SlideShare ist ein Scribd-Unternehmen logo
1 von 35
RITTRAINING
WHY DO WE NEEDRAPID INTERVENTION TEAMS?
WHY RIT?
OSHA 29 CFR 1910.134 IF FIREFIGHTERS MUST ENTER AN AREA THAT IS IMMEDIATLEY DANGEROUS TO LIFE AND HEALTH (IDLH) THAT TWO MEMBERS SHOULD ENTER TOGETHER AND REMAIN IN VISUAL OR VOICE CONTACT WITH ONE ANOTHER AT ALL TIMES. RADIO CONTACT ONLY HAS BEEN DEEMED UNACCEPTABLE DUE TO THE POSSIBILITY OF RADIO FAILURE AND POSSIBLE CHANCE OF INABILITY TO OPERATE THE RADIO BY THE AFFECTED FIREFIGHTER IN AN EXTREME SITUATION.
1021 1001 1401 1500 NFPA 1407 1720 1983 1561 1710 1981 Standard for Training Fire Service Rapid Intervention Crews
RIT STUDY FINDINGS Average rescue personnel 12 Average time 12 minutes It took an average of eight to nine minutes to reach the downed firefighter from The time of the Mayday. Average time to find, package and secure an air supply and remove firefighter was 22 minutes. An average of 12 firefighters to rescue each downed firefighter, while one in five of the rescuers experienced a Mayday of their own. Times obtained were not under heat and smoke conditions. An involved, lengthy extrication process was not required for the Downed firefighter.
RIT / FIREGROUND SURVIVAL
Definition Mayday as defined by Webster's Dictionary:  an international radio-telephone signal word used as a distress call. It derives from the French m'aider, meaning "come help me". The mere phrase “Mayday” has forever changed the careers and lives of many dedicated fire service professionals & became is the reason behind RIT.
Firefighter Distress Signal Initiation or transmission of a firefighter distress signal produces more stress and potential chaos than any other single type of incident we may encounter throughout our careers.  As firefighters, fire officers and trainers, we must develop a standard plan of action that allow us to properly manage and overcome these chaotic and stressful events.
IS RIT THE SOLUTION?
Preparing & Planning for a “MAYDAY” call Preplanning structures in your district can empower command with much needed information in a Mayday / RIT situation Proper risk management coupled with a structured firefighter survival program enables today’s firefighters to understand the associated risks they are to encounter. Properly trained firefighters who are trained and disciplined in RIT tactics and skills.
Pre-fire planning / Pre-fire Analysis Case studies have shown that the success or failure of any “Mayday” incident is a direct result of effective ICS and pre-fire planning. The best preparatory effort given to the fireground commander is the pre-plan or the pre-fire analysis. What are a few “firefighter killers” in our district?
Frank Brannigan Frank Brannigan once stated, “There is no substitute for the fire department developing a system of accumulating and organizing information for retrieval at the time of the fire”.
Five Pre-fire Indicators : Potential “Mayday” incident and/or compromised fireground operations: Weight - excessive weight in the overhead should be of immediate concern to the IC when deciding to deploy additional firefighters during a rescue effort.  This may include: HVAC units, large billboards, storage tanks, etc. Fuel Loads - Excessive fuel loads (flammable or combustible) are an indication of potential rapid-fire spread which may lead to firefighters being trapped or overcome during initial firefighting. Building History – Previous fires, structural collapses, renovations (known & unknown) to the IC may lead to the entrapment of firefighters.
Pre-fire Indicators (con’t) Deterioration– A factor to the fireground continues to be vacant buildings or buildings in ill repair.  As firefighters we’re taught early on that all buildings are occupied until proven otherwise.  Pre-fire planning should enable the IC which buildings require absolute defensive operations to support firefighter safety and survival. Support Systems / Truss Construction – Examples of firefighter fatalities have been shared with the fire service for years.  Bowstring and light weight truss construction must be of utmost importance to the IC.
Truss Collapse Being under a burning truss , is like playing Russian Roulette  with a loaded revolver.  (Most notable bowstring truss collapse is the Hackensack, NJ fire which killed several firefighters).  As fireground commanders begin to consider deploying RIT teams for rescue efforts, careful consideration must be given to the potential of truss collapse, which could further complicate if not compound the rescue efforts. (This should also be considered before deploying interior attack teams).
Firefighter Survival Training Firefighters who have been properly trained in self-survival skills can greatly enhance the possibility of a successful RIT team rescue.  Standardized, predictable actions of a trapped, lost or disoriented firefighter will enable rescuers to locate and remove the firefighter in a more timely  and effective manner.
10 Standardized Actions for Lost and Disoriented Firefighters Initiate an emergency “Mayday” / Activate Emergency Distress Button. Stay “calm” and preserve your air supply. Activate P.A.S.S.
10 Standardized Actions for Lost and Disoriented Firefighters (cont.) Provide a situation / problem report. If trapped or disoriented as a crew, it’s imperative to “stay together”. Search for an exit – look for light. Attempt to follow a hose line or life line to safety.
10 Standardized Actions for Lost and Disoriented Firefighters (cont.) Retreat to an area of safety. Assume a horizontal position (if possible) to enhance the audible signal of your P.A.S.S. and enhance thermal protection. Use your flashlight as a beacon device and attempt to making tapping noises using tools or other objects.
Fireground Preparations: Proactive fireground preparations for survival cannot be over stated! Proactive ladders - provide secondary means of egress and serves as an immediate access point for RIT members Scene lighting at entry point or all 4 sides if possible – provides enhanced firefighter accountability and directional orientation for lost or disoriented firefighters. Back-up / Safety lines – provides an additional line of support in case of rapid-fire development.
Discipline / Enforcement Strict discipline and strong enforcement enable fireground commanders to adequately account for and assign the necessary crews to complete the task without the fear of freelancing or contradictory actions. RIT – In the event of a Mayday incident, physical and mental limitations will be taxed to the limit, rescuers must be forced to follow rules of personal safety at all times.  Teams that fail to follow the directions of the IC and their respective RIT Officer will most likely become victims themselves.
Discipline / Enforcement (con’t): Suppression Personnel – Personnel assigned to fire attack / suppression operations must overcome the desire to get involved.  Previously assigned fire attack/suppression crews must maintain their position in order to limit the threat of flame impingement on the trapped or disoriented firefigter(s).   A trapped or disoriented firefighter has two factors working against them: 1) limited air supply and 2) flame impingement barring the fact that direct physical trauma is not involved.
Tragic Training Memories: Firefighters in Boulder (CO) and around the nation are remembering one of its worst days when two of their own died during a training exercise. On January 26, 1982, Fire Engineer Bill Duran and FF Scott Smith died when the fire flashed and ran through the abandoned garage where the live fire training was held.
Tragic Training Memories (con’t) The flashover also forced surviving FF Dan Cutler through a wall...ending up with burns over 60 %. Hearings were held to figure out what caused the deaths and found there were still combustible ceiling tiles in the building. There were also no water supply established, no back-up engine companies for the training and firefighters did not do a walk thru to find the exits....amongst other problems. This tragic LODD was "the final straw" for the creation of NFPA 1403, “Standard for Live Fire Training”.
Critical Factors Personnel Safety – as rescue efforts begin, adrenalin often times overruns our ability to think clearly which may inevitably lead to rescuer injuries which further complicates the rescue operation.  “Be a part of the solution and not a part of the problem”. Communication – The IC must maintain constant communication with RIT team(s) throughout the incident.
Deployment of the RIT RIT should be deployed only after a quick briefing of known facts from the IC. By adequately identifying the last known location, number of personnel involved and the possible cause of deployment of RIT, personnel can properly prepare themselves for assignment and ensure proper equipment is deployed.
3 Things the to consider when deploying RIT personnel Initial RIT (Reconnaissance Team) Locate the downed, trapped member(s) Establish a tractable means of access to the victim(s) Determine additional needs (air, water, fans, extrication, thermal imaging cameras, etc.) Suggested team size: 2 firefighters, 1 officer
Deploying RIT personnel (con’t) Secondary RIT (Stabilization/Removal Team) Provide equipment and personnel as requested by the Recon Team Begin extrication process, clear debris for rapid egress Suggested team size: 2-4 firefighters
Deploying RIT personnel (con’t) Third and subsequent RIT (Support Team(s) Provide external support as requested by initial teams Provide personnel to relieve initial teams
Termination of Rescue Efforts Although no firefighter, fire officer or IC ever wants to terminate a rescue effort, firefighter safety “must” remain the top priority.  As unfortunate as it may be, the IC must terminate the rescue efforts when conditions begin to jeopardize the safety of those involved.  No decision, order or assignment ever given by an IC during their career will ever bare equal weight.  It’s decisions of this nature that will ultimately decide the number of members lost or injured.
Summarizing a “MAYDAY” Incident PAR – upon immediate distress signal, call for a PAR of on-scene units. Initiate RIT Operations – utilizing a technique that is expedious. Hazard Assessment – Upon locating downed firefighter(s), RIT personnel must quickly perform a hazard assessment to ensure their own safety.
Summary (con’t) Identify victim needs – air supply, fire impingement, extrication needs, etc. Initiate victim removal (if possible) – an initial progress report of findings and/or actions should be relayed to the IC. Provide medical care – upon removal from the hazard area, on-scene EMS personnel should provide immediate care / transport.
Summary (con’t) PAR – once victim(s) have been extracted from hazard area, another PAR should be given by all on-scene companies. Post-incident analysis / debriefing – following all RIT deployments a formal post-incident analysis should be conducted to review, revise and update existing procedures.
Conclusion Assume the worst and prepare for the worst. By doing this we enable yourself to overcome anything less than the worst with positive results.  Preparing for anything less will put you in a reactionary or catch-up mode during a high stress, high emotional incident in which the lives of fellow firefighters lie in the balance. Are there any questions?

Weitere ähnliche Inhalte

Was ist angesagt?

Incident command
Incident commandIncident command
Incident commandBruce Mims
 
Chapter 9 fire fighter
Chapter 9 fire fighter Chapter 9 fire fighter
Chapter 9 fire fighter Dan Koopman
 
ORGANISING AND STARTING A CSSR OPERATION
ORGANISING AND STARTING A CSSR OPERATIONORGANISING AND STARTING A CSSR OPERATION
ORGANISING AND STARTING A CSSR OPERATIONANUP SINGH
 
Chapter 05- Foundations of Firefighting Tactics and Strategies
Chapter 05- Foundations of Firefighting Tactics and StrategiesChapter 05- Foundations of Firefighting Tactics and Strategies
Chapter 05- Foundations of Firefighting Tactics and Strategiessnoshoesam
 
Chapter 04 Safety and Aircraft Hazards
Chapter 04  Safety and Aircraft HazardsChapter 04  Safety and Aircraft Hazards
Chapter 04 Safety and Aircraft HazardsTraining1PFD
 
10 Phases of Fire Fighting Operation (Day 1 Part 2).pptx
10 Phases of Fire Fighting Operation (Day 1 Part 2).pptx10 Phases of Fire Fighting Operation (Day 1 Part 2).pptx
10 Phases of Fire Fighting Operation (Day 1 Part 2).pptxBfpRsixTibiaoFireSta
 
WAYS TO IMPROVE OUR STATION-BASED ARFF TRAINING
WAYS TO IMPROVE OUR STATION-BASED ARFF TRAININGWAYS TO IMPROVE OUR STATION-BASED ARFF TRAINING
WAYS TO IMPROVE OUR STATION-BASED ARFF TRAININGAlex CT, GIFireE (UK)
 
Techniques of search and rescue (2)
Techniques of search and rescue (2)Techniques of search and rescue (2)
Techniques of search and rescue (2)ANUP SINGH
 
Fire safety in the Workplace
Fire safety in the WorkplaceFire safety in the Workplace
Fire safety in the WorkplaceAlphaPlusChampion
 
Actions in case of fire incident
Actions in case of fire incident Actions in case of fire incident
Actions in case of fire incident Ashiqur Rahman
 
Chapter 05 Fire and Rescue Communications
Chapter 05 Fire and Rescue Communications Chapter 05 Fire and Rescue Communications
Chapter 05 Fire and Rescue Communications Training1PFD
 
Basic Fire Fighting Training
Basic Fire Fighting TrainingBasic Fire Fighting Training
Basic Fire Fighting TrainingChristian Escaler
 
Chapter 16 rescue procedures 6 07
Chapter 16 rescue procedures 6 07Chapter 16 rescue procedures 6 07
Chapter 16 rescue procedures 6 07Beth Cummings
 
Fire extinguisher training
Fire extinguisher trainingFire extinguisher training
Fire extinguisher traininghawkmedoo
 
Fire safety an introduction
Fire safety an introductionFire safety an introduction
Fire safety an introductionTpcil Venkatesan
 

Was ist angesagt? (20)

Incident command
Incident commandIncident command
Incident command
 
Chapter 9 fire fighter
Chapter 9 fire fighter Chapter 9 fire fighter
Chapter 9 fire fighter
 
ORGANISING AND STARTING A CSSR OPERATION
ORGANISING AND STARTING A CSSR OPERATIONORGANISING AND STARTING A CSSR OPERATION
ORGANISING AND STARTING A CSSR OPERATION
 
E6 chapter 10_iluminacionl
E6 chapter 10_iluminacionlE6 chapter 10_iluminacionl
E6 chapter 10_iluminacionl
 
BASIC EXTRICATION TRAINING
BASIC EXTRICATION TRAININGBASIC EXTRICATION TRAINING
BASIC EXTRICATION TRAINING
 
Chapter 05- Foundations of Firefighting Tactics and Strategies
Chapter 05- Foundations of Firefighting Tactics and StrategiesChapter 05- Foundations of Firefighting Tactics and Strategies
Chapter 05- Foundations of Firefighting Tactics and Strategies
 
Chapter 04 Safety and Aircraft Hazards
Chapter 04  Safety and Aircraft HazardsChapter 04  Safety and Aircraft Hazards
Chapter 04 Safety and Aircraft Hazards
 
10 Phases of Fire Fighting Operation (Day 1 Part 2).pptx
10 Phases of Fire Fighting Operation (Day 1 Part 2).pptx10 Phases of Fire Fighting Operation (Day 1 Part 2).pptx
10 Phases of Fire Fighting Operation (Day 1 Part 2).pptx
 
WAYS TO IMPROVE OUR STATION-BASED ARFF TRAINING
WAYS TO IMPROVE OUR STATION-BASED ARFF TRAININGWAYS TO IMPROVE OUR STATION-BASED ARFF TRAINING
WAYS TO IMPROVE OUR STATION-BASED ARFF TRAINING
 
Techniques of search and rescue (2)
Techniques of search and rescue (2)Techniques of search and rescue (2)
Techniques of search and rescue (2)
 
Fire safety in the Workplace
Fire safety in the WorkplaceFire safety in the Workplace
Fire safety in the Workplace
 
Actions in case of fire incident
Actions in case of fire incident Actions in case of fire incident
Actions in case of fire incident
 
Chapter 05 Fire and Rescue Communications
Chapter 05 Fire and Rescue Communications Chapter 05 Fire and Rescue Communications
Chapter 05 Fire and Rescue Communications
 
Basic Fire Fighting Training
Basic Fire Fighting TrainingBasic Fire Fighting Training
Basic Fire Fighting Training
 
Chapter 16 rescue procedures 6 07
Chapter 16 rescue procedures 6 07Chapter 16 rescue procedures 6 07
Chapter 16 rescue procedures 6 07
 
HazMat Ch13
HazMat Ch13HazMat Ch13
HazMat Ch13
 
Chapter 01
Chapter 01Chapter 01
Chapter 01
 
Fire extinguisher training
Fire extinguisher trainingFire extinguisher training
Fire extinguisher training
 
Fire safety an introduction
Fire safety an introductionFire safety an introduction
Fire safety an introduction
 
Active Shooter Booklet
Active Shooter BookletActive Shooter Booklet
Active Shooter Booklet
 

Andere mochten auch

2014 electrical safety
2014 electrical safety2014 electrical safety
2014 electrical safetyAndy Mihans
 
Forcible Entry Using Irons
Forcible Entry Using IronsForcible Entry Using Irons
Forcible Entry Using Ironsguest9d6a1e
 
Buffalo Grove Fire Dept Forcible Entry PPT
Buffalo Grove Fire Dept Forcible Entry PPTBuffalo Grove Fire Dept Forcible Entry PPT
Buffalo Grove Fire Dept Forcible Entry PPTNicholas Otto
 
Scene size up and initial assessment
Scene size up and initial assessmentScene size up and initial assessment
Scene size up and initial assessmentkkirkemtp
 
Manual de nós (bombeiros 2)
Manual de nós (bombeiros 2)Manual de nós (bombeiros 2)
Manual de nós (bombeiros 2)Ismael Rosa
 
Think and grow rich - Napoleon Hill
Think and grow rich -  Napoleon HillThink and grow rich -  Napoleon Hill
Think and grow rich - Napoleon Hillpankaj thakur
 
Em today 2014 firefighter down (1)
Em today 2014   firefighter down (1)Em today 2014   firefighter down (1)
Em today 2014 firefighter down (1)mckinnec
 
Truck co tactics
Truck co tacticsTruck co tactics
Truck co tacticsAndy Mihans
 
Firefighters
FirefightersFirefighters
Firefightersmhjaping
 
Rapid interven team.dom
Rapid interven team.domRapid interven team.dom
Rapid interven team.dommdeyne
 
HFD THERMAL IMAGING
HFD THERMAL IMAGINGHFD THERMAL IMAGING
HFD THERMAL IMAGINGhfdshepard
 
Smartset Heat Map GUI
Smartset Heat Map GUISmartset Heat Map GUI
Smartset Heat Map GUIStuart Priest
 
Invest In Princeton Fd Curriculum
Invest In Princeton Fd CurriculumInvest In Princeton Fd Curriculum
Invest In Princeton Fd Curriculumjpetrakis
 
Los bomberos
Los bomberosLos bomberos
Los bomberosJNG00
 
AIE CONFINED SPACE RESCUE (2)
AIE CONFINED SPACE RESCUE (2)AIE CONFINED SPACE RESCUE (2)
AIE CONFINED SPACE RESCUE (2)Shawn Boswell
 
Presentacion ley 1346
Presentacion ley 1346Presentacion ley 1346
Presentacion ley 1346oavacca
 

Andere mochten auch (20)

2014 electrical safety
2014 electrical safety2014 electrical safety
2014 electrical safety
 
Forcible Entry Using Irons
Forcible Entry Using IronsForcible Entry Using Irons
Forcible Entry Using Irons
 
Buffalo Grove Fire Dept Forcible Entry PPT
Buffalo Grove Fire Dept Forcible Entry PPTBuffalo Grove Fire Dept Forcible Entry PPT
Buffalo Grove Fire Dept Forcible Entry PPT
 
Scene size up and initial assessment
Scene size up and initial assessmentScene size up and initial assessment
Scene size up and initial assessment
 
Solar PV fire safety
Solar PV fire safetySolar PV fire safety
Solar PV fire safety
 
Manual de nós (bombeiros 2)
Manual de nós (bombeiros 2)Manual de nós (bombeiros 2)
Manual de nós (bombeiros 2)
 
Think and grow rich - Napoleon Hill
Think and grow rich -  Napoleon HillThink and grow rich -  Napoleon Hill
Think and grow rich - Napoleon Hill
 
Chapter 07
Chapter 07Chapter 07
Chapter 07
 
Em today 2014 firefighter down (1)
Em today 2014   firefighter down (1)Em today 2014   firefighter down (1)
Em today 2014 firefighter down (1)
 
Truck co tactics
Truck co tacticsTruck co tactics
Truck co tactics
 
Firefighters
FirefightersFirefighters
Firefighters
 
Rapid interven team.dom
Rapid interven team.domRapid interven team.dom
Rapid interven team.dom
 
HFD THERMAL IMAGING
HFD THERMAL IMAGINGHFD THERMAL IMAGING
HFD THERMAL IMAGING
 
Sugarloaf engine company
Sugarloaf engine companySugarloaf engine company
Sugarloaf engine company
 
Smartset Heat Map GUI
Smartset Heat Map GUISmartset Heat Map GUI
Smartset Heat Map GUI
 
Invest In Princeton Fd Curriculum
Invest In Princeton Fd CurriculumInvest In Princeton Fd Curriculum
Invest In Princeton Fd Curriculum
 
10 Things You Need To Know About Ir Windows Iriss
10 Things You Need To Know About Ir Windows Iriss10 Things You Need To Know About Ir Windows Iriss
10 Things You Need To Know About Ir Windows Iriss
 
Los bomberos
Los bomberosLos bomberos
Los bomberos
 
AIE CONFINED SPACE RESCUE (2)
AIE CONFINED SPACE RESCUE (2)AIE CONFINED SPACE RESCUE (2)
AIE CONFINED SPACE RESCUE (2)
 
Presentacion ley 1346
Presentacion ley 1346Presentacion ley 1346
Presentacion ley 1346
 

Ähnlich wie Craig Fire RIT Training

BFS 3251, Introduction to Fire Protection 1 UNIT VII.docx
BFS 3251, Introduction to Fire Protection  1  UNIT VII.docxBFS 3251, Introduction to Fire Protection  1  UNIT VII.docx
BFS 3251, Introduction to Fire Protection 1 UNIT VII.docxhartrobert670
 
Fire Ground Operations For Ems
Fire Ground Operations For EmsFire Ground Operations For Ems
Fire Ground Operations For EmsKirke Phillips
 
UNIT VIII STUDY GUIDEEmergency OperationsReadingAssignment.docx
UNIT VIII STUDY GUIDEEmergency OperationsReadingAssignment.docxUNIT VIII STUDY GUIDEEmergency OperationsReadingAssignment.docx
UNIT VIII STUDY GUIDEEmergency OperationsReadingAssignment.docxdickonsondorris
 
Chapter 14
Chapter 14Chapter 14
Chapter 14Joe
 
Professionals - Wildfires - Response part 2
Professionals - Wildfires - Response part 2Professionals - Wildfires - Response part 2
Professionals - Wildfires - Response part 2NCC-CCT
 
Internal Disaster Preparedness and Management in Hospitals
Internal Disaster Preparedness and Management in HospitalsInternal Disaster Preparedness and Management in Hospitals
Internal Disaster Preparedness and Management in HospitalsLallu Joseph
 
Volunteer Fire Brigade Training Module 5 rescue and emergency medical operations
Volunteer Fire Brigade Training Module 5 rescue and emergency medical operationsVolunteer Fire Brigade Training Module 5 rescue and emergency medical operations
Volunteer Fire Brigade Training Module 5 rescue and emergency medical operationsRonaldo Pioquinto
 
Professionals - Wildfires - Preparedness part 2
Professionals - Wildfires - Preparedness part 2Professionals - Wildfires - Preparedness part 2
Professionals - Wildfires - Preparedness part 2NCC-CCT
 
Professionals - Wildfires - Response part 3
Professionals - Wildfires - Response part 3Professionals - Wildfires - Response part 3
Professionals - Wildfires - Response part 3NCC-CCT
 
Emergency organization in underground coal mine with indian case studies IITB...
Emergency organization in underground coal mine with indian case studies IITB...Emergency organization in underground coal mine with indian case studies IITB...
Emergency organization in underground coal mine with indian case studies IITB...NITESH SHAH STUDENT AT IITBHU
 
Fire Fighting Duties
Fire Fighting DutiesFire Fighting Duties
Fire Fighting DutiesRenard Pierre
 
Professionals - Wildfires - Response part 1
Professionals - Wildfires - Response part 1Professionals - Wildfires - Response part 1
Professionals - Wildfires - Response part 1NCC-CCT
 

Ähnlich wie Craig Fire RIT Training (20)

BFS 3251, Introduction to Fire Protection 1 UNIT VII.docx
BFS 3251, Introduction to Fire Protection  1  UNIT VII.docxBFS 3251, Introduction to Fire Protection  1  UNIT VII.docx
BFS 3251, Introduction to Fire Protection 1 UNIT VII.docx
 
Fire Ground Operations For Ems
Fire Ground Operations For EmsFire Ground Operations For Ems
Fire Ground Operations For Ems
 
UNIT VIII STUDY GUIDEEmergency OperationsReadingAssignment.docx
UNIT VIII STUDY GUIDEEmergency OperationsReadingAssignment.docxUNIT VIII STUDY GUIDEEmergency OperationsReadingAssignment.docx
UNIT VIII STUDY GUIDEEmergency OperationsReadingAssignment.docx
 
TRNGUIDE10-4.pdf
TRNGUIDE10-4.pdfTRNGUIDE10-4.pdf
TRNGUIDE10-4.pdf
 
Chapter 14
Chapter 14Chapter 14
Chapter 14
 
Professionals - Wildfires - Response part 2
Professionals - Wildfires - Response part 2Professionals - Wildfires - Response part 2
Professionals - Wildfires - Response part 2
 
Chapter 14
Chapter 14Chapter 14
Chapter 14
 
Internal Disaster Preparedness and Management in Hospitals
Internal Disaster Preparedness and Management in HospitalsInternal Disaster Preparedness and Management in Hospitals
Internal Disaster Preparedness and Management in Hospitals
 
Volunteer Fire Brigade Training Module 5 rescue and emergency medical operations
Volunteer Fire Brigade Training Module 5 rescue and emergency medical operationsVolunteer Fire Brigade Training Module 5 rescue and emergency medical operations
Volunteer Fire Brigade Training Module 5 rescue and emergency medical operations
 
Emergency Preparedness 01.docx
Emergency Preparedness 01.docxEmergency Preparedness 01.docx
Emergency Preparedness 01.docx
 
RUI ERP Workshop.pptx
RUI ERP Workshop.pptxRUI ERP Workshop.pptx
RUI ERP Workshop.pptx
 
Disaster management
Disaster managementDisaster management
Disaster management
 
Professionals - Wildfires - Preparedness part 2
Professionals - Wildfires - Preparedness part 2Professionals - Wildfires - Preparedness part 2
Professionals - Wildfires - Preparedness part 2
 
Professionals - Wildfires - Response part 3
Professionals - Wildfires - Response part 3Professionals - Wildfires - Response part 3
Professionals - Wildfires - Response part 3
 
Emergency organization in underground coal mine with indian case studies IITB...
Emergency organization in underground coal mine with indian case studies IITB...Emergency organization in underground coal mine with indian case studies IITB...
Emergency organization in underground coal mine with indian case studies IITB...
 
Fire Fighting Duties
Fire Fighting DutiesFire Fighting Duties
Fire Fighting Duties
 
Command systems
Command systemsCommand systems
Command systems
 
Professionals - Wildfires - Response part 1
Professionals - Wildfires - Response part 1Professionals - Wildfires - Response part 1
Professionals - Wildfires - Response part 1
 
FEMA Balanced Fire Protection Brochure
FEMA Balanced Fire Protection BrochureFEMA Balanced Fire Protection Brochure
FEMA Balanced Fire Protection Brochure
 
Emergency precaution 01
Emergency precaution 01Emergency precaution 01
Emergency precaution 01
 

Mehr von Grand Futures Prevention Coalition (6)

2011 recruit orientation
2011 recruit orientation2011 recruit orientation
2011 recruit orientation
 
Metering and co old
Metering and co oldMetering and co old
Metering and co old
 
Metering and co
Metering and coMetering and co
Metering and co
 
Grand Futures Wkshop 1 Results
Grand Futures   Wkshop 1 ResultsGrand Futures   Wkshop 1 Results
Grand Futures Wkshop 1 Results
 
Sho Workshop
Sho WorkshopSho Workshop
Sho Workshop
 
Data 2 Action(Final)
Data   2    Action(Final)Data   2    Action(Final)
Data 2 Action(Final)
 

Kürzlich hochgeladen

Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 

Kürzlich hochgeladen (20)

Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 

Craig Fire RIT Training

  • 2. WHY DO WE NEEDRAPID INTERVENTION TEAMS?
  • 4. OSHA 29 CFR 1910.134 IF FIREFIGHTERS MUST ENTER AN AREA THAT IS IMMEDIATLEY DANGEROUS TO LIFE AND HEALTH (IDLH) THAT TWO MEMBERS SHOULD ENTER TOGETHER AND REMAIN IN VISUAL OR VOICE CONTACT WITH ONE ANOTHER AT ALL TIMES. RADIO CONTACT ONLY HAS BEEN DEEMED UNACCEPTABLE DUE TO THE POSSIBILITY OF RADIO FAILURE AND POSSIBLE CHANCE OF INABILITY TO OPERATE THE RADIO BY THE AFFECTED FIREFIGHTER IN AN EXTREME SITUATION.
  • 5. 1021 1001 1401 1500 NFPA 1407 1720 1983 1561 1710 1981 Standard for Training Fire Service Rapid Intervention Crews
  • 6. RIT STUDY FINDINGS Average rescue personnel 12 Average time 12 minutes It took an average of eight to nine minutes to reach the downed firefighter from The time of the Mayday. Average time to find, package and secure an air supply and remove firefighter was 22 minutes. An average of 12 firefighters to rescue each downed firefighter, while one in five of the rescuers experienced a Mayday of their own. Times obtained were not under heat and smoke conditions. An involved, lengthy extrication process was not required for the Downed firefighter.
  • 7. RIT / FIREGROUND SURVIVAL
  • 8. Definition Mayday as defined by Webster's Dictionary: an international radio-telephone signal word used as a distress call. It derives from the French m'aider, meaning "come help me". The mere phrase “Mayday” has forever changed the careers and lives of many dedicated fire service professionals & became is the reason behind RIT.
  • 9. Firefighter Distress Signal Initiation or transmission of a firefighter distress signal produces more stress and potential chaos than any other single type of incident we may encounter throughout our careers. As firefighters, fire officers and trainers, we must develop a standard plan of action that allow us to properly manage and overcome these chaotic and stressful events.
  • 10. IS RIT THE SOLUTION?
  • 11. Preparing & Planning for a “MAYDAY” call Preplanning structures in your district can empower command with much needed information in a Mayday / RIT situation Proper risk management coupled with a structured firefighter survival program enables today’s firefighters to understand the associated risks they are to encounter. Properly trained firefighters who are trained and disciplined in RIT tactics and skills.
  • 12. Pre-fire planning / Pre-fire Analysis Case studies have shown that the success or failure of any “Mayday” incident is a direct result of effective ICS and pre-fire planning. The best preparatory effort given to the fireground commander is the pre-plan or the pre-fire analysis. What are a few “firefighter killers” in our district?
  • 13. Frank Brannigan Frank Brannigan once stated, “There is no substitute for the fire department developing a system of accumulating and organizing information for retrieval at the time of the fire”.
  • 14. Five Pre-fire Indicators : Potential “Mayday” incident and/or compromised fireground operations: Weight - excessive weight in the overhead should be of immediate concern to the IC when deciding to deploy additional firefighters during a rescue effort. This may include: HVAC units, large billboards, storage tanks, etc. Fuel Loads - Excessive fuel loads (flammable or combustible) are an indication of potential rapid-fire spread which may lead to firefighters being trapped or overcome during initial firefighting. Building History – Previous fires, structural collapses, renovations (known & unknown) to the IC may lead to the entrapment of firefighters.
  • 15. Pre-fire Indicators (con’t) Deterioration– A factor to the fireground continues to be vacant buildings or buildings in ill repair. As firefighters we’re taught early on that all buildings are occupied until proven otherwise. Pre-fire planning should enable the IC which buildings require absolute defensive operations to support firefighter safety and survival. Support Systems / Truss Construction – Examples of firefighter fatalities have been shared with the fire service for years. Bowstring and light weight truss construction must be of utmost importance to the IC.
  • 16. Truss Collapse Being under a burning truss , is like playing Russian Roulette with a loaded revolver. (Most notable bowstring truss collapse is the Hackensack, NJ fire which killed several firefighters). As fireground commanders begin to consider deploying RIT teams for rescue efforts, careful consideration must be given to the potential of truss collapse, which could further complicate if not compound the rescue efforts. (This should also be considered before deploying interior attack teams).
  • 17. Firefighter Survival Training Firefighters who have been properly trained in self-survival skills can greatly enhance the possibility of a successful RIT team rescue. Standardized, predictable actions of a trapped, lost or disoriented firefighter will enable rescuers to locate and remove the firefighter in a more timely and effective manner.
  • 18. 10 Standardized Actions for Lost and Disoriented Firefighters Initiate an emergency “Mayday” / Activate Emergency Distress Button. Stay “calm” and preserve your air supply. Activate P.A.S.S.
  • 19. 10 Standardized Actions for Lost and Disoriented Firefighters (cont.) Provide a situation / problem report. If trapped or disoriented as a crew, it’s imperative to “stay together”. Search for an exit – look for light. Attempt to follow a hose line or life line to safety.
  • 20. 10 Standardized Actions for Lost and Disoriented Firefighters (cont.) Retreat to an area of safety. Assume a horizontal position (if possible) to enhance the audible signal of your P.A.S.S. and enhance thermal protection. Use your flashlight as a beacon device and attempt to making tapping noises using tools or other objects.
  • 21. Fireground Preparations: Proactive fireground preparations for survival cannot be over stated! Proactive ladders - provide secondary means of egress and serves as an immediate access point for RIT members Scene lighting at entry point or all 4 sides if possible – provides enhanced firefighter accountability and directional orientation for lost or disoriented firefighters. Back-up / Safety lines – provides an additional line of support in case of rapid-fire development.
  • 22. Discipline / Enforcement Strict discipline and strong enforcement enable fireground commanders to adequately account for and assign the necessary crews to complete the task without the fear of freelancing or contradictory actions. RIT – In the event of a Mayday incident, physical and mental limitations will be taxed to the limit, rescuers must be forced to follow rules of personal safety at all times. Teams that fail to follow the directions of the IC and their respective RIT Officer will most likely become victims themselves.
  • 23. Discipline / Enforcement (con’t): Suppression Personnel – Personnel assigned to fire attack / suppression operations must overcome the desire to get involved. Previously assigned fire attack/suppression crews must maintain their position in order to limit the threat of flame impingement on the trapped or disoriented firefigter(s). A trapped or disoriented firefighter has two factors working against them: 1) limited air supply and 2) flame impingement barring the fact that direct physical trauma is not involved.
  • 24. Tragic Training Memories: Firefighters in Boulder (CO) and around the nation are remembering one of its worst days when two of their own died during a training exercise. On January 26, 1982, Fire Engineer Bill Duran and FF Scott Smith died when the fire flashed and ran through the abandoned garage where the live fire training was held.
  • 25. Tragic Training Memories (con’t) The flashover also forced surviving FF Dan Cutler through a wall...ending up with burns over 60 %. Hearings were held to figure out what caused the deaths and found there were still combustible ceiling tiles in the building. There were also no water supply established, no back-up engine companies for the training and firefighters did not do a walk thru to find the exits....amongst other problems. This tragic LODD was "the final straw" for the creation of NFPA 1403, “Standard for Live Fire Training”.
  • 26. Critical Factors Personnel Safety – as rescue efforts begin, adrenalin often times overruns our ability to think clearly which may inevitably lead to rescuer injuries which further complicates the rescue operation. “Be a part of the solution and not a part of the problem”. Communication – The IC must maintain constant communication with RIT team(s) throughout the incident.
  • 27. Deployment of the RIT RIT should be deployed only after a quick briefing of known facts from the IC. By adequately identifying the last known location, number of personnel involved and the possible cause of deployment of RIT, personnel can properly prepare themselves for assignment and ensure proper equipment is deployed.
  • 28. 3 Things the to consider when deploying RIT personnel Initial RIT (Reconnaissance Team) Locate the downed, trapped member(s) Establish a tractable means of access to the victim(s) Determine additional needs (air, water, fans, extrication, thermal imaging cameras, etc.) Suggested team size: 2 firefighters, 1 officer
  • 29. Deploying RIT personnel (con’t) Secondary RIT (Stabilization/Removal Team) Provide equipment and personnel as requested by the Recon Team Begin extrication process, clear debris for rapid egress Suggested team size: 2-4 firefighters
  • 30. Deploying RIT personnel (con’t) Third and subsequent RIT (Support Team(s) Provide external support as requested by initial teams Provide personnel to relieve initial teams
  • 31. Termination of Rescue Efforts Although no firefighter, fire officer or IC ever wants to terminate a rescue effort, firefighter safety “must” remain the top priority. As unfortunate as it may be, the IC must terminate the rescue efforts when conditions begin to jeopardize the safety of those involved. No decision, order or assignment ever given by an IC during their career will ever bare equal weight. It’s decisions of this nature that will ultimately decide the number of members lost or injured.
  • 32. Summarizing a “MAYDAY” Incident PAR – upon immediate distress signal, call for a PAR of on-scene units. Initiate RIT Operations – utilizing a technique that is expedious. Hazard Assessment – Upon locating downed firefighter(s), RIT personnel must quickly perform a hazard assessment to ensure their own safety.
  • 33. Summary (con’t) Identify victim needs – air supply, fire impingement, extrication needs, etc. Initiate victim removal (if possible) – an initial progress report of findings and/or actions should be relayed to the IC. Provide medical care – upon removal from the hazard area, on-scene EMS personnel should provide immediate care / transport.
  • 34. Summary (con’t) PAR – once victim(s) have been extracted from hazard area, another PAR should be given by all on-scene companies. Post-incident analysis / debriefing – following all RIT deployments a formal post-incident analysis should be conducted to review, revise and update existing procedures.
  • 35. Conclusion Assume the worst and prepare for the worst. By doing this we enable yourself to overcome anything less than the worst with positive results. Preparing for anything less will put you in a reactionary or catch-up mode during a high stress, high emotional incident in which the lives of fellow firefighters lie in the balance. Are there any questions?

Hinweis der Redaktion

  1. All of what we are discussing today is the result of a LODD. It is Important to honor those who have lost lives in the fire service by learning from mistakes made and ensuring we are better prepared for the future. MAYDAY MAYDAY MAYDAY…..will bring a since of uneasiness and urgency. Comes from knowing one of our own is in trouble.
  2. 100 firefighters lost each year.
  3. 2009 but lets get beyond the technical and into what RIT is designed for.
  4. RIT is only a piece of the puzzle . Why? Study at Arizona State University and the pheonixfd following Bret Tarver incident findings. Consisted of 200 RIT drills, held in buildings between 5,000 to 7,000 sq ft.A hoseline extended into the structure 150 feet with two firefighters off the line 40 feet.
  5. Frank Brannigan was the author of Building Construction for the Fire Service which was in its third edition when he died. The fourth edition had been completed before his death and was published posthumously. Brannigan is primarily recognized for his efforts to increase firefighter safety through education on the dangers of building collapse.
  6. Car Dealership wood bow string construction collapsed killed 5