SlideShare a Scribd company logo
1 of 1
Download to read offline
CPM‐500 EVM/SE/TPM Integration

Dependencies Between Measures
Stakeholders Define Needs and Capabilities

Suppliers Define Physical Solutions

KPP

Mission 
Need

MoE

MoP

TPM

“Operational 
measures of 
success related to 
the  achievement 
of the mission or 
operational 
objective being 
evaluated.

Measures that 
characterize 
p y
physical or 
functional 
attributes relating 
to the system 
operation

Measures used to 
assess design 
p g
progress, 
,
compliance to 
performance 
requirements,  and 
technical risks

“Coming to Grips with Measures of Effectiveness,” N. Sproles, 
Rights Reserved
Systems Engineering, Volume 3, Number 1, pp. 50‐58

21/58

More Related Content

What's hot

What's hot (20)

Software metrics
Software metricsSoftware metrics
Software metrics
 
Informing Program Performance with Technical Performance Measures (TPMs)
Informing Program Performance with Technical Performance Measures (TPMs)Informing Program Performance with Technical Performance Measures (TPMs)
Informing Program Performance with Technical Performance Measures (TPMs)
 
Software project plannings
Software project planningsSoftware project plannings
Software project plannings
 
Software Engineering (Requirements Engineering & Software Maintenance)
Software Engineering (Requirements Engineering  & Software Maintenance)Software Engineering (Requirements Engineering  & Software Maintenance)
Software Engineering (Requirements Engineering & Software Maintenance)
 
Software Engineering (Metrics for Process and Projects)
Software Engineering (Metrics for Process and Projects)Software Engineering (Metrics for Process and Projects)
Software Engineering (Metrics for Process and Projects)
 
Estimating cost and schedule for monte carlo simulation
Estimating cost and schedule for monte carlo simulationEstimating cost and schedule for monte carlo simulation
Estimating cost and schedule for monte carlo simulation
 
software metrics(process,project,product)
software metrics(process,project,product)software metrics(process,project,product)
software metrics(process,project,product)
 
Software maintenance
Software maintenanceSoftware maintenance
Software maintenance
 
Estimating Software Maintenance Costs
Estimating Software Maintenance CostsEstimating Software Maintenance Costs
Estimating Software Maintenance Costs
 
Software matrics and measurement
Software matrics and measurementSoftware matrics and measurement
Software matrics and measurement
 
Lecture3
Lecture3Lecture3
Lecture3
 
Getting it Right
Getting it Right Getting it Right
Getting it Right
 
Showing how to Increase the Probability of Project Success by applying the ...
Showing how to Increase the Probability of Project Success by applying the ...Showing how to Increase the Probability of Project Success by applying the ...
Showing how to Increase the Probability of Project Success by applying the ...
 
Software Measurement: Lecture 1. Measures and Metrics
Software Measurement: Lecture 1. Measures and MetricsSoftware Measurement: Lecture 1. Measures and Metrics
Software Measurement: Lecture 1. Measures and Metrics
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk Management
 
Object Oriented Software Engineering (OOSE) presentation on SOFTWARE MAINTENANCE
Object Oriented Software Engineering (OOSE) presentation on SOFTWARE MAINTENANCEObject Oriented Software Engineering (OOSE) presentation on SOFTWARE MAINTENANCE
Object Oriented Software Engineering (OOSE) presentation on SOFTWARE MAINTENANCE
 
Metrics
MetricsMetrics
Metrics
 
Lightweight Processes: A Definition
Lightweight Processes: A DefinitionLightweight Processes: A Definition
Lightweight Processes: A Definition
 
Risk
RiskRisk
Risk
 
Software Maintenance and Evolution
Software Maintenance and EvolutionSoftware Maintenance and Evolution
Software Maintenance and Evolution
 

More from Glen Alleman

More from Glen Alleman (20)

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPM
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk management
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guide
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planning
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement Baseline
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six Sigma
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure Rollout
 
Integrated Master Plan Development
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Integrated Master Plan Development
 

Moe mop tpm connections