SlideShare a Scribd company logo
1 of 8
Coursework Guidance
Info 4
Mark allocation in GOLD
Evaluation of the Implemented Solution (7)
• Critical Evaluation (2)
• User Requirements (2)
• Personal Performance (3)
Critical Evaluation (2)
A critical evaluation of the solution e.g.
-does it work well?
-what are it’s strengths and weaknesses?
-does it achieve what you set out to do.
Critical Evaluation (2)
1. The candidate has evaluated the
implemented solution.
2. The candidate has critically evaluated
the implemented solution identifying
strengths and weaknesses and areas
for improvement.
User Requirements (2)
The system needs to be critically evaluated
against the evaluation criteria of the user
requirements. The tests should have been
carried out in the testing section so it is here
you explain the success of your solution to the
original problem. Paste the requirements here
and justify the solutions success under each
one. (actually reference the relevant testing
pages etc.)
User Requirements (2)
1. The candidate has critically evaluated
the implemented solution against the
evaluation criteria or the requirements
of the client.
2. The candidate has critically evaluated
the implemented solution against the
evaluation criteria and the
requirements of the client.
Personal Performance (3)
This should identify the strengths and
weaknesses in your approach to this
project.
Were your methods suitable? How
would you improve your performance in
a similar project in the future?
Personal Performance (3)
1. The candidate has evaluated their own
performance in producing the solution.
2. The candidate has identified strengths and
weaknesses in the approach they have
taken in producing the solution.
3. The candidate has identified strengths and
weaknesses in the approach they have
taken and has identified how they would
improve their performance on a similar
project in the future.

More Related Content

What's hot

Chapter no 5 understanding requirements
Chapter no 5 understanding requirementsChapter no 5 understanding requirements
Chapter no 5 understanding requirements
naveed428
 

What's hot (17)

Mi0033 – software engineering
Mi0033 – software engineeringMi0033 – software engineering
Mi0033 – software engineering
 
Requirements engineering@mahmud@
Requirements engineering@mahmud@Requirements engineering@mahmud@
Requirements engineering@mahmud@
 
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)Fundamental test process (TESTING IMPLEMENTATION SYSTEM)
Fundamental test process (TESTING IMPLEMENTATION SYSTEM)
 
TESTING IMPLEMENTATION SYSTEM
TESTING IMPLEMENTATION SYSTEMTESTING IMPLEMENTATION SYSTEM
TESTING IMPLEMENTATION SYSTEM
 
Exam quistions
Exam quistionsExam quistions
Exam quistions
 
Product reliability and design process
Product reliability and design processProduct reliability and design process
Product reliability and design process
 
Assessment Survey From Assets55
Assessment Survey From Assets55Assessment Survey From Assets55
Assessment Survey From Assets55
 
Comparative Analysis of Model Based Testing and Formal Based Testing - A Review
Comparative Analysis of Model Based Testing and Formal Based Testing - A ReviewComparative Analysis of Model Based Testing and Formal Based Testing - A Review
Comparative Analysis of Model Based Testing and Formal Based Testing - A Review
 
Crud and jad
Crud and jadCrud and jad
Crud and jad
 
Mi0033 software engineering
Mi0033   software engineeringMi0033   software engineering
Mi0033 software engineering
 
Requirement Management 1
Requirement Management 1Requirement Management 1
Requirement Management 1
 
Chapter no 5 understanding requirements
Chapter no 5 understanding requirementsChapter no 5 understanding requirements
Chapter no 5 understanding requirements
 
Testing Throughout the Software Life Cycle - Section 2
Testing Throughout the Software Life Cycle - Section 2Testing Throughout the Software Life Cycle - Section 2
Testing Throughout the Software Life Cycle - Section 2
 
Software Testing Introduction
Software Testing IntroductionSoftware Testing Introduction
Software Testing Introduction
 
Hema se
Hema seHema se
Hema se
 
Tqm product reliability
Tqm   product reliabilityTqm   product reliability
Tqm product reliability
 
Prvt file test
Prvt file testPrvt file test
Prvt file test
 

Similar to 5 evaluation of the implemented solution

5 evaluation of the implemented solution
5 evaluation of the implemented solution5 evaluation of the implemented solution
5 evaluation of the implemented solution
gpiper
 
Unit8 Engineering DesignModule BriefGrading C.docx
Unit8 Engineering DesignModule BriefGrading C.docxUnit8 Engineering DesignModule BriefGrading C.docx
Unit8 Engineering DesignModule BriefGrading C.docx
dickonsondorris
 
WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...
WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...
WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...
madhurpatidar2
 
Qm0013 quality management tools
Qm0013   quality management toolsQm0013   quality management tools
Qm0013 quality management tools
smumbahelp
 

Similar to 5 evaluation of the implemented solution (20)

5 evaluation of the implemented solution
5 evaluation of the implemented solution5 evaluation of the implemented solution
5 evaluation of the implemented solution
 
EDAR Training Fall 2015
EDAR Training Fall 2015EDAR Training Fall 2015
EDAR Training Fall 2015
 
Unit4 reverse engineering
Unit4 reverse engineeringUnit4 reverse engineering
Unit4 reverse engineering
 
chapter 7.ppt
chapter 7.pptchapter 7.ppt
chapter 7.ppt
 
SPM 5 - Release Planning
SPM 5 - Release PlanningSPM 5 - Release Planning
SPM 5 - Release Planning
 
Unit8 Engineering DesignModule BriefGrading C.docx
Unit8 Engineering DesignModule BriefGrading C.docxUnit8 Engineering DesignModule BriefGrading C.docx
Unit8 Engineering DesignModule BriefGrading C.docx
 
Quality functional deployment
Quality functional deploymentQuality functional deployment
Quality functional deployment
 
BABOK v3 讀書會 CH7 20150611
BABOK v3 讀書會 CH7 20150611BABOK v3 讀書會 CH7 20150611
BABOK v3 讀書會 CH7 20150611
 
Quality Function Deployment (QFD) Seminar Presentation
Quality Function Deployment (QFD) Seminar PresentationQuality Function Deployment (QFD) Seminar Presentation
Quality Function Deployment (QFD) Seminar Presentation
 
BABOK v3 讀書會 CH8 20150618
BABOK v3 讀書會 CH8 20150618BABOK v3 讀書會 CH8 20150618
BABOK v3 讀書會 CH8 20150618
 
Tools and Techniques of Quality Planning
Tools and Techniques of Quality PlanningTools and Techniques of Quality Planning
Tools and Techniques of Quality Planning
 
Business Analysis Core Standard Knowledge Areas
Business Analysis Core Standard Knowledge AreasBusiness Analysis Core Standard Knowledge Areas
Business Analysis Core Standard Knowledge Areas
 
Ch 3 -continued.pptx
Ch 3 -continued.pptxCh 3 -continued.pptx
Ch 3 -continued.pptx
 
WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...
WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...
WINSEM2021-22_ITE2004_ETH_VL2021220500452_Reference_Material_I_03-01-2022_Sof...
 
Engineering Processes-CMMI
Engineering Processes-CMMIEngineering Processes-CMMI
Engineering Processes-CMMI
 
Task 1 evaluate a product
Task 1 evaluate a productTask 1 evaluate a product
Task 1 evaluate a product
 
Business Requirements development
Business Requirements development Business Requirements development
Business Requirements development
 
Business Analyst Overview
Business Analyst OverviewBusiness Analyst Overview
Business Analyst Overview
 
Qm0013 quality management tools
Qm0013   quality management toolsQm0013   quality management tools
Qm0013 quality management tools
 
Kano Analysis and Software Requrements
Kano Analysis and Software RequrementsKano Analysis and Software Requrements
Kano Analysis and Software Requrements
 

5 evaluation of the implemented solution

  • 1. Coursework Guidance Info 4 Mark allocation in GOLD
  • 2. Evaluation of the Implemented Solution (7) • Critical Evaluation (2) • User Requirements (2) • Personal Performance (3)
  • 3. Critical Evaluation (2) A critical evaluation of the solution e.g. -does it work well? -what are it’s strengths and weaknesses? -does it achieve what you set out to do.
  • 4. Critical Evaluation (2) 1. The candidate has evaluated the implemented solution. 2. The candidate has critically evaluated the implemented solution identifying strengths and weaknesses and areas for improvement.
  • 5. User Requirements (2) The system needs to be critically evaluated against the evaluation criteria of the user requirements. The tests should have been carried out in the testing section so it is here you explain the success of your solution to the original problem. Paste the requirements here and justify the solutions success under each one. (actually reference the relevant testing pages etc.)
  • 6. User Requirements (2) 1. The candidate has critically evaluated the implemented solution against the evaluation criteria or the requirements of the client. 2. The candidate has critically evaluated the implemented solution against the evaluation criteria and the requirements of the client.
  • 7. Personal Performance (3) This should identify the strengths and weaknesses in your approach to this project. Were your methods suitable? How would you improve your performance in a similar project in the future?
  • 8. Personal Performance (3) 1. The candidate has evaluated their own performance in producing the solution. 2. The candidate has identified strengths and weaknesses in the approach they have taken in producing the solution. 3. The candidate has identified strengths and weaknesses in the approach they have taken and has identified how they would improve their performance on a similar project in the future.