Public Meeting


Belle View/New Alexandria/River Towers

    Flood Risk Management Study
            Status Update


             October 25, 2012
Purposes of Meeting

• Review the Belle View/New
  Alexandria/River Towers flood risk
  management study
• Initiate a discussion with residents about
  the alignment of a flood wall/levee
• Start to create consensus among
  residents about the best location of the
  proposed floodwall/levee



                                               2
Agenda

• Welcome
• Presentation by the U.S. Army Corps of
  Engineers (Corps)
• Question/Answers and Feedback
• Final Steps




                                           3
Communities are at Risk of Flooding


  1% Annual
  Chance
  Floodplain*
  Based on
  Storm Surge
  Elevation 11.2
  ft (NGVD29)




*1% annual chance flood is the flood that has a 1% chance of occurring in any
given year, sometimes referred to as the 100-year flood
                                                                                4
Flood Inundation Areas to Elev. 14 Ft.

• Sea Level Rise
will increase
chance of
flooding
• Floods higher
than the 1%
chance flood
DO occur




                                               5
Elevation Data
• Many low openings/first floors: elevation
  6-11 feet
• Majority of ground elevation is 8-9 feet in
  Belle View, 4-9 feet in New Alexandria
• 2% annual chance (50 year/Hurricane
  Isabel) storm surge: 9.6 feet
• 1% annual chance (100 year) storm
  surge: 11.2 feet
• 0.2% annual chance (500 year) storm
  surge: 16.2 feet
                                                6
Previous Study
• Completed Feb 2008 – Flood Damage Reduction
  Analysis for Belle Haven Watershed (by Corps)
  – Fairfax County requested that Corps conduct a study to
    evaluate various flood damage reduction alternatives to
    determine if they are technically feasible
  – Conducted under technical services program; was not a
    Corps project study authorized by Congress
  – County asked Corps to conduct preliminary economic
    analysis to determine if a project might meet the federal
    economic justification requirements
  – Evaluated alternatives to protect entire study area, and
    New Alexandria/Belle View independently



                                                                7
Project Goals and Objectives

• Goal
  – Provide adequate flood risk management
    measures that are technically feasible and
    financially prudent for the safety of communities
• Objectives
  – Examine various alternatives for reducing flood
    risk and damages – primarily from storm surge
  – Minimize risk to the community
  – Minimize environmental impacts
  – Incorporate needs/desires of the communities to
    the degree possible

                                                        8
2008 Study - Most Cost Effective, Plan 1b
• Preliminary concept plan assumed top of
  levee/floodwall at elevation 12.0’ (0.8’
  above 1% annual chance elevation; no risk
  and uncertainty analysis was conducted;
  cannot say will provide “100-year
  protection” and no sea level rise
  considered)
• Approx. 6600 feet long; 4-6 feet above
  ground



                                              9
Plan 1b (2008 Study) -
Levee/Floodwall Alternative




                              10
Plan 1b (cont.)
• Requires 2 closure structures – along Belle
  Haven Road and Belle View Blvd
• Minimizes impacts to wetlands
• Impacts many trees
• Is partially located on NPS and River Towers
  property
• Requires 1 pumping station
• Estimated costs Plan 1b - Levee/Wall 12’
  – Construction Cost = $12.7M
  – Benefit to Cost Ratio (BCR) = 2.5
  – Current cost and BCR: $13.7M and 2.2
                                                 11
NPS Concerns Regarding Plan 1b

•   Impact to GW Memorial Parkway
•   Impact to trees
•   Impact to view/aesthetics
•   Would prefer project to be off their
    property (if on federal property, need NEPA
    process, Congressional authorization, etc.)




                                                  12
River Towers Concerns Regarding
                    Plan 1b

•   Impacts to Dykes Marsh
•   Impacts to River Towers property
•   Impacts to view/aesthetics
•   Impact of pump station on their property
•   Requested that the project be moved off
    their property




                                               13
Community Concerns Regarding Plan 1b

• Impacts to view/aesthetics & trees
• Impacts to Dyke Marsh
• Impacts to private property
• Level of protection & want it to fix the
  problem
• FEMA certification & the need for
  insurance
• Global warming/sea level rise
• Environmental impacts

                                             14
Study Progress

• 2009 – County conducted field survey and
  tree survey for study

• 2010 – 2012 – Development and evaluation of
  new alternatives
  – Team identified various new alignments
  – Coordinated alignments with NPS and made revisions
  – Investigated portable flood barriers
  – Developed concept plans, costs and benefits for the new
    plans
  – Completed a preliminary sea level rise analysis
  – Coordinated with community leaders


                                                              15
Previous and New/Modified
Floodwall/Levee Alignments
Height of Protection Overview

• 1% annual chance flood elevation (100-yr
  elevation based on storm surge) = 11.2 feet
• FEMA - for certification of project (no flood
  insurance requirement), FEMA requires the
  project be 3 feet higher than the 1% annual chance
  elevation = 14.2 feet
• CORPS – for Corps built projects, wall must be
  built higher than the design event to account for
  risk and uncertainty (varies per project, but for the
  1% annual chance flood design, typically 3-4 feet
  higher than the 1% annual chance flood elevation)
  plus sea level rise must be considered = 14.2-15.2
  feet + SLR consideration
                                                          17
Height of Protection (Cont.)
• Sea level rise predictions by the year 2100
   – Based on historic rate = 1 foot
   – Based on Intergovernmental Panel on Climate Change
     (IPCC) study = between 0.6 - 1.9 feet
   – Based on National Research Council (NRC study) = between
     1.5 – 4.7 feet
• Height of floodwall/levee has not been decided;
  initially top of protection at elevation 12 feet has
  been used for concept plan so that is can be
  compared with original plan. However, 3 heights
  of protection will eventually be evaluated and
  compared for the final alignment; higher
  protection is recommended to account for risk
  and uncertainty and sea level rise

                                                                18
Corps’ Vegetation/Tree Setback
                Requirements
• Trees can adversely impact floodwalls and levees and
  cause the flood protection system to fail
• Vegetation/tree-free zone (except grass) extends 15 feet
  on each side of a floodwall
• If a large tree has the potential to damage the wall if it
  overturns, then it should be removed. General rule of
  thumb - trees should be a minimum distance of half their
  height from a floodwall
• County surveyed trees along potential alignments;
  arborist preliminarily identified highest priority trees
  based on species/condition
• Tree setback will be based on tree height and risk; we are
  currently showing a 40-foot setback


                                                               19
Alternative
Floodwall/Levee
  Alignments
Boulevard View South
           (South of Belle View Blvd)

• Alternative BVS1 – Wall along eastern edge
  of Boulevard View (original alignment)
• Alternative BVS2 – Wall along center of
  Boulevard View
• Alternative BVS3 – Wall along western
  edge of Boulevard View




                                               21
Boulevard View South




                       22
Alternative BVS1




                   23
Boulevard View South
   Looking South




                       24
Concept View of BVS1 Looking South
    Floodwall Elevation 12 Feet




      Wall approximately 4 feet high


                                       25
Concept View of BVS1Looking South
   Floodwall Elevation 14.5 Feet




     Wall approximately 6.5 feet high



                                        26
Alternative BVS2




                   27
Alternative BVS3




                   28
Revised Alternative BVS3




                           29
Concept View of BVS3 Looking South
    Floodwall Elevation 12 Feet




   Wall approximately 4 feet high;
   Revised BVS3 wall would be constructed
   further west, closer to BV buildings


                                            30
Concept View of BVS3 Looking South
   Floodwall Elevation 14.5 Feet




  Wall approximately 6.5 feet high;
  Revised BVS3 wall would be constructed
  further west, closer to BV buildings


                                           31
Boulevard View South
   Looking West




                       32
Concept View of BVS3 Looking West
       Floodwall Elevation 12 Feet




                           Closure structure for access



Wall approximately 4 feet high;
Revised BVS3 wall would be closer to buildings

                                                          33
Concept View of BVS3 Looking West
   Floodwall Elevation 14.5 Feet




Wall approximately 6.5 feet high;
Revised BVS3 wall would be closer to buildings



                                                 34
Sample Closure Structures




                            35
36
37
38
Boulevard View Central
           (From Belle View Blvd north to
                  Old Towne Rd)

• Alternative BVC1 – Wall along eastern edge of
  Boulevard View (original alignment)
• Alternative BVC2 – Move Boulevard View to the
  west; wall along eastern edge of Boulevard View
• Alternative BVC3 – Wall on west side of Boulevard
  View
• Revised Alternative BVC3 – Wall on west side of
  Boulevard View south of I Street; north of I Street
  – shift road west and wall on east side




                                                        39
Boulevard View Central




                         40
Alternative BVC1




                   41
Boulevard View Central Looking
Southeast Along Road Near H Street




                                     42
Concept View of BVC1 Looking Southeast
      Floodwall Elevation 12 Feet




                Wall approximately 3 feet high


                                                 43
Concept View of BVC1 Looking East
   Floodwall Elevation 14.5 Feet




            Wall approximately 5.5 feet high


                                               44
Boulevard View Central Looking West




                                      45
Concept View of BVC1 Looking West
    Floodwall Elevation 12 Feet




     Wall approximately 3 feet high




                                      46
Concept View of BVC1 Looking West
   Floodwall Elevation 14.5 Feet




      Wall approximately 5.5 feet high




                                         47
Alternative BVC2




                   48
Alternative BVC3




                   49
Revised Alternative BVC3




                           50
51
52
53
54
55
Boulevard View North
     (From Old Towne Rd to Belle Haven Rd)

• Alternative BVN1 - Wall behind houses
  along NPS property (original alignment)
• Alternative BVN2 – Wall behind houses on
  private property
• Alternative BVN3 – Wall runs along Old
  Towne Rd and 10th Street; 7 houses
  outside protection




                                             56
Boulevard View North




                       57
Alternative BVN1




                   58
Alternative BVN2




                   59
Boulevard View North




BVN1 and BVN2 - Wall would run
near existing fence (existing wood
fence is approx. 4’4” high)



                                           60
Alternative BVN3




                   61
62
63
64
65
66
New Alignment –
Floodwall along
    GWMP




                  67
68
Southern Area
              (near River Towers)

• Alternative S1 – Levee/wall along south
  side of River Towers (original alignment)
• Alternative S1A – Levee/wall along south
  side of River Towers closer to building
• Alternative S2 – Wall adjacent to Belle View
  Condo north of West channel
• Alternative S3 – Wall along southern curb
  of BV parking lot north of West channel
• Alternative S4 – Wall along northern curb
  of parking lot south of West channel
                                                 69
Southern Area




                70
Alternative S1




                 71
Looking South from River Towers




                                  72
Concept View of S1 Looking South
    Levee Elevation 12 Feet




Levee approximately 7 feet high


                                   73
Concept View of S1 Looking South
   Levee Elevation 14.5 Feet




Levee approximately 9.5 feet high

                                    74
New Alignment - Alternative S1A




                                  75
Looking West Behind Eastern River Tower




                                          76
Looking South Behind Eastern
        River Tower




                               77
Looking West Behind Center River Tower




                                         78
Looking South Behind Center River Tower




                                          79
Alternatives S2, S3, and S4




                              80
Alternative S2 – Western Part




                                81
Southern Area Looking East Between
Belle View Condo and West Channel




                                     82
Concept View of S2 Looking East
  Floodwall Elevation 12 Feet




           Wall approximately 4 feet high




                                            83
Concept View of S2 Looking East
 Floodwall Elevation 14.5 Feet




          Wall approximately 6.5 feet high



                                             84
Alternative S3 – Western Part




                                85
Concept View of S3 Looking East
  Floodwall Elevation 12 Feet




          Wall approximately 4 feet high


                                           86
Concept View of S3 Looking East
 Floodwall Elevation 14.5 Feet




          Wall approximately 6.5 feet high


                                             87
Alternative S4 – Western Part




                                88
Southern Area Looking Northwest
     across West Channel




                                  89
Eastern Part of Alternative S2, S3, S4




                                         90
Southern Area (Eastern Part) Looking
     North from River Towers




  S2, S3 and S4 - Wall would replace existing fences




                                                       91
Southern Area (Far Eastern Part)




S2, S3 and S4 - Wall would extend along this area
                                                    92
Closure Structures/Increased Risk
• The more closure structures a project has,
  the higher the risk of possible failure
• Original alignment (S1, BVS1, BVC1, BVN1)
  = 2 road closures
• Innermost alignment (S2, BVS3, BVC3,
  BVN3) = approx. 50 closures (roads,
  sidewalks, and driveways)




                                               93
Evaluation of New Plans
New Plan 1

• BVN3, BVC3, BVS3,
S1a
• No impacts to NPS
property
• River Towers within line
of protection; project on
River Towers property
• Houses near 10th St.
outside line of protection
• Estimated cost: $26.5 M
• BCR 1.2
New Plan 2

• BVN3, BVC3, BVS3, S2
• No impacts to NPS
property
• River Towers and houses
near 10th St. outside line
of protection
• Not on River Towers
property
• Estimated cost: $31.4 M
• BCR 1.0
New Plan 3

• BVN3, BVC3, BVS3, S4
• No impacts to NPS
property
• River Towers and
houses near 10th St.
outside line of protection
• S4 section on River
Towers property
• Estimated cost: $28.6 M
• BCR 1.1
New Plan 4

• BVN1, BVC3, BVS3,
Sa1
• On NPS and River
Towers property
• All structures are within
line of protection
• Estimated cost: $22.5 M
• BCR 1.4
New Plan 5

• GWMP, Sa1
• On NPS and River
Towers property
• All structures are within
line of protection
• Estimated cost: $35.2 M
• BCR 0.9
Challenges
• Except for original plan (that will have major impact
  to NPS trees), all BCR’s are less than 1.4
• Majority of alternatives would include numerous
  closure structures that County would be
  responsible for maintaining and closing
• Innermost alignments would impact Boulevard View
   – many large trees in front of condos would have to be removed
   – roadway would have to be realigned in sections
   – significant impact to utilities




                                                                    100
Challenges (Cont’d)
• BVN3 would not protect houses near 10th street;
  many challenges with aligning wall down 10th
  street
• Alignments off of River Towers property
  – plans are more expensive
  – cross roads and tributary, cross utilities, may need
    additional pump station
  – RT property would be outside line of protection and would
    be flooded if floodwaters were higher than elev. 11-12 ft.
    (HVAC, elevators, utilities, parking lots, etc.)
  – would need to leave one closure gate open for emergency
    vehicles; would have to close just before flooding

                                                                 101
Challenges (Cont’d)
• GWMP alignment
  – has less impacts to trees and utilities and less
    closures than other alignments (however closures will
    be large)
  – road will be partially closed during/after closure
    installation
  – project cost will be high
  – will have significant review process due to NPS land
    (Congressional approval, NEPA, etc.), and may likely
    be considered an “impairment”, which would prevent
    the construction of the project


                                                            102
Potential Next Steps
• Based on feedback from public, County may select
  a project alignment for further analysis and design
• Corps will develop, evaluate and compare concept
  plans for the selected alignment for 3 different
  heights of protection and County will select a final
  height of protection
• If alignment impacts NPS property, formal NEPA
  process will be initiated concurrently
• Corps will develop more detailed design for the final
  project
• Depending on many factors, the earliest project
  construction would occur would be 4-5 years after
  completion of 65% design
                                                          103
Minimize Your Flood Risk!
• Purchase flood insurance, even if you are not
  required to
• Sign up for flood alerts through the County’s
  RiverWatch Program (www.fairfaxcounty.gov/cean)
• Move critical and valuable items from the basement
  or the first floor (documents, old photographs,
  computer, etc.)
• Consider elevating new utilities when they are being
  installed since they are expensive to replace (hot
  water heater, air conditioning/heating unit)
• Have an evacuation plan for you and your family


                                                         104
For More Information Contact:

Donald Demetrius, P.E., PhD., Chief
Watershed Projects Evaluation Branch, Stormwater Planning
   Division
Fairfax County Department of Public Works and Environmental
   Services
12000 Government Center Parkway
Fairfax, VA 22035
703-324-5500, TTy 711
donald.demetrius@fairfaxcounty.gov

Presentation will be available on-line at:
http://www.slideshare.net/fairfaxcounty


                                                              105
Questions?

Thoughts?

Concerns?

Weitere ähnliche Inhalte

Was ist angesagt?

Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Fairfax County
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Fairfax County
 
Huntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectHuntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectFairfax County
 
Sunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectSunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectFairfax County
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Fairfax County
 
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationPohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationFairfax County
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationFairfax County
 
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali... Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...Fairfax County
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...ascemiami-dade
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...ascemiami-dade
 
Huntington Levee Community Meeting
Huntington Levee Community MeetingHuntington Levee Community Meeting
Huntington Levee Community MeetingFairfax County
 
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood  Stormwater Improvement Preliminary Design ReviewTucker Avenue Neighborhood  Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design ReviewFairfax County
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectFairfax County
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream ImprovementFairfax County
 
Franklin Park Chesterbrook Neighborhood Project Highlights
Franklin Park Chesterbrook Neighborhood Project HighlightsFranklin Park Chesterbrook Neighborhood Project Highlights
Franklin Park Chesterbrook Neighborhood Project HighlightsFairfax County
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Fairfax County
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Fairfax County
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration Fairfax County
 
Newsletter 4 - Planning for Futire Flood Risks
Newsletter 4 - Planning for Futire Flood RisksNewsletter 4 - Planning for Futire Flood Risks
Newsletter 4 - Planning for Futire Flood Risksang_felty
 

Was ist angesagt? (20)

Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016
 
Huntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectHuntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation Project
 
Sunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectSunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement Project
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
 
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationPohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali... Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...
 
Huntington Levee Community Meeting
Huntington Levee Community MeetingHuntington Levee Community Meeting
Huntington Levee Community Meeting
 
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood  Stormwater Improvement Preliminary Design ReviewTucker Avenue Neighborhood  Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration Project
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream Improvement
 
Week 7
Week 7Week 7
Week 7
 
Franklin Park Chesterbrook Neighborhood Project Highlights
Franklin Park Chesterbrook Neighborhood Project HighlightsFranklin Park Chesterbrook Neighborhood Project Highlights
Franklin Park Chesterbrook Neighborhood Project Highlights
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Newsletter 4 - Planning for Futire Flood Risks
Newsletter 4 - Planning for Futire Flood RisksNewsletter 4 - Planning for Futire Flood Risks
Newsletter 4 - Planning for Futire Flood Risks
 

Andere mochten auch

Floodmap Desktop for ArcGIS
Floodmap Desktop for ArcGISFloodmap Desktop for ArcGIS
Floodmap Desktop for ArcGISewug
 
Denbigh flood risk management scheme case study
Denbigh flood risk management scheme   case studyDenbigh flood risk management scheme   case study
Denbigh flood risk management scheme case studymikewel
 
Flood risk reduction & flood mgmt
Flood risk reduction & flood mgmtFlood risk reduction & flood mgmt
Flood risk reduction & flood mgmtGWP SOUTHEAST ASIA
 
Workshop on Climate Resilience, Integrated Drought and Flood Management
Workshop on Climate Resilience, Integrated Drought and Flood ManagementWorkshop on Climate Resilience, Integrated Drought and Flood Management
Workshop on Climate Resilience, Integrated Drought and Flood ManagementGlobal Water Partnership
 
Flood and Watershed Management: Dealing with Natural Disasters
Flood and Watershed Management: Dealing with Natural DisastersFlood and Watershed Management: Dealing with Natural Disasters
Flood and Watershed Management: Dealing with Natural Disasters2020resilience
 
Flood Solutions – Soft Engineering Strategies
Flood Solutions – Soft Engineering StrategiesFlood Solutions – Soft Engineering Strategies
Flood Solutions – Soft Engineering Strategiestudorgeog
 
Workshop on Flood management in a transboundary context, 13-14.12.2011, Justo...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Justo...Workshop on Flood management in a transboundary context, 13-14.12.2011, Justo...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Justo...GWP-Mediterranean (GWP-Med)
 
Pakistan Flood Control System
Pakistan Flood Control SystemPakistan Flood Control System
Pakistan Flood Control Systemgrandestrategy
 
Flood control by Dr Sandeep Yadav
Flood control by Dr Sandeep YadavFlood control by Dr Sandeep Yadav
Flood control by Dr Sandeep YadavPradeep Yadav
 
Flood frequency analyses
Flood frequency analysesFlood frequency analyses
Flood frequency analysesvivek gami
 
Flooding 6 Solutions To Flooding
Flooding 6 Solutions To FloodingFlooding 6 Solutions To Flooding
Flooding 6 Solutions To Floodingtudorgeog
 
Difference between supervision and monitoring by sajjad awan
Difference between supervision and monitoring by sajjad awanDifference between supervision and monitoring by sajjad awan
Difference between supervision and monitoring by sajjad awanMalik Sajjad Ahmad Awan
 
Chapter 3 surface water hydrology
Chapter 3 surface water hydrologyChapter 3 surface water hydrology
Chapter 3 surface water hydrologyMohammed Salahat
 
Flood management Ppt
Flood management PptFlood management Ppt
Flood management PptPamGoward
 

Andere mochten auch (20)

Floodmap Desktop for ArcGIS
Floodmap Desktop for ArcGISFloodmap Desktop for ArcGIS
Floodmap Desktop for ArcGIS
 
Denbigh flood risk management scheme case study
Denbigh flood risk management scheme   case studyDenbigh flood risk management scheme   case study
Denbigh flood risk management scheme case study
 
Flood risk management
Flood risk  management Flood risk  management
Flood risk management
 
Traditional arid zone water management (Including flood management)
Traditional arid zone water management (Including flood management)Traditional arid zone water management (Including flood management)
Traditional arid zone water management (Including flood management)
 
Flood risk reduction & flood mgmt
Flood risk reduction & flood mgmtFlood risk reduction & flood mgmt
Flood risk reduction & flood mgmt
 
Workshop on Climate Resilience, Integrated Drought and Flood Management
Workshop on Climate Resilience, Integrated Drought and Flood ManagementWorkshop on Climate Resilience, Integrated Drought and Flood Management
Workshop on Climate Resilience, Integrated Drought and Flood Management
 
Flood and Watershed Management: Dealing with Natural Disasters
Flood and Watershed Management: Dealing with Natural DisastersFlood and Watershed Management: Dealing with Natural Disasters
Flood and Watershed Management: Dealing with Natural Disasters
 
Flood Solutions – Soft Engineering Strategies
Flood Solutions – Soft Engineering StrategiesFlood Solutions – Soft Engineering Strategies
Flood Solutions – Soft Engineering Strategies
 
Workshop on Flood management in a transboundary context, 13-14.12.2011, Justo...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Justo...Workshop on Flood management in a transboundary context, 13-14.12.2011, Justo...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Justo...
 
Pakistan Flood Control System
Pakistan Flood Control SystemPakistan Flood Control System
Pakistan Flood Control System
 
Floods
FloodsFloods
Floods
 
Flood control by Dr Sandeep Yadav
Flood control by Dr Sandeep YadavFlood control by Dr Sandeep Yadav
Flood control by Dr Sandeep Yadav
 
Flood frequency analyses
Flood frequency analysesFlood frequency analyses
Flood frequency analyses
 
Flooding 6 Solutions To Flooding
Flooding 6 Solutions To FloodingFlooding 6 Solutions To Flooding
Flooding 6 Solutions To Flooding
 
Flood management m4
Flood management m4Flood management m4
Flood management m4
 
Causes of flooding
Causes of floodingCauses of flooding
Causes of flooding
 
Difference between supervision and monitoring by sajjad awan
Difference between supervision and monitoring by sajjad awanDifference between supervision and monitoring by sajjad awan
Difference between supervision and monitoring by sajjad awan
 
Chapter 3 surface water hydrology
Chapter 3 surface water hydrologyChapter 3 surface water hydrology
Chapter 3 surface water hydrology
 
GIS IN DISASTER MANAGEMENT
GIS IN DISASTER MANAGEMENTGIS IN DISASTER MANAGEMENT
GIS IN DISASTER MANAGEMENT
 
Flood management Ppt
Flood management PptFlood management Ppt
Flood management Ppt
 

Ähnlich wie Belle View/New Alexandria/River Towers-Flood Risk Management Status Update

Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesSMRPC
 
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Fairfax County
 
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Fairfax County
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNew Jersey Future
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayFairfax County
 
Dead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectDead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectFairfax County
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxJohnathanSHill
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxJohnathanSHill
 
Environmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringEnvironmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringMartin Preene
 
Flood Proofing, Land-Watershed Management, Flood Hazard.pdf
Flood Proofing, Land-Watershed Management, Flood Hazard.pdfFlood Proofing, Land-Watershed Management, Flood Hazard.pdf
Flood Proofing, Land-Watershed Management, Flood Hazard.pdfSJAADHIWDW
 
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdfNYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdfecowatchers
 
Army Corps of Engineers Report on Restoration Planning in Jamaica bay
Army Corps of Engineers Report on Restoration Planning in Jamaica bayArmy Corps of Engineers Report on Restoration Planning in Jamaica bay
Army Corps of Engineers Report on Restoration Planning in Jamaica bayecowatchers
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectFairfax County
 
Fairfax County Flood Response Strategy
Fairfax County Flood Response StrategyFairfax County Flood Response Strategy
Fairfax County Flood Response StrategyFairfax County
 
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay CommunitiesACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay Communitiesecowatchers
 
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Fairfax County
 
Paul Spring Branch Stream Restoration Project Community Meeting
Paul Spring Branch Stream Restoration Project Community MeetingPaul Spring Branch Stream Restoration Project Community Meeting
Paul Spring Branch Stream Restoration Project Community MeetingFairfax County
 
Flood alleviationbrief170214
Flood alleviationbrief170214Flood alleviationbrief170214
Flood alleviationbrief170214Naoise
 

Ähnlich wie Belle View/New Alexandria/River Towers-Flood Risk Management Status Update (20)

Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach Communities
 
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
 
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
Rocky Run Tributary at Hickory Hollow Lane Stream Restoration Feb. 2021
 
Lawrence Park PIC 3 slides
Lawrence Park PIC 3 slidesLawrence Park PIC 3 slides
Lawrence Park PIC 3 slides
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 Forbes
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter Way
 
Dead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectDead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration Project
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
Environmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringEnvironmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and Dewatering
 
Flood Proofing, Land-Watershed Management, Flood Hazard.pdf
Flood Proofing, Land-Watershed Management, Flood Hazard.pdfFlood Proofing, Land-Watershed Management, Flood Hazard.pdf
Flood Proofing, Land-Watershed Management, Flood Hazard.pdf
 
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdfNYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
NYNJHAT Presentation slides for Jamaica Bay Task Force Meeting 17 Nov 22.pdf
 
Army Corps of Engineers Report on Restoration Planning in Jamaica bay
Army Corps of Engineers Report on Restoration Planning in Jamaica bayArmy Corps of Engineers Report on Restoration Planning in Jamaica bay
Army Corps of Engineers Report on Restoration Planning in Jamaica bay
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration Project
 
Fairfax County Flood Response Strategy
Fairfax County Flood Response StrategyFairfax County Flood Response Strategy
Fairfax County Flood Response Strategy
 
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay CommunitiesACOE Coastal Storm Management Alternative for Jamaica Bay Communities
ACOE Coastal Storm Management Alternative for Jamaica Bay Communities
 
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
 
Paul Spring Branch Stream Restoration Project Community Meeting
Paul Spring Branch Stream Restoration Project Community MeetingPaul Spring Branch Stream Restoration Project Community Meeting
Paul Spring Branch Stream Restoration Project Community Meeting
 
Flood alleviationbrief170214
Flood alleviationbrief170214Flood alleviationbrief170214
Flood alleviationbrief170214
 

Mehr von Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Mehr von Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Kürzlich hochgeladen

Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxunark75
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxSasikiranMarri
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptUsmanKaran
 

Kürzlich hochgeladen (9)

Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptx
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptx
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.ppt
 

Belle View/New Alexandria/River Towers-Flood Risk Management Status Update

  • 1. Public Meeting Belle View/New Alexandria/River Towers Flood Risk Management Study Status Update October 25, 2012
  • 2. Purposes of Meeting • Review the Belle View/New Alexandria/River Towers flood risk management study • Initiate a discussion with residents about the alignment of a flood wall/levee • Start to create consensus among residents about the best location of the proposed floodwall/levee 2
  • 3. Agenda • Welcome • Presentation by the U.S. Army Corps of Engineers (Corps) • Question/Answers and Feedback • Final Steps 3
  • 4. Communities are at Risk of Flooding 1% Annual Chance Floodplain* Based on Storm Surge Elevation 11.2 ft (NGVD29) *1% annual chance flood is the flood that has a 1% chance of occurring in any given year, sometimes referred to as the 100-year flood 4
  • 5. Flood Inundation Areas to Elev. 14 Ft. • Sea Level Rise will increase chance of flooding • Floods higher than the 1% chance flood DO occur 5
  • 6. Elevation Data • Many low openings/first floors: elevation 6-11 feet • Majority of ground elevation is 8-9 feet in Belle View, 4-9 feet in New Alexandria • 2% annual chance (50 year/Hurricane Isabel) storm surge: 9.6 feet • 1% annual chance (100 year) storm surge: 11.2 feet • 0.2% annual chance (500 year) storm surge: 16.2 feet 6
  • 7. Previous Study • Completed Feb 2008 – Flood Damage Reduction Analysis for Belle Haven Watershed (by Corps) – Fairfax County requested that Corps conduct a study to evaluate various flood damage reduction alternatives to determine if they are technically feasible – Conducted under technical services program; was not a Corps project study authorized by Congress – County asked Corps to conduct preliminary economic analysis to determine if a project might meet the federal economic justification requirements – Evaluated alternatives to protect entire study area, and New Alexandria/Belle View independently 7
  • 8. Project Goals and Objectives • Goal – Provide adequate flood risk management measures that are technically feasible and financially prudent for the safety of communities • Objectives – Examine various alternatives for reducing flood risk and damages – primarily from storm surge – Minimize risk to the community – Minimize environmental impacts – Incorporate needs/desires of the communities to the degree possible 8
  • 9. 2008 Study - Most Cost Effective, Plan 1b • Preliminary concept plan assumed top of levee/floodwall at elevation 12.0’ (0.8’ above 1% annual chance elevation; no risk and uncertainty analysis was conducted; cannot say will provide “100-year protection” and no sea level rise considered) • Approx. 6600 feet long; 4-6 feet above ground 9
  • 10. Plan 1b (2008 Study) - Levee/Floodwall Alternative 10
  • 11. Plan 1b (cont.) • Requires 2 closure structures – along Belle Haven Road and Belle View Blvd • Minimizes impacts to wetlands • Impacts many trees • Is partially located on NPS and River Towers property • Requires 1 pumping station • Estimated costs Plan 1b - Levee/Wall 12’ – Construction Cost = $12.7M – Benefit to Cost Ratio (BCR) = 2.5 – Current cost and BCR: $13.7M and 2.2 11
  • 12. NPS Concerns Regarding Plan 1b • Impact to GW Memorial Parkway • Impact to trees • Impact to view/aesthetics • Would prefer project to be off their property (if on federal property, need NEPA process, Congressional authorization, etc.) 12
  • 13. River Towers Concerns Regarding Plan 1b • Impacts to Dykes Marsh • Impacts to River Towers property • Impacts to view/aesthetics • Impact of pump station on their property • Requested that the project be moved off their property 13
  • 14. Community Concerns Regarding Plan 1b • Impacts to view/aesthetics & trees • Impacts to Dyke Marsh • Impacts to private property • Level of protection & want it to fix the problem • FEMA certification & the need for insurance • Global warming/sea level rise • Environmental impacts 14
  • 15. Study Progress • 2009 – County conducted field survey and tree survey for study • 2010 – 2012 – Development and evaluation of new alternatives – Team identified various new alignments – Coordinated alignments with NPS and made revisions – Investigated portable flood barriers – Developed concept plans, costs and benefits for the new plans – Completed a preliminary sea level rise analysis – Coordinated with community leaders 15
  • 17. Height of Protection Overview • 1% annual chance flood elevation (100-yr elevation based on storm surge) = 11.2 feet • FEMA - for certification of project (no flood insurance requirement), FEMA requires the project be 3 feet higher than the 1% annual chance elevation = 14.2 feet • CORPS – for Corps built projects, wall must be built higher than the design event to account for risk and uncertainty (varies per project, but for the 1% annual chance flood design, typically 3-4 feet higher than the 1% annual chance flood elevation) plus sea level rise must be considered = 14.2-15.2 feet + SLR consideration 17
  • 18. Height of Protection (Cont.) • Sea level rise predictions by the year 2100 – Based on historic rate = 1 foot – Based on Intergovernmental Panel on Climate Change (IPCC) study = between 0.6 - 1.9 feet – Based on National Research Council (NRC study) = between 1.5 – 4.7 feet • Height of floodwall/levee has not been decided; initially top of protection at elevation 12 feet has been used for concept plan so that is can be compared with original plan. However, 3 heights of protection will eventually be evaluated and compared for the final alignment; higher protection is recommended to account for risk and uncertainty and sea level rise 18
  • 19. Corps’ Vegetation/Tree Setback Requirements • Trees can adversely impact floodwalls and levees and cause the flood protection system to fail • Vegetation/tree-free zone (except grass) extends 15 feet on each side of a floodwall • If a large tree has the potential to damage the wall if it overturns, then it should be removed. General rule of thumb - trees should be a minimum distance of half their height from a floodwall • County surveyed trees along potential alignments; arborist preliminarily identified highest priority trees based on species/condition • Tree setback will be based on tree height and risk; we are currently showing a 40-foot setback 19
  • 21. Boulevard View South (South of Belle View Blvd) • Alternative BVS1 – Wall along eastern edge of Boulevard View (original alignment) • Alternative BVS2 – Wall along center of Boulevard View • Alternative BVS3 – Wall along western edge of Boulevard View 21
  • 24. Boulevard View South Looking South 24
  • 25. Concept View of BVS1 Looking South Floodwall Elevation 12 Feet Wall approximately 4 feet high 25
  • 26. Concept View of BVS1Looking South Floodwall Elevation 14.5 Feet Wall approximately 6.5 feet high 26
  • 30. Concept View of BVS3 Looking South Floodwall Elevation 12 Feet Wall approximately 4 feet high; Revised BVS3 wall would be constructed further west, closer to BV buildings 30
  • 31. Concept View of BVS3 Looking South Floodwall Elevation 14.5 Feet Wall approximately 6.5 feet high; Revised BVS3 wall would be constructed further west, closer to BV buildings 31
  • 32. Boulevard View South Looking West 32
  • 33. Concept View of BVS3 Looking West Floodwall Elevation 12 Feet Closure structure for access Wall approximately 4 feet high; Revised BVS3 wall would be closer to buildings 33
  • 34. Concept View of BVS3 Looking West Floodwall Elevation 14.5 Feet Wall approximately 6.5 feet high; Revised BVS3 wall would be closer to buildings 34
  • 36. 36
  • 37. 37
  • 38. 38
  • 39. Boulevard View Central (From Belle View Blvd north to Old Towne Rd) • Alternative BVC1 – Wall along eastern edge of Boulevard View (original alignment) • Alternative BVC2 – Move Boulevard View to the west; wall along eastern edge of Boulevard View • Alternative BVC3 – Wall on west side of Boulevard View • Revised Alternative BVC3 – Wall on west side of Boulevard View south of I Street; north of I Street – shift road west and wall on east side 39
  • 42. Boulevard View Central Looking Southeast Along Road Near H Street 42
  • 43. Concept View of BVC1 Looking Southeast Floodwall Elevation 12 Feet Wall approximately 3 feet high 43
  • 44. Concept View of BVC1 Looking East Floodwall Elevation 14.5 Feet Wall approximately 5.5 feet high 44
  • 45. Boulevard View Central Looking West 45
  • 46. Concept View of BVC1 Looking West Floodwall Elevation 12 Feet Wall approximately 3 feet high 46
  • 47. Concept View of BVC1 Looking West Floodwall Elevation 14.5 Feet Wall approximately 5.5 feet high 47
  • 51. 51
  • 52. 52
  • 53. 53
  • 54. 54
  • 55. 55
  • 56. Boulevard View North (From Old Towne Rd to Belle Haven Rd) • Alternative BVN1 - Wall behind houses along NPS property (original alignment) • Alternative BVN2 – Wall behind houses on private property • Alternative BVN3 – Wall runs along Old Towne Rd and 10th Street; 7 houses outside protection 56
  • 60. Boulevard View North BVN1 and BVN2 - Wall would run near existing fence (existing wood fence is approx. 4’4” high) 60
  • 62. 62
  • 63. 63
  • 64. 64
  • 65. 65
  • 66. 66
  • 68. 68
  • 69. Southern Area (near River Towers) • Alternative S1 – Levee/wall along south side of River Towers (original alignment) • Alternative S1A – Levee/wall along south side of River Towers closer to building • Alternative S2 – Wall adjacent to Belle View Condo north of West channel • Alternative S3 – Wall along southern curb of BV parking lot north of West channel • Alternative S4 – Wall along northern curb of parking lot south of West channel 69
  • 72. Looking South from River Towers 72
  • 73. Concept View of S1 Looking South Levee Elevation 12 Feet Levee approximately 7 feet high 73
  • 74. Concept View of S1 Looking South Levee Elevation 14.5 Feet Levee approximately 9.5 feet high 74
  • 75. New Alignment - Alternative S1A 75
  • 76. Looking West Behind Eastern River Tower 76
  • 77. Looking South Behind Eastern River Tower 77
  • 78. Looking West Behind Center River Tower 78
  • 79. Looking South Behind Center River Tower 79
  • 80. Alternatives S2, S3, and S4 80
  • 81. Alternative S2 – Western Part 81
  • 82. Southern Area Looking East Between Belle View Condo and West Channel 82
  • 83. Concept View of S2 Looking East Floodwall Elevation 12 Feet Wall approximately 4 feet high 83
  • 84. Concept View of S2 Looking East Floodwall Elevation 14.5 Feet Wall approximately 6.5 feet high 84
  • 85. Alternative S3 – Western Part 85
  • 86. Concept View of S3 Looking East Floodwall Elevation 12 Feet Wall approximately 4 feet high 86
  • 87. Concept View of S3 Looking East Floodwall Elevation 14.5 Feet Wall approximately 6.5 feet high 87
  • 88. Alternative S4 – Western Part 88
  • 89. Southern Area Looking Northwest across West Channel 89
  • 90. Eastern Part of Alternative S2, S3, S4 90
  • 91. Southern Area (Eastern Part) Looking North from River Towers S2, S3 and S4 - Wall would replace existing fences 91
  • 92. Southern Area (Far Eastern Part) S2, S3 and S4 - Wall would extend along this area 92
  • 93. Closure Structures/Increased Risk • The more closure structures a project has, the higher the risk of possible failure • Original alignment (S1, BVS1, BVC1, BVN1) = 2 road closures • Innermost alignment (S2, BVS3, BVC3, BVN3) = approx. 50 closures (roads, sidewalks, and driveways) 93
  • 95. New Plan 1 • BVN3, BVC3, BVS3, S1a • No impacts to NPS property • River Towers within line of protection; project on River Towers property • Houses near 10th St. outside line of protection • Estimated cost: $26.5 M • BCR 1.2
  • 96. New Plan 2 • BVN3, BVC3, BVS3, S2 • No impacts to NPS property • River Towers and houses near 10th St. outside line of protection • Not on River Towers property • Estimated cost: $31.4 M • BCR 1.0
  • 97. New Plan 3 • BVN3, BVC3, BVS3, S4 • No impacts to NPS property • River Towers and houses near 10th St. outside line of protection • S4 section on River Towers property • Estimated cost: $28.6 M • BCR 1.1
  • 98. New Plan 4 • BVN1, BVC3, BVS3, Sa1 • On NPS and River Towers property • All structures are within line of protection • Estimated cost: $22.5 M • BCR 1.4
  • 99. New Plan 5 • GWMP, Sa1 • On NPS and River Towers property • All structures are within line of protection • Estimated cost: $35.2 M • BCR 0.9
  • 100. Challenges • Except for original plan (that will have major impact to NPS trees), all BCR’s are less than 1.4 • Majority of alternatives would include numerous closure structures that County would be responsible for maintaining and closing • Innermost alignments would impact Boulevard View – many large trees in front of condos would have to be removed – roadway would have to be realigned in sections – significant impact to utilities 100
  • 101. Challenges (Cont’d) • BVN3 would not protect houses near 10th street; many challenges with aligning wall down 10th street • Alignments off of River Towers property – plans are more expensive – cross roads and tributary, cross utilities, may need additional pump station – RT property would be outside line of protection and would be flooded if floodwaters were higher than elev. 11-12 ft. (HVAC, elevators, utilities, parking lots, etc.) – would need to leave one closure gate open for emergency vehicles; would have to close just before flooding 101
  • 102. Challenges (Cont’d) • GWMP alignment – has less impacts to trees and utilities and less closures than other alignments (however closures will be large) – road will be partially closed during/after closure installation – project cost will be high – will have significant review process due to NPS land (Congressional approval, NEPA, etc.), and may likely be considered an “impairment”, which would prevent the construction of the project 102
  • 103. Potential Next Steps • Based on feedback from public, County may select a project alignment for further analysis and design • Corps will develop, evaluate and compare concept plans for the selected alignment for 3 different heights of protection and County will select a final height of protection • If alignment impacts NPS property, formal NEPA process will be initiated concurrently • Corps will develop more detailed design for the final project • Depending on many factors, the earliest project construction would occur would be 4-5 years after completion of 65% design 103
  • 104. Minimize Your Flood Risk! • Purchase flood insurance, even if you are not required to • Sign up for flood alerts through the County’s RiverWatch Program (www.fairfaxcounty.gov/cean) • Move critical and valuable items from the basement or the first floor (documents, old photographs, computer, etc.) • Consider elevating new utilities when they are being installed since they are expensive to replace (hot water heater, air conditioning/heating unit) • Have an evacuation plan for you and your family 104
  • 105. For More Information Contact: Donald Demetrius, P.E., PhD., Chief Watershed Projects Evaluation Branch, Stormwater Planning Division Fairfax County Department of Public Works and Environmental Services 12000 Government Center Parkway Fairfax, VA 22035 703-324-5500, TTy 711 donald.demetrius@fairfaxcounty.gov Presentation will be available on-line at: http://www.slideshare.net/fairfaxcounty 105