Global CCS Institute Europe
Member Meeting
Bergen, 8th May 2012


Philip Ringrose, Project Network Steering Committee
Contents

1. The Projects


2. The Network




  |               |   |   |   2
1) The Projects




  |          |    |   |   3
A strong portfolio
                                                                    Sleipner, NO
                                                                    Gas processing
                                                                        1Mtpa CO2
Don Valley,
   UK
 Power sector
 650 MW, pre-                                                      Bełchatów, PL
  combustion                                                         Power sector
  5 Mtpa CO2                                                           250MW,
                                                                    post-combustion
                                                                     1.8Mtpa CO2

 ROAD, NL                                                         Jänschwalde,
Power sector                                                           DE
  250MW,                                                            Power sector
    post-       Compostilla, ES                                        300MW,
                Power sector 323MW,
                                          Porto Tolle, IT
 combustion                                                       post-combustion &
                      oxyfuel         Power sector 250MW, post-
1.1 Mtpa CO2                                 combustion                oxyfuel
                   1.6 Mtpa CO2                                     1.7Mtpa CO2
                                             1 Mtpa CO2
         |               |                      |                        |    4
Bełchatów
Project developer: PGE
      Partners: Alstom, Dow Chemical,
      PGI, Gazoprojekt, Schlumberger.
Capture
      260MWe post-combustion.
      Lignite.




                                        Transport
                                            60-140km pipeline.
                                        Storage
                                            Deep saline aquifer.
                                            Onshore.
                                            1.8 MtCO2/yr.


  |                   |                 |                  |       5
Update Bełchatów

     Comprehensive FEED study completed.

     Capture Ready status for new-build 858 MW e Power Plant
     obtained.

     Storage site selection completed.

     Feasibility study for transport completed.

     Ongoing public engagement campaign.




 |                    |                           |            |   6
Compostilla

 Project developer: Endesa
     Partners: CIUDEN, Foster Wheeler.

 Capture
     330MWe oxy-combustion.


                                         Transport
                                             150km pipeline.

                                         Storage
                                             Deep saline aquifer.
                                             Onshore.
                                             1.6 MtCO2/yr.


 |                 |                         |                      |   7
Update Compostilla

     Regulation on transport and plant operation not in place (no level
     playing field in the market).

     - Capture:       Technology Development Plant in advanced
                      stage of construction.
     - Transport:     Pipeline design concluded.
     - Storage:       - Preliminary characterization of subsurface
                        structures well advanced.
                      - Technology Development Plant fully
                        operational in 2013.
                      - Action plan for public engagement.

     Major challenges are non-technical (finance, regulatory and
     public perception).

 |                    |                       |                    |   8
Don Valley
 Project developer: 2CO Energy

 Capture
     650 MWe pre-combustion.

 Transport
     175 + 175 km pipeline.




                               Storage
                                  EOR, depleted gas reservoirs or
                                  deep saline formation.
                                  Offshore.
                                  5 MtCO2/yr.


 |                  |                    |                  |       9
Update Don Valley

     Project owned by 2Co, and Samsung C&T recently agreed to
     take a strategic 15% stake in the project.

     Scope of the project broadened (includes EOR).

     National Grid’s initial public consultation complete, with a
     preferred onshore route recently announced




 |                    |                         |                   |   10
Jänschwalde
Project developer: Vattenfall
Investment: €1.5bn (€1.2bn for capture)
Capture
      250MWe post-combustion.
      50MWe oxy-combustion.
      η=36% (38%).
      Flexible operation (50-103%).
      97% availability targeted.
      Lignite.

                                      Transport
                                          50-100km pipeline.
                                      Storage
                                          Deep saline aquifer (or gas field).
                                          Onshore.
                                          1.7 MtCO2/yr.

  |                     |                         |                    |   11
Update Jänschwalde

 Due to the ongoing impasse in the German CCS law, Vattenfall
 has decided to halt plans for its CCS demonstration project in
 Jänschwalde.

 Unfortunately the project will also be leaving the Network in the
 coming month.

 Lessons learnt from this project will be shared with the other
 Network members at the Network knowledge sharing even on the
 24-25th of May.




 |                   |                        |                  |   12
Porto Tolle
Project developer: ENEL

Capture
      264MWe (net) post-combustion.
      Construction permit for new 2GW power plant
      issued Jan 2011 (η =45%).
      Retrofit of one 660MW unit.


                                             Transport
                                                        100km pipeline.

                                             Storage
                                                        Deep saline aquifer.
                                                        20km offshore.
                                                        ~1 MtCO2/yr.

  |                    |                            |                      |   13
Update Porto Tolle
  Pilot in Brindisi has run over 2.400 hrs (promising results in the
  energy consumption).
  Problems with permit base power plan (conversion oil to coal)
  have been solved.
  Transposition of EU Directive accomplished.
  - Transport: - Application for permits ground surveys
                       submitted.
  - Injection:       - Feasibility studies for subsurface structure
                       and injection system.
                     - FEED for platform and well(s).
  - Storage:         - Ongoing modelling of storage site and
                       engineering of exploration drilling.
                     - Application for exploration permit ongoing.

 |                   |                         |                  |    14
ROAD, Rotterdam
Project developer: Maasvlakte CCS Project
      Partners: E.ON Benelux, GdF Suez

Capture
      250MWe (net) post-combustion.
      Power plant η=46%
      (with capture plant η=36% (designed)).
      Baseload.
      90% capture.
                                               Transport
                                                     25km pipeline.

                                               Storage
                                                     Depleted gas reservoirs.
                                                     Offshore.
                                                     1.1 MtCO2/yr.


  |                     |                        |                    |   15
Update ROAD

     Design of capture plant is complete

     Draft permits (environmental/spatial) are about to be published.

     Storage permit has been successfully reviewed by the
     Commission, which has given its first Opinion

     Flow assurance study has been completed

     Storage facility negotiations are progressing well

     FID Q2, 2012



 |                    |                        |                 |   16
Sleipner
Project developer: Statoil
      Partners: ExxonMobil, Total

Capture
      In operation since October 1996.
      Gas processing
      Conventional amine capture.
                                         Transport
                                             1km delivery pipe.

                                         Storage
                                             Deep saline aquifer.
                                             Offshore.
                                             0.9 Mtpa CO2 stored.
                                             Over 13 Mt CO2
                                             injected to date.


  |                     |                |                 |      17
Update Sleipner                                                                           Geophysical
                 CO2 injection history                                                                  monitoring
                                                                                     2D
                                                                                                          surveys
                            14
                            13
 Accumulated injected CO2




                            12    Wellhead pressure stable at ~ 64 – 65 bar
                            11    Wellhead temperature set at 25 oC
                            10
      [million tons]




                             9
                             8
                             7
                             6
                             5
                             4
                             3
                             2
                             1
                             0
                             1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

                                                                      Year
  The Sleipner CO2 story
      |                                             |                                 |                         |    18
18
2) The Network




 |          |    |   |   19
What is the CCS Project Network?
     Established in 2009 to generate early benefit from a coordinated
     European action on CCS-demonstration projects
     Current members includes the seven projects; however Jänschwalde
     will unfortunately be leaving the Network until the project is restarted
     Projects fulfilling qualification criteria can join

Objectives
   Enabling knowledge-sharing amongst projects
   Leverage experience of projects in order to gain public confidence
   about CCS
   Promote CCS, EU leadership and cooperation potential to third
   parties/countries


     |                  |                        |                   |   20
Network update – change of secretariat
New secretariat for the Network effective 21 March 2012.
The new secretariat consists of:

          The Global CCS Institute is a not-for-profit independent entity. It’s global members include
           350 government, industry, academia bodies. It focuses on knowledge sharing and assisting
           projects



          IFPEN is a public-sector research, industrial innovation and training centre active in the
           fields of energy, transport and the environment.



          TNO applies scientific knowledge with the aim of strengthening the innovative power of
           industry and government.


          SINTEF is one of the largest independent European research institutes, focusing on power
           generation and energy conversion technologies, distribution and end-use.


   |                          |                                    |                          |    21
How do we operate?
Structure
    Members, bound by Membership Agreement and Knowledge Sharing
    Protocol.
    Steering Committee provides leadership.
    Advisory Forum provides guidance.
    Wide outreach to stakeholders and dissemination of data and findings.


Activities
    Regular knowledge sharing events, reporting & dissemination.
    Knowledge reporting form twice-yearly.
    Website and Intranet.
    International links.
    Engagement with forums such as ZEP.

      |                 |                       |                  |   22
What have we done?
   Thematic webinars April/May 2012.
   Working sessions in Oslo and Hamburg (2010) and Rotterdam (2011).
   Knowledge sharing event in Porto Tolle, Compostilla and Lódz (2011).
   Advisory Forum-meetings in Brussels in 2010 and 2011.
   Four themes have been focussed on in 2010 and 2011.
         Public Engagement.
         Risk Management (2010).
         Permitting.
         Storage (2011).
and Lessons learned reports have been published on the 2010 and 2011
themes.

     |                     |                   |                 |   23
What will we do?
A deeper and more focused approach to knowledge sharing:
     Collecting data and sharing them in-line with the Protocol.
     Reviewing the current system for data collection and sharing.
     Greater and clearer dissemination of findings
     More focused topics to be developed in 2012:
         Public Engagement
         Regulatory Development
         Storage (monitoring, characterisation)

     Development of “new” tools such as webinars and methods for fast-
     bilateral exchange.



 |                       |                           |               |   24
What are our challenges going forward?
The real challenge is in progress of the projects themselves!
      If the projects are in a good shape, the Network is in a good shape.
      Some projects on the verge of important decisions.
      Main hurdles:
          Project finance
          Time
          Public and political support for storage

          Extrinsic threats




  |                           |                      |                  |    25
Conclusions
The Network is in a good shape.

We need to go deeper into knowledge sharing
(vs. exchange of lessons learned “only”).

The real challenges lie in the progress of the projects themselves and
the hurdles which seem to remain unchanged whilst time goes on
(a generally felt concern).




  |                  |                        |                 |   26

Weitere ähnliche Inhalte

Was ist angesagt?

Laura Miller - CCS Projects – Presentation at the Global CCS Institute Member...
Laura Miller - CCS Projects – Presentation at the Global CCS Institute Member...Laura Miller - CCS Projects – Presentation at the Global CCS Institute Member...
Laura Miller - CCS Projects – Presentation at the Global CCS Institute Member...
Global CCS Institute
 
TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012
TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012
TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012
Global CCS Institute
 
Gynybos atase vizitas
Gynybos atase vizitasGynybos atase vizitas
Gynybos atase vizitas
IgnalinaNPP
 
Deepwater oilgasmalaysia 0407.tuan-hay_ewe
Deepwater oilgasmalaysia 0407.tuan-hay_eweDeepwater oilgasmalaysia 0407.tuan-hay_ewe
Deepwater oilgasmalaysia 0407.tuan-hay_ewe
hdvmal
 
E+PC Uranium Capability Statement (Final)
E+PC Uranium Capability Statement (Final)E+PC Uranium Capability Statement (Final)
E+PC Uranium Capability Statement (Final)
BCreaven
 
Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...
Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...
Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...
Global CCS Institute
 
VACON NXP Grid Converter - Cleaner power for ports and ships
VACON NXP Grid Converter - Cleaner power for ports and ships VACON NXP Grid Converter - Cleaner power for ports and ships
VACON NXP Grid Converter - Cleaner power for ports and ships
Vacon Plc
 
Final presentation for the final project ahmad alqahtani
Final presentation for the final project ahmad alqahtaniFinal presentation for the final project ahmad alqahtani
Final presentation for the final project ahmad alqahtani
Ahmad AlQahtani
 
Project update.29.04
Project update.29.04Project update.29.04
Project update.29.04
osxri
 

Was ist angesagt? (20)

Laura Miller - CCS Projects – Presentation at the Global CCS Institute Member...
Laura Miller - CCS Projects – Presentation at the Global CCS Institute Member...Laura Miller - CCS Projects – Presentation at the Global CCS Institute Member...
Laura Miller - CCS Projects – Presentation at the Global CCS Institute Member...
 
The Promise of Molten Salt: A Vision of CSP Displacing Coal
The Promise of Molten Salt: A Vision of CSP Displacing CoalThe Promise of Molten Salt: A Vision of CSP Displacing Coal
The Promise of Molten Salt: A Vision of CSP Displacing Coal
 
TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012
TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012
TCM Mongstad - Alstom CCS & Chilled Ammonia - May 2012
 
Gynybos atase vizitas
Gynybos atase vizitasGynybos atase vizitas
Gynybos atase vizitas
 
Sierra Geothermal Power
Sierra Geothermal PowerSierra Geothermal Power
Sierra Geothermal Power
 
Deepwater oilgasmalaysia 0407.tuan-hay_ewe
Deepwater oilgasmalaysia 0407.tuan-hay_eweDeepwater oilgasmalaysia 0407.tuan-hay_ewe
Deepwater oilgasmalaysia 0407.tuan-hay_ewe
 
E+PC Uranium Capability Statement (Final)
E+PC Uranium Capability Statement (Final)E+PC Uranium Capability Statement (Final)
E+PC Uranium Capability Statement (Final)
 
Jeffrey Brown – Summit Power Group – Texas Clean Energy Project: coal feedsto...
Jeffrey Brown – Summit Power Group – Texas Clean Energy Project: coal feedsto...Jeffrey Brown – Summit Power Group – Texas Clean Energy Project: coal feedsto...
Jeffrey Brown – Summit Power Group – Texas Clean Energy Project: coal feedsto...
 
Black & Veatch Power Generation
Black & Veatch Power GenerationBlack & Veatch Power Generation
Black & Veatch Power Generation
 
Manejo integral del desarrollo de parques industriales para la generación elé...
Manejo integral del desarrollo de parques industriales para la generación elé...Manejo integral del desarrollo de parques industriales para la generación elé...
Manejo integral del desarrollo de parques industriales para la generación elé...
 
Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...
Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...
Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...
 
The AFCR and its Contributions to the Back End of the Fuel Cycle
The AFCR and its Contributions to the Back End of the Fuel CycleThe AFCR and its Contributions to the Back End of the Fuel Cycle
The AFCR and its Contributions to the Back End of the Fuel Cycle
 
VACON NXP Grid Converter - Cleaner power for ports and ships
VACON NXP Grid Converter - Cleaner power for ports and ships VACON NXP Grid Converter - Cleaner power for ports and ships
VACON NXP Grid Converter - Cleaner power for ports and ships
 
Praire creek
Praire creekPraire creek
Praire creek
 
Global CCS Institute - Day 1 - Panel 1 - International Progress on CCS Projects
Global CCS Institute - Day 1 - Panel 1 - International Progress on CCS ProjectsGlobal CCS Institute - Day 1 - Panel 1 - International Progress on CCS Projects
Global CCS Institute - Day 1 - Panel 1 - International Progress on CCS Projects
 
Tom Georgis | SolarReserve
Tom Georgis | SolarReserveTom Georgis | SolarReserve
Tom Georgis | SolarReserve
 
Final presentation for the final project ahmad alqahtani
Final presentation for the final project ahmad alqahtaniFinal presentation for the final project ahmad alqahtani
Final presentation for the final project ahmad alqahtani
 
E+PC Power & Energy Capability
E+PC Power & Energy CapabilityE+PC Power & Energy Capability
E+PC Power & Energy Capability
 
Project update.29.04
Project update.29.04Project update.29.04
Project update.29.04
 
Syrah presentation for graphite conference November 2013
Syrah presentation for graphite conference November 2013Syrah presentation for graphite conference November 2013
Syrah presentation for graphite conference November 2013
 

Ähnlich wie Ccs project network update

CO2 transport systems development status of three large-scale European CCS de...
CO2 transport systems development status of three large-scale European CCS de...CO2 transport systems development status of three large-scale European CCS de...
CO2 transport systems development status of three large-scale European CCS de...
Global CCS Institute
 
Capture Facility & CO2 Stream Composition and Characterization
Capture Facility & CO2 Stream Composition and CharacterizationCapture Facility & CO2 Stream Composition and Characterization
Capture Facility & CO2 Stream Composition and Characterization
Global CCS Institute
 
TOGS2012-RiversideEnergy
TOGS2012-RiversideEnergyTOGS2012-RiversideEnergy
TOGS2012-RiversideEnergy
Dawn Hendrick
 
Modeling the CO2 hub terminal concept
Modeling the CO2 hub terminal conceptModeling the CO2 hub terminal concept
Modeling the CO2 hub terminal concept
jhjsmits
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012
Mike Vernon
 

Ähnlich wie Ccs project network update (20)

CO2 transport systems development status of three large-scale European CCS de...
CO2 transport systems development status of three large-scale European CCS de...CO2 transport systems development status of three large-scale European CCS de...
CO2 transport systems development status of three large-scale European CCS de...
 
CCS Development and Prospects in Indonesia - Sugihardjo
CCS Development and Prospects  in Indonesia - SugihardjoCCS Development and Prospects  in Indonesia - Sugihardjo
CCS Development and Prospects in Indonesia - Sugihardjo
 
Revithoussa l.n.g. terminal_presentation
Revithoussa l.n.g. terminal_presentationRevithoussa l.n.g. terminal_presentation
Revithoussa l.n.g. terminal_presentation
 
7th study meeting Tokyo - Holger Bietz
7th study meeting Tokyo - Holger Bietz7th study meeting Tokyo - Holger Bietz
7th study meeting Tokyo - Holger Bietz
 
Capture Facility & CO2 Stream Composition and Characterization
Capture Facility & CO2 Stream Composition and CharacterizationCapture Facility & CO2 Stream Composition and Characterization
Capture Facility & CO2 Stream Composition and Characterization
 
Economic Analysis Of Advanced Ultra Supercritical Pulverized Coal Power
Economic Analysis Of Advanced Ultra Supercritical Pulverized Coal PowerEconomic Analysis Of Advanced Ultra Supercritical Pulverized Coal Power
Economic Analysis Of Advanced Ultra Supercritical Pulverized Coal Power
 
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
 
The Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
The Severn Estuary - A sustainable low carbon energy resource - Peter KyddThe Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
The Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
 
Immobilisation and Storage of Nuclear Waste
Immobilisation and Storage of Nuclear WasteImmobilisation and Storage of Nuclear Waste
Immobilisation and Storage of Nuclear Waste
 
Immobilisation and Storage of Nuclear Waste
Immobilisation and Storage of Nuclear WasteImmobilisation and Storage of Nuclear Waste
Immobilisation and Storage of Nuclear Waste
 
The Peterhead Carbon Capture and Storage Project - plenary presentation given...
The Peterhead Carbon Capture and Storage Project - plenary presentation given...The Peterhead Carbon Capture and Storage Project - plenary presentation given...
The Peterhead Carbon Capture and Storage Project - plenary presentation given...
 
TOGS2012-RiversideEnergy
TOGS2012-RiversideEnergyTOGS2012-RiversideEnergy
TOGS2012-RiversideEnergy
 
Copperbelt energy eep presentation
Copperbelt energy   eep presentationCopperbelt energy   eep presentation
Copperbelt energy eep presentation
 
Ndola 10 mw biomass power project feasibility study (in partnership with eep)
Ndola 10 mw biomass power project feasibility study (in partnership with eep)Ndola 10 mw biomass power project feasibility study (in partnership with eep)
Ndola 10 mw biomass power project feasibility study (in partnership with eep)
 
2Co Energy - Don Valley Power Project - Securing Energy Supporting Growth – D...
2Co Energy - Don Valley Power Project - Securing Energy Supporting Growth – D...2Co Energy - Don Valley Power Project - Securing Energy Supporting Growth – D...
2Co Energy - Don Valley Power Project - Securing Energy Supporting Growth – D...
 
Atlantic Council - Darren Mollot
Atlantic Council - Darren MollotAtlantic Council - Darren Mollot
Atlantic Council - Darren Mollot
 
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
 
Modeling the CO2 hub terminal concept
Modeling the CO2 hub terminal conceptModeling the CO2 hub terminal concept
Modeling the CO2 hub terminal concept
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012
 
Barry Jones – Global CCS Institute – Global development and prospect of CCS p...
Barry Jones – Global CCS Institute – Global development and prospect of CCS p...Barry Jones – Global CCS Institute – Global development and prospect of CCS p...
Barry Jones – Global CCS Institute – Global development and prospect of CCS p...
 

Mehr von Global CCS Institute

Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Global CCS Institute
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Global CCS Institute
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Global CCS Institute
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Global CCS Institute
 
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Global CCS Institute
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basins
Global CCS Institute
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Global CCS Institute
 
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Global CCS Institute
 

Mehr von Global CCS Institute (20)

Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project
 
Webinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSWebinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCS
 
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
 
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
 
Global CCS Institute Presentation
Global CCS Institute PresentationGlobal CCS Institute Presentation
Global CCS Institute Presentation
 
ION Engineering Presentation
ION Engineering PresentationION Engineering Presentation
ION Engineering Presentation
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) Presentation
 
Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation Challenge
 
Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
 
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basins
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
 
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
 
Water use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsWater use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systems
 

Kürzlich hochgeladen

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Kürzlich hochgeladen (20)

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 

Ccs project network update

  • 1. Global CCS Institute Europe Member Meeting Bergen, 8th May 2012 Philip Ringrose, Project Network Steering Committee
  • 2. Contents 1. The Projects 2. The Network | | | | 2
  • 3. 1) The Projects | | | | 3
  • 4. A strong portfolio Sleipner, NO Gas processing 1Mtpa CO2 Don Valley, UK Power sector 650 MW, pre- Bełchatów, PL combustion Power sector 5 Mtpa CO2 250MW, post-combustion 1.8Mtpa CO2 ROAD, NL Jänschwalde, Power sector DE 250MW, Power sector post- Compostilla, ES 300MW, Power sector 323MW, Porto Tolle, IT combustion post-combustion & oxyfuel Power sector 250MW, post- 1.1 Mtpa CO2 combustion oxyfuel 1.6 Mtpa CO2 1.7Mtpa CO2 1 Mtpa CO2 | | | | 4
  • 5. Bełchatów Project developer: PGE Partners: Alstom, Dow Chemical, PGI, Gazoprojekt, Schlumberger. Capture 260MWe post-combustion. Lignite. Transport 60-140km pipeline. Storage Deep saline aquifer. Onshore. 1.8 MtCO2/yr. | | | | 5
  • 6. Update Bełchatów Comprehensive FEED study completed. Capture Ready status for new-build 858 MW e Power Plant obtained. Storage site selection completed. Feasibility study for transport completed. Ongoing public engagement campaign. | | | | 6
  • 7. Compostilla Project developer: Endesa Partners: CIUDEN, Foster Wheeler. Capture 330MWe oxy-combustion. Transport 150km pipeline. Storage Deep saline aquifer. Onshore. 1.6 MtCO2/yr. | | | | 7
  • 8. Update Compostilla Regulation on transport and plant operation not in place (no level playing field in the market). - Capture: Technology Development Plant in advanced stage of construction. - Transport: Pipeline design concluded. - Storage: - Preliminary characterization of subsurface structures well advanced. - Technology Development Plant fully operational in 2013. - Action plan for public engagement. Major challenges are non-technical (finance, regulatory and public perception). | | | | 8
  • 9. Don Valley Project developer: 2CO Energy Capture 650 MWe pre-combustion. Transport 175 + 175 km pipeline. Storage EOR, depleted gas reservoirs or deep saline formation. Offshore. 5 MtCO2/yr. | | | | 9
  • 10. Update Don Valley Project owned by 2Co, and Samsung C&T recently agreed to take a strategic 15% stake in the project. Scope of the project broadened (includes EOR). National Grid’s initial public consultation complete, with a preferred onshore route recently announced | | | | 10
  • 11. Jänschwalde Project developer: Vattenfall Investment: €1.5bn (€1.2bn for capture) Capture 250MWe post-combustion. 50MWe oxy-combustion. η=36% (38%). Flexible operation (50-103%). 97% availability targeted. Lignite. Transport 50-100km pipeline. Storage Deep saline aquifer (or gas field). Onshore. 1.7 MtCO2/yr. | | | | 11
  • 12. Update Jänschwalde Due to the ongoing impasse in the German CCS law, Vattenfall has decided to halt plans for its CCS demonstration project in Jänschwalde. Unfortunately the project will also be leaving the Network in the coming month. Lessons learnt from this project will be shared with the other Network members at the Network knowledge sharing even on the 24-25th of May. | | | | 12
  • 13. Porto Tolle Project developer: ENEL Capture 264MWe (net) post-combustion. Construction permit for new 2GW power plant issued Jan 2011 (η =45%). Retrofit of one 660MW unit. Transport 100km pipeline. Storage Deep saline aquifer. 20km offshore. ~1 MtCO2/yr. | | | | 13
  • 14. Update Porto Tolle Pilot in Brindisi has run over 2.400 hrs (promising results in the energy consumption). Problems with permit base power plan (conversion oil to coal) have been solved. Transposition of EU Directive accomplished. - Transport: - Application for permits ground surveys submitted. - Injection: - Feasibility studies for subsurface structure and injection system. - FEED for platform and well(s). - Storage: - Ongoing modelling of storage site and engineering of exploration drilling. - Application for exploration permit ongoing. | | | | 14
  • 15. ROAD, Rotterdam Project developer: Maasvlakte CCS Project Partners: E.ON Benelux, GdF Suez Capture 250MWe (net) post-combustion. Power plant η=46% (with capture plant η=36% (designed)). Baseload. 90% capture. Transport 25km pipeline. Storage Depleted gas reservoirs. Offshore. 1.1 MtCO2/yr. | | | | 15
  • 16. Update ROAD Design of capture plant is complete Draft permits (environmental/spatial) are about to be published. Storage permit has been successfully reviewed by the Commission, which has given its first Opinion Flow assurance study has been completed Storage facility negotiations are progressing well FID Q2, 2012 | | | | 16
  • 17. Sleipner Project developer: Statoil Partners: ExxonMobil, Total Capture In operation since October 1996. Gas processing Conventional amine capture. Transport 1km delivery pipe. Storage Deep saline aquifer. Offshore. 0.9 Mtpa CO2 stored. Over 13 Mt CO2 injected to date. | | | | 17
  • 18. Update Sleipner Geophysical CO2 injection history monitoring 2D surveys 14 13 Accumulated injected CO2 12 Wellhead pressure stable at ~ 64 – 65 bar 11 Wellhead temperature set at 25 oC 10 [million tons] 9 8 7 6 5 4 3 2 1 0 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Year The Sleipner CO2 story | | | | 18 18
  • 19. 2) The Network | | | | 19
  • 20. What is the CCS Project Network? Established in 2009 to generate early benefit from a coordinated European action on CCS-demonstration projects Current members includes the seven projects; however Jänschwalde will unfortunately be leaving the Network until the project is restarted Projects fulfilling qualification criteria can join Objectives Enabling knowledge-sharing amongst projects Leverage experience of projects in order to gain public confidence about CCS Promote CCS, EU leadership and cooperation potential to third parties/countries | | | | 20
  • 21. Network update – change of secretariat New secretariat for the Network effective 21 March 2012. The new secretariat consists of:  The Global CCS Institute is a not-for-profit independent entity. It’s global members include 350 government, industry, academia bodies. It focuses on knowledge sharing and assisting projects  IFPEN is a public-sector research, industrial innovation and training centre active in the fields of energy, transport and the environment.  TNO applies scientific knowledge with the aim of strengthening the innovative power of industry and government.  SINTEF is one of the largest independent European research institutes, focusing on power generation and energy conversion technologies, distribution and end-use. | | | | 21
  • 22. How do we operate? Structure Members, bound by Membership Agreement and Knowledge Sharing Protocol. Steering Committee provides leadership. Advisory Forum provides guidance. Wide outreach to stakeholders and dissemination of data and findings. Activities Regular knowledge sharing events, reporting & dissemination. Knowledge reporting form twice-yearly. Website and Intranet. International links. Engagement with forums such as ZEP. | | | | 22
  • 23. What have we done? Thematic webinars April/May 2012. Working sessions in Oslo and Hamburg (2010) and Rotterdam (2011). Knowledge sharing event in Porto Tolle, Compostilla and Lódz (2011). Advisory Forum-meetings in Brussels in 2010 and 2011. Four themes have been focussed on in 2010 and 2011. Public Engagement. Risk Management (2010). Permitting. Storage (2011). and Lessons learned reports have been published on the 2010 and 2011 themes. | | | | 23
  • 24. What will we do? A deeper and more focused approach to knowledge sharing: Collecting data and sharing them in-line with the Protocol. Reviewing the current system for data collection and sharing. Greater and clearer dissemination of findings More focused topics to be developed in 2012: Public Engagement Regulatory Development Storage (monitoring, characterisation) Development of “new” tools such as webinars and methods for fast- bilateral exchange. | | | | 24
  • 25. What are our challenges going forward? The real challenge is in progress of the projects themselves! If the projects are in a good shape, the Network is in a good shape. Some projects on the verge of important decisions. Main hurdles: Project finance Time Public and political support for storage Extrinsic threats | | | | 25
  • 26. Conclusions The Network is in a good shape. We need to go deeper into knowledge sharing (vs. exchange of lessons learned “only”). The real challenges lie in the progress of the projects themselves and the hurdles which seem to remain unchanged whilst time goes on (a generally felt concern). | | | | 26