Weitere ähnliche Inhalte Ähnlich wie CIC Backhaul Development Short 3 9 2010 (20) CIC Backhaul Development Short 3 9 20102. 2 PROBLEM / SITUATION Locating Fiber Complex & Time Consuming Microwave Design Complex & Time Consuming Deploying Ethernet Complex and Challenging Financial Analysis Fractured and Complex Internet Fiber PSTN & Internet T-1 3G/4G RF Cell Tower POP PSTN Backhaul Bottleneck 6. Financial Analysis that Manages all Variables (Proprietary Financial Analysis Model)PathDesignerTM <insert screen> FiberSourceR 38. 10 SELECT PROJECTS – WIRELESS BACKHAUL 2005 – 2009: Clearwire7,300+ Sites, 55+ Markets largest backhaul project in US 2008 XOHM 5 Markets, 2,000+ Sites 2007 – 2008: Sprint 1,800 Sites, ALU/Ericsson 2004 – 2005: FiberTower 1,300+ Sites, 5 Markets 2005 – 2006: Cingular State of Colorado 2002 – 2004: AT&TMarket-wide Systems for Indiana, Ohio, Michigan 10 41. 13 Complex Deployments Detroit Raleigh Durham Dallas Metro Grand Rapids Washington DC Philadelphia Kansas City 13 46. Project management of fiber builds; collocationsMicrowave Actual 16,000+ paths since 2002 99.99 quality level Microwave Engineering & Survey Capacity Current field staff capable of +10,000 sites/year Rapid scalability Microwave installation Capacity Current field staff capable of +2,000 sites/year