Introduction to
R & M Management

Fred Schenkelberg
FMS Reliability
Reliability Engineering and Management Consultant

Carl S. Carlson
ReliaSoft Corporation
Senior Reliability Consultant
Reliability Engineering & Management Consultant

Fred Schenkelberg

Carl S. Carlson

Reliability Engineering
& Management Consultant

Senior Reliability Consultant

FMS Reliability
(408) 710-8248
fms@fmsreliability.com

ReliaSoft Corporation
carl.carlson@reliasoft.com
carl.carlson@effectivefmeas.com

2014 RAMS – Tutorial 2A - Schenkelberg

2
Tutorial Objectives
To introduce an outline to
guide management of an
effective reliability
program.
To make you think about
how to integrate reliability
engineering within an
organization.
2014 RAMS – Tutorial 2A - Schenkelberg

3
First Challenge as Reliability Engineer
New heating cable design
How long will it last?

2014 RAMS – Tutorial 2A - Schenkelberg

4
What did I need to know?
Timeline
Budget
Samples

What else?

2014 RAMS – Tutorial 2A - Schenkelberg

5
How long1 or 5 year
Is this a should it last?

problem?
What is the goal?

How does your organization
state
reliability goals?
2014 RAMS – Tutorial 2A - Schenkelberg

6
First Assignment as Reliability Engineer

Put together a reliability plan for new vehicle program
Lesson learned: select the vital few tasks
2014 RAMS – Tutorial 2A - Schenkelberg

7
Outline of topics






Requirements Tasks
Risk Reduction Tasks
Assurance Tasks
Organizational Tasks
Primary Steps to Achieving High Reliability

2014 RAMS – Tutorial 2A - Schenkelberg

8
Requirements Tasks
Set Reliability Targets
Function
Environment

Duration
Probability

2014 RAMS – Tutorial 2A - Schenkelberg

9
2014 RAMS – Tutorial 2A - Schenkelberg

10
Balance with other objectives
Features or functions of

the product

Cost of the product
Time to market
Reliability
2014 RAMS – Tutorial 2A - Schenkelberg

11
Cable, sensor, power supply,
Cable part of a larger system
controller, and connectors

•

•

Materials, processes, assembly,
design, transportation, and
installation

2014 RAMS – Tutorial 2A - Schenkelberg

12
Story of 50% field failure rate

All elements met
reliability goal.
Field data agreed
2014 RAMS – Tutorial 2A - Schenkelberg

13
Apportion the goal

Sys
Sub 1

Sub 2

Sub 3

Sub 4

2014 RAMS – Tutorial 2A - Schenkelberg

Sub 5

14
Apportion the goal

Sys
Sub 1

Sub 2

Sub 3

Sub 4

Sub 5

With series system,
product of sub system reliability
is system reliability.
2014 RAMS – Tutorial 2A - Schenkelberg

15
Apportion complete goal
Function
Environment

Duration
Probability

2014 RAMS – Tutorial 2A - Schenkelberg

16
NoStory of “you need to improve reliability”
goal
No field data
No Pareto of issues

Just make it better,
2014 RAMS Tutorial
as warranty expenses too –high2A - Schenkelberg

17
Where should
they reside?

Communication
of Reliability
Goals

2014 RAMS – Tutorial 2A - Schenkelberg

18
Requirements Tasks
Identify Reliability Data Needs
 Reliability data supports measuring and assuring
reliability requirements are attained.
 Data can take the form of test failures, field
failures, degradation measurements, test or
analysis successes, and other forms.
 Focus on data integrity and correct measurements.

2014 RAMS – Tutorial 2A - Schenkelberg

19
Two basic questions

What will fail?
When will it fail?
Information to permit appropriate
product development decisions
2014 RAMS – Tutorial 2A - Schenkelberg

20
Testing to Pass

2014 RAMS – Tutorial 2A - Schenkelberg

21
Outline of topics






Requirements Tasks
Risk Reduction Tasks
Assurance Tasks
Organizational Tasks
Primary Steps to Achieving High Reliability

2014 RAMS – Tutorial 2A - Schenkelberg

22
Risk Reduction Tasks
Design-in reliability






This step involves selecting the “Design for
Reliability” tools that can be executed in the design
and manufacturing stages of product development
process
Such as Failure Mode & Effects Analysis, Derating,
Design Margin Analysis, Highly Accelerated Life
Testing, etc.
The focus of the DFR tools should be on high risk
areas, such as new technology and new applications
2014 RAMS – Tutorial 2A - Schenkelberg

23
• Understand stress
• Understand strength
• Separate stress from strength

2014 RAMS – Tutorial 2A - Schenkelberg

24
Henry Petroski
Design Paradigms

2014 RAMS – Tutorial 2A - Schenkelberg

25
Discovery

2014 RAMS – Tutorial 2A - Schenkelberg

26
Discovery Tools
Discovery Tools

2014 RAMS – Tutorial 2A - Schenkelberg

27
Prediction of early life failures
Not commonly possibly for unknown variation

Design in some margin
Derating
Safety factor
Determine margin
If variation is known, determine probability of
failures – still difficult to know when though.
2014 RAMS – Tutorial 2A - Schenkelberg

28
Risk Reduction Tasks
Achieve supplier reliability







Incorporate reliability specifications and tasks into
supplier bid packages
Select suppliers who are capable of achieving
reliability objectives
Identify critical supplier parts
Review and approve supplier tasks for critical parts
before shipment

2014 RAMS – Tutorial 2A - Schenkelberg

29
Extra tasks for critical suppliers
Due care tasks for all other suppliers

2014 RAMS – Tutorial 2A - Schenkelberg

30
Risk Reduction Tasks
Implement reliable manufacturing




Manufacturing Reliability is essential to ensuring the
manufacturing and assembly operations do not reduce
the inherent design reliability of products.
Steps must be taken to control manufacturing
processes so they are both stable and capable.

2014 RAMS – Tutorial 2A - Schenkelberg

31
Outline of topics






Requirements Tasks
Risk Reduction Tasks
Assurance Tasks
Organizational Tasks
Primary Steps to Achieving High Reliability

2014 RAMS – Tutorial 2A - Schenkelberg

32
Assurance Tasks
Verify Reliability Requirements Met






Develop and use reliability tests that use physical
testing methods, as well as analytical modeling
techniques.
Focus needs to be on proper analysis and
accelerated life testing.
Supplier reliability requirements for critical parts
must be verified before shipment.

2014 RAMS – Tutorial 2A - Schenkelberg

33
When will it fail?

Everything Fails at some point.
2014 RAMS – Tutorial 2A - Schenkelberg

34
Typical early life failures
Product does not meet
design specifications
Material or component
characterization
Process characterization
Assembly characterization

2014 RAMS – Tutorial 2A - Schenkelberg

35
Hit by a big hammer
Some stress is too large to accommodate
Lightening
Vehicle accident
Meteor strike
Hurricane

Possibly foreseen or expected, and not
economical to design the ability to withstand
2014 RAMS – Tutorial 2A - Schenkelberg

36
Prediction of overstress
Not commonly possibly

Design errors
Environment
Unexpected use

When significant adverse consequence may occur
explore mitigation or fail safe approaches
2014 RAMS – Tutorial 2A - Schenkelberg

37
Wear out and related
Everything fails –
eventually
Understand failure
mechanisms and
environment
The race to cause a failure

2014 RAMS – Tutorial 2A - Schenkelberg

38
Prediction of wear out
Guesses
Estimates
Predictions
Previous products
Models
Testing
2014 RAMS – Tutorial 2A - Schenkelberg

39
Life testing
Standards
Set levels
Environmental extremes
Single stress and model for acceleration factor
Determine the model and acceleration factor
Physics of failure modeling/testing
Pick one that fits risk, resources, and time
2014 RAMS – Tutorial 2A - Schenkelberg

40
Is it good enough?

2014 RAMS – Tutorial 2A - Schenkelberg

41
Is it good enough?

How do we know?

2014 RAMS – Tutorial 2A - Schenkelberg

42
Is it good enough?

How do we know?
We understand the
failure mechanisms
& business objectives
2014 RAMS – Tutorial 2A - Schenkelberg

43
Assurance Tasks
Continuously Improve Reliability






The value of physical testing should be enhanced
through use of appropriate Reliability Growth
Models and Life Data Analysis.
A Failure Review system (FRACAS) should be
instituted.
Reliability improvement methods throughout
product life cycle must be maintained.

2014 RAMS – Tutorial 2A - Schenkelberg

44
FRACAS
A method to keep it all together
Triage
Prioritization
Closure

Grey area of when to stop fixing and ship
2014 RAMS – Tutorial 2A - Schenkelberg

45
Assurance Tasks
Maintain High Reliability Throughout Life




Establishing and implementing proper service and
maintenance procedures will extend product life
and help ensure safe and trouble-free usage.
Understanding and addressing customer issues
during field usage is important.

2014 RAMS – Tutorial 2A - Schenkelberg

46
Maintenance Considerations

2014 RAMS – Tutorial 2A - Schenkelberg

47
Value

2014 RAMS – Tutorial 2A - Schenkelberg

48
Outline of topics






Requirements Tasks
Risk Reduction Tasks
Assurance Tasks
Organizational Tasks
Primary Steps to Achieving High Reliability

2014 RAMS – Tutorial 2A - Schenkelberg

49
Organizational Tasks
Establish organizational resources
 Organizational resources include personnel,
training, procedures, and business processes.
 Will help move the organization to higher stages
in the Maturity Matrix

2014 RAMS – Tutorial 2A - Schenkelberg

50
Organizational Tasks
Institutionalize Reliability Tasks
 It is the responsibility of engineering to achieve
reliability objectives.
 Reliability methods must be integrated into
ongoing engineering procedures and tasks,
including design reviews, supplier selection, work
instructions, design procedures, etc.

2014 RAMS – Tutorial 2A - Schenkelberg

51
Achieving reliability objectives
is an organization-wide
endeavor.

2014 RAMS – Tutorial 2A - Schenkelberg

52
Organizational Tasks
Advance up the Maturity Matrix


Maturity Matrix represents stages of “maturity” of
a company with respect to







Product Requirements
Engineering
Feedback Process
Management

There are 5 stages of maturity that represent
increasing levels of organizational and
engineering capability
2014 RAMS – Tutorial 2A - Schenkelberg

53
Primary Steps to Achieving High
Reliability
Step 1: Develop Reliability Strategic Vision
Step 2: Perform Reliability Gap Assessment
Step 3: Develop Reliability Program Plan
Step 4: Execute Reliability Program Plan
Step 5: Assess Program Lessons Learned

2014 RAMS – Tutorial 2A - Schenkelberg

54
Primary Steps to Achieving High Reliability
(High Level)
Step 1:
Develop
Reliability
Strategic
Vision

Step 2:
Perform
Reliability Gap
Assessment

Step 3:
Develop
Reliability
Program Plan

Requirements Tasks
Step A:
Set reliability
targets

Step B:
Identify
reliability data
needs

Assurance Tasks
Step F:
Verify
reliability
reqmts met

Step G:
Continuously

improve
reliability

Step 4:
Execute
Reliability
Program Plan

Step 5:
Assess Prgm
Lessons
Learned

Risk Reduction Tasks
Step C:
Design-in
Reliability

Step D:
Achieve
supplier
reliability

Step E:
Implement
reliable
manufacturing

Organizational Tasks

Step I:
Step H:
Establish
Maintain
organizational
high
resources
reliability
2014 RAMS –
thru-out life Tutorial 2A - Schenkelberg

Step J:
Institutionalize

reliability
tasks

Step K:
Advance Up
Maturity
Matrix
55
Step 1: Develop Reliability Strategic
Vision






In the words of American educator Steven Covey,
“begin with the end in mind.”
The Reliability Strategic Vision outlines the
overall vision for Reliability for the organization
or program.
It should be developed with full management
support, understood by all employees, and
integrated into work activities.
2014 RAMS – Tutorial 2A - Schenkelberg

56
Step 2: Perform Reliability Gap Assessment
A Reliability “Gap” Assessment is:
 A comprehensive analysis of the specific “gaps” between a
company’s vision for reliability and current reliability capability
 It begins with developing or understanding the company’s
reliability vision, and then analyzes the specific shortcomings to
achieving that vision.
 The “gaps” are those issues or shortcomings that if closed or
resolved would move the company in the direction of achieving
its reliability vision. It is input to the Reliability Program Plan.
 “Gaps” include both organizational capability and application of
reliability methods.
2014 RAMS – Tutorial 2A - Schenkelberg

57
Step 3: Develop Reliability Program Plan






A Reliability Program Plan (RPP) is a document that
defines the entire set of tasks that need to be
accomplished on a project or program, including
responsibility for execution, timing and resources, in
order to achieve the program reliability objectives.
The objective is to design and manufacture a highly
reliable product, on time, and in a cost effective manner.
Includes Steps A thru K

2014 RAMS – Tutorial 2A - Schenkelberg

58
Step 4: Execute Reliability Program Plan








Reliability Program Plan execution requires
management buy-in and support
Reliability plan tasks should be integrated into
company project planning and execution mechanisms
Provide a Work Break-Down Structure and schedule
for the RPP (who, what, when, where, etc.)
Empower reliability to raise the red flag when needed

2014 RAMS – Tutorial 2A - Schenkelberg

59
Step 5: Assess Program Lessons Learned






No reliability program is flawless
Maintain record of issues with development and
execution of reliability plan
Move the organization up the maturity matrix

2014 RAMS – Tutorial 2A - Schenkelberg

60
Conclusions
 Developing and executing an effective Reliability
Program Plan is essential to achieving high reliability
for products and processes
 By following the information in this
tutorial, companies can develop effective Reliability
Program Plans that achieve reliability
objectives, while staying within budget and timing
constraints.

2014 RAMS – Tutorial 2A - Schenkelberg

61

Weitere ähnliche Inhalte

Was ist angesagt?

Design for Reliability (DfR) Seminar
Design for Reliability (DfR) SeminarDesign for Reliability (DfR) Seminar
Design for Reliability (DfR) SeminarAccendo Reliability
 
Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationAndy_Watson_Sim
 
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Amirul Faiz Amil Azman
 
7 principles of quality management
7 principles of quality management7 principles of quality management
7 principles of quality managementNikhil Kadam
 
Reliability Engineering and Terotechnology
Reliability Engineering and TerotechnologyReliability Engineering and Terotechnology
Reliability Engineering and TerotechnologyChristian Enoval
 
Storage tank inspection presentation
Storage tank inspection presentationStorage tank inspection presentation
Storage tank inspection presentationIan Moore
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e bookjericfreimuth
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.pptbowerj
 

Was ist angesagt? (20)

Design for Reliability (DfR) Seminar
Design for Reliability (DfR) SeminarDesign for Reliability (DfR) Seminar
Design for Reliability (DfR) Seminar
 
RCM
RCMRCM
RCM
 
Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance Presentation
 
Reliability engineering ppt-Internship
Reliability engineering ppt-InternshipReliability engineering ppt-Internship
Reliability engineering ppt-Internship
 
Equipment Criticality Analysis
Equipment Criticality AnalysisEquipment Criticality Analysis
Equipment Criticality Analysis
 
Basic engineering_Checklist
Basic engineering_ChecklistBasic engineering_Checklist
Basic engineering_Checklist
 
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
 
7 principles of quality management
7 principles of quality management7 principles of quality management
7 principles of quality management
 
Fmea
FmeaFmea
Fmea
 
Design For Reliability
Design For ReliabilityDesign For Reliability
Design For Reliability
 
Sheath bonding method for underground cables
Sheath bonding method for underground cablesSheath bonding method for underground cables
Sheath bonding method for underground cables
 
Reliability Engineering and Terotechnology
Reliability Engineering and TerotechnologyReliability Engineering and Terotechnology
Reliability Engineering and Terotechnology
 
Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)
 
Reliability Engineering
Reliability EngineeringReliability Engineering
Reliability Engineering
 
Intro to burn in & ess quantification
Intro to burn in & ess quantificationIntro to burn in & ess quantification
Intro to burn in & ess quantification
 
Storage tank inspection presentation
Storage tank inspection presentationStorage tank inspection presentation
Storage tank inspection presentation
 
Reliability
ReliabilityReliability
Reliability
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
 

Ähnlich wie Introduction to Reliability and Maintenance Management

RAMS 2013 Tutorial Introduction to R & M Management
RAMS 2013 Tutorial Introduction to R & M ManagementRAMS 2013 Tutorial Introduction to R & M Management
RAMS 2013 Tutorial Introduction to R & M ManagementAccendo Reliability
 
RAMS 2013 Tutorial Effective Reliability Traits and Management
RAMS 2013 Tutorial Effective Reliability Traits and ManagementRAMS 2013 Tutorial Effective Reliability Traits and Management
RAMS 2013 Tutorial Effective Reliability Traits and ManagementAccendo Reliability
 
Root Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) WorkshopRoot Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) WorkshopAccendo Reliability
 
Webinar | Asset Management Health Check
Webinar | Asset Management Health CheckWebinar | Asset Management Health Check
Webinar | Asset Management Health CheckStork
 
Getting Started with Risk-Based Testing
Getting Started with Risk-Based TestingGetting Started with Risk-Based Testing
Getting Started with Risk-Based TestingTechWell
 
Lee's Resume
Lee's ResumeLee's Resume
Lee's ResumeLee Sena
 
Unit 1 : Reliability Basics
Unit 1 :  Reliability BasicsUnit 1 :  Reliability Basics
Unit 1 : Reliability Basicssameer agrawal
 
Getting Started with Risk-based Testing
Getting Started with Risk-based TestingGetting Started with Risk-based Testing
Getting Started with Risk-based TestingTechWell
 
Measuring Quality: Testing Metrics and Trends in Practice
Measuring Quality: Testing Metrics and Trends in PracticeMeasuring Quality: Testing Metrics and Trends in Practice
Measuring Quality: Testing Metrics and Trends in PracticeTechWell
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Omnex Inc.
 
Mes presentation subsea reliability
Mes presentation  subsea reliability  Mes presentation  subsea reliability
Mes presentation subsea reliability Changiz Rezvani
 
Mes presentation subsea reliability
Mes presentation subsea reliability  Mes presentation subsea reliability
Mes presentation subsea reliability Changiz Rezvani
 
Mes presentation subsea reliability changiz
Mes presentation  subsea reliability changizMes presentation  subsea reliability changiz
Mes presentation subsea reliability changizChangiz Rezvani
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality managementsmumbahelp
 
Introduction to Reliability and Maintenance Management - Paper
Introduction to Reliability and Maintenance Management - PaperIntroduction to Reliability and Maintenance Management - Paper
Introduction to Reliability and Maintenance Management - PaperAccendo Reliability
 
Accelerating Your Mastery of APM Through Skills Self-Analysis - AppSphere16
Accelerating Your Mastery of APM Through Skills Self-Analysis - AppSphere16Accelerating Your Mastery of APM Through Skills Self-Analysis - AppSphere16
Accelerating Your Mastery of APM Through Skills Self-Analysis - AppSphere16AppDynamics
 
Webinar: Traceability Over the Entire Lifecycle in codeBeamer
Webinar: Traceability Over the Entire Lifecycle in codeBeamerWebinar: Traceability Over the Entire Lifecycle in codeBeamer
Webinar: Traceability Over the Entire Lifecycle in codeBeamerIntland Software GmbH
 

Ähnlich wie Introduction to Reliability and Maintenance Management (20)

RAMS 2013 Tutorial Introduction to R & M Management
RAMS 2013 Tutorial Introduction to R & M ManagementRAMS 2013 Tutorial Introduction to R & M Management
RAMS 2013 Tutorial Introduction to R & M Management
 
RAMS 2013 Tutorial Effective Reliability Traits and Management
RAMS 2013 Tutorial Effective Reliability Traits and ManagementRAMS 2013 Tutorial Effective Reliability Traits and Management
RAMS 2013 Tutorial Effective Reliability Traits and Management
 
Root Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) WorkshopRoot Cause and Corrective Action (RCCA) Workshop
Root Cause and Corrective Action (RCCA) Workshop
 
Webinar | Asset Management Health Check
Webinar | Asset Management Health CheckWebinar | Asset Management Health Check
Webinar | Asset Management Health Check
 
141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
 
Getting Started with Risk-Based Testing
Getting Started with Risk-Based TestingGetting Started with Risk-Based Testing
Getting Started with Risk-Based Testing
 
Lee's Resume
Lee's ResumeLee's Resume
Lee's Resume
 
Unit 1 : Reliability Basics
Unit 1 :  Reliability BasicsUnit 1 :  Reliability Basics
Unit 1 : Reliability Basics
 
Getting Started with Risk-based Testing
Getting Started with Risk-based TestingGetting Started with Risk-based Testing
Getting Started with Risk-based Testing
 
Measuring Quality: Testing Metrics and Trends in Practice
Measuring Quality: Testing Metrics and Trends in PracticeMeasuring Quality: Testing Metrics and Trends in Practice
Measuring Quality: Testing Metrics and Trends in Practice
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503
 
Mes presentation subsea reliability
Mes presentation  subsea reliability  Mes presentation  subsea reliability
Mes presentation subsea reliability
 
Mes presentation subsea reliability
Mes presentation subsea reliability  Mes presentation subsea reliability
Mes presentation subsea reliability
 
Mes presentation subsea reliability changiz
Mes presentation  subsea reliability changizMes presentation  subsea reliability changiz
Mes presentation subsea reliability changiz
 
Pm0017 project quality management
Pm0017  project quality managementPm0017  project quality management
Pm0017 project quality management
 
Introduction to Reliability and Maintenance Management - Paper
Introduction to Reliability and Maintenance Management - PaperIntroduction to Reliability and Maintenance Management - Paper
Introduction to Reliability and Maintenance Management - Paper
 
Accelerating Your Mastery of APM Through Skills Self-Analysis - AppSphere16
Accelerating Your Mastery of APM Through Skills Self-Analysis - AppSphere16Accelerating Your Mastery of APM Through Skills Self-Analysis - AppSphere16
Accelerating Your Mastery of APM Through Skills Self-Analysis - AppSphere16
 
Dulan_Resume_QE
Dulan_Resume_QEDulan_Resume_QE
Dulan_Resume_QE
 
Webinar: Traceability Over the Entire Lifecycle in codeBeamer
Webinar: Traceability Over the Entire Lifecycle in codeBeamerWebinar: Traceability Over the Entire Lifecycle in codeBeamer
Webinar: Traceability Over the Entire Lifecycle in codeBeamer
 

Mehr von Accendo Reliability

Should RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfShould RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfAccendo Reliability
 
T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdfAccendo Reliability
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdfAccendo Reliability
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdfAccendo Reliability
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdfAccendo Reliability
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdfAccendo Reliability
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdfAccendo Reliability
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdfAccendo Reliability
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdfAccendo Reliability
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdfAccendo Reliability
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdfAccendo Reliability
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyerAccendo Reliability
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life TestAccendo Reliability
 

Mehr von Accendo Reliability (20)

Should RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfShould RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdf
 
T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdf
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdf
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf
 
13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf
 
11-RCM is like a diet.pdf
11-RCM is like a diet.pdf11-RCM is like a diet.pdf
11-RCM is like a diet.pdf
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdf
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf
 
03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf
 
02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf
 
01-5 CBM Facts.pdf
01-5 CBM Facts.pdf01-5 CBM Facts.pdf
01-5 CBM Facts.pdf
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyer
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life Test
 
Reliability Programs
Reliability ProgramsReliability Programs
Reliability Programs
 

Kürzlich hochgeladen

Infrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsInfrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsYoss Cohen
 
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...BookNet Canada
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integrationmarketing932765
 
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Mark Simos
 
Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Karmanjay Verma
 
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical InfrastructureVarsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructureitnewsafrica
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Digital Tools & AI in Career Development
Digital Tools & AI in Career DevelopmentDigital Tools & AI in Career Development
Digital Tools & AI in Career DevelopmentMahmoud Rabie
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxfnnc6jmgwh
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfAarwolf Industries LLC
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkPixlogix Infotech
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
A Glance At The Java Performance Toolbox
A Glance At The Java Performance ToolboxA Glance At The Java Performance Toolbox
A Glance At The Java Performance ToolboxAna-Maria Mihalceanu
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialJoão Esperancinha
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024TopCSSGallery
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 

Kürzlich hochgeladen (20)

Infrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsInfrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platforms
 
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
Transcript: New from BookNet Canada for 2024: BNC SalesData and LibraryData -...
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
 
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
 
Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#
 
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical InfrastructureVarsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Digital Tools & AI in Career Development
Digital Tools & AI in Career DevelopmentDigital Tools & AI in Career Development
Digital Tools & AI in Career Development
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdf
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App Framework
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
A Glance At The Java Performance Toolbox
A Glance At The Java Performance ToolboxA Glance At The Java Performance Toolbox
A Glance At The Java Performance Toolbox
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorial
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 

Introduction to Reliability and Maintenance Management

  • 1. Introduction to R & M Management Fred Schenkelberg FMS Reliability Reliability Engineering and Management Consultant Carl S. Carlson ReliaSoft Corporation Senior Reliability Consultant
  • 2. Reliability Engineering & Management Consultant Fred Schenkelberg Carl S. Carlson Reliability Engineering & Management Consultant Senior Reliability Consultant FMS Reliability (408) 710-8248 fms@fmsreliability.com ReliaSoft Corporation carl.carlson@reliasoft.com carl.carlson@effectivefmeas.com 2014 RAMS – Tutorial 2A - Schenkelberg 2
  • 3. Tutorial Objectives To introduce an outline to guide management of an effective reliability program. To make you think about how to integrate reliability engineering within an organization. 2014 RAMS – Tutorial 2A - Schenkelberg 3
  • 4. First Challenge as Reliability Engineer New heating cable design How long will it last? 2014 RAMS – Tutorial 2A - Schenkelberg 4
  • 5. What did I need to know? Timeline Budget Samples What else? 2014 RAMS – Tutorial 2A - Schenkelberg 5
  • 6. How long1 or 5 year Is this a should it last? problem? What is the goal? How does your organization state reliability goals? 2014 RAMS – Tutorial 2A - Schenkelberg 6
  • 7. First Assignment as Reliability Engineer Put together a reliability plan for new vehicle program Lesson learned: select the vital few tasks 2014 RAMS – Tutorial 2A - Schenkelberg 7
  • 8. Outline of topics      Requirements Tasks Risk Reduction Tasks Assurance Tasks Organizational Tasks Primary Steps to Achieving High Reliability 2014 RAMS – Tutorial 2A - Schenkelberg 8
  • 9. Requirements Tasks Set Reliability Targets Function Environment Duration Probability 2014 RAMS – Tutorial 2A - Schenkelberg 9
  • 10. 2014 RAMS – Tutorial 2A - Schenkelberg 10
  • 11. Balance with other objectives Features or functions of the product Cost of the product Time to market Reliability 2014 RAMS – Tutorial 2A - Schenkelberg 11
  • 12. Cable, sensor, power supply, Cable part of a larger system controller, and connectors • • Materials, processes, assembly, design, transportation, and installation 2014 RAMS – Tutorial 2A - Schenkelberg 12
  • 13. Story of 50% field failure rate All elements met reliability goal. Field data agreed 2014 RAMS – Tutorial 2A - Schenkelberg 13
  • 14. Apportion the goal Sys Sub 1 Sub 2 Sub 3 Sub 4 2014 RAMS – Tutorial 2A - Schenkelberg Sub 5 14
  • 15. Apportion the goal Sys Sub 1 Sub 2 Sub 3 Sub 4 Sub 5 With series system, product of sub system reliability is system reliability. 2014 RAMS – Tutorial 2A - Schenkelberg 15
  • 17. NoStory of “you need to improve reliability” goal No field data No Pareto of issues Just make it better, 2014 RAMS Tutorial as warranty expenses too –high2A - Schenkelberg 17
  • 18. Where should they reside? Communication of Reliability Goals 2014 RAMS – Tutorial 2A - Schenkelberg 18
  • 19. Requirements Tasks Identify Reliability Data Needs  Reliability data supports measuring and assuring reliability requirements are attained.  Data can take the form of test failures, field failures, degradation measurements, test or analysis successes, and other forms.  Focus on data integrity and correct measurements. 2014 RAMS – Tutorial 2A - Schenkelberg 19
  • 20. Two basic questions What will fail? When will it fail? Information to permit appropriate product development decisions 2014 RAMS – Tutorial 2A - Schenkelberg 20
  • 21. Testing to Pass 2014 RAMS – Tutorial 2A - Schenkelberg 21
  • 22. Outline of topics      Requirements Tasks Risk Reduction Tasks Assurance Tasks Organizational Tasks Primary Steps to Achieving High Reliability 2014 RAMS – Tutorial 2A - Schenkelberg 22
  • 23. Risk Reduction Tasks Design-in reliability    This step involves selecting the “Design for Reliability” tools that can be executed in the design and manufacturing stages of product development process Such as Failure Mode & Effects Analysis, Derating, Design Margin Analysis, Highly Accelerated Life Testing, etc. The focus of the DFR tools should be on high risk areas, such as new technology and new applications 2014 RAMS – Tutorial 2A - Schenkelberg 23
  • 24. • Understand stress • Understand strength • Separate stress from strength 2014 RAMS – Tutorial 2A - Schenkelberg 24
  • 25. Henry Petroski Design Paradigms 2014 RAMS – Tutorial 2A - Schenkelberg 25
  • 26. Discovery 2014 RAMS – Tutorial 2A - Schenkelberg 26
  • 27. Discovery Tools Discovery Tools 2014 RAMS – Tutorial 2A - Schenkelberg 27
  • 28. Prediction of early life failures Not commonly possibly for unknown variation Design in some margin Derating Safety factor Determine margin If variation is known, determine probability of failures – still difficult to know when though. 2014 RAMS – Tutorial 2A - Schenkelberg 28
  • 29. Risk Reduction Tasks Achieve supplier reliability     Incorporate reliability specifications and tasks into supplier bid packages Select suppliers who are capable of achieving reliability objectives Identify critical supplier parts Review and approve supplier tasks for critical parts before shipment 2014 RAMS – Tutorial 2A - Schenkelberg 29
  • 30. Extra tasks for critical suppliers Due care tasks for all other suppliers 2014 RAMS – Tutorial 2A - Schenkelberg 30
  • 31. Risk Reduction Tasks Implement reliable manufacturing   Manufacturing Reliability is essential to ensuring the manufacturing and assembly operations do not reduce the inherent design reliability of products. Steps must be taken to control manufacturing processes so they are both stable and capable. 2014 RAMS – Tutorial 2A - Schenkelberg 31
  • 32. Outline of topics      Requirements Tasks Risk Reduction Tasks Assurance Tasks Organizational Tasks Primary Steps to Achieving High Reliability 2014 RAMS – Tutorial 2A - Schenkelberg 32
  • 33. Assurance Tasks Verify Reliability Requirements Met    Develop and use reliability tests that use physical testing methods, as well as analytical modeling techniques. Focus needs to be on proper analysis and accelerated life testing. Supplier reliability requirements for critical parts must be verified before shipment. 2014 RAMS – Tutorial 2A - Schenkelberg 33
  • 34. When will it fail? Everything Fails at some point. 2014 RAMS – Tutorial 2A - Schenkelberg 34
  • 35. Typical early life failures Product does not meet design specifications Material or component characterization Process characterization Assembly characterization 2014 RAMS – Tutorial 2A - Schenkelberg 35
  • 36. Hit by a big hammer Some stress is too large to accommodate Lightening Vehicle accident Meteor strike Hurricane Possibly foreseen or expected, and not economical to design the ability to withstand 2014 RAMS – Tutorial 2A - Schenkelberg 36
  • 37. Prediction of overstress Not commonly possibly Design errors Environment Unexpected use When significant adverse consequence may occur explore mitigation or fail safe approaches 2014 RAMS – Tutorial 2A - Schenkelberg 37
  • 38. Wear out and related Everything fails – eventually Understand failure mechanisms and environment The race to cause a failure 2014 RAMS – Tutorial 2A - Schenkelberg 38
  • 39. Prediction of wear out Guesses Estimates Predictions Previous products Models Testing 2014 RAMS – Tutorial 2A - Schenkelberg 39
  • 40. Life testing Standards Set levels Environmental extremes Single stress and model for acceleration factor Determine the model and acceleration factor Physics of failure modeling/testing Pick one that fits risk, resources, and time 2014 RAMS – Tutorial 2A - Schenkelberg 40
  • 41. Is it good enough? 2014 RAMS – Tutorial 2A - Schenkelberg 41
  • 42. Is it good enough? How do we know? 2014 RAMS – Tutorial 2A - Schenkelberg 42
  • 43. Is it good enough? How do we know? We understand the failure mechanisms & business objectives 2014 RAMS – Tutorial 2A - Schenkelberg 43
  • 44. Assurance Tasks Continuously Improve Reliability    The value of physical testing should be enhanced through use of appropriate Reliability Growth Models and Life Data Analysis. A Failure Review system (FRACAS) should be instituted. Reliability improvement methods throughout product life cycle must be maintained. 2014 RAMS – Tutorial 2A - Schenkelberg 44
  • 45. FRACAS A method to keep it all together Triage Prioritization Closure Grey area of when to stop fixing and ship 2014 RAMS – Tutorial 2A - Schenkelberg 45
  • 46. Assurance Tasks Maintain High Reliability Throughout Life   Establishing and implementing proper service and maintenance procedures will extend product life and help ensure safe and trouble-free usage. Understanding and addressing customer issues during field usage is important. 2014 RAMS – Tutorial 2A - Schenkelberg 46
  • 47. Maintenance Considerations 2014 RAMS – Tutorial 2A - Schenkelberg 47
  • 48. Value 2014 RAMS – Tutorial 2A - Schenkelberg 48
  • 49. Outline of topics      Requirements Tasks Risk Reduction Tasks Assurance Tasks Organizational Tasks Primary Steps to Achieving High Reliability 2014 RAMS – Tutorial 2A - Schenkelberg 49
  • 50. Organizational Tasks Establish organizational resources  Organizational resources include personnel, training, procedures, and business processes.  Will help move the organization to higher stages in the Maturity Matrix 2014 RAMS – Tutorial 2A - Schenkelberg 50
  • 51. Organizational Tasks Institutionalize Reliability Tasks  It is the responsibility of engineering to achieve reliability objectives.  Reliability methods must be integrated into ongoing engineering procedures and tasks, including design reviews, supplier selection, work instructions, design procedures, etc. 2014 RAMS – Tutorial 2A - Schenkelberg 51
  • 52. Achieving reliability objectives is an organization-wide endeavor. 2014 RAMS – Tutorial 2A - Schenkelberg 52
  • 53. Organizational Tasks Advance up the Maturity Matrix  Maturity Matrix represents stages of “maturity” of a company with respect to      Product Requirements Engineering Feedback Process Management There are 5 stages of maturity that represent increasing levels of organizational and engineering capability 2014 RAMS – Tutorial 2A - Schenkelberg 53
  • 54. Primary Steps to Achieving High Reliability Step 1: Develop Reliability Strategic Vision Step 2: Perform Reliability Gap Assessment Step 3: Develop Reliability Program Plan Step 4: Execute Reliability Program Plan Step 5: Assess Program Lessons Learned 2014 RAMS – Tutorial 2A - Schenkelberg 54
  • 55. Primary Steps to Achieving High Reliability (High Level) Step 1: Develop Reliability Strategic Vision Step 2: Perform Reliability Gap Assessment Step 3: Develop Reliability Program Plan Requirements Tasks Step A: Set reliability targets Step B: Identify reliability data needs Assurance Tasks Step F: Verify reliability reqmts met Step G: Continuously improve reliability Step 4: Execute Reliability Program Plan Step 5: Assess Prgm Lessons Learned Risk Reduction Tasks Step C: Design-in Reliability Step D: Achieve supplier reliability Step E: Implement reliable manufacturing Organizational Tasks Step I: Step H: Establish Maintain organizational high resources reliability 2014 RAMS – thru-out life Tutorial 2A - Schenkelberg Step J: Institutionalize reliability tasks Step K: Advance Up Maturity Matrix 55
  • 56. Step 1: Develop Reliability Strategic Vision    In the words of American educator Steven Covey, “begin with the end in mind.” The Reliability Strategic Vision outlines the overall vision for Reliability for the organization or program. It should be developed with full management support, understood by all employees, and integrated into work activities. 2014 RAMS – Tutorial 2A - Schenkelberg 56
  • 57. Step 2: Perform Reliability Gap Assessment A Reliability “Gap” Assessment is:  A comprehensive analysis of the specific “gaps” between a company’s vision for reliability and current reliability capability  It begins with developing or understanding the company’s reliability vision, and then analyzes the specific shortcomings to achieving that vision.  The “gaps” are those issues or shortcomings that if closed or resolved would move the company in the direction of achieving its reliability vision. It is input to the Reliability Program Plan.  “Gaps” include both organizational capability and application of reliability methods. 2014 RAMS – Tutorial 2A - Schenkelberg 57
  • 58. Step 3: Develop Reliability Program Plan    A Reliability Program Plan (RPP) is a document that defines the entire set of tasks that need to be accomplished on a project or program, including responsibility for execution, timing and resources, in order to achieve the program reliability objectives. The objective is to design and manufacture a highly reliable product, on time, and in a cost effective manner. Includes Steps A thru K 2014 RAMS – Tutorial 2A - Schenkelberg 58
  • 59. Step 4: Execute Reliability Program Plan     Reliability Program Plan execution requires management buy-in and support Reliability plan tasks should be integrated into company project planning and execution mechanisms Provide a Work Break-Down Structure and schedule for the RPP (who, what, when, where, etc.) Empower reliability to raise the red flag when needed 2014 RAMS – Tutorial 2A - Schenkelberg 59
  • 60. Step 5: Assess Program Lessons Learned    No reliability program is flawless Maintain record of issues with development and execution of reliability plan Move the organization up the maturity matrix 2014 RAMS – Tutorial 2A - Schenkelberg 60
  • 61. Conclusions  Developing and executing an effective Reliability Program Plan is essential to achieving high reliability for products and processes  By following the information in this tutorial, companies can develop effective Reliability Program Plans that achieve reliability objectives, while staying within budget and timing constraints. 2014 RAMS – Tutorial 2A - Schenkelberg 61

Hinweis der Redaktion

  1. Describe problem, scope and timeline. What I knew and didn’t know. Just part of a larger development project.
  2. When decision needs to be madeHow important is the decisionTesting resources (chambers, measurement systems)Model and failure mechanismsWhat models and testing would be acceptable (believed)?
  3. 20 year product with very few or none dropping in power output by 20% or more. Buried in concrete tied to rebar in mountain road bridges, activated during and for 4 hours after snowfall.
  4. Carl’s story about his first assignment as reliability engineer for the Caprice program. He had to develop a Reliability Plan and present to management. The plan was an exceedingly LONG list of reliability tasks.
  5. First three are nearly possible to measure every day – R is not and at best only estimated. How to balance and make the appropriate decisions.Slightly different for maintained units – function, cost to maintain, time to repair, and availability
  6. The cable is part of a larger system
  7. Story of 50% field failure rate
  8. Include key suppliers or vendors by providing them full reliability goals appropriate to their element of the product
  9. Include key suppliers or vendors by providing them full reliability goals appropriate to their element of the product
  10. Carl’s story about when GM used to communicate reliability goals by memo, and never made them actual requirements.
  11. Carl’s story when he was manager of Fisher Body door system test lab, and all doors passed “tests”, in spite of highly unreliable doors in the field.
  12. Carl’s story about chief engineer of the Brooklyn Bridge using design margins for the bridge cable. This story fits best after Fred’s bridge story after slide 26.
  13. Maricopa & Phoenix Railroad Bridge Collapse – 1902 in Tempe AZ – flood water weaken – collapsed in following dry season
  14. Petroski – designers design away from failureIf it is unknown what will fail, how can the design avoid it?Current standing bridge built in 1912
  15. Literature, previous field returns, root cause analysis of any failure, engineering judgment, modeling and simulations, experimentationImage is a colored wood engraving, called Universum and is from The Flammarion engraving is a wood engraving by an unknown artist, so named because its first documented appearance is in Camille Flammarion's 1888 book L'atmosphère: météorologie populaire ("The Atmosphere: Popular Meteorology")
  16. Old diesel train buffer’s between cars
  17. Carl’s story about Cadillac CTS program, the first to use full scale reliability requirements and verification with suppliers of critical parts.
  18. Supply Chain and Manufacturing VariationOverstress conditionsWear out and related
  19. Rolling stones t shirt – new employee and separating circuit boards by hand
  20. Story of one organization with 31 failure mechanisms and model used for decision making
  21. Cable reliability testing and models
  22. Story of study by intern on what was found and what caused field failures
  23. Story of using reliability to achieve availability
  24. Carl’s story about a missile program where the reliability engineer was assigned the task to achieve project reliability goals, without any support from the rest of engineering.