2004 –2005
On the Cover:
The Forum Shops at Caesars
The spectacular three-level (plus basement), 304,000-square-foot expansion of The Forum Shops at Caesars opened one month ahead of
schedule and on budget. Owned by Simon Property Group of Indianapolis, IN, the high-end, extensively themed Forum Shops is considered
one of the most successful malls in the country based on its sales per square-foot, which is three times the industry average. As general
                                                                                                                                                                          In 2004, Perini celebrated its 110th
contractor, we worked closely with KGA Architecture and Dougall Design Associates.
                                                                                                                                                                          Anniversary and was named one of the
                                                                                                                                                                          “Best Managed Companies in America”
Forty subcontractors, 450 craftspeople and 60 suppliers and vendors contributed to the construction effort. Throughout construction, work
                                                                                                                                                                          by Forbes magazine. Perini ranked No. 1 in
was phased to accommodate shoppers 24 hours a day, seven days a week.
                                                                                                                                                  the construction sector. Public recognition and awards are always
                                                                                                                                                  appreciated, but we consider the best measure of our success to
The Forum Shops at Caesars features a Mitsubishi spiral escalator, the first of its kind in Las Vegas. Perini, KGA and the project team collab-
                                                                                                                                                  be satisfied clients.
orated on designing structural supports that allowed the spiral escalators to be free-standing. A large atrium, capped by a 44-foot diameter,
104-foot-high domed skylight, posed life safety and air handling challenges that were resolved through team effort.
                                                                                                                                                  In the building market, our preconstruction services resolve issues




“
                                                                                                                                                  and concerns far ahead of groundbreaking. Once construction
Perini’s project personnel are experienced with large, complicated projects and that’s very important when you’re                                 is underway, projects are driven by schedule and our consistent




                                                ”
working on sophisticated projects at full speed.                                                                                                  performance often leads to early completions, allowing revenue
                                                                                                                                                  streams to flow sooner than expected. Our leading position in
Bradley D. Schulz, Principal, KGA Architecture                                                                                                    the hospitality and gaming market over the past 25 years yields
                                                                                                                                                  untold benefits to private owners and Native American tribes
                                                                                                                                                  planning new resorts and facilities.

                                                                                                                                                  Our management services group is known as a “go to” organiza-
                                                                                                                                                  tion for logistically challenging government work including multi-
                                                                                                                                                  trade, fast track design-build projects abroad and rapid response
                                                                                                                                                  contract completion assignments in the U.S. The leading supplier
                                                                                                                                                  of nuclear power in the nation, Exelon, entrusts us to manage the
                                                                                                                                                  time-critical repair and maintenance of their fleet of generating
                                                                                                                                                                                                                         In This Issue
                                                                                                                                                  plants. Our enthusiasm for the work is matched only by the
                                                                                                                                                  quality of our work product.                                           Perini Building Company, Inc.
                                                                                                                                                                                                                         Hospitality+Gaming                                           2
                                                                                                                                                                                                                         Native American Gaming                                       6
                                                                                                                                                  In 1894, Perini began as a small civil works contractor. Since         Retail+Mixed Use Development                                 8
                                                                                                                                                  that time, our civil construction operation has built its reputation   Residential+Senior Living                                   10
                                                                                                                                                                                                                         Commercial+High Technology                                  11
                                                                                                                                                  on hard work, innovation and problem solving. Today, our civil
                                                                                                                                                                                                                         James A. Cummings, Inc.
                                                                                                                                                  operations are focused on the Metropolitan New York area includ-
                                                                                                                                                                                                                         General Building                                            12
                                                                                                                                                  ing Northern New Jersey, and with the acquisition of Cherry Hill
                                                                                                                                                                                                                         Perini Management Services, Inc.
                                                                                                                                                  Construction, our market has expanded to the Mid-Atlantic states
                                                                                                                                                                                                                         International+Specialized Domestic Projects                 14
                                                                                                                                                  and the Southeast.
                                                                                                                                                                                                                         Perini Civil Construction
                                                                                                                                                                                                                         Infrastructure Repair+Replacement                           18
                                                                                                                                                  In this issue of Second Century, we present Perini’s most recent
                                                                                                                                                                                                                         Diversity in Construction:
                                                                                                                                                  portfolio of work, especially projects completed or well underway      MGM MIRAGE                                                  20
                                                                                                                                                  in 2004. Our “Backlog Briefs” section is noteworthy for the sheer
                                                                                                                                                                                                                         Backlog Briefs                                Inside Back Cover
                                                                                                                                                  size and diversity of upcoming construction programs illustrated
                                                                                                                                                                                                                         Directory                                           Back Cover
                                                                                                                                                  there, projects that will assuredly benefit from our involvement.

                                                                                                                                                                                                                                                                                           1
Perini Building Company
Hospitality+Gaming
                                               Perini Building Company is best known for aggressive, fast track construction of hospitality
                                               and gaming projects throughout the United States. Our success in this and other specialized
                                               niche markets results from our comprehensive preconstruction services, a collaborative
                                               culture, and performance that exceeds expectations. Year to year, our backlog of work
                                               includes many repeat clients and Native American tribes, giving credence to our philosophy,
                                               “Building Relationships on Trust.”

                                               We maintain full-service offices in Phoenix, Las Vegas and Boston with support offices
                                               in major markets including Atlantic City, San Diego, Detroit and Orlando.

                                               In addition to hotels and casinos, we are highly regarded for our performance on sports
                                               and entertainment venues, health care facilities, college and university campus structures,
                                               and commercial residential developments. More recently, the Company has established
                                               a strong reputation converting existing properties to new uses such as office space to
                                               biotechnology labs and racetracks to video gaming facilities.




Building Relationships on Trust: Executing a Master Plan
In the highly specialized hospitality and gaming market, comprehensive preconstruction services, collaborative relationships with project
owners and design teams, and effective field operations are essential to building successful projects and enduring relationships.



              Caesars Palace
              Las Vegas, NV

              Major Projects Underway
              or Completed (2000–Present)
                                                                             7
              1. Augustus Tower
                 (under construction)
              2. Caesars Plaza and
                                                                                               9
                 Valet Parking
              3. New Registration & Spa
                 (under construction)                                                                        5
                                                                                           8
              4. The Forum Shops at Caesars                                                                                        4
                                                                                                        6
                                                                   1
              5. Caesars Palace Showroom
                 Colosseum
                                                                                                                                              Caesars Palace Augustus Tower
                                                                                       3
              6. North Casino
                                                                                                                                              Las Vegas, Nevada
              7. Palace Tower
                                                                                                                                              Caesars Palace’s new 26-story, 949-room luxury Augustus Tower will bring the total number of rooms at Caesars Palace to 3,349 when completed
              8. Centurion Tower Penthouse
                                                                                                    2
                 Renovations                                                                                                                  in August 2005. Designed by Bergman Walls & Associates, Ltd. with interiors by Wilson & Associates, Barbara Gisel Design Ltd. and Allard &
              9. Exterior Refacing:
                                                                                                                                              Conversano Design, the 345-foot-tall tower is part of a master plan aimed at refurbishing the mega-resort that has included the recent addition of
                 Centurion, Roman,
                                                                                                                                              several Perini-built facilities including the 4,148-seat Caesars Palace Showroom Colosseum, the expansion of The Forum Shops at Caesars, the
                 Forum Towers
                                                                                                                                              open-air Roman Plaza, new registration area and spa.
              Not Shown: Pool Villas


2                                                                                                                                                                                                                                                                                                  3
Perini Building Company                                                                                                                                Resorts Hotel/Casino Expansion
                                                                                                                                                       Atlantic City, New Jersey
Hospitality+Gaming
                                                                                                                                                       A new Grand Lobby (below), the largest guest rooms in Atlantic City, 42 luxury suites and 14,000 additional square feet of
                                                                                                                                                       gaming space are features of the new 27-story, art deco “Rendezvous Tower” built for Colony Capital LLC. Bergman Walls
                                                                                                                                                       & Associates, Ltd. led the design team that included SOSH Architects and interior designers Lorri Halliday, Dalton
                                                                                                                                                       Robertsson & Associates, and MPM Studios.

Hartford Marriott Downtown
Hartford, Connecticut
The Hartford Marriott Downtown is a 22-story, 409-room hotel developed by the Waterford Group of
Waterford, CT and located adjacent to the new Connecticut Convention Center. Brennan Beer Gorman
is leading the design team with interiors by Alexandra Champalimaud & Associates. Upon its completion,
the Marriott Downtown will be the largest hotel in Hartford and will feature 13,500 square feet of meeting
space, several restaurants and bars, an indoor pool and a day spa.




                                                                                                                                                                                                                               Green Valley Ranch Expansion
                                                                                                                                                                                                                               Henderson, Nevada
                                                                                                                                                                                                                               We returned to the AAA Four Diamond Green
                                                                                                                                                                                                                               Valley Ranch to build its new, eight-story,
                                                                                                                                                                                                                               288,000-square-foot, 298-room hotel tower
                                                                                                                                                                                                                               with 85,000-square-foot ballroom designed by
                                                                                                                                                                                                                               Friedmutter Group with interiors by Architropolis.
                                                                                                                                                                                                                               We also performed all related site work, pools,
                                                                                                                                                                                                                               hardscape and landscaping; and design/build
                                                                                                                                                                                                                               of a three-story, 262-space parking structure.
                                                                                                                                                                                                                               Frommer’s Guide calls Green Valley Ranch,
                                                                                                                                                                                                                               “...flatout fabulous.”

     Renaissance Las Vegas Hotel
     Las Vegas, Nevada
     We delivered this 14-story, 548-room hotel developed by Jackson Shaw/Paradise Las Vegas LP three months ahead of schedule. The Renaissance,
     designed by Dennis Hill Architect c/o HPA, Inc. with interiors by Morrison Seifert Murphy, holds the distinction of being Nevada’s largest non-
     gaming hotel. The facility includes a 9,850-square-foot Grand Ballroom, 20,000 square feet of meeting space and a six-story parking garage.




4                                                                                                                                                                                                                                                                                   5
Perini Building Company
Native American Gaming


Morongo Casino, Resort & Spa
Cabazon, California
We delivered the award-winning Las Vegas-style Morongo Casino, Resort &
Spa in just 17 months, on time and on budget. Our design-assist construction
contract—working with the Morongo Band of Mission Indians, The Jerde
Partnership, Thalden.Boyd Architects and Hirsh Bedner Associates—encom-
passed 680,000 square feet, including a 27-story hotel tower with a two-story,
glass rooftop penthouse lounge and restaurant, and a 413,000-square-foot
low-rise building with a 113,000-square-foot casino.




“
Perini excels at high-quality construction and
completing projects expeditiously, which was
of utmost importance to bring the tribe’s vision



                                                          ”
of an outstanding entertainment facility to life.

Deron Marquez
Chairman of the San Manuel Band of Mission Indians




                                                                                                                                                                             Pechanga Resort & Casino, Phase II Expansion
San Manuel Indian Bingo & Casino                                                                                                                                             Temecula, California
Highland, California                                                                                                                                                         The completion of the Phase II expansion of the Pechanga Resort & Casino marked a decade of significant growth for the Pechanga Band of
A collaborative atmosphere was instrumental in building such a quality project on time and on budget for the San Manuel Band of Mission Indians. Designed by                 Luiseño Indians. In 1995, the tribe opened a small casino on its 4,400-acre reservation between Los Angeles and San Diego. In 2002, we built a
architect Wimberly Allison Tong & Goo (WAT&G) with interiors by Yates-Silverman,Inc., the three-level, 480,000-square-foot casino and bingo complex incorporates             14-story, 522-room hotel with 420,000 square feet of gaming space. More recently, we completed the 415,000-square-foot expansion, including
elements of the tribe’s cultural motifs and is articulated in paving patterns and glass etchings. The facility also includes a 450-car valet parking facility, multi-level   105,000 square feet of new gaming space, the 26,000-square-foot “Silk” nightclub, new food court, underground parking and administrative
1,190-car parking structure, and enclosed, 425-foot-long pedestrian bridge with moving walkways connecting the casino and the parking garage.                                offices, designed by the architectural firm Delawie, Wilkes, Rodrigues, Barker with interiors by Yates-Silverman, Inc.



6                                                                                                                                                                                                                                                                                                                             7
Perini Building Company
Retail+Mixed Use Development


                                                       The Pier at Caesars
                                                       Atlantic City, New Jersey
                                                       Atlantic City is betting on retail and non-gaming revenues playing a major role in its future prosperity. In a published survey of tourists visiting
                                                       Las Vegas, 63% shop and 69% gamble. High-end retail experiences like The Forum Shops at Caesars (see inside front cover) are drawing record
                                                       crowds. Pier Developers, Inc., an affiliate of Gordon Group Holdings, LLC of Greenwich, CT believes The Pier at Caesars, a three-level, 575,000-
                                                       square-foot, high-end retail, dining and entertainment experience designed by Elkus Manfredi Architects and Rockwell Group, will have a similar
                                                       impact on Atlantic City.




Seminole Paradise
Hollywood, Florida
The development of the 350,000-square-foot
Seminole Paradise is a joint venture between the
Cordish Company of Baltimore and the Seminole
Tribe of Florida. Designed by Morris Architects,
Seminole Paradise is part of the Seminole Hard
Rock Hotel and Casino and consists of the 5,600-
seat Hard Rock Live! concert venue (see Backlog
Briefs), 10 nightclubs, 10 restaurants and 20
                                                   World-Class Retail Environments
unique retail shops surrounding a 12-acre,
                                                   Retail developments like The Pier at Caesars, The Forum Shops at Caesars and The Shops at Mohegan Sun are examples of
man-made lake.
                                                   highly themed environments that require the quality of construction to match the essence of the world-class brands leasing space.
                                                   Elaborate designs and fast track schedules require our best resources and effort from preconstruction through to completion.

8                                                                                                                                                                                                             9
Perini Building Company                                                                                                                         Perini Building Company
Residential+Senior Living                                                                                                                       Commercial+High Technology


Eastern Connecticut State University
Residential Village I, II and III
Willimantic, Connecticut
In joint venture with Manafort Brothers, Inc. of
Plainville, CT and in association with ADD Inc,
an architecture and interior design firm from
Cambridge, MA, we were selected as the
design/builder of three new student residences at
Eastern Connecticut State University in Willimantic.
                                                                                                                                                                             Alnylam Pharmaceuticals
Construction of the phased design/build program
                                                                                                                                                                             Lab Conversion
began in June 2003. The first of the three buildings                                                                                                                         Cambridge, Massachusetts
to be constructed—a freshman dormitory—was
                                                                                                                                                                             We converted 45,000 square feet
built as a fast track project and was completed
                                                                                                                                                                             of office space built by the Company
in August 2004, in time for fall semester. The two
                                                                                                                                                                             in 2001 to research facilities for
upper class residence halls with suites are sched-
                                                                                                                                                                             Alnylam Pharmaceuticals Inc., a
uled to be ready for occupancy Fall 2005.
                                                                                                                                                                             Cambridge-based biotechnology
                                                                                                                                                                             company specializing in RNA inter-
                                                                                                                                                                             ference research and therapeutics.
                                                                                                                                                                             The conversion project reunited the
                                                                                                                                                                             team that designed and built the
                                                                                                                                                                             original building: Perini Building
                                                                                                                                                                             Company, ADD Inc, and AHA
                                                                                                                                                                             Consulting Engineers. The 128,000-
                                                                                                                                                                             square-foot building was developed
                                                                                                                                                                             by The Beal Companies LLP and is
                                                                                                                                                                             located in the heart of Cambridge’s
                                                                                                                                                                             biotechnology research area,
                                                                                                                                                                             surrounded by prominent biotech
                                                                                                                                                                             firms, MIT, and Harvard.




     Las Ventanas
     Summerlin, Nevada
     Phase I of Southern Nevada’s first full-service life care retirement complex features two, 3-story independent living buildings contain-
     ing 90 units, a 6,500 square-foot wellness center, and a 1-story community center with a fitness center and pool. Developed by
     Greystone Development Co. and designed by Three Architecture, Inc., Las Ventanas was designed as a multi-generational community
     with independent living, assisted living as well as skilled nursing care.



10                                                                                                                                                                                                             11
“
                                                                                                                                             Thank you for your high level of professionalism, helping (us) to keep our commitment in providing a quality building
James A. Cummings, Inc.



                                                                                                                                                                                            ”
                                                                                                                                             environment for teaching and research.
General Building
                                                                                                                                             Steve Hawkins, Sr. Project Manager
James A. Cummings, Inc. is a leading licensed general contractor in the State of Florida with offices in Ft. Lauderdale, West Palm Beach
                                                                                                                                             FIU Facilities Planning & Construction
and Orlando. Cummings is well known for its construction of K-12 schools, airport and mass transit facilities, college and university
campus structures, athletic facilities, parking garages, stadiums and hospitals. Cummings’ dedication to building quality facilities on
time, within budget and without litigation has made it one of the top-ranked commercial construction companies in Florida.




     Consolidated Car Rental Facility
     Ft. Lauderdale, Florida
     Levels one through four of the massive, nine-level, 4.5 million-square-foot car rental facility and 9,000-car parking garage built by
     a joint venture led by Cummings were turned over to the owner, the Broward County Board of County Commissioners, on January 12,
     2005. Designed by Spillis Candela & Partners, the facility includes 150,000 square feet of lobby and customer service area. In addi-
     tion, the first floor of the garage includes 126 fueling stations, several car washes and vehicle maintenance areas.

                                                                                                                                             Theater and Performing Arts Building                                                Health and Life Sciences Building, Phase II
                                                                                                                                             Dillard High School                                                                 Florida International University
                                                                                                                                             Ft. Lauderdale, Florida                                                             Miami, Florida
                                                                                                                                             Cummings worked closely with BRPH Architects-Engineers, Inc. at Dillard High        This six-story, 100,000-square-foot building, designed by VOA Associates, Inc.,
                                                                                                                                             School, a phased replacement project. The scope of the work included 250,000        is the final phase of a two-phase project. The new building (above, left) features
                                                                                                                                             square feet of new and renovated building area. New construction included the       an anatomy lab; research labs for genetics; human biology, physiology, biochem-
                                                                                                                                             Theatre and Performing Arts Building, featuring a 624-seat auditorium with          istry and cellular biology; and administrative and faculty offices, classrooms and
                                                                                                                                             orchestra pit lift, recital hall, practice rooms, and recording and dance studio.   seminar rooms.




                                                                                                                                                                                          Building Safer Communities: Key Biscayne, Florida
                                                                                                                                                                                            James A. Cummings has been instrumental in improving the quality of life for residents
                                                                                                                                                                                           of Key Biscayne by applying its construction expertise and resources to elements of the
                                                                                                                                                                                         community’s Village Civic Center master plan.

                                                                                                                                                                                                                                               Fire Rescue Station
                                                                                                                                                                                                                                               Designed by OBM, Inc., the three-story, 25,000-square-foot Fire
                                                                                                                                                                                                                                               Rescue Station is the focal point of the master plan. In addition
                                                                                                                                                                                                                                               to the fire department, the facility also includes Council Chambers
                                                                                                                                                                                                                                               for the Village Council.

                                                                                                                                                                                                                                               Police Station and Administrative Offices
                                                                                                                                                                                                                                               Designed by Spillis Candela DMJM, the 40,000-square-foot build-
                                                                                                                                                                                                                                               ing features an open courtyard and houses the police department
                                                                                                                                                                                                                                               and all Village government offices.

                                                                                                                                                                                                                                               Community Center
                                                                                                                                                                                                                                               Village residents of all ages can enjoy this multipurpose community
                                                                                                                                                                                                                                               center designed by Robert G. Currie & Associates featuring
                                                                                                                                                                                                                                               a pool, gymnasium and indoor basketball/volleyball facilities.




12                                                                                                                                                                                                                                                                                                             13
Perini Management Services, Inc.
International+Specialized Domestic Projects
                                                                                                                                                 A Job Well Done
Perini Management Services, Inc. (PMSI) plans and executes rapid response assignments and multi-
                                                                                                                                                Impressed by the quality, process and progress of the construction of the Buzurgan Power Plant in Iraq,
year contracts through diversified construction and design/build services. We have demonstrated
                                                                                                                                               Major General Ronald L. Johnson, then-Commander of the Gulf Region Division, U.S. Army Corps of
an expertise in managing the logistics of construction throughout the world, especially in challenging
                                                                                                                                             Engineers, presented the Perini-led team with this Medal of Excellence.
and hostile environments.

Our customers include the U.S. military and government agencies, power suppliers, surety compa-
nies and multinational organizations in the U.S. and overseas. As demonstrated by consistently
superior performance, we are particularly well suited for multi-year, multi-discipline, task order
and ID/IQ (Indefinite Delivery / Indefinite Quantity) construction programs.

The U.S.-sponsored post-war reconstruction of Afghanistan and Iraq has provided us with several
opportunities to advance our reputation for comprehensive planning, rapid deployment and effective
design/build team leadership.




“
Perini projects contributed nearly 200 MW to the national grid, enough to service an



                                     ”
estimated 600,000 Iraqi homes.




Restoration of Electrical Infrastructure
Southeastern Iraq
                                                                                                                     40 MW Power Plant
Perini completed the rehabilitation of 360 kilometers of high voltage transmission line and towers in southeastern   Buzurgan, Iraq
Iraq, and the rehabilitation of nine low voltage substations in central Iraq. All of these projects were awarded     We made history in August 2004 when a new 40 MW power plant in Buzurgan, Iraq was connected to the Iraqi electrical grid—the first new power
under a contingency contract with the U.S. Army Corps of Engineers. The new power will benefit the local popu-       plant to be constructed and commissioned in Iraq since 1976. Our team designed and constructed the plant, as well as the adjacent switchyard
lation, which now receives 15 to 24 continuous hours of power a day. This is in comparison to approximately          to connect to the nearby 132kV transmission line. The team included POWER Engineers as the lead design engineer, with Tetra Tech and General
only three hours of power per day before the war.                                                                    Electric’s Aero Energy and Industrial Systems divisions providing specialized support. In addition, we installed a 40 MW generator at an existing
                                                                                                                     power plant in southern Iraq, and refurbished two 63 MW generators at a second existing plant.



14                                                                                                                                                                                                                                                                       15
Perini Management Services, Inc.


                                                                                                                                                                                                                                                                             Facility Consolidation Project
                                                                                                                                                                                                                                                                             Islamabad, Pakistan
                                                                                                                                                                                                                                                                             The recently completed Facility Consolidation Project was a
                                                                                                                                                                                                                                                                             design-build contract to renovate the Chancery building and
                                                                                                                                                                                                                                                                             ancillary facilities at the U.S. Embassy compound in Islamabad,
                                                                                                                                                                                                                                                                             Pakistan. The goal of the project was to consolidate similar
                                                                                                                                                                                                                                                                             functions within the Chancery building, and to create office
                                                                                                                                                                                                                                                                             space for off-site personnel to relocate within the Embassy
                                                                                                                                                                                                                                                                             compound. The project included the renovation of five different
                                                                                                                                                                                                                                                                             areas into office space, construction of a new guard booth,
                                                                                                                                                                                                                                                                             the relocation and expansion of the Chancery kitchen, and the
                                                                                                                                                                                                                                                                             upgrade of the central air conditioning plant facility that serves
                                                                                                                                                                                                                                                                             the Chancery building.




     Afghan National Army Brigade Facility
     Darualaman, Afghanistan
     Perini was awarded a task order by the U.S. Army Corps of Engineers to provide buildings and a helipad for the build-out at the
     Darualaman brigade facility. We designed and constructed the helipad, brigade and garrison headquarters buildings, a community center,
     the complete renovation of three existing two-story buildings, and additional power generators, switchgear and fuel tanks. We also
     constructed 22 one-story barracks for this project. The site was located near the former King and Queen’s Palaces, which sit in ruins
     on nearby hills and dominate the local landscape.




                                                                                                                                                                         Washington State Legislative Building
                                                                                                                                                                         Olympia, Washington
                                                                                                                                                                         PMSI provides rapid response contract completion services to major American surety companies with the ability to complete any size defaulted project, at any location,
Afghan National Army Brigade Facilities
                                                                                                                                                                         commencing work within a 48-hour window. We provide consultation, cost analysis, technical, financial and administrative oversight to reduce liquidated damages or
Mazar-e-Sharif and Gardez, Afghanistan
                                                                                                                                                                         other financial damages to the Surety. We provide a seamless takeover or an immediate resumption of the project work. In Washington State, we were called in by
Under a contract with the US Army Corps of Engineers, we continue to design and construct brigade facilities for the Afghan National Army. The facilities will support
                                                                                                                                                                         Zurich to complete the work of a subcontractor who, at 70% completion, defaulted on its contract to perform concrete work, structural upgrades and seismic reinforce-
a regional brigade and include water treatment, storage and distribution systems; a sewage collection system; a prime power plant and site power distribution system;
                                                                                                                                                                         ment on the Legislative Building that was damaged by the Nisqually Earthquake on February 28, 2001 (magnitude 6.8). In addition to completing work on the lower
dining facilities; administrative buildings and barracks, helipads, training ranges, communications systems, and associated site work. The scope of work also includes
                                                                                                                                                                         portion of the building, we were responsible for providing temporary services including power, sanitation and transportation of workers.
the development of a master plan for each base to guide future expansion.


16                                                                                                                                                                                                                                                                                                                                                17
Perini Civil Construction
Infrastructure Repair+Replacement
Perini Civil Construction is focused on transportation and infrastructure repair and replacement projects in Metropolitan New York and
Northern New Jersey. In addition to mass transit systems and highways and bridges, we are well suited to construct mainline sewers,
water distribution networks and waste water treatment facilities.

Our strength lies in the resourcefulness of our people. We view project challenges not as obstacles to progress, but as opportunities for
teamwork, collaboration and innovation. We are tenacious advocates of the owner’s best interests and work cooperatively with its project
partners to exceed all expectations.




Jamaica Station
Jamaica, New York
Throughout 2004, Perini continued
construction of Jamaica Station, an
intermodal transportation center that
is the terminus of the JFK AirTrain,
an 8.4-mile elevated transit system.
New York Construction News, a
McGraw-Hill publication, awarded
Jamaica Station its “2004 Airport
Project of the Year.”




Cherry Hill Construction
Jessup, Maryland
The acquisition of Cherry Hill
Construction, Inc. in January 2005
will broaden our presence in the
                                                                                                                                            Bronx-Whitestone Bridge
Mid-Atlantic States and Southeast
                                                                                                                                            Queens, New York
U.S. Cherry Hill specializes in
                                                                                                                                            A joint venture of Perini and O&G of Torrington, CT is replacing 780,000 square feet of the original 64-year old roadway deck on the Bronx-
excavation, foundations, paving and
                                                                                                                                            Whitestone Bridge with a new lightweight, orthotropic steel deck that will strengthen the bridge while reducing the weight of the span by
civil infrastructure. Cherry Hill has
                                                                                                                                            22 percent. Deck replacement of all six of the bridge’s lanes includes removal of the original 4 1⁄2 inch thick concrete-filled steel grid deck,
regional operations in Maryland,
                                                                                                                                            crossbeams and stringers with a new lightweight steel orthotropic deck with a bonded aggregate riding surface similar to the deck Perini
Virginia, Delaware, District of
                                                                                                                                            installed on the Triborough Bridge.
Columbia and Florida.


18                                                                                                                                                                                                                                                                                             19
Diversity in Construction: MGM MIRAGE                                                                                                                                   Backlog Briefs


MGM MIRAGE is setting the standard for diversity in the hospitality and gaming industry. The Company recognizes diversity as
                                                                                                                                                                                                                                                Project CityCenter
“a timeless, enduring value, but nonetheless an evolutionary process” that requires dedication, innovation and focus.                                                                                                                           MGM MIRAGE
                                                                                                                                                                                                                                                Perini Building Company has been selected by MGM MIRAGE to
                                                                                                                                                                                                                                                build a major portion of Project CityCenter, one of the largest building
MGM MIRAGE requires minority participation on all construction bids, creating joint ventures that pair qualified minority-owned,                                                                                                                construction programs currently underway in the United States. MGM
women-owned and disadvantaged business enterprises with majority contractors. The benefits of the initiative to the minority contractor                                                                                                         MIRAGE plans for Perini’s construction contract to include a 4,000-
                                                                                                                                                                                                                                                room hotel tower, casino, convention center, showroom, approximately
include a greater knowledge of all developmental phases of construction and increased limits of state contracting licenses. For us and                                                                                                          500,000 square-feet of retail and restaurants, three branded boutique
                                                                                                                                                                                                                                                hotels and numerous residential towers. Perini will also be responsible
other majority contractors, the benefits include the opportunity to build relationships with qualified minority contractors, to share in                                                                                                        for constructing the infrastructure, hardscape and landscape.
the success of each project and to identify resources needed to meet the expectations of discerning owners and an ever-increasingly                                                                                                             Ehrenkrantz, Eckstut & Kuhn Architects, creator of Battery Park in New
                                                                                                                                                                                                                                                York City, developed the master plan. Perini expects to break ground
sophisticated market.                                                                                                                                                                                                                           on Project CityCenter—located between the Bellagio and Monte Carlo
                                                                                                                                                                                                                                                casino resorts in Las Vegas—in the summer of 2005 with planned
                                                                                                                                                                                                                                                completion of the entire project by the end of 2009.




                                                                                                         “   Perini introduced us to the fast-paced
                                                                                                             hospitality and gaming market where
                                                                                                                                                                                         Red Rock Casino.Resort.Spa                                             Hard Rock Live!
                                                                                                             quality and speed of execution are                                          Summerlin, Nevada                                                      Hollywood, Florida
                                                                                                             fundamental to success. Perini fully                                        Station Casinos, Inc.                                                  Seminole Properties Retail Inc.
                                                                                                             embraced the spirit and intent of                                           In Brief: Design by Friedmutter Group, Phases I and II consist         In Brief: Design by Morris Architects is 5,600-seat,
                                                                                                                                                                                         of 850 rooms, 94,000 square feet of meeting and convention             120,000-square-foot multi-purpose entertainment venue.
                                                                                                             MGM’s diversity initiative, mentoring                                       space, a 35,000-square-foot spa, and parking for 5,500 vehicles.
                                                                                                                                                                                         Phase II had not been awarded as of May 1, 2005.
                                                                                                             our people, opening doors to new                                                                                                                   Environmental Science/Criminal Justice Facility,
                                                                                                                                                                                                                                                                Phase II
                                                                                                             opportunities and enabling the                                                                                                                     Miami-Dade College, North Campus
                                                                                                             growth of our company to exceed                                                                                                                    In Brief: Design by M.C. Harry & Associates, 95,000-
                                                                                                                                                                                                                                                                square-foot environmental science building featuring




                                                                                                                          ”
                                                                                                             expectations.                                                               One Queensridge Place Phase I
                                                                                                                                                                                                                                                                biology, chemistry and physics labs, lecture hall, faculty
                                                                                                                                                                                         Queensridge, Nevada
                                                                                                                                                                                                                                                                offices and conference rooms.
                                                                                                                                                                                         Queensridge Towers, LLC
                                                                                                             Richard Copeland, President                                                 In Brief: Design by JMA Architecture Studios is two luxury             Hudson Line Stations Rehabilitation, Phase I
                                                                                                                                                                                         18-story condominium towers above two levels of parking.
                                                                                                             Thor Construction, Inc.                                                                                                                            Westchester County, New York
     MGM Grand Emerald Tower                                                                                                                                                             Condominiums will range from approximately 2,000 square feet
                                                                                                                                                                                                                                                                MTA Metro-North Railroad
                                                                                                                                                                                         to 14,000-square-foot penthouses. The development will include
     In joint venture with M/W/DBE Partner TBL Construction, Inc., Perini is remodeling
                                                                                                                                                                                         spa facilities, fitness center, wine cellar, meeting rooms and         In Brief: Rehabilitation of four Metro-North Railroad stations
     floors 1 through 14 of the Emerald Tower (not shown), including the low rise                                                                                                        social areas.                                                          including platforms and overpasses and construction of
     structure. Project architect is Marnell Corrao Associates.                                                                                                                                                                                                 elevators to make stations ADA compliant.

                                                                                                                                                                                         Westgate City Center, Phase One                                        Green Valley Ranch Spa Expansion
                                                                                                                                                                                         Glendale, Arizona                                                      Henderson, Nevada
                                        MGM Grand
                                                                                                                                                                                         Coyote Center Development LLC                                          Green Valley Ranch Gaming LLC
                                        Dome & Sports Book Remodel
                                                                                                                                                                                         In Brief: Design by Kurt D. Reed Associates, Inc. features             In Brief: Design by Architropolis is two-level, 26,000-
                                        The Perini/Madison joint venture                                                                                                                 610,000 square feet of themed commercial retail space, includ-         square-foot expansion and remodel including fitness
                                        is relocating and remodeling the                                                                                                                 ing 2 four-story buildings with one level of underground parking,      room, VIP and additional treatment rooms, relaxation
                                                                                                                                                                                         surface parking, 7 one-story buildings, an interactive water park      lounge, men’s and women’s locker rooms, offices,
                                        MGM Grand poker room and sports
                                                                                                                                                                                         for children, and a two-acre water feature that will include           retail space, waiting room, spa, steam room, pool, five
                                        book, including VIP suites in sports                                                                                                             animated fountain displays.                                            cabanas and outdoor showers.
                                        book; a new bar (at left, under
                                        construction) and delicatessen.                                                                                                                                                                                         Brooklyn/Queens Expressway
                                                                                                                                                                                         Gaylord National Hotel and Convention Center                           Queens, New York
                                        Marnell Corrao Associates is            Skylofts at MGM Grand
                                                                                                                                                                                         Prince Georges County, Maryland
                                                                                                                                                                                                                                                                New York State Department of Transportation
                                        the project architect.                  The joint venture of Perini/Thor is remodeling the 29th floor at MGM Grand.
                                                                                                                                                                                         Gaylord Hotels, a subsidiary of Gaylord Entertainment Co.
                                                                                                                                                                                                                                                                In Brief: Realignment, widening and new concrete
                                                                                Designed by Leo A. Daly with interiors by Tony Chi and Associates, the project
                                                                                                                                                                                         In Brief: Design by Gensler Architecture with interiors by Avery       of .8 miles of I-278, replacement/rehabilitation of 11
                                        Recent Projects:                        includes phased demolition and reconstruction of high roller suites, totaling 106,000                    Brooks & Associates features 1,503 rooms, over 400,000 square          bridges, new ramps, retaining walls and noise wall.
                                        Theme Park Demolition                   square feet, creating one, two and three-bedroom, multi-floor luxury “Skylofts” of                       feet of convention and meeting space, and parking for 2,600 cars.      In joint venture with Tutor-Saliba Corporation.
                                                                                                                                                                                         An 18-story, 65,000-square-foot glass atrium will be constructed
                                        Spa Lounge Remodel                      1,400 square feet, 3,200 square feet and 6,200 square feet respectively.
                                                                                                                                                                                         in the signature style for which the Gaylord Hotels brand is
                                        (Perini/Thor JV)
                                                                                                                                                                                         known. In joint venture with Tompkins Builders, Inc.



20
Additional Projects 2004–2005
Richard J. Rizzo
Chairman
                                                               (Not featured in Second Century but active in ‘04 or acquired by May 1, 2005)
Perini Building Company, Inc.
360 East Coronado Road
                                                               Perini Building Company, Inc.
Phoenix, AZ 85004
                                                               49–51 Commonwealth Avenue, Boston, MA
(602) 256-6777
                                                               126–130 Beacon Street, Boston, MA
                                                               AstraZeneca Plant Expansion, Westborough, MA
Kenneth R. Bock
                                                               AstraZeneca 6th Respule Interior Fit-up, Westborough, MA
Vice President, Business Development
                                                               Caesars Palace Plaza, Las Vegas, NV
Perini Building Company, Inc.
                                                               Caritas St. Elizabeth’s Medical Center, Brighton, MA
360 East Coronado Road
                                                               CCA Florence Correctional Center Housing Addition, Florence, NV
Phoenix, AZ 85004                                              Chumash Casino Resort, Santa Ynez, CA
(602) 256-6777                                                 Donald W. Reynolds Girl Scout Training & Service Center, Las Vegas, NV
                                                               Ferrara’s Cafe, Las Vegas, NV
Greg Maestas                                                   Green Valley Ranch Secluded Plunge Pool, Henderson, NV
Director of Business Development                               La Posada Senior Living Community. Palm Beach Lakes, FL
Perini Building Company, Inc.                                  Lucent Technologies, Westford, MA
3960 Howard Hughes Parkway Suite 620                           MGM Grand Mansion Casino & Robuchon Restaurant, Las Vegas, NV
Las Vegas, NV 89109                                            North Garage and Roadway Infrastructure, Hartford, CT
                                                               Palms Penthouse Suites, Tenant Improvements, Las Vegas, NV
(702) 792-9209
                                                               Riverside Resort Parking Structure & Casino Addition, Laughlin, NV
                                                               San Manuel Fire Remediation Project, Highland, CA
Joseph R. Perini
                                                               Segafredo Zanetti Espresso, Las Vegas, NV
Vice President, Business Development
                                                               Seminole Hard Rock Hotel & Casino. Hollywood, FL
Perini Building Company, Inc.
                                                               Thunder Valley Casino Remodel, Lincoln, CA
73 Mt. Wayte Avenue
                                                               Thunder Valley Casino–Athens Connector, Lincoln, CA
Framingham, MA 01701
(508) 628-2257
                                                               James A. Cummings, Inc.
                                                               Apopka/Rock Springs/Zellwood Elementary School Relief, Apopka, FL
Ray de la Feuilliez
                                                               Class Size Reduction Program, Broward County, FL
Vice President of Business Development
                                                               Dave Thomas Education Center, Coconut Creek, FL
James A. Cummings, Inc.
                                                               Federal Inspection Services, Terminal 4, Fort Lauderdale, FL
3575 NW 53rd Street
                                                               Florida Atlantic University (FAU), College of Business, Boca Raton, FL
Ft. Lauderdale, FL 33309
                                                               FAU, Lifelong Learning Complex, Jupiter, FL
(954) 733-4211 ext. 244
                                                               FAU/Harbor Branch Oceanographic Institute, Marine Science Partnership, Ft. Pierce, FL
                                                               Forest Hill High School, West Palm Beach, FL
Ed Greco                                                       Life Behavioral Science Complex, Florida Atlantic University, Boca Raton, FL
Director of Business Development                               Lost Lake Elementary School, Lake County, FL
Perini Management Services, Inc.                               McArthur High School, Hollywood, FL
73 Mt. Wayte Avenue                                            Museum Parking Garage, Coral Gables, FL
Framingham, MA 01701                                           New Meadow Woods Middle School Relief, Orlando, FL
(508) 628-2417                                                 New Piedmont Lakes Middle School Relief, Apopka, FL
                                                               No. Lauderdale Neighborhood Library, North Lauderdale, FL
                                                               Osceola Creek Middle School, Loxahatchee, FL
Henry Cheung
                                                               Parking Garage, Florida Atlantic University, Boca Raton, FL
Chief Estimator
                                                               Pines Middle School, Pembroke Pines, FL
Perini Civil Construction
                                                               Pine Ridge Elementary School, Clermont, FL
1022 Lower South Street
                                                               Roosevelt Elementary School, West Palm Beach, FL
Peekskill, NY 10566
                                                               Sunset Strip Neighborhood Library, Sunrise, FL
(914) 739-1908
                                                               Village of Miami Shores Charter School, Miami Shores, FL
                                                               West Regional Library Renovation and Addition, Plantation, FL
David B. Openshaw
                                                               YMCA Family Center of West Broward, Weston, FL
Executive Vice President & General Manager
Cherry Hill Construction, Inc.
                                                               Perini Management Services, Inc.
8211 Washington Boulevard
                                                               Exelon Nuclear Maintenance, IL, PA, NJ
Jessup, MD 20794
                                                               Office of Overseas Buildings Operations, Islamabad, Pakistan
(410) 799-3577
                                                               Upgraded Early Warning Radar NETL, Fylingdales, United Kingdom
                                                               Lindbergh Middle School Renovations, Long Beach, CA
www.perini.com
                                                               Sewer and Water Project, Holbrook, MA
                                                               Wastewater Collection System, Meridian, MS
                                                               Lincoln City Community Center, Lincoln City, OR
Second Century
                                                               Municipal Buildings, Mobile, AL
Project Management: Field Communications Associates, Inc.
                                                               Henry Hudson Parkway Bridge Restoration, Manhattan, NY
Creative: Beagan+Nguyen Design
Principal Photography: Field Communications Associates, Inc.
Other Photography/Renderings:                                  Perini Civil
Ian Vaughan Productions, Inc.                                  (Does not include Cherry Hill Construction, Inc.)
Gregg Photographic, LLC                                        Bowery Bay Water Pollution Plant, Astoria, NY
Ed Zealy Photography
                                                               Harlem Substation Rehabilitation, Manhattan, NY
Greg Kohl, AC Photo
                                                               Henry Hudson Parkway Bridge Restoration, Manhattan, NY
JMA Architectural Studios
                                                               Long Island Expressway, Queens, NY
Station Casinos Inc.
                                                               Newtown Creek Water Pollution Control Plant, Brooklyn, NY
Coyote Center Development LLC
                                                               Triborough Bridge Structure & Deck Replacement, Randall’s Island, NY
Gensler Architecture

Weitere ähnliche Inhalte

Was ist angesagt?

Highlights from OD Summit 2009 India
Highlights from OD Summit 2009 IndiaHighlights from OD Summit 2009 India
Highlights from OD Summit 2009 Indiadoujak
 
Fact Sheet EDG, Inc. Rev 07
Fact Sheet EDG, Inc. Rev  07Fact Sheet EDG, Inc. Rev  07
Fact Sheet EDG, Inc. Rev 07guest2c6403
 
Mountford Pigott Select Portfolio 2012 (100dpi)
Mountford Pigott Select Portfolio 2012 (100dpi)Mountford Pigott Select Portfolio 2012 (100dpi)
Mountford Pigott Select Portfolio 2012 (100dpi)MatMills
 
Ux Re Capabilities Overview
Ux Re Capabilities OverviewUx Re Capabilities Overview
Ux Re Capabilities Overviewguest7d4849
 
LEED Canada Buildings Review 2002-2009
LEED Canada Buildings Review 2002-2009LEED Canada Buildings Review 2002-2009
LEED Canada Buildings Review 2002-2009scottbrooker
 
10. Urban Development Capability Statement
10. Urban Development Capability Statement10. Urban Development Capability Statement
10. Urban Development Capability Statementhamadagkhater
 
Db Right Qualifications
Db Right QualificationsDb Right Qualifications
Db Right Qualificationsjcornwell
 
TRC Oppday Q255
TRC Oppday Q255TRC Oppday Q255
TRC Oppday Q255Shaen PD
 
Waste Management Capability
Waste Management CapabilityWaste Management Capability
Waste Management Capabilityhamadagkhater
 

Was ist angesagt? (13)

Highlights from OD Summit 2009 India
Highlights from OD Summit 2009 IndiaHighlights from OD Summit 2009 India
Highlights from OD Summit 2009 India
 
MMA.Architects
MMA.ArchitectsMMA.Architects
MMA.Architects
 
Fact Sheet EDG, Inc. Rev 07
Fact Sheet EDG, Inc. Rev  07Fact Sheet EDG, Inc. Rev  07
Fact Sheet EDG, Inc. Rev 07
 
Mountford Pigott Select Portfolio 2012 (100dpi)
Mountford Pigott Select Portfolio 2012 (100dpi)Mountford Pigott Select Portfolio 2012 (100dpi)
Mountford Pigott Select Portfolio 2012 (100dpi)
 
Ux Re Capabilities Overview
Ux Re Capabilities OverviewUx Re Capabilities Overview
Ux Re Capabilities Overview
 
SPD Brochure
SPD BrochureSPD Brochure
SPD Brochure
 
Ngsurvey profile
Ngsurvey profileNgsurvey profile
Ngsurvey profile
 
LEED Canada Buildings Review 2002-2009
LEED Canada Buildings Review 2002-2009LEED Canada Buildings Review 2002-2009
LEED Canada Buildings Review 2002-2009
 
10. Urban Development Capability Statement
10. Urban Development Capability Statement10. Urban Development Capability Statement
10. Urban Development Capability Statement
 
Db Right Qualifications
Db Right QualificationsDb Right Qualifications
Db Right Qualifications
 
TRC Oppday Q255
TRC Oppday Q255TRC Oppday Q255
TRC Oppday Q255
 
Waste Management Capability
Waste Management CapabilityWaste Management Capability
Waste Management Capability
 
Q210newsletter
Q210newsletterQ210newsletter
Q210newsletter
 

Andere mochten auch

Andere mochten auch (7)

Webfonts in the wild
Webfonts in the wildWebfonts in the wild
Webfonts in the wild
 
JavaScript Proven Practises
JavaScript Proven PractisesJavaScript Proven Practises
JavaScript Proven Practises
 
Mediengerechtes Webdesign
Mediengerechtes WebdesignMediengerechtes Webdesign
Mediengerechtes Webdesign
 
Give Us Clean Hands
Give Us Clean HandsGive Us Clean Hands
Give Us Clean Hands
 
11designer
11designer11designer
11designer
 
Westminster Wireframes
Westminster WireframesWestminster Wireframes
Westminster Wireframes
 
Julio
JulioJulio
Julio
 

Ähnlich wie perini 2005_Second_Century

Home centre case study
Home centre case studyHome centre case study
Home centre case studyJoeyDorrington
 
Sustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering ConferenceSustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering Conferencecassie111
 
Cullen Master Builder Portfolio
Cullen Master Builder PortfolioCullen Master Builder Portfolio
Cullen Master Builder Portfoliokrhino2000
 
Barry Wehmiller Corporate Brochure
Barry Wehmiller Corporate Brochure Barry Wehmiller Corporate Brochure
Barry Wehmiller Corporate Brochure Jimigiller
 
GTL e-brochure
GTL e-brochureGTL e-brochure
GTL e-brochuregavinrixon
 
Colliers Technology Solutions
Colliers Technology SolutionsColliers Technology Solutions
Colliers Technology SolutionsDanpcre
 
RDCLARK TESTIMONIALS
RDCLARK TESTIMONIALSRDCLARK TESTIMONIALS
RDCLARK TESTIMONIALSRDCLARK
 
Bbx Biz Plan Presentation
Bbx Biz Plan PresentationBbx Biz Plan Presentation
Bbx Biz Plan PresentationPaul Brisson
 
saic annual reports 2005
saic annual reports 2005saic annual reports 2005
saic annual reports 2005finance42
 
JLL - Building Surveying 2012
JLL - Building Surveying 2012JLL - Building Surveying 2012
JLL - Building Surveying 2012Colin Harrop
 
Johnson Controls - Building Efficiency Fact Sheet
Johnson Controls - Building Efficiency Fact SheetJohnson Controls - Building Efficiency Fact Sheet
Johnson Controls - Building Efficiency Fact SheetJohnsonControls
 
Global Energy Group Corporate Brochure
Global Energy Group Corporate BrochureGlobal Energy Group Corporate Brochure
Global Energy Group Corporate Brochureandrewmatheson
 
NetIG Corporate Profile
NetIG Corporate ProfileNetIG Corporate Profile
NetIG Corporate ProfilePaul Manley
 
baker hughes Annual Report 2005
baker hughes  Annual Report 2005baker hughes  Annual Report 2005
baker hughes Annual Report 2005finance26
 
Rdfs Article Dec08
Rdfs Article Dec08Rdfs Article Dec08
Rdfs Article Dec08laurasc
 
Right people service overview final 2013
Right people service overview final 2013Right people service overview final 2013
Right people service overview final 2013Kate McCabe
 

Ähnlich wie perini 2005_Second_Century (20)

Home centre case study
Home centre case studyHome centre case study
Home centre case study
 
Sustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering ConferenceSustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering Conference
 
Cullen Master Builder Portfolio
Cullen Master Builder PortfolioCullen Master Builder Portfolio
Cullen Master Builder Portfolio
 
Barry Wehmiller Corporate Brochure
Barry Wehmiller Corporate Brochure Barry Wehmiller Corporate Brochure
Barry Wehmiller Corporate Brochure
 
GTL e-brochure
GTL e-brochureGTL e-brochure
GTL e-brochure
 
Colliers Technology Solutions
Colliers Technology SolutionsColliers Technology Solutions
Colliers Technology Solutions
 
RDCLARK TESTIMONIALS
RDCLARK TESTIMONIALSRDCLARK TESTIMONIALS
RDCLARK TESTIMONIALS
 
Bbx Biz Plan Presentation
Bbx Biz Plan PresentationBbx Biz Plan Presentation
Bbx Biz Plan Presentation
 
saic annual reports 2005
saic annual reports 2005saic annual reports 2005
saic annual reports 2005
 
JLL - Building Surveying 2012
JLL - Building Surveying 2012JLL - Building Surveying 2012
JLL - Building Surveying 2012
 
Our Vision day in The Sstar
Our Vision day in The SstarOur Vision day in The Sstar
Our Vision day in The Sstar
 
Johnson Controls - Building Efficiency Fact Sheet
Johnson Controls - Building Efficiency Fact SheetJohnson Controls - Building Efficiency Fact Sheet
Johnson Controls - Building Efficiency Fact Sheet
 
Global Energy Group Corporate Brochure
Global Energy Group Corporate BrochureGlobal Energy Group Corporate Brochure
Global Energy Group Corporate Brochure
 
Document Composition Case Study
Document Composition Case StudyDocument Composition Case Study
Document Composition Case Study
 
NetIG Corporate Profile
NetIG Corporate ProfileNetIG Corporate Profile
NetIG Corporate Profile
 
Ssg Overview
Ssg OverviewSsg Overview
Ssg Overview
 
baker hughes Annual Report 2005
baker hughes  Annual Report 2005baker hughes  Annual Report 2005
baker hughes Annual Report 2005
 
Brochure Resume
Brochure ResumeBrochure Resume
Brochure Resume
 
Rdfs Article Dec08
Rdfs Article Dec08Rdfs Article Dec08
Rdfs Article Dec08
 
Right people service overview final 2013
Right people service overview final 2013Right people service overview final 2013
Right people service overview final 2013
 

Mehr von finance50

Scania Presentation_Q2_2008_tcm10-211097
Scania Presentation_Q2_2008_tcm10-211097Scania Presentation_Q2_2008_tcm10-211097
Scania Presentation_Q2_2008_tcm10-211097finance50
 
Scania%20Jan%20Ytterberg%2C%20CFO_tcm10-214730
Scania%20Jan%20Ytterberg%2C%20CFO_tcm10-214730Scania%20Jan%20Ytterberg%2C%20CFO_tcm10-214730
Scania%20Jan%20Ytterberg%2C%20CFO_tcm10-214730finance50
 
Scania Presentation%20Q3%202008_tcm10-219195
Scania Presentation%20Q3%202008_tcm10-219195Scania Presentation%20Q3%202008_tcm10-219195
Scania Presentation%20Q3%202008_tcm10-219195finance50
 
Scania HQ%20Bank%20Investor%20meeting_tcm10-219785
Scania HQ%20Bank%20Investor%20meeting_tcm10-219785Scania HQ%20Bank%20Investor%20meeting_tcm10-219785
Scania HQ%20Bank%20Investor%20meeting_tcm10-219785finance50
 
Scania Presentation-Q4-2008_tcm10-227202
Scania Presentation-Q4-2008_tcm10-227202Scania Presentation-Q4-2008_tcm10-227202
Scania Presentation-Q4-2008_tcm10-227202finance50
 
scana Presentation%20Q3%202008_tcm10-219195
scana  Presentation%20Q3%202008_tcm10-219195scana  Presentation%20Q3%202008_tcm10-219195
scana Presentation%20Q3%202008_tcm10-219195finance50
 
Scania%202008%20Q3%20report%20FINAL_tcm10-219196
Scania%202008%20Q3%20report%20FINAL_tcm10-219196Scania%202008%20Q3%20report%20FINAL_tcm10-219196
Scania%202008%20Q3%20report%20FINAL_tcm10-219196finance50
 
Scania%202008%20Q3%20svensk%20rapport%20FINAL_tcm10-219191
Scania%202008%20Q3%20svensk%20rapport%20FINAL_tcm10-219191Scania%202008%20Q3%20svensk%20rapport%20FINAL_tcm10-219191
Scania%202008%20Q3%20svensk%20rapport%20FINAL_tcm10-219191finance50
 
scana Presentation-Q4-2008_tcm10-227202
scana  Presentation-Q4-2008_tcm10-227202scana  Presentation-Q4-2008_tcm10-227202
scana Presentation-Q4-2008_tcm10-227202finance50
 
Scania%20bokslutskommunik%C3%A9%202008_tcm10-227198
Scania%20bokslutskommunik%C3%A9%202008_tcm10-227198Scania%20bokslutskommunik%C3%A9%202008_tcm10-227198
Scania%20bokslutskommunik%C3%A9%202008_tcm10-227198finance50
 
scana 2008_SV_lowres_tcm10-229942
scana  2008_SV_lowres_tcm10-229942scana  2008_SV_lowres_tcm10-229942
scana 2008_SV_lowres_tcm10-229942finance50
 
scana 66684-EN_2008_lowres_tcm10-229950
scana  66684-EN_2008_lowres_tcm10-229950scana  66684-EN_2008_lowres_tcm10-229950
scana 66684-EN_2008_lowres_tcm10-229950finance50
 
perini nyse_compliance
perini   nyse_complianceperini   nyse_compliance
perini nyse_compliancefinance50
 
perini nyse_compliance
perini   nyse_complianceperini   nyse_compliance
perini nyse_compliancefinance50
 
perini corporategovernanceguidelines
perini   corporategovernanceguidelinesperini   corporategovernanceguidelines
perini corporategovernanceguidelinesfinance50
 
perini corporategovernanceguidelines
perini   corporategovernanceguidelinesperini   corporategovernanceguidelines
perini corporategovernanceguidelinesfinance50
 
perini CodeBusinessConductEthics
perini   CodeBusinessConductEthicsperini   CodeBusinessConductEthics
perini CodeBusinessConductEthicsfinance50
 
perini CodeBusinessConductEthics
perini   CodeBusinessConductEthicsperini   CodeBusinessConductEthics
perini CodeBusinessConductEthicsfinance50
 
perini corporate_governance_nominating
perini   corporate_governance_nominatingperini   corporate_governance_nominating
perini corporate_governance_nominatingfinance50
 
perini compensationcommitteecharter
perini   compensationcommitteecharterperini   compensationcommitteecharter
perini compensationcommitteecharterfinance50
 

Mehr von finance50 (20)

Scania Presentation_Q2_2008_tcm10-211097
Scania Presentation_Q2_2008_tcm10-211097Scania Presentation_Q2_2008_tcm10-211097
Scania Presentation_Q2_2008_tcm10-211097
 
Scania%20Jan%20Ytterberg%2C%20CFO_tcm10-214730
Scania%20Jan%20Ytterberg%2C%20CFO_tcm10-214730Scania%20Jan%20Ytterberg%2C%20CFO_tcm10-214730
Scania%20Jan%20Ytterberg%2C%20CFO_tcm10-214730
 
Scania Presentation%20Q3%202008_tcm10-219195
Scania Presentation%20Q3%202008_tcm10-219195Scania Presentation%20Q3%202008_tcm10-219195
Scania Presentation%20Q3%202008_tcm10-219195
 
Scania HQ%20Bank%20Investor%20meeting_tcm10-219785
Scania HQ%20Bank%20Investor%20meeting_tcm10-219785Scania HQ%20Bank%20Investor%20meeting_tcm10-219785
Scania HQ%20Bank%20Investor%20meeting_tcm10-219785
 
Scania Presentation-Q4-2008_tcm10-227202
Scania Presentation-Q4-2008_tcm10-227202Scania Presentation-Q4-2008_tcm10-227202
Scania Presentation-Q4-2008_tcm10-227202
 
scana Presentation%20Q3%202008_tcm10-219195
scana  Presentation%20Q3%202008_tcm10-219195scana  Presentation%20Q3%202008_tcm10-219195
scana Presentation%20Q3%202008_tcm10-219195
 
Scania%202008%20Q3%20report%20FINAL_tcm10-219196
Scania%202008%20Q3%20report%20FINAL_tcm10-219196Scania%202008%20Q3%20report%20FINAL_tcm10-219196
Scania%202008%20Q3%20report%20FINAL_tcm10-219196
 
Scania%202008%20Q3%20svensk%20rapport%20FINAL_tcm10-219191
Scania%202008%20Q3%20svensk%20rapport%20FINAL_tcm10-219191Scania%202008%20Q3%20svensk%20rapport%20FINAL_tcm10-219191
Scania%202008%20Q3%20svensk%20rapport%20FINAL_tcm10-219191
 
scana Presentation-Q4-2008_tcm10-227202
scana  Presentation-Q4-2008_tcm10-227202scana  Presentation-Q4-2008_tcm10-227202
scana Presentation-Q4-2008_tcm10-227202
 
Scania%20bokslutskommunik%C3%A9%202008_tcm10-227198
Scania%20bokslutskommunik%C3%A9%202008_tcm10-227198Scania%20bokslutskommunik%C3%A9%202008_tcm10-227198
Scania%20bokslutskommunik%C3%A9%202008_tcm10-227198
 
scana 2008_SV_lowres_tcm10-229942
scana  2008_SV_lowres_tcm10-229942scana  2008_SV_lowres_tcm10-229942
scana 2008_SV_lowres_tcm10-229942
 
scana 66684-EN_2008_lowres_tcm10-229950
scana  66684-EN_2008_lowres_tcm10-229950scana  66684-EN_2008_lowres_tcm10-229950
scana 66684-EN_2008_lowres_tcm10-229950
 
perini nyse_compliance
perini   nyse_complianceperini   nyse_compliance
perini nyse_compliance
 
perini nyse_compliance
perini   nyse_complianceperini   nyse_compliance
perini nyse_compliance
 
perini corporategovernanceguidelines
perini   corporategovernanceguidelinesperini   corporategovernanceguidelines
perini corporategovernanceguidelines
 
perini corporategovernanceguidelines
perini   corporategovernanceguidelinesperini   corporategovernanceguidelines
perini corporategovernanceguidelines
 
perini CodeBusinessConductEthics
perini   CodeBusinessConductEthicsperini   CodeBusinessConductEthics
perini CodeBusinessConductEthics
 
perini CodeBusinessConductEthics
perini   CodeBusinessConductEthicsperini   CodeBusinessConductEthics
perini CodeBusinessConductEthics
 
perini corporate_governance_nominating
perini   corporate_governance_nominatingperini   corporate_governance_nominating
perini corporate_governance_nominating
 
perini compensationcommitteecharter
perini   compensationcommitteecharterperini   compensationcommitteecharter
perini compensationcommitteecharter
 

Kürzlich hochgeladen

VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...Call Girls in Nagpur High Profile
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfGale Pooley
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfGale Pooley
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja Nehwal
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfGale Pooley
 
Basic concepts related to Financial modelling
Basic concepts related to Financial modellingBasic concepts related to Financial modelling
Basic concepts related to Financial modellingbaijup5
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdfFinTech Belgium
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...ssifa0344
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Call Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdf
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdf
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
Basic concepts related to Financial modelling
Basic concepts related to Financial modellingBasic concepts related to Financial modelling
Basic concepts related to Financial modelling
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
 
Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024
 

perini 2005_Second_Century

  • 1.
  • 2. 2004 –2005 On the Cover: The Forum Shops at Caesars The spectacular three-level (plus basement), 304,000-square-foot expansion of The Forum Shops at Caesars opened one month ahead of schedule and on budget. Owned by Simon Property Group of Indianapolis, IN, the high-end, extensively themed Forum Shops is considered one of the most successful malls in the country based on its sales per square-foot, which is three times the industry average. As general In 2004, Perini celebrated its 110th contractor, we worked closely with KGA Architecture and Dougall Design Associates. Anniversary and was named one of the “Best Managed Companies in America” Forty subcontractors, 450 craftspeople and 60 suppliers and vendors contributed to the construction effort. Throughout construction, work by Forbes magazine. Perini ranked No. 1 in was phased to accommodate shoppers 24 hours a day, seven days a week. the construction sector. Public recognition and awards are always appreciated, but we consider the best measure of our success to The Forum Shops at Caesars features a Mitsubishi spiral escalator, the first of its kind in Las Vegas. Perini, KGA and the project team collab- be satisfied clients. orated on designing structural supports that allowed the spiral escalators to be free-standing. A large atrium, capped by a 44-foot diameter, 104-foot-high domed skylight, posed life safety and air handling challenges that were resolved through team effort. In the building market, our preconstruction services resolve issues “ and concerns far ahead of groundbreaking. Once construction Perini’s project personnel are experienced with large, complicated projects and that’s very important when you’re is underway, projects are driven by schedule and our consistent ” working on sophisticated projects at full speed. performance often leads to early completions, allowing revenue streams to flow sooner than expected. Our leading position in Bradley D. Schulz, Principal, KGA Architecture the hospitality and gaming market over the past 25 years yields untold benefits to private owners and Native American tribes planning new resorts and facilities. Our management services group is known as a “go to” organiza- tion for logistically challenging government work including multi- trade, fast track design-build projects abroad and rapid response contract completion assignments in the U.S. The leading supplier of nuclear power in the nation, Exelon, entrusts us to manage the time-critical repair and maintenance of their fleet of generating In This Issue plants. Our enthusiasm for the work is matched only by the quality of our work product. Perini Building Company, Inc. Hospitality+Gaming 2 Native American Gaming 6 In 1894, Perini began as a small civil works contractor. Since Retail+Mixed Use Development 8 that time, our civil construction operation has built its reputation Residential+Senior Living 10 Commercial+High Technology 11 on hard work, innovation and problem solving. Today, our civil James A. Cummings, Inc. operations are focused on the Metropolitan New York area includ- General Building 12 ing Northern New Jersey, and with the acquisition of Cherry Hill Perini Management Services, Inc. Construction, our market has expanded to the Mid-Atlantic states International+Specialized Domestic Projects 14 and the Southeast. Perini Civil Construction Infrastructure Repair+Replacement 18 In this issue of Second Century, we present Perini’s most recent Diversity in Construction: portfolio of work, especially projects completed or well underway MGM MIRAGE 20 in 2004. Our “Backlog Briefs” section is noteworthy for the sheer Backlog Briefs Inside Back Cover size and diversity of upcoming construction programs illustrated Directory Back Cover there, projects that will assuredly benefit from our involvement. 1
  • 3. Perini Building Company Hospitality+Gaming Perini Building Company is best known for aggressive, fast track construction of hospitality and gaming projects throughout the United States. Our success in this and other specialized niche markets results from our comprehensive preconstruction services, a collaborative culture, and performance that exceeds expectations. Year to year, our backlog of work includes many repeat clients and Native American tribes, giving credence to our philosophy, “Building Relationships on Trust.” We maintain full-service offices in Phoenix, Las Vegas and Boston with support offices in major markets including Atlantic City, San Diego, Detroit and Orlando. In addition to hotels and casinos, we are highly regarded for our performance on sports and entertainment venues, health care facilities, college and university campus structures, and commercial residential developments. More recently, the Company has established a strong reputation converting existing properties to new uses such as office space to biotechnology labs and racetracks to video gaming facilities. Building Relationships on Trust: Executing a Master Plan In the highly specialized hospitality and gaming market, comprehensive preconstruction services, collaborative relationships with project owners and design teams, and effective field operations are essential to building successful projects and enduring relationships. Caesars Palace Las Vegas, NV Major Projects Underway or Completed (2000–Present) 7 1. Augustus Tower (under construction) 2. Caesars Plaza and 9 Valet Parking 3. New Registration & Spa (under construction) 5 8 4. The Forum Shops at Caesars 4 6 1 5. Caesars Palace Showroom Colosseum Caesars Palace Augustus Tower 3 6. North Casino Las Vegas, Nevada 7. Palace Tower Caesars Palace’s new 26-story, 949-room luxury Augustus Tower will bring the total number of rooms at Caesars Palace to 3,349 when completed 8. Centurion Tower Penthouse 2 Renovations in August 2005. Designed by Bergman Walls & Associates, Ltd. with interiors by Wilson & Associates, Barbara Gisel Design Ltd. and Allard & 9. Exterior Refacing: Conversano Design, the 345-foot-tall tower is part of a master plan aimed at refurbishing the mega-resort that has included the recent addition of Centurion, Roman, several Perini-built facilities including the 4,148-seat Caesars Palace Showroom Colosseum, the expansion of The Forum Shops at Caesars, the Forum Towers open-air Roman Plaza, new registration area and spa. Not Shown: Pool Villas 2 3
  • 4. Perini Building Company Resorts Hotel/Casino Expansion Atlantic City, New Jersey Hospitality+Gaming A new Grand Lobby (below), the largest guest rooms in Atlantic City, 42 luxury suites and 14,000 additional square feet of gaming space are features of the new 27-story, art deco “Rendezvous Tower” built for Colony Capital LLC. Bergman Walls & Associates, Ltd. led the design team that included SOSH Architects and interior designers Lorri Halliday, Dalton Robertsson & Associates, and MPM Studios. Hartford Marriott Downtown Hartford, Connecticut The Hartford Marriott Downtown is a 22-story, 409-room hotel developed by the Waterford Group of Waterford, CT and located adjacent to the new Connecticut Convention Center. Brennan Beer Gorman is leading the design team with interiors by Alexandra Champalimaud & Associates. Upon its completion, the Marriott Downtown will be the largest hotel in Hartford and will feature 13,500 square feet of meeting space, several restaurants and bars, an indoor pool and a day spa. Green Valley Ranch Expansion Henderson, Nevada We returned to the AAA Four Diamond Green Valley Ranch to build its new, eight-story, 288,000-square-foot, 298-room hotel tower with 85,000-square-foot ballroom designed by Friedmutter Group with interiors by Architropolis. We also performed all related site work, pools, hardscape and landscaping; and design/build of a three-story, 262-space parking structure. Frommer’s Guide calls Green Valley Ranch, “...flatout fabulous.” Renaissance Las Vegas Hotel Las Vegas, Nevada We delivered this 14-story, 548-room hotel developed by Jackson Shaw/Paradise Las Vegas LP three months ahead of schedule. The Renaissance, designed by Dennis Hill Architect c/o HPA, Inc. with interiors by Morrison Seifert Murphy, holds the distinction of being Nevada’s largest non- gaming hotel. The facility includes a 9,850-square-foot Grand Ballroom, 20,000 square feet of meeting space and a six-story parking garage. 4 5
  • 5. Perini Building Company Native American Gaming Morongo Casino, Resort & Spa Cabazon, California We delivered the award-winning Las Vegas-style Morongo Casino, Resort & Spa in just 17 months, on time and on budget. Our design-assist construction contract—working with the Morongo Band of Mission Indians, The Jerde Partnership, Thalden.Boyd Architects and Hirsh Bedner Associates—encom- passed 680,000 square feet, including a 27-story hotel tower with a two-story, glass rooftop penthouse lounge and restaurant, and a 413,000-square-foot low-rise building with a 113,000-square-foot casino. “ Perini excels at high-quality construction and completing projects expeditiously, which was of utmost importance to bring the tribe’s vision ” of an outstanding entertainment facility to life. Deron Marquez Chairman of the San Manuel Band of Mission Indians Pechanga Resort & Casino, Phase II Expansion San Manuel Indian Bingo & Casino Temecula, California Highland, California The completion of the Phase II expansion of the Pechanga Resort & Casino marked a decade of significant growth for the Pechanga Band of A collaborative atmosphere was instrumental in building such a quality project on time and on budget for the San Manuel Band of Mission Indians. Designed by Luiseño Indians. In 1995, the tribe opened a small casino on its 4,400-acre reservation between Los Angeles and San Diego. In 2002, we built a architect Wimberly Allison Tong & Goo (WAT&G) with interiors by Yates-Silverman,Inc., the three-level, 480,000-square-foot casino and bingo complex incorporates 14-story, 522-room hotel with 420,000 square feet of gaming space. More recently, we completed the 415,000-square-foot expansion, including elements of the tribe’s cultural motifs and is articulated in paving patterns and glass etchings. The facility also includes a 450-car valet parking facility, multi-level 105,000 square feet of new gaming space, the 26,000-square-foot “Silk” nightclub, new food court, underground parking and administrative 1,190-car parking structure, and enclosed, 425-foot-long pedestrian bridge with moving walkways connecting the casino and the parking garage. offices, designed by the architectural firm Delawie, Wilkes, Rodrigues, Barker with interiors by Yates-Silverman, Inc. 6 7
  • 6. Perini Building Company Retail+Mixed Use Development The Pier at Caesars Atlantic City, New Jersey Atlantic City is betting on retail and non-gaming revenues playing a major role in its future prosperity. In a published survey of tourists visiting Las Vegas, 63% shop and 69% gamble. High-end retail experiences like The Forum Shops at Caesars (see inside front cover) are drawing record crowds. Pier Developers, Inc., an affiliate of Gordon Group Holdings, LLC of Greenwich, CT believes The Pier at Caesars, a three-level, 575,000- square-foot, high-end retail, dining and entertainment experience designed by Elkus Manfredi Architects and Rockwell Group, will have a similar impact on Atlantic City. Seminole Paradise Hollywood, Florida The development of the 350,000-square-foot Seminole Paradise is a joint venture between the Cordish Company of Baltimore and the Seminole Tribe of Florida. Designed by Morris Architects, Seminole Paradise is part of the Seminole Hard Rock Hotel and Casino and consists of the 5,600- seat Hard Rock Live! concert venue (see Backlog Briefs), 10 nightclubs, 10 restaurants and 20 World-Class Retail Environments unique retail shops surrounding a 12-acre, Retail developments like The Pier at Caesars, The Forum Shops at Caesars and The Shops at Mohegan Sun are examples of man-made lake. highly themed environments that require the quality of construction to match the essence of the world-class brands leasing space. Elaborate designs and fast track schedules require our best resources and effort from preconstruction through to completion. 8 9
  • 7. Perini Building Company Perini Building Company Residential+Senior Living Commercial+High Technology Eastern Connecticut State University Residential Village I, II and III Willimantic, Connecticut In joint venture with Manafort Brothers, Inc. of Plainville, CT and in association with ADD Inc, an architecture and interior design firm from Cambridge, MA, we were selected as the design/builder of three new student residences at Eastern Connecticut State University in Willimantic. Alnylam Pharmaceuticals Construction of the phased design/build program Lab Conversion began in June 2003. The first of the three buildings Cambridge, Massachusetts to be constructed—a freshman dormitory—was We converted 45,000 square feet built as a fast track project and was completed of office space built by the Company in August 2004, in time for fall semester. The two in 2001 to research facilities for upper class residence halls with suites are sched- Alnylam Pharmaceuticals Inc., a uled to be ready for occupancy Fall 2005. Cambridge-based biotechnology company specializing in RNA inter- ference research and therapeutics. The conversion project reunited the team that designed and built the original building: Perini Building Company, ADD Inc, and AHA Consulting Engineers. The 128,000- square-foot building was developed by The Beal Companies LLP and is located in the heart of Cambridge’s biotechnology research area, surrounded by prominent biotech firms, MIT, and Harvard. Las Ventanas Summerlin, Nevada Phase I of Southern Nevada’s first full-service life care retirement complex features two, 3-story independent living buildings contain- ing 90 units, a 6,500 square-foot wellness center, and a 1-story community center with a fitness center and pool. Developed by Greystone Development Co. and designed by Three Architecture, Inc., Las Ventanas was designed as a multi-generational community with independent living, assisted living as well as skilled nursing care. 10 11
  • 8. Thank you for your high level of professionalism, helping (us) to keep our commitment in providing a quality building James A. Cummings, Inc. ” environment for teaching and research. General Building Steve Hawkins, Sr. Project Manager James A. Cummings, Inc. is a leading licensed general contractor in the State of Florida with offices in Ft. Lauderdale, West Palm Beach FIU Facilities Planning & Construction and Orlando. Cummings is well known for its construction of K-12 schools, airport and mass transit facilities, college and university campus structures, athletic facilities, parking garages, stadiums and hospitals. Cummings’ dedication to building quality facilities on time, within budget and without litigation has made it one of the top-ranked commercial construction companies in Florida. Consolidated Car Rental Facility Ft. Lauderdale, Florida Levels one through four of the massive, nine-level, 4.5 million-square-foot car rental facility and 9,000-car parking garage built by a joint venture led by Cummings were turned over to the owner, the Broward County Board of County Commissioners, on January 12, 2005. Designed by Spillis Candela & Partners, the facility includes 150,000 square feet of lobby and customer service area. In addi- tion, the first floor of the garage includes 126 fueling stations, several car washes and vehicle maintenance areas. Theater and Performing Arts Building Health and Life Sciences Building, Phase II Dillard High School Florida International University Ft. Lauderdale, Florida Miami, Florida Cummings worked closely with BRPH Architects-Engineers, Inc. at Dillard High This six-story, 100,000-square-foot building, designed by VOA Associates, Inc., School, a phased replacement project. The scope of the work included 250,000 is the final phase of a two-phase project. The new building (above, left) features square feet of new and renovated building area. New construction included the an anatomy lab; research labs for genetics; human biology, physiology, biochem- Theatre and Performing Arts Building, featuring a 624-seat auditorium with istry and cellular biology; and administrative and faculty offices, classrooms and orchestra pit lift, recital hall, practice rooms, and recording and dance studio. seminar rooms. Building Safer Communities: Key Biscayne, Florida James A. Cummings has been instrumental in improving the quality of life for residents of Key Biscayne by applying its construction expertise and resources to elements of the community’s Village Civic Center master plan. Fire Rescue Station Designed by OBM, Inc., the three-story, 25,000-square-foot Fire Rescue Station is the focal point of the master plan. In addition to the fire department, the facility also includes Council Chambers for the Village Council. Police Station and Administrative Offices Designed by Spillis Candela DMJM, the 40,000-square-foot build- ing features an open courtyard and houses the police department and all Village government offices. Community Center Village residents of all ages can enjoy this multipurpose community center designed by Robert G. Currie & Associates featuring a pool, gymnasium and indoor basketball/volleyball facilities. 12 13
  • 9. Perini Management Services, Inc. International+Specialized Domestic Projects A Job Well Done Perini Management Services, Inc. (PMSI) plans and executes rapid response assignments and multi- Impressed by the quality, process and progress of the construction of the Buzurgan Power Plant in Iraq, year contracts through diversified construction and design/build services. We have demonstrated Major General Ronald L. Johnson, then-Commander of the Gulf Region Division, U.S. Army Corps of an expertise in managing the logistics of construction throughout the world, especially in challenging Engineers, presented the Perini-led team with this Medal of Excellence. and hostile environments. Our customers include the U.S. military and government agencies, power suppliers, surety compa- nies and multinational organizations in the U.S. and overseas. As demonstrated by consistently superior performance, we are particularly well suited for multi-year, multi-discipline, task order and ID/IQ (Indefinite Delivery / Indefinite Quantity) construction programs. The U.S.-sponsored post-war reconstruction of Afghanistan and Iraq has provided us with several opportunities to advance our reputation for comprehensive planning, rapid deployment and effective design/build team leadership. “ Perini projects contributed nearly 200 MW to the national grid, enough to service an ” estimated 600,000 Iraqi homes. Restoration of Electrical Infrastructure Southeastern Iraq 40 MW Power Plant Perini completed the rehabilitation of 360 kilometers of high voltage transmission line and towers in southeastern Buzurgan, Iraq Iraq, and the rehabilitation of nine low voltage substations in central Iraq. All of these projects were awarded We made history in August 2004 when a new 40 MW power plant in Buzurgan, Iraq was connected to the Iraqi electrical grid—the first new power under a contingency contract with the U.S. Army Corps of Engineers. The new power will benefit the local popu- plant to be constructed and commissioned in Iraq since 1976. Our team designed and constructed the plant, as well as the adjacent switchyard lation, which now receives 15 to 24 continuous hours of power a day. This is in comparison to approximately to connect to the nearby 132kV transmission line. The team included POWER Engineers as the lead design engineer, with Tetra Tech and General only three hours of power per day before the war. Electric’s Aero Energy and Industrial Systems divisions providing specialized support. In addition, we installed a 40 MW generator at an existing power plant in southern Iraq, and refurbished two 63 MW generators at a second existing plant. 14 15
  • 10. Perini Management Services, Inc. Facility Consolidation Project Islamabad, Pakistan The recently completed Facility Consolidation Project was a design-build contract to renovate the Chancery building and ancillary facilities at the U.S. Embassy compound in Islamabad, Pakistan. The goal of the project was to consolidate similar functions within the Chancery building, and to create office space for off-site personnel to relocate within the Embassy compound. The project included the renovation of five different areas into office space, construction of a new guard booth, the relocation and expansion of the Chancery kitchen, and the upgrade of the central air conditioning plant facility that serves the Chancery building. Afghan National Army Brigade Facility Darualaman, Afghanistan Perini was awarded a task order by the U.S. Army Corps of Engineers to provide buildings and a helipad for the build-out at the Darualaman brigade facility. We designed and constructed the helipad, brigade and garrison headquarters buildings, a community center, the complete renovation of three existing two-story buildings, and additional power generators, switchgear and fuel tanks. We also constructed 22 one-story barracks for this project. The site was located near the former King and Queen’s Palaces, which sit in ruins on nearby hills and dominate the local landscape. Washington State Legislative Building Olympia, Washington PMSI provides rapid response contract completion services to major American surety companies with the ability to complete any size defaulted project, at any location, Afghan National Army Brigade Facilities commencing work within a 48-hour window. We provide consultation, cost analysis, technical, financial and administrative oversight to reduce liquidated damages or Mazar-e-Sharif and Gardez, Afghanistan other financial damages to the Surety. We provide a seamless takeover or an immediate resumption of the project work. In Washington State, we were called in by Under a contract with the US Army Corps of Engineers, we continue to design and construct brigade facilities for the Afghan National Army. The facilities will support Zurich to complete the work of a subcontractor who, at 70% completion, defaulted on its contract to perform concrete work, structural upgrades and seismic reinforce- a regional brigade and include water treatment, storage and distribution systems; a sewage collection system; a prime power plant and site power distribution system; ment on the Legislative Building that was damaged by the Nisqually Earthquake on February 28, 2001 (magnitude 6.8). In addition to completing work on the lower dining facilities; administrative buildings and barracks, helipads, training ranges, communications systems, and associated site work. The scope of work also includes portion of the building, we were responsible for providing temporary services including power, sanitation and transportation of workers. the development of a master plan for each base to guide future expansion. 16 17
  • 11. Perini Civil Construction Infrastructure Repair+Replacement Perini Civil Construction is focused on transportation and infrastructure repair and replacement projects in Metropolitan New York and Northern New Jersey. In addition to mass transit systems and highways and bridges, we are well suited to construct mainline sewers, water distribution networks and waste water treatment facilities. Our strength lies in the resourcefulness of our people. We view project challenges not as obstacles to progress, but as opportunities for teamwork, collaboration and innovation. We are tenacious advocates of the owner’s best interests and work cooperatively with its project partners to exceed all expectations. Jamaica Station Jamaica, New York Throughout 2004, Perini continued construction of Jamaica Station, an intermodal transportation center that is the terminus of the JFK AirTrain, an 8.4-mile elevated transit system. New York Construction News, a McGraw-Hill publication, awarded Jamaica Station its “2004 Airport Project of the Year.” Cherry Hill Construction Jessup, Maryland The acquisition of Cherry Hill Construction, Inc. in January 2005 will broaden our presence in the Bronx-Whitestone Bridge Mid-Atlantic States and Southeast Queens, New York U.S. Cherry Hill specializes in A joint venture of Perini and O&G of Torrington, CT is replacing 780,000 square feet of the original 64-year old roadway deck on the Bronx- excavation, foundations, paving and Whitestone Bridge with a new lightweight, orthotropic steel deck that will strengthen the bridge while reducing the weight of the span by civil infrastructure. Cherry Hill has 22 percent. Deck replacement of all six of the bridge’s lanes includes removal of the original 4 1⁄2 inch thick concrete-filled steel grid deck, regional operations in Maryland, crossbeams and stringers with a new lightweight steel orthotropic deck with a bonded aggregate riding surface similar to the deck Perini Virginia, Delaware, District of installed on the Triborough Bridge. Columbia and Florida. 18 19
  • 12. Diversity in Construction: MGM MIRAGE Backlog Briefs MGM MIRAGE is setting the standard for diversity in the hospitality and gaming industry. The Company recognizes diversity as Project CityCenter “a timeless, enduring value, but nonetheless an evolutionary process” that requires dedication, innovation and focus. MGM MIRAGE Perini Building Company has been selected by MGM MIRAGE to build a major portion of Project CityCenter, one of the largest building MGM MIRAGE requires minority participation on all construction bids, creating joint ventures that pair qualified minority-owned, construction programs currently underway in the United States. MGM women-owned and disadvantaged business enterprises with majority contractors. The benefits of the initiative to the minority contractor MIRAGE plans for Perini’s construction contract to include a 4,000- room hotel tower, casino, convention center, showroom, approximately include a greater knowledge of all developmental phases of construction and increased limits of state contracting licenses. For us and 500,000 square-feet of retail and restaurants, three branded boutique hotels and numerous residential towers. Perini will also be responsible other majority contractors, the benefits include the opportunity to build relationships with qualified minority contractors, to share in for constructing the infrastructure, hardscape and landscape. the success of each project and to identify resources needed to meet the expectations of discerning owners and an ever-increasingly Ehrenkrantz, Eckstut & Kuhn Architects, creator of Battery Park in New York City, developed the master plan. Perini expects to break ground sophisticated market. on Project CityCenter—located between the Bellagio and Monte Carlo casino resorts in Las Vegas—in the summer of 2005 with planned completion of the entire project by the end of 2009. “ Perini introduced us to the fast-paced hospitality and gaming market where Red Rock Casino.Resort.Spa Hard Rock Live! quality and speed of execution are Summerlin, Nevada Hollywood, Florida fundamental to success. Perini fully Station Casinos, Inc. Seminole Properties Retail Inc. embraced the spirit and intent of In Brief: Design by Friedmutter Group, Phases I and II consist In Brief: Design by Morris Architects is 5,600-seat, of 850 rooms, 94,000 square feet of meeting and convention 120,000-square-foot multi-purpose entertainment venue. MGM’s diversity initiative, mentoring space, a 35,000-square-foot spa, and parking for 5,500 vehicles. Phase II had not been awarded as of May 1, 2005. our people, opening doors to new Environmental Science/Criminal Justice Facility, Phase II opportunities and enabling the Miami-Dade College, North Campus growth of our company to exceed In Brief: Design by M.C. Harry & Associates, 95,000- square-foot environmental science building featuring ” expectations. One Queensridge Place Phase I biology, chemistry and physics labs, lecture hall, faculty Queensridge, Nevada offices and conference rooms. Queensridge Towers, LLC Richard Copeland, President In Brief: Design by JMA Architecture Studios is two luxury Hudson Line Stations Rehabilitation, Phase I 18-story condominium towers above two levels of parking. Thor Construction, Inc. Westchester County, New York MGM Grand Emerald Tower Condominiums will range from approximately 2,000 square feet MTA Metro-North Railroad to 14,000-square-foot penthouses. The development will include In joint venture with M/W/DBE Partner TBL Construction, Inc., Perini is remodeling spa facilities, fitness center, wine cellar, meeting rooms and In Brief: Rehabilitation of four Metro-North Railroad stations floors 1 through 14 of the Emerald Tower (not shown), including the low rise social areas. including platforms and overpasses and construction of structure. Project architect is Marnell Corrao Associates. elevators to make stations ADA compliant. Westgate City Center, Phase One Green Valley Ranch Spa Expansion Glendale, Arizona Henderson, Nevada MGM Grand Coyote Center Development LLC Green Valley Ranch Gaming LLC Dome & Sports Book Remodel In Brief: Design by Kurt D. Reed Associates, Inc. features In Brief: Design by Architropolis is two-level, 26,000- The Perini/Madison joint venture 610,000 square feet of themed commercial retail space, includ- square-foot expansion and remodel including fitness is relocating and remodeling the ing 2 four-story buildings with one level of underground parking, room, VIP and additional treatment rooms, relaxation surface parking, 7 one-story buildings, an interactive water park lounge, men’s and women’s locker rooms, offices, MGM Grand poker room and sports for children, and a two-acre water feature that will include retail space, waiting room, spa, steam room, pool, five book, including VIP suites in sports animated fountain displays. cabanas and outdoor showers. book; a new bar (at left, under construction) and delicatessen. Brooklyn/Queens Expressway Gaylord National Hotel and Convention Center Queens, New York Marnell Corrao Associates is Skylofts at MGM Grand Prince Georges County, Maryland New York State Department of Transportation the project architect. The joint venture of Perini/Thor is remodeling the 29th floor at MGM Grand. Gaylord Hotels, a subsidiary of Gaylord Entertainment Co. In Brief: Realignment, widening and new concrete Designed by Leo A. Daly with interiors by Tony Chi and Associates, the project In Brief: Design by Gensler Architecture with interiors by Avery of .8 miles of I-278, replacement/rehabilitation of 11 Recent Projects: includes phased demolition and reconstruction of high roller suites, totaling 106,000 Brooks & Associates features 1,503 rooms, over 400,000 square bridges, new ramps, retaining walls and noise wall. Theme Park Demolition square feet, creating one, two and three-bedroom, multi-floor luxury “Skylofts” of feet of convention and meeting space, and parking for 2,600 cars. In joint venture with Tutor-Saliba Corporation. An 18-story, 65,000-square-foot glass atrium will be constructed Spa Lounge Remodel 1,400 square feet, 3,200 square feet and 6,200 square feet respectively. in the signature style for which the Gaylord Hotels brand is (Perini/Thor JV) known. In joint venture with Tompkins Builders, Inc. 20
  • 13. Additional Projects 2004–2005 Richard J. Rizzo Chairman (Not featured in Second Century but active in ‘04 or acquired by May 1, 2005) Perini Building Company, Inc. 360 East Coronado Road Perini Building Company, Inc. Phoenix, AZ 85004 49–51 Commonwealth Avenue, Boston, MA (602) 256-6777 126–130 Beacon Street, Boston, MA AstraZeneca Plant Expansion, Westborough, MA Kenneth R. Bock AstraZeneca 6th Respule Interior Fit-up, Westborough, MA Vice President, Business Development Caesars Palace Plaza, Las Vegas, NV Perini Building Company, Inc. Caritas St. Elizabeth’s Medical Center, Brighton, MA 360 East Coronado Road CCA Florence Correctional Center Housing Addition, Florence, NV Phoenix, AZ 85004 Chumash Casino Resort, Santa Ynez, CA (602) 256-6777 Donald W. Reynolds Girl Scout Training & Service Center, Las Vegas, NV Ferrara’s Cafe, Las Vegas, NV Greg Maestas Green Valley Ranch Secluded Plunge Pool, Henderson, NV Director of Business Development La Posada Senior Living Community. Palm Beach Lakes, FL Perini Building Company, Inc. Lucent Technologies, Westford, MA 3960 Howard Hughes Parkway Suite 620 MGM Grand Mansion Casino & Robuchon Restaurant, Las Vegas, NV Las Vegas, NV 89109 North Garage and Roadway Infrastructure, Hartford, CT Palms Penthouse Suites, Tenant Improvements, Las Vegas, NV (702) 792-9209 Riverside Resort Parking Structure & Casino Addition, Laughlin, NV San Manuel Fire Remediation Project, Highland, CA Joseph R. Perini Segafredo Zanetti Espresso, Las Vegas, NV Vice President, Business Development Seminole Hard Rock Hotel & Casino. Hollywood, FL Perini Building Company, Inc. Thunder Valley Casino Remodel, Lincoln, CA 73 Mt. Wayte Avenue Thunder Valley Casino–Athens Connector, Lincoln, CA Framingham, MA 01701 (508) 628-2257 James A. Cummings, Inc. Apopka/Rock Springs/Zellwood Elementary School Relief, Apopka, FL Ray de la Feuilliez Class Size Reduction Program, Broward County, FL Vice President of Business Development Dave Thomas Education Center, Coconut Creek, FL James A. Cummings, Inc. Federal Inspection Services, Terminal 4, Fort Lauderdale, FL 3575 NW 53rd Street Florida Atlantic University (FAU), College of Business, Boca Raton, FL Ft. Lauderdale, FL 33309 FAU, Lifelong Learning Complex, Jupiter, FL (954) 733-4211 ext. 244 FAU/Harbor Branch Oceanographic Institute, Marine Science Partnership, Ft. Pierce, FL Forest Hill High School, West Palm Beach, FL Ed Greco Life Behavioral Science Complex, Florida Atlantic University, Boca Raton, FL Director of Business Development Lost Lake Elementary School, Lake County, FL Perini Management Services, Inc. McArthur High School, Hollywood, FL 73 Mt. Wayte Avenue Museum Parking Garage, Coral Gables, FL Framingham, MA 01701 New Meadow Woods Middle School Relief, Orlando, FL (508) 628-2417 New Piedmont Lakes Middle School Relief, Apopka, FL No. Lauderdale Neighborhood Library, North Lauderdale, FL Osceola Creek Middle School, Loxahatchee, FL Henry Cheung Parking Garage, Florida Atlantic University, Boca Raton, FL Chief Estimator Pines Middle School, Pembroke Pines, FL Perini Civil Construction Pine Ridge Elementary School, Clermont, FL 1022 Lower South Street Roosevelt Elementary School, West Palm Beach, FL Peekskill, NY 10566 Sunset Strip Neighborhood Library, Sunrise, FL (914) 739-1908 Village of Miami Shores Charter School, Miami Shores, FL West Regional Library Renovation and Addition, Plantation, FL David B. Openshaw YMCA Family Center of West Broward, Weston, FL Executive Vice President & General Manager Cherry Hill Construction, Inc. Perini Management Services, Inc. 8211 Washington Boulevard Exelon Nuclear Maintenance, IL, PA, NJ Jessup, MD 20794 Office of Overseas Buildings Operations, Islamabad, Pakistan (410) 799-3577 Upgraded Early Warning Radar NETL, Fylingdales, United Kingdom Lindbergh Middle School Renovations, Long Beach, CA www.perini.com Sewer and Water Project, Holbrook, MA Wastewater Collection System, Meridian, MS Lincoln City Community Center, Lincoln City, OR Second Century Municipal Buildings, Mobile, AL Project Management: Field Communications Associates, Inc. Henry Hudson Parkway Bridge Restoration, Manhattan, NY Creative: Beagan+Nguyen Design Principal Photography: Field Communications Associates, Inc. Other Photography/Renderings: Perini Civil Ian Vaughan Productions, Inc. (Does not include Cherry Hill Construction, Inc.) Gregg Photographic, LLC Bowery Bay Water Pollution Plant, Astoria, NY Ed Zealy Photography Harlem Substation Rehabilitation, Manhattan, NY Greg Kohl, AC Photo Henry Hudson Parkway Bridge Restoration, Manhattan, NY JMA Architectural Studios Long Island Expressway, Queens, NY Station Casinos Inc. Newtown Creek Water Pollution Control Plant, Brooklyn, NY Coyote Center Development LLC Triborough Bridge Structure & Deck Replacement, Randall’s Island, NY Gensler Architecture