SlideShare ist ein Scribd-Unternehmen logo
1 von 5
Georgios Vagiannis
Project Manager Engineering
Engineering and Special Projects
Business Group Indoor Climate
Tangstedter Landstr. 111
22415 Hamburg Germany
T +49 (0)40 30 986-465
F +49 (0)40 30 986-49465
georgios.vagiannis@uponor.com
The concept of combined geothermal energy and
Thermal Active Building Systems (TABS): GEOTABS
Date: 15.03.2013
Location: Hamburg
Distribution: Ioannis Filippidis, Energia innovation Ltd
Salman Zafar, ecoMENA
Dear Sirs,
Uponor is a leading international provider of plumbing and indoor climate systems for the
residential and commercial building markets. Our solutions play an important role in
people's lives globally by providing products that create a comfortable environment for
living, work and leisure.
The concept of combined geothermal energy and Thermal Active Building Systems
(TABS), known as GEOTABS, has been developed the last years and has known great
success. The energy saving potential is substantial, starting from 20% and going up to
70%. For a system like this though to reach its maximum potential of energy savings,
professional design, control and installation, combined with a product of highest quality,
must be combined from feasibility stage to final building-in-operation stage. The latter
means that experienced and professional partners are considered crucial for system
optimization.
There are numerous researches, studies and references in the last years that show the
energy savings that the GEOTABS system can provide when it comes to heating and
cooling of buildings. Apart from some other studies that have been sent to you, we would
like to provide you with some general results of a related study from Uponor “Full cost
comparison of TABS vs. other HVAC”, conducted in cooperation with Equa Simulation
Finland Oy and Mott MacDonald Limited, UK.
This study compared a Life Cycle Cost (LCC) analysis of an office building with a TAB
system to dominant traditional systems in five European countries; Germany, UK,
France, Russia and Spain. Two locations where selected from each country and the local
dominant traditional systems where compared to TABS and also GEOTABS (TABS with HP
as seen below). Spain which its two selected locations, Madrid and Barcelona, are
considered to be closer climatically to the Middle East and the locally dominant systems
in Spain, all air system and fan coils, very close to the systems installed in the most
cases in the Middle Eastern region also. It should also be noted that the mechanical
minimum fresh air ventilation system was introduced to create the same indoor air
quality (IAQ) condition for all compared cases.
The Building Energy Simulation (BES) data used to collate the report was provided by
Equa Simulation Finland Oy. Cost analyses were performed by Mott MacDonald Limited.
Using outputs from thermal modelling by Equa carried out on each case, Mott MacDonald
created design concepts and quantity survey for each mechanical services method. Costs
were obtained from a variety of sources, including manufacturers, construction
economists, and Mott MacDonald’s own expertise.
The building consisted of four floors with a total area of 1000 m2
, length of 29 m, width
of 11 m, storey height of 2.8 m and total height of 12 m (Fig.1).
Georgios Vagiannis
Project Manager Engineering
Engineering and Special Projects
Business Group Indoor Climate
Tangstedter Landstr. 111
22415 Hamburg Germany
T +49 (0)40 30 986-465
F +49 (0)40 30 986-49465
georgios.vagiannis@uponor.com
Fig. 1: The office building into investigation.
The LCC calculation is undertaken in accordance with the method corresponding to the
term of global cost in EU Regulation No 244/2012, in terms of whole life cost for a 15
year calculation period. Local and central plant (HVAC system items) were sized based on
cooling/heating loads and ventilation rates from BES modeling, in the same method in
the course of completing a mechanical scheme design. Whole life costs for building and
building elements were calculated by summing up the different types of costs (initial
investment, energy, running, disposal) and applying on these the discount rate as to
refer them back to the starting year, plus the residual value as can be seen in Fig. 2
below.
Fig. 2: Whole life costs calculation.
So the LCC comprises the initial investment costs (material and labor cost, project
management and design cost as a percentage of material cost), running costs
(maintenance, capital for renovation/replacement at the end of equipment lifetime) and
energy costs (utilities and fuel prices, annual energy use).
Georgios Vagiannis
Project Manager Engineering
Engineering and Special Projects
Business Group Indoor Climate
Tangstedter Landstr. 111
22415 Hamburg Germany
T +49 (0)40 30 986-465
F +49 (0)40 30 986-49465
georgios.vagiannis@uponor.com
Some final and general results for the location of Madrid are provided below. Annual used
primary energy shows a total sum that has been used by the building. Primary energy
refers to the energy carriers at the beginning of the energy conversion chains (natural
resources) prior to undergoing any human-made conversions or transformations. Primary
energy factors: for electricity 2.21 and for natural gas 1.07.
Fig. 3: Annual delivered primary energy [kWh].
Annual energy cost including cost of installing a new connection and annual standing
charge calculated for 15 years of life cycle. Cost of installing a new connection for natural
gas is not included in the case of TABS with HP.
Fig. 4: Average annual energy costs comparison average per year, 15 years calculation period.
To conclude on the LCC comparison between the proposed systems, the whole life cost
per year is provided, for a calculation for 15 years period and with medium price
escalation of 3% for gas and electricity.
0
20000
40000
60000
80000
100000
120000
140000
160000
All air fancoil TAB TAB w HP
Heating
HVAC aux
Cooling
0
2000
4000
6000
8000
10000
12000
TAB TAB w HP Fan coil All air
HVAC aux. cost/year
Heating cost/year
Cooling cost/year
Georgios Vagiannis
Project Manager Engineering
Engineering and Special Projects
Business Group Indoor Climate
Tangstedter Landstr. 111
22415 Hamburg Germany
T +49 (0)40 30 986-465
F +49 (0)40 30 986-49465
georgios.vagiannis@uponor.com
Fig. 5: Global cost, average per year, 15 years calculation period.
Concluding in the results for the location that was provided above, Madrid, and also from
the results from all the other locations, the TAB system (TABS) had the lowest LCC global
cost from the studied systems. This low LCC global cost was also accompanied by the
best thermal comfort results among all the studied systems, thermal comfort advantages
that only a radiant cooling system can provide. The TABS with heat pump had the second
average lowest LCC global cost with lowest primary energy consumption, accompanied
by the same optimized thermal comfort conditions. The TABS without heat pump had the
second best average primary energy consumption.
It is important also to mention that the LCC global cost average rankings for both TABS
variations (with or without heat pump) were the same with all variations of electricity and
gas price escalation rate and for both calculation periods (10 and 15 years).
The advantageous use of TAB ceiling cooling with high supply water temperatures (17°C
- 22°C) enabled the high COP in cooling and constituted more efficient free cooling from
ground with the installation of the heat pump. The utilization of an intelligent control
system was the key to minimize the energy demand for cooling and thus the related
costs.
The investment costs of both TABS versions were the lowest of the investigated systems
and also the cost optimal one. The latter was enabled also through the lowest
maintenance costs among the systems, simply due to the compared lower amount of
components which needed service and maintenance. It is essential to point out that the
TABS with the installed pipework in the ceiling provides relative safety from mechanical
and chemical stress and has an estimated lifetime of 50 years. Moreover, the residual
value of TABS investments after 10 or 15 years calculation period is in both TABS cases
bigger than with the other systems, where most of their components have a shorter
lifetime (10-30 years) than the TABS ones.
The advantages that TABS is equipped with derive from the function of the TABS itself.
All the other investigated systems have lower supply temperature level with typical
dimension supply temperature of 7°C. Besides, cooling of the office spaces takes place
mainly by convection. The latter means that without cooled radiating surfaces the same
indoor operative temperature requires more cooling than with the TABS ceiling system.
At the same time the lower cooling water temperature decreased the COP for cooling in
lower levels than with the TABS. Furthermore, the convective cooling with high air
0
10000
20000
30000
40000
50000
60000
TAB TAB w HP Fan coil All air
HVAC aux. cost/year
Heating cost/year
Cooling cost/year
Maintenance cost/year
Renovation cost/year
Investment cost/year
Georgios Vagiannis
Project Manager Engineering
Engineering and Special Projects
Business Group Indoor Climate
Tangstedter Landstr. 111
22415 Hamburg Germany
T +49 (0)40 30 986-465
F +49 (0)40 30 986-49465
georgios.vagiannis@uponor.com
quantities increases the risk of draught and thus comfort dissatisfaction. Finally, the all
air system and the fan coil system used higher air volumes and lower supply
temperatures than TAB system, resulting in that way in higher fan energy and so even
higher risk for draught and comfort dissatisfaction.
All the above conclude to the fact that a TAB system can constitute an economical
optimal solution, when calculated for an economically reasonable time, where all relevant
costs are included. A ground source heat pump can deliver also lower running costs,
accompanied though with increased investment costs, which by all means constitute
lower LCC global costs of the other investigated systems. Moreover, the substantial
economical LCC advantages of the TABS are accompanied by optimized indoor thermal
comfort results of a radiant cooling system. In conclusion, a TAB system has proven
adaptable and cost effective for the Spanish conditions, providing both cost reductions
and improved indoor environment. Finally, the system is future proof as it works with any
kind of energy source and facilitates the integration of renewable and free cooling
sources.
Hamburg, 15.03.2013
Georgios Vagiannis

Weitere ähnliche Inhalte

Andere mochten auch

0 oh putain
0 oh putain0 oh putain
0 oh putainecyrbaf
 
Albert Riba (Mamut o Sapiens). Las 10 inquietudes vitales para adaptarse y em...
Albert Riba (Mamut o Sapiens). Las 10 inquietudes vitales para adaptarse y em...Albert Riba (Mamut o Sapiens). Las 10 inquietudes vitales para adaptarse y em...
Albert Riba (Mamut o Sapiens). Las 10 inquietudes vitales para adaptarse y em...SalonMiEmpresa
 
No hago las cosas por dinero, las hago por mucho, mucho dinero
No hago las cosas por dinero, las hago por mucho, mucho dineroNo hago las cosas por dinero, las hago por mucho, mucho dinero
No hago las cosas por dinero, las hago por mucho, mucho dineroSalonMiEmpresa
 
Félix Lozano. Team Academy
Félix Lozano. Team AcademyFélix Lozano. Team Academy
Félix Lozano. Team AcademySalonMiEmpresa
 
Diversità per Recommender Systems
Diversità per Recommender SystemsDiversità per Recommender Systems
Diversità per Recommender SystemsPaolo Tomeo
 
Concept of radiant cooling and geothermal system
Concept of radiant cooling and geothermal systemConcept of radiant cooling and geothermal system
Concept of radiant cooling and geothermal systemENERGIA INNOVATION Ltd
 
Introduction to Machine Learning with TensorFlow
Introduction to Machine Learning with TensorFlowIntroduction to Machine Learning with TensorFlow
Introduction to Machine Learning with TensorFlowPaolo Tomeo
 
Kung fu Programming
Kung fu ProgrammingKung fu Programming
Kung fu ProgrammingWisecube AI
 
Validable. Business Model y Lean Startup
Validable. Business Model y  Lean StartupValidable. Business Model y  Lean Startup
Validable. Business Model y Lean StartupSalonMiEmpresa
 
¿Quién puede ayudarme (a poder ser gratis) con la Propiedad Industrial? - Cor...
¿Quién puede ayudarme (a poder ser gratis) con la Propiedad Industrial? - Cor...¿Quién puede ayudarme (a poder ser gratis) con la Propiedad Industrial? - Cor...
¿Quién puede ayudarme (a poder ser gratis) con la Propiedad Industrial? - Cor...SalonMiEmpresa
 

Andere mochten auch (14)

The power of introverts
The power of introvertsThe power of introverts
The power of introverts
 
0 oh putain
0 oh putain0 oh putain
0 oh putain
 
Albert Riba (Mamut o Sapiens). Las 10 inquietudes vitales para adaptarse y em...
Albert Riba (Mamut o Sapiens). Las 10 inquietudes vitales para adaptarse y em...Albert Riba (Mamut o Sapiens). Las 10 inquietudes vitales para adaptarse y em...
Albert Riba (Mamut o Sapiens). Las 10 inquietudes vitales para adaptarse y em...
 
No hago las cosas por dinero, las hago por mucho, mucho dinero
No hago las cosas por dinero, las hago por mucho, mucho dineroNo hago las cosas por dinero, las hago por mucho, mucho dinero
No hago las cosas por dinero, las hago por mucho, mucho dinero
 
Félix Lozano. Team Academy
Félix Lozano. Team AcademyFélix Lozano. Team Academy
Félix Lozano. Team Academy
 
Buildings for tomorrow
Buildings for tomorrowBuildings for tomorrow
Buildings for tomorrow
 
Diversità per Recommender Systems
Diversità per Recommender SystemsDiversità per Recommender Systems
Diversità per Recommender Systems
 
Ioannis project portfolio selected
Ioannis project portfolio selectedIoannis project portfolio selected
Ioannis project portfolio selected
 
Concept of radiant cooling and geothermal system
Concept of radiant cooling and geothermal systemConcept of radiant cooling and geothermal system
Concept of radiant cooling and geothermal system
 
Introduction to Machine Learning with TensorFlow
Introduction to Machine Learning with TensorFlowIntroduction to Machine Learning with TensorFlow
Introduction to Machine Learning with TensorFlow
 
Kung fu Programming
Kung fu ProgrammingKung fu Programming
Kung fu Programming
 
Uponor radiant cooling gv
Uponor radiant cooling gvUponor radiant cooling gv
Uponor radiant cooling gv
 
Validable. Business Model y Lean Startup
Validable. Business Model y  Lean StartupValidable. Business Model y  Lean Startup
Validable. Business Model y Lean Startup
 
¿Quién puede ayudarme (a poder ser gratis) con la Propiedad Industrial? - Cor...
¿Quién puede ayudarme (a poder ser gratis) con la Propiedad Industrial? - Cor...¿Quién puede ayudarme (a poder ser gratis) con la Propiedad Industrial? - Cor...
¿Quién puede ayudarme (a poder ser gratis) con la Propiedad Industrial? - Cor...
 

Mehr von ENERGIA INNOVATION Ltd

Mehr von ENERGIA INNOVATION Ltd (6)

Hpcy2020 aplication
Hpcy2020 aplicationHpcy2020 aplication
Hpcy2020 aplication
 
Energia innovation company profile 2019
Energia innovation company profile 2019Energia innovation company profile 2019
Energia innovation company profile 2019
 
hygene air 50 rev3 en
hygene air 50 rev3 enhygene air 50 rev3 en
hygene air 50 rev3 en
 
Product energia
Product energiaProduct energia
Product energia
 
Xanthi energia-innovation
Xanthi energia-innovationXanthi energia-innovation
Xanthi energia-innovation
 
06 2011 Eppy I Gb S
06 2011 Eppy I Gb S06 2011 Eppy I Gb S
06 2011 Eppy I Gb S
 

Kürzlich hochgeladen

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 

Kürzlich hochgeladen (20)

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 

Geotabs gv uponor

  • 1. Georgios Vagiannis Project Manager Engineering Engineering and Special Projects Business Group Indoor Climate Tangstedter Landstr. 111 22415 Hamburg Germany T +49 (0)40 30 986-465 F +49 (0)40 30 986-49465 georgios.vagiannis@uponor.com The concept of combined geothermal energy and Thermal Active Building Systems (TABS): GEOTABS Date: 15.03.2013 Location: Hamburg Distribution: Ioannis Filippidis, Energia innovation Ltd Salman Zafar, ecoMENA Dear Sirs, Uponor is a leading international provider of plumbing and indoor climate systems for the residential and commercial building markets. Our solutions play an important role in people's lives globally by providing products that create a comfortable environment for living, work and leisure. The concept of combined geothermal energy and Thermal Active Building Systems (TABS), known as GEOTABS, has been developed the last years and has known great success. The energy saving potential is substantial, starting from 20% and going up to 70%. For a system like this though to reach its maximum potential of energy savings, professional design, control and installation, combined with a product of highest quality, must be combined from feasibility stage to final building-in-operation stage. The latter means that experienced and professional partners are considered crucial for system optimization. There are numerous researches, studies and references in the last years that show the energy savings that the GEOTABS system can provide when it comes to heating and cooling of buildings. Apart from some other studies that have been sent to you, we would like to provide you with some general results of a related study from Uponor “Full cost comparison of TABS vs. other HVAC”, conducted in cooperation with Equa Simulation Finland Oy and Mott MacDonald Limited, UK. This study compared a Life Cycle Cost (LCC) analysis of an office building with a TAB system to dominant traditional systems in five European countries; Germany, UK, France, Russia and Spain. Two locations where selected from each country and the local dominant traditional systems where compared to TABS and also GEOTABS (TABS with HP as seen below). Spain which its two selected locations, Madrid and Barcelona, are considered to be closer climatically to the Middle East and the locally dominant systems in Spain, all air system and fan coils, very close to the systems installed in the most cases in the Middle Eastern region also. It should also be noted that the mechanical minimum fresh air ventilation system was introduced to create the same indoor air quality (IAQ) condition for all compared cases. The Building Energy Simulation (BES) data used to collate the report was provided by Equa Simulation Finland Oy. Cost analyses were performed by Mott MacDonald Limited. Using outputs from thermal modelling by Equa carried out on each case, Mott MacDonald created design concepts and quantity survey for each mechanical services method. Costs were obtained from a variety of sources, including manufacturers, construction economists, and Mott MacDonald’s own expertise. The building consisted of four floors with a total area of 1000 m2 , length of 29 m, width of 11 m, storey height of 2.8 m and total height of 12 m (Fig.1).
  • 2. Georgios Vagiannis Project Manager Engineering Engineering and Special Projects Business Group Indoor Climate Tangstedter Landstr. 111 22415 Hamburg Germany T +49 (0)40 30 986-465 F +49 (0)40 30 986-49465 georgios.vagiannis@uponor.com Fig. 1: The office building into investigation. The LCC calculation is undertaken in accordance with the method corresponding to the term of global cost in EU Regulation No 244/2012, in terms of whole life cost for a 15 year calculation period. Local and central plant (HVAC system items) were sized based on cooling/heating loads and ventilation rates from BES modeling, in the same method in the course of completing a mechanical scheme design. Whole life costs for building and building elements were calculated by summing up the different types of costs (initial investment, energy, running, disposal) and applying on these the discount rate as to refer them back to the starting year, plus the residual value as can be seen in Fig. 2 below. Fig. 2: Whole life costs calculation. So the LCC comprises the initial investment costs (material and labor cost, project management and design cost as a percentage of material cost), running costs (maintenance, capital for renovation/replacement at the end of equipment lifetime) and energy costs (utilities and fuel prices, annual energy use).
  • 3. Georgios Vagiannis Project Manager Engineering Engineering and Special Projects Business Group Indoor Climate Tangstedter Landstr. 111 22415 Hamburg Germany T +49 (0)40 30 986-465 F +49 (0)40 30 986-49465 georgios.vagiannis@uponor.com Some final and general results for the location of Madrid are provided below. Annual used primary energy shows a total sum that has been used by the building. Primary energy refers to the energy carriers at the beginning of the energy conversion chains (natural resources) prior to undergoing any human-made conversions or transformations. Primary energy factors: for electricity 2.21 and for natural gas 1.07. Fig. 3: Annual delivered primary energy [kWh]. Annual energy cost including cost of installing a new connection and annual standing charge calculated for 15 years of life cycle. Cost of installing a new connection for natural gas is not included in the case of TABS with HP. Fig. 4: Average annual energy costs comparison average per year, 15 years calculation period. To conclude on the LCC comparison between the proposed systems, the whole life cost per year is provided, for a calculation for 15 years period and with medium price escalation of 3% for gas and electricity. 0 20000 40000 60000 80000 100000 120000 140000 160000 All air fancoil TAB TAB w HP Heating HVAC aux Cooling 0 2000 4000 6000 8000 10000 12000 TAB TAB w HP Fan coil All air HVAC aux. cost/year Heating cost/year Cooling cost/year
  • 4. Georgios Vagiannis Project Manager Engineering Engineering and Special Projects Business Group Indoor Climate Tangstedter Landstr. 111 22415 Hamburg Germany T +49 (0)40 30 986-465 F +49 (0)40 30 986-49465 georgios.vagiannis@uponor.com Fig. 5: Global cost, average per year, 15 years calculation period. Concluding in the results for the location that was provided above, Madrid, and also from the results from all the other locations, the TAB system (TABS) had the lowest LCC global cost from the studied systems. This low LCC global cost was also accompanied by the best thermal comfort results among all the studied systems, thermal comfort advantages that only a radiant cooling system can provide. The TABS with heat pump had the second average lowest LCC global cost with lowest primary energy consumption, accompanied by the same optimized thermal comfort conditions. The TABS without heat pump had the second best average primary energy consumption. It is important also to mention that the LCC global cost average rankings for both TABS variations (with or without heat pump) were the same with all variations of electricity and gas price escalation rate and for both calculation periods (10 and 15 years). The advantageous use of TAB ceiling cooling with high supply water temperatures (17°C - 22°C) enabled the high COP in cooling and constituted more efficient free cooling from ground with the installation of the heat pump. The utilization of an intelligent control system was the key to minimize the energy demand for cooling and thus the related costs. The investment costs of both TABS versions were the lowest of the investigated systems and also the cost optimal one. The latter was enabled also through the lowest maintenance costs among the systems, simply due to the compared lower amount of components which needed service and maintenance. It is essential to point out that the TABS with the installed pipework in the ceiling provides relative safety from mechanical and chemical stress and has an estimated lifetime of 50 years. Moreover, the residual value of TABS investments after 10 or 15 years calculation period is in both TABS cases bigger than with the other systems, where most of their components have a shorter lifetime (10-30 years) than the TABS ones. The advantages that TABS is equipped with derive from the function of the TABS itself. All the other investigated systems have lower supply temperature level with typical dimension supply temperature of 7°C. Besides, cooling of the office spaces takes place mainly by convection. The latter means that without cooled radiating surfaces the same indoor operative temperature requires more cooling than with the TABS ceiling system. At the same time the lower cooling water temperature decreased the COP for cooling in lower levels than with the TABS. Furthermore, the convective cooling with high air 0 10000 20000 30000 40000 50000 60000 TAB TAB w HP Fan coil All air HVAC aux. cost/year Heating cost/year Cooling cost/year Maintenance cost/year Renovation cost/year Investment cost/year
  • 5. Georgios Vagiannis Project Manager Engineering Engineering and Special Projects Business Group Indoor Climate Tangstedter Landstr. 111 22415 Hamburg Germany T +49 (0)40 30 986-465 F +49 (0)40 30 986-49465 georgios.vagiannis@uponor.com quantities increases the risk of draught and thus comfort dissatisfaction. Finally, the all air system and the fan coil system used higher air volumes and lower supply temperatures than TAB system, resulting in that way in higher fan energy and so even higher risk for draught and comfort dissatisfaction. All the above conclude to the fact that a TAB system can constitute an economical optimal solution, when calculated for an economically reasonable time, where all relevant costs are included. A ground source heat pump can deliver also lower running costs, accompanied though with increased investment costs, which by all means constitute lower LCC global costs of the other investigated systems. Moreover, the substantial economical LCC advantages of the TABS are accompanied by optimized indoor thermal comfort results of a radiant cooling system. In conclusion, a TAB system has proven adaptable and cost effective for the Spanish conditions, providing both cost reductions and improved indoor environment. Finally, the system is future proof as it works with any kind of energy source and facilitates the integration of renewable and free cooling sources. Hamburg, 15.03.2013 Georgios Vagiannis