SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Downloaden Sie, um offline zu lesen
Memorandum of understanding
M/S A.B business and services and represented by Bhairav p. Kabrawala having their office at 7,suryadarsan apartment, Near
swaminarayan temple. adajan. Surat. Gujarat - 395009. Hereinafter for brevity's sake referred to as first party, which expression shall,
unless excluded By or repugnant to the contest, be deemed to mean and include its permitted assigns and successors - in - interest.

                                                           And

M/S Satish Gajera and have their registered office at (hereinafter for brevity's sake referred to as 102, Shiv nagar So., B/H Ashok
nagar, Katargam, Surat " "second party" which expression shall, unless excluded by or pugnant to the contest, be deemed to mean and
include its permitted assigns and successors - in - interest.)
Whereas the first party is engaged in the business of outsourcing the business for the IT and it enabled service industry and it has entered
into an agreement to execute the data transcription operations in details in the scope of work, which needs to be, executed through
various delivery partners. Presently it is in a position to procure the business for data conversions more meaningfully descr ibed in the
column scope of work.


And whereas the second party is engaged inter alias, in the business of providing a wide spectrum of software solution and services. The
second party has acquired the necessary expertise and developed the requisite skill base and in fracture for successful execution of data
conversion work. Whereas second party is entering into the agreement with the first party to carry on the data conversion work on its own.
The second party will exercise in maintaining quality control of the jobs assignment.


This memorandum of understanding represents the business agreement and operational understandings between the parties, and shall
remain in effect for a period of the (trial work period) from the date of providing the trial work ( signup ) whichever is la ter and can be
extended for the period as mutually agreed upon.


Both parties shall sign a second agreement on date of trial qc reports necessary as per terms and conditions.


This agreement witnessed as follow:-


                  1.   Availability of data


                  The first party will provide image files up to 50 pages / system work to second party through cd or mail, the second
                  party would then data enter it into the word document format using notepad as required by the first party and this would
                  be delivered sending image files and notepad files by currier or mail. If the first party is not able to provide the work load
                  then will be refunding 50% of the deposit amount as an compensation and the ID will be terminated.


                  2.   Period of trial work


                  The first party shall give a work for 15 days ( include holidays ) and second party shall be complete it within 20 days and
                  send it to at first party the first party shall give a accuracy report within 7 days, after submissions per technical
                  specifications, technical specifications are included in this agreement with qc parameter. This agreement Valid for 11
                  month.


3.   Service charges / processing charges:-


     The vendor agrees to pay non-refundable Rs 500/- and 1000/- refundable* (for 1 ID's /1 systems)
4.   Responsibilities and obligation of the second party

     Turnaround time is 15 days (include holidays) and your work should be completed within the tat period with required quality
     parameters


     The first party will not be responsible for the problem at your premises such as hardware, virus, electricity, internet connectivity etc,
     and no reason shall be entered in non- completion of work data


     If second party not able to get up accuracy parameters as mentioned in Annexure II then first party shall not provide commercial work.


     The second party shall take maximum care on accuracy and delivery schedule of the data entry / conversion job. Time and accuracy
     is essence of this contract, any delay in delivery or accuracy less than and invoking of risk and cost clause.




5. TERMINATION

     If Business Associate fails to submit data on time or, If Business Associate fails to give accuracy as mentioned above in all output files
     and fails to get billing even after rework, Client reserves the right to terminate the agreement with notice period of 1 mont h. And
     Client/Associate will not be responsible for any further data and payment whatsoever to the Business Associate.


     This AGREEMENT may be terminated by any of the parties for breach of understanding on any clauses of this agreement giving 30
     days notice to either party giving clearly account of the reasons for such termination. W ith the mutual consent of both the parties, this
     AGREEMENT can be terminated at shorter notice, on termination from either party, for whatever reason, the payments due to
     Business Associate or Client, for the work accurately done till the date of termination should be paid as per payment clause of the
     Agreement.


     No modification of the terms of this AGREEMENT shall be valid unless it is in writing and signed both the parties.


     6. Other regulations


         The project will get terminate in case the second party gets fail to submit the New work, Rework and Re-rework on time.


         If second party is qualify for commercial work then first party is agree to give commercial work with following specifications:-


         Rate 100 Rs per page


         Payment mode 100% after the QC Report within 5 Days.


     Payouts according to your accuracy.
>    Accuracy level -                97% to 99% -        Rs 5000/-

>    Accuracy level -                93% to 97% -        Rs.2000/-

>    Accuracy level -                89% to 93% -        Rs.700
Below 90%=No payment.


                   The payment for the reworked data will be as follows,

       >       Accuracy level-      97% to 99%- Rs. 10,00/-

       >       Accuracy level-     93% to 97%- Rs. 5,00/-


                   Below 93% - No Payment The Payment for the Re-Rework will be as

follows (If Required) The Second Party has to pay Rs 500 application fees as QC charges.

       >       Accuracy Level -             95% to 100% -             Rs 6,00/-


                7. Quality checking & quality acceptance standards & specifications.
                TECHNICAL INSTRUCTIONS
      Every line should match with the corresponding line in the IMAGE; hence the pages shall
       Automatically match with the IMAGE file pages.

       Font should be Times New Roman and font size 10.

      Justification of text is not required even if it is done in the IMAGE file.

      Paragraph spacing should be done by using paragraph spacing (before or after only) (Auto Spacing
       should not be used).

      If a word splitted in the IMAGE file then the same should be done in word file. If a line Ends in IMAGE
       file then the same should be done in word file.

      Headers and Footers option should not be used.
      Color (if any in the IMAGE file) should be given in black color.


       Accent characters, if any, shall be converted and typed as normal characters. Ex: 's' Should be
       typed as ae, 'g' to be typed as c.

      Always type the text as normal text. Bold, italics in text part are not at all required.



REJECTION CRITERIA

                File name of the converted word file does not match with the corresponding image file name.
                In completed word files found.
                Any third party software used for text checking or conversion
                Should not type files in MS Office 2007.
   Accent characters found in any file.
                Any images are found in the word document.
                Text is in other than "Times New Roman" font.
                If colored text are found in any word file.
                If hyper links are found in any of the word file.
                Any other files are found in the zip folder except the word document. (like temporary files or
                 any other file types).
                If the converted file is not in .txt format or any other extension files found.
                If the completed Job files has not been submitted within the deadline mentioned by the
                 company.
REWORK / Re-rework CHANCE
                                                  Accuracy Parameters
                 Type of Error                                 Number of errors                      % Deduction

Line / Missing Line                                                   Each Line                          1.5 %

Improper Alignment                                                    On Page                            1.5 %

Spelling Error                                                        On Page                            1.2 %

Extra Line Entered                                                    On Page                            1%

Text / Extra Missing                                                  On Page                            0.70%

Extra Enter                                              Before / Between/ After Para                    2%

Extra Space                                                           On Page                            1%

Punctuation                                                           On Page                            0.3

Found in other Formats(E.g. Word)                            Any 1 page or Full Slot                   Rejected

Found in Capital Letters                                              On Page                          Rejected


Missing word
                                                                On page                                 1.1%



     TERMS AND CONDITIONS FOR REWORK and Re-rework


                The Accuracy level as per Data Verification Report should be below 80%.
                The user has to get a Confirmation of Acceptance of Rework and Re-rework from us SERVICES for his/her
                 Rework assignment. No Rework will be accepted without Confirmation of Acceptance.
   After sending the request for the Rework and Re-rework acceptance, the eligible users can start the rework
               immediately and the Confirmation of acceptance of rework will be sending to users within 3-4 working days.
              Total days for Rework assignment will be 3 days and 2 days for Re-rework (if required) from the date of
               declaration of Data Verification Report. The Rework and re-rework Data Verification Report will be declared
               on the next cycle of Result declaration.
              The request for Rework acceptance should reach in the prescribed schedule given in the Data
               Verification Report. No request for Rework will be accepted afterwards.
       Company's decision will be final in all the terms and conditions cited above.


    DISPUTE RESOLUTION & JURISDICTION


       In the event of any dispute or difference arising between the parties hereto relating to or arising out of this

        Agreement, including the implementation, execution, interpretation, rectification, validity, enforceability,

        termination or rescission thereof, including the rights, obligations or liabilities of the parties hereto, the same will

        be adjudicated and determined by arbitration. The arbitration shall be conducted by a panel of two arbitrators

        one each selected parties hereto. And both the arbitrators thus appointed shall be appoint the third arbitrator

        who shall function as the presiding arbitrator. The arbitration shall be conducted at Surat, Gujarat in the English

        language. Any arbitration award shall include attorney's fees for the prevailing party. The courts in the city of

        Surat shall have exclusive jurisdiction to entertain try and determined any dispute.


The first party is only responsible for giving correspondence and guidelines for the said work under the
breach of this agreement.


Certificate by the second party m/s


I have read and understood the contract agreement terms and conditions, have signed each page.


For and on behalf of first party                                                        for and behalf of second party


M/S A.B business and services


 (Bhairav p. Kabrawala)
Sample Files:

                                                 Page                                            4769
fewer jaw o^ an exadperated wkaie. in the midst o^ tkis consternation, ^uee^ue^ dropped LftL to k is knees, and '-'"•"tin^ under tL path oj the koom, wkipp J L U J a
rope, secured one end, to tL I uiwarks, and tken iadio, caut At it round tke boom as it swept over kis kead[ and a t tL next jerk, the f      ^ ipped? and atf wad 6a^e.
the schooner wa6 ruri in to tk e usind,, and wki fe tke kandd were
cLaring awatg tke 6 tern bat,                        r   itripped to tks u/aidt, darted ^rom tL 6 ids with a long living arc of a
leap. L Lee minuted or more lie wad deen vimming like a dog? throwing kid fomf armd dtraig kt on t LI ire hint, and kg fkrrti revealing ki6 brawny 6kouiderd tkrougk the
                                                           freezing Joa*n. i Hooked at the grand and orioud Ifttt 6aw no one to be dave d. tL < greenhorn Lad gone down.
    lin^if^ 6 par tke otLr file a iadio, cau, tra.
                                                                                              dkooting kimdelf perpend,icuizriu from. tL
    iivflii that
                                                                                                                                    xtterd
                                       few mmulei more, a,
        dragging a iiieLss jo,            tL boat              ■lied the            tL poor kumpkin was res         torel. a tik anas vo ted to
                        bii. trump; the captain ke^ed kid pardan. jrom tkat Lur i ciii
          zueq a no,                                                                            <ur i ctove      s^uee^ue^ iike a bar run: . ke did
    fftonoud bul daw no one, lo be Saved. me greenhorn nad t^one down, ihooltn^ hanieij- p, water, ijaajcjue^, now took
    i £ M                            took kid Lt I na d                    tLrre ever suck unconsciousneii       not seem, to tkink
     i         poor ^uee^ue^
    a instants glance around kim, and seeming to dee fust ho down and disappeared, a jLu-' minutes more, and, ke rode
     an
    a^ain, one arm itiii striking out, and with tL otLr


•e, dived




 Such pages will be given by first party, page will contain 49 to 52 lines max. and second party should
 complete the files in notepad and as per the technical instructions given below and submit on or before
 the dead line.




 QC Declaration:-



 QC Declaration Will be Responsible for the checking Random Pages in the New work, Rework and as well
 as Re-rework. All the pages won't be checked and if the Accuracy goes below then 80% then the center
 won't be responsible for the future checking for the same. Again the Second Party needs to check all the
 pages and submit the rework and re-rework.

Weitere ähnliche Inhalte

Andere mochten auch

Mou format.for industry institute interaction
Mou format.for industry institute interactionMou format.for industry institute interaction
Mou format.for industry institute interactionRaveendra Ramachandra
 
Mou kelab badminton dengan pba
Mou kelab badminton dengan pbaMou kelab badminton dengan pba
Mou kelab badminton dengan pbaWani Yahya
 
MOU BKP UPSI
MOU BKP UPSIMOU BKP UPSI
MOU BKP UPSIohdmoh
 
Mou sekolah-industri
Mou sekolah-industriMou sekolah-industri
Mou sekolah-industriFitri Ana
 
Gec Presentation Petrochemical &amp; Refinery
Gec Presentation Petrochemical &amp; RefineryGec Presentation Petrochemical &amp; Refinery
Gec Presentation Petrochemical &amp; Refinerylynnielong
 
76221591 mou-smk-du-di-oto
76221591 mou-smk-du-di-oto76221591 mou-smk-du-di-oto
76221591 mou-smk-du-di-otoOji Daroji
 
Refining petrochemical integration bangkok june 2012 final draft
Refining petrochemical integration bangkok june 2012 final draftRefining petrochemical integration bangkok june 2012 final draft
Refining petrochemical integration bangkok june 2012 final draftNoor Jivraj
 
An Overview of the US Downstream Project Landscape
An Overview of the US Downstream Project LandscapeAn Overview of the US Downstream Project Landscape
An Overview of the US Downstream Project LandscapeEnergy Construction Forum
 
Memorandum of understanding
Memorandum of understandingMemorandum of understanding
Memorandum of understandingNAFCareerAcads
 
Construction of oil refinery in oman
Construction of oil refinery in omanConstruction of oil refinery in oman
Construction of oil refinery in omanGowtham Gangumolla
 
Oil Refinery ----- An Intro
Oil Refinery ----- An IntroOil Refinery ----- An Intro
Oil Refinery ----- An IntroMuhammad Abbas
 
Memorandum of understanding
Memorandum of understandingMemorandum of understanding
Memorandum of understandingtawi123
 
Reliance Refining Building Worlds Larges Coke Gasification Project
Reliance Refining Building Worlds Larges Coke Gasification ProjectReliance Refining Building Worlds Larges Coke Gasification Project
Reliance Refining Building Worlds Larges Coke Gasification ProjectTodd Pencarinha
 
Global Petrochemicals & Polymers Market | Trends And Forecast 2015-2021
Global Petrochemicals & Polymers Market | Trends And Forecast 2015-2021Global Petrochemicals & Polymers Market | Trends And Forecast 2015-2021
Global Petrochemicals & Polymers Market | Trends And Forecast 2015-2021Occams Business Research & Consulting
 
5000bpd Refinery Example
5000bpd Refinery Example5000bpd Refinery Example
5000bpd Refinery ExampleRitch Wingo
 

Andere mochten auch (20)

Sample mou responsible entity
Sample mou   responsible entitySample mou   responsible entity
Sample mou responsible entity
 
Mou format.for industry institute interaction
Mou format.for industry institute interactionMou format.for industry institute interaction
Mou format.for industry institute interaction
 
Memorandum of undertaking
Memorandum of undertakingMemorandum of undertaking
Memorandum of undertaking
 
Mou kelab badminton dengan pba
Mou kelab badminton dengan pbaMou kelab badminton dengan pba
Mou kelab badminton dengan pba
 
Memorandum of associamtion MaharviConstruction
Memorandum of associamtion MaharviConstructionMemorandum of associamtion MaharviConstruction
Memorandum of associamtion MaharviConstruction
 
MOU BKP UPSI
MOU BKP UPSIMOU BKP UPSI
MOU BKP UPSI
 
Mou sekolah-industri
Mou sekolah-industriMou sekolah-industri
Mou sekolah-industri
 
Gec Presentation Petrochemical &amp; Refinery
Gec Presentation Petrochemical &amp; RefineryGec Presentation Petrochemical &amp; Refinery
Gec Presentation Petrochemical &amp; Refinery
 
76221591 mou-smk-du-di-oto
76221591 mou-smk-du-di-oto76221591 mou-smk-du-di-oto
76221591 mou-smk-du-di-oto
 
Refining petrochemical integration bangkok june 2012 final draft
Refining petrochemical integration bangkok june 2012 final draftRefining petrochemical integration bangkok june 2012 final draft
Refining petrochemical integration bangkok june 2012 final draft
 
An Overview of the US Downstream Project Landscape
An Overview of the US Downstream Project LandscapeAn Overview of the US Downstream Project Landscape
An Overview of the US Downstream Project Landscape
 
Memorandum of understanding
Memorandum of understandingMemorandum of understanding
Memorandum of understanding
 
Kuai modular refineries
Kuai modular refineriesKuai modular refineries
Kuai modular refineries
 
Construction of oil refinery in oman
Construction of oil refinery in omanConstruction of oil refinery in oman
Construction of oil refinery in oman
 
Oil Refinery ----- An Intro
Oil Refinery ----- An IntroOil Refinery ----- An Intro
Oil Refinery ----- An Intro
 
Memorandum of understanding
Memorandum of understandingMemorandum of understanding
Memorandum of understanding
 
Reliance Refining Building Worlds Larges Coke Gasification Project
Reliance Refining Building Worlds Larges Coke Gasification ProjectReliance Refining Building Worlds Larges Coke Gasification Project
Reliance Refining Building Worlds Larges Coke Gasification Project
 
Memorandum of understanding
Memorandum of understandingMemorandum of understanding
Memorandum of understanding
 
Global Petrochemicals & Polymers Market | Trends And Forecast 2015-2021
Global Petrochemicals & Polymers Market | Trends And Forecast 2015-2021Global Petrochemicals & Polymers Market | Trends And Forecast 2015-2021
Global Petrochemicals & Polymers Market | Trends And Forecast 2015-2021
 
5000bpd Refinery Example
5000bpd Refinery Example5000bpd Refinery Example
5000bpd Refinery Example
 

Ähnlich wie Memorandum of understanding

New ahmedabad plan copy
New ahmedabad plan   copyNew ahmedabad plan   copy
New ahmedabad plan copygreatnisu
 
Department of Information TechnologyStatewide IT Procurement Off
Department of Information TechnologyStatewide IT Procurement OffDepartment of Information TechnologyStatewide IT Procurement Off
Department of Information TechnologyStatewide IT Procurement OffLinaCovington707
 
PART IDirections Please review the License Agreement below .docx
PART IDirections Please review the License Agreement below .docxPART IDirections Please review the License Agreement below .docx
PART IDirections Please review the License Agreement below .docxodiliagilby
 
[INSERT TITLE HERE] 1Homework 3PART IDirections Pleas.docx
[INSERT TITLE HERE] 1Homework 3PART IDirections Pleas.docx[INSERT TITLE HERE] 1Homework 3PART IDirections Pleas.docx
[INSERT TITLE HERE] 1Homework 3PART IDirections Pleas.docxdanielfoster65629
 
Voice Mail System RFP Analysis and RequirementsThis is a Req.docx
Voice Mail System RFP Analysis and RequirementsThis is a Req.docxVoice Mail System RFP Analysis and RequirementsThis is a Req.docx
Voice Mail System RFP Analysis and RequirementsThis is a Req.docxtienboileau
 
Mts form filling project
Mts form filling projectMts form filling project
Mts form filling projectritesh008
 
Past performance everything
Past performance everythingPast performance everything
Past performance everythingjpeabody
 
Building and Implementing MT systems @ eBay – TAUS Global Content Summit 2019
Building and Implementing MT systems @ eBay – TAUS Global Content Summit 2019Building and Implementing MT systems @ eBay – TAUS Global Content Summit 2019
Building and Implementing MT systems @ eBay – TAUS Global Content Summit 2019Jose Luis Bonilla Sánchez
 

Ähnlich wie Memorandum of understanding (10)

New ahmedabad plan copy
New ahmedabad plan   copyNew ahmedabad plan   copy
New ahmedabad plan copy
 
Department of Information TechnologyStatewide IT Procurement Off
Department of Information TechnologyStatewide IT Procurement OffDepartment of Information TechnologyStatewide IT Procurement Off
Department of Information TechnologyStatewide IT Procurement Off
 
PART IDirections Please review the License Agreement below .docx
PART IDirections Please review the License Agreement below .docxPART IDirections Please review the License Agreement below .docx
PART IDirections Please review the License Agreement below .docx
 
[INSERT TITLE HERE] 1Homework 3PART IDirections Pleas.docx
[INSERT TITLE HERE] 1Homework 3PART IDirections Pleas.docx[INSERT TITLE HERE] 1Homework 3PART IDirections Pleas.docx
[INSERT TITLE HERE] 1Homework 3PART IDirections Pleas.docx
 
Voice Mail System RFP Analysis and RequirementsThis is a Req.docx
Voice Mail System RFP Analysis and RequirementsThis is a Req.docxVoice Mail System RFP Analysis and RequirementsThis is a Req.docx
Voice Mail System RFP Analysis and RequirementsThis is a Req.docx
 
PUSD Measure H1 Program Management RFP/SQ
PUSD Measure H1 Program Management RFP/SQPUSD Measure H1 Program Management RFP/SQ
PUSD Measure H1 Program Management RFP/SQ
 
Mts form filling project
Mts form filling projectMts form filling project
Mts form filling project
 
Past performance everything
Past performance everythingPast performance everything
Past performance everything
 
Sample seo-contract
Sample seo-contractSample seo-contract
Sample seo-contract
 
Building and Implementing MT systems @ eBay – TAUS Global Content Summit 2019
Building and Implementing MT systems @ eBay – TAUS Global Content Summit 2019Building and Implementing MT systems @ eBay – TAUS Global Content Summit 2019
Building and Implementing MT systems @ eBay – TAUS Global Content Summit 2019
 

Kürzlich hochgeladen

Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024D Cloud Solutions
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1DianaGray10
 
Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Brian Pichman
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-pyJamie (Taka) Wang
 
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...DianaGray10
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Adtran
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxMatsuo Lab
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopBachir Benyammi
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding TeamAdam Moalla
 
UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8DianaGray10
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsSafe Software
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostMatt Ray
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioChristian Posta
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?IES VE
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfDaniel Santiago Silva Capera
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfAijun Zhang
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsSeth Reyes
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfDianaGray10
 

Kürzlich hochgeladen (20)

Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1
 
Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-py
 
20150722 - AGV
20150722 - AGV20150722 - AGV
20150722 - AGV
 
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptx
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 Workshop
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team
 
UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and Istio
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdf
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and Hazards
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
 

Memorandum of understanding

  • 1. Memorandum of understanding M/S A.B business and services and represented by Bhairav p. Kabrawala having their office at 7,suryadarsan apartment, Near swaminarayan temple. adajan. Surat. Gujarat - 395009. Hereinafter for brevity's sake referred to as first party, which expression shall, unless excluded By or repugnant to the contest, be deemed to mean and include its permitted assigns and successors - in - interest. And M/S Satish Gajera and have their registered office at (hereinafter for brevity's sake referred to as 102, Shiv nagar So., B/H Ashok nagar, Katargam, Surat " "second party" which expression shall, unless excluded by or pugnant to the contest, be deemed to mean and include its permitted assigns and successors - in - interest.) Whereas the first party is engaged in the business of outsourcing the business for the IT and it enabled service industry and it has entered into an agreement to execute the data transcription operations in details in the scope of work, which needs to be, executed through various delivery partners. Presently it is in a position to procure the business for data conversions more meaningfully descr ibed in the column scope of work. And whereas the second party is engaged inter alias, in the business of providing a wide spectrum of software solution and services. The second party has acquired the necessary expertise and developed the requisite skill base and in fracture for successful execution of data conversion work. Whereas second party is entering into the agreement with the first party to carry on the data conversion work on its own. The second party will exercise in maintaining quality control of the jobs assignment. This memorandum of understanding represents the business agreement and operational understandings between the parties, and shall remain in effect for a period of the (trial work period) from the date of providing the trial work ( signup ) whichever is la ter and can be extended for the period as mutually agreed upon. Both parties shall sign a second agreement on date of trial qc reports necessary as per terms and conditions. This agreement witnessed as follow:- 1. Availability of data The first party will provide image files up to 50 pages / system work to second party through cd or mail, the second party would then data enter it into the word document format using notepad as required by the first party and this would be delivered sending image files and notepad files by currier or mail. If the first party is not able to provide the work load then will be refunding 50% of the deposit amount as an compensation and the ID will be terminated. 2. Period of trial work The first party shall give a work for 15 days ( include holidays ) and second party shall be complete it within 20 days and send it to at first party the first party shall give a accuracy report within 7 days, after submissions per technical specifications, technical specifications are included in this agreement with qc parameter. This agreement Valid for 11 month. 3. Service charges / processing charges:- The vendor agrees to pay non-refundable Rs 500/- and 1000/- refundable* (for 1 ID's /1 systems)
  • 2. 4. Responsibilities and obligation of the second party Turnaround time is 15 days (include holidays) and your work should be completed within the tat period with required quality parameters The first party will not be responsible for the problem at your premises such as hardware, virus, electricity, internet connectivity etc, and no reason shall be entered in non- completion of work data If second party not able to get up accuracy parameters as mentioned in Annexure II then first party shall not provide commercial work. The second party shall take maximum care on accuracy and delivery schedule of the data entry / conversion job. Time and accuracy is essence of this contract, any delay in delivery or accuracy less than and invoking of risk and cost clause. 5. TERMINATION If Business Associate fails to submit data on time or, If Business Associate fails to give accuracy as mentioned above in all output files and fails to get billing even after rework, Client reserves the right to terminate the agreement with notice period of 1 mont h. And Client/Associate will not be responsible for any further data and payment whatsoever to the Business Associate. This AGREEMENT may be terminated by any of the parties for breach of understanding on any clauses of this agreement giving 30 days notice to either party giving clearly account of the reasons for such termination. W ith the mutual consent of both the parties, this AGREEMENT can be terminated at shorter notice, on termination from either party, for whatever reason, the payments due to Business Associate or Client, for the work accurately done till the date of termination should be paid as per payment clause of the Agreement. No modification of the terms of this AGREEMENT shall be valid unless it is in writing and signed both the parties. 6. Other regulations The project will get terminate in case the second party gets fail to submit the New work, Rework and Re-rework on time. If second party is qualify for commercial work then first party is agree to give commercial work with following specifications:- Rate 100 Rs per page Payment mode 100% after the QC Report within 5 Days. Payouts according to your accuracy. > Accuracy level - 97% to 99% - Rs 5000/- > Accuracy level - 93% to 97% - Rs.2000/- > Accuracy level - 89% to 93% - Rs.700
  • 3. Below 90%=No payment. The payment for the reworked data will be as follows, > Accuracy level- 97% to 99%- Rs. 10,00/- > Accuracy level- 93% to 97%- Rs. 5,00/- Below 93% - No Payment The Payment for the Re-Rework will be as follows (If Required) The Second Party has to pay Rs 500 application fees as QC charges. > Accuracy Level - 95% to 100% - Rs 6,00/- 7. Quality checking & quality acceptance standards & specifications. TECHNICAL INSTRUCTIONS  Every line should match with the corresponding line in the IMAGE; hence the pages shall Automatically match with the IMAGE file pages.  Font should be Times New Roman and font size 10.  Justification of text is not required even if it is done in the IMAGE file.  Paragraph spacing should be done by using paragraph spacing (before or after only) (Auto Spacing should not be used).  If a word splitted in the IMAGE file then the same should be done in word file. If a line Ends in IMAGE file then the same should be done in word file.  Headers and Footers option should not be used.  Color (if any in the IMAGE file) should be given in black color.  Accent characters, if any, shall be converted and typed as normal characters. Ex: 's' Should be typed as ae, 'g' to be typed as c.  Always type the text as normal text. Bold, italics in text part are not at all required. REJECTION CRITERIA  File name of the converted word file does not match with the corresponding image file name.  In completed word files found.  Any third party software used for text checking or conversion  Should not type files in MS Office 2007.
  • 4. Accent characters found in any file.  Any images are found in the word document.  Text is in other than "Times New Roman" font.  If colored text are found in any word file.  If hyper links are found in any of the word file.  Any other files are found in the zip folder except the word document. (like temporary files or any other file types).  If the converted file is not in .txt format or any other extension files found.  If the completed Job files has not been submitted within the deadline mentioned by the company. REWORK / Re-rework CHANCE Accuracy Parameters Type of Error Number of errors % Deduction Line / Missing Line Each Line 1.5 % Improper Alignment On Page 1.5 % Spelling Error On Page 1.2 % Extra Line Entered On Page 1% Text / Extra Missing On Page 0.70% Extra Enter Before / Between/ After Para 2% Extra Space On Page 1% Punctuation On Page 0.3 Found in other Formats(E.g. Word) Any 1 page or Full Slot Rejected Found in Capital Letters On Page Rejected Missing word On page 1.1% TERMS AND CONDITIONS FOR REWORK and Re-rework  The Accuracy level as per Data Verification Report should be below 80%.  The user has to get a Confirmation of Acceptance of Rework and Re-rework from us SERVICES for his/her Rework assignment. No Rework will be accepted without Confirmation of Acceptance.
  • 5. After sending the request for the Rework and Re-rework acceptance, the eligible users can start the rework immediately and the Confirmation of acceptance of rework will be sending to users within 3-4 working days.  Total days for Rework assignment will be 3 days and 2 days for Re-rework (if required) from the date of declaration of Data Verification Report. The Rework and re-rework Data Verification Report will be declared on the next cycle of Result declaration.  The request for Rework acceptance should reach in the prescribed schedule given in the Data Verification Report. No request for Rework will be accepted afterwards.  Company's decision will be final in all the terms and conditions cited above. DISPUTE RESOLUTION & JURISDICTION  In the event of any dispute or difference arising between the parties hereto relating to or arising out of this Agreement, including the implementation, execution, interpretation, rectification, validity, enforceability, termination or rescission thereof, including the rights, obligations or liabilities of the parties hereto, the same will be adjudicated and determined by arbitration. The arbitration shall be conducted by a panel of two arbitrators one each selected parties hereto. And both the arbitrators thus appointed shall be appoint the third arbitrator who shall function as the presiding arbitrator. The arbitration shall be conducted at Surat, Gujarat in the English language. Any arbitration award shall include attorney's fees for the prevailing party. The courts in the city of Surat shall have exclusive jurisdiction to entertain try and determined any dispute. The first party is only responsible for giving correspondence and guidelines for the said work under the breach of this agreement. Certificate by the second party m/s I have read and understood the contract agreement terms and conditions, have signed each page. For and on behalf of first party for and behalf of second party M/S A.B business and services (Bhairav p. Kabrawala)
  • 6. Sample Files: Page 4769 fewer jaw o^ an exadperated wkaie. in the midst o^ tkis consternation, ^uee^ue^ dropped LftL to k is knees, and '-'"•"tin^ under tL path oj the koom, wkipp J L U J a rope, secured one end, to tL I uiwarks, and tken iadio, caut At it round tke boom as it swept over kis kead[ and a t tL next jerk, the f ^ ipped? and atf wad 6a^e. the schooner wa6 ruri in to tk e usind,, and wki fe tke kandd were cLaring awatg tke 6 tern bat, r itripped to tks u/aidt, darted ^rom tL 6 ids with a long living arc of a leap. L Lee minuted or more lie wad deen vimming like a dog? throwing kid fomf armd dtraig kt on t LI ire hint, and kg fkrrti revealing ki6 brawny 6kouiderd tkrougk the freezing Joa*n. i Hooked at the grand and orioud Ifttt 6aw no one to be dave d. tL < greenhorn Lad gone down. lin^if^ 6 par tke otLr file a iadio, cau, tra. dkooting kimdelf perpend,icuizriu from. tL iivflii that xtterd few mmulei more, a, dragging a iiieLss jo, tL boat ■lied the tL poor kumpkin was res torel. a tik anas vo ted to bii. trump; the captain ke^ed kid pardan. jrom tkat Lur i ciii zueq a no, <ur i ctove s^uee^ue^ iike a bar run: . ke did fftonoud bul daw no one, lo be Saved. me greenhorn nad t^one down, ihooltn^ hanieij- p, water, ijaajcjue^, now took i £ M took kid Lt I na d tLrre ever suck unconsciousneii not seem, to tkink i poor ^uee^ue^ a instants glance around kim, and seeming to dee fust ho down and disappeared, a jLu-' minutes more, and, ke rode an a^ain, one arm itiii striking out, and with tL otLr •e, dived Such pages will be given by first party, page will contain 49 to 52 lines max. and second party should complete the files in notepad and as per the technical instructions given below and submit on or before the dead line. QC Declaration:- QC Declaration Will be Responsible for the checking Random Pages in the New work, Rework and as well as Re-rework. All the pages won't be checked and if the Accuracy goes below then 80% then the center won't be responsible for the future checking for the same. Again the Second Party needs to check all the pages and submit the rework and re-rework.