Value Questionnaire
Prepared for:
Prepared by: «Fred» «Schenkelberg», «Consultant»
June 1, 2010
Value Questionnaire 1
FMS Reliability
Value
Objective
Identify value before and after any reliability task. Think about the difference the work has and the decisions it enables.
Reliability VALUE ADDED/ROI QUESTIONAIRE
Savings/Impact/Benefit Response
1. Engineering
effort saved:
a. How long would it have taken your
team to undertake the work ESTC pro-
vided. Take into account research time
and whether you had the skills availa-
ble.
b. If you did not have the skills availa-
ble how many people would have need-
ed to be recruited to undertake the
work?
c. How long would it take for these
people to become productive?
d. Estimate training cost associated
with new personnel.
2.Opportunity
Cost
a. If engineers from the business had
been used to do this work would they
have not been able do other product re-
lated work. I.e. delivered new func-
tions?
3. Material
costs:
a. Did we avoid or save any direct prod-
uct material or test equipment costs?
b. If so please identify type and cost.
Name of report 2
«Organization»
4. TTM im-
pact:
a. Did ESTC help you meet or beat your
TTM goals?
b. Did ESTC identify any problems
which would have impacted your TTM?
c. Has the use of ESTC
tools/techniques identified issues which
would of impacted TTM?
d. If the above are applicable please
identify type of problems and estimate
TTM impact in days/weeks/months.
e. If applicable what is the estimated
cost of a delay in TTM?
f. If applicable what is the opportunity
in $ of additional income from an early
TTM?
5. TT Volume
impact:
a. Did ESTC help you accelerate or
meet you Time to Volume goals
b. If applicable what is the estimated $
impact of avoiding the TTV issues that
ESTC identified
6. Risk/cost/
warranty re-
duction
a. Has the ESTC work directly identi-
fied or mitigated a field related problem.
b. If so estimate the probable cost of
the field problem in $ (i.e. units affected
x repair cost)
c. Has the ESTC work reduced the
probability of field related problems?
d. If so give a guide by how much and
the estimated cost of avoidance (i.e. Es-
timate 1000 units per month failure at
$50 each reduced by 5%)
e. Has ESTC work provided processes
which will reduce the risk of field fail-
ures?
Value Questionnaire 3
FMS Reliability
7. TCE: a. Has the ESTC work contributed to
the TCE of your product?
b. If so identify how? i.e. estimated
number of customer calls avoided
8. Indirect
Impact:
a. What advantages did ESTC provide
over an external consultancy? (i.e. time,
cost, contractual issues, Intellectual
Property, response time)
9. Misc a. Please identify any other benefits or
cost savings from using ESTC re-
sources.

Weitere ähnliche Inhalte

Andere mochten auch

Slide share How Customer Focused is Your Organisation? Use This Diagnostic ...
Slide share   How Customer Focused is Your Organisation? Use This Diagnostic ...Slide share   How Customer Focused is Your Organisation? Use This Diagnostic ...
Slide share How Customer Focused is Your Organisation? Use This Diagnostic ...Dr. Ted Marra
 
Questionnaire results
Questionnaire resultsQuestionnaire results
Questionnaire resultstayler1996
 
Organizational Diagnosis Questionnaire (ODQ)
Organizational Diagnosis Questionnaire (ODQ)Organizational Diagnosis Questionnaire (ODQ)
Organizational Diagnosis Questionnaire (ODQ)mikejavate
 
questionnaire on employee attrition
questionnaire on employee attritionquestionnaire on employee attrition
questionnaire on employee attritionchhayatripathi23
 
Employee retention questionnaire
Employee retention questionnaireEmployee retention questionnaire
Employee retention questionnaireKarthik Rao [LION]
 
Questionnaire on Employee Turnover
Questionnaire on Employee TurnoverQuestionnaire on Employee Turnover
Questionnaire on Employee TurnoverwaQas ilYas
 
Employee retention strategy in bpo industry
Employee retention strategy in bpo industryEmployee retention strategy in bpo industry
Employee retention strategy in bpo industryDamyanti Vaishnav
 
Employee-retention-
 Employee-retention- Employee-retention-
Employee-retention-Dinesh Reddy
 
Questionnaire on training and development
Questionnaire on training and developmentQuestionnaire on training and development
Questionnaire on training and developmentSusmitha Chowdary
 
Questionnaire on Work Culture
Questionnaire on Work CultureQuestionnaire on Work Culture
Questionnaire on Work CultureVenkata Vihari K
 

Andere mochten auch (12)

Slide share How Customer Focused is Your Organisation? Use This Diagnostic ...
Slide share   How Customer Focused is Your Organisation? Use This Diagnostic ...Slide share   How Customer Focused is Your Organisation? Use This Diagnostic ...
Slide share How Customer Focused is Your Organisation? Use This Diagnostic ...
 
Questionnaire results
Questionnaire resultsQuestionnaire results
Questionnaire results
 
Measuring Strategy Questionnaire
Measuring Strategy QuestionnaireMeasuring Strategy Questionnaire
Measuring Strategy Questionnaire
 
Organizational Diagnosis Questionnaire (ODQ)
Organizational Diagnosis Questionnaire (ODQ)Organizational Diagnosis Questionnaire (ODQ)
Organizational Diagnosis Questionnaire (ODQ)
 
questionnaire on employee attrition
questionnaire on employee attritionquestionnaire on employee attrition
questionnaire on employee attrition
 
Employee retention questionnaire
Employee retention questionnaireEmployee retention questionnaire
Employee retention questionnaire
 
Questionnaire on Employee Turnover
Questionnaire on Employee TurnoverQuestionnaire on Employee Turnover
Questionnaire on Employee Turnover
 
Employee retention strategy in bpo industry
Employee retention strategy in bpo industryEmployee retention strategy in bpo industry
Employee retention strategy in bpo industry
 
Employee-retention-
 Employee-retention- Employee-retention-
Employee-retention-
 
Questionnaire on Performance Management System
Questionnaire on Performance Management SystemQuestionnaire on Performance Management System
Questionnaire on Performance Management System
 
Questionnaire on training and development
Questionnaire on training and developmentQuestionnaire on training and development
Questionnaire on training and development
 
Questionnaire on Work Culture
Questionnaire on Work CultureQuestionnaire on Work Culture
Questionnaire on Work Culture
 

Ähnlich wie Value questionnaire

1.A cumulative effort curve for a project generally has an S-shap.docx
1.A cumulative effort curve for a project generally has an S-shap.docx1.A cumulative effort curve for a project generally has an S-shap.docx
1.A cumulative effort curve for a project generally has an S-shap.docxjackiewalcutt
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)Steve Nails
 
Using periodic audits to prevent catastrophic project failure
Using periodic audits to prevent catastrophic project failureUsing periodic audits to prevent catastrophic project failure
Using periodic audits to prevent catastrophic project failureicgfmconference
 
Outpost24 webinar - The economics of penetration testing in the new threat la...
Outpost24 webinar - The economics of penetration testing in the new threat la...Outpost24 webinar - The economics of penetration testing in the new threat la...
Outpost24 webinar - The economics of penetration testing in the new threat la...Outpost24
 
INCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICS
INCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICSINCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICS
INCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICSNayeem Chowdhury, ECRE, TAS
 
ENGIN 36 Final Exam Take Home Exam May 15, 2020 .docx
ENGIN 36 Final Exam Take Home Exam May 15, 2020 .docxENGIN 36 Final Exam Take Home Exam May 15, 2020 .docx
ENGIN 36 Final Exam Take Home Exam May 15, 2020 .docxkhanpaulita
 
5_Why_Root_Cause_Corrective_Actions.pptx
5_Why_Root_Cause_Corrective_Actions.pptx5_Why_Root_Cause_Corrective_Actions.pptx
5_Why_Root_Cause_Corrective_Actions.pptxDeepakMore54
 
10 questions to be able to answer about your school network
10 questions to be able to answer about your school network10 questions to be able to answer about your school network
10 questions to be able to answer about your school networkInspirEdu
 
Final Project Organizational AnalysisFinal Project Organizatio.docx
Final Project Organizational AnalysisFinal Project Organizatio.docxFinal Project Organizational AnalysisFinal Project Organizatio.docx
Final Project Organizational AnalysisFinal Project Organizatio.docxAKHIL969626
 
INTE 296 – Assignment 1 Assignment 1 Due Date Februar.docx
INTE 296 – Assignment 1 Assignment 1 Due Date Februar.docxINTE 296 – Assignment 1 Assignment 1 Due Date Februar.docx
INTE 296 – Assignment 1 Assignment 1 Due Date Februar.docxmariuse18nolet
 
Is your ladder leaning against the right wall?
Is your ladder leaning against the right wall?Is your ladder leaning against the right wall?
Is your ladder leaning against the right wall?Stephen Morris
 
Why Is New Software Always Late
Why Is New Software Always LateWhy Is New Software Always Late
Why Is New Software Always LateAlex Beston
 
Research Paper On Selenium
Research Paper On SeleniumResearch Paper On Selenium
Research Paper On SeleniumAnn Johnson
 
8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving ApproachJ. García - Verdugo
 
5_Why_Root_Cause_Corrective_Actions.pdf
5_Why_Root_Cause_Corrective_Actions.pdf5_Why_Root_Cause_Corrective_Actions.pdf
5_Why_Root_Cause_Corrective_Actions.pdfJenniferElizarraras1
 
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysPROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysGoLeanSixSigma.com
 
201008 Software Testing Notes (part 1/2)
201008 Software Testing Notes (part 1/2)201008 Software Testing Notes (part 1/2)
201008 Software Testing Notes (part 1/2)Javier Gonzalez-Sanchez
 

Ähnlich wie Value questionnaire (20)

1.A cumulative effort curve for a project generally has an S-shap.docx
1.A cumulative effort curve for a project generally has an S-shap.docx1.A cumulative effort curve for a project generally has an S-shap.docx
1.A cumulative effort curve for a project generally has an S-shap.docx
 
Technical Debt
Technical DebtTechnical Debt
Technical Debt
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)
 
Technical debt
Technical debtTechnical debt
Technical debt
 
Using periodic audits to prevent catastrophic project failure
Using periodic audits to prevent catastrophic project failureUsing periodic audits to prevent catastrophic project failure
Using periodic audits to prevent catastrophic project failure
 
Outpost24 webinar - The economics of penetration testing in the new threat la...
Outpost24 webinar - The economics of penetration testing in the new threat la...Outpost24 webinar - The economics of penetration testing in the new threat la...
Outpost24 webinar - The economics of penetration testing in the new threat la...
 
INCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICS
INCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICSINCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICS
INCREASE YOUR RESUME / CV VALUE THROUGH PERFORMANCE METRICS
 
ENGIN 36 Final Exam Take Home Exam May 15, 2020 .docx
ENGIN 36 Final Exam Take Home Exam May 15, 2020 .docxENGIN 36 Final Exam Take Home Exam May 15, 2020 .docx
ENGIN 36 Final Exam Take Home Exam May 15, 2020 .docx
 
5_Why_Root_Cause_Corrective_Actions.pptx
5_Why_Root_Cause_Corrective_Actions.pptx5_Why_Root_Cause_Corrective_Actions.pptx
5_Why_Root_Cause_Corrective_Actions.pptx
 
10 questions to be able to answer about your school network
10 questions to be able to answer about your school network10 questions to be able to answer about your school network
10 questions to be able to answer about your school network
 
Final Project Organizational AnalysisFinal Project Organizatio.docx
Final Project Organizational AnalysisFinal Project Organizatio.docxFinal Project Organizational AnalysisFinal Project Organizatio.docx
Final Project Organizational AnalysisFinal Project Organizatio.docx
 
INTE 296 – Assignment 1 Assignment 1 Due Date Februar.docx
INTE 296 – Assignment 1 Assignment 1 Due Date Februar.docxINTE 296 – Assignment 1 Assignment 1 Due Date Februar.docx
INTE 296 – Assignment 1 Assignment 1 Due Date Februar.docx
 
FMEA: How to Find the Value
FMEA: How to Find the Value FMEA: How to Find the Value
FMEA: How to Find the Value
 
Is your ladder leaning against the right wall?
Is your ladder leaning against the right wall?Is your ladder leaning against the right wall?
Is your ladder leaning against the right wall?
 
Why Is New Software Always Late
Why Is New Software Always LateWhy Is New Software Always Late
Why Is New Software Always Late
 
Research Paper On Selenium
Research Paper On SeleniumResearch Paper On Selenium
Research Paper On Selenium
 
8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach
 
5_Why_Root_Cause_Corrective_Actions.pdf
5_Why_Root_Cause_Corrective_Actions.pdf5_Why_Root_Cause_Corrective_Actions.pdf
5_Why_Root_Cause_Corrective_Actions.pdf
 
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysPROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
 
201008 Software Testing Notes (part 1/2)
201008 Software Testing Notes (part 1/2)201008 Software Testing Notes (part 1/2)
201008 Software Testing Notes (part 1/2)
 

Mehr von Accendo Reliability

Should RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfShould RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfAccendo Reliability
 
T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdfAccendo Reliability
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdfAccendo Reliability
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdfAccendo Reliability
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdfAccendo Reliability
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdfAccendo Reliability
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdfAccendo Reliability
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdfAccendo Reliability
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdfAccendo Reliability
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdfAccendo Reliability
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdfAccendo Reliability
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyerAccendo Reliability
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life TestAccendo Reliability
 

Mehr von Accendo Reliability (20)

Should RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfShould RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdf
 
T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdf
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdf
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf
 
13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf
 
11-RCM is like a diet.pdf
11-RCM is like a diet.pdf11-RCM is like a diet.pdf
11-RCM is like a diet.pdf
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdf
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf
 
03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf
 
02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf
 
01-5 CBM Facts.pdf
01-5 CBM Facts.pdf01-5 CBM Facts.pdf
01-5 CBM Facts.pdf
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyer
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life Test
 
Reliability Programs
Reliability ProgramsReliability Programs
Reliability Programs
 

Kürzlich hochgeladen

Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Zilliz
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 

Kürzlich hochgeladen (20)

Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 

Value questionnaire

  • 1. «Organization» 15466 Los Gatos Blvd #109-371 Los Gatos, CA 95032 T (408) 710-8248 «Email» «URLs» Value Questionnaire Prepared for: Prepared by: «Fred» «Schenkelberg», «Consultant» June 1, 2010
  • 2. Value Questionnaire 1 FMS Reliability Value Objective Identify value before and after any reliability task. Think about the difference the work has and the decisions it enables. Reliability VALUE ADDED/ROI QUESTIONAIRE Savings/Impact/Benefit Response 1. Engineering effort saved: a. How long would it have taken your team to undertake the work ESTC pro- vided. Take into account research time and whether you had the skills availa- ble. b. If you did not have the skills availa- ble how many people would have need- ed to be recruited to undertake the work? c. How long would it take for these people to become productive? d. Estimate training cost associated with new personnel. 2.Opportunity Cost a. If engineers from the business had been used to do this work would they have not been able do other product re- lated work. I.e. delivered new func- tions? 3. Material costs: a. Did we avoid or save any direct prod- uct material or test equipment costs? b. If so please identify type and cost.
  • 3. Name of report 2 «Organization» 4. TTM im- pact: a. Did ESTC help you meet or beat your TTM goals? b. Did ESTC identify any problems which would have impacted your TTM? c. Has the use of ESTC tools/techniques identified issues which would of impacted TTM? d. If the above are applicable please identify type of problems and estimate TTM impact in days/weeks/months. e. If applicable what is the estimated cost of a delay in TTM? f. If applicable what is the opportunity in $ of additional income from an early TTM? 5. TT Volume impact: a. Did ESTC help you accelerate or meet you Time to Volume goals b. If applicable what is the estimated $ impact of avoiding the TTV issues that ESTC identified 6. Risk/cost/ warranty re- duction a. Has the ESTC work directly identi- fied or mitigated a field related problem. b. If so estimate the probable cost of the field problem in $ (i.e. units affected x repair cost) c. Has the ESTC work reduced the probability of field related problems? d. If so give a guide by how much and the estimated cost of avoidance (i.e. Es- timate 1000 units per month failure at $50 each reduced by 5%) e. Has ESTC work provided processes which will reduce the risk of field fail- ures?
  • 4. Value Questionnaire 3 FMS Reliability 7. TCE: a. Has the ESTC work contributed to the TCE of your product? b. If so identify how? i.e. estimated number of customer calls avoided 8. Indirect Impact: a. What advantages did ESTC provide over an external consultancy? (i.e. time, cost, contractual issues, Intellectual Property, response time) 9. Misc a. Please identify any other benefits or cost savings from using ESTC re- sources.