to look for ▫ Preparing and using implementation checklist © 22
  • 23. 08-01-2014 45 5S Evaluation © 46 5S Evaluation • An activity or related activities to determine whether there is an existence of a system & the system is in operation as per established norms • It also verifies whether the system & results are taking the organization towards the desired objectives. © 23
  • 24. 08-01-2014 47 5S Evaluation How to evaluate the benefits of 5S? 1. Visible benefits: 1. Photographic evidence 2. Employee movement tracking 2. Audit: 1. Internal audits of processes 2. External audits through consultants 3. Ratings: 1. Employee feedback 2. Binary responses and % ratings © 48 Visible benefits 1. Photographic evidence © 24
  • 25. 08-01-2014 49 Visible benefits 2. Employee movement tracking © 50 Audits No. Category Topic Workplace 5S Audit Sheet Description & Score 1 2 3 Audit Questions 4 1 Sort 0% - 20% 21% - 40% 41% - 60% 61% - 80% 81% - 100% Removal of Unnecessary items does not exist exists but is not known known but not used often used 0% - 20% 21% - 40% 41% - 60% 61% - 80% Improvement Points 3 2 81% - 100% of the audit area 3 Set in Order Proper condition of items A process for setting items in order Workplace condition Free of trash, scrap, soil, leaks, dust etc. within 0% - 20% 21% - 40% 41% - 60% 61% - 80% 81% - 100% Cleaning to inspect 3 of the audit area always used A process for removing un-necessary items Workplace condition Necessary items are at point of use for 2 _/5 5 Workplace condition Un-necessary items are removed from A process for daily cleaning to inspect the workplace condition does not exist exists but is not known known but not used often used always used Shine does not exist exists but is not known known but not used often used always used 4 of the audit area 3 1 Standards exist for markings, colors, item Workplace condition locations, signage etc. at 4 Standardise A process to review, revise and update Revision of standards standards 0% - 20% 21% - 40% 41% - 60% 61% - 80% 81% - 100% does not exist exists but is not known known but not used often used of the audit area always used 3 1 The current high score for 5s is maintained Workplace condition by 5 Sustain Auditing 5S Auditor name: A process for auditing and checking 5S condition and processes Audit Date: 0% - 20% 21% - 40% 41% - 60% 61% - 80% 81% - 100% does not exist exists but is not known known but not used often used of the audit area always used Total score for this audit out of 100 1 Conduct another red tag activity Refresh training for all supervisers and operators in red tagging procedure Arrangement of items at point of use is good overall but clearly there are more tools than needed for the job There are standards for point of use tool storage We need a better way to catch fabric scraps on the floor Cleaning is ad-hoc and up to individual recommend making time at start and end of shift to tidy up Some areas have excellent visuals (cutting area) while others none A process for revision of standards is needed - currntly revision only occurs because of customer complaints There is no tracking of 5S scores Management does not audit 5S regularly 1 44% © 25
  • 26. 08-01-2014 51 Ratings An example of how 5S implementation can be evaluated using Binary and % ratings* Evaluating Seiri (Sort) stage: 1. Material availability Give 1 mark if material is fully available or give 0 marks if material is not fully available 2. Defective goods If there are X items which contains Y items as defective Then the marks will be Fraction of fine goods = [1{Y/X}] 3. Operating condition Give 1 mark if operating condition is under control and give 0 marks if operating condition is not under control. © 52 Ratings An example of how 5S implementation can be evaluated using Binary and % ratings* Evaluating Seiri (Sort) stage: 4. Relative information about working condition, process guidelines, tools information, material information etc., is also important for Seiri rating. Give 1 mark for full information and give 0 marks for partial information. 5. Elimination of waste Let total N no of wast are listed but only M were eliminated the marks of elimination process will be Fraction of waste elimination = [1- {M/N}] © 26
  • 27. 08-01-2014 53 Ratings An example of how 5S implementation can be evaluated using Binary and % ratings* Evaluating Seiri (Sort) stage: • Now add all five marks and get total rating of Seiri out of 5. If the Seiri system will get less than 3 marks then do the arrangement again • Do this for all the stages and calculate the average 5S rating * Based on a paper on Performance Improvement through 5S in Small Scale Industry: A case study by P. M. Rojasra, M. N. Qureshi, International Journal of Modern Engineering Research (IJMER) Vol. 3, Issue. 3, May - June 2013 pp-1654-1660 © 54 Attributes of an evaluator • • • • One who believes in 5 S Strict, Fair and Tactful Must be able to do it in an competent manner Willing to go to the workplace, offer advice and point out problems when necessary • Should be able to comment on successes and shortcomings clearly © 27
  • 28. 08-01-2014 55 Group Activity We will work on a hypothetical scenario to implement 5S 1. Divide in groups of 6 each. 2. Think of any activity which you engage in regularly. For example: Working in Office, Working in kitchen, Working on your computer, Running a plant etc. 3. Discuss how you can implement 5S in these activities (Use flip charts) 4. Also mention how you will evaluate the improvements after using the 5S technique 5. Present to the gathering © 56 Absence of 5S leads to 5D 1. 2. 3. 4. 5. Delays Defects Dissatisfied customers Declining profits Demoralized employees © 28
  • 29. 08-01-2014 57 Litmus test for 5S • 30 second rule • One must locate any item within 30 seconds if 5S is properly implemented • Ex: Electronic records retrieval from your desktop/laptop © 58 How can 5S help you? 1. 2. 3. 4. 5. 6. Neat and Clean Workplace Smooth working No Obstruction Safety increases Productivity improves Quality improves © 29
  • 30. 08-01-2014 59 How can 5S help you? 7. 8. 9. 10. 11. Wastage decreases Machine maintenance becomes easy Visual Control become possible Motivated employees Spacious workstations © 60 Visual Management © 30
  • 31. 08-01-2014 61 What is Visual Management A technique where control of an activity or process is made easier or more effective by deliberate use of visual signals. They give feedback to an operator about how a process is working and can alert the operator to act Usually used in 5S, but can be implemented with any process improvement initiative Visual Controls can also include audible signals The 3 beeps from your microwave once your food has finished cooking © 62 Goals of Visual Management The goal of visual controls is to make a process: Self-explaining Scoreboard at a baseball game Self-ordering RO system Self-regulating Traffic lights Self-improving Facilitate corrections in MS Word or email © 31
  • 32. 08-01-2014 63 The idea behind Visual Management When someone walks into the workplace they should be able to determine: ▫ ▫ ▫ ▫ What the process is, Who the customers and suppliers are, What the deliverables are, Where and what resources are being used in the process, ▫ The health of the process, ▫ That there is an effective measurement system in place. © 64 Examples of Visual Management The red light on your DVR indicating a movie is recording Different colored clothing for different cricket teams Painted lines on the highway The red and green lights outside of an operation theatre Traffic lights © 32
  • 33. 08-01-2014 Visual Control tools 1. Takt boards 2. Issue boards 3. 5S boards 4. KANBAN cards © 1. Takt board Part number specific Process summary Number of parts in a process Jobs in process Quantity of WIP Value of WIP Daily Takt rate for each part Daily Takt rate for process Daily summary information Daily summary information Takt Productivity Actual output Actual output WIP WIP Cycle time Cycle time © 33
  • 34. 08-01-2014 1. Takt board © 2. Performance/Productivity board Production/process related issues “Can-do” items can be resolved by the team “Need help” need external assistance from management team, engineer, maintenance to resolve Dashboard metrics Productivity First pass yield (scrap, repair, rework) Rolled throughput yield Timeliness On-time delivery Weekly Takt rate average Equipment uptime/downtime (unscheduled maintenance) Quality Process capability and stability indices Financial Cross-training matrices © 34
  • 35. 08-01-2014 3. 5S Board Information Used to maintain 5S Set in order maps Standardize checklists 5S audit results (checklist) 5S audit results (spider graph) Action plan for improvement Before/after photos © 4. Kanbans Visual signal to: Replenish materials consumed in the production process over time Trigger action © 35
  • 36. 08-01-2014 71 Cellular layout © Cellular Layout Linking of manual and machine operations into the most efficient combination to maximize value-added content while minimizing waste. Punch De-burr Cut to size Package Form Sand © 36
  • 37. 08-01-2014 73 Benefits of Cellular layout • Simplified scheduling and communication • Minimal inventory needed between processes • Increased visibility • provide quick feedback and problem resolution • Development of increased product knowledge • workers are trained to understand the total process • Shorter lead times • Small lots and one piece flow • to match customer demand © 74 5 step cellular design process 1. 2. 3. 4. 5. Group Products Establish Takt Time Review the Work Sequence Balance the Process Design the Cell Layout © 37
  • 38. 08-01-2014 75 1. Group Products Product grouping considerations Group products with similar: • Process/Resource Requirements • Changeover/Set-up Times • Process Time Variation • Demand vs. Capacity © 76 2. Establish Takt time • Takt time can change • What can you change to match takt time? ▫ Number of people ▫ Number of cells (requires investment in machinery) © 38
  • 39. 08-01-2014 77 3. Review the work sequence 1. Observe and document the tasks each worker performs ▫ ▫ Observe, don’t just ask The steps are defined by the designer 2. Break operations into observable segments 3. Study machine capacity, cycle times, and changeover times 4. Look for value-added and non-value-added elements © 78 4. Balance the process Before After 60 60 50 Seconds Seconds 50 40 30 20 10 40 30 20 10 0 0 1 2 3 4 Operation Work Content 5 1 2 3 4 Operation Work Content © 39
  • 40. 08-01-2014 79 4. Design the cellular layout Design the work to: • • • • • Minimize motion Avoid unnatural postures and movements Avoid sharp turns in motion Make moves easy to perform without much concentration Use hands and forearms instead of upper arms and shoulders for light work Minimize lifting • • Follow a rhythm © 40