Tankers




TANKERS
Suezmax Oil Tanker
166,300 / 152,300 DWT




Builder / Yard:     Shipyard Brodosplit / 433, 434
Owner / Flag:       Aenona Maritime Ltd / Malta
Delivery:           2003, 2004
Designed by:        Shipyard Brodosplit

Single screw diesel engine driven Oil Tanker with longitudinal bulkhead, bulbous bow, and transom stern. Living quarters including
navigation bridge, engine room with fuel oil tanks on both sides and pump room located aft. Double bottom / double side tanks
and peak tanks intended for segregated ballast. Cargo space divided into twelve (12) cargo and two (2) slop tanks. Hull structure
made of mild and higher tensile steel. Three (3) grades of cargo can be handled simultaneously.




8 CROATIAN SHIPBUILDING
T
ANKERS




    Classification:                             Bureau Veritas   Painting:
                               I HULL MACH OIL TANKER
                      ESP UNRESTRICTED NAVIGATION, SYS-NEQ-1     Cargo tanks
                             VERISTAR -HULL, AUT -UMS, SPM       (bottom +0.5 m, deck head -2 m)       HS pure epoxy (250 my)
                                                                 Slop tanks                            HS pure epoxy (250 my)
    Main dimensions:                                             Under water hull and boot topping
                                                                 Coal tar epoxy + vinyl                       tar epoxy + SPC
    Lenght over all                             281.20 m                                         (125 my + 125 my + 300 my)
    Length between perpendiculars               270.00 m
    Breadth moulded                              48.20 m         Cargo equipment:
    Depth moulded                                23.00 m
    Design draught                               16.00 m         Cargo pumps     3 x 3,500 m3/h at 140 mWC, s.g. 1.0, 1 cSt
    Scantling draught                            17.10 m                              centrifugal pumps, steam turbine driven
    Deadweight at design draught                152,300 t        Cargo stripping   1 x 250 m3/h at 140 mWC, s.g. 1.0, 1 cSt
    Deadweight at scantling draught             166,300 t                                piston, vertical, double acting steam
    Main engine Split-MAN-B&W                  6S70MC-C                                        turbine driven stripping pumps
    Selected maximum continuous rating 16,780 kW/82 rpm                             2 x 400 m3/h at 30 mWC, s.g. 1.0, 1 cSt
    Trial speed at design draught and 85% SMCR    15.8 kn                                                     stripping eductor
    Main engine daily fuel oil consumption      56.7 t/day       Cargo manifolds                                   3 x 500 mm
    Cruising range                             23,000 nm
    Crew complement                                     30       Auxiliary engines plant:

    Capacities (100%):                                           Main diesel-generator sets                           3 x 910 kW
                                                                 Emergency diesel-generator set                        1 x 96 kW
    Cargo and slop tanks                           185,000 m3
    Ballast tanks                                   52,500 m3    Heating plant:
    Heavy fuel oil                                   3,800 m3
    Diesel                                             150 m3    Auxiliary oil fired boilers 2 x 30 t/h saturated steam at 16 bar G
    Fresh and feed water                               300 m3    Composite boiler 1 x 1.8/1.4 t/h saturated steam at 7 bar G




                                                                                                    CROATIAN SHIPBUILDING 9
Oil Tanker
111,809 / 101,770 DWT




Name:             m/s UNISINA                                      Lenght over all                 246.76 m
Owner / Flag:     Unisina Navigation Co. / Liberia                 Length btw perp.                238.00 m
Builder / Yard:   Shipyard 3.MAJ / 661                             Breadth moulded                  42.48 m
Delivered:        1994                                             Depth moulded                    20.70 m
Classification:   LRS 100 A1 Oil Tanker (Duble hull)   LMC, UMS,   Draught design                   14.45 m
                  IGS, COW, PL, SBT                                Draught scantling                15.52 m
Designed by:      Shipyard 3.MAJ                                   Deadweight at draught 14.45 m   100,425 t
                                                                   Deadweight at draught 15.52 m   110,461 t
                                                                   Gross tonnage                    58,091




10 CROATIAN SHIPBUILDING
T
ANKERS




    Main engine: 3.MAJ ∑ SULZER                      5 RTA 72         Cargo temperature increasing from 44 deg. C to 66 deg. C needs
    MCR:                                    10,550 kW / 78 rpm        4 days at outside air temperature of 2 deg. C and sea temp. of 5
    Trial speed at draught of 14.45 m                                 deg. C.
    and 9,495 kW (90% MCR)                           14.45 knots      Cargo tanks ventilation is performed by centralized system with
                                                                      pressure/vacuum valves at each tank. Centralized and remote
    Capacities:                                                       control of cargo handling and temperature monitoring is provi-
                                                                      ded.
    Cargo                                             121,329m3
                                                                      Fixed washing devices of closed type are provided at each tank
    Slop tanks                                          2,747 m3
                                                                      using preheated sea water.
    Loading / unloading time:                     abt. 15.5 hours
                                                                      Cargo equipment:
    Provisions:
                                                                      •   Four cargo pumps, vert. centrifugal type, driven by steam
    Heavy fuel oil                                      2,745 m3          turbines of 2,000 m3/h at 15 bar head each.
    Diesel fuel oil                                       282 m3      •   One stripping pump, steam piston type of 250 m3/h at
    Lubrication oil                                       119 m3          15 bar cap.
    Fresh water                                           619 m3      •   One ejector of 650 m3/h at 2.5 bar capacity.
                                                                  3
                                                                      •   Steam coil heating 8 bar system.
    Ballast water                                      38,757 m       •   Washing sea water system with steam heater of
    HFO consumption of M.E.                     38.0 t / 24 hours         360 m3/h, 8 bar capacity (heating water from 45 deg.
    The UNISINA is a single screw, single deck and double hull            C up to 80 deg. C)
    vessel with engine room and accommodation superstructure          •   Inert gas system of 10,000 m3/h capacity.
    aft, intended mainly for carriage of crude oil (up to 1.05 t/m3
    spec. gravity) and foreseen for simultaneous carriage of 4        Steam plant:
    segregated oil cargoes.                                           •   Two boilers, oil fired, 18 bar, cap. 30 t/h steam each.
    Hull is made of mild and HT shipbuilding steel.                   •   One comp. boiler, 8 bar, cap. 2.5 t/h oil fired + 1.8 t/h
    Cargo loading/unloading system provides simultaneous                  exhaust gas heated sections.
    handling of each segregation.
    Steam plant provides driving of cargo pumps and heating of        Auxiliary engines plant:
    cargo through pipe coils.                                         •   Three el. gen. sets, 60 cycles, 1,050 kVA, D.M. driven, each.
                                                                      •   One emergency el. gen. set, 60 cycles, 200 kVA, D.M.
                                                                          driven.




                                                                                                        CROATIAN SHIPBUILDING 11
Oil Tanker
108,000 / 94,700 DWT




Builder / Yard:     Shipyard Brodosplit / 439, 440
Owner / Flag:       Prisco Tanker Ltd, Douglas, Isle of man / Rusija (Primorsk)
                    Nord Aframax Tankers, Nicosia, Cyprus / Rusija (Primorsk)
Delivery:           2003, 2004
Designed by:        Shipyard Brodosplit

Single screw diesel engine driven Oil Tanker with longitudinal bulkhead, bulbous bow, and transom stern. Living quarters including
navigation bridge, engine room with fuel oil tanks on both sides and pump room located aft. Double bottom / double side tanks
and peak tanks intended for segregated ballast. Cargo space divided into twelve (12) cargo and two (2) slop tanks. Hull structure
made of mild and higher tensile steel. Four (4) grades of cargo can be handled simultaneously.



12 CROATIAN SHIPBUILDING
T
ANKERS




    Classification:     Det Norske Veritas 1A1 Tanker for Oil   Painting:
                      ESP, NAUTICUS (Newbuilding) E0, ICE-1C,
                                                                Cargo tanks and slop tanks              Pure epoxy (300 my)
                        LCS (SID), W1-OC, CLEAN, SPM, TMON
                                                                Under water hull and boot topping            Coal tar epoxy +
                                                                                                     + vinyl tar epoxy + SPC
    Main dimensions:
                                                                                               (250 my + 50 my + 300 my)
    Lenght over all                             246.00 m        Ice belt               Sealer + Anti abrasion epoxy coating
    Length between perpendiculars               236.00 m                                                  (50 my + 400 my)
    Breadth moulded                              42.00 m        Open deck and exposed superstructure          Epoxy (300 my)
    Depth moulded                                21.00 m
    Design draught                               13.50 m        Cargo equipment:
    Scantling draught                            14.90 m
                                                                Cargo pumps          4 x 3000 m3/h at 130 mLC, s.g. 0.9, 1 cSt
    Deadweight at design draught                 94,700 t
                                                                                        centrifugal pumps, steam turbine driven
    Deadweight at scantling draught             108,000 t
                                                                Cargo stripping       1 x 200 m3/h at 130 mLC, s.g. 0.9, 1 cSt
    Main engine Split-MAN-B&W                  7S60MC-C
                                                                                                centrifugal pump, steam turbine
    Selected maximum continuous rating 14,130 kW/94 rpm
                                                                                                          driven stripping pump
    Trial speed at design draught and 90% SMCR    16.1 kn
                                                                                        1 x 250 m3/h at 25 mLC, s.g. 0.9, 1 cSt
    Main engine daily fuel oil consumption      51.2 t/day
                                                                                                               stripping eductor
    Cruising range                             18,000 nm
                                                                Cargo manifolds                                     4 x 500 mm
    Crew complement                                     26
                                                                Auxiliary engines plant:
    Capacities (100%):
                                                                Main diesel-generator sets                           3 x 870 kW
    Cargo and slop tanks                         126,000 m3
                                                                Emergency diesel-generator set                        1 x 99 kW
    Ballast tanks                                 37,000 m3
    Heavy fuel oil                                 2,700 m3
                                                                Heating plant:
    Diesel                                           150 m3
    Fresh and feed water                             250 m3     Auxiliary oil fired boilers 2 x 35 t/h saturated steam at 16 bar G
                                                                Composite boiler 1 x 2.5/1.7 t/h saturated steam at 7 bar G




                                                                                                  CROATIAN SHIPBUILDING 13
Oil Tanker
101,000 / 79,400 DWT




Name:             m/s ZRINSKI                        Length over all                      244.30 m
Manager:          Tankerska Plovidba / Zadar         Length btw perp.                     236.00 m
Owner / Flag:     Riva Shipping Co. Ltd. / Liberia   Breadth moulded                       39.40 m
Builder / Yard:   Shipyard Brodosplit / 376          Depth moulded                         21.30 m
Sister vessel:    377                                Draught, design / scantling   12.19 / 14.65 m
Delivered:        1994, 1995                         Corresponding deadweight 79,400 / 101,000 tons
Classification:   LRS; 100 A1 Oil Tanker
                    LMC, UMS, IGS, COW, SPM




14 CROATIAN SHIPBUILDING
T
ANKERS




    Main engine:         BRODOSPLIT-MAN-B&W 6 L 60 MC               Protection by coal tar epoxy and chlorinated rubber system on
    SMCR                              10,440 kW / 117 rpm           external surfaces and alkyd system on internal surfaces. Ballast
    Trial speed at 90% SMCR and draught of 12.19 m                  tanks coated by coal tar epoxy paint.
                                                 14.50 knots        Cargo oil tanks: Pure epoxy but only overhead plus one (1) m
                                                                    below.
    Capacities:
    Cargo tanks capacity                                            Cargo and ballast equipment:
    (incl. slops tanks 100% full tanks):            111,000 m3
                                                                    •   Three (3) centrifugal cargo pumps, each of 2,300 m3/ h
                                                                        at 12.5 bar. Two pumps steam turbine driven and one
    Provisions:
                                                                        diesel engine driven.
    Heavy fuel oil                                     2,800 m3     •   One stripping piston pump of 150 m3/ h at 9 bar,
    Diesel fuel oil                                      300 m3         el. motor driven.
    Lubrication Oil                                       90 m3     •   Two ballast pumps vertical, centrifugal type,
    Fresh Water & Feed Water                             290 m3         electric driven of 1,500 m3 at 3 bar.
                                                                    •   One ballast eductor 200 m3 / h.
    Ballast water segregated:                        44,800 m3      •   One scrubber cooling SW pump abt. 200 m3 / h 3 bar.
    Cruising range at 90% SMCR                      20,000 n.m      •   One turbines condenser cooling SW pump
    M.E. daily fuel oil consumption                  37.45 tons         centrifugal el. motor driven, in engine room,
                                                                        capacity abt. 900 m3/ h at 1.8 bar.
    The vessel and all her equipment shall be suitable for world
    wide service for transporting of 3 grades of crude oil, which   Steam plant:
    can be discharged simultaneously.
                                                                    •   One oil fired boiler 25 t/h saturated steam 15.5 bar G
    The single screwed vessel with one continuous deck,
                                                                    •   One exhaust gas economizer 1.5 t/h satur. steam of
    bulbous bow, raked stem and transom stern.
                                                                        7 bar G.
    Engine room with accommodation for the complement of 26
    persons in superstructure is located aft.
                                                                    Auxiliary engines plant:
    The vessel generally divided by watertight transverse
    bulkheads into the following compartments: fore peak, seven     •   Two main diesel generators, each 600 kW, 450 V AC,
    (7) cargo tanks, ballast tanks, two slop/cargo tanks, pump          60 Hz, 3-phase.
    room, engine room and after peak. Cargo area shall be           •   One main diesel generator 880 kW, 450 V AC, 60 Hz,
    constructed as double hull with double bottom and double            3-phase.
    side ballast tanks. Centre tanks to be used for the cargo and   •   One emergency diesel generator 140 kW, 450 V AC,
    side tanks// double bottom tanks for water ballast.                 60 Hz, 3-phase.




                                                                                                     CROATIAN SHIPBUILDING 15
Oil Product Tanker
95,000 / 71,300 DWT




Builder / Yard:    Shipyard Brodosplit / 435, 436, 437, 438
Owner / Flag:      European Navigation Inc. / Greece
Delivery:          2003, 2004
Designed by:       Shipyard Brodosplit

Single screw diesel engine driven Oil Product Tanker with longitudinal bulkhead, bulbous bow, and transom stern. Living quarters
including navigation bridge, engine room with fuel oil tanks on both sides and pump room located aft. Double bottom / double side
tanks and peak tanks intended for segregated ballast. Cargo space divided into twelve (12) cargo and two (2) slop tanks.
Hull structure made of mild and higher tensile steel. Six (6) grades of cargo can be handled simultaneously.




16 CROATIAN SHIPBUILDING
T
ANKERS




    Classification:                American Bureau of Shipping   Painting:
                        A1 (E) Oil Carrier, AMS, SH, ACCU,
                                                                 Cargo tanks and slop tanks           Phenolic epoxy (300 my)
                Double Hull Tanker, ESP, SPM, UWILD, VEC, CPP
                                                                 Under water hull and boot topping     Epoxy + Tie coat + SPC
                                                                                                  (250 my + 75 my + 450 my)
    Main dimensions:
                                                                 Open deck and exposed superstructure
    Lenght over all                             228.60 m                                                 Epoxy + Polyurethane
    Length between perpendiculars               220.00 m                                                    (260 my + 60 my)
    Breadth moulded                              42.00 m
    Depth moulded                                21.00 m         Cargo equipment:
    Design draught                              11.354 m
                                                                 Cargo pumps       12 x 1000 m3/h at 130 mLC, s.g. 0.8, 1 cSt
    Scantling draught                            14.05 m
                                                                                 submerged, centrifugal, hydraulic motor driven
    Deadweight at design draught                 71,300 t
                                                                                                             cargo tanks pumps
    Deadweight at scantling draught              95,000 t
                                                                                     2 x 250 m3/h at 130 mLC, s.g. 0.8, 1 cSt
    Main engine Split-MAN-B&W                  6S60MC-C
                                                                                 submerged, centrifugal, hydraulic motor driven
    Selected maximum continuous rating 13,530 kW/105 rpm
                                                                                                              slop tanks pumps
    Trial speed at design draught and 90% SMCR    15.8 kn
                                                                                       1 x 150 m3/h at 70 mLC, s.g. 0.8, 1 cSt
    Main engine daily fuel oil consumption      49.0 t/day
                                                                                submersible, centrifugal, hydraulic motor driven
    Cruising range                             18,000 nm
                                                                                                           portable cargo pump
    Crew complement                                     28
                                                                 Cargo manifolds                                    6 x 350 mm
    Capacities (100%):
                                                                 Auxiliary engines plant:
    Cargo and slop tanks                          116,000 m3
                                                                 Main diesel-generator sets                          4 x 990 kW
    Ballast tanks                                  38,000 m3
                                                                 Emergency diesel-generator set                      1 x 160 kW
    Heavy fuel oil                                  2,500 m3
    Diesel                                            150 m3
                                                                 Heating plant:
    Fresh and feed water                              250 m3
                                                                 Auxiliary oil fired boilers 1 x 25 t/h saturated steam at 7 bar G
                                                                 Composite boiler 1 x 2.0/1.6 t/h saturated steam at 7 bar G




                                                                                                   CROATIAN SHIPBUILDING 17
Oil Tanker / Chemical Carrier
83,651 / 59,866 DWT




Name:             m/s PANDA                              Lenght over all                 228.21 m
Owner / Flag:     The East Asiatic Co. Ltd. / Liberia    Length btw perp.                220.00 m
Builder / Yard:   Shipyard 3.MAJ / 594                   Breadth moulded                  32.20 m
Sister vessels:   650, 652                               Depth moulded                    21.66 m
Delivered:        1987, 1988, 1990                       Draught design                   12.52 m
Classification:   DNV; 1A1 Tanker for oil (COW, INERT)   Draught scantling                16.02 m
                  EO, bis, Tanker for chemicals          Deadweight at draught 12.52 m    59,866 t
Designed by:      Shipyard 3.MAJ                         Deadweight at draught 16.02 m    83,651 t
                                                         Gross tonnage                     44,322




18 CROATIAN SHIPBUILDING
T
ANKERS




    Main engine: 3.MAJ - SULZER                   6 RTA 62      Cargo equipment:
    MCR:                                  8,330 kW / 85 rpm     •   Twelve cargo pumps, vert. centrifugal type, stainless
    Trial speed at 7,500 kW                                         steel, hydr. driven, 950 m3/h at 13 bar capacity each.
    (90% MCR) on draught of 12.52                14.35 knots    •   Two slop pumps, vert. centrifugal type, hydr. driven,
                                                                    70 m3/h at 13 bar capacity each.
    Capacities:                                                 •   One sludge pump, vert. centrifugal type, hydr. driven,
    Cargo tanks, incl. slops & sludge:            89,181 m3         70 m3/h at 7 bar capacity each.
    Slop tanks & sludge retention tank:            2,578 m3     •   One portable pump, hydr. driven, capacity 500 m3/h
    Cargo loading / unloading time:          abt. 10.5 hours        at 3 bar.
                                                                    Pump capacities are related to cargo density
    Provisions:                                                     0.85 t/m3 and viscosity 1 m2/ sec at 50 deg. C.
                                                                •   Heating system:
    Heavy fuel oil                                 1,957 m3         deck exchangers capacity: 44-66 deg. C /96 hours
    Diesel fuel oil                                  256 m3         Conditions: viscosity 380 m2/sec at 50 deg. C sea water
    Lubrication oil                                  167 m3         temp. + 5 deg. C, air ambient temp. + 20 deg. C
    Fresh water                                      301 m3     •   Cleaning system:
                                                                    - hot / cold sea and fresh water, fixed tank cleaning /
    Ballast water                                  31,886 m3        / washing machines - 6 portable washing machines
    HFO consumption of M.E.                 29.9 t / 24 hours   •   Control:
    Crew complement                        26 + 6 Suez crew         remote integrated microcomputed control and extensive
                                                                    monitoring system.

                                                                Steam plant:
                                                                •   Two boilers, oil fired, 8 bar, cap. 20 + 6 t/h steam.

                                                                Auxiliary engines plant:
                                                                •   Two el. gen. sets, 60 cycles, 1,025 kVA D.M. driven each.
                                                                •   One el. gen. / hydr. power set, 60 cycles, 875 kW, D.M.
                                                                    driven.
                                                                •   One hydr. power set, 60 cycles, 1,320 kW, D.M. driven.




                                                                                                 CROATIAN SHIPBUILDING 19
Oil Tanker
70,700 / 60,300 DWT




Name:             m/s MARGARA                       Length over all                   abt. 228.20 m
Designed by:      Shipyard 3.MAJ                    Length btw perp.                       220.00 m
Builder / Yard:   Shipyard 3.MAJ / 662              Breadth moulded                         32.20 m
Sister Vessels:   663, 673, 674                     Depth moulded                           20.10 m
Delivered:        1999, 2000, 2001                  Draught design                          12.55 m
Owner / Flag:     Doria Shipping Co. Ltd. / Malta   Draught scantling                       14.10 m
Classification:   ABS A1 (E) Oil Carrier, SH,       Deadweight at design draught       abt. 60,300 t
                    AMS, ACCU, Ice Class IC         Deadweight at scantling draught    abt. 70,700 t




20 CROATIAN SHIPBUILDING
T
ANKERS




    Main engine:                                                   Cargo equipment:
    3. MAJ - SULZER                                 6 RTA 62U      •   Piping and pump system arranged for 5 segregations
    Trial speed at 9,800 kW and                                        and one pair of slop tanks
    design draught                             abt. 15.00 knots    •   One hydraulically driven submerged cargo pump fitted in
                                                                       each cargo/slop tank, capacity abt. 900 m3/h / 300 m3/h
    Capacities:                                                        respectively at 130 mlc, density 0.8 t/m3
    Cargo tanks including slop tanks (98% full) abt. 80,400 m3     •   Hydraulic power units (four electric and three diesel engine
                                                                       driven) for simultaneous discharging of 5400 m3/h of cargo
    Provisions                                                         at 130 mlc, density 0.8 t/m3
    Heavy fuel oil                                 abt. 2,670 t    •   Inert gas plant 6750 m3/h
    Diesel oil                                       abt. 220 t
    Light diesel oil                                  abt. 17 t    Steam plant:
    Lub. oil                                         abt. 115 t    •   Two oil fired boilers, steam capacity abt. 14 t/h at 8 bar
    Fresh water                                      abt. 160 t        each
    Feed water                                        abt. 70 t    •   One exhaust gas/oil fired composite boiler capacity
                                                                       abt. 1.5/2.0 t/h at 8 bar
    Water ballast                               abt. 30,600 t
    Crew complement:                          27+6 Suez crew       Auxiliary engines plant:
    Cargo space with longitudinal bulkhead consisting of 10 car-   •   Three diesel generator sets of abt. 1100 kVA, 3 x 450 V,
    go tanks (5 pairs, P&S) and 2 slop tanks. The entire cargo         60 Hz, 900 min-1 burning DO and HFO
    tank length protected by double hull (double bottom and dou-   •   One emergency diesel geneator set of abt. 150 kVA,
    ble side) forming water ballast tanks.                             3 x 450 V, 60 Hz.
    Additional pollution prevention measures comprising inner
    bottom/double side for fuel oil tanks.
    Material protection: cargo tanks protected with epoxy paint-
    ing system.




                                                                                                    CROATIAN SHIPBUILDING 21
Oil Product Tanker
65,200 / 52,000 DWT




Designed by:          Shipyard Brodosplit                              Length over all                    228.60 m
Builder / Yard Nos:   Shipyard Brodosplit / 441-444                    Length between perpendiculats      175.50 m
Owner / Flag:         CH P-MAX I-IV Limited / Bermuda                  Breadth moulded                     40.00 m
Delivery:             2005, 2006                                       Depth moulded                       17.90 m
Classification:       Det Norske Veritas, DNV A1 Tanker for Oil ESP,   Design draught                      11.30 m
                      NAUTICUS (Newbuilding):                          Scantling draught                   13.00 m
                      PLUS-2, ICE-1B, ETC, E0, VCS2, RPS, NAUT-AW      Deadweight at design draught        52,750 t
Project No.:          995                                              Deadweight and scantling draught    63,700 t




22 CROATIAN SHIPBUILDING
T
ANKERS




    Main engines Split-MAN-B&W                2x6S46MC-C            Cargo equipment:
    Selected maximum continuous rating 2x7.860 kW/129 rpm
                                                                    •   Cargo pumps
    Service speed at design draught                14.5 kn
                                                                        10x800 m3/h at 120 mLC, s.g. 0.8, 1 cSt
    Main engine daily fuel oil consumption       41.0 t/day
                                                                        submerged, centrifugal, electric motor driven cargo tanks
    Cruising range                              14,000 nm
                                                                        pumps.
    Crew complement                                      28
                                                                        2x300 m3/h at 120 mLC, s.g. 0.8, 1 cST
    Capacities (100%):                                                  submerged, centrifugal, electric motor driven slop tanks
                                                                        pumps.
    Cargo and slop tanks                             69,400 m3
    Ballast tanks                                    25,800 m3          1x200 m3/h at 70 mLC, s.g. 0.8, 1 cSt
    Heavy Fuel Oil                                    1,920 m3          submersible, centrifugal, hydraulic motor driven portable
    Diesel oil                                          240 m3          cargo pump.
    Fresh and feed water                                360 m3      •   Cargo manifolds                      5 x 300 mm
    Twin screw diesel engine driven Oil Product Tanker with         Auxiliary engines plant:
    longitudinal bulkhead, bulbous bow, and transom stern.
    Living quarters including navigation bridge, engine room with   •   Main diesel-generators sets          4 x 865 kW
    fuel oil tanks. Double bottom/double side tanks and peak        •   Emergency diesel-generator set       1 x 100 kW
    tanks intended for segregated ballast. Cargo space divided
    into ten (10) cargo and two (2) slop tanks. Hull structure      Heating plant:
    made of mild and higher tensile steel. Five (5) grades of       •   Auxiliary oil fired boilers 2 x 8 t/h saturated steam at 7 bar G
    cargo can be handled simultaneously.                            •   Economiser boiler        1 x 1.2 t/h saturated steam at 7 bar G
    Painting:
    Cargo tanks and slop tanks            Pure epoxy (300 my)
    Under water hull and boot topping
          Epoxy + Tie coat + SPC(300 my + 75 my + 250 my)
    Open deck and exposed superstructure
     Epoxy + Tie coat + Polyurethane (300 my + 75 my + 50 my)




                                                                                                      CROATIAN SHIPBUILDING 23
Tanker For Chemicals,
Oil and Oil Products
47,300 DWT




Name:             m/t MERCINI LADY                                      Length overall                           182.50 m
Owner / Flag:     Cambridge Shipping & Tr. Co. / Liberia                Length between perpendiculars            174.80 m
Builder / Yard:   Shipyard 3.MAJ / 676                                  Breadth, moulded                          32.20 m
Delivered:        2003                                                  Depth, moulded to upper deck              17.50 m
Sister ships:     677, 694 to be delivered 2004                         Design draught                            11.00 m
Classification:   LLOYD’S REGISTER OF SHIPPING 100 A1                   Deadweight at design draught (11.00 m) 41,000 t
                  double hull oil & chemical tanker, ship type 3 in     Scantling draught                         12.20 m
                  association with list of defined cargoes, ESP, SPM,   Deadweight at scantling draught (12.20 m) 47,300 t
                  *IWS, LI LMC, UMS, IGS
                  Descriptive notes: ShipRight (SDA, FDA, CM, PCWBT,
                  SERS, SCM) COW, SBT / PL, ETA
                  Maximum filling height with caustic soda is 67%
Designed by:      Shipyard 3.MAJ




24 CROATIAN SHIPBUILDING
T
ANKERS




    Main engine                  3. MAJ - SULZER 6 RTA 48 T-B             Cargo equipment:
    CMCR                                8,310 kW at 123 min-1
    Trial speed with 7480 kW (90% CMCR)                                   Each pair of cargo tanks arranged as segregated piping system,
    at scantling draught                          14.60 knots             giving a total six cross-overs and one cross-over for pair of slop tanks
                                                                          and retention tank.
                                                                          Hydraulically driven submerged cargo pumps:
    Capacities (98%):
                                                                          • Cargo tanks: 12 x 550 m3/h at 130 mlc
    Cargo tanks (slop and retention included)             53,030 m3       • Slop tanks: 2 x 300 m3/h at 130 mlc
    Ballast tanks (100%)                                  22,270 m3       • Retention tank: 1 x 100 m3/h at 130 mlc
                                                                          • Portable pumps: 2 x 70 m3/h at 50 mlc
    Provisions                                                            Four electrically driven hydraulic power units.
                                                                          Cargo pumps are of stainless steel AISI 316
    Heavy fuel oil                                          1,633 m3      and cargo pipes of AISI 316 L.
    Diesel oil                                                135 m3      Cargo tanks heating with deck heaters. Slop and residual tanks heating
    Lubrication oil                                            68 m3      with heating coils.
    Fresh water                                               354 m3      Inert gas generator, capacity 4,200 m3/h.
                                                                          Fixed tank cleaning machines for each cargo tank.
    Cargo unloading time                              abt. 16 hours       One electro-hydraulic cargo hose handling crane, 150 kN SWL.
    Consumption of HFO                                     32 t/day
    Cruising range                        abt. 15,400 nautical miles
                                                                          Steam plant:
    Crew complement                               28 + 6 Suez crew
                                                                          •    One oil fired boiler, steam capacity 19 t/h at 10 bar
    The vessel is double hull tanker for oil and oil products and IMO     •    One composite boiler, steam capacity 1.6 t/h (exhaust
    type 3 tanker for chemicals. Cargo space is divided into six pairs         gas section) and 2.0 t/h (oil fired section) at 10 bar
    of cargo tanks, one pair of slop tanks and one retention tank. The
    structure of cargo tanks is designed for cargo density of 1.025       Auxiliary engines plant:
    t/m3 in completely filled tanks and for cargo density up to 1.53
    t/m3 in partially filled tanks with filling height corresponding to   •    Three diesel generators sets, abt. 3 x 1350 kW
    the density ratio, including zig-zag and asymmetrical P&S loading.    •    One emergency diesel generator set
    Double hull consists of six pairs of double bottom / double side
    water ballast tanks.
    Engine room is equipped for unattended operation.

    Painting:                        Cargo tanks - phenolic epoxy
                                     Ballast tanks - light colour epoxy




                                                                                                             CROATIAN SHIPBUILDING 25
Tanker for Chemicals
and Oil Products
46.764 TDW




Name:             M/V TARANTELLA                                   Length over all              182.90 m
Owner / Flag:     Whitefin Shipping Company Ltd. / Liberia         Length btw perp.             176.00 m
Builder / Yard    Shipyard Trogir / 302, 303, 304, 305, 306, 307   Breadth moulded               32.20 m
Designed by:      Shipyard Trogir                                  Depth moulded to main deck    17.20 m
Delivery:         2002, 2003, 2004                                 Draught design, moulded       11.00 m
Classification:   DNV: A1 Tanker for Oil products and Chemicals    Deadweight at draught         41,216 t
                  ESP E0 CCO W1 LCS(DIS) VCS-2 HL(1.6)             Draught scantling             12.20 m
                  COAT-2 PLUS-2 ETC NAUTICUS (Newbuilding)         Deadweight                    46,764 t
                  Ship type 2, a2, b3, c3, v3, f2, str. 0.05




26 CROATIAN SHIPBUILDING
T
ANKERS




    Main engine:           2 x MAC 8M32C / Totally 7,680 kW       •   Slop pumps
    Trial speed at 90% MCR                      15,02 knots           - 2 x deepwell el.driven 250 m3 /h at 100 mLC, s.g. 0.8,
                                                                       visc. 1.0 cSt
    Capacities:                                                   •   Portable pumps
                                                              3       - 1 x submersible, hydraulic driven 18 0m3 /h at 70 mLC,
    Cargo tanks                                     52,969 m
                                                                      s.g. 0.8, visc 1.0 cSt
    Slop tanks                                       1,050 m3
                                                                  •   Frequency converter power plant in engine room
                                                              3   •   Cargo piping of stainless steel
    Heavy fuel oil                                   1,473 m
                                                                      - Nitrogen gas system cap. 4,400 Nm3 /h
    Diesel fuel oil                                    134 m3
                                                                  •   Cargo tanks heating: steam/thermal oil, cargo deck heaters
    Lubrication oil                                     43 m3
                                                                  •   Slop tanks heating: heating coils AISI 316 L
    Fresh water                                        847 m3
                                                                  •   Tank washing: cold/hot sea and fresh water,
                                                                      two (2) tank cleaning machines per tank
    Ballast water tanks:                        19,813 m3
                                                                  •   Cargo tanks drying: air heater 700 C and air fan
    Cargo loading / unloading time: 3,500 m3 /h ∑ 16 hours
                                                                      30,000 Nm3 /h
    HFO consuption of M.E.:                    30,00 t/day
                                                                  •   Lifting crane for cargo hose handling, hydraulically driven
    Cruising Range                    13,900 nautical miles
                                                                      100 kN cap. at 21 m outreach
    At speed                                    14,2 knots
                                                                  •   Ballast pumps: 2xdeep well el.driven 1000m3 at 25 mLC
    Crew Complement: 18 + 6 spare + Pilot + 4 Suez Crew
                                                                  Steam plant:
    Cargo tanks and slop tanks are protected by phenolic epoxy,
    300 mic                                                       •   Two oil fired boilers, cap. 14,000 kg/h at 14 bar each
    Ballast tanks are protected by epoxy, 300 mic.                •   Two economizers, cap. 700 kg/h at 14 bar

    Cargo equipment:                                              Auxiliary engines plant:
    •    Cargo pumps:                                             •   Two diesel driven electric generators, 682 kW at 720 RPM
         - 6 x deepwell el.driven 400 m3 /h at 110 mLC,           •   One shaft generator 3200 kW at 1200 RPM
         s.g. 0.8, visc. 1.0 cSt                                  •   One emergency diesel driven electric generator, 125 kW
         - 8 x deepwell el.driven 250 m3 /h at 100 mLC,               at 1800 RPM
         s.g. 0.8, visc. 1.0 cSt




                                                                                                  CROATIAN SHIPBUILDING 27
Oil and Chemical Tanker




Name:             m/s AZOV SEA                                               Length over all                    abt 182.50 m
Owner / Flag:     Valloy Shipping Co. / Liberia                              Length btw perp.                       174.80 m
Builder / Yard:   Shipyard Trogir / 229 - 237                                Breadth moulded                         32.20 m
Designed by:      Shipyard Trogir, 9 sister vessels, 6 of which              Depth moulded                           17.50 m
                  delivered by shipyards: ULJANIK and BRODOSPLIT             Draught design                          11.00 m
Delivered:        1998, 1999                                                 Deadweight at draught 11.00 m           41,100 t
Classification:   LRS 100 A1 Double Hull Oil and Chemical                    Draught scantling                       12.20 m
                  Tanker, ESP, SPM, S.G. 1.025, Ship Type 3 in Association   Deadweight, at draught 12.20 m         47,400 m
                  with a list of Defined Cargoes @ LMC, UMS, IGS, IWS        Main engine                   8,310 kW/123 rpm
                                                                             Trial speed at 90% MCR, draught 11.0 m 15.00 kn




28 CROATIAN SHIPBUILDING
T
ANKERS




    Capacities:                                                    Cargo equipment:
                                                               3
    Cargo tanks                                     53,100 m       •   Cargo pumps, submerged type, hydraulically driven
    Slop tanks                                       1,150 m3          - 10 x capacity 352 m3/h at 12 bar head each,
                                                                       - 2 x capacity 100 m3/h at 12 bar head, in slop tanks,
    Heavy fuel oil                                    1,704 m3         - 1 x portable submersible type, cap.70 m3/h at 5 bar head,
    Diesel fuel oil                                     134 m3         - 10 x cargo deck heater,
    Lubrication oil                                      74 m3     •   Hydraulic power plant in engine room.
    Fresh water                                         300 m3     •   Cargo piping of stainless steel.
                                                                   •   Inert gas system cap. 4,650 N m3/h.
    Ballast water tanks:                          21,726 m3        •   Slop tanks heating: heating coils Cunifer 90/10.
    Cargo loading/unloading time:                   16 hours       •   Tank washing: COW and hot sea water,
    HFO consumption of M.E.                  32.0 t/24 hours           - Cargo tanks: 1 cleaning machine per tank.
    Cruising Range                                                     - Slop tanks: 1 cleaning machine per tank,
    (speed 14.3 knots, 20% serv. allowance)      15,750 Nm             - Steam sea water heater 100 m3/h at 10 bar,
    Crew Complement:                        22+6 Suez crew         •   Lifting crane for cargo hose handling,
                                                                       hydraulically driven, cap. 150 kN.
    Five different grades of oil can be carried, loaded and dis-   •   Ballast pumps submerged type, hydraulically
    charged simultaneously. Cargo tanks are separated by dou-          driven 2 x 750 m3/h at 1.8 bar.
    ble bottom and 2 m width of double sides from shell plating
    with structural elements within ballast tanks or above deck    Steam plant:
    keeping inner tank walls smooth, without obstructions.
                                                                   •   One oil fired boiler, cap. 19 t/h saturated steam, 10 bar.
    Cargo tanks are protected by epoxy fenoline paint system.
                                                                   •   One economizer, cap. 1.4 t/h saturated steam,10 bar.

                                                                   Auxiliary engines plant:
                                                                   •   Three diesel driven electric generators, 60 cycles,
                                                                       2 x 1,600 kVA + 1 x 850 kVA.
                                                                   •   One emergency diesel driven electric generator,
                                                                       60 cycles, 120 kVA.




                                                                                                    CROATIAN SHIPBUILDING 29
Oil & Chemical Tanker
47,400 DWT




Name:             m/s HISPANICA                                        Length over all                   182.50 m
Owner / Flag:     Lancaster Shipping Ltd, Sliena / Malta               Length btw perp.                  174.80 m
Builder / Yard:   Shipyard Uljanik / 443                               Breadth extreme                    32.20 m
Sister vessels:   444-447                                              Depth moulded                      17.50 m
Delivery:         2002, 2003, 2004                                     Draught design                     11.00 m
Designed by:      Shipyard Uljanik                                     Draught scantling                 12,197 m
Classification:   LR; 100A1 Double Hull Oil and Chemicals              Deadweight at design draught       41,247 t
                  Tanker, Ship type 2, in association with a list of   Deadweight at scantling draught    47,465 t
                  defined cargoes; ESP, SPM, *IWS with the
                  descriptive notes in column 6 of the Register
                  Book Ship Right SDA, FDA, CM, maximum filling
                  height with caustic soda 67%, ETA LMC,
                  UMS, IGS, COW, SBT, PL




30 CROATIAN SHIPBUILDING
T
ANKERS




    Main engine:        ULJANIK/MAN-B&W; 6S50MC-C Mk 6            Cargo equipment:
    MCR:                                  8580 kW/127 RPM
                                                                  •   10 stainless steel deepwell centrifugal cargo pumps,
    Trial speed at 87% MCR, on draught of 11,00 m
                                                                      hydraulically driven, cap. 550 m3/h at 125 mlc
                                                15.60 knots
                                                                      (S.G. 0.8 t/m3) visc. 1.0 cSt.
                                                                  •   2 stainless steel deepwell centrifugal slop pumps,
    Capacities:
                                                                      hydraulically driven, cap. 100 m3/h at 125 mlc
    Cargo tanks including slops                     54,297 m3         (S.G. 0.8 t/m3) visc. 1.0 cSt.
    Ballast tanks                                   21,177 m3     •   2 portable stainless steel sumbersible centrifugal cargo
                                                                      pump, hydr. capacity 70 m3/h at 50 mlc (S.G. 0.8 t/m3)
    Provisions:                                                       visc. 1.0 cSt.
                                                                  •   Heating: each cargo tank is fitted with stainless steel deck
    Heavy fuel oil                                     1,774 m3
                                                                      heater, slop tank with stainless steel heating coils.
    Diesel fuel oil                                      141 m3
                                                                  •   Venting: high velocity, press/vacuum valves. Gas freeing
    Lubricating oil                                       71 m3
                                                                      by portable air driven ventilators. Vapour return arrange-
    Fresh water                                          357 m3
                                                                      ment at manifold.
                                                                  •   Cleaning: - 1 stainless steel machine per each tank
    Cargo loading time:                          abt. 19 hours
                                                                  •   Inerting: capacity of 4125 m3/h .
    Consumption HFO:                            abt. 37,2 t/day
                                                                  •   Hose handling: - 1 crane of 100 kN SWL electro-hydrauli-
    Cruising Range:                               15,200 n.m.
                                                                      cally operated.
    Crew Complement:                                28 persons
                                                                  Heating plant:
    The vessel is suitable for transporting crude oil and dirty
    petroleum products and chemicals world wide.                  •   One oil fired boiler, steam capacity 19 t/h.
    10 submerged pumps are fitted in cargo tanks plus two in      •   One exhaust gas boiler cap. 1200 kg/h.
    slops.
    One cargo manifold is arranged for two cargo pumps, five      Auxiliary engines plant:
    segregations. All cargo tanks are composed of vertical cor-
                                                                  •   Three diesel generator sets, 60 cycles of 1120 kW
    rugated bulkheads and plane surfaces. Hull structure mild
                                                                      driven each.
    steel.
                                                                  •   One emergency diesel generator set, 60 cycles of 109 kW.
    Painting: Cargo and slop tanks - epoxy phenolic.




                                                                                                   CROATIAN SHIPBUILDING 31
Oil Product / Chemical Tanker
45,000 / 40,000 DWT




Name:               m/s ELKA GLORY
Owner / Flag:       Carriage Shipping Inc. / Monrovia
Builder / Yard:     Shipyard Brodosplit / 428
Sister vessels:     415, 416, 417, 427, 432
Designed by:        Shipyard Brodosplit
Delivery:           2001-2005

Single screw diesel engine driven Oil Product / Chemical Tanker with longitudinal bulkhead, bulbous
bow, and transom stern. Living quarters including navigation bridge, engine room with fuel oil tanks
on both sides and pump room located aft. Double bottom / double side tanks and peak tanks
intended for segregated ballast. Cargo space divided into sixteen (16) cargo and two (2) slop tanks.
Hull structure made of mild steel. Eight (8) grades of cargo can be handled simultaneously.



32 CROATIAN SHIPBUILDING
T
ANKERS




    Classification:      Det Norske Veritas 1A1 Tanker for Oil   Open deck and exposed superstructure Epoxy + Polyurethane
                               and Chemicals IMO Type 3 - ESP                                            (260 my + 60 my)
                                              E0 ETC, Nauticus
                                                                 Cargo equipment:
    Main dimensions:
                                                                 Cargo pumps          16 x 580 m3/h at 120 mLC, s.g. 0.8, 1 cSt
    Lenght over all                             183.40 m                                       submerged, centrifugal, hydraulic
    Length between perpendiculars               175.00 m                                        motor driven cargo tanks pumps
    Breadth moulded                              32.00 m                               2 x 120 m3/h at 130 mLC, s.g. 0.8, 1 cSt
    Depth moulded                                17.95 m                                       submerged, centrifugal, hydraulic
    Design draught                               11.00 m                                         motor driven slop tanks pumps
    Scantling draught                            12.00 m                                1 x 150 m3/h at 70 mLC, s.g. 0.8, 1 cSt
    Deadweight at design draught                 40,000 t                                     submersible, centrifugal, hydraulic
    Deadweight at scantling draught              45,000 t                                     motor driven portable cargo pump
    Main engine Split-MAN-B&W                  6S50MC-C          Cargo manifolds                                    8 x 300 mm
    Selected maximum continuous rating 9,180 kW/123 rpm
    Trial speed at design draught and 90% SMCR    15.9 kn        Auxiliary engines plant:
    Main engine daily fuel oil consumption      33.6 t/day
                                                                 Main diesel-generator sets                           2 x 990 kW
    Cruising range                             20,000 nm
                                                                                                                      2 x 740 kW
    Crew complement                                     27
                                                                 Emergency diesel-generator set                       1 x 170 kW
    Capacities (100%):
                                                                 Heating plant:
    Cargo and slop tanks                           55,200 m3
                                                                 Auxiliary oil fired boilers 1 x 16 t/h saturated steam at 7 bar G
    Ballast tanks                                  21,500 m3
                                                                 Donkey boiler               1 x 1.5 t/h saturated steam at 7 bar G
    Heavy fuel oil                                  1,900 m3
                                                                 Exhaust gas economiser 1 x 1.4 t/h saturated steam at 7 bar G
    Diesel                                            130 m3
    Fresh and feed water                              200 m3

    Painting:
    Cargo tanks and slop tanks         Phenolic epoxy (300 my)
    Under water hull and boot topping Epoxy + Tie coat + SPC
                                   (250 my + 75 my + 450 my)




                                                                                                   CROATIAN SHIPBUILDING 33
Handy Size Oil Product Tanker
45,000 / 40,000 DWT




Name:             m/s MARINOULA                          Length over all                182.40 m
Owner / Flag:     Southseas Shipping Ltd. / Malta        Length btw perp.               174.00 m
Builder / Yard:   Shipyard Brodosplit / 406              Breadth moulded                 32.20 m
Sister vessel:    Yard 407                               Depth moulded                   17.60 m
Delivered:        2000                                   Draught design                  11.00 m
Classification:   LR 100 A1 Oil Tanker (double hull),    Draught scantling               12.00 m
                     LMC, UMS, IGS, ESP, COW, IWS, SCM   Deadweight at des. draught      40,000 t
Designed by:      Shipyard Brodosplit                    Deadweight at scant. draught    45,000 t




34 CROATIAN SHIPBUILDING
T
ANKERS




    Main engine:           BRODOSPLIT-MAN-B&W 6S50MC                 Painting:
    SMCR:                               8,580 kW / 127 rpm
                                                                     Cargo tanks - Epoxy
    Trial speed at 90% SMCR, on design draught 15.3 knots
                                                                     Ballast tanks - Light colour CT epoxy
                                                                     Under water hull - Epoxy + vynil tar + SPC
    Capacities:
                                                                     Deck and exposed superstr.- Epoxy + polyurethan
    Cargo + slop tanks                                53,000 m3
    Segregated ballast tanks                          20,000 m3      Cargo equipment:
                                                                     •   Cargo pumps: 4 x 1100 m3/h at 120 mlC, s.g.
    Provisions:
                                                                         0.96, 1 cSt, steam turbine driven.
    Heavy fuel oil                                      1,700 m3     •   Stripping 1 x 100 m3/h at120 m el. driven cargo
    Diesel fuel oil                                       130 m3         pump + 1 x 200 m3/h at 20 m eductor.
    Fresh water                                           200 m3     •   Cargo manifolds: 4 x 300 mm

    Main engine consumption                            31.8 t/day    Auxiliary engines plant:
    Cruising range                                    18,000 nm
                                                                     •   Three diesel-generator sets, 740 kW, 720 rpm, 60 Hz
    Crew complement                                            28
                                                                     •   One emergency generator, 96 kW, 1800 rpm, 60 Hz
    Single screw diesel engine driven Oil Tanker with longitudinal
                                                                     Heating plant:
    bulkhead, bulbous bow, transom stern and forecastle. Living
    quarters including navigation bridge, engine room with fuel      •   Two oil fired boiler capacity 16.0 t/h.
    oil tanks on both sides and pump room located aft. Double        •   One composite oil fired boiler, oil fired section
    bottom / double side tanks and peak tanks intended for seg-          capacity 1.5 t/h, economizer capacity 1.4t/h.
    regated ballast. Cargo space divided into ten (10) cargo and
    two (2) slop tanks. Structural steel and profiles made of mild
    steel.
    • Intended cargoes: oil products.
          Four (4) grades of cargo can be handled simultaneously.




                                                                                                       CROATIAN SHIPBUILDING 35
Oil and Chemical Tanker




Name:             m/s TROGIR                                                Length over all                        181.00 m
Owner / Flag      Trogir Shipping Ltd. / Liberia                            Length btw perp.                       173.80 m
Builder / Yard:   Shipyard Trogir/ 217                                      Breadth moulded                         32.00 m
Designed by:      Shipyard Trogir                                           Depth moulded                           17.00 m
                  (12 sister vessels, 8 of which delivered by               Draught design                          10.00 m
                  Shipyards ULJANIK, 3.MAJ, and BRODOSPLIT)                 Deadweight at draught of 10,00 mabt. 35,660 t
Delivered:        1995, 1996, 1997                                          Draught scantling                       11.00 m
Classification:   LRS; 100 A1 Oil and Chemical Tanker,                      Deadweight, at draught of 11,00 abt.    40,700 t
                  (Double Hull, Caustic soda only), SPM, Max. filling 67%   Main engine                    8,310 kW/123 rpm
                  of depth, S.G.1.53 LMC, UMS, IGS, COW, PL, SBT            Trial speed at 90% MCR, draft 10.0 m 15.10 knots




36 CROATIAN SHIPBUILDING
T
ANKERS




    Capacities:                                                   Cargo equipment:
                                                              3
    Cargo tanks                                     50,172 m      •   Cargo pumps, submerged type, hydraulically driven,
    Slop tanks                                       1,144 m3         - 10 x 500 m3/h at 12 bar head each,
                                                                      - 2 x 100 m3/h at 10 bar head, in slop tanks,
    Heavy fuel oil                                    1,697 m3        - 1 x portable submersible type, cap.70 m3/h at 5 bar head.
    Diesel fuel oil                                     173 m3    •   Hydraulic power plant suitable for simult. operation of
    Lubricating oil                                      71 m3        8 cargo pumps.
    Fresh water                                         359 m3    •   Cargo piping of stainless steel, AISI 316L.
                                                                  •   Inert gas system cap. 5 750 N m3/h.
    Ballast water tanks:                           19,546 m3      •   Cargo heating: stainless steel heating coils.
    Cargo loading/unloading time:                   12 hours      •   Tank washing: COW and hot sea water, heater 100 m3/h,
    HFO consumption of M.E.                   32.0 t/24 hours         - Cargo and slop tanks: 1 cleaning machine per tank.
    Cruising Range                                                •   Deck crane for cargo hose handling, hydraulically driven,
    (speed 14,4 knots, 20% serv.all.)              16,150 Nm          150kN.
    Crew Complement:                                      23      •   Ballast pumps:
                                                                      2 x 650 m3/h at 1.8 bar in pump room,
    The vessel is intended for worldwide service and suitable         1 x 50 m3/h at 1.8 bar, eductor.
    for loading, carriage, and simultaneous discharge of five
    different grades of black and/or white petroleum products.    Steam plant:
    The vessel is also designed to carry 50% solution of
                                                                  •   One oil fired boiler, cap. 19 t/h satur. steam
    caustic soda S.G. 1.53 at 67% filling of cargo tanks.
                                                                  •   One economizer, cap. 1.6 t/h satur. steam
    Completely double hulled in way of cargo tanks, double
    bottom of B/15 depth and side protective tanks of not less
                                                                  Auxiliary engines plant:
    than 2,00 m width. Structural elements within ballast tanks
    or above deck keeping inner tank walls smooth, without        •   Three diesel driven el.generators, 60 cycles,
    obstructions.                                                     1,350 kVA each
                                                                  •   One emergency diesel driven el.generator, 60 cycles,
                                                                      109 kVA.




                                                                                                    CROATIAN SHIPBUILDING 37
Tanker For Chemicals,
Oil and Oil Products
37,000 DWT




Name:             m/t BRO ELIZABETH                                   Length overall (extreme)                 183.97 m
Owner / Flag:     Broström Tankers SA / France                        Length between perpendiculars            176.00 m
Builder / Yard:   Shipyard 3. MAJ / 678                               Breadth, moulded                          30.00 m
Delivered:        2001, 2002                                          Depth, moulded to upper deck             15.911 m
Sister ship:      Yard 679                                            Design draught (extreme)                  9.016 m
Classification:   BUREAU VERITAS                                      Deadweight at design draught (9.016 m)    29,616 t
                  I 3/3 E Oil and Chemical Tanker, F, ESP, DEEP SEA   Scantling draught (extreme)              10.516 m
                  IG, OIL POL-ENG, OIL POL-CARG, NLS POL, COW         Deadweight at scantling
                  SBT PL CDS, CSA, SPM, ETA, CNC-1                    draught (10.516 m)                        37,026 t
                     AUT, MACH, BOILER, VERISTAR
Designed by:      Shipyard 3. MAJ




38 CROATIAN SHIPBUILDING
T
ANKERS




    Main engine                  3. MAJ - SULZER 6 RTA 52 U                Cargo equipment:
    CMCR                              7,900 kW at 120 min-1
    Trial speed with 6,715 kW                                              Independent pipeline from each pairs of cargo tanks and one pair of
    (85% CMCR) at design draught                15.25 knots                slop tanks arranged to cross-over manifold.
                                                                           Hydraulically driven submerged centrifugal cargo pumps:
    Capacities (100%):                                                     • Cargo tanks: 16 x 500 m3/h at 135 mlc
                                                                           • Slop tanks: 2 x 300 m3/h at 135 mlc
    Cargo tanks (slop included)                             43,259 m3      • Residual tanks: 2 x 80 m3/h at 120 mlc
    Residual tanks                                             239 m3      • Portable pump: 1 x 150 m3/h at 70 mlc
    Ballast tanks                                           18,185 m3      One diesel engine driven power unit of 463 kW and four electrically
    Washing water tanks                                        263 m3      driven hydraulic power units, each of 447 kW.
                                                                           Cargo pumps and pipes are of stainless steel AISI 316.
    Provisions                                                             Cargo tanks heating with deck heaters. Slop and residual tanks
    Heavy fuel oil                                           1,485 m3      heating with heating coils.
    Diesel oil                                                 199 m3      Inert gas generator, capacity 5,000 m3/h and nitrogen generator,
    Lubrication oil                                             97 m3      capacity 100 m3/h.
    Fresh water                                                224 m3      Fixed tank cleaning machines:
                                                                           • Cargo tanks: 32 x 31 m3/h at 8 bar
    Cargo unloading time                            abt. 10.5 hours        • Slop tanks: 4 x 17.5 m3/h at 8 bar.
    Consumption of HFO                                   29.7 t/day        One tank cleaning pump, 200 m3/h at 120 mlc.
    Cruising range                       abt. 14,800 nautical miles        One electro- hydraulic cargo hose handling crane, 100 kN SWL.
    Crew complement                26 crew + 1 pilot + 6 Suez crew
                                                                           Steam plant:
    The vessel is double hull tanker for oil and oil products and IMO
    type 2 tanker for chemicals. Cargo space is divided into eight         •   One oil fired boiler, steam capacity 16 t/h at 8 bar
    pairs of cargo tanks, one pair of slop tanks and one pair of           •   One composite boiler, steam capacity 1.2 t/h (exhaust gas
    residual tanks. The structure of cargo tanks is designed for               section) and 1.5 t/h (oil fired section) at 8 bar
    cargo density of 1.025 t/m3 in completely filled tanks and for
    cargo density up to 1.54 t/m3 in partially filled tanks with filling   Auxiliary engines plant:
    height corresponding to the density ratio, including zig-zag and       •   Two diesel generators sets, 780 kW each
    asymmetrical loading.                                                  •   One diesel generator set, 1,280 kW
    Double hull consists of four pairs of double bottom and four           •   One emergency diesel generator set, 217 kW
    pairs of double side water ballast tanks. Engine room is
    equipped for unattended operation.
    Painting:         Cargo tanks - phenolic epoxy
                      Ballast tanks - light colour epoxy
                      Underwater shell - SPC antifouling




                                                                                                             CROATIAN SHIPBUILDING 39
Tanker For Chemicals
and Oil Products
35,000 DWT




Name:             m/t MARITEA                     Length overall (extreme)               175.870 m
Owner / Flag:     CALISA / Italy                  Length between perpendiculars          169.000 m
Builder / Yard:   Shipyard 3. MAJ / 682           Breadth, moulded                        29.787 m
Delivered:        2002, 2003                      Depth, moulded to upper deck            16.805 m
Sister ship:      Yard 684                        Design draught (extreme)                11.018 m
Classification:   RINA M 100-A-1.1, Nav IL,       Deadweight at design draught (11.018 m) 34,659 t
                  Cst (oil-chem), ESP, IAI,
                      IAP, IAQ-1, IIQ, MAN,
                  NAU, FTC, RSD, SCC, VCS, EP2,
                  IV, IWS, TMS, P, OWS, PMS,
Designed by:      Shipyard 3. MAJ




40 CROATIAN SHIPBUILDING
T
ANKERS




    Main engine                    3. MAJ - SULZER 6 RTA 52 U             Cargo equipment:
    CMCR                                9,000 kW at 130 min-1
    Trial speed with 7,620 kW (85% CMCR)                                  Independent pipeline from one pair of cargo tanks and each slop
    at design draught                             15.30 knots             and recovery tank arranged to cross-over manifold. Stern loading
                                                                          station provided.
                                                                          Hydraulically driven submerged centrifugal cargo pumps:
    Capacities (100%):
                                                                          • Cargo tanks: 12 x 500 m3/h at 150 mlc
    Cargo tanks (slop included)                            43,200 m3      • Slop tanks: 2 x 200 m3/h at 150 mlc
    Ballast tanks                                          17,018 m3      • Recovery tank: 1 x 200 m3/h at 150 mlc
    Washing water tanks                                     1,119 m3      • Portable pump: 1 x 150 m3/h at 80 mlc
                                                                          Six electrically driven hydraulic power units, each of 435 kW.
    Provisions                                                            Cargo pumps and pipes are of stainless steel AISI 316L.
                                                                          Cargo, slop and recovery tanks heating with thermal oil
    Heavy fuel oil                                          1,266 m3      and heating coils.
    Diesel oil                                                191 m3      Inert gas generator, capacity 5,000 m3/h.
    Lubrication oil                                           133 m3      Fixed tank cleaning machines:
    Fresh water                                               175 m3      • Cargo tanks No. 2 P&S: 4 x 16.4 m3/h at 9 bar
                                                                          • Remaining cargo tanks: 20 x 19.1 m3/h at 9 bar
    Cargo unloading time                       abt. 10.5 hours            • Slop tanks: 6 x 9.1 m3/h at 9 bar
    Consumption of HFO with 8,120 kW                  38 t/day            • Recovery tank: 1 x 17 m3/h at 9 bar
    Cruising range                   abt. 10,300 nautical miles           Two tank cleaning pumps, 80 m3/h at 130 mlc.
                                                                          One electro-hydraulic cargo hose handling crane, 100 kN SWL.
    Crew complement                                26 + 6 Suez crew
                                                                          Thermal oil plant:
    The vessel is double hull tanker for oil products and IMO type 2
    tanker for chemicals. Cargo space is divided into six pairs of        •   Two thermal oil heaters, capacity 5,000 kW each
    cargo tanks, one pair of slop tanks and one recovery tank. The        •   One thermal oil economiser, capacity 850 kW
    structure of cargo tanks is designed for cargo density of 1.025
    t/m3 in completely filled tanks and for cargo density up to 1.54      Auxiliary engines plant:
    t/m3 in partially filled tanks with filling height corresponding to
    the density ratio. Double hull consists of six pairs of double        •   Three diesel generators sets, 1,280 kW each
    bottom / double side water ballast tanks and washing water            •   One emergency diesel generator set, 217 kW
    tanks. Engine room is equipped for unattended operation.

    Painting:         Cargo tanks - phenolic epoxy
                      Ballast tanks - light colour solvent free epoxy




                                                                                                            CROATIAN SHIPBUILDING 41
Tanker For Chemicals,
Oil and Oil Products
24,000 DWT




Name:             m/t ADMIRAL                                       Length overall (extreme)                 167.67 m
Owner / Flag:     MT Admiral Schiffahrtsgesellschaft / Gibraltar    Length between perpendiculars            160.80 m
Builder / Yard:   Shipyard 3.MAJ / 680                              Breadth, moulded                          26.40 m
Delivered:        2002, 2003                                        Depth, moulded to upper deck             13.812 m
Sister ships:     681, 683, 687                                     Design draught (extreme)                  9.017 m
Classification:   GERMANISCHER LLOYD 100 A5 E2 Chemical             Deadweight at design draught (9.017 m) 23,337 t
                  Tanker Type 2, Oil Tanker, NAV- 0, IW, ESP, ERS   Summer draught (extreme)                  9.187 m
                    MC E2, AUT INERT, RP1                           Deadweight at summer draught (9.187 m) 23,998 t
Designed by:      Shipyard 3.MAJ                                    Main engine 3. MAJ - SULZER 6 RTA 48 T-B
                                                                    CMCR                         7,850 kW at 127 min-1
                                                                    Trial speed with 6,600 kW (84% CMCR)
                                                                    at design draught                     15.42 knots




42 CROATIAN SHIPBUILDING
T
ANKERS




    Capacities (100%):                                                      Painting:               Cargo tanks - modified epoxy
                                                                       3                            Ballast tanks - light colour epoxy
    Cargo tanks (slop included)                             30,113 m
    Retention tank                                              45 m3
                                                                            Cargo equipment:
    Ballast tanks                                           11,894 m3
    Washing water tanks                                        277 m3       Independent pipeline from each cargo tank pair and one line from
                                                                            slop and retention tank arranged to cross-over manifold, giving a
    Provisions                                                              total seven cargo crossovers, slop crossover and one common line.
                                                                            Hydraulically driven submerged cargo pumps:
    Heavy fuel oil                                            1,033 m3
                                                                            • Cargo tanks: 350 m3/h at 110 mlc
    Diesel oil                                                  267 m3
                                                                            • Slop tanks: 100 m3/h at 110 mlc
    Lubrication oil                                              54 m3
                                                                            • Retention tank: 100 m3/h at 110 mlc
    Fresh water                                                 180 m3
                                                                            • Portable pump: 150 m3/h at 70 mlc
    Cargo unloading time                       abt. 10 hours                Four electrically driven hydraulic power units, each of 325 kW.
    Consumption of HFO                             31.2 t/day               Cargo pumps and pipes are of stainless steel AISI 316.
    Cruising range                 abt. 10,000 nautical miles               Cargo tanks heating with deck heaters. Slop and residual tanks
    Crew complement 22 crew + 2 pilots + 4 Suez / repair men                heating with heating coils.
                                                                            Inert gas generator, capacity 3,750 m3/h.
    The vessel is double hull tanker for oil and oil products and IMO       Fixed tank cleaning machines for cargo and slop tanks, capacity
    type 2 tanker for chemicals. Cargo space is divided into seven          20 m3/h at 10 bar.
    pairs of cargo tanks, one pair of slop tanks and one retention          One tank cleaning pump, 100 m3/h at 130 mlc.
    tank. The structure of cargo tanks is designed for cargo density        One electro-hydraulic cargo hose handling crane, 100 kN SWL.
    of 1,025 t/m3 in completely filled tanks and for cargo density up
    to 1.55 t/m3 in partially filled tanks with filling height correspon-   Steam plant:
    ding to the density ratio, including zig-zag and alternate loading.
    The structure of the cargo tanks No. 4 P&S and 5 P&S is                 •    One oil fired boiler, steam capacity 12 t/h at 7 bar
    designed for cargo density of 1.55 t/m3 in completely filled            •    One composite boiler, steam capacity 1.2 t/h (exhaust gas
    tanks.                                                                       section) and 1.5 t/h (oil fired section) at 7 bar
    Double hull consists of seven pairs of double bottom / double
    side water ballast tanks. Cofferdams are provided between fuel          Auxiliary engines plant:
    oil tanks and shell plating. Hull and machinery are designed to
    comply with requirements for navigation in ice. The ship’s hull is      •    Three diesel generators sets, 3 x 1,020 kW
    specially equipped for in-water surveys.                                •    One emergency diesel generator set, 218 kW
    Engine room is equipped for unattended operation. Redundant             •    One PTO generator, transmitting power of 1,260 kW from ME
    propulsion system is arranged by PTO generator working as PTI
    motor (electric power of 1260 kW) driving CP propeller trough
    tunnel shaft gear.




                                                                                                              CROATIAN SHIPBUILDING 43
Oil & Chemical Tanker
17,499 DWT / 17,550 DWT




Name:             m/s ALTAIR                                                Length over all                149.30 m
Owner / Flag:     Altair Marine Inc. / Liberia                              Length btw perp.               141.00 m
Builder / Yard:   Shipyard Uljanik / 429, 430, 431, 432                     Breadth moulded                 23.80 m
Delivered:        1999, 2000                                                Depth moulded                   12.65 m
Designed by:      Shipyard Uljanik                                          Draught design                   8.50 m
Classification:   DNV; 1A1 Tanker for Chemicals and Oil products,           Deadweight at design draught    17,499 t
                  in association with a list of defined cargoes; ESP, EO,
                  W1-OC, ICE-C, TMON
                  Ship type 2, a2, b3, c3, f2, str. 0.1, hl (1.59)



44 CROATIAN SHIPBUILDING
T
ANKERS




    Main engine:                ULJANIK/MAN-B&W; 7S42MC            Cargo equipment:
    MCR:                                 7,175 kW/136 RPM
                                                                   •   14 stainless steel deepwell centrifugal cargo pumps, hydr.
    Trial speed at 90% MCR, on draught of 8,50 m
                                                                       driven, cap. 250 m3/h at 105 mlc (S.G. 0.8 t/m3) visc.
                                                15.70 knots
                                                                       1.0 cSt.
                                                                   •   2 stainless steel deepwell centrifugal slop pumps,
    Capacities:
                                                                       hydraulically driven, cap. 80 m3/h at 100 mlc
    Cargo tanks including slops                        23,350 m3       (S.G. 0.8 t/m3) visc. 1.0 cSt.
    Ballast tanks                                       8,239 m3   •   2 portable stainless steel sumbersible centrifugal cargo
                                                                       pump, hydr. capacity 70 m3/h at 50 mlc (S.G. 0.8 t/m3)
    Provisions:                                                        visc. 1.0 cSt.
                                                                   •   Heating: stainless steel heating coils in tanks including
    Heavy fuel oil                                       724 m3
                                                                       slops.
    Diesel fuel oil                                      120 m3
                                                                   •   Venting: high velocity, press/vacuum valves. Gas freeing by
    Lubricating oil                                       95 m3
                                                                       portable driven ventilators. Vapour return arrangement at
    Fresh water                                          200 m3
                                                                       manifold.
                                                                   •   Cleaning: - 1 stainless steel machine per each tank
    Cargo loading/unloading time:                abt. 12 hours
                                                                   •   Inerting: capacity of 2,500 m3/h .
    Consumption HFO:                            abt. 30,4 t/day
                                                                   •   Hose handling: - 1 crane of 100 kN SWL hydraulically
    Cruising Range:                                 8,000 n.m.
                                                                       operated.
    Crew Complement:                                24 persons
                                                                   Heating plant:
    The vessel is suitable for transporting clean and dirty
    petroleum products and chemicals world wide.                   •   One oil fired boiler, steam capacity 11 t/h.
    14 submerged pumps are fitted in cargo tanks plus two in       •   One exhaust gas boiler cap. 1,000 kg/h.
    slop tanks.
    One cargo manifold is arranged for one cargo pump, seven       Auxiliary engines plant:
    segregations. All cargo tanks are composed of vertical
                                                                   •   Three diesel generator sets, 60 cycles of 700 kW
    corrugated bulkheads and plane surfaces.
                                                                       driven each.
    Hull structure mild steel.
                                                                   •   One emergency diesel generator set, 60 cycles of 100 kW.
    Painting: Cargo and slop tanks - epoxy phenolic.




                                                                                                    CROATIAN SHIPBUILDING 45
Liquefied Gas Tanker
LPG / NH3 / VCM                                                             Lenght over all
                                                                            Length btw perp.
                                                                                                                     157.00 m
                                                                                                                     146.90 m
                                                                            Breadth moulded                            22.80 m
15,000 CU. M.                                                               Depth moulded                              15.40 m
                                                                            Draught design                              7.50 m
                                                                            Draught scantling                           9.25 m
Designed by:          Shipyard 3.MAJ                                        Deadweight, at draught 7.50 m              10,500 t
Project No.:          2588                                                  Deadweight, at draught 9.25 m              16,000 t
Classification:       Germanischer Lloyd 100 A4 E1                          Main engine: 3.MAJ - SULZER               6 RTA 52
                      “Liquified Gas Tanker Type 2G” MC E1 AUT, INERT       MCR:                            8,400 kW / 130 rpm
                                                                            Trial speed at 7,50 draught and
                                                                            6,490 kW for propulsion only           17.00 knots
                                                                            Cargoes:
                                                                            Ammonia anhydrous, Butadiene, Butane, Butane
                                                                            Propane mixtures, Butylene, Isoprene, Propane,
                                                                            Propylene, Propylene Oxide, Vynil Chloride.




Capacities:                                                                 •   El. driven, stainless steel pumps designed for
                                                              3                 density 0.972 t/ m3, 120 mlC, and - 48 deg. C,
No. 1 tank                                           4,672 m
                                                                                (6 multistage deep well pumps of 250 m3/h + 2
No. 2 tank (2 x 2,607 m3)                            5,214 m3
                                                                                centrifugal, single stage, booster pumps of 250
No. 3 tank                                           5,214 m3
                                                                                m3/h).
Total (cargo)                                       15,100 m3
                                                                            •   Reliquefaction plant for cooling down and
                                                                                maintenance of preset temperture/pressure
Provisions:
                                                                                consists of: 2 open cycle units (each comprising:
Heavy fuel oil                                       1,146 m3                   1 compressor, 1 suction separator, 1 economi-
Diesel fuel oil                                        116 m3                   zer/intercooler, instrumentation, etc.), 2 additio-
Fresh water                                            100 m3                   nal compressors (serving both reliquefaction
                                                                                units) and 2 gas condensers.
Ballast Water                                        4,683 m3               •   2 pairs of pressure relief valves to each tank,
HFO consumption of M.E. (85% MCR)             29.2 t/ 24 hours                  with set point one pair 5.2 bar and other pair
Crew complement                                            25                   3.2 bar.
                                                                            •   Inert gas system for production of nitrogen
Cargo system:                                                                   used for feeding holds and/or tanks purging
                                                                                operation.
•    3 horizontal insulated bilobe type tanks, max. pressure 4 bar gauge,   •   Cargo control room for control and sounding
     min. temp. -48 deg. C max. density 0.972 t /m3                             equipment arranged in accommodation.
•    System designed for loading, reliquefying and discharging two
     independent cargoes.




46 CROATIAN SHIPBUILDING
T
ANKERS




    Tanker For
    Oil Products                                                                        Length over all
                                                                                        Lenth btw perp.
                                                                                                                               abt. 144.00 m
                                                                                                                                    138.00 m
                                                                                        Breadth moulded                              21.00 m
    and Chemicals                                                                       Depth moulded
                                                                                        Draught design
                                                                                        Draught scantling
                                                                                                                                     11.10 m
                                                                                                                                       7.50 m
                                                                                                                                       7.90 m
    13,000 / 12,000 DWT                                                                 Deadweight at design draught           abt. 12,000 t
                                                                                        Deadweight at scantling draught         abt. 13,000 t
                                                                                        Main engine 3. MAJ - SULZER                  6 RTA 48
    Designed by:             Shipyard 3. MAJ                                            CMCR:                              5500 kW/136 rpm
    Project No.              2707                                                       Trial speed at design draught and 4,400 kW
    Classification:          Germanischer Lloyd 100 A5, E3, Oil Tanker,                 for propulsion                          abt. 15 knots
                             Chemical Tanker - TYPE 2 MC, E3, AUT, IW,
                             NAV-O                                                      Capacities:
                                                                                        Cargo tanks (incl. slop tanks)          abt. 16,250 m3
                                                                                        Water ballast                            abt. 6,000 m3




    Provisions:                                                                         •    One hydraulically driven submerged cargo pump
    Heavy fuel oil                             abt. 560 m  3                                 fitted in each tank, capacity abt. 350 m3/h (cargo
    Diesel oil                                 abt. 150 m3                                   tanks) respectively 110 m3/h (slop tanks) at
    Fresh water                                abt. 120 m3                                   110 mlC, density 0.8 t/m3.
    Fresh water (cleaning)                     abt. 200 m3                              •    Hydraulic power units for simultaneous
                                                                                             discharging of 2800 m3/h of cargo at 110 mlC,
    Crew complement:                      22+4 Suez crew                                     density 0.8 t/m3.
                                                                                        •    Inert gas generator 3500 m3/h.
    The vessel shall be double hull tanker for oil products and chemicals of IMO type   Steam plant:
    2 and 3, density not over 1.55 t/m3, including UREA /Ammonium nitrate solution
                                                                                        •    One oil fired boiler 10 t/h
    (containing aqua ammonia), in accordance with vessel/protective system capa-
                                                                                        •    One oil fired/exhaust gas composite boiler
    bilities.
                                                                                             1.5/1.0 t/h
                                                                                        •    One steam generator for cargo heating.
    Cargo equipment:
                                                                                        Auxiliary engines plant:
    •    Cargo oil tanks protected with painting system resistant to wide range of
         acids, bases, solvents and salt water (siloxirane polymer resin or similar).   •    Three diesel generator sets of abt. 870 kVA,
    •    Pipes and fitting in contact with cargo made of stainless steel.                    3 x 450 V, 60 Hz, 900 min-1 burning DO.
    •    Piping and pumps system arranged for 14 segregated                             •    One PTO generator of abt. 1,600 kVA,
         cargo grades and for one pair of slop tanks.                                        3 x 450 V, 60 Hz.
                                                                                        •    One emergency diesel generator of abt. 150 kVA,
                                                                                             3 x 450 V, 60 Hz.




                                                                                                          CROATIAN SHIPBUILDING 47
Oil-Chemical Tanker / Asphalt Carrier
9,200 DWT




Designed by:      Shipyard Kraljevica                                Lenght over all                        108.50m
Project:          05-01                                              Lenght btw perp.                         99.60m
Builder / Yard:   Shipyard Kraljevica / 531,532                      Breadth, moulded                         18.60m
Owner / Flag:     Asphalt (Gulf of Mexico) Ltd / Isle of Man         Depth, moulded                           10.60m
Delivery:         2004                                               Draught to summer load line               8.34m
Classification:   Bureau Veritas                                     Deadweight at summer load line about 9,200 m.t.
                  CLASS 1 + HULL + Chemical Tanker /                 Main engine             1 x 3,680 kW at 750 rpm
                  Asphalt Carrier T=250‡C DEEP SEA (IMO II)          Speed at summer load line and 3,680 kW
                  ∑ ESPUNRESTRICTED NAVIGATION + MACH                                                     13.4 knots
                  + AUT ∑ UMS         SYS ∑ IBS + IN WATER SURWAY,
                  MON SHAFT




48 CROATIAN SHIPBUILDING
T
ANKERS




    Capacitites:                                                    Thermal Oil plant:

    Cargo tanks (including slop tanks)              abt. 7,750 m3   •   Two thermal oil heaters of about 1.200,000 kcal/h,
    Water ballast                                   abt. 2,675 m3       provided for cargo tanks heating.
                                                                    •   One exhaust gas oil fired marine boiler of 2.0 t/h
    Provisions:
                                                                    Auxiliary engines plant:
    Heavy Fuel Oil                                    abt. 682 m3
    Diesel Oil                                         abt. 53 m3   •   Three Diesel generators of about 590 kVA each, 440 V,
    Fresh Water                                        abt. 89 m3       60 HZ
                                                                    •   One emergency Diesel generator of 125 kVA, 440 V,
    Crew complement 17 persons +1 pilot cabin                           60 HZ
    The Vessel shall be single hull tanks for oil products,
    asphalt, bitumen, coaltar, coaltar, coaltar naphta solvent,
    Creosote (colatar), creosote (wood), antracene oil.

    Cargo System:

    •    Cargo to be handled with three screw pump fitted in
         centralized pump room, electrically driven.
    •    Two grades of cargo to be loaded / discharged at any
         time with double valve segregation throughout.
    •    Cargo to be loaded through three drag lines to each
         main segregation line in cargo tanks.




                                                                                                   CROATIAN SHIPBUILDING 49
Tankeri

Weitere ähnliche Inhalte

Was ist angesagt?

propellers and propulsion.pptx
propellers and propulsion.pptxpropellers and propulsion.pptx
propellers and propulsion.pptxSaptarshiBasu23
 
Early stage Ship design Process
Early stage Ship design ProcessEarly stage Ship design Process
Early stage Ship design Processpraveench1888
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)Marine Study
 
Ship tonnage measurement
Ship tonnage measurementShip tonnage measurement
Ship tonnage measurementFurqon Hanief
 
NAME 338 ( Ship Design Project and Presentation )
NAME 338 ( Ship Design Project and Presentation )NAME 338 ( Ship Design Project and Presentation )
NAME 338 ( Ship Design Project and Presentation )mortuja05
 
Design of a 20,000 t double acting ice class general cargo ship of service ...
Design of a 20,000 t double acting ice class general cargo ship   of service ...Design of a 20,000 t double acting ice class general cargo ship   of service ...
Design of a 20,000 t double acting ice class general cargo ship of service ...Md. Ashifur Rahaman
 
Propeller and Rudder
Propeller and RudderPropeller and Rudder
Propeller and Rudderberkayerd
 
Marine piping systems
Marine piping systemsMarine piping systems
Marine piping systemskmsu
 
Ship design project Final presentation
Ship design project Final presentationShip design project Final presentation
Ship design project Final presentationKifayath Chowdhury
 

Was ist angesagt? (20)

Ship Rudders
Ship RuddersShip Rudders
Ship Rudders
 
Marine Steering Gear and SOLAS Requirements
Marine Steering Gear and SOLAS RequirementsMarine Steering Gear and SOLAS Requirements
Marine Steering Gear and SOLAS Requirements
 
propellers and propulsion.pptx
propellers and propulsion.pptxpropellers and propulsion.pptx
propellers and propulsion.pptx
 
Early stage Ship design Process
Early stage Ship design ProcessEarly stage Ship design Process
Early stage Ship design Process
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)
 
Ship tonnage measurement
Ship tonnage measurementShip tonnage measurement
Ship tonnage measurement
 
Propeller
PropellerPropeller
Propeller
 
Ship Construction by Jayan Pillai
Ship Construction by Jayan PillaiShip Construction by Jayan Pillai
Ship Construction by Jayan Pillai
 
NAME 338 ( Ship Design Project and Presentation )
NAME 338 ( Ship Design Project and Presentation )NAME 338 ( Ship Design Project and Presentation )
NAME 338 ( Ship Design Project and Presentation )
 
Design of a 20,000 t double acting ice class general cargo ship of service ...
Design of a 20,000 t double acting ice class general cargo ship   of service ...Design of a 20,000 t double acting ice class general cargo ship   of service ...
Design of a 20,000 t double acting ice class general cargo ship of service ...
 
Ship Construction- Ship Dimensions
Ship Construction- Ship DimensionsShip Construction- Ship Dimensions
Ship Construction- Ship Dimensions
 
Stability of ships
Stability of shipsStability of ships
Stability of ships
 
Ship Construction- Bulkhead
Ship Construction- BulkheadShip Construction- Bulkhead
Ship Construction- Bulkhead
 
Propeller and Rudder
Propeller and RudderPropeller and Rudder
Propeller and Rudder
 
Marine piping systems
Marine piping systemsMarine piping systems
Marine piping systems
 
CLASSIFICATION OF SHIP
CLASSIFICATION OF SHIPCLASSIFICATION OF SHIP
CLASSIFICATION OF SHIP
 
Ship design project Final presentation
Ship design project Final presentationShip design project Final presentation
Ship design project Final presentation
 
Ship Form Coefficients
Ship Form CoefficientsShip Form Coefficients
Ship Form Coefficients
 
Ship Motion and Stresses
Ship Motion and StressesShip Motion and Stresses
Ship Motion and Stresses
 
Rudder & Steering Design
Rudder & Steering Design  Rudder & Steering Design
Rudder & Steering Design
 

Andere mochten auch

Teekay Tankers Second Quarter 2014 Earnings Presentation
Teekay Tankers Second Quarter 2014 Earnings PresentationTeekay Tankers Second Quarter 2014 Earnings Presentation
Teekay Tankers Second Quarter 2014 Earnings PresentationTeekay Tankers Ltd
 
Một số biện pháp quản lý, xử lý nước thải nhiễm dầu; ứng phó sự cố tràn dầu v...
Một số biện pháp quản lý, xử lý nước thải nhiễm dầu; ứng phó sự cố tràn dầu v...Một số biện pháp quản lý, xử lý nước thải nhiễm dầu; ứng phó sự cố tràn dầu v...
Một số biện pháp quản lý, xử lý nước thải nhiễm dầu; ứng phó sự cố tràn dầu v...SOS Môi Trường
 
Gas detect. brochure may 2013 1
Gas detect. brochure may 2013 1Gas detect. brochure may 2013 1
Gas detect. brochure may 2013 1a1-cbiss
 
Steer and/or sink the supertanker by Andrew Rendell
Steer and/or sink the supertanker by Andrew RendellSteer and/or sink the supertanker by Andrew Rendell
Steer and/or sink the supertanker by Andrew RendellValtech UK
 
MarengI2012
MarengI2012 MarengI2012
MarengI2012 diezara
 
“Neighborhood Trees Summer Inspectors: Social Pressure for Tree Health” by Su...
“Neighborhood Trees Summer Inspectors: Social Pressure for Tree Health” by Su...“Neighborhood Trees Summer Inspectors: Social Pressure for Tree Health” by Su...
“Neighborhood Trees Summer Inspectors: Social Pressure for Tree Health” by Su...Rails-To-Trails Conservancy
 
Communication on boardship
Communication on boardshipCommunication on boardship
Communication on boardshipjalal2010
 
P&I Klübü ve Özelli̇kleri̇
P&I Klübü ve Özelli̇kleri̇P&I Klübü ve Özelli̇kleri̇
P&I Klübü ve Özelli̇kleri̇berkayerd
 
Matemati̇ksel seyi̇rler
Matemati̇ksel seyi̇rlerMatemati̇ksel seyi̇rler
Matemati̇ksel seyi̇rlerbgulcen
 
Berth,Yard & Vessel Planning
Berth,Yard & Vessel PlanningBerth,Yard & Vessel Planning
Berth,Yard & Vessel PlanningPaco Rojo
 

Andere mochten auch (20)

Production Drawing
Production DrawingProduction Drawing
Production Drawing
 
MARPOL Annex IV & Sewage Treatment Plant
MARPOL Annex IV & Sewage Treatment PlantMARPOL Annex IV & Sewage Treatment Plant
MARPOL Annex IV & Sewage Treatment Plant
 
Teekay Tankers Second Quarter 2014 Earnings Presentation
Teekay Tankers Second Quarter 2014 Earnings PresentationTeekay Tankers Second Quarter 2014 Earnings Presentation
Teekay Tankers Second Quarter 2014 Earnings Presentation
 
Bollard Pull
Bollard PullBollard Pull
Bollard Pull
 
2nd Presentation NAME 338
2nd Presentation NAME 3382nd Presentation NAME 338
2nd Presentation NAME 338
 
Plate Estimation
Plate EstimationPlate Estimation
Plate Estimation
 
Midship Section Modulus
Midship Section ModulusMidship Section Modulus
Midship Section Modulus
 
Một số biện pháp quản lý, xử lý nước thải nhiễm dầu; ứng phó sự cố tràn dầu v...
Một số biện pháp quản lý, xử lý nước thải nhiễm dầu; ứng phó sự cố tràn dầu v...Một số biện pháp quản lý, xử lý nước thải nhiễm dầu; ứng phó sự cố tràn dầu v...
Một số biện pháp quản lý, xử lý nước thải nhiễm dầu; ứng phó sự cố tràn dầu v...
 
TRANSAS ECDIS CERT
TRANSAS ECDIS CERTTRANSAS ECDIS CERT
TRANSAS ECDIS CERT
 
Gas detect. brochure may 2013 1
Gas detect. brochure may 2013 1Gas detect. brochure may 2013 1
Gas detect. brochure may 2013 1
 
30 business i environment i society mba 2016
30 business i environment i society mba 201630 business i environment i society mba 2016
30 business i environment i society mba 2016
 
Steer and/or sink the supertanker by Andrew Rendell
Steer and/or sink the supertanker by Andrew RendellSteer and/or sink the supertanker by Andrew Rendell
Steer and/or sink the supertanker by Andrew Rendell
 
MarengI2012
MarengI2012 MarengI2012
MarengI2012
 
“Neighborhood Trees Summer Inspectors: Social Pressure for Tree Health” by Su...
“Neighborhood Trees Summer Inspectors: Social Pressure for Tree Health” by Su...“Neighborhood Trees Summer Inspectors: Social Pressure for Tree Health” by Su...
“Neighborhood Trees Summer Inspectors: Social Pressure for Tree Health” by Su...
 
Maritime ICT
Maritime ICTMaritime ICT
Maritime ICT
 
Communication on boardship
Communication on boardshipCommunication on boardship
Communication on boardship
 
P&I Klübü ve Özelli̇kleri̇
P&I Klübü ve Özelli̇kleri̇P&I Klübü ve Özelli̇kleri̇
P&I Klübü ve Özelli̇kleri̇
 
Matemati̇ksel seyi̇rler
Matemati̇ksel seyi̇rlerMatemati̇ksel seyi̇rler
Matemati̇ksel seyi̇rler
 
Scantling of Ship
Scantling of ShipScantling of Ship
Scantling of Ship
 
Berth,Yard & Vessel Planning
Berth,Yard & Vessel PlanningBerth,Yard & Vessel Planning
Berth,Yard & Vessel Planning
 

Ähnlich wie Tankeri

PC 375 catalogue(in english)
PC 375 catalogue(in english)PC 375 catalogue(in english)
PC 375 catalogue(in english)Zorareh Nouri
 
Ocean pride nov 16
Ocean pride    nov 16Ocean pride    nov 16
Ocean pride nov 16Duong Truong
 
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXCopy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXMrbThinh
 
Propulsion Systems Of Ships
Propulsion Systems Of ShipsPropulsion Systems Of Ships
Propulsion Systems Of ShipsVipin Devaraj
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
BOURBON's Fleet
BOURBON's FleetBOURBON's Fleet
BOURBON's FleetBOURBON
 
Hyper Sub specs
Hyper Sub specsHyper Sub specs
Hyper Sub specsFred Page
 
Revithoussa l.n.g. terminal_presentation
Revithoussa l.n.g. terminal_presentationRevithoussa l.n.g. terminal_presentation
Revithoussa l.n.g. terminal_presentationmoniaros
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andalANIL kumar
 
atlantic-rotterdam
atlantic-rotterdamatlantic-rotterdam
atlantic-rotterdamDick Vogel
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Abhijeet Thakur
 
Ed1 r4 product specification
Ed1 r4 product specificationEd1 r4 product specification
Ed1 r4 product specificationPrabhakar Tiwari
 
SURATGARH SUPER THERMAL POWER STATION
SURATGARH  SUPER  THERMAL POWER    STATION SURATGARH  SUPER  THERMAL POWER    STATION
SURATGARH SUPER THERMAL POWER STATION Sagar Sharma
 

Ähnlich wie Tankeri (20)

PC 375 catalogue(in english)
PC 375 catalogue(in english)PC 375 catalogue(in english)
PC 375 catalogue(in english)
 
Ocean pride nov 16
Ocean pride    nov 16Ocean pride    nov 16
Ocean pride nov 16
 
SARAH DESGAGNES details
SARAH DESGAGNES detailsSARAH DESGAGNES details
SARAH DESGAGNES details
 
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTXCopy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
Copy of 563050-TSHD 650-ES (SPEC-DAM - 3479100 - 1 - A) - 1.PPTX
 
Propulsion Systems Of Ships
Propulsion Systems Of ShipsPropulsion Systems Of Ships
Propulsion Systems Of Ships
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
BOURBON's Fleet
BOURBON's FleetBOURBON's Fleet
BOURBON's Fleet
 
Raptor AHTS
Raptor AHTSRaptor AHTS
Raptor AHTS
 
Hyper Sub specs
Hyper Sub specsHyper Sub specs
Hyper Sub specs
 
Revithoussa l.n.g. terminal_presentation
Revithoussa l.n.g. terminal_presentationRevithoussa l.n.g. terminal_presentation
Revithoussa l.n.g. terminal_presentation
 
The Amundsen Class Shuttles
The Amundsen Class ShuttlesThe Amundsen Class Shuttles
The Amundsen Class Shuttles
 
Maersk rig fleet
Maersk rig fleetMaersk rig fleet
Maersk rig fleet
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andal
 
atlantic-rotterdam
atlantic-rotterdamatlantic-rotterdam
atlantic-rotterdam
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT
 
Fastnet Nore
Fastnet NoreFastnet Nore
Fastnet Nore
 
Seven Polaris
Seven PolarisSeven Polaris
Seven Polaris
 
S3000
S3000S3000
S3000
 
Ed1 r4 product specification
Ed1 r4 product specificationEd1 r4 product specification
Ed1 r4 product specification
 
SURATGARH SUPER THERMAL POWER STATION
SURATGARH  SUPER  THERMAL POWER    STATION SURATGARH  SUPER  THERMAL POWER    STATION
SURATGARH SUPER THERMAL POWER STATION
 

Kürzlich hochgeladen

Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 

Kürzlich hochgeladen (20)

Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 

Tankeri

  • 2. Suezmax Oil Tanker 166,300 / 152,300 DWT Builder / Yard: Shipyard Brodosplit / 433, 434 Owner / Flag: Aenona Maritime Ltd / Malta Delivery: 2003, 2004 Designed by: Shipyard Brodosplit Single screw diesel engine driven Oil Tanker with longitudinal bulkhead, bulbous bow, and transom stern. Living quarters including navigation bridge, engine room with fuel oil tanks on both sides and pump room located aft. Double bottom / double side tanks and peak tanks intended for segregated ballast. Cargo space divided into twelve (12) cargo and two (2) slop tanks. Hull structure made of mild and higher tensile steel. Three (3) grades of cargo can be handled simultaneously. 8 CROATIAN SHIPBUILDING
  • 3. T ANKERS Classification: Bureau Veritas Painting: I HULL MACH OIL TANKER ESP UNRESTRICTED NAVIGATION, SYS-NEQ-1 Cargo tanks VERISTAR -HULL, AUT -UMS, SPM (bottom +0.5 m, deck head -2 m) HS pure epoxy (250 my) Slop tanks HS pure epoxy (250 my) Main dimensions: Under water hull and boot topping Coal tar epoxy + vinyl tar epoxy + SPC Lenght over all 281.20 m (125 my + 125 my + 300 my) Length between perpendiculars 270.00 m Breadth moulded 48.20 m Cargo equipment: Depth moulded 23.00 m Design draught 16.00 m Cargo pumps 3 x 3,500 m3/h at 140 mWC, s.g. 1.0, 1 cSt Scantling draught 17.10 m centrifugal pumps, steam turbine driven Deadweight at design draught 152,300 t Cargo stripping 1 x 250 m3/h at 140 mWC, s.g. 1.0, 1 cSt Deadweight at scantling draught 166,300 t piston, vertical, double acting steam Main engine Split-MAN-B&W 6S70MC-C turbine driven stripping pumps Selected maximum continuous rating 16,780 kW/82 rpm 2 x 400 m3/h at 30 mWC, s.g. 1.0, 1 cSt Trial speed at design draught and 85% SMCR 15.8 kn stripping eductor Main engine daily fuel oil consumption 56.7 t/day Cargo manifolds 3 x 500 mm Cruising range 23,000 nm Crew complement 30 Auxiliary engines plant: Capacities (100%): Main diesel-generator sets 3 x 910 kW Emergency diesel-generator set 1 x 96 kW Cargo and slop tanks 185,000 m3 Ballast tanks 52,500 m3 Heating plant: Heavy fuel oil 3,800 m3 Diesel 150 m3 Auxiliary oil fired boilers 2 x 30 t/h saturated steam at 16 bar G Fresh and feed water 300 m3 Composite boiler 1 x 1.8/1.4 t/h saturated steam at 7 bar G CROATIAN SHIPBUILDING 9
  • 4. Oil Tanker 111,809 / 101,770 DWT Name: m/s UNISINA Lenght over all 246.76 m Owner / Flag: Unisina Navigation Co. / Liberia Length btw perp. 238.00 m Builder / Yard: Shipyard 3.MAJ / 661 Breadth moulded 42.48 m Delivered: 1994 Depth moulded 20.70 m Classification: LRS 100 A1 Oil Tanker (Duble hull) LMC, UMS, Draught design 14.45 m IGS, COW, PL, SBT Draught scantling 15.52 m Designed by: Shipyard 3.MAJ Deadweight at draught 14.45 m 100,425 t Deadweight at draught 15.52 m 110,461 t Gross tonnage 58,091 10 CROATIAN SHIPBUILDING
  • 5. T ANKERS Main engine: 3.MAJ ∑ SULZER 5 RTA 72 Cargo temperature increasing from 44 deg. C to 66 deg. C needs MCR: 10,550 kW / 78 rpm 4 days at outside air temperature of 2 deg. C and sea temp. of 5 Trial speed at draught of 14.45 m deg. C. and 9,495 kW (90% MCR) 14.45 knots Cargo tanks ventilation is performed by centralized system with pressure/vacuum valves at each tank. Centralized and remote Capacities: control of cargo handling and temperature monitoring is provi- ded. Cargo 121,329m3 Fixed washing devices of closed type are provided at each tank Slop tanks 2,747 m3 using preheated sea water. Loading / unloading time: abt. 15.5 hours Cargo equipment: Provisions: • Four cargo pumps, vert. centrifugal type, driven by steam Heavy fuel oil 2,745 m3 turbines of 2,000 m3/h at 15 bar head each. Diesel fuel oil 282 m3 • One stripping pump, steam piston type of 250 m3/h at Lubrication oil 119 m3 15 bar cap. Fresh water 619 m3 • One ejector of 650 m3/h at 2.5 bar capacity. 3 • Steam coil heating 8 bar system. Ballast water 38,757 m • Washing sea water system with steam heater of HFO consumption of M.E. 38.0 t / 24 hours 360 m3/h, 8 bar capacity (heating water from 45 deg. The UNISINA is a single screw, single deck and double hull C up to 80 deg. C) vessel with engine room and accommodation superstructure • Inert gas system of 10,000 m3/h capacity. aft, intended mainly for carriage of crude oil (up to 1.05 t/m3 spec. gravity) and foreseen for simultaneous carriage of 4 Steam plant: segregated oil cargoes. • Two boilers, oil fired, 18 bar, cap. 30 t/h steam each. Hull is made of mild and HT shipbuilding steel. • One comp. boiler, 8 bar, cap. 2.5 t/h oil fired + 1.8 t/h Cargo loading/unloading system provides simultaneous exhaust gas heated sections. handling of each segregation. Steam plant provides driving of cargo pumps and heating of Auxiliary engines plant: cargo through pipe coils. • Three el. gen. sets, 60 cycles, 1,050 kVA, D.M. driven, each. • One emergency el. gen. set, 60 cycles, 200 kVA, D.M. driven. CROATIAN SHIPBUILDING 11
  • 6. Oil Tanker 108,000 / 94,700 DWT Builder / Yard: Shipyard Brodosplit / 439, 440 Owner / Flag: Prisco Tanker Ltd, Douglas, Isle of man / Rusija (Primorsk) Nord Aframax Tankers, Nicosia, Cyprus / Rusija (Primorsk) Delivery: 2003, 2004 Designed by: Shipyard Brodosplit Single screw diesel engine driven Oil Tanker with longitudinal bulkhead, bulbous bow, and transom stern. Living quarters including navigation bridge, engine room with fuel oil tanks on both sides and pump room located aft. Double bottom / double side tanks and peak tanks intended for segregated ballast. Cargo space divided into twelve (12) cargo and two (2) slop tanks. Hull structure made of mild and higher tensile steel. Four (4) grades of cargo can be handled simultaneously. 12 CROATIAN SHIPBUILDING
  • 7. T ANKERS Classification: Det Norske Veritas 1A1 Tanker for Oil Painting: ESP, NAUTICUS (Newbuilding) E0, ICE-1C, Cargo tanks and slop tanks Pure epoxy (300 my) LCS (SID), W1-OC, CLEAN, SPM, TMON Under water hull and boot topping Coal tar epoxy + + vinyl tar epoxy + SPC Main dimensions: (250 my + 50 my + 300 my) Lenght over all 246.00 m Ice belt Sealer + Anti abrasion epoxy coating Length between perpendiculars 236.00 m (50 my + 400 my) Breadth moulded 42.00 m Open deck and exposed superstructure Epoxy (300 my) Depth moulded 21.00 m Design draught 13.50 m Cargo equipment: Scantling draught 14.90 m Cargo pumps 4 x 3000 m3/h at 130 mLC, s.g. 0.9, 1 cSt Deadweight at design draught 94,700 t centrifugal pumps, steam turbine driven Deadweight at scantling draught 108,000 t Cargo stripping 1 x 200 m3/h at 130 mLC, s.g. 0.9, 1 cSt Main engine Split-MAN-B&W 7S60MC-C centrifugal pump, steam turbine Selected maximum continuous rating 14,130 kW/94 rpm driven stripping pump Trial speed at design draught and 90% SMCR 16.1 kn 1 x 250 m3/h at 25 mLC, s.g. 0.9, 1 cSt Main engine daily fuel oil consumption 51.2 t/day stripping eductor Cruising range 18,000 nm Cargo manifolds 4 x 500 mm Crew complement 26 Auxiliary engines plant: Capacities (100%): Main diesel-generator sets 3 x 870 kW Cargo and slop tanks 126,000 m3 Emergency diesel-generator set 1 x 99 kW Ballast tanks 37,000 m3 Heavy fuel oil 2,700 m3 Heating plant: Diesel 150 m3 Fresh and feed water 250 m3 Auxiliary oil fired boilers 2 x 35 t/h saturated steam at 16 bar G Composite boiler 1 x 2.5/1.7 t/h saturated steam at 7 bar G CROATIAN SHIPBUILDING 13
  • 8. Oil Tanker 101,000 / 79,400 DWT Name: m/s ZRINSKI Length over all 244.30 m Manager: Tankerska Plovidba / Zadar Length btw perp. 236.00 m Owner / Flag: Riva Shipping Co. Ltd. / Liberia Breadth moulded 39.40 m Builder / Yard: Shipyard Brodosplit / 376 Depth moulded 21.30 m Sister vessel: 377 Draught, design / scantling 12.19 / 14.65 m Delivered: 1994, 1995 Corresponding deadweight 79,400 / 101,000 tons Classification: LRS; 100 A1 Oil Tanker LMC, UMS, IGS, COW, SPM 14 CROATIAN SHIPBUILDING
  • 9. T ANKERS Main engine: BRODOSPLIT-MAN-B&W 6 L 60 MC Protection by coal tar epoxy and chlorinated rubber system on SMCR 10,440 kW / 117 rpm external surfaces and alkyd system on internal surfaces. Ballast Trial speed at 90% SMCR and draught of 12.19 m tanks coated by coal tar epoxy paint. 14.50 knots Cargo oil tanks: Pure epoxy but only overhead plus one (1) m below. Capacities: Cargo tanks capacity Cargo and ballast equipment: (incl. slops tanks 100% full tanks): 111,000 m3 • Three (3) centrifugal cargo pumps, each of 2,300 m3/ h at 12.5 bar. Two pumps steam turbine driven and one Provisions: diesel engine driven. Heavy fuel oil 2,800 m3 • One stripping piston pump of 150 m3/ h at 9 bar, Diesel fuel oil 300 m3 el. motor driven. Lubrication Oil 90 m3 • Two ballast pumps vertical, centrifugal type, Fresh Water & Feed Water 290 m3 electric driven of 1,500 m3 at 3 bar. • One ballast eductor 200 m3 / h. Ballast water segregated: 44,800 m3 • One scrubber cooling SW pump abt. 200 m3 / h 3 bar. Cruising range at 90% SMCR 20,000 n.m • One turbines condenser cooling SW pump M.E. daily fuel oil consumption 37.45 tons centrifugal el. motor driven, in engine room, capacity abt. 900 m3/ h at 1.8 bar. The vessel and all her equipment shall be suitable for world wide service for transporting of 3 grades of crude oil, which Steam plant: can be discharged simultaneously. • One oil fired boiler 25 t/h saturated steam 15.5 bar G The single screwed vessel with one continuous deck, • One exhaust gas economizer 1.5 t/h satur. steam of bulbous bow, raked stem and transom stern. 7 bar G. Engine room with accommodation for the complement of 26 persons in superstructure is located aft. Auxiliary engines plant: The vessel generally divided by watertight transverse bulkheads into the following compartments: fore peak, seven • Two main diesel generators, each 600 kW, 450 V AC, (7) cargo tanks, ballast tanks, two slop/cargo tanks, pump 60 Hz, 3-phase. room, engine room and after peak. Cargo area shall be • One main diesel generator 880 kW, 450 V AC, 60 Hz, constructed as double hull with double bottom and double 3-phase. side ballast tanks. Centre tanks to be used for the cargo and • One emergency diesel generator 140 kW, 450 V AC, side tanks// double bottom tanks for water ballast. 60 Hz, 3-phase. CROATIAN SHIPBUILDING 15
  • 10. Oil Product Tanker 95,000 / 71,300 DWT Builder / Yard: Shipyard Brodosplit / 435, 436, 437, 438 Owner / Flag: European Navigation Inc. / Greece Delivery: 2003, 2004 Designed by: Shipyard Brodosplit Single screw diesel engine driven Oil Product Tanker with longitudinal bulkhead, bulbous bow, and transom stern. Living quarters including navigation bridge, engine room with fuel oil tanks on both sides and pump room located aft. Double bottom / double side tanks and peak tanks intended for segregated ballast. Cargo space divided into twelve (12) cargo and two (2) slop tanks. Hull structure made of mild and higher tensile steel. Six (6) grades of cargo can be handled simultaneously. 16 CROATIAN SHIPBUILDING
  • 11. T ANKERS Classification: American Bureau of Shipping Painting: A1 (E) Oil Carrier, AMS, SH, ACCU, Cargo tanks and slop tanks Phenolic epoxy (300 my) Double Hull Tanker, ESP, SPM, UWILD, VEC, CPP Under water hull and boot topping Epoxy + Tie coat + SPC (250 my + 75 my + 450 my) Main dimensions: Open deck and exposed superstructure Lenght over all 228.60 m Epoxy + Polyurethane Length between perpendiculars 220.00 m (260 my + 60 my) Breadth moulded 42.00 m Depth moulded 21.00 m Cargo equipment: Design draught 11.354 m Cargo pumps 12 x 1000 m3/h at 130 mLC, s.g. 0.8, 1 cSt Scantling draught 14.05 m submerged, centrifugal, hydraulic motor driven Deadweight at design draught 71,300 t cargo tanks pumps Deadweight at scantling draught 95,000 t 2 x 250 m3/h at 130 mLC, s.g. 0.8, 1 cSt Main engine Split-MAN-B&W 6S60MC-C submerged, centrifugal, hydraulic motor driven Selected maximum continuous rating 13,530 kW/105 rpm slop tanks pumps Trial speed at design draught and 90% SMCR 15.8 kn 1 x 150 m3/h at 70 mLC, s.g. 0.8, 1 cSt Main engine daily fuel oil consumption 49.0 t/day submersible, centrifugal, hydraulic motor driven Cruising range 18,000 nm portable cargo pump Crew complement 28 Cargo manifolds 6 x 350 mm Capacities (100%): Auxiliary engines plant: Cargo and slop tanks 116,000 m3 Main diesel-generator sets 4 x 990 kW Ballast tanks 38,000 m3 Emergency diesel-generator set 1 x 160 kW Heavy fuel oil 2,500 m3 Diesel 150 m3 Heating plant: Fresh and feed water 250 m3 Auxiliary oil fired boilers 1 x 25 t/h saturated steam at 7 bar G Composite boiler 1 x 2.0/1.6 t/h saturated steam at 7 bar G CROATIAN SHIPBUILDING 17
  • 12. Oil Tanker / Chemical Carrier 83,651 / 59,866 DWT Name: m/s PANDA Lenght over all 228.21 m Owner / Flag: The East Asiatic Co. Ltd. / Liberia Length btw perp. 220.00 m Builder / Yard: Shipyard 3.MAJ / 594 Breadth moulded 32.20 m Sister vessels: 650, 652 Depth moulded 21.66 m Delivered: 1987, 1988, 1990 Draught design 12.52 m Classification: DNV; 1A1 Tanker for oil (COW, INERT) Draught scantling 16.02 m EO, bis, Tanker for chemicals Deadweight at draught 12.52 m 59,866 t Designed by: Shipyard 3.MAJ Deadweight at draught 16.02 m 83,651 t Gross tonnage 44,322 18 CROATIAN SHIPBUILDING
  • 13. T ANKERS Main engine: 3.MAJ - SULZER 6 RTA 62 Cargo equipment: MCR: 8,330 kW / 85 rpm • Twelve cargo pumps, vert. centrifugal type, stainless Trial speed at 7,500 kW steel, hydr. driven, 950 m3/h at 13 bar capacity each. (90% MCR) on draught of 12.52 14.35 knots • Two slop pumps, vert. centrifugal type, hydr. driven, 70 m3/h at 13 bar capacity each. Capacities: • One sludge pump, vert. centrifugal type, hydr. driven, Cargo tanks, incl. slops & sludge: 89,181 m3 70 m3/h at 7 bar capacity each. Slop tanks & sludge retention tank: 2,578 m3 • One portable pump, hydr. driven, capacity 500 m3/h Cargo loading / unloading time: abt. 10.5 hours at 3 bar. Pump capacities are related to cargo density Provisions: 0.85 t/m3 and viscosity 1 m2/ sec at 50 deg. C. • Heating system: Heavy fuel oil 1,957 m3 deck exchangers capacity: 44-66 deg. C /96 hours Diesel fuel oil 256 m3 Conditions: viscosity 380 m2/sec at 50 deg. C sea water Lubrication oil 167 m3 temp. + 5 deg. C, air ambient temp. + 20 deg. C Fresh water 301 m3 • Cleaning system: - hot / cold sea and fresh water, fixed tank cleaning / Ballast water 31,886 m3 / washing machines - 6 portable washing machines HFO consumption of M.E. 29.9 t / 24 hours • Control: Crew complement 26 + 6 Suez crew remote integrated microcomputed control and extensive monitoring system. Steam plant: • Two boilers, oil fired, 8 bar, cap. 20 + 6 t/h steam. Auxiliary engines plant: • Two el. gen. sets, 60 cycles, 1,025 kVA D.M. driven each. • One el. gen. / hydr. power set, 60 cycles, 875 kW, D.M. driven. • One hydr. power set, 60 cycles, 1,320 kW, D.M. driven. CROATIAN SHIPBUILDING 19
  • 14. Oil Tanker 70,700 / 60,300 DWT Name: m/s MARGARA Length over all abt. 228.20 m Designed by: Shipyard 3.MAJ Length btw perp. 220.00 m Builder / Yard: Shipyard 3.MAJ / 662 Breadth moulded 32.20 m Sister Vessels: 663, 673, 674 Depth moulded 20.10 m Delivered: 1999, 2000, 2001 Draught design 12.55 m Owner / Flag: Doria Shipping Co. Ltd. / Malta Draught scantling 14.10 m Classification: ABS A1 (E) Oil Carrier, SH, Deadweight at design draught abt. 60,300 t AMS, ACCU, Ice Class IC Deadweight at scantling draught abt. 70,700 t 20 CROATIAN SHIPBUILDING
  • 15. T ANKERS Main engine: Cargo equipment: 3. MAJ - SULZER 6 RTA 62U • Piping and pump system arranged for 5 segregations Trial speed at 9,800 kW and and one pair of slop tanks design draught abt. 15.00 knots • One hydraulically driven submerged cargo pump fitted in each cargo/slop tank, capacity abt. 900 m3/h / 300 m3/h Capacities: respectively at 130 mlc, density 0.8 t/m3 Cargo tanks including slop tanks (98% full) abt. 80,400 m3 • Hydraulic power units (four electric and three diesel engine driven) for simultaneous discharging of 5400 m3/h of cargo Provisions at 130 mlc, density 0.8 t/m3 Heavy fuel oil abt. 2,670 t • Inert gas plant 6750 m3/h Diesel oil abt. 220 t Light diesel oil abt. 17 t Steam plant: Lub. oil abt. 115 t • Two oil fired boilers, steam capacity abt. 14 t/h at 8 bar Fresh water abt. 160 t each Feed water abt. 70 t • One exhaust gas/oil fired composite boiler capacity abt. 1.5/2.0 t/h at 8 bar Water ballast abt. 30,600 t Crew complement: 27+6 Suez crew Auxiliary engines plant: Cargo space with longitudinal bulkhead consisting of 10 car- • Three diesel generator sets of abt. 1100 kVA, 3 x 450 V, go tanks (5 pairs, P&S) and 2 slop tanks. The entire cargo 60 Hz, 900 min-1 burning DO and HFO tank length protected by double hull (double bottom and dou- • One emergency diesel geneator set of abt. 150 kVA, ble side) forming water ballast tanks. 3 x 450 V, 60 Hz. Additional pollution prevention measures comprising inner bottom/double side for fuel oil tanks. Material protection: cargo tanks protected with epoxy paint- ing system. CROATIAN SHIPBUILDING 21
  • 16. Oil Product Tanker 65,200 / 52,000 DWT Designed by: Shipyard Brodosplit Length over all 228.60 m Builder / Yard Nos: Shipyard Brodosplit / 441-444 Length between perpendiculats 175.50 m Owner / Flag: CH P-MAX I-IV Limited / Bermuda Breadth moulded 40.00 m Delivery: 2005, 2006 Depth moulded 17.90 m Classification: Det Norske Veritas, DNV A1 Tanker for Oil ESP, Design draught 11.30 m NAUTICUS (Newbuilding): Scantling draught 13.00 m PLUS-2, ICE-1B, ETC, E0, VCS2, RPS, NAUT-AW Deadweight at design draught 52,750 t Project No.: 995 Deadweight and scantling draught 63,700 t 22 CROATIAN SHIPBUILDING
  • 17. T ANKERS Main engines Split-MAN-B&W 2x6S46MC-C Cargo equipment: Selected maximum continuous rating 2x7.860 kW/129 rpm • Cargo pumps Service speed at design draught 14.5 kn 10x800 m3/h at 120 mLC, s.g. 0.8, 1 cSt Main engine daily fuel oil consumption 41.0 t/day submerged, centrifugal, electric motor driven cargo tanks Cruising range 14,000 nm pumps. Crew complement 28 2x300 m3/h at 120 mLC, s.g. 0.8, 1 cST Capacities (100%): submerged, centrifugal, electric motor driven slop tanks pumps. Cargo and slop tanks 69,400 m3 Ballast tanks 25,800 m3 1x200 m3/h at 70 mLC, s.g. 0.8, 1 cSt Heavy Fuel Oil 1,920 m3 submersible, centrifugal, hydraulic motor driven portable Diesel oil 240 m3 cargo pump. Fresh and feed water 360 m3 • Cargo manifolds 5 x 300 mm Twin screw diesel engine driven Oil Product Tanker with Auxiliary engines plant: longitudinal bulkhead, bulbous bow, and transom stern. Living quarters including navigation bridge, engine room with • Main diesel-generators sets 4 x 865 kW fuel oil tanks. Double bottom/double side tanks and peak • Emergency diesel-generator set 1 x 100 kW tanks intended for segregated ballast. Cargo space divided into ten (10) cargo and two (2) slop tanks. Hull structure Heating plant: made of mild and higher tensile steel. Five (5) grades of • Auxiliary oil fired boilers 2 x 8 t/h saturated steam at 7 bar G cargo can be handled simultaneously. • Economiser boiler 1 x 1.2 t/h saturated steam at 7 bar G Painting: Cargo tanks and slop tanks Pure epoxy (300 my) Under water hull and boot topping Epoxy + Tie coat + SPC(300 my + 75 my + 250 my) Open deck and exposed superstructure Epoxy + Tie coat + Polyurethane (300 my + 75 my + 50 my) CROATIAN SHIPBUILDING 23
  • 18. Tanker For Chemicals, Oil and Oil Products 47,300 DWT Name: m/t MERCINI LADY Length overall 182.50 m Owner / Flag: Cambridge Shipping & Tr. Co. / Liberia Length between perpendiculars 174.80 m Builder / Yard: Shipyard 3.MAJ / 676 Breadth, moulded 32.20 m Delivered: 2003 Depth, moulded to upper deck 17.50 m Sister ships: 677, 694 to be delivered 2004 Design draught 11.00 m Classification: LLOYD’S REGISTER OF SHIPPING 100 A1 Deadweight at design draught (11.00 m) 41,000 t double hull oil & chemical tanker, ship type 3 in Scantling draught 12.20 m association with list of defined cargoes, ESP, SPM, Deadweight at scantling draught (12.20 m) 47,300 t *IWS, LI LMC, UMS, IGS Descriptive notes: ShipRight (SDA, FDA, CM, PCWBT, SERS, SCM) COW, SBT / PL, ETA Maximum filling height with caustic soda is 67% Designed by: Shipyard 3.MAJ 24 CROATIAN SHIPBUILDING
  • 19. T ANKERS Main engine 3. MAJ - SULZER 6 RTA 48 T-B Cargo equipment: CMCR 8,310 kW at 123 min-1 Trial speed with 7480 kW (90% CMCR) Each pair of cargo tanks arranged as segregated piping system, at scantling draught 14.60 knots giving a total six cross-overs and one cross-over for pair of slop tanks and retention tank. Hydraulically driven submerged cargo pumps: Capacities (98%): • Cargo tanks: 12 x 550 m3/h at 130 mlc Cargo tanks (slop and retention included) 53,030 m3 • Slop tanks: 2 x 300 m3/h at 130 mlc Ballast tanks (100%) 22,270 m3 • Retention tank: 1 x 100 m3/h at 130 mlc • Portable pumps: 2 x 70 m3/h at 50 mlc Provisions Four electrically driven hydraulic power units. Cargo pumps are of stainless steel AISI 316 Heavy fuel oil 1,633 m3 and cargo pipes of AISI 316 L. Diesel oil 135 m3 Cargo tanks heating with deck heaters. Slop and residual tanks heating Lubrication oil 68 m3 with heating coils. Fresh water 354 m3 Inert gas generator, capacity 4,200 m3/h. Fixed tank cleaning machines for each cargo tank. Cargo unloading time abt. 16 hours One electro-hydraulic cargo hose handling crane, 150 kN SWL. Consumption of HFO 32 t/day Cruising range abt. 15,400 nautical miles Steam plant: Crew complement 28 + 6 Suez crew • One oil fired boiler, steam capacity 19 t/h at 10 bar The vessel is double hull tanker for oil and oil products and IMO • One composite boiler, steam capacity 1.6 t/h (exhaust type 3 tanker for chemicals. Cargo space is divided into six pairs gas section) and 2.0 t/h (oil fired section) at 10 bar of cargo tanks, one pair of slop tanks and one retention tank. The structure of cargo tanks is designed for cargo density of 1.025 Auxiliary engines plant: t/m3 in completely filled tanks and for cargo density up to 1.53 t/m3 in partially filled tanks with filling height corresponding to • Three diesel generators sets, abt. 3 x 1350 kW the density ratio, including zig-zag and asymmetrical P&S loading. • One emergency diesel generator set Double hull consists of six pairs of double bottom / double side water ballast tanks. Engine room is equipped for unattended operation. Painting: Cargo tanks - phenolic epoxy Ballast tanks - light colour epoxy CROATIAN SHIPBUILDING 25
  • 20. Tanker for Chemicals and Oil Products 46.764 TDW Name: M/V TARANTELLA Length over all 182.90 m Owner / Flag: Whitefin Shipping Company Ltd. / Liberia Length btw perp. 176.00 m Builder / Yard Shipyard Trogir / 302, 303, 304, 305, 306, 307 Breadth moulded 32.20 m Designed by: Shipyard Trogir Depth moulded to main deck 17.20 m Delivery: 2002, 2003, 2004 Draught design, moulded 11.00 m Classification: DNV: A1 Tanker for Oil products and Chemicals Deadweight at draught 41,216 t ESP E0 CCO W1 LCS(DIS) VCS-2 HL(1.6) Draught scantling 12.20 m COAT-2 PLUS-2 ETC NAUTICUS (Newbuilding) Deadweight 46,764 t Ship type 2, a2, b3, c3, v3, f2, str. 0.05 26 CROATIAN SHIPBUILDING
  • 21. T ANKERS Main engine: 2 x MAC 8M32C / Totally 7,680 kW • Slop pumps Trial speed at 90% MCR 15,02 knots - 2 x deepwell el.driven 250 m3 /h at 100 mLC, s.g. 0.8, visc. 1.0 cSt Capacities: • Portable pumps 3 - 1 x submersible, hydraulic driven 18 0m3 /h at 70 mLC, Cargo tanks 52,969 m s.g. 0.8, visc 1.0 cSt Slop tanks 1,050 m3 • Frequency converter power plant in engine room 3 • Cargo piping of stainless steel Heavy fuel oil 1,473 m - Nitrogen gas system cap. 4,400 Nm3 /h Diesel fuel oil 134 m3 • Cargo tanks heating: steam/thermal oil, cargo deck heaters Lubrication oil 43 m3 • Slop tanks heating: heating coils AISI 316 L Fresh water 847 m3 • Tank washing: cold/hot sea and fresh water, two (2) tank cleaning machines per tank Ballast water tanks: 19,813 m3 • Cargo tanks drying: air heater 700 C and air fan Cargo loading / unloading time: 3,500 m3 /h ∑ 16 hours 30,000 Nm3 /h HFO consuption of M.E.: 30,00 t/day • Lifting crane for cargo hose handling, hydraulically driven Cruising Range 13,900 nautical miles 100 kN cap. at 21 m outreach At speed 14,2 knots • Ballast pumps: 2xdeep well el.driven 1000m3 at 25 mLC Crew Complement: 18 + 6 spare + Pilot + 4 Suez Crew Steam plant: Cargo tanks and slop tanks are protected by phenolic epoxy, 300 mic • Two oil fired boilers, cap. 14,000 kg/h at 14 bar each Ballast tanks are protected by epoxy, 300 mic. • Two economizers, cap. 700 kg/h at 14 bar Cargo equipment: Auxiliary engines plant: • Cargo pumps: • Two diesel driven electric generators, 682 kW at 720 RPM - 6 x deepwell el.driven 400 m3 /h at 110 mLC, • One shaft generator 3200 kW at 1200 RPM s.g. 0.8, visc. 1.0 cSt • One emergency diesel driven electric generator, 125 kW - 8 x deepwell el.driven 250 m3 /h at 100 mLC, at 1800 RPM s.g. 0.8, visc. 1.0 cSt CROATIAN SHIPBUILDING 27
  • 22. Oil and Chemical Tanker Name: m/s AZOV SEA Length over all abt 182.50 m Owner / Flag: Valloy Shipping Co. / Liberia Length btw perp. 174.80 m Builder / Yard: Shipyard Trogir / 229 - 237 Breadth moulded 32.20 m Designed by: Shipyard Trogir, 9 sister vessels, 6 of which Depth moulded 17.50 m delivered by shipyards: ULJANIK and BRODOSPLIT Draught design 11.00 m Delivered: 1998, 1999 Deadweight at draught 11.00 m 41,100 t Classification: LRS 100 A1 Double Hull Oil and Chemical Draught scantling 12.20 m Tanker, ESP, SPM, S.G. 1.025, Ship Type 3 in Association Deadweight, at draught 12.20 m 47,400 m with a list of Defined Cargoes @ LMC, UMS, IGS, IWS Main engine 8,310 kW/123 rpm Trial speed at 90% MCR, draught 11.0 m 15.00 kn 28 CROATIAN SHIPBUILDING
  • 23. T ANKERS Capacities: Cargo equipment: 3 Cargo tanks 53,100 m • Cargo pumps, submerged type, hydraulically driven Slop tanks 1,150 m3 - 10 x capacity 352 m3/h at 12 bar head each, - 2 x capacity 100 m3/h at 12 bar head, in slop tanks, Heavy fuel oil 1,704 m3 - 1 x portable submersible type, cap.70 m3/h at 5 bar head, Diesel fuel oil 134 m3 - 10 x cargo deck heater, Lubrication oil 74 m3 • Hydraulic power plant in engine room. Fresh water 300 m3 • Cargo piping of stainless steel. • Inert gas system cap. 4,650 N m3/h. Ballast water tanks: 21,726 m3 • Slop tanks heating: heating coils Cunifer 90/10. Cargo loading/unloading time: 16 hours • Tank washing: COW and hot sea water, HFO consumption of M.E. 32.0 t/24 hours - Cargo tanks: 1 cleaning machine per tank. Cruising Range - Slop tanks: 1 cleaning machine per tank, (speed 14.3 knots, 20% serv. allowance) 15,750 Nm - Steam sea water heater 100 m3/h at 10 bar, Crew Complement: 22+6 Suez crew • Lifting crane for cargo hose handling, hydraulically driven, cap. 150 kN. Five different grades of oil can be carried, loaded and dis- • Ballast pumps submerged type, hydraulically charged simultaneously. Cargo tanks are separated by dou- driven 2 x 750 m3/h at 1.8 bar. ble bottom and 2 m width of double sides from shell plating with structural elements within ballast tanks or above deck Steam plant: keeping inner tank walls smooth, without obstructions. • One oil fired boiler, cap. 19 t/h saturated steam, 10 bar. Cargo tanks are protected by epoxy fenoline paint system. • One economizer, cap. 1.4 t/h saturated steam,10 bar. Auxiliary engines plant: • Three diesel driven electric generators, 60 cycles, 2 x 1,600 kVA + 1 x 850 kVA. • One emergency diesel driven electric generator, 60 cycles, 120 kVA. CROATIAN SHIPBUILDING 29
  • 24. Oil & Chemical Tanker 47,400 DWT Name: m/s HISPANICA Length over all 182.50 m Owner / Flag: Lancaster Shipping Ltd, Sliena / Malta Length btw perp. 174.80 m Builder / Yard: Shipyard Uljanik / 443 Breadth extreme 32.20 m Sister vessels: 444-447 Depth moulded 17.50 m Delivery: 2002, 2003, 2004 Draught design 11.00 m Designed by: Shipyard Uljanik Draught scantling 12,197 m Classification: LR; 100A1 Double Hull Oil and Chemicals Deadweight at design draught 41,247 t Tanker, Ship type 2, in association with a list of Deadweight at scantling draught 47,465 t defined cargoes; ESP, SPM, *IWS with the descriptive notes in column 6 of the Register Book Ship Right SDA, FDA, CM, maximum filling height with caustic soda 67%, ETA LMC, UMS, IGS, COW, SBT, PL 30 CROATIAN SHIPBUILDING
  • 25. T ANKERS Main engine: ULJANIK/MAN-B&W; 6S50MC-C Mk 6 Cargo equipment: MCR: 8580 kW/127 RPM • 10 stainless steel deepwell centrifugal cargo pumps, Trial speed at 87% MCR, on draught of 11,00 m hydraulically driven, cap. 550 m3/h at 125 mlc 15.60 knots (S.G. 0.8 t/m3) visc. 1.0 cSt. • 2 stainless steel deepwell centrifugal slop pumps, Capacities: hydraulically driven, cap. 100 m3/h at 125 mlc Cargo tanks including slops 54,297 m3 (S.G. 0.8 t/m3) visc. 1.0 cSt. Ballast tanks 21,177 m3 • 2 portable stainless steel sumbersible centrifugal cargo pump, hydr. capacity 70 m3/h at 50 mlc (S.G. 0.8 t/m3) Provisions: visc. 1.0 cSt. • Heating: each cargo tank is fitted with stainless steel deck Heavy fuel oil 1,774 m3 heater, slop tank with stainless steel heating coils. Diesel fuel oil 141 m3 • Venting: high velocity, press/vacuum valves. Gas freeing Lubricating oil 71 m3 by portable air driven ventilators. Vapour return arrange- Fresh water 357 m3 ment at manifold. • Cleaning: - 1 stainless steel machine per each tank Cargo loading time: abt. 19 hours • Inerting: capacity of 4125 m3/h . Consumption HFO: abt. 37,2 t/day • Hose handling: - 1 crane of 100 kN SWL electro-hydrauli- Cruising Range: 15,200 n.m. cally operated. Crew Complement: 28 persons Heating plant: The vessel is suitable for transporting crude oil and dirty petroleum products and chemicals world wide. • One oil fired boiler, steam capacity 19 t/h. 10 submerged pumps are fitted in cargo tanks plus two in • One exhaust gas boiler cap. 1200 kg/h. slops. One cargo manifold is arranged for two cargo pumps, five Auxiliary engines plant: segregations. All cargo tanks are composed of vertical cor- • Three diesel generator sets, 60 cycles of 1120 kW rugated bulkheads and plane surfaces. Hull structure mild driven each. steel. • One emergency diesel generator set, 60 cycles of 109 kW. Painting: Cargo and slop tanks - epoxy phenolic. CROATIAN SHIPBUILDING 31
  • 26. Oil Product / Chemical Tanker 45,000 / 40,000 DWT Name: m/s ELKA GLORY Owner / Flag: Carriage Shipping Inc. / Monrovia Builder / Yard: Shipyard Brodosplit / 428 Sister vessels: 415, 416, 417, 427, 432 Designed by: Shipyard Brodosplit Delivery: 2001-2005 Single screw diesel engine driven Oil Product / Chemical Tanker with longitudinal bulkhead, bulbous bow, and transom stern. Living quarters including navigation bridge, engine room with fuel oil tanks on both sides and pump room located aft. Double bottom / double side tanks and peak tanks intended for segregated ballast. Cargo space divided into sixteen (16) cargo and two (2) slop tanks. Hull structure made of mild steel. Eight (8) grades of cargo can be handled simultaneously. 32 CROATIAN SHIPBUILDING
  • 27. T ANKERS Classification: Det Norske Veritas 1A1 Tanker for Oil Open deck and exposed superstructure Epoxy + Polyurethane and Chemicals IMO Type 3 - ESP (260 my + 60 my) E0 ETC, Nauticus Cargo equipment: Main dimensions: Cargo pumps 16 x 580 m3/h at 120 mLC, s.g. 0.8, 1 cSt Lenght over all 183.40 m submerged, centrifugal, hydraulic Length between perpendiculars 175.00 m motor driven cargo tanks pumps Breadth moulded 32.00 m 2 x 120 m3/h at 130 mLC, s.g. 0.8, 1 cSt Depth moulded 17.95 m submerged, centrifugal, hydraulic Design draught 11.00 m motor driven slop tanks pumps Scantling draught 12.00 m 1 x 150 m3/h at 70 mLC, s.g. 0.8, 1 cSt Deadweight at design draught 40,000 t submersible, centrifugal, hydraulic Deadweight at scantling draught 45,000 t motor driven portable cargo pump Main engine Split-MAN-B&W 6S50MC-C Cargo manifolds 8 x 300 mm Selected maximum continuous rating 9,180 kW/123 rpm Trial speed at design draught and 90% SMCR 15.9 kn Auxiliary engines plant: Main engine daily fuel oil consumption 33.6 t/day Main diesel-generator sets 2 x 990 kW Cruising range 20,000 nm 2 x 740 kW Crew complement 27 Emergency diesel-generator set 1 x 170 kW Capacities (100%): Heating plant: Cargo and slop tanks 55,200 m3 Auxiliary oil fired boilers 1 x 16 t/h saturated steam at 7 bar G Ballast tanks 21,500 m3 Donkey boiler 1 x 1.5 t/h saturated steam at 7 bar G Heavy fuel oil 1,900 m3 Exhaust gas economiser 1 x 1.4 t/h saturated steam at 7 bar G Diesel 130 m3 Fresh and feed water 200 m3 Painting: Cargo tanks and slop tanks Phenolic epoxy (300 my) Under water hull and boot topping Epoxy + Tie coat + SPC (250 my + 75 my + 450 my) CROATIAN SHIPBUILDING 33
  • 28. Handy Size Oil Product Tanker 45,000 / 40,000 DWT Name: m/s MARINOULA Length over all 182.40 m Owner / Flag: Southseas Shipping Ltd. / Malta Length btw perp. 174.00 m Builder / Yard: Shipyard Brodosplit / 406 Breadth moulded 32.20 m Sister vessel: Yard 407 Depth moulded 17.60 m Delivered: 2000 Draught design 11.00 m Classification: LR 100 A1 Oil Tanker (double hull), Draught scantling 12.00 m LMC, UMS, IGS, ESP, COW, IWS, SCM Deadweight at des. draught 40,000 t Designed by: Shipyard Brodosplit Deadweight at scant. draught 45,000 t 34 CROATIAN SHIPBUILDING
  • 29. T ANKERS Main engine: BRODOSPLIT-MAN-B&W 6S50MC Painting: SMCR: 8,580 kW / 127 rpm Cargo tanks - Epoxy Trial speed at 90% SMCR, on design draught 15.3 knots Ballast tanks - Light colour CT epoxy Under water hull - Epoxy + vynil tar + SPC Capacities: Deck and exposed superstr.- Epoxy + polyurethan Cargo + slop tanks 53,000 m3 Segregated ballast tanks 20,000 m3 Cargo equipment: • Cargo pumps: 4 x 1100 m3/h at 120 mlC, s.g. Provisions: 0.96, 1 cSt, steam turbine driven. Heavy fuel oil 1,700 m3 • Stripping 1 x 100 m3/h at120 m el. driven cargo Diesel fuel oil 130 m3 pump + 1 x 200 m3/h at 20 m eductor. Fresh water 200 m3 • Cargo manifolds: 4 x 300 mm Main engine consumption 31.8 t/day Auxiliary engines plant: Cruising range 18,000 nm • Three diesel-generator sets, 740 kW, 720 rpm, 60 Hz Crew complement 28 • One emergency generator, 96 kW, 1800 rpm, 60 Hz Single screw diesel engine driven Oil Tanker with longitudinal Heating plant: bulkhead, bulbous bow, transom stern and forecastle. Living quarters including navigation bridge, engine room with fuel • Two oil fired boiler capacity 16.0 t/h. oil tanks on both sides and pump room located aft. Double • One composite oil fired boiler, oil fired section bottom / double side tanks and peak tanks intended for seg- capacity 1.5 t/h, economizer capacity 1.4t/h. regated ballast. Cargo space divided into ten (10) cargo and two (2) slop tanks. Structural steel and profiles made of mild steel. • Intended cargoes: oil products. Four (4) grades of cargo can be handled simultaneously. CROATIAN SHIPBUILDING 35
  • 30. Oil and Chemical Tanker Name: m/s TROGIR Length over all 181.00 m Owner / Flag Trogir Shipping Ltd. / Liberia Length btw perp. 173.80 m Builder / Yard: Shipyard Trogir/ 217 Breadth moulded 32.00 m Designed by: Shipyard Trogir Depth moulded 17.00 m (12 sister vessels, 8 of which delivered by Draught design 10.00 m Shipyards ULJANIK, 3.MAJ, and BRODOSPLIT) Deadweight at draught of 10,00 mabt. 35,660 t Delivered: 1995, 1996, 1997 Draught scantling 11.00 m Classification: LRS; 100 A1 Oil and Chemical Tanker, Deadweight, at draught of 11,00 abt. 40,700 t (Double Hull, Caustic soda only), SPM, Max. filling 67% Main engine 8,310 kW/123 rpm of depth, S.G.1.53 LMC, UMS, IGS, COW, PL, SBT Trial speed at 90% MCR, draft 10.0 m 15.10 knots 36 CROATIAN SHIPBUILDING
  • 31. T ANKERS Capacities: Cargo equipment: 3 Cargo tanks 50,172 m • Cargo pumps, submerged type, hydraulically driven, Slop tanks 1,144 m3 - 10 x 500 m3/h at 12 bar head each, - 2 x 100 m3/h at 10 bar head, in slop tanks, Heavy fuel oil 1,697 m3 - 1 x portable submersible type, cap.70 m3/h at 5 bar head. Diesel fuel oil 173 m3 • Hydraulic power plant suitable for simult. operation of Lubricating oil 71 m3 8 cargo pumps. Fresh water 359 m3 • Cargo piping of stainless steel, AISI 316L. • Inert gas system cap. 5 750 N m3/h. Ballast water tanks: 19,546 m3 • Cargo heating: stainless steel heating coils. Cargo loading/unloading time: 12 hours • Tank washing: COW and hot sea water, heater 100 m3/h, HFO consumption of M.E. 32.0 t/24 hours - Cargo and slop tanks: 1 cleaning machine per tank. Cruising Range • Deck crane for cargo hose handling, hydraulically driven, (speed 14,4 knots, 20% serv.all.) 16,150 Nm 150kN. Crew Complement: 23 • Ballast pumps: 2 x 650 m3/h at 1.8 bar in pump room, The vessel is intended for worldwide service and suitable 1 x 50 m3/h at 1.8 bar, eductor. for loading, carriage, and simultaneous discharge of five different grades of black and/or white petroleum products. Steam plant: The vessel is also designed to carry 50% solution of • One oil fired boiler, cap. 19 t/h satur. steam caustic soda S.G. 1.53 at 67% filling of cargo tanks. • One economizer, cap. 1.6 t/h satur. steam Completely double hulled in way of cargo tanks, double bottom of B/15 depth and side protective tanks of not less Auxiliary engines plant: than 2,00 m width. Structural elements within ballast tanks or above deck keeping inner tank walls smooth, without • Three diesel driven el.generators, 60 cycles, obstructions. 1,350 kVA each • One emergency diesel driven el.generator, 60 cycles, 109 kVA. CROATIAN SHIPBUILDING 37
  • 32. Tanker For Chemicals, Oil and Oil Products 37,000 DWT Name: m/t BRO ELIZABETH Length overall (extreme) 183.97 m Owner / Flag: Broström Tankers SA / France Length between perpendiculars 176.00 m Builder / Yard: Shipyard 3. MAJ / 678 Breadth, moulded 30.00 m Delivered: 2001, 2002 Depth, moulded to upper deck 15.911 m Sister ship: Yard 679 Design draught (extreme) 9.016 m Classification: BUREAU VERITAS Deadweight at design draught (9.016 m) 29,616 t I 3/3 E Oil and Chemical Tanker, F, ESP, DEEP SEA Scantling draught (extreme) 10.516 m IG, OIL POL-ENG, OIL POL-CARG, NLS POL, COW Deadweight at scantling SBT PL CDS, CSA, SPM, ETA, CNC-1 draught (10.516 m) 37,026 t AUT, MACH, BOILER, VERISTAR Designed by: Shipyard 3. MAJ 38 CROATIAN SHIPBUILDING
  • 33. T ANKERS Main engine 3. MAJ - SULZER 6 RTA 52 U Cargo equipment: CMCR 7,900 kW at 120 min-1 Trial speed with 6,715 kW Independent pipeline from each pairs of cargo tanks and one pair of (85% CMCR) at design draught 15.25 knots slop tanks arranged to cross-over manifold. Hydraulically driven submerged centrifugal cargo pumps: Capacities (100%): • Cargo tanks: 16 x 500 m3/h at 135 mlc • Slop tanks: 2 x 300 m3/h at 135 mlc Cargo tanks (slop included) 43,259 m3 • Residual tanks: 2 x 80 m3/h at 120 mlc Residual tanks 239 m3 • Portable pump: 1 x 150 m3/h at 70 mlc Ballast tanks 18,185 m3 One diesel engine driven power unit of 463 kW and four electrically Washing water tanks 263 m3 driven hydraulic power units, each of 447 kW. Cargo pumps and pipes are of stainless steel AISI 316. Provisions Cargo tanks heating with deck heaters. Slop and residual tanks Heavy fuel oil 1,485 m3 heating with heating coils. Diesel oil 199 m3 Inert gas generator, capacity 5,000 m3/h and nitrogen generator, Lubrication oil 97 m3 capacity 100 m3/h. Fresh water 224 m3 Fixed tank cleaning machines: • Cargo tanks: 32 x 31 m3/h at 8 bar Cargo unloading time abt. 10.5 hours • Slop tanks: 4 x 17.5 m3/h at 8 bar. Consumption of HFO 29.7 t/day One tank cleaning pump, 200 m3/h at 120 mlc. Cruising range abt. 14,800 nautical miles One electro- hydraulic cargo hose handling crane, 100 kN SWL. Crew complement 26 crew + 1 pilot + 6 Suez crew Steam plant: The vessel is double hull tanker for oil and oil products and IMO type 2 tanker for chemicals. Cargo space is divided into eight • One oil fired boiler, steam capacity 16 t/h at 8 bar pairs of cargo tanks, one pair of slop tanks and one pair of • One composite boiler, steam capacity 1.2 t/h (exhaust gas residual tanks. The structure of cargo tanks is designed for section) and 1.5 t/h (oil fired section) at 8 bar cargo density of 1.025 t/m3 in completely filled tanks and for cargo density up to 1.54 t/m3 in partially filled tanks with filling Auxiliary engines plant: height corresponding to the density ratio, including zig-zag and • Two diesel generators sets, 780 kW each asymmetrical loading. • One diesel generator set, 1,280 kW Double hull consists of four pairs of double bottom and four • One emergency diesel generator set, 217 kW pairs of double side water ballast tanks. Engine room is equipped for unattended operation. Painting: Cargo tanks - phenolic epoxy Ballast tanks - light colour epoxy Underwater shell - SPC antifouling CROATIAN SHIPBUILDING 39
  • 34. Tanker For Chemicals and Oil Products 35,000 DWT Name: m/t MARITEA Length overall (extreme) 175.870 m Owner / Flag: CALISA / Italy Length between perpendiculars 169.000 m Builder / Yard: Shipyard 3. MAJ / 682 Breadth, moulded 29.787 m Delivered: 2002, 2003 Depth, moulded to upper deck 16.805 m Sister ship: Yard 684 Design draught (extreme) 11.018 m Classification: RINA M 100-A-1.1, Nav IL, Deadweight at design draught (11.018 m) 34,659 t Cst (oil-chem), ESP, IAI, IAP, IAQ-1, IIQ, MAN, NAU, FTC, RSD, SCC, VCS, EP2, IV, IWS, TMS, P, OWS, PMS, Designed by: Shipyard 3. MAJ 40 CROATIAN SHIPBUILDING
  • 35. T ANKERS Main engine 3. MAJ - SULZER 6 RTA 52 U Cargo equipment: CMCR 9,000 kW at 130 min-1 Trial speed with 7,620 kW (85% CMCR) Independent pipeline from one pair of cargo tanks and each slop at design draught 15.30 knots and recovery tank arranged to cross-over manifold. Stern loading station provided. Hydraulically driven submerged centrifugal cargo pumps: Capacities (100%): • Cargo tanks: 12 x 500 m3/h at 150 mlc Cargo tanks (slop included) 43,200 m3 • Slop tanks: 2 x 200 m3/h at 150 mlc Ballast tanks 17,018 m3 • Recovery tank: 1 x 200 m3/h at 150 mlc Washing water tanks 1,119 m3 • Portable pump: 1 x 150 m3/h at 80 mlc Six electrically driven hydraulic power units, each of 435 kW. Provisions Cargo pumps and pipes are of stainless steel AISI 316L. Cargo, slop and recovery tanks heating with thermal oil Heavy fuel oil 1,266 m3 and heating coils. Diesel oil 191 m3 Inert gas generator, capacity 5,000 m3/h. Lubrication oil 133 m3 Fixed tank cleaning machines: Fresh water 175 m3 • Cargo tanks No. 2 P&S: 4 x 16.4 m3/h at 9 bar • Remaining cargo tanks: 20 x 19.1 m3/h at 9 bar Cargo unloading time abt. 10.5 hours • Slop tanks: 6 x 9.1 m3/h at 9 bar Consumption of HFO with 8,120 kW 38 t/day • Recovery tank: 1 x 17 m3/h at 9 bar Cruising range abt. 10,300 nautical miles Two tank cleaning pumps, 80 m3/h at 130 mlc. One electro-hydraulic cargo hose handling crane, 100 kN SWL. Crew complement 26 + 6 Suez crew Thermal oil plant: The vessel is double hull tanker for oil products and IMO type 2 tanker for chemicals. Cargo space is divided into six pairs of • Two thermal oil heaters, capacity 5,000 kW each cargo tanks, one pair of slop tanks and one recovery tank. The • One thermal oil economiser, capacity 850 kW structure of cargo tanks is designed for cargo density of 1.025 t/m3 in completely filled tanks and for cargo density up to 1.54 Auxiliary engines plant: t/m3 in partially filled tanks with filling height corresponding to the density ratio. Double hull consists of six pairs of double • Three diesel generators sets, 1,280 kW each bottom / double side water ballast tanks and washing water • One emergency diesel generator set, 217 kW tanks. Engine room is equipped for unattended operation. Painting: Cargo tanks - phenolic epoxy Ballast tanks - light colour solvent free epoxy CROATIAN SHIPBUILDING 41
  • 36. Tanker For Chemicals, Oil and Oil Products 24,000 DWT Name: m/t ADMIRAL Length overall (extreme) 167.67 m Owner / Flag: MT Admiral Schiffahrtsgesellschaft / Gibraltar Length between perpendiculars 160.80 m Builder / Yard: Shipyard 3.MAJ / 680 Breadth, moulded 26.40 m Delivered: 2002, 2003 Depth, moulded to upper deck 13.812 m Sister ships: 681, 683, 687 Design draught (extreme) 9.017 m Classification: GERMANISCHER LLOYD 100 A5 E2 Chemical Deadweight at design draught (9.017 m) 23,337 t Tanker Type 2, Oil Tanker, NAV- 0, IW, ESP, ERS Summer draught (extreme) 9.187 m MC E2, AUT INERT, RP1 Deadweight at summer draught (9.187 m) 23,998 t Designed by: Shipyard 3.MAJ Main engine 3. MAJ - SULZER 6 RTA 48 T-B CMCR 7,850 kW at 127 min-1 Trial speed with 6,600 kW (84% CMCR) at design draught 15.42 knots 42 CROATIAN SHIPBUILDING
  • 37. T ANKERS Capacities (100%): Painting: Cargo tanks - modified epoxy 3 Ballast tanks - light colour epoxy Cargo tanks (slop included) 30,113 m Retention tank 45 m3 Cargo equipment: Ballast tanks 11,894 m3 Washing water tanks 277 m3 Independent pipeline from each cargo tank pair and one line from slop and retention tank arranged to cross-over manifold, giving a Provisions total seven cargo crossovers, slop crossover and one common line. Hydraulically driven submerged cargo pumps: Heavy fuel oil 1,033 m3 • Cargo tanks: 350 m3/h at 110 mlc Diesel oil 267 m3 • Slop tanks: 100 m3/h at 110 mlc Lubrication oil 54 m3 • Retention tank: 100 m3/h at 110 mlc Fresh water 180 m3 • Portable pump: 150 m3/h at 70 mlc Cargo unloading time abt. 10 hours Four electrically driven hydraulic power units, each of 325 kW. Consumption of HFO 31.2 t/day Cargo pumps and pipes are of stainless steel AISI 316. Cruising range abt. 10,000 nautical miles Cargo tanks heating with deck heaters. Slop and residual tanks Crew complement 22 crew + 2 pilots + 4 Suez / repair men heating with heating coils. Inert gas generator, capacity 3,750 m3/h. The vessel is double hull tanker for oil and oil products and IMO Fixed tank cleaning machines for cargo and slop tanks, capacity type 2 tanker for chemicals. Cargo space is divided into seven 20 m3/h at 10 bar. pairs of cargo tanks, one pair of slop tanks and one retention One tank cleaning pump, 100 m3/h at 130 mlc. tank. The structure of cargo tanks is designed for cargo density One electro-hydraulic cargo hose handling crane, 100 kN SWL. of 1,025 t/m3 in completely filled tanks and for cargo density up to 1.55 t/m3 in partially filled tanks with filling height correspon- Steam plant: ding to the density ratio, including zig-zag and alternate loading. The structure of the cargo tanks No. 4 P&S and 5 P&S is • One oil fired boiler, steam capacity 12 t/h at 7 bar designed for cargo density of 1.55 t/m3 in completely filled • One composite boiler, steam capacity 1.2 t/h (exhaust gas tanks. section) and 1.5 t/h (oil fired section) at 7 bar Double hull consists of seven pairs of double bottom / double side water ballast tanks. Cofferdams are provided between fuel Auxiliary engines plant: oil tanks and shell plating. Hull and machinery are designed to comply with requirements for navigation in ice. The ship’s hull is • Three diesel generators sets, 3 x 1,020 kW specially equipped for in-water surveys. • One emergency diesel generator set, 218 kW Engine room is equipped for unattended operation. Redundant • One PTO generator, transmitting power of 1,260 kW from ME propulsion system is arranged by PTO generator working as PTI motor (electric power of 1260 kW) driving CP propeller trough tunnel shaft gear. CROATIAN SHIPBUILDING 43
  • 38. Oil & Chemical Tanker 17,499 DWT / 17,550 DWT Name: m/s ALTAIR Length over all 149.30 m Owner / Flag: Altair Marine Inc. / Liberia Length btw perp. 141.00 m Builder / Yard: Shipyard Uljanik / 429, 430, 431, 432 Breadth moulded 23.80 m Delivered: 1999, 2000 Depth moulded 12.65 m Designed by: Shipyard Uljanik Draught design 8.50 m Classification: DNV; 1A1 Tanker for Chemicals and Oil products, Deadweight at design draught 17,499 t in association with a list of defined cargoes; ESP, EO, W1-OC, ICE-C, TMON Ship type 2, a2, b3, c3, f2, str. 0.1, hl (1.59) 44 CROATIAN SHIPBUILDING
  • 39. T ANKERS Main engine: ULJANIK/MAN-B&W; 7S42MC Cargo equipment: MCR: 7,175 kW/136 RPM • 14 stainless steel deepwell centrifugal cargo pumps, hydr. Trial speed at 90% MCR, on draught of 8,50 m driven, cap. 250 m3/h at 105 mlc (S.G. 0.8 t/m3) visc. 15.70 knots 1.0 cSt. • 2 stainless steel deepwell centrifugal slop pumps, Capacities: hydraulically driven, cap. 80 m3/h at 100 mlc Cargo tanks including slops 23,350 m3 (S.G. 0.8 t/m3) visc. 1.0 cSt. Ballast tanks 8,239 m3 • 2 portable stainless steel sumbersible centrifugal cargo pump, hydr. capacity 70 m3/h at 50 mlc (S.G. 0.8 t/m3) Provisions: visc. 1.0 cSt. • Heating: stainless steel heating coils in tanks including Heavy fuel oil 724 m3 slops. Diesel fuel oil 120 m3 • Venting: high velocity, press/vacuum valves. Gas freeing by Lubricating oil 95 m3 portable driven ventilators. Vapour return arrangement at Fresh water 200 m3 manifold. • Cleaning: - 1 stainless steel machine per each tank Cargo loading/unloading time: abt. 12 hours • Inerting: capacity of 2,500 m3/h . Consumption HFO: abt. 30,4 t/day • Hose handling: - 1 crane of 100 kN SWL hydraulically Cruising Range: 8,000 n.m. operated. Crew Complement: 24 persons Heating plant: The vessel is suitable for transporting clean and dirty petroleum products and chemicals world wide. • One oil fired boiler, steam capacity 11 t/h. 14 submerged pumps are fitted in cargo tanks plus two in • One exhaust gas boiler cap. 1,000 kg/h. slop tanks. One cargo manifold is arranged for one cargo pump, seven Auxiliary engines plant: segregations. All cargo tanks are composed of vertical • Three diesel generator sets, 60 cycles of 700 kW corrugated bulkheads and plane surfaces. driven each. Hull structure mild steel. • One emergency diesel generator set, 60 cycles of 100 kW. Painting: Cargo and slop tanks - epoxy phenolic. CROATIAN SHIPBUILDING 45
  • 40. Liquefied Gas Tanker LPG / NH3 / VCM Lenght over all Length btw perp. 157.00 m 146.90 m Breadth moulded 22.80 m 15,000 CU. M. Depth moulded 15.40 m Draught design 7.50 m Draught scantling 9.25 m Designed by: Shipyard 3.MAJ Deadweight, at draught 7.50 m 10,500 t Project No.: 2588 Deadweight, at draught 9.25 m 16,000 t Classification: Germanischer Lloyd 100 A4 E1 Main engine: 3.MAJ - SULZER 6 RTA 52 “Liquified Gas Tanker Type 2G” MC E1 AUT, INERT MCR: 8,400 kW / 130 rpm Trial speed at 7,50 draught and 6,490 kW for propulsion only 17.00 knots Cargoes: Ammonia anhydrous, Butadiene, Butane, Butane Propane mixtures, Butylene, Isoprene, Propane, Propylene, Propylene Oxide, Vynil Chloride. Capacities: • El. driven, stainless steel pumps designed for 3 density 0.972 t/ m3, 120 mlC, and - 48 deg. C, No. 1 tank 4,672 m (6 multistage deep well pumps of 250 m3/h + 2 No. 2 tank (2 x 2,607 m3) 5,214 m3 centrifugal, single stage, booster pumps of 250 No. 3 tank 5,214 m3 m3/h). Total (cargo) 15,100 m3 • Reliquefaction plant for cooling down and maintenance of preset temperture/pressure Provisions: consists of: 2 open cycle units (each comprising: Heavy fuel oil 1,146 m3 1 compressor, 1 suction separator, 1 economi- Diesel fuel oil 116 m3 zer/intercooler, instrumentation, etc.), 2 additio- Fresh water 100 m3 nal compressors (serving both reliquefaction units) and 2 gas condensers. Ballast Water 4,683 m3 • 2 pairs of pressure relief valves to each tank, HFO consumption of M.E. (85% MCR) 29.2 t/ 24 hours with set point one pair 5.2 bar and other pair Crew complement 25 3.2 bar. • Inert gas system for production of nitrogen Cargo system: used for feeding holds and/or tanks purging operation. • 3 horizontal insulated bilobe type tanks, max. pressure 4 bar gauge, • Cargo control room for control and sounding min. temp. -48 deg. C max. density 0.972 t /m3 equipment arranged in accommodation. • System designed for loading, reliquefying and discharging two independent cargoes. 46 CROATIAN SHIPBUILDING
  • 41. T ANKERS Tanker For Oil Products Length over all Lenth btw perp. abt. 144.00 m 138.00 m Breadth moulded 21.00 m and Chemicals Depth moulded Draught design Draught scantling 11.10 m 7.50 m 7.90 m 13,000 / 12,000 DWT Deadweight at design draught abt. 12,000 t Deadweight at scantling draught abt. 13,000 t Main engine 3. MAJ - SULZER 6 RTA 48 Designed by: Shipyard 3. MAJ CMCR: 5500 kW/136 rpm Project No. 2707 Trial speed at design draught and 4,400 kW Classification: Germanischer Lloyd 100 A5, E3, Oil Tanker, for propulsion abt. 15 knots Chemical Tanker - TYPE 2 MC, E3, AUT, IW, NAV-O Capacities: Cargo tanks (incl. slop tanks) abt. 16,250 m3 Water ballast abt. 6,000 m3 Provisions: • One hydraulically driven submerged cargo pump Heavy fuel oil abt. 560 m 3 fitted in each tank, capacity abt. 350 m3/h (cargo Diesel oil abt. 150 m3 tanks) respectively 110 m3/h (slop tanks) at Fresh water abt. 120 m3 110 mlC, density 0.8 t/m3. Fresh water (cleaning) abt. 200 m3 • Hydraulic power units for simultaneous discharging of 2800 m3/h of cargo at 110 mlC, Crew complement: 22+4 Suez crew density 0.8 t/m3. • Inert gas generator 3500 m3/h. The vessel shall be double hull tanker for oil products and chemicals of IMO type Steam plant: 2 and 3, density not over 1.55 t/m3, including UREA /Ammonium nitrate solution • One oil fired boiler 10 t/h (containing aqua ammonia), in accordance with vessel/protective system capa- • One oil fired/exhaust gas composite boiler bilities. 1.5/1.0 t/h • One steam generator for cargo heating. Cargo equipment: Auxiliary engines plant: • Cargo oil tanks protected with painting system resistant to wide range of acids, bases, solvents and salt water (siloxirane polymer resin or similar). • Three diesel generator sets of abt. 870 kVA, • Pipes and fitting in contact with cargo made of stainless steel. 3 x 450 V, 60 Hz, 900 min-1 burning DO. • Piping and pumps system arranged for 14 segregated • One PTO generator of abt. 1,600 kVA, cargo grades and for one pair of slop tanks. 3 x 450 V, 60 Hz. • One emergency diesel generator of abt. 150 kVA, 3 x 450 V, 60 Hz. CROATIAN SHIPBUILDING 47
  • 42. Oil-Chemical Tanker / Asphalt Carrier 9,200 DWT Designed by: Shipyard Kraljevica Lenght over all 108.50m Project: 05-01 Lenght btw perp. 99.60m Builder / Yard: Shipyard Kraljevica / 531,532 Breadth, moulded 18.60m Owner / Flag: Asphalt (Gulf of Mexico) Ltd / Isle of Man Depth, moulded 10.60m Delivery: 2004 Draught to summer load line 8.34m Classification: Bureau Veritas Deadweight at summer load line about 9,200 m.t. CLASS 1 + HULL + Chemical Tanker / Main engine 1 x 3,680 kW at 750 rpm Asphalt Carrier T=250‡C DEEP SEA (IMO II) Speed at summer load line and 3,680 kW ∑ ESPUNRESTRICTED NAVIGATION + MACH 13.4 knots + AUT ∑ UMS SYS ∑ IBS + IN WATER SURWAY, MON SHAFT 48 CROATIAN SHIPBUILDING
  • 43. T ANKERS Capacitites: Thermal Oil plant: Cargo tanks (including slop tanks) abt. 7,750 m3 • Two thermal oil heaters of about 1.200,000 kcal/h, Water ballast abt. 2,675 m3 provided for cargo tanks heating. • One exhaust gas oil fired marine boiler of 2.0 t/h Provisions: Auxiliary engines plant: Heavy Fuel Oil abt. 682 m3 Diesel Oil abt. 53 m3 • Three Diesel generators of about 590 kVA each, 440 V, Fresh Water abt. 89 m3 60 HZ • One emergency Diesel generator of 125 kVA, 440 V, Crew complement 17 persons +1 pilot cabin 60 HZ The Vessel shall be single hull tanks for oil products, asphalt, bitumen, coaltar, coaltar, coaltar naphta solvent, Creosote (colatar), creosote (wood), antracene oil. Cargo System: • Cargo to be handled with three screw pump fitted in centralized pump room, electrically driven. • Two grades of cargo to be loaded / discharged at any time with double valve segregation throughout. • Cargo to be loaded through three drag lines to each main segregation line in cargo tanks. CROATIAN SHIPBUILDING 49