SlideShare ist ein Scribd-Unternehmen logo
1 von 48
What Went Wrong?
   In 1986, two hospital patients died after receiving fatal doses of
    radiation from a Therac 25 machine after a software problem
    caused the machine to ignore calibration data
   Britain’s Coast Guard was unable to use its computers for
    several hours in May 2004 after being hit by the Sasser
    virus, which knocked out the electronic mapping systems, e-
    mail, and other computer functions, forcing workers to revert
    to pen, paper, and radios
   More than 100 incidents of lost or stolen financial information
    were reported over the past year, including personal
    information of 1.2 federal employees, 200,000 online trading
    customers, and 33,000 Air Force officers


                                    Schwalbe, Information Technology Project Management
Project Quality Management

          Prepared by Sir Gio Friginal
Quality
   The totality of characteristics of an entity that bear upon
    its ability to satisfy stated or implied needs (ISO)
   Conformance to requirements
   Customer’s Point of View
       Fitness for use
   Basic Issues
       It begins with customer
       It ends with customer
Why do we have poor quality?
   Lack of discipline
       Poorly defined requirement
       Uncontrolled changes
       Poor documentation
       Quality control
       Integration
       Testing
   Poor management
       Unclear objectives
       Not ready to do that project
       Staff problems
       Unrealistic demands
Project Quality Management
   Project quality management includes the process required to
    ensure that the project satisfies the needs for which it is
    undertaken.
   PQM includes all the activities of the overall management
    function that determine the quality policy, objectives, and
    responsibilities and implement them within the quality system
Project Quality Management Sub Processes
   QUALITY PLANNING
   QUALITY ASSURANCE
   QUALITY CONTROL
   These processes interact with each other as well as with the processes of
    other knowledge areas
   Each process involves an effort of one or more individual or group of
    individuals based on the need of the project.
   Each process occurs at least once in every project phase during the project
    life cycle
P R O J E C T Q U A L IT Y M A N A G E M E N T



   Q U A L IT P L A N N IN G         Q U A L IT Y A S S U R A N C E      Q U A L IT Y C O N T R O L



1- INPUTS                            1- INPUTS                         1- INPUTS

-Quality policy                      -Quality management plan          -work results

-Scope statement                     -result of quality control        -quality management plan
                                     measurements                      -Operational definitions
-Product description
                                     -Operational definitions          -checklists
-Standards and regulations
                                     2- TOOLS AND TECH.                2- TOOLS AND TECH.
-Other process outputs
                                     -Quality planning tools and       -inspection
2- TOOLS AND TECH.
                                     techniques
-benefit/ cost analysis                                                -Control charts
                                     -Quality audits
-Benchmarking                                                          -Pareto diagrams
                                     3- OUTPUTS
-Flowcharting                                                          -Statistical sampling
                                     -Quality improvement
-Design of experiments                                                 -flowcharting

3- OUTPUTS                                                             -Trend analysis

-Quality management plan                                               3- OUTPUTS

-Operational definitions                                               -Quality improvement

-checklists                                                            -Acceptance decisions

-Inputs to other processes                                             -rework
                                                                       -Completed checklist
                                                                       -Process adjustment
PQM Approach compatibility
   Compatible with ISO 9000 and 1000 series of standard
    guidelines
   Proprietary approaches to quality as recommended by
    Deming, Juran, and Crosby, and others.
   Nonproprietary approaches such as TQM, Continuous
    improvement approaches and others.
Nature of PQM
   Project quality management must address both the
    management of the project and the product of the
    project.
   Failure to meet quality requirements in either dimension
    can have serious and negative consequences for any or all
    of the project stakeholders
Examples of negative consequences
   Meeting the customer requirement by over working the
    project team may lead to negative consequence in
    employee turnover
   Meeting project schedules by rushing planned quality
    inspections may produce negative consequences when
    errors go undetected
   Quality vs. Grade
       Grade - category or rank given to entities having the same
        functional use but different technical characteristics
Quality Planning
   Identifying which quality standards are relevant to the
    project and determining how to satisfy them
Quality Planning
   Quality Planning involves identifying with quality
    standards
   It is a key facilitating process during the Project
    planning Process
   In modern quality management quality is planned in
    and not inspected in
   Prior to the development of ISO 9000 series, quality
    planning concepts were widely discussed as part of
    quality assurance.
Quality Planning Flowchart


 INPUTS                     TOOLS AND        OUTPUTS
                           TECHNIQUES

 1-Quality policy         1- Benefit/ cost   1-Quality Management
 2- Scope statement       analysis           plan
 3- Product description   2- Benchmarking    2- operational;
 4- Standards and         3- flowcharting    definitions
 regulations              4- Design of       3- checklists
 5- Other process         experiments        4-inputs to other
 outputs                                     processes
Quality Planning Inputs
    Quality policy
   The over all intentions and direction of an organization with
    regard to quality, as formally expressed by the top
    management
   In the case of a joint venture, a quality policy for the individual
    project should be developed
   The management team is responsible for dissipating the quality
    policy to all project stakeholders through appropriate
    information distribution channels
Quality Planning Inputs
    Scope Statement

   The scope statement is a key input to quality planning
    because it documents major project deliverables as well
    as project objectives which serve to define important
    stakeholder requirements
Quality Planning Inputs
    Product description

   Although the elements of the product description may be
    embodied in the scope statement, the product
    description often contains details of technical issues and
    other concerns that may affect quality planning
Quality Planning Inputs
    Standards and Regulations

   The project management team any application-area-
    specific standards or regulations that may affect the
    project
Quality Planning Inputs

                                   Quality
            Organizational Level   Goals, Systems, Contro
                                   l, Competition



               Project Level       Test
                                   planning, scheduling, res
                                   ources



             Operational Level      Test data, Test
                                    runs, Reviews, Reportin
                                    g
Quality Planning Inputs
    Other Process Outputs

   In addition to the scope statement and product
    description, processes in other knowledge areas may
    produce outputs that should be considered as part of
    the quality planning
   Example: procurement planning outputs may identify
    contractor quality requirements that should be
    reflected in the overall Quality Management Plan
Tools and Techniques for Quality
Planning
   Benefit / cost analysis

 The planning process must consider benefit/cost tradeoffs
 The Primary Benefit: Is less work, higher productivity, lower
  costs, and increased stakeholder satisfaction
 The Primary Cost: Is the expanses associated with PQM
  activities
Note: it is elementary that the benefit should outweigh the cost
Tools and Techniques for Quality
Planning
    Benchmarking
   Benchmarking involves comparing actual or planned
    project practices to those of other projects to
    generate ideas to:
1- Generate ideas for improvement
2- provide a standard for measurement of performance

Note: other projects compared may be within the same
 organization or out side and may be within the same
 application area or in another
Tools and Techniques for Quality
Planning
    Flow charting

   The flowcharting techniques in quality management
    generally include
-   cause and effect diagram
-   System or process flow charts

   Flowcharting can help in anticipating probable quality
    problems and thus helps to develop approaches for
    dealing with them
Tools and Techniques for Quality
Planning
Tools and Techniques for Quality
Planning
Tools and Techniques for Quality
Planning
Design of Experiments

   This is an analytical technique which aims to define
    variables that have most influence on the overall
    outcome
   This technique is commonly applicable to the product
    of the project issues.
   However this technique can also be used in project
    management issues such as cost and schedule
    tradeoffs to allow for optima solutions.
Tools and Techniques for Quality
Planning
Cost of quality

   Total cost of all efforts to achieve product/ service quality
       Cost of conformance
           Prevention cost
           Appraisal cost
       Cost of non-conformance
           Internal failure
           External failure
Outputs from Quality Planning
Quality Management Plan

   The quality management plan should describe how a
    project management team will implement its quality
    policy
   Also called Quality System, (in ISO terminology), the
    plan should define :
-   The organizational structure
-   Roles and responsibilities
-   Resources needed for implementation of quality management
Outputs from Quality Planning
    Quality Management Plan (continued)

   The Quality Plan should address:
-   Quality Control of the project
-   Quality Assurance
-   Quality Improvement of the project

Note: the project quality plan can be highly detailed or broadly
 framed based on the needs of the project
Outputs from Quality Planning
    Operational Definitions
   An operational definition describes what something is
    and how it is measured by the quality control process.
    For example:
-   the project management team must indicate the start and end
    of every activity in a detailed schedule
-   Weather the whole activity or certain deliverables are to be
    measured
Operational definitions are also called Metrics in some
 areas of application
Outputs from Quality Planning
    Checklists
   A checklist is a structured tool used to verify that a set of
    required steps or requirements have been performed.
   Many organizations have standard checklists to ensure
    consistency of frequently performed activities
Outputs from Quality Planning
    Inputs To Other Processes

   The quality planning process may identify need for further
    activity in another area
Quality Assurance
   Quality assurance encompasses all the planned and systematic
    activity implemented in a quality system to provide confidence
    that the project will satisfy the relevant quality standards
   Quality assurance is provided by a Quality Assurance dept.
   Quality assurance can be INTERNAL ( from the project
    management team to the performing organization)
   Quality assurance can be EXTERNAL (provided to the
    customer and other parties actively involved in the work of
    the project
Quality Assurance Flowchart


 INPUTS                     TOOLS AND           OUTPUTS
                          TECHNIQUES

 1-Quality management    1- Quality planning    1-Quality
 plan                    tools and techniques   improvement
 2- Results of quality   2- Quality audits
 control measurements
 3- Operational
 definitions
Inputs To Quality Assurance
   Quality management plan as previously described

   Results of quality control measurements which are
    records of quality control testing and measurement in
    a format of comparison or analysis

   Operational definitions as previously described in the
    output of the Quality Planning
Tools and Techniques For Quality
    Assurance
   Quality Planning tools and techniques , which can be
    used for quality assurance as well
   Quality Audits which are a structured review of other
    quality management activities:
-   they may be timely or carried out randomly
-   They may be carried out by properly trained Internal-
    auditors or by third parties such as quality systems
    registration agencies
Outputs From Quality Assurance
    Quality Improvement

   Quality improvement includes taking action to increase the
    effectiveness and efficiency of the project to be provide added
    benefits to the stakeholders of that project .

   In many cases the implementation of quality improvements will
    require preparation of change requests or taking corrective
    actions and will be handled according to procedure for overall
    change control
Quality Control
   Quality control involves monitoring specific project results to
    determine if they comply with relevant standards and
    identifying ways to eliminate causes of unsatisfactory results.
   Project results mentioned include both PRODUCT results
    such as deliverables and MANAGEMENT results such as cost
    and schedule performance
   Quality control is often performed by a quality control
    department
   The project management team should have a working
    knowledge of statistical quality control especially sampling and
    probability to help evaluate and control outputs.
Quality Control
   The project management should be aware of the
    following among other subjects:

-   prevention ( keeping errors out of the process)
-   Inspection (keeping errors out of the customers hand
-   Attribute sampling (for conformity of results)
-   Variable sampling (where the results are rated on a continuous scale that
    measures the degree of conformity or non conformity
-   Special cause ( unusual events)
-   Random causes ( normal process variations)
-   Tolerances ( where results should fall with in a defined tolerance range
-   Control limits ( the process is in control if it falls within these defined
    limits)
Quality Control Flowchart


 INPUTS               TOOLS AND              OUTPUTS
                    TECHNIQUES

 1-Work results    1- Inspection             1-Quality
 2- Quality        2- Control charts         improvement
 management plan   3- Pareto diagram         2- Acceptance
 3- Operational    4- Statistical sampling   decisions
 definitions       5- Flowcharting            3- Rework
 4- Checklists     6-Trend analysis          4-Process adjustments
Inputs To Quality Control
   Work results : including both product results and
    process results
   The quality management plan
   Operational definitions
   Checklists
Tools and Techniques for Quality Control
    Inspection
   Inspection includes activities such as
    measuring, examining and testing undertaken to
    determine whether results conform to requirements
   Inspection can be carried out on the level of a single
    activity or a final product
   Inspections can be called reviews, product
    reviews, audits, and walk-throughs
Tools and Techniques for Quality Control
   Control Charts
   These charts are graphical representations that display the
    result of a process over time and are used to determine if the
    process is “in control”
   When in control the process should not be adjusted , however
    it may be changed in order to provide improvements
   Control charts may be used to monitor any type of output
    variable
   Control charts are most often used to monitor repetitive
    activity in production but can also be used to monitor cost
    and schedule variances
Tools and Techniques for Quality Control
Pareto Diagram
   A Pareto diagram is a histogram ordered by frequency of
    occurrence which shows how many results were generated by
    what category or identified cause
   The project management team should take action to fix the
    problems that are causing the greatest number of defects first
   Typically the Pareto diagram reflects that a relatively small
    number of causes are responsible for the majority of the
    problems or defects.
Tools and Techniques for Quality Control
    Statistical Sampling
   Statistical sampling involves choosing a part of a
    population of interest for inspection
   Appropriate sampling can effectively reduce the cost
    of quality control
   There is a vast body of knowledge related to
    statistical sampling and therefore the management
    must be aware of the various sampling techniques
Tools and Techniques for Quality Control
    Trend Analysis
   The trend analysis involves the use of mathematical
    techniques to forecast future outcomes based on
    historical results it is often used to monitor:
    - Technical performance – how many defects have been
    identified and how many remain uncorrected
    - Cost and schedule performance – how many activities in a
    certain period were completed with significant variances
Outputs for Quality Control
   Quality improvement ( previously described)

   Acceptance decisions, where the inspected items will
    either be accepted or rejected and those rejected
    may be reworked
   Rework, which is an action taken to bring defects or
    nonconforming items into compliance with
    requirements and specifications. Rework is a frequent
    cause of project over-runs and the project
    management team must make an effort to minimize it
    .
Outputs for Quality Control
   Completed Checklists, which become a part of a project
    record when they are used
   Process Adjustments, which involves immediate corrective
    or preventive action as a result of quality control
    measurements. In some cases the adjustment may need
    to be handled according to procedures for overall change
    control.
Conclusion
 In conclusion we find that in order to achieve PQM
 or Project Quality Management , one has to integrate
 the concepts of Project management with the
 processes of quality management at the project scale
 and throughout its different phases.

 for effective PQM it is essential that the project
 management team be aware of the concepts of
 quality management to be able to make use of the
 described processes and implement them to achieve
 the required end product

Weitere ähnliche Inhalte

Was ist angesagt?

Project Quality Management
 Project Quality Management Project Quality Management
Project Quality ManagementSerdar Temiz
 
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Agus Suhanto
 
Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Agus Suhanto
 
Project Quality Management - PMBOK
Project Quality Management - PMBOKProject Quality Management - PMBOK
Project Quality Management - PMBOKArief Rahmana
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality ManagementSAJJAD KHUDHUR ABBAS
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesMohamed Loey
 
Project Management Principles and Process
Project Management Principles and ProcessProject Management Principles and Process
Project Management Principles and ProcessCharles Cotter, PhD
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementAnand Bobade
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
Project Management
Project ManagementProject Management
Project Managementajithsrc
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoringharoldtaylor1113
 
Quality planning
Quality planningQuality planning
Quality planningRahul Hada
 
Project Quality Management - PMBOK 5th Edition
Project Quality Management - PMBOK 5th EditionProject Quality Management - PMBOK 5th Edition
Project Quality Management - PMBOK 5th Editionpankajsh10
 

Was ist angesagt? (20)

Project Quality Management
 Project Quality Management Project Quality Management
Project Quality Management
 
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Project Quality Management - PMBOK6
Project Quality Management - PMBOK6
 
Project cost management
Project cost managementProject cost management
Project cost management
 
Project Quality Management - PMBOK
Project Quality Management - PMBOKProject Quality Management - PMBOK
Project Quality Management - PMBOK
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
Project cost management-slides
Project cost management-slidesProject cost management-slides
Project cost management-slides
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Project Management Principles and Process
Project Management Principles and ProcessProject Management Principles and Process
Project Management Principles and Process
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
Project Management
Project ManagementProject Management
Project Management
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoring
 
Quality planning
Quality planningQuality planning
Quality planning
 
Project scope management 1
Project scope management 1Project scope management 1
Project scope management 1
 
Project Quality Management - PMBOK 5th Edition
Project Quality Management - PMBOK 5th EditionProject Quality Management - PMBOK 5th Edition
Project Quality Management - PMBOK 5th Edition
 

Andere mochten auch

Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project managementselinasimpson1601
 
2011 App Failures - Year in Review CAST
2011 App Failures  - Year in Review CAST2011 App Failures  - Year in Review CAST
2011 App Failures - Year in Review CASTCAST
 
Air Traffic System Technologies
Air Traffic System TechnologiesAir Traffic System Technologies
Air Traffic System TechnologiesÜlger Ahmet
 
software failures
 software failures software failures
software failuresRespa Peter
 
Disaster At Chernobyl
Disaster At ChernobylDisaster At Chernobyl
Disaster At ChernobylBen Dover
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaImran Jamil
 

Andere mochten auch (12)

Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project management
 
2011 App Failures - Year in Review CAST
2011 App Failures  - Year in Review CAST2011 App Failures  - Year in Review CAST
2011 App Failures - Year in Review CAST
 
Air Traffic System Technologies
Air Traffic System TechnologiesAir Traffic System Technologies
Air Traffic System Technologies
 
software failures
 software failures software failures
software failures
 
Disaster At Chernobyl
Disaster At ChernobylDisaster At Chernobyl
Disaster At Chernobyl
 
Ariane 5 launcher failure
Ariane 5 launcher failure Ariane 5 launcher failure
Ariane 5 launcher failure
 
Nuclear accidents
Nuclear accidentsNuclear accidents
Nuclear accidents
 
Quality Metrics
Quality MetricsQuality Metrics
Quality Metrics
 
Lean vs agile manufacturing
Lean vs agile manufacturingLean vs agile manufacturing
Lean vs agile manufacturing
 
Failure of nokia
Failure of nokiaFailure of nokia
Failure of nokia
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
 
Apple's 16 October 2014 iPad and Mac Event
Apple's 16 October 2014 iPad and Mac EventApple's 16 October 2014 iPad and Mac Event
Apple's 16 October 2014 iPad and Mac Event
 

Ähnlich wie Project Quality Management

PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptAhtashamArshad4
 
PROJECT QUALITY KNOLEDGE AREA.ppt
PROJECT QUALITY KNOLEDGE    AREA.pptPROJECT QUALITY KNOLEDGE    AREA.ppt
PROJECT QUALITY KNOLEDGE AREA.pptRandolphRodrigues2
 
Quality Management
Quality ManagementQuality Management
Quality ManagementAldo Arecco
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Managementmzedan
 
7.quality management chapter 7
7.quality management chapter 77.quality management chapter 7
7.quality management chapter 7Warui Maina
 
Statistical quality control 1,2
Statistical quality control 1,2Statistical quality control 1,2
Statistical quality control 1,2ROBERA WEGI
 
New approach to Process Validation 4
New approach to Process Validation 4New approach to Process Validation 4
New approach to Process Validation 4Santosh Singh
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRSPaul Morffew
 
Quality management templates
Quality management templatesQuality management templates
Quality management templatesselinasimpson371
 
Product quality management
Product quality managementProduct quality management
Product quality managementSunil Meena
 
20071119_Quality_Tools_ver2 PMI Westchestler Quality
20071119_Quality_Tools_ver2 PMI Westchestler Quality20071119_Quality_Tools_ver2 PMI Westchestler Quality
20071119_Quality_Tools_ver2 PMI Westchestler QualityKumaran637735
 

Ähnlich wie Project Quality Management (20)

PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.ppt
 
PROJECT QUALITY KNOLEDGE AREA.ppt
PROJECT QUALITY KNOLEDGE    AREA.pptPROJECT QUALITY KNOLEDGE    AREA.ppt
PROJECT QUALITY KNOLEDGE AREA.ppt
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Pmb
PmbPmb
Pmb
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
7- PMP Training - Quality Management
7- PMP Training - Quality Management7- PMP Training - Quality Management
7- PMP Training - Quality Management
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
7.quality management chapter 7
7.quality management chapter 77.quality management chapter 7
7.quality management chapter 7
 
Statistical quality control 1,2
Statistical quality control 1,2Statistical quality control 1,2
Statistical quality control 1,2
 
Quality-by-Design by chattar
Quality-by-Design by chattarQuality-by-Design by chattar
Quality-by-Design by chattar
 
New approach to Process Validation 4
New approach to Process Validation 4New approach to Process Validation 4
New approach to Process Validation 4
 
8.2 Manage Quality
8.2 Manage Quality8.2 Manage Quality
8.2 Manage Quality
 
Quality management forms
Quality management formsQuality management forms
Quality management forms
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRS
 
Quality management templates
Quality management templatesQuality management templates
Quality management templates
 
Product quality management
Product quality managementProduct quality management
Product quality management
 
Project quality management
Project quality managementProject quality management
Project quality management
 
SQA.ppt
SQA.pptSQA.ppt
SQA.ppt
 
20071119_Quality_Tools_ver2 PMI Westchestler Quality
20071119_Quality_Tools_ver2 PMI Westchestler Quality20071119_Quality_Tools_ver2 PMI Westchestler Quality
20071119_Quality_Tools_ver2 PMI Westchestler Quality
 

Kürzlich hochgeladen

4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseCeline George
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleCeline George
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 

Kürzlich hochgeladen (20)

prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP Module
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 

Project Quality Management

  • 1. What Went Wrong?  In 1986, two hospital patients died after receiving fatal doses of radiation from a Therac 25 machine after a software problem caused the machine to ignore calibration data  Britain’s Coast Guard was unable to use its computers for several hours in May 2004 after being hit by the Sasser virus, which knocked out the electronic mapping systems, e- mail, and other computer functions, forcing workers to revert to pen, paper, and radios  More than 100 incidents of lost or stolen financial information were reported over the past year, including personal information of 1.2 federal employees, 200,000 online trading customers, and 33,000 Air Force officers Schwalbe, Information Technology Project Management
  • 2. Project Quality Management Prepared by Sir Gio Friginal
  • 3. Quality  The totality of characteristics of an entity that bear upon its ability to satisfy stated or implied needs (ISO)  Conformance to requirements  Customer’s Point of View  Fitness for use  Basic Issues  It begins with customer  It ends with customer
  • 4. Why do we have poor quality?  Lack of discipline  Poorly defined requirement  Uncontrolled changes  Poor documentation  Quality control  Integration  Testing  Poor management  Unclear objectives  Not ready to do that project  Staff problems  Unrealistic demands
  • 5. Project Quality Management  Project quality management includes the process required to ensure that the project satisfies the needs for which it is undertaken.  PQM includes all the activities of the overall management function that determine the quality policy, objectives, and responsibilities and implement them within the quality system
  • 6. Project Quality Management Sub Processes  QUALITY PLANNING  QUALITY ASSURANCE  QUALITY CONTROL  These processes interact with each other as well as with the processes of other knowledge areas  Each process involves an effort of one or more individual or group of individuals based on the need of the project.  Each process occurs at least once in every project phase during the project life cycle
  • 7. P R O J E C T Q U A L IT Y M A N A G E M E N T Q U A L IT P L A N N IN G Q U A L IT Y A S S U R A N C E Q U A L IT Y C O N T R O L 1- INPUTS 1- INPUTS 1- INPUTS -Quality policy -Quality management plan -work results -Scope statement -result of quality control -quality management plan measurements -Operational definitions -Product description -Operational definitions -checklists -Standards and regulations 2- TOOLS AND TECH. 2- TOOLS AND TECH. -Other process outputs -Quality planning tools and -inspection 2- TOOLS AND TECH. techniques -benefit/ cost analysis -Control charts -Quality audits -Benchmarking -Pareto diagrams 3- OUTPUTS -Flowcharting -Statistical sampling -Quality improvement -Design of experiments -flowcharting 3- OUTPUTS -Trend analysis -Quality management plan 3- OUTPUTS -Operational definitions -Quality improvement -checklists -Acceptance decisions -Inputs to other processes -rework -Completed checklist -Process adjustment
  • 8. PQM Approach compatibility  Compatible with ISO 9000 and 1000 series of standard guidelines  Proprietary approaches to quality as recommended by Deming, Juran, and Crosby, and others.  Nonproprietary approaches such as TQM, Continuous improvement approaches and others.
  • 9. Nature of PQM  Project quality management must address both the management of the project and the product of the project.  Failure to meet quality requirements in either dimension can have serious and negative consequences for any or all of the project stakeholders
  • 10. Examples of negative consequences  Meeting the customer requirement by over working the project team may lead to negative consequence in employee turnover  Meeting project schedules by rushing planned quality inspections may produce negative consequences when errors go undetected  Quality vs. Grade  Grade - category or rank given to entities having the same functional use but different technical characteristics
  • 11. Quality Planning  Identifying which quality standards are relevant to the project and determining how to satisfy them
  • 12. Quality Planning  Quality Planning involves identifying with quality standards  It is a key facilitating process during the Project planning Process  In modern quality management quality is planned in and not inspected in  Prior to the development of ISO 9000 series, quality planning concepts were widely discussed as part of quality assurance.
  • 13. Quality Planning Flowchart INPUTS TOOLS AND OUTPUTS TECHNIQUES 1-Quality policy 1- Benefit/ cost 1-Quality Management 2- Scope statement analysis plan 3- Product description 2- Benchmarking 2- operational; 4- Standards and 3- flowcharting definitions regulations 4- Design of 3- checklists 5- Other process experiments 4-inputs to other outputs processes
  • 14. Quality Planning Inputs Quality policy  The over all intentions and direction of an organization with regard to quality, as formally expressed by the top management  In the case of a joint venture, a quality policy for the individual project should be developed  The management team is responsible for dissipating the quality policy to all project stakeholders through appropriate information distribution channels
  • 15. Quality Planning Inputs Scope Statement  The scope statement is a key input to quality planning because it documents major project deliverables as well as project objectives which serve to define important stakeholder requirements
  • 16. Quality Planning Inputs Product description  Although the elements of the product description may be embodied in the scope statement, the product description often contains details of technical issues and other concerns that may affect quality planning
  • 17. Quality Planning Inputs Standards and Regulations  The project management team any application-area- specific standards or regulations that may affect the project
  • 18. Quality Planning Inputs Quality Organizational Level Goals, Systems, Contro l, Competition Project Level Test planning, scheduling, res ources Operational Level Test data, Test runs, Reviews, Reportin g
  • 19. Quality Planning Inputs Other Process Outputs  In addition to the scope statement and product description, processes in other knowledge areas may produce outputs that should be considered as part of the quality planning  Example: procurement planning outputs may identify contractor quality requirements that should be reflected in the overall Quality Management Plan
  • 20. Tools and Techniques for Quality Planning  Benefit / cost analysis  The planning process must consider benefit/cost tradeoffs  The Primary Benefit: Is less work, higher productivity, lower costs, and increased stakeholder satisfaction  The Primary Cost: Is the expanses associated with PQM activities Note: it is elementary that the benefit should outweigh the cost
  • 21. Tools and Techniques for Quality Planning Benchmarking  Benchmarking involves comparing actual or planned project practices to those of other projects to generate ideas to: 1- Generate ideas for improvement 2- provide a standard for measurement of performance Note: other projects compared may be within the same organization or out side and may be within the same application area or in another
  • 22. Tools and Techniques for Quality Planning Flow charting  The flowcharting techniques in quality management generally include - cause and effect diagram - System or process flow charts  Flowcharting can help in anticipating probable quality problems and thus helps to develop approaches for dealing with them
  • 23. Tools and Techniques for Quality Planning
  • 24. Tools and Techniques for Quality Planning
  • 25. Tools and Techniques for Quality Planning Design of Experiments  This is an analytical technique which aims to define variables that have most influence on the overall outcome  This technique is commonly applicable to the product of the project issues.  However this technique can also be used in project management issues such as cost and schedule tradeoffs to allow for optima solutions.
  • 26. Tools and Techniques for Quality Planning Cost of quality  Total cost of all efforts to achieve product/ service quality  Cost of conformance  Prevention cost  Appraisal cost  Cost of non-conformance  Internal failure  External failure
  • 27. Outputs from Quality Planning Quality Management Plan  The quality management plan should describe how a project management team will implement its quality policy  Also called Quality System, (in ISO terminology), the plan should define : - The organizational structure - Roles and responsibilities - Resources needed for implementation of quality management
  • 28. Outputs from Quality Planning Quality Management Plan (continued)  The Quality Plan should address: - Quality Control of the project - Quality Assurance - Quality Improvement of the project Note: the project quality plan can be highly detailed or broadly framed based on the needs of the project
  • 29. Outputs from Quality Planning Operational Definitions  An operational definition describes what something is and how it is measured by the quality control process. For example: - the project management team must indicate the start and end of every activity in a detailed schedule - Weather the whole activity or certain deliverables are to be measured Operational definitions are also called Metrics in some areas of application
  • 30. Outputs from Quality Planning Checklists  A checklist is a structured tool used to verify that a set of required steps or requirements have been performed.  Many organizations have standard checklists to ensure consistency of frequently performed activities
  • 31. Outputs from Quality Planning Inputs To Other Processes  The quality planning process may identify need for further activity in another area
  • 32. Quality Assurance  Quality assurance encompasses all the planned and systematic activity implemented in a quality system to provide confidence that the project will satisfy the relevant quality standards  Quality assurance is provided by a Quality Assurance dept.  Quality assurance can be INTERNAL ( from the project management team to the performing organization)  Quality assurance can be EXTERNAL (provided to the customer and other parties actively involved in the work of the project
  • 33. Quality Assurance Flowchart INPUTS TOOLS AND OUTPUTS TECHNIQUES 1-Quality management 1- Quality planning 1-Quality plan tools and techniques improvement 2- Results of quality 2- Quality audits control measurements 3- Operational definitions
  • 34. Inputs To Quality Assurance  Quality management plan as previously described  Results of quality control measurements which are records of quality control testing and measurement in a format of comparison or analysis  Operational definitions as previously described in the output of the Quality Planning
  • 35. Tools and Techniques For Quality Assurance  Quality Planning tools and techniques , which can be used for quality assurance as well  Quality Audits which are a structured review of other quality management activities: - they may be timely or carried out randomly - They may be carried out by properly trained Internal- auditors or by third parties such as quality systems registration agencies
  • 36. Outputs From Quality Assurance Quality Improvement  Quality improvement includes taking action to increase the effectiveness and efficiency of the project to be provide added benefits to the stakeholders of that project .  In many cases the implementation of quality improvements will require preparation of change requests or taking corrective actions and will be handled according to procedure for overall change control
  • 37. Quality Control  Quality control involves monitoring specific project results to determine if they comply with relevant standards and identifying ways to eliminate causes of unsatisfactory results.  Project results mentioned include both PRODUCT results such as deliverables and MANAGEMENT results such as cost and schedule performance  Quality control is often performed by a quality control department  The project management team should have a working knowledge of statistical quality control especially sampling and probability to help evaluate and control outputs.
  • 38. Quality Control  The project management should be aware of the following among other subjects: - prevention ( keeping errors out of the process) - Inspection (keeping errors out of the customers hand - Attribute sampling (for conformity of results) - Variable sampling (where the results are rated on a continuous scale that measures the degree of conformity or non conformity - Special cause ( unusual events) - Random causes ( normal process variations) - Tolerances ( where results should fall with in a defined tolerance range - Control limits ( the process is in control if it falls within these defined limits)
  • 39. Quality Control Flowchart INPUTS TOOLS AND OUTPUTS TECHNIQUES 1-Work results 1- Inspection 1-Quality 2- Quality 2- Control charts improvement management plan 3- Pareto diagram 2- Acceptance 3- Operational 4- Statistical sampling decisions definitions 5- Flowcharting 3- Rework 4- Checklists 6-Trend analysis 4-Process adjustments
  • 40. Inputs To Quality Control  Work results : including both product results and process results  The quality management plan  Operational definitions  Checklists
  • 41. Tools and Techniques for Quality Control Inspection  Inspection includes activities such as measuring, examining and testing undertaken to determine whether results conform to requirements  Inspection can be carried out on the level of a single activity or a final product  Inspections can be called reviews, product reviews, audits, and walk-throughs
  • 42. Tools and Techniques for Quality Control  Control Charts  These charts are graphical representations that display the result of a process over time and are used to determine if the process is “in control”  When in control the process should not be adjusted , however it may be changed in order to provide improvements  Control charts may be used to monitor any type of output variable  Control charts are most often used to monitor repetitive activity in production but can also be used to monitor cost and schedule variances
  • 43. Tools and Techniques for Quality Control Pareto Diagram  A Pareto diagram is a histogram ordered by frequency of occurrence which shows how many results were generated by what category or identified cause  The project management team should take action to fix the problems that are causing the greatest number of defects first  Typically the Pareto diagram reflects that a relatively small number of causes are responsible for the majority of the problems or defects.
  • 44. Tools and Techniques for Quality Control Statistical Sampling  Statistical sampling involves choosing a part of a population of interest for inspection  Appropriate sampling can effectively reduce the cost of quality control  There is a vast body of knowledge related to statistical sampling and therefore the management must be aware of the various sampling techniques
  • 45. Tools and Techniques for Quality Control Trend Analysis  The trend analysis involves the use of mathematical techniques to forecast future outcomes based on historical results it is often used to monitor: - Technical performance – how many defects have been identified and how many remain uncorrected - Cost and schedule performance – how many activities in a certain period were completed with significant variances
  • 46. Outputs for Quality Control  Quality improvement ( previously described)  Acceptance decisions, where the inspected items will either be accepted or rejected and those rejected may be reworked  Rework, which is an action taken to bring defects or nonconforming items into compliance with requirements and specifications. Rework is a frequent cause of project over-runs and the project management team must make an effort to minimize it .
  • 47. Outputs for Quality Control  Completed Checklists, which become a part of a project record when they are used  Process Adjustments, which involves immediate corrective or preventive action as a result of quality control measurements. In some cases the adjustment may need to be handled according to procedures for overall change control.
  • 48. Conclusion In conclusion we find that in order to achieve PQM or Project Quality Management , one has to integrate the concepts of Project management with the processes of quality management at the project scale and throughout its different phases. for effective PQM it is essential that the project management team be aware of the concepts of quality management to be able to make use of the described processes and implement them to achieve the required end product

Hinweis der Redaktion

  1. How will you know that the product that you are making has a quality(ISO)Quality doesn’t happen by accident-planning
  2. Basic measurement