SlideShare a Scribd company logo
1 of 5
Download to read offline
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY, ANANTAPUR
ANANTAPUR - 515002 (A.P.) INDIA
EXAMINATION BRANCH
B Tech II Year I Semester (R07) Supplementary Examinations - May 2013 Results
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
ASHOK KUMAR G07F61A0206
R7210206 ELECTRICAL MACHINES ‐ I 10 AB 10 F 0
R7210203 PULSE & DIGITAL CIRCUITS 9 31 40 P 4
R7210201 MATHEMATICS ‐ III 14 AB 14 F 0
R7210205 ELECTROMAGNETIC FIELDS 9 AB 9 F 0
R7210208 ELECTRICAL CIRCUITS AND SIMULATION LAB 17 39 56 P 2
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 15 32 47 P 4
BHANUPRAVEENREDDY AVULA07F61A0209
R7210203 PULSE & DIGITAL CIRCUITS 7 AB 7 F 0
R7210206 ELECTRICAL MACHINES ‐ I ‐1 AB 0 F 0
CHIRANJEEVI KOTAPATI07F61A0218
R7210201 MATHEMATICS ‐ III 3 20 23 F 0
R7210206 ELECTRICAL MACHINES ‐ I 5 14 19 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 14 14 28 F 0
ELAGANURU DHANANJAYULU07F61A0219
R7210201 MATHEMATICS ‐ III 8 AB 8 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 11 29 40 P 4
S GOPINATH07F61A0223
R7210203 PULSE & DIGITAL CIRCUITS 3 AB 3 F 0
R7210206 ELECTRICAL MACHINES ‐ I 3 AB 3 F 0
R7210204 SWITCHING THEORY & LOGIC DESIGN 4 AB 4 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 AB 7 F 0
R7210201 MATHEMATICS ‐ III 2 AB 2 F 0
R7210205 ELECTROMAGNETIC FIELDS 5 AB 5 F 0
GOWTHAMKUMAR P07F61A0226
R7210206 ELECTRICAL MACHINES ‐ I 8 AB 8 F 0
R7210201 MATHEMATICS ‐ III 7 AB 7 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 8 AB 8 F 0
MAHESH BABU S07F61A0256
R7210205 ELECTROMAGNETIC FIELDS 9 8 17 F 0
R7210206 ELECTRICAL MACHINES ‐ I 8 9 17 F 0
Page 1 of 5
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 10, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
R7210203 PULSE & DIGITAL CIRCUITS 5 13 18 F 0
V R MAHESH07F61A0258
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 12 28 40 P 4
R7210205 ELECTROMAGNETIC FIELDS 6 4 10 F 0
NARESH KEERTHIPATI07F61A0268
R7210201 MATHEMATICS ‐ III 8 AB 8 F 0
R7210205 ELECTROMAGNETIC FIELDS 5 AB 5 F 0
R7210206 ELECTRICAL MACHINES ‐ I 8 18 26 F 0
R7210203 PULSE & DIGITAL CIRCUITS 4 5 9 F 0
NAVAKANTH G S07F61A0271
R7210205 ELECTROMAGNETIC FIELDS 5 3 8 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 13 20 F 0
R7210201 MATHEMATICS ‐ III 1 2 3 F 0
R7210206 ELECTRICAL MACHINES ‐ I 5 4 9 F 0
NAVEEN KUMAR G07F61A0272
R7210204 SWITCHING THEORY & LOGIC DESIGN 9 7 16 F 0
R7210206 ELECTRICAL MACHINES ‐ I 3 37 40 P 4
R7210205 ELECTROMAGNETIC FIELDS 3 25 28 F 0
R7210203 PULSE & DIGITAL CIRCUITS 4 28 32 F 0
NANDIPATI RAVITEJA07F61A0285
R7210203 PULSE & DIGITAL CIRCUITS 7 0 7 F 0
R7210205 ELECTROMAGNETIC FIELDS 6 AB 6 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 1 8 F 0
REDDYBHASKAR D07F61A0286
R7210201 MATHEMATICS ‐ III 7 AB 7 F 0
R7210203 PULSE & DIGITAL CIRCUITS 10 4 14 F 0
R7210205 ELECTROMAGNETIC FIELDS 5 7 12 F 0
S SAMEER07F61A0292
R7210201 MATHEMATICS ‐ III 7 AB 7 F 0
R7210204 SWITCHING THEORY & LOGIC DESIGN 12 AB 12 F 0
R7210206 ELECTRICAL MACHINES ‐ I 7 AB 7 F 0
SANDEEP KUMAR B07F61A0293
R7210201 MATHEMATICS ‐ III 6 AB 6 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 10 AB 10 F 0
GANGAPATNAM SIVAKUMAR07F61A02A1
R7210205 ELECTROMAGNETIC FIELDS 5 AB 5 F 0
R7210201 MATHEMATICS ‐ III 4 AB 4 F 0
S SUNIL KUMAR07F61A02A7
Page 2 of 5
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 10, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
R7210201 MATHEMATICS ‐ III 5 9 14 F 0
R7210205 ELECTROMAGNETIC FIELDS 11 29 40 P 4
SURESH N07F61A02A8
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 11 20 31 F 0
R7210203 PULSE & DIGITAL CIRCUITS 2 14 16 F 0
R7210204 SWITCHING THEORY & LOGIC DESIGN 13 7 20 F 0
R7210205 ELECTROMAGNETIC FIELDS 6 12 18 F 0
R7210206 ELECTRICAL MACHINES ‐ I 4 3 7 F 0
R7210201 MATHEMATICS ‐ III 3 AB 3 F 0
G VEENADHARI07F61A02B8
R7210204 SWITCHING THEORY & LOGIC DESIGN 12 AB 12 F 0
RAGHAVARAJU BHANU07F61A0304
R7210304 MECHANICS OF SOLIDS 7 17 24 F 0
V TEJESH07F61A0328
R7210302 OBJECT ORIENTED PROGRAMMING 10 35 45 P 4
R7210304 MECHANICS OF SOLIDS 2 16 18 F 0
MUTHYALA KUMAR07F61A0444
R7210201 MATHEMATICS ‐ III 9 1 10 F 0
M MOHAN KRISHNA07F61A0456
R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 6 8 14 F 0
V NAVEEN07F61A0578
R7210501 PROBABILITY & STATISTICS 10 16 26 F 0
R7210505 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 11 30 41 P 4
R7210506 UNIX & SHELL PROGRAMMING 3 AB 3 F 0
KARAVATI RAVI07F61A0597
R7210506 UNIX & SHELL PROGRAMMING 4 36 40 P 4
P ROOPESH KUMAR07F61A05A1
R7210501 PROBABILITY & STATISTICS 8 AB 8 F 0
N SHANMUKHA SREENIVAS07F61A05A7
R7210506 UNIX & SHELL PROGRAMMING 7 AB 7 F 0
SRIHARI SARAKOLLU07F61A05B2
R7210502 MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE ‐1 AB 0 F 0
SRIPATHI K07F61A05B5
R7210501 PROBABILITY & STATISTICS 6 AB 6 F 0
R7210503 ADVANCED DATA STRUCTURES 9 3 12 F 0
P M PREETHI07F61A1220
R7210501 PROBABILITY & STATISTICS 8 5 13 F 0
R7210502 MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE 9 5 14 F 0
KANALA SIVASANKAR08F61A0148
Page 3 of 5
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 10, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
R7210101 MATHEMATICS ‐ II 13 AB 13 F 0
NOOKALA TEJESWAR08F61A0155
R7210101 MATHEMATICS ‐ II 12 14 26 F 0
R7210106 FLUID MECHANICS 17 14 31 F 0
R7210105 SURVEYING 17 28 45 P 4
P S V PRASAD08F61A0242
R7210201 MATHEMATICS ‐ III 15 AB 15 F 0
R7210205 ELECTROMAGNETIC FIELDS 13 38 51 P 4
C VINODHKUMAR08F61A0272
R7210204 SWITCHING THEORY & LOGIC DESIGN 15 AB 15 F 0
R7210201 MATHEMATICS ‐ III 17 AB 17 F 0
R7210206 ELECTRICAL MACHINES ‐ I 13 AB 13 F 0
K VISHNU08F61A0273
R7210205 ELECTROMAGNETIC FIELDS 9 AB 9 F 0
R7210204 SWITCHING THEORY & LOGIC DESIGN 12 AB 12 F 0
R7210206 ELECTRICAL MACHINES ‐ I 11 AB 11 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 14 AB 14 F 0
R7210201 MATHEMATICS ‐ III 13 0 13 F 0
LAKAKULA BHARATHDEEP08F61A0304
R7210301 PRODUCTION TECHNOLOGY 9 AB 9 F 0
R7210102 ELECTRICAL & ELECTRONICS ENGINEERING 11 AB 11 F 0
V CHANDRA SEKHAR08F61A0422
R7210201 MATHEMATICS ‐ III 13 AB 13 F 0
R7210406 ELECTRONIC CIRCUIT ANALYSIS 17 AB 17 F 0
R7210405 ELECTRICAL TECHNOLOGY 19 AB 19 F 0
KOTAPATI HARISH08F61A0436
R7210201 MATHEMATICS ‐ III 7 AB 7 F 0
R7210406 ELECTRONIC CIRCUIT ANALYSIS 11 AB 11 F 0
R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 12 AB 12 F 0
R7210404 SIGNALS & SYSTEMS 13 AB 13 F 0
PALAKALA RAGHAVENDRA08F61A0486
R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 12 20 32 F 0
K RANGANATHAN08F61A0586
R7210504 DIGITAL LOGIC DESIGN 14 30 44 P 4
R7210501 PROBABILITY & STATISTICS 7 14 21 F 0
R7210503 ADVANCED DATA STRUCTURES 10 32 42 P 4
M REDDY SEKHAR08F61A0588
R7210501 PROBABILITY & STATISTICS 9 2 11 F 0
SAMPATHI S HEMANTH KUMAR08F61A1212
Page 4 of 5
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 10, 2013
SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS
R7210502 MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE 12 AB 12 F 0
M RADHA SWAMY08F65A0207
R7210206 ELECTRICAL MACHINES ‐ I 7 33 40 P 4
R7210204 SWITCHING THEORY & LOGIC DESIGN 8 AB 8 F 0
R7210203 PULSE & DIGITAL CIRCUITS 5 16 21 F 0
R7210205 ELECTROMAGNETIC FIELDS 4 4 8 F 0
R7210201 MATHEMATICS ‐ III 3 AB 3 F 0
R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 16 23 F 0
MANOJ KUMAR V09F65A0103
R7210103 STRENGTH OF MATERIALS ‐ I 10 AB 10 F 0
R7210101 MATHEMATICS ‐ II 10 AB 10 F 0
B VINOD KUMAR09F65A0412
R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 10 17 27 F 0
R7210201 MATHEMATICS ‐ III 14 3 17 F 0
R7210404 SIGNALS & SYSTEMS 8 10 18 F 0
Page 5 of 5
CONTROLLER OF EXAMINATIONS 
Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two 
weeks from the above date
Saturday, August 10, 2013

More Related Content

What's hot

B.tech i year (r07) supple results nov 2012
B.tech i year (r07) supple results nov 2012B.tech i year (r07) supple results nov 2012
B.tech i year (r07) supple results nov 2012VARIGONDA GOPI
 
III B.TECH. I SEM (R05) SUPPLE. MAY 2013
III B.TECH. I SEM (R05) SUPPLE. MAY 2013III B.TECH. I SEM (R05) SUPPLE. MAY 2013
III B.TECH. I SEM (R05) SUPPLE. MAY 2013P.G.GOPI NATH
 
B.tech ii year ii sem (r07) supple results nov 2012
B.tech ii year ii sem (r07) supple results nov 2012B.tech ii year ii sem (r07) supple results nov 2012
B.tech ii year ii sem (r07) supple results nov 2012VARIGONDA GOPI
 
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013P.G.GOPI NATH
 
Iv b.tech i semester (r09) supplementary may 2013 results
Iv b.tech i semester (r09) supplementary may 2013 resultsIv b.tech i semester (r09) supplementary may 2013 results
Iv b.tech i semester (r09) supplementary may 2013 resultsVARIGONDA GOPI
 
III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013P.G.GOPI NATH
 
I year m.tech i sem apr 2013 results
I year m.tech i sem apr 2013 resultsI year m.tech i sem apr 2013 results
I year m.tech i sem apr 2013 resultsVARIGONDA GOPI
 
Iv b.tech. ii sem (r07) supple april 2013
Iv b.tech. ii sem (r07) supple april 2013Iv b.tech. ii sem (r07) supple april 2013
Iv b.tech. ii sem (r07) supple april 2013P.G.GOPI NATH
 
I year r05 results.pdf
I year r05 results.pdfI year r05 results.pdf
I year r05 results.pdfP.G.GOPI NATH
 
I B.Tech R07 supple june 2014 exam results
I B.Tech R07 supple june 2014 exam resultsI B.Tech R07 supple june 2014 exam results
I B.Tech R07 supple june 2014 exam resultsVARIGONDA GOPI
 
SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012P.G.GOPI NATH
 
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013P.G.GOPI NATH
 
B.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 ResultsB.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 ResultsVARIGONDA GOPI
 
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013P.G.GOPI NATH
 
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011P.G.GOPI NATH
 
B.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 resultsB.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 resultsVARIGONDA GOPI
 
B.tech ii year ii sem (r09) regular & supple may 2013 exam results
B.tech ii year ii sem (r09) regular & supple may 2013 exam resultsB.tech ii year ii sem (r09) regular & supple may 2013 exam results
B.tech ii year ii sem (r09) regular & supple may 2013 exam resultsVARIGONDA GOPI
 
B.tech ii yr i sem(r07) supple exams may 2013 results
B.tech ii yr i sem(r07) supple exams may 2013 resultsB.tech ii yr i sem(r07) supple exams may 2013 results
B.tech ii yr i sem(r07) supple exams may 2013 resultsVARIGONDA GOPI
 
Iii b.tech i sem (r09) supple exams may 2013 results
Iii b.tech i sem (r09) supple exams may 2013 resultsIii b.tech i sem (r09) supple exams may 2013 results
Iii b.tech i sem (r09) supple exams may 2013 resultsAB Madhu Mohana Raju
 

What's hot (20)

4 e 21r07s (1)
4 e 21r07s (1)4 e 21r07s (1)
4 e 21r07s (1)
 
B.tech i year (r07) supple results nov 2012
B.tech i year (r07) supple results nov 2012B.tech i year (r07) supple results nov 2012
B.tech i year (r07) supple results nov 2012
 
III B.TECH. I SEM (R05) SUPPLE. MAY 2013
III B.TECH. I SEM (R05) SUPPLE. MAY 2013III B.TECH. I SEM (R05) SUPPLE. MAY 2013
III B.TECH. I SEM (R05) SUPPLE. MAY 2013
 
B.tech ii year ii sem (r07) supple results nov 2012
B.tech ii year ii sem (r07) supple results nov 2012B.tech ii year ii sem (r07) supple results nov 2012
B.tech ii year ii sem (r07) supple results nov 2012
 
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
M.TECH. I SEMESTER REG-SUPLLE. APRIL 2013
 
Iv b.tech i semester (r09) supplementary may 2013 results
Iv b.tech i semester (r09) supplementary may 2013 resultsIv b.tech i semester (r09) supplementary may 2013 results
Iv b.tech i semester (r09) supplementary may 2013 results
 
III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013III B.TECH. I SEM R07 SUPPLE MAY 2013
III B.TECH. I SEM R07 SUPPLE MAY 2013
 
I year m.tech i sem apr 2013 results
I year m.tech i sem apr 2013 resultsI year m.tech i sem apr 2013 results
I year m.tech i sem apr 2013 results
 
Iv b.tech. ii sem (r07) supple april 2013
Iv b.tech. ii sem (r07) supple april 2013Iv b.tech. ii sem (r07) supple april 2013
Iv b.tech. ii sem (r07) supple april 2013
 
I year r05 results.pdf
I year r05 results.pdfI year r05 results.pdf
I year r05 results.pdf
 
I B.Tech R07 supple june 2014 exam results
I B.Tech R07 supple june 2014 exam resultsI B.Tech R07 supple june 2014 exam results
I B.Tech R07 supple june 2014 exam results
 
SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM RR SUPPLE APRIL MAY 2012
 
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
IV B.TECH. II SEM ADVANCED SUPPLE. JUNE 2013
 
B.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 ResultsB.Tech IV yr II sem R09 Apr-May 2013 Results
B.Tech IV yr II sem R09 Apr-May 2013 Results
 
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013II B.TECH. II SEM R07 SUPPLE. APRIL 2013
II B.TECH. II SEM R07 SUPPLE. APRIL 2013
 
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
IV B.TECH. I SEM (R09) SUPPLE APRIL/MAY-2011
 
B.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 resultsB.tech IV yr I sem(R07) supple exams may - 2013 results
B.tech IV yr I sem(R07) supple exams may - 2013 results
 
B.tech ii year ii sem (r09) regular & supple may 2013 exam results
B.tech ii year ii sem (r09) regular & supple may 2013 exam resultsB.tech ii year ii sem (r09) regular & supple may 2013 exam results
B.tech ii year ii sem (r09) regular & supple may 2013 exam results
 
B.tech ii yr i sem(r07) supple exams may 2013 results
B.tech ii yr i sem(r07) supple exams may 2013 resultsB.tech ii yr i sem(r07) supple exams may 2013 results
B.tech ii yr i sem(r07) supple exams may 2013 results
 
Iii b.tech i sem (r09) supple exams may 2013 results
Iii b.tech i sem (r09) supple exams may 2013 resultsIii b.tech i sem (r09) supple exams may 2013 results
Iii b.tech i sem (r09) supple exams may 2013 results
 

Viewers also liked

I year (r09) supple. pending mechanical result june 2012
I year (r09) supple. pending mechanical result june 2012I year (r09) supple. pending mechanical result june 2012
I year (r09) supple. pending mechanical result june 2012P.G.GOPI NATH
 
I SEM M.TECH. SUPPLE. APRIL 2013
I SEM M.TECH. SUPPLE. APRIL 2013I SEM M.TECH. SUPPLE. APRIL 2013
I SEM M.TECH. SUPPLE. APRIL 2013P.G.GOPI NATH
 
III B.TECH I SEM RR NOV-2012 TIME TABLE
III B.TECH I SEM RR NOV-2012 TIME TABLEIII B.TECH I SEM RR NOV-2012 TIME TABLE
III B.TECH I SEM RR NOV-2012 TIME TABLEP.G.GOPI NATH
 
II YEAR B.TECH I SEM R09 REG NOV-DEC 2011
II YEAR B.TECH I SEM R09 REG NOV-DEC 2011II YEAR B.TECH I SEM R09 REG NOV-DEC 2011
II YEAR B.TECH I SEM R09 REG NOV-DEC 2011P.G.GOPI NATH
 
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012P.G.GOPI NATH
 
IV SEM SUPPLE OCT 2012 RESULT
IV SEM SUPPLE OCT 2012 RESULTIV SEM SUPPLE OCT 2012 RESULT
IV SEM SUPPLE OCT 2012 RESULTP.G.GOPI NATH
 
Mca regular and supplementary september 2013 examinations notification and ti...
Mca regular and supplementary september 2013 examinations notification and ti...Mca regular and supplementary september 2013 examinations notification and ti...
Mca regular and supplementary september 2013 examinations notification and ti...P.G.GOPI NATH
 
III SEM MCA(R9) SUPPLE. JUNE 2012
III SEM MCA(R9) SUPPLE. JUNE 2012III SEM MCA(R9) SUPPLE. JUNE 2012
III SEM MCA(R9) SUPPLE. JUNE 2012P.G.GOPI NATH
 
SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012P.G.GOPI NATH
 
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011P.G.GOPI NATH
 
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012P.G.GOPI NATH
 
II YEAR B.TECH II SEM R09 SUPPLE MAY 2012
II YEAR B.TECH II SEM R09 SUPPLE MAY 2012II YEAR B.TECH II SEM R09 SUPPLE MAY 2012
II YEAR B.TECH II SEM R09 SUPPLE MAY 2012P.G.GOPI NATH
 
III B.TECH. II SEM R09 PENDING RESULT
III B.TECH. II SEM R09 PENDING RESULTIII B.TECH. II SEM R09 PENDING RESULT
III B.TECH. II SEM R09 PENDING RESULTP.G.GOPI NATH
 
IV B.TECH I SEM R05 NOV-2012 TIME TABLE
IV B.TECH I SEM R05 NOV-2012 TIME TABLEIV B.TECH I SEM R05 NOV-2012 TIME TABLE
IV B.TECH I SEM R05 NOV-2012 TIME TABLEP.G.GOPI NATH
 
SIETK III B.TECH II SEM R09 REG APRIL MAY 2012
SIETK III B.TECH II SEM R09 REG APRIL MAY 2012SIETK III B.TECH II SEM R09 REG APRIL MAY 2012
SIETK III B.TECH II SEM R09 REG APRIL MAY 2012P.G.GOPI NATH
 
SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012P.G.GOPI NATH
 
III B.TECH. II SEM R05 SUPPLE. APRIL 2013
III B.TECH. II SEM R05 SUPPLE. APRIL 2013III B.TECH. II SEM R05 SUPPLE. APRIL 2013
III B.TECH. II SEM R05 SUPPLE. APRIL 2013P.G.GOPI NATH
 
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012P.G.GOPI NATH
 
IV B.TECH I SEM RR NOV-2012 TIME TABLE
IV B.TECH I SEM RR NOV-2012 TIME TABLEIV B.TECH I SEM RR NOV-2012 TIME TABLE
IV B.TECH I SEM RR NOV-2012 TIME TABLEP.G.GOPI NATH
 
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULARCONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULARP.G.GOPI NATH
 

Viewers also liked (20)

I year (r09) supple. pending mechanical result june 2012
I year (r09) supple. pending mechanical result june 2012I year (r09) supple. pending mechanical result june 2012
I year (r09) supple. pending mechanical result june 2012
 
I SEM M.TECH. SUPPLE. APRIL 2013
I SEM M.TECH. SUPPLE. APRIL 2013I SEM M.TECH. SUPPLE. APRIL 2013
I SEM M.TECH. SUPPLE. APRIL 2013
 
III B.TECH I SEM RR NOV-2012 TIME TABLE
III B.TECH I SEM RR NOV-2012 TIME TABLEIII B.TECH I SEM RR NOV-2012 TIME TABLE
III B.TECH I SEM RR NOV-2012 TIME TABLE
 
II YEAR B.TECH I SEM R09 REG NOV-DEC 2011
II YEAR B.TECH I SEM R09 REG NOV-DEC 2011II YEAR B.TECH I SEM R09 REG NOV-DEC 2011
II YEAR B.TECH I SEM R09 REG NOV-DEC 2011
 
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
CONGRATULATIONS TO CENTUM SCORERS IN II YEAR II SEM JNTUA EXAMS MAY 2012
 
IV SEM SUPPLE OCT 2012 RESULT
IV SEM SUPPLE OCT 2012 RESULTIV SEM SUPPLE OCT 2012 RESULT
IV SEM SUPPLE OCT 2012 RESULT
 
Mca regular and supplementary september 2013 examinations notification and ti...
Mca regular and supplementary september 2013 examinations notification and ti...Mca regular and supplementary september 2013 examinations notification and ti...
Mca regular and supplementary september 2013 examinations notification and ti...
 
III SEM MCA(R9) SUPPLE. JUNE 2012
III SEM MCA(R9) SUPPLE. JUNE 2012III SEM MCA(R9) SUPPLE. JUNE 2012
III SEM MCA(R9) SUPPLE. JUNE 2012
 
SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R05 SUPPLE APRIL MAY 2012
 
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
I YEAR B.TECH R07 SUPPLE NOV-DEC 2011
 
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
SIETK IV YEAR B.TECH I SEM R05 APRIL MAY 2012
 
II YEAR B.TECH II SEM R09 SUPPLE MAY 2012
II YEAR B.TECH II SEM R09 SUPPLE MAY 2012II YEAR B.TECH II SEM R09 SUPPLE MAY 2012
II YEAR B.TECH II SEM R09 SUPPLE MAY 2012
 
III B.TECH. II SEM R09 PENDING RESULT
III B.TECH. II SEM R09 PENDING RESULTIII B.TECH. II SEM R09 PENDING RESULT
III B.TECH. II SEM R09 PENDING RESULT
 
IV B.TECH I SEM R05 NOV-2012 TIME TABLE
IV B.TECH I SEM R05 NOV-2012 TIME TABLEIV B.TECH I SEM R05 NOV-2012 TIME TABLE
IV B.TECH I SEM R05 NOV-2012 TIME TABLE
 
SIETK III B.TECH II SEM R09 REG APRIL MAY 2012
SIETK III B.TECH II SEM R09 REG APRIL MAY 2012SIETK III B.TECH II SEM R09 REG APRIL MAY 2012
SIETK III B.TECH II SEM R09 REG APRIL MAY 2012
 
SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012
 SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012 SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH II SEM R05 SUPPLE APRIL MAY 2012
 
III B.TECH. II SEM R05 SUPPLE. APRIL 2013
III B.TECH. II SEM R05 SUPPLE. APRIL 2013III B.TECH. II SEM R05 SUPPLE. APRIL 2013
III B.TECH. II SEM R05 SUPPLE. APRIL 2013
 
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
SIETK II YEAR B.TECH I SEM R07 SUPPLE APRIL MAY 2012
 
IV B.TECH I SEM RR NOV-2012 TIME TABLE
IV B.TECH I SEM RR NOV-2012 TIME TABLEIV B.TECH I SEM RR NOV-2012 TIME TABLE
IV B.TECH I SEM RR NOV-2012 TIME TABLE
 
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULARCONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
CONGRATULATIONS TO CENTUM SCORER IN I YEAR R09 REGULAR
 

Similar to II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013

B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013prasadmvreddy
 
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...Karthik Kumar
 
B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013prasadmvreddy
 
II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011
II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011
II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011P.G.GOPI NATH
 
2 1 reg R09 2012 results
2 1 reg R09 2012 results2 1 reg R09 2012 results
2 1 reg R09 2012 resultsKarthik Kumar
 
Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012Karthik Kumar
 
II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012
II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012
II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012P.G.GOPI NATH
 
II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012
II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012
II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012P.G.GOPI NATH
 
3 1 R09 supply-may-2012
3 1  R09  supply-may-20123 1  R09  supply-may-2012
3 1 R09 supply-may-2012Karthik Kumar
 
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...VARIGONDA GOPI
 
2 2 Ro9 supply may-2012
2 2  Ro9 supply  may-20122 2  Ro9 supply  may-2012
2 2 Ro9 supply may-2012Karthik Kumar
 
Iii i(r07) supplementary results may-2012
Iii i(r07) supplementary results may-2012Iii i(r07) supplementary results may-2012
Iii i(r07) supplementary results may-2012SISTKEXAMSECTION
 
I year supple pending results-may 2012
I year supple  pending results-may 2012I year supple  pending results-may 2012
I year supple pending results-may 2012Karthik Kumar
 
I year supple pending results-may 2012(2)
I year supple  pending results-may 2012(2)I year supple  pending results-may 2012(2)
I year supple pending results-may 2012(2)Karthik Kumar
 
I b tech results.pdf
I b tech results.pdfI b tech results.pdf
I b tech results.pdfKarthik Kumar
 
3 u i year (r09) supple novdec 11 results
3 u i year (r09) supple novdec  11 results3 u i year (r09) supple novdec  11 results
3 u i year (r09) supple novdec 11 resultsKarthik Kumar
 

Similar to II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013 (20)

B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013B tech ii yr i sem r9 supplementary may 2013
B tech ii yr i sem r9 supplementary may 2013
 
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
3 u b tech ii year i (r09) semester supplementary examinations november 2011 ...
 
B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013B.tech ii year ii semester (r09) regular & supplementary april may 2013
B.tech ii year ii semester (r09) regular & supplementary april may 2013
 
II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011
II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011
II YEAR B.TECH I SEM R07SUPPLE NOV-DEC 2011
 
2 1 R09 supply
2 1  R09  supply2 1  R09  supply
2 1 R09 supply
 
2 1 R09 supply(2)
2 1 R09  supply(2)2 1 R09  supply(2)
2 1 R09 supply(2)
 
2 1 reg R09 2012 results
2 1 reg R09 2012 results2 1 reg R09 2012 results
2 1 reg R09 2012 results
 
Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012Ii ii ro9 supple march 2012
Ii ii ro9 supple march 2012
 
II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012
II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012
II YEAR B.TECH. I SEM (R07) SUPPLE. NOV-2012
 
3 u 3-1 reg r09
3 u  3-1 reg r093 u  3-1 reg r09
3 u 3-1 reg r09
 
II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012
II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012
II YEAR B.TECH. II SEM(R09) SUPPLE DEC-2012
 
3 1 R09 supply-may-2012
3 1  R09  supply-may-20123 1  R09  supply-may-2012
3 1 R09 supply-may-2012
 
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
B.Tech II year I sem (R09) Regular & Supplementary April/May 2013 Examination...
 
2 2 Ro9 supply may-2012
2 2  Ro9 supply  may-20122 2  Ro9 supply  may-2012
2 2 Ro9 supply may-2012
 
Iii i(r07) supplementary results may-2012
Iii i(r07) supplementary results may-2012Iii i(r07) supplementary results may-2012
Iii i(r07) supplementary results may-2012
 
I year supple pending results-may 2012
I year supple  pending results-may 2012I year supple  pending results-may 2012
I year supple pending results-may 2012
 
I year supple pending results-may 2012(2)
I year supple  pending results-may 2012(2)I year supple  pending results-may 2012(2)
I year supple pending results-may 2012(2)
 
4 e 21r07s (1)
4 e 21r07s (1)4 e 21r07s (1)
4 e 21r07s (1)
 
I b tech results.pdf
I b tech results.pdfI b tech results.pdf
I b tech results.pdf
 
3 u i year (r09) supple novdec 11 results
3 u i year (r09) supple novdec  11 results3 u i year (r09) supple novdec  11 results
3 u i year (r09) supple novdec 11 results
 

More from P.G.GOPI NATH

Mba regular and supplementary september 2013 examinations notification and ti...
Mba regular and supplementary september 2013 examinations notification and ti...Mba regular and supplementary september 2013 examinations notification and ti...
Mba regular and supplementary september 2013 examinations notification and ti...P.G.GOPI NATH
 
IV B.TECH. I SEM(R05) SUPPLE.
IV B.TECH. I SEM(R05) SUPPLE. IV B.TECH. I SEM(R05) SUPPLE.
IV B.TECH. I SEM(R05) SUPPLE. P.G.GOPI NATH
 
I sem m.tech. supple results
I sem m.tech. supple resultsI sem m.tech. supple results
I sem m.tech. supple resultsP.G.GOPI NATH
 
II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013P.G.GOPI NATH
 
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013P.G.GOPI NATH
 
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTSIMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTSP.G.GOPI NATH
 
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTSJNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTSP.G.GOPI NATH
 
WAIVER OF CREDITS FOR B.TECH R09 BACH
WAIVER OF CREDITS FOR B.TECH R09 BACHWAIVER OF CREDITS FOR B.TECH R09 BACH
WAIVER OF CREDITS FOR B.TECH R09 BACHP.G.GOPI NATH
 
MBA II SEM SUPPLE MARCH 2013
MBA II SEM SUPPLE MARCH 2013MBA II SEM SUPPLE MARCH 2013
MBA II SEM SUPPLE MARCH 2013P.G.GOPI NATH
 
MCA II SEM SUPPLE MARCH 2013
MCA II SEM SUPPLE MARCH 2013MCA II SEM SUPPLE MARCH 2013
MCA II SEM SUPPLE MARCH 2013P.G.GOPI NATH
 
MBA II SEM SUPPLEMENTARY RESULTS MAY
MBA II SEM SUPPLEMENTARY RESULTS MAYMBA II SEM SUPPLEMENTARY RESULTS MAY
MBA II SEM SUPPLEMENTARY RESULTS MAYP.G.GOPI NATH
 

More from P.G.GOPI NATH (12)

Mba regular and supplementary september 2013 examinations notification and ti...
Mba regular and supplementary september 2013 examinations notification and ti...Mba regular and supplementary september 2013 examinations notification and ti...
Mba regular and supplementary september 2013 examinations notification and ti...
 
IV B.TECH. I SEM(R05) SUPPLE.
IV B.TECH. I SEM(R05) SUPPLE. IV B.TECH. I SEM(R05) SUPPLE.
IV B.TECH. I SEM(R05) SUPPLE.
 
I sem m.tech. supple results
I sem m.tech. supple resultsI sem m.tech. supple results
I sem m.tech. supple results
 
II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013II B.TECH. II SEM R05 SUPPLE APRIL 2013
II B.TECH. II SEM R05 SUPPLE APRIL 2013
 
F6 32 r05s
F6 32 r05sF6 32 r05s
F6 32 r05s
 
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
II SEM M.TECH. SUPPLE. EXAMS APRIL 2013
 
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTSIMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
IMPORTANT CIRCULAR FOR 2013 BATCH B.TECH STUDENTS
 
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTSJNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
JNTUA PROMOTION RULES FOR LACK OF CREDITS STUDENTS
 
WAIVER OF CREDITS FOR B.TECH R09 BACH
WAIVER OF CREDITS FOR B.TECH R09 BACHWAIVER OF CREDITS FOR B.TECH R09 BACH
WAIVER OF CREDITS FOR B.TECH R09 BACH
 
MBA II SEM SUPPLE MARCH 2013
MBA II SEM SUPPLE MARCH 2013MBA II SEM SUPPLE MARCH 2013
MBA II SEM SUPPLE MARCH 2013
 
MCA II SEM SUPPLE MARCH 2013
MCA II SEM SUPPLE MARCH 2013MCA II SEM SUPPLE MARCH 2013
MCA II SEM SUPPLE MARCH 2013
 
MBA II SEM SUPPLEMENTARY RESULTS MAY
MBA II SEM SUPPLEMENTARY RESULTS MAYMBA II SEM SUPPLEMENTARY RESULTS MAY
MBA II SEM SUPPLEMENTARY RESULTS MAY
 

Recently uploaded

"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesZilliz
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 

Recently uploaded (20)

"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector Databases
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 

II B.TECH I SEM R07 SUPPLE APRIL/MAY 2013

  • 1. JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY, ANANTAPUR ANANTAPUR - 515002 (A.P.) INDIA EXAMINATION BRANCH B Tech II Year I Semester (R07) Supplementary Examinations - May 2013 Results SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS ASHOK KUMAR G07F61A0206 R7210206 ELECTRICAL MACHINES ‐ I 10 AB 10 F 0 R7210203 PULSE & DIGITAL CIRCUITS 9 31 40 P 4 R7210201 MATHEMATICS ‐ III 14 AB 14 F 0 R7210205 ELECTROMAGNETIC FIELDS 9 AB 9 F 0 R7210208 ELECTRICAL CIRCUITS AND SIMULATION LAB 17 39 56 P 2 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 15 32 47 P 4 BHANUPRAVEENREDDY AVULA07F61A0209 R7210203 PULSE & DIGITAL CIRCUITS 7 AB 7 F 0 R7210206 ELECTRICAL MACHINES ‐ I ‐1 AB 0 F 0 CHIRANJEEVI KOTAPATI07F61A0218 R7210201 MATHEMATICS ‐ III 3 20 23 F 0 R7210206 ELECTRICAL MACHINES ‐ I 5 14 19 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 14 14 28 F 0 ELAGANURU DHANANJAYULU07F61A0219 R7210201 MATHEMATICS ‐ III 8 AB 8 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 11 29 40 P 4 S GOPINATH07F61A0223 R7210203 PULSE & DIGITAL CIRCUITS 3 AB 3 F 0 R7210206 ELECTRICAL MACHINES ‐ I 3 AB 3 F 0 R7210204 SWITCHING THEORY & LOGIC DESIGN 4 AB 4 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 AB 7 F 0 R7210201 MATHEMATICS ‐ III 2 AB 2 F 0 R7210205 ELECTROMAGNETIC FIELDS 5 AB 5 F 0 GOWTHAMKUMAR P07F61A0226 R7210206 ELECTRICAL MACHINES ‐ I 8 AB 8 F 0 R7210201 MATHEMATICS ‐ III 7 AB 7 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 8 AB 8 F 0 MAHESH BABU S07F61A0256 R7210205 ELECTROMAGNETIC FIELDS 9 8 17 F 0 R7210206 ELECTRICAL MACHINES ‐ I 8 9 17 F 0 Page 1 of 5 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 10, 2013
  • 2. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS R7210203 PULSE & DIGITAL CIRCUITS 5 13 18 F 0 V R MAHESH07F61A0258 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 12 28 40 P 4 R7210205 ELECTROMAGNETIC FIELDS 6 4 10 F 0 NARESH KEERTHIPATI07F61A0268 R7210201 MATHEMATICS ‐ III 8 AB 8 F 0 R7210205 ELECTROMAGNETIC FIELDS 5 AB 5 F 0 R7210206 ELECTRICAL MACHINES ‐ I 8 18 26 F 0 R7210203 PULSE & DIGITAL CIRCUITS 4 5 9 F 0 NAVAKANTH G S07F61A0271 R7210205 ELECTROMAGNETIC FIELDS 5 3 8 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 13 20 F 0 R7210201 MATHEMATICS ‐ III 1 2 3 F 0 R7210206 ELECTRICAL MACHINES ‐ I 5 4 9 F 0 NAVEEN KUMAR G07F61A0272 R7210204 SWITCHING THEORY & LOGIC DESIGN 9 7 16 F 0 R7210206 ELECTRICAL MACHINES ‐ I 3 37 40 P 4 R7210205 ELECTROMAGNETIC FIELDS 3 25 28 F 0 R7210203 PULSE & DIGITAL CIRCUITS 4 28 32 F 0 NANDIPATI RAVITEJA07F61A0285 R7210203 PULSE & DIGITAL CIRCUITS 7 0 7 F 0 R7210205 ELECTROMAGNETIC FIELDS 6 AB 6 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 1 8 F 0 REDDYBHASKAR D07F61A0286 R7210201 MATHEMATICS ‐ III 7 AB 7 F 0 R7210203 PULSE & DIGITAL CIRCUITS 10 4 14 F 0 R7210205 ELECTROMAGNETIC FIELDS 5 7 12 F 0 S SAMEER07F61A0292 R7210201 MATHEMATICS ‐ III 7 AB 7 F 0 R7210204 SWITCHING THEORY & LOGIC DESIGN 12 AB 12 F 0 R7210206 ELECTRICAL MACHINES ‐ I 7 AB 7 F 0 SANDEEP KUMAR B07F61A0293 R7210201 MATHEMATICS ‐ III 6 AB 6 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 10 AB 10 F 0 GANGAPATNAM SIVAKUMAR07F61A02A1 R7210205 ELECTROMAGNETIC FIELDS 5 AB 5 F 0 R7210201 MATHEMATICS ‐ III 4 AB 4 F 0 S SUNIL KUMAR07F61A02A7 Page 2 of 5 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 10, 2013
  • 3. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS R7210201 MATHEMATICS ‐ III 5 9 14 F 0 R7210205 ELECTROMAGNETIC FIELDS 11 29 40 P 4 SURESH N07F61A02A8 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 11 20 31 F 0 R7210203 PULSE & DIGITAL CIRCUITS 2 14 16 F 0 R7210204 SWITCHING THEORY & LOGIC DESIGN 13 7 20 F 0 R7210205 ELECTROMAGNETIC FIELDS 6 12 18 F 0 R7210206 ELECTRICAL MACHINES ‐ I 4 3 7 F 0 R7210201 MATHEMATICS ‐ III 3 AB 3 F 0 G VEENADHARI07F61A02B8 R7210204 SWITCHING THEORY & LOGIC DESIGN 12 AB 12 F 0 RAGHAVARAJU BHANU07F61A0304 R7210304 MECHANICS OF SOLIDS 7 17 24 F 0 V TEJESH07F61A0328 R7210302 OBJECT ORIENTED PROGRAMMING 10 35 45 P 4 R7210304 MECHANICS OF SOLIDS 2 16 18 F 0 MUTHYALA KUMAR07F61A0444 R7210201 MATHEMATICS ‐ III 9 1 10 F 0 M MOHAN KRISHNA07F61A0456 R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 6 8 14 F 0 V NAVEEN07F61A0578 R7210501 PROBABILITY & STATISTICS 10 16 26 F 0 R7210505 MANAGERIAL ECONOMICS & FINANCIAL ANALYSIS 11 30 41 P 4 R7210506 UNIX & SHELL PROGRAMMING 3 AB 3 F 0 KARAVATI RAVI07F61A0597 R7210506 UNIX & SHELL PROGRAMMING 4 36 40 P 4 P ROOPESH KUMAR07F61A05A1 R7210501 PROBABILITY & STATISTICS 8 AB 8 F 0 N SHANMUKHA SREENIVAS07F61A05A7 R7210506 UNIX & SHELL PROGRAMMING 7 AB 7 F 0 SRIHARI SARAKOLLU07F61A05B2 R7210502 MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE ‐1 AB 0 F 0 SRIPATHI K07F61A05B5 R7210501 PROBABILITY & STATISTICS 6 AB 6 F 0 R7210503 ADVANCED DATA STRUCTURES 9 3 12 F 0 P M PREETHI07F61A1220 R7210501 PROBABILITY & STATISTICS 8 5 13 F 0 R7210502 MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE 9 5 14 F 0 KANALA SIVASANKAR08F61A0148 Page 3 of 5 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 10, 2013
  • 4. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS R7210101 MATHEMATICS ‐ II 13 AB 13 F 0 NOOKALA TEJESWAR08F61A0155 R7210101 MATHEMATICS ‐ II 12 14 26 F 0 R7210106 FLUID MECHANICS 17 14 31 F 0 R7210105 SURVEYING 17 28 45 P 4 P S V PRASAD08F61A0242 R7210201 MATHEMATICS ‐ III 15 AB 15 F 0 R7210205 ELECTROMAGNETIC FIELDS 13 38 51 P 4 C VINODHKUMAR08F61A0272 R7210204 SWITCHING THEORY & LOGIC DESIGN 15 AB 15 F 0 R7210201 MATHEMATICS ‐ III 17 AB 17 F 0 R7210206 ELECTRICAL MACHINES ‐ I 13 AB 13 F 0 K VISHNU08F61A0273 R7210205 ELECTROMAGNETIC FIELDS 9 AB 9 F 0 R7210204 SWITCHING THEORY & LOGIC DESIGN 12 AB 12 F 0 R7210206 ELECTRICAL MACHINES ‐ I 11 AB 11 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 14 AB 14 F 0 R7210201 MATHEMATICS ‐ III 13 0 13 F 0 LAKAKULA BHARATHDEEP08F61A0304 R7210301 PRODUCTION TECHNOLOGY 9 AB 9 F 0 R7210102 ELECTRICAL & ELECTRONICS ENGINEERING 11 AB 11 F 0 V CHANDRA SEKHAR08F61A0422 R7210201 MATHEMATICS ‐ III 13 AB 13 F 0 R7210406 ELECTRONIC CIRCUIT ANALYSIS 17 AB 17 F 0 R7210405 ELECTRICAL TECHNOLOGY 19 AB 19 F 0 KOTAPATI HARISH08F61A0436 R7210201 MATHEMATICS ‐ III 7 AB 7 F 0 R7210406 ELECTRONIC CIRCUIT ANALYSIS 11 AB 11 F 0 R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 12 AB 12 F 0 R7210404 SIGNALS & SYSTEMS 13 AB 13 F 0 PALAKALA RAGHAVENDRA08F61A0486 R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 12 20 32 F 0 K RANGANATHAN08F61A0586 R7210504 DIGITAL LOGIC DESIGN 14 30 44 P 4 R7210501 PROBABILITY & STATISTICS 7 14 21 F 0 R7210503 ADVANCED DATA STRUCTURES 10 32 42 P 4 M REDDY SEKHAR08F61A0588 R7210501 PROBABILITY & STATISTICS 9 2 11 F 0 SAMPATHI S HEMANTH KUMAR08F61A1212 Page 4 of 5 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 10, 2013
  • 5. SUBJECT CODE SUBJECT NAME I.M E.M TOTAL RESULT CREDITS R7210502 MATHEMATICAL FOUNDATIONS OF COMPUTER SCIENCE 12 AB 12 F 0 M RADHA SWAMY08F65A0207 R7210206 ELECTRICAL MACHINES ‐ I 7 33 40 P 4 R7210204 SWITCHING THEORY & LOGIC DESIGN 8 AB 8 F 0 R7210203 PULSE & DIGITAL CIRCUITS 5 16 21 F 0 R7210205 ELECTROMAGNETIC FIELDS 4 4 8 F 0 R7210201 MATHEMATICS ‐ III 3 AB 3 F 0 R7210202 FLUID MECHANICS & HYDRAULIC MACHINERY 7 16 23 F 0 MANOJ KUMAR V09F65A0103 R7210103 STRENGTH OF MATERIALS ‐ I 10 AB 10 F 0 R7210101 MATHEMATICS ‐ II 10 AB 10 F 0 B VINOD KUMAR09F65A0412 R7210402 PROBABILITY THEORY & STOCHASTIC PROCESS 10 17 27 F 0 R7210201 MATHEMATICS ‐ III 14 3 17 F 0 R7210404 SIGNALS & SYSTEMS 8 10 18 F 0 Page 5 of 5 CONTROLLER OF EXAMINATIONS  Note: Any discrepancy in the result noted above must be brought to the notice of the Controller of Examinations, within two  weeks from the above date Saturday, August 10, 2013