How to manage technical risk in CO2 capture
technology development
Tuesday 10 June 2014, 1700 AEDT
Oscar Fr. Graff
Oscar holds a Master of Science degree in chemical
engineering from the Norwegian University of Science
and Technology (NTNU). He joined Aker in 1980 and
has been involved in concept and technology
development, major offshore and onshore projects,
and in different management positions.
Oscar has been actively involved in the development
of CO2 capture technology since 1999. He assumed
the position as Chief Technical Officer (CTO) in Aker
Clean Carbon in 2008 and is presently
Department Manager and CTO for Carbon Capture in
Aker Solutions.
Chief Technology Officer, Department of Clean Carbon, Aker Solutions
Anastasia Isaenko
Educated in process engineering, Anastasia Isaenko has
worked with Carbon Capture and Storage (CCS) related
issues since 2007.
Anastasia has been involved in Technology Qualification
projects within CCS and renewable energy technologies as
well as development of DNV Recommended Practices for
Qualifying CO2 Capture Technologies.
Consultant, Carbon Capture and Storage, DNV GL
QUESTIONS
 We will collect questions during
the presentation.
 Your MC will pose these
question to the presenters after
the presentation.
 Please submit your questions
directly into the GoToWebinar
control panel.
The webinar will start shortly.
Confidential © 2014 Aker Solutions Preferred partner
Preferred partner
How to manage technical risk in CO2 capture
technology development
Value creation
through innovation
Slide 5
Webinar by Global CCS Institute
10 June 2014
Oscar Graff
CCS Department Manager and CTO
Confidential © 2014 Aker Solutions Preferred partner
CCS in Aker Solutions
Technology ownership: Aker Solutions (100%)
Office: Fornebu (Oslo), Norway
■ A focused technology company
■ 20 years of CCS know-how and experience acquired via Aker projects
■ Core competence within flue gas treatment and CO2 capture
■ Invested ~400 MNOK (~$65M) in capture technology
■ Leading one of the largest CCS R&D programmes in Europe (SOLVit)
■ Operating a unique, advanced mobile test unit (MTU), engaged in several CCS projects.
■ Design, construction, start-up and operation of amine plant at Technology Centre Mongstad (TCM)
■ About 30 experts and 300 employees in Aker companies have been engaged in CCS
■ A leading technology provider of carbon capture world-wide (fossil fuels, refineries and cement)
■ Aker Solutions’ step by step business approach (risk management):
A global supplier of cost-effective CO2 capture plants and technology
1996 1996 1998 2007 2008 2011
Sleipner Field Kårstø Demo Study Mobile Test Unit
(MTU)
Large Scale Pilot
TCM
Kårstø CO2 Pilot
Develop – Test – Improve – Deploy
NTNU/SINTEF Lab Rig
2012
Slide 6
Confidential © 2014 Aker Solutions Preferred partner
Capture Technology – Potential risk elements
■ Complete design of capture plant and utility systems
■ Integration with emitter (main plant)
■ Heat and mass balance
■ Material selection
■ Instrument and control & monitoring
■ Equipment
■ Solvent
■ Turn-down
■ Availability
■ Lifetime
■ CO2 purity
■ Liquid waste
■ Emissions to air
■ Capture rate, energy demand
■ Solvent make-up, etc.
■ Performance guarantees
Slide 7
Performance guarantees can only be given
after the required qualifications,
tests and verifications have been carried out
Confidential © 2014 Aker Solutions Preferred partner
What are the main challenges?
■ New amine solvents:
■ Capture efficiency
■ Energy demand (steam)
■ Degradation/make-up
■ Corrosion
■ Foaming
■ Reclaiming
■ Emission to air
■ HSE data
■ Materials (equipment, piping, valves, instruments, liner, gaskets etc.)
■ Equipment (type, internals etc.)
■ Actual flue gas condition (composition, particles, P & T)
■ Scale-up
Slide 8
Commercial application:
- only after long term testing (6-12 months) on actual flue gas in large scale pilot
Confidential © 2014 Aker Solutions Preferred partner
R&D Programmes:
- SOLVit - Reclaiming
- BigCO2 - BigCCS
- CASTOR - Emissions
- Plastic Liner/Mat. - Cleo
Technology Qualification:
- DNV (DNV-RP-J201)
- CCM Project (4000 hr’s test at TCM)
Lab facilities:
- NTNU / SINTEF / IFE / Norner / NILU
Pilot Testing:
- TCM, Mongstad
- Tiller Pilot, Trondheim
- Mobile Test Unit (MTU)
- EnBW in Heilbronn
Aker Solutions partner in substantial R&D&Q programmes:
Total Projects = ~750 MNOK (~ $125M)
CCS Gas
Industrial
emissions
(cement, etc.)
CCS CoalStudy & FEED
TCM/CCM
Slide 9
TCM/CCM
Emission
degradation
in
atmosphere
Confidential © 2014 Aker Solutions Preferred partner
Develop and demonstrate solvents with
minimum energy consumption and lowest
possible environmental impact. This is done
step-wise and systematic:
SOLVit R&D
– main objectives:
Lab-
bench scale
Lab-
pilot scale
Full-height
pilot, Tiller
Real exhaust:
- MTU
- Heilbronn
Theoretical
evaluations
TCM:
- CHP gas
- RFCC gas
SOLVit Phase 1, 2 & 3 SOLVit Phase 3
Unique CC R&D Programme
 7 years programme (2008-2015)
 Fundamental R&D
 Extensive testing in pilots
 Heavy industry involvement
 332 MNOK ~$54M (phase 1,2 & 3)
Slide 10
Research environment Industrial environment
Confidential © 2014 Aker Solutions Preferred partner
Testing with clients actual flue gas at their site
MTU (Mobile Test Unit) – operating a complete capture plant from 2008
DCC
Blower Cooler
Absorber
Transport
ReclaimerDesorber
Process
Container
incl. Energy
Saver
MTU:
• Different flue gases
• Process improvements
• New robust solvents
• Reclaiming
• Degradation
• Corrosion
• Emissions
• LCC evaluations
• Capacity: 2000 TPA CO2
Slide 11
Main tool for verifications
and risk reduction!
Confidential © 2014 Aker Solutions Preferred partner
MTU, Mobile Test Unit - Advanced CO2 capture pilot
Test campaigns in industrial environment since 2008:
coal & gas power, refinery & cement industry
Over 17 000
operating hours
MTU in operation at
Longannet Power Plant
Picture: Scottish Power
Alabama, US
National CCC
Risavika & TCM
Norway
ACCTM 1st in UK
ACCTM 1st at NCCC
2009
2011
2008 2012
Slide 12
ACCTM 1st at TCM
Confidential © 2014 Aker Solutions Preferred partner
MTU relocated to Norcem cement plant at Brevik, Norway
Slide 13
1st large scale testing globally on a cement plant
Confidential © 2014 Aker Solutions Preferred partner
 Technology: Aker Solutions
 Capacity: 78 000 tonnes CO2/year
 Gas Power (CHP) flue gas
~3,5 vol-% CO2
 Residual Catalytic Cracker (RCC) flue gas
12,9 vol-% CO2, resembling flue gas from coal
 Large turndowns, 16-100% plant capacity
 Flexibility in stripper operating pressures
 Flexibility in packing heights
 Utilities and tie-ins designed for 120%
to be able to test plant limitations
 Mobile Test Unit (MTU) screening tests run in parallel
 Extensive online analysis and monitoring instruments
 Unique equipment:
o Concrete absorber w/PP liner
o Two stripper systems with alternative reboiler design
o Energy saver module (~20% reduction in steam)
TCM- Unique and flexible amine facility in 2012
Slide 14
Confidential © 2014 Aker Solutions Preferred partner7 May 2014 Milestone Mongstad 3Slide 15
15 months extensive test programme
at Technology Centre Mongstad - TCM
Confidential © 2014 Aker Solutions Preferred partner
Our staged CCS development programme
■ From lab to commercial plants
■ DNV technology qualification (DNV-RP-J201)
The preferred partner
1996 2006 2015
Membrane Contactor Advance Post Combustion: reduced energy & solvent losses
SOLVit R&D
Reduced technical and commercial risk. Cost reductions
20081996 1998 2006 2010 2012 20xx
SINTEF/NTNU
Part of SOLVit
Syntetic gas
Diam.: 0.15 m
Height: 6 m
Capture: 0.01 t/h
AKER K-LAB
Membrane tests
Gas engine
Diam.: 0.4 m
Height: 12 m
Capture: 0.2 t/h
AKER SOLUTIONS
Mobile facility (MTU)
Coal, gas power,cement
Diam.: 0.4 m
Height: 25 m
Capture: 0.2 t/h
TILLER RIG
Part of SOLVit
Propane burner
Diam.: 0.2 m
Height: 25 m
Capture: 0.05 t/h
AKER SOLUTIONS
Mongstad Techn. Centre
Gas power & cracker
Diam.: 2.9 m
Height: 62 m
Capture: 8.9 t/h
FULL SCALE
Coal & gas power,
cement
Diam.: 10-20 m
Height: 45-50 m
Capture: 100-250 t/h
CASTOR+ RIG
EU Project
Coal power
Diam.: 1.1 m
Height: 28 m
Capture: 1.0 t/h
Aker S is partner
Cap. x ~15Capture x ~50
Experience from six pilots into full-scale
1 2 3 4 5 6
DNV GL © 2013 10 june 2014 SAFER, SMARTER, GREENERDNV GL © 2013
10 june 2014
Anastasia Isaenko-DNV GL
How to manage technical risk in CO2
capture technology development
Global CCS Institute webinar
17
DNV GL © 2013 10 june 2014
Technology Qualification
DNV GL’s Definition of Qualification:
Qualification is the process of providing the evidence
that the technology will function within specific limits
with an acceptable level of confidence
Technology
Developer
Confidence
Project
Manager
Stakeholders
DNV GL © 2013 10 june 2014
Technology Challenges
 Introducing new unproven technology at commercial scale represent a technical
risk for various stakeholders in terms of technology performance, HSE issues,
project cost overruns and delays
 Many technology providers are unable to give process guarantees on key
performance parameters
19
DNV-RP-J201 “Qualification procedures for CO2 capture technology”
(2010)
DNV GL © 2013 10 june 2014
The challenge facing new technology users –
Known or New Technology?
20
Return on Investment
Known
Technology
New
Technology
0 E[RoI] E[RoI] E[RoI]
New Technology
After TQ
Probability
New Technology increase the expected
value of the investment ...
but also increases the uncertainty
DNV GL © 2013 10 june 2014
Qualification Process (e.g. CO2 capture with amine)
21
Qualification Basis
Technology
Qualified
Qualification Plan
Execution of Plan
(Collect evidence)
Performance Assessment
Technology Assessment
Threat Assessment
Concept
Improvement
CO2 + N2 + O2
CO2-lean
solvent
CO2-rich solvent
N2 + O2
Absorber
Low temp.
Stripper
High temp.
Cooler
Steam
CO2
Power
and
heat
Flue gas
Capture rate: 86 %
Energy penalty: 66 MW
Define the expectations of the technology
e.g capture rate, emissions, energy penalty, reliability etc.
DNV GL © 2013 10 june 2014
Qualification Process
22
Qualification Basis
Technology
Qualified
Qualification Plan
Execution of Plan
(Collect evidence)
Performance Assessment
Technology Assessment
Threat Assessment
Concept
Improvement
1: Proven technology 2 - 4: New Technology
Technology Assessment according to DNV RP-J201
Application Area
1
Proven
2
Limited field history
3
New or unproven
1. Known 1 2 3
2. New 2 3 4
Technology status
Application Area
1
Proven
2
Limited field history
3
New or unproven
1. Known 1 2 3
2. New 2 3 4
Technology status
Divide the technology into manageable elements
and rate them
DNV GL © 2013 10 june 2014
Qualification Process
23
Qualification Basis
Technology
Qualified
Qualification Plan
Execution of Plan
(Collect evidence)
Performance Assessment
Technology Assessment
Threat Assessment
Concept
Improvement
Identify all relevant threats for the elements defined as new
and, judge the associated risks.
DNV GL © 2013 10 june 2014
Qualification Process
24
Qualification Basis
Technology
Qualified
Qualification Plan
Execution of Plan
(Collect evidence)
Performance Assessment
Technology Assessment
Threat Assessment
Concept
Improvement
…..
Long term (min. 3000 h) test with corrosion probesCorrosionLeakagePiping
Lab testing of
materials
suitability
3
Long term (min. 3000 h) test of solvent properties
Too high degradation of
solvent
Reduced CO2
capture rate
Solvent
Verify solvent
Properties
2
Pilot scale distributor testModelling uncertainty
Uneven
distribution in
column
Liquid distributor
in absorber
Validate CFD
Modelling1
Type of activityFailure MechanismFailure ModeComponent
Qualification
method
No
To adequately address the identified failure modes
DNV GL © 2013 10 june 2014
Qualification Process
25
Qualification Basis
Technology
Qualified
Qualification Plan
Execution of Plan
(Collect evidence)
Performance Assessment
Technology Assessment
Threat Assessment
Concept
Improvement
Collect qualification
data
(Work the plan)
DNV GL © 2013 10 june 2014
Qualification Process
26
Qualification Basis
Technology
Qualified
Qualification Plan
Execution of Plan
(Collect evidence)
Performance Assessment
Technology Assessment
Threat Assessment
DNV GL © 2013 10 june 2014
DNV GL deliverablesQualification Work Process
Qualification Basis
Technology
Qualified
Qualification Plan
Execution of the plan
Performance Assessment
Technology Assessment
Threat Assessment
Statements from DNV GL
TECHNICAL REPORT
DET NORSKE VERITAS
Technology
Assessment
Report
Statement of
Feasibility
“No show
stoppers”
TECHNICAL REPORT
DET NORSKE VERITAS
Technology
Qualification
Plan
Endorsement of
Qualification Plan
“Technically
executable”
Technology
Certificate
“Technology
qualified”
TECHNICAL REPORT
DET NORSKE VERITAS
Technology
Qualification
Report
DNV GL © 2013 10 june 2014
Concluding remarks on Technology Qualification
 The risk of introducing unproven technologies can be high
 The DNV GL’s methodology focuses on addressing the high risk
elements of the technology
 The methodology ensures that the adequate tests are undertaken
before the deployment of the technology
 The technology risk management builds confidence in new
technologies
28
Technology risk management can provide confidence where wanted
process guarantees cannot be given
DNV GL © 2013 10 june 2014
Thank you for your attention!
29
Confidential © 2014 Aker Solutions Preferred partner
Back-up slides
Slide 30
Confidential © 2014 Aker Solutions Preferred partner
ACC
Direct
Contact
Cooler
Flue
Gas
Fan
ACC
Absorber
Tower
Treated
Flue Gas
Flue Gas
Inlet
CO2
Compressor
CO2 to transport
ACC
Energy
Saver
ACC
Reclaimer
ACC
Reboiler
ACC
Desorber
Filter
package
ACC
Emission Control
& Anti-Mist
Water Wash
&
Water Balance
Absorption
Section
Rich/Lean
Hx
Technology, Process Design and Equipment: Technology advantages:
1. Most mature
2. Flexibility
3. For retrofit and new built
4. For various flue gases
5. Life Cycle Cost
6. Potential improvements
Technology Characteristics:
 Excellent performance data for coal and gas
power plants
 Testing of refinery cracker gas and gas from
cement industry
 Cost, energy and environmental focus
 Modularization
Key Equipment
1. Absorber Tower
2. Desorber incl. Reboiler
3. Direct Contact Cooler
4. Reclaimer
5. Energy Saver
Full scale plant and process design, specification of proprietary equipment packages,
solvent formulation, performance guarantees and licencing of technology
Slide 31
ACC= Advanced Carbon Capture
Confidential © 2014 Aker Solutions Preferred partner
Testing with clients actual flue gas at their site
MTU (Mobile Test Unit) – operating a complete capture plant from 2008
DCC
Blower Cooler
Absorber
Transport
ReclaimerDesorber
Process
Container
incl. Energy
Saver
MTU:
• Different flue gases
• Process improvements
• New robust solvents
• Reclaiming
• Degradation
• Corrosion
• Emissions
• LCC evaluations
• Capacity: 2000 TPA CO2
Slide 32
Confidential © 2014 Aker Solutions Preferred partner
Test Center Mongstad (TCM)
■ Video at youtube:
http://www.youtube.com/watch?v=adu4-ahLE_0&feature=youtu.be
Slide 33
Confidential © 2014 Aker Solutions Preferred partner
Copyright and disclaimer
Copyright
Copyright of all published material including photographs, drawings and images in this document remains vested in Aker Solutions and
third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor
used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall
be altered or removed from any reproduction.
Disclaimer
This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and
uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations,
estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major
markets for Aker Solutions ASA and Aker Solutions ASA’s (including subsidiaries and affiliates) lines of business. These expectations,
estimates and projections are generally identifiable by statements containing words such as “expects”, “believes”, “estimates” or similar
expressions. Important factors that could cause actual results to differ materially from those expectations include, among others,
economic and market conditions in the geographic areas and industries that are or will be major markets for Aker Solutions’ businesses,
oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency
exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Aker Solutions ASA believes
that its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations will
be achieved or that the actual results will be as set out in the Presentation. Aker Solutions ASA is making no representation or warranty,
expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Aker Solutions ASA nor any of its
directors, officers or employees will have any liability to you or any other persons resulting from your use.
Aker Solutions consists of many legally independent entities, constituting their own separate identities. Aker Solutions is used as the
common brand or trade mark for most of these entities. In this presentation we may sometimes use “Aker Solutions”, “we” or “us” when
we refer to Aker Solutions companies in general or where no useful purpose is served by identifying any particular Aker Solutions
company.
Slide 34
QUESTIONS / DISCUSSION
Please submit your questions in
English directly into the
GoToWebinar control panel.
The webinar will start shortly.
Please submit any feedback to: webinar@globalccsinstitute.com

More Related Content

What's hot

Energy Efficiency Measures in Cement Industries
Energy Efficiency Measures in Cement IndustriesEnergy Efficiency Measures in Cement Industries
Energy Efficiency Measures in Cement IndustriesDr Ramhari Poudyal
 
Massey Ferguson Global Series Product Book
Massey Ferguson Global Series Product BookMassey Ferguson Global Series Product Book
Massey Ferguson Global Series Product BookTim Miller
 
TYRE RECYCLING AND ITS BENEFITS
TYRE RECYCLING AND ITS BENEFITSTYRE RECYCLING AND ITS BENEFITS
TYRE RECYCLING AND ITS BENEFITSCA Vijay Kothari
 
Green Tyre Technology; Airless tyre
Green Tyre Technology; Airless tyreGreen Tyre Technology; Airless tyre
Green Tyre Technology; Airless tyrenitheshdnayak
 
cement-plant-operation-handbook
cement-plant-operation-handbookcement-plant-operation-handbook
cement-plant-operation-handbookVijay Kumar
 
Burner bible
Burner bibleBurner bible
Burner biblesimmsos
 
Heat & Mass Balance PPT in cement industry version 2.0.pdf
Heat & Mass Balance PPT in cement industry version 2.0.pdfHeat & Mass Balance PPT in cement industry version 2.0.pdf
Heat & Mass Balance PPT in cement industry version 2.0.pdfNITIN ASNANI
 
Massey ferguson mf 290 tractor (fr) service parts catalogue manual (part numb...
Massey ferguson mf 290 tractor (fr) service parts catalogue manual (part numb...Massey ferguson mf 290 tractor (fr) service parts catalogue manual (part numb...
Massey ferguson mf 290 tractor (fr) service parts catalogue manual (part numb...udfujjsejkkem
 
History of automobiles 2015
History of automobiles 2015History of automobiles 2015
History of automobiles 2015sandhyakirana
 
Tires and wheels
Tires and wheelsTires and wheels
Tires and wheelsCraig Kielb
 
seminar-Airless tyres.pptx
seminar-Airless tyres.pptxseminar-Airless tyres.pptx
seminar-Airless tyres.pptxVISHNUGMANOJ
 
Automobile engineering
Automobile engineeringAutomobile engineering
Automobile engineeringAhad1996
 
Manufacturing process of tyre
Manufacturing process of tyreManufacturing process of tyre
Manufacturing process of tyreHarsh Shrimali
 
MODERN AUTOMOTIVE TECHNOLOGY
MODERN AUTOMOTIVE TECHNOLOGYMODERN AUTOMOTIVE TECHNOLOGY
MODERN AUTOMOTIVE TECHNOLOGYVivek Kamal
 
Report on Airless Tyre or Non-Pneumatic tyre
Report on Airless Tyre or Non-Pneumatic tyreReport on Airless Tyre or Non-Pneumatic tyre
Report on Airless Tyre or Non-Pneumatic tyrePermi Jagadish
 
Go karting project report Degree level
Go karting project report Degree levelGo karting project report Degree level
Go karting project report Degree levelAniket pawar
 
Vehicle Body Terminology, Visibility & Space
Vehicle Body  Terminology, Visibility & SpaceVehicle Body  Terminology, Visibility & Space
Vehicle Body Terminology, Visibility & SpaceRajat Seth
 
Kubota b1550 e tractor parts catalogue manual
Kubota b1550 e tractor parts catalogue manualKubota b1550 e tractor parts catalogue manual
Kubota b1550 e tractor parts catalogue manualfjjsekwsxkdmmem
 
Motorman - Oil filter cataloge
Motorman - Oil filter catalogeMotorman - Oil filter cataloge
Motorman - Oil filter catalogeHenry Song
 

What's hot (20)

Energy Efficiency Measures in Cement Industries
Energy Efficiency Measures in Cement IndustriesEnergy Efficiency Measures in Cement Industries
Energy Efficiency Measures in Cement Industries
 
Massey Ferguson Global Series Product Book
Massey Ferguson Global Series Product BookMassey Ferguson Global Series Product Book
Massey Ferguson Global Series Product Book
 
TYRE RECYCLING AND ITS BENEFITS
TYRE RECYCLING AND ITS BENEFITSTYRE RECYCLING AND ITS BENEFITS
TYRE RECYCLING AND ITS BENEFITS
 
Green Tyre Technology; Airless tyre
Green Tyre Technology; Airless tyreGreen Tyre Technology; Airless tyre
Green Tyre Technology; Airless tyre
 
cement-plant-operation-handbook
cement-plant-operation-handbookcement-plant-operation-handbook
cement-plant-operation-handbook
 
Burner bible
Burner bibleBurner bible
Burner bible
 
Heat & Mass Balance PPT in cement industry version 2.0.pdf
Heat & Mass Balance PPT in cement industry version 2.0.pdfHeat & Mass Balance PPT in cement industry version 2.0.pdf
Heat & Mass Balance PPT in cement industry version 2.0.pdf
 
Massey ferguson mf 290 tractor (fr) service parts catalogue manual (part numb...
Massey ferguson mf 290 tractor (fr) service parts catalogue manual (part numb...Massey ferguson mf 290 tractor (fr) service parts catalogue manual (part numb...
Massey ferguson mf 290 tractor (fr) service parts catalogue manual (part numb...
 
History of automobiles 2015
History of automobiles 2015History of automobiles 2015
History of automobiles 2015
 
Tires and wheels
Tires and wheelsTires and wheels
Tires and wheels
 
seminar-Airless tyres.pptx
seminar-Airless tyres.pptxseminar-Airless tyres.pptx
seminar-Airless tyres.pptx
 
Automobile engineering
Automobile engineeringAutomobile engineering
Automobile engineering
 
Manufacturing process of tyre
Manufacturing process of tyreManufacturing process of tyre
Manufacturing process of tyre
 
MODERN AUTOMOTIVE TECHNOLOGY
MODERN AUTOMOTIVE TECHNOLOGYMODERN AUTOMOTIVE TECHNOLOGY
MODERN AUTOMOTIVE TECHNOLOGY
 
Report on Airless Tyre or Non-Pneumatic tyre
Report on Airless Tyre or Non-Pneumatic tyreReport on Airless Tyre or Non-Pneumatic tyre
Report on Airless Tyre or Non-Pneumatic tyre
 
Go karting project report Degree level
Go karting project report Degree levelGo karting project report Degree level
Go karting project report Degree level
 
Vehicle Body Terminology, Visibility & Space
Vehicle Body  Terminology, Visibility & SpaceVehicle Body  Terminology, Visibility & Space
Vehicle Body Terminology, Visibility & Space
 
Kubota b1550 e tractor parts catalogue manual
Kubota b1550 e tractor parts catalogue manualKubota b1550 e tractor parts catalogue manual
Kubota b1550 e tractor parts catalogue manual
 
Motorman - Oil filter cataloge
Motorman - Oil filter catalogeMotorman - Oil filter cataloge
Motorman - Oil filter cataloge
 
Baghouse Team
Baghouse TeamBaghouse Team
Baghouse Team
 

Viewers also liked

Risk and financial portfolio analytics - A technical Introduction
Risk and financial portfolio analytics - A technical IntroductionRisk and financial portfolio analytics - A technical Introduction
Risk and financial portfolio analytics - A technical IntroductionRaul Chong
 
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...Global CCS Institute
 
Cement and co2 what's happening
Cement and co2   what's happeningCement and co2   what's happening
Cement and co2 what's happeningJohn Kline
 
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...Global CCS Institute
 
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...Global CCS Institute
 
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonaldCosts for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonaldGlobal CCS Institute
 
Cement and CO2: A Victim of Success
Cement and CO2: A Victim of SuccessCement and CO2: A Victim of Success
Cement and CO2: A Victim of SuccessJohn Kline
 
Risk fundamental & technical analysi- dow theory- chartss
Risk  fundamental  & technical analysi- dow theory- chartssRisk  fundamental  & technical analysi- dow theory- chartss
Risk fundamental & technical analysi- dow theory- chartssDeepika S.R.
 
Carbon Capture and Storage
Carbon Capture and StorageCarbon Capture and Storage
Carbon Capture and Storageravi8492
 

Viewers also liked (14)

Risk and financial portfolio analytics - A technical Introduction
Risk and financial portfolio analytics - A technical IntroductionRisk and financial portfolio analytics - A technical Introduction
Risk and financial portfolio analytics - A technical Introduction
 
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
 
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
 
Cement and co2 what's happening
Cement and co2   what's happeningCement and co2   what's happening
Cement and co2 what's happening
 
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
 
Environmental Risk Management
Environmental Risk ManagementEnvironmental Risk Management
Environmental Risk Management
 
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
 
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonaldCosts for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
Costs for CO2 capture in cement manufacture - Duncan Barker, Mott MacDonald
 
Cement and CO2: A Victim of Success
Cement and CO2: A Victim of SuccessCement and CO2: A Victim of Success
Cement and CO2: A Victim of Success
 
The opportunities for reducing CO2 emissions in the iron and steel industry -...
The opportunities for reducing CO2 emissions in the iron and steel industry -...The opportunities for reducing CO2 emissions in the iron and steel industry -...
The opportunities for reducing CO2 emissions in the iron and steel industry -...
 
Carbon Capture & Storage
Carbon Capture & StorageCarbon Capture & Storage
Carbon Capture & Storage
 
Risk fundamental & technical analysi- dow theory- chartss
Risk  fundamental  & technical analysi- dow theory- chartssRisk  fundamental  & technical analysi- dow theory- chartss
Risk fundamental & technical analysi- dow theory- chartss
 
Capture of CO2
Capture of CO2Capture of CO2
Capture of CO2
 
Carbon Capture and Storage
Carbon Capture and StorageCarbon Capture and Storage
Carbon Capture and Storage
 

Similar to Webinar: How to manage technical risk in CO2 capture technology development

Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...Global CCS Institute
 
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Sigve Hamilton Aspelund
 
CV Sigve Hamilton Aspelund 092014 Production Engineer
CV Sigve Hamilton Aspelund 092014  Production EngineerCV Sigve Hamilton Aspelund 092014  Production Engineer
CV Sigve Hamilton Aspelund 092014 Production EngineerSigve Hamilton Aspelund
 
CCS technology development Norway - key activities - learnings – way forward
CCS technology development Norway   - key activities - learnings – way forwardCCS technology development Norway   - key activities - learnings – way forward
CCS technology development Norway - key activities - learnings – way forwardGassnova SF
 
lucas_trevor 10.11.14
lucas_trevor 10.11.14lucas_trevor 10.11.14
lucas_trevor 10.11.14Trevor Lucas
 
Norway – a leading role in CCS development
Norway – a leading role in CCS developmentNorway – a leading role in CCS development
Norway – a leading role in CCS developmentGassnova SF
 
Ash Townes. AMEC. 27th January
Ash Townes. AMEC. 27th JanuaryAsh Townes. AMEC. 27th January
Ash Townes. AMEC. 27th JanuaryUKTI2014
 
CV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionCV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionSigve Hamilton Aspelund
 
Opera presentation tecnalia_20170306_v1.3
Opera presentation tecnalia_20170306_v1.3Opera presentation tecnalia_20170306_v1.3
Opera presentation tecnalia_20170306_v1.3TECNALIA Marine Energy
 
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Global CCS Institute
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSGlobal CCS Institute
 
Norway_Johan sverdrup, report 2015
Norway_Johan sverdrup, report 2015Norway_Johan sverdrup, report 2015
Norway_Johan sverdrup, report 2015Business Finland
 

Similar to Webinar: How to manage technical risk in CO2 capture technology development (20)

Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...
 
COP19: A Year of Progress
COP19: A Year of ProgressCOP19: A Year of Progress
COP19: A Year of Progress
 
Status and Results from the Norcem CO2 Capture Project, Liv Bjerge (Norcem) U...
Status and Results from the Norcem CO2 Capture Project, Liv Bjerge (Norcem) U...Status and Results from the Norcem CO2 Capture Project, Liv Bjerge (Norcem) U...
Status and Results from the Norcem CO2 Capture Project, Liv Bjerge (Norcem) U...
 
CV Sigve Hamilton Aspelund 092014
CV Sigve Hamilton Aspelund 092014 CV Sigve Hamilton Aspelund 092014
CV Sigve Hamilton Aspelund 092014
 
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
 
CV Sigve Hamilton Aspelund 092014 Production Engineer
CV Sigve Hamilton Aspelund 092014  Production EngineerCV Sigve Hamilton Aspelund 092014  Production Engineer
CV Sigve Hamilton Aspelund 092014 Production Engineer
 
CCS technology development Norway - key activities - learnings – way forward
CCS technology development Norway   - key activities - learnings – way forwardCCS technology development Norway   - key activities - learnings – way forward
CCS technology development Norway - key activities - learnings – way forward
 
lucas_trevor 10.11.14
lucas_trevor 10.11.14lucas_trevor 10.11.14
lucas_trevor 10.11.14
 
Norway – a leading role in CCS development
Norway – a leading role in CCS developmentNorway – a leading role in CCS development
Norway – a leading role in CCS development
 
Ash Townes. AMEC. 27th January
Ash Townes. AMEC. 27th JanuaryAsh Townes. AMEC. 27th January
Ash Townes. AMEC. 27th January
 
CV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionCV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short version
 
Opera presentation tecnalia_20170306_v1.3
Opera presentation tecnalia_20170306_v1.3Opera presentation tecnalia_20170306_v1.3
Opera presentation tecnalia_20170306_v1.3
 
Overview R&DD Activities in the Climit Program, Hans Jørg Fell (Gassnova) UK/...
Overview R&DD Activities in the Climit Program, Hans Jørg Fell (Gassnova) UK/...Overview R&DD Activities in the Climit Program, Hans Jørg Fell (Gassnova) UK/...
Overview R&DD Activities in the Climit Program, Hans Jørg Fell (Gassnova) UK/...
 
20190403 cv sigve hamilton aspelund
20190403 cv sigve hamilton aspelund20190403 cv sigve hamilton aspelund
20190403 cv sigve hamilton aspelund
 
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
 
Mark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CVMark Crame Lead Instrument Engineer CV
Mark Crame Lead Instrument Engineer CV
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
 
CV Sigve Hamilton Aspelund 042015 b
CV Sigve Hamilton Aspelund 042015 bCV Sigve Hamilton Aspelund 042015 b
CV Sigve Hamilton Aspelund 042015 b
 
Norway_Johan sverdrup, report 2015
Norway_Johan sverdrup, report 2015Norway_Johan sverdrup, report 2015
Norway_Johan sverdrup, report 2015
 
TCM presentation May 2013
TCM presentation May 2013TCM presentation May 2013
TCM presentation May 2013
 

More from Global CCS Institute

Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Global CCS Institute
 
Webinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSWebinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSGlobal CCS Institute
 
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Global CCS Institute
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Global CCS Institute
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationGlobal CCS Institute
 
Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeGlobal CCS Institute
 
Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Global CCS Institute
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Global CCS Institute
 
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Global CCS Institute
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsGlobal CCS Institute
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Global CCS Institute
 
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Global CCS Institute
 
Water use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsWater use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsGlobal CCS Institute
 
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...Global CCS Institute
 
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processGlobal CCS Institute
 

More from Global CCS Institute (20)

Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project
 
Webinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSWebinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCS
 
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
 
Global CCS Institute Presentation
Global CCS Institute PresentationGlobal CCS Institute Presentation
Global CCS Institute Presentation
 
ION Engineering Presentation
ION Engineering PresentationION Engineering Presentation
ION Engineering Presentation
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) Presentation
 
Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation Challenge
 
Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
 
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basins
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
 
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
 
Water use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsWater use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systems
 
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
 
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
 

Recently uploaded

Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKJago de Vreede
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 

Recently uploaded (20)

Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 

Webinar: How to manage technical risk in CO2 capture technology development

  • 1. How to manage technical risk in CO2 capture technology development Tuesday 10 June 2014, 1700 AEDT
  • 2. Oscar Fr. Graff Oscar holds a Master of Science degree in chemical engineering from the Norwegian University of Science and Technology (NTNU). He joined Aker in 1980 and has been involved in concept and technology development, major offshore and onshore projects, and in different management positions. Oscar has been actively involved in the development of CO2 capture technology since 1999. He assumed the position as Chief Technical Officer (CTO) in Aker Clean Carbon in 2008 and is presently Department Manager and CTO for Carbon Capture in Aker Solutions. Chief Technology Officer, Department of Clean Carbon, Aker Solutions
  • 3. Anastasia Isaenko Educated in process engineering, Anastasia Isaenko has worked with Carbon Capture and Storage (CCS) related issues since 2007. Anastasia has been involved in Technology Qualification projects within CCS and renewable energy technologies as well as development of DNV Recommended Practices for Qualifying CO2 Capture Technologies. Consultant, Carbon Capture and Storage, DNV GL
  • 4. QUESTIONS  We will collect questions during the presentation.  Your MC will pose these question to the presenters after the presentation.  Please submit your questions directly into the GoToWebinar control panel. The webinar will start shortly.
  • 5. Confidential © 2014 Aker Solutions Preferred partner Preferred partner How to manage technical risk in CO2 capture technology development Value creation through innovation Slide 5 Webinar by Global CCS Institute 10 June 2014 Oscar Graff CCS Department Manager and CTO
  • 6. Confidential © 2014 Aker Solutions Preferred partner CCS in Aker Solutions Technology ownership: Aker Solutions (100%) Office: Fornebu (Oslo), Norway ■ A focused technology company ■ 20 years of CCS know-how and experience acquired via Aker projects ■ Core competence within flue gas treatment and CO2 capture ■ Invested ~400 MNOK (~$65M) in capture technology ■ Leading one of the largest CCS R&D programmes in Europe (SOLVit) ■ Operating a unique, advanced mobile test unit (MTU), engaged in several CCS projects. ■ Design, construction, start-up and operation of amine plant at Technology Centre Mongstad (TCM) ■ About 30 experts and 300 employees in Aker companies have been engaged in CCS ■ A leading technology provider of carbon capture world-wide (fossil fuels, refineries and cement) ■ Aker Solutions’ step by step business approach (risk management): A global supplier of cost-effective CO2 capture plants and technology 1996 1996 1998 2007 2008 2011 Sleipner Field Kårstø Demo Study Mobile Test Unit (MTU) Large Scale Pilot TCM Kårstø CO2 Pilot Develop – Test – Improve – Deploy NTNU/SINTEF Lab Rig 2012 Slide 6
  • 7. Confidential © 2014 Aker Solutions Preferred partner Capture Technology – Potential risk elements ■ Complete design of capture plant and utility systems ■ Integration with emitter (main plant) ■ Heat and mass balance ■ Material selection ■ Instrument and control & monitoring ■ Equipment ■ Solvent ■ Turn-down ■ Availability ■ Lifetime ■ CO2 purity ■ Liquid waste ■ Emissions to air ■ Capture rate, energy demand ■ Solvent make-up, etc. ■ Performance guarantees Slide 7 Performance guarantees can only be given after the required qualifications, tests and verifications have been carried out
  • 8. Confidential © 2014 Aker Solutions Preferred partner What are the main challenges? ■ New amine solvents: ■ Capture efficiency ■ Energy demand (steam) ■ Degradation/make-up ■ Corrosion ■ Foaming ■ Reclaiming ■ Emission to air ■ HSE data ■ Materials (equipment, piping, valves, instruments, liner, gaskets etc.) ■ Equipment (type, internals etc.) ■ Actual flue gas condition (composition, particles, P & T) ■ Scale-up Slide 8 Commercial application: - only after long term testing (6-12 months) on actual flue gas in large scale pilot
  • 9. Confidential © 2014 Aker Solutions Preferred partner R&D Programmes: - SOLVit - Reclaiming - BigCO2 - BigCCS - CASTOR - Emissions - Plastic Liner/Mat. - Cleo Technology Qualification: - DNV (DNV-RP-J201) - CCM Project (4000 hr’s test at TCM) Lab facilities: - NTNU / SINTEF / IFE / Norner / NILU Pilot Testing: - TCM, Mongstad - Tiller Pilot, Trondheim - Mobile Test Unit (MTU) - EnBW in Heilbronn Aker Solutions partner in substantial R&D&Q programmes: Total Projects = ~750 MNOK (~ $125M) CCS Gas Industrial emissions (cement, etc.) CCS CoalStudy & FEED TCM/CCM Slide 9 TCM/CCM Emission degradation in atmosphere
  • 10. Confidential © 2014 Aker Solutions Preferred partner Develop and demonstrate solvents with minimum energy consumption and lowest possible environmental impact. This is done step-wise and systematic: SOLVit R&D – main objectives: Lab- bench scale Lab- pilot scale Full-height pilot, Tiller Real exhaust: - MTU - Heilbronn Theoretical evaluations TCM: - CHP gas - RFCC gas SOLVit Phase 1, 2 & 3 SOLVit Phase 3 Unique CC R&D Programme  7 years programme (2008-2015)  Fundamental R&D  Extensive testing in pilots  Heavy industry involvement  332 MNOK ~$54M (phase 1,2 & 3) Slide 10 Research environment Industrial environment
  • 11. Confidential © 2014 Aker Solutions Preferred partner Testing with clients actual flue gas at their site MTU (Mobile Test Unit) – operating a complete capture plant from 2008 DCC Blower Cooler Absorber Transport ReclaimerDesorber Process Container incl. Energy Saver MTU: • Different flue gases • Process improvements • New robust solvents • Reclaiming • Degradation • Corrosion • Emissions • LCC evaluations • Capacity: 2000 TPA CO2 Slide 11 Main tool for verifications and risk reduction!
  • 12. Confidential © 2014 Aker Solutions Preferred partner MTU, Mobile Test Unit - Advanced CO2 capture pilot Test campaigns in industrial environment since 2008: coal & gas power, refinery & cement industry Over 17 000 operating hours MTU in operation at Longannet Power Plant Picture: Scottish Power Alabama, US National CCC Risavika & TCM Norway ACCTM 1st in UK ACCTM 1st at NCCC 2009 2011 2008 2012 Slide 12 ACCTM 1st at TCM
  • 13. Confidential © 2014 Aker Solutions Preferred partner MTU relocated to Norcem cement plant at Brevik, Norway Slide 13 1st large scale testing globally on a cement plant
  • 14. Confidential © 2014 Aker Solutions Preferred partner  Technology: Aker Solutions  Capacity: 78 000 tonnes CO2/year  Gas Power (CHP) flue gas ~3,5 vol-% CO2  Residual Catalytic Cracker (RCC) flue gas 12,9 vol-% CO2, resembling flue gas from coal  Large turndowns, 16-100% plant capacity  Flexibility in stripper operating pressures  Flexibility in packing heights  Utilities and tie-ins designed for 120% to be able to test plant limitations  Mobile Test Unit (MTU) screening tests run in parallel  Extensive online analysis and monitoring instruments  Unique equipment: o Concrete absorber w/PP liner o Two stripper systems with alternative reboiler design o Energy saver module (~20% reduction in steam) TCM- Unique and flexible amine facility in 2012 Slide 14
  • 15. Confidential © 2014 Aker Solutions Preferred partner7 May 2014 Milestone Mongstad 3Slide 15 15 months extensive test programme at Technology Centre Mongstad - TCM
  • 16. Confidential © 2014 Aker Solutions Preferred partner Our staged CCS development programme ■ From lab to commercial plants ■ DNV technology qualification (DNV-RP-J201) The preferred partner 1996 2006 2015 Membrane Contactor Advance Post Combustion: reduced energy & solvent losses SOLVit R&D Reduced technical and commercial risk. Cost reductions 20081996 1998 2006 2010 2012 20xx SINTEF/NTNU Part of SOLVit Syntetic gas Diam.: 0.15 m Height: 6 m Capture: 0.01 t/h AKER K-LAB Membrane tests Gas engine Diam.: 0.4 m Height: 12 m Capture: 0.2 t/h AKER SOLUTIONS Mobile facility (MTU) Coal, gas power,cement Diam.: 0.4 m Height: 25 m Capture: 0.2 t/h TILLER RIG Part of SOLVit Propane burner Diam.: 0.2 m Height: 25 m Capture: 0.05 t/h AKER SOLUTIONS Mongstad Techn. Centre Gas power & cracker Diam.: 2.9 m Height: 62 m Capture: 8.9 t/h FULL SCALE Coal & gas power, cement Diam.: 10-20 m Height: 45-50 m Capture: 100-250 t/h CASTOR+ RIG EU Project Coal power Diam.: 1.1 m Height: 28 m Capture: 1.0 t/h Aker S is partner Cap. x ~15Capture x ~50 Experience from six pilots into full-scale 1 2 3 4 5 6
  • 17. DNV GL © 2013 10 june 2014 SAFER, SMARTER, GREENERDNV GL © 2013 10 june 2014 Anastasia Isaenko-DNV GL How to manage technical risk in CO2 capture technology development Global CCS Institute webinar 17
  • 18. DNV GL © 2013 10 june 2014 Technology Qualification DNV GL’s Definition of Qualification: Qualification is the process of providing the evidence that the technology will function within specific limits with an acceptable level of confidence Technology Developer Confidence Project Manager Stakeholders
  • 19. DNV GL © 2013 10 june 2014 Technology Challenges  Introducing new unproven technology at commercial scale represent a technical risk for various stakeholders in terms of technology performance, HSE issues, project cost overruns and delays  Many technology providers are unable to give process guarantees on key performance parameters 19 DNV-RP-J201 “Qualification procedures for CO2 capture technology” (2010)
  • 20. DNV GL © 2013 10 june 2014 The challenge facing new technology users – Known or New Technology? 20 Return on Investment Known Technology New Technology 0 E[RoI] E[RoI] E[RoI] New Technology After TQ Probability New Technology increase the expected value of the investment ... but also increases the uncertainty
  • 21. DNV GL © 2013 10 june 2014 Qualification Process (e.g. CO2 capture with amine) 21 Qualification Basis Technology Qualified Qualification Plan Execution of Plan (Collect evidence) Performance Assessment Technology Assessment Threat Assessment Concept Improvement CO2 + N2 + O2 CO2-lean solvent CO2-rich solvent N2 + O2 Absorber Low temp. Stripper High temp. Cooler Steam CO2 Power and heat Flue gas Capture rate: 86 % Energy penalty: 66 MW Define the expectations of the technology e.g capture rate, emissions, energy penalty, reliability etc.
  • 22. DNV GL © 2013 10 june 2014 Qualification Process 22 Qualification Basis Technology Qualified Qualification Plan Execution of Plan (Collect evidence) Performance Assessment Technology Assessment Threat Assessment Concept Improvement 1: Proven technology 2 - 4: New Technology Technology Assessment according to DNV RP-J201 Application Area 1 Proven 2 Limited field history 3 New or unproven 1. Known 1 2 3 2. New 2 3 4 Technology status Application Area 1 Proven 2 Limited field history 3 New or unproven 1. Known 1 2 3 2. New 2 3 4 Technology status Divide the technology into manageable elements and rate them
  • 23. DNV GL © 2013 10 june 2014 Qualification Process 23 Qualification Basis Technology Qualified Qualification Plan Execution of Plan (Collect evidence) Performance Assessment Technology Assessment Threat Assessment Concept Improvement Identify all relevant threats for the elements defined as new and, judge the associated risks.
  • 24. DNV GL © 2013 10 june 2014 Qualification Process 24 Qualification Basis Technology Qualified Qualification Plan Execution of Plan (Collect evidence) Performance Assessment Technology Assessment Threat Assessment Concept Improvement ….. Long term (min. 3000 h) test with corrosion probesCorrosionLeakagePiping Lab testing of materials suitability 3 Long term (min. 3000 h) test of solvent properties Too high degradation of solvent Reduced CO2 capture rate Solvent Verify solvent Properties 2 Pilot scale distributor testModelling uncertainty Uneven distribution in column Liquid distributor in absorber Validate CFD Modelling1 Type of activityFailure MechanismFailure ModeComponent Qualification method No To adequately address the identified failure modes
  • 25. DNV GL © 2013 10 june 2014 Qualification Process 25 Qualification Basis Technology Qualified Qualification Plan Execution of Plan (Collect evidence) Performance Assessment Technology Assessment Threat Assessment Concept Improvement Collect qualification data (Work the plan)
  • 26. DNV GL © 2013 10 june 2014 Qualification Process 26 Qualification Basis Technology Qualified Qualification Plan Execution of Plan (Collect evidence) Performance Assessment Technology Assessment Threat Assessment
  • 27. DNV GL © 2013 10 june 2014 DNV GL deliverablesQualification Work Process Qualification Basis Technology Qualified Qualification Plan Execution of the plan Performance Assessment Technology Assessment Threat Assessment Statements from DNV GL TECHNICAL REPORT DET NORSKE VERITAS Technology Assessment Report Statement of Feasibility “No show stoppers” TECHNICAL REPORT DET NORSKE VERITAS Technology Qualification Plan Endorsement of Qualification Plan “Technically executable” Technology Certificate “Technology qualified” TECHNICAL REPORT DET NORSKE VERITAS Technology Qualification Report
  • 28. DNV GL © 2013 10 june 2014 Concluding remarks on Technology Qualification  The risk of introducing unproven technologies can be high  The DNV GL’s methodology focuses on addressing the high risk elements of the technology  The methodology ensures that the adequate tests are undertaken before the deployment of the technology  The technology risk management builds confidence in new technologies 28 Technology risk management can provide confidence where wanted process guarantees cannot be given
  • 29. DNV GL © 2013 10 june 2014 Thank you for your attention! 29
  • 30. Confidential © 2014 Aker Solutions Preferred partner Back-up slides Slide 30
  • 31. Confidential © 2014 Aker Solutions Preferred partner ACC Direct Contact Cooler Flue Gas Fan ACC Absorber Tower Treated Flue Gas Flue Gas Inlet CO2 Compressor CO2 to transport ACC Energy Saver ACC Reclaimer ACC Reboiler ACC Desorber Filter package ACC Emission Control & Anti-Mist Water Wash & Water Balance Absorption Section Rich/Lean Hx Technology, Process Design and Equipment: Technology advantages: 1. Most mature 2. Flexibility 3. For retrofit and new built 4. For various flue gases 5. Life Cycle Cost 6. Potential improvements Technology Characteristics:  Excellent performance data for coal and gas power plants  Testing of refinery cracker gas and gas from cement industry  Cost, energy and environmental focus  Modularization Key Equipment 1. Absorber Tower 2. Desorber incl. Reboiler 3. Direct Contact Cooler 4. Reclaimer 5. Energy Saver Full scale plant and process design, specification of proprietary equipment packages, solvent formulation, performance guarantees and licencing of technology Slide 31 ACC= Advanced Carbon Capture
  • 32. Confidential © 2014 Aker Solutions Preferred partner Testing with clients actual flue gas at their site MTU (Mobile Test Unit) – operating a complete capture plant from 2008 DCC Blower Cooler Absorber Transport ReclaimerDesorber Process Container incl. Energy Saver MTU: • Different flue gases • Process improvements • New robust solvents • Reclaiming • Degradation • Corrosion • Emissions • LCC evaluations • Capacity: 2000 TPA CO2 Slide 32
  • 33. Confidential © 2014 Aker Solutions Preferred partner Test Center Mongstad (TCM) ■ Video at youtube: http://www.youtube.com/watch?v=adu4-ahLE_0&feature=youtu.be Slide 33
  • 34. Confidential © 2014 Aker Solutions Preferred partner Copyright and disclaimer Copyright Copyright of all published material including photographs, drawings and images in this document remains vested in Aker Solutions and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction. Disclaimer This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major markets for Aker Solutions ASA and Aker Solutions ASA’s (including subsidiaries and affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as “expects”, “believes”, “estimates” or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries that are or will be major markets for Aker Solutions’ businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Aker Solutions ASA believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Aker Solutions ASA is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Aker Solutions ASA nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use. Aker Solutions consists of many legally independent entities, constituting their own separate identities. Aker Solutions is used as the common brand or trade mark for most of these entities. In this presentation we may sometimes use “Aker Solutions”, “we” or “us” when we refer to Aker Solutions companies in general or where no useful purpose is served by identifying any particular Aker Solutions company. Slide 34
  • 35. QUESTIONS / DISCUSSION Please submit your questions in English directly into the GoToWebinar control panel. The webinar will start shortly.
  • 36. Please submit any feedback to: webinar@globalccsinstitute.com