What are Spares Parts
   Spare parts are extra parts that are near to a
    functioning part
   When a machine has problems, spare parts
    can be used to replace broken /damaged parts
    so that the machine can function.
   Example :-
       power  module (eg. Transformer)
       Electronic parts (eg. Integrated components / semi-
        conductors and etc.
What is Criticality Assessment
   Give an indication of which items of plant are
    most critical to your process.
   Good idea to do a criticality assessment so
    everybody involved on your plant knows how
    crucial any single item of plant is to the
    process and how quickly to act when
    diagnosed an impending failure.
What is Spare Criticality
Assessment
   Spare Critically Assessment plays an
    important role in achieving the desired plant
    availability at an optimum cost
   Downtime for such plant and machinery is
    prohibitively expensive
   It has been observed in many industries that
    the non-availability of spare parts, as and
    when required for repairs, contributes to as
    much as 50% of the total down time
Classification of Spare Parts
1.       Critical spares
          without which the machine can’t be operated even in
           suboptimal efficiency
          with a high failure rate
          with long procurement lead time
          without a substitute
          used in critical machines (identified for preventive
           maintenance)
2.       Non critical spares
          without which machine can run (at least sub optimally)
          that have high reliability
          that can be made / purchased in short notice
          that have substitutes
          available off shelf as standard parts (bearings etc.)
Models for Type of Spares
   Non-repairable Spares




     Partswhich fail can’t be repaired and must be
     replaced with a new parts
Models for Type of Spares
   Repairable Spares




     Parts
          which fail can be repaired and be used back
     as spares
Assessment Method
   Analytic hierarchy process
     findout relevant factors of the critical spare parts
      and determine the relative importance
   Grey prediction model
     find a sequence of each element corresponding
      to future dynamism, thereby developing prediction
      model
   Back-propagation network
     used   as a tool for judging the predictability
   Moving average method
     The moving average (MA) is the mean of the
      previous data sets used to perform CSP demand
Assessment Method
Management of Spare Parts
   Proper planning and control of spare parts
    inventory.
   Eg: Material forecast planning, Asset
    recovery services, Equipment receiving and
    staging, Equipment tracking and reporting.
How To Manage Spare Parts
1.    Identify requirement
    Standard procedures and relevant
     documentation is obtained
    Current holdings are monitored and checked
     against levels determined by procedures
    Each holding location is checked as to needs
How To Manage Spare Parts
2.    Procure parts
    Current holdings are matched with need
    Requests for additional parts are made in
     accordance with enterprise procedures
    Checks are made as to extra holdings in other
     locations
How To Manage Spare Parts
3.    Initiate replacement process
    Need for spare parts is determined
    Data base is activated to check possible location of
     specific parts required
    Arrangements are put in place to deploy the part to
     the site where it is required
    Part is changed over with the faulty part
    Faulty part is recovered and disposed of or returned
     for repair as determined by condition and enterprise
     policy
How To Manage Spare Parts
4.    Reorder part replacements
    Relevant part request (forms/documentation) is
     completed and forwarded to the vendor
    Delivery of replacement is followed up on a
     regular and ongoing basis (eg: phone call)
    Alternate spares are sought where difficulties
     (delay/no stock) are experienced with
     replacement
How To Manage Spare Parts
5.    Complete administrative tasks
    Relevant documentation is completed, signed
     and forwarded to the appropriate area (eg:
     Account Payable - Boucher, Account Receivable
     – receiving documentation, Filing and Retention
     document – filing history)
    Regular audit of stock holdings is conducted in
     accordance with enterprise policy
    Checks are made to ensure that all parts are
     latest issue and are compatible with installed
     systems and equipment
Inventory
   Inventory is the total amount of goods and/or
    materials contained in a store or factory at any
    given time.

   Helps us know the precise number of items on
    the shelves and storage areas in order to
    place orders or control losses
Inventory Analysis
   Commonly used inventory analyses are:
   (1) FSN Analysis
   (2) HML Analysis
   (3) VED Analysis
Inventory Analysis
   FSN Analysis
     Fast Moving (F) = Items that are frequently issued say
      more than once a month.
     Slow Moving (S) = Items that are issued less than
      once a month
     Non-Moving (N) = Items that are not issuedused for
      more than 2 years.
   Help establishing most suitable stores layout by
    locating all the fast moving items near the
    dispensing window to reduce the handling efforts
Inventory Analysis
   HML Analysis
     HighCost (H) : Item whose unit value is very high
     Medium Cost (M) : Item whose unit value is of
      medium value
     Low Cost (L) : Item whose unit value is low

   Efforts may be necessary to find out the
    means for prolonging the life of high value
    parts through reconditioning and repair
Inventory Analysis
   VED Analysis
       VITAL (V) : A spare part will be termed vital, if on account of its
        non-availability there will be very high loss due to production
        downtime and/or a very high cost will be involved if the part is
        procured on emergency basis. In a process industry, most spare
        parts for the bottleneck machine or process will be of vital
        nature.For example, bearings for a kiln in a cement plant will be
        considered vital.
       ESSENTIAL (E) : A spare part will be considered essential if, due
        to its non-availability, moderate loss is incurred. For example,
        bearings for motors of auxiliary pumps will be classified as
        essential.
       DESIRABLE (D) : A spare part will be desirable if the production
        loss is not very significant due to its non-availability. Most of the
        parts will fall under this category. For example, gaskets for piping
        connection.
The End

More Related Content

What's hot

sparepartsmanagment
sparepartsmanagmentsparepartsmanagment
sparepartsmanagmentRAKESH SINGH
 
Spare Parts Management
Spare Parts ManagementSpare Parts Management
Spare Parts ManagementDavid Inbar
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 
Spare parts management
Spare parts managementSpare parts management
Spare parts managementMedha Yadav
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systemsAnil Mohindru
 
Spare parts management
Spare parts management Spare parts management
Spare parts management Smita Sinha
 
Maintenance types
Maintenance typesMaintenance types
Maintenance typesMotasem Ash
 
Reliability Centered Maintenance Made Simple
Reliability Centered Maintenance Made SimpleReliability Centered Maintenance Made Simple
Reliability Centered Maintenance Made SimpleRicky Smith CMRP, CMRT
 
Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type  Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type suresh tusia
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementVijay325
 
Material Control- techniques
Material Control- techniquesMaterial Control- techniques
Material Control- techniquesmonikakansal
 
17.maintenance and reliability
17.maintenance and reliability17.maintenance and reliability
17.maintenance and reliabilityamibitayes
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenanceNafis Ahmad
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementTripti Mittal
 
Spare parts management
Spare parts managementSpare parts management
Spare parts managementMedha Yadav
 

What's hot (20)

sparepartsmanagment
sparepartsmanagmentsparepartsmanagment
sparepartsmanagment
 
Spare Parts Management
Spare Parts ManagementSpare Parts Management
Spare Parts Management
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
Spare parts management
Spare parts managementSpare parts management
Spare parts management
 
Maintanance management
Maintanance managementMaintanance management
Maintanance management
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
Spare parts management
Spare parts management Spare parts management
Spare parts management
 
Maintenance types
Maintenance typesMaintenance types
Maintenance types
 
Reliability Centered Maintenance Made Simple
Reliability Centered Maintenance Made SimpleReliability Centered Maintenance Made Simple
Reliability Centered Maintenance Made Simple
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
 
Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type  Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Material Control- techniques
Material Control- techniquesMaterial Control- techniques
Material Control- techniques
 
17.maintenance and reliability
17.maintenance and reliability17.maintenance and reliability
17.maintenance and reliability
 
Maintenence management
Maintenence managementMaintenence management
Maintenence management
 
Evidence-Based Maintenance: How to Evaluate the Effectiveness of your Mainten...
Evidence-Based Maintenance: How to Evaluate the Effectiveness of your Mainten...Evidence-Based Maintenance: How to Evaluate the Effectiveness of your Mainten...
Evidence-Based Maintenance: How to Evaluate the Effectiveness of your Mainten...
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
RCM
RCMRCM
RCM
 
Spare parts management
Spare parts managementSpare parts management
Spare parts management
 

Viewers also liked

Back Office PPT
Back Office PPTBack Office PPT
Back Office PPTShallu K
 
9 Keys to Maximizing Profits and Equipment Uptime through Inventory Managemen...
9 Keys to Maximizing Profits and Equipment Uptime through Inventory Managemen...9 Keys to Maximizing Profits and Equipment Uptime through Inventory Managemen...
9 Keys to Maximizing Profits and Equipment Uptime through Inventory Managemen...IMAFS Inc.
 
Types of Maintenance Evaluation
Types of Maintenance EvaluationTypes of Maintenance Evaluation
Types of Maintenance EvaluationRohit Arora
 
Implementation evaluation and maintenance of the mis
Implementation evaluation and maintenance of the misImplementation evaluation and maintenance of the mis
Implementation evaluation and maintenance of the misSneha Autade
 
Recent Trends in Inventory Control
Recent Trends in Inventory ControlRecent Trends in Inventory Control
Recent Trends in Inventory Controlshaikhsaif
 
Analysis of invetory control techniques
Analysis of invetory control techniquesAnalysis of invetory control techniques
Analysis of invetory control techniquesSameer Chaudhari
 
Inventory control
Inventory controlInventory control
Inventory controlSaagar Shah
 
Kanban at MoneySupermarket.com
Kanban at MoneySupermarket.comKanban at MoneySupermarket.com
Kanban at MoneySupermarket.comThoughtworks
 

Viewers also liked (20)

Back Office PPT
Back Office PPTBack Office PPT
Back Office PPT
 
9 Keys to Maximizing Profits and Equipment Uptime through Inventory Managemen...
9 Keys to Maximizing Profits and Equipment Uptime through Inventory Managemen...9 Keys to Maximizing Profits and Equipment Uptime through Inventory Managemen...
9 Keys to Maximizing Profits and Equipment Uptime through Inventory Managemen...
 
Types of Maintenance Evaluation
Types of Maintenance EvaluationTypes of Maintenance Evaluation
Types of Maintenance Evaluation
 
Implementation evaluation and maintenance of the mis
Implementation evaluation and maintenance of the misImplementation evaluation and maintenance of the mis
Implementation evaluation and maintenance of the mis
 
Inventory Control
Inventory ControlInventory Control
Inventory Control
 
Operations
OperationsOperations
Operations
 
Ved anaylsis om ppt
Ved anaylsis om pptVed anaylsis om ppt
Ved anaylsis om ppt
 
Inventory control
Inventory controlInventory control
Inventory control
 
Cost analysis for entrepreneurs
Cost analysis for entrepreneurs Cost analysis for entrepreneurs
Cost analysis for entrepreneurs
 
Recent Trends in Inventory Control
Recent Trends in Inventory ControlRecent Trends in Inventory Control
Recent Trends in Inventory Control
 
Tqm
TqmTqm
Tqm
 
Analysis of invetory control techniques
Analysis of invetory control techniquesAnalysis of invetory control techniques
Analysis of invetory control techniques
 
Ch 9
Ch 9Ch 9
Ch 9
 
Inventory Control
Inventory ControlInventory Control
Inventory Control
 
Inventory control
Inventory controlInventory control
Inventory control
 
Kanban at MoneySupermarket.com
Kanban at MoneySupermarket.comKanban at MoneySupermarket.com
Kanban at MoneySupermarket.com
 
inventory control for construction
inventory control for constructioninventory control for construction
inventory control for construction
 
Inventory control
Inventory controlInventory control
Inventory control
 
Legal challenges in E-commerce
Legal challenges in E-commerce Legal challenges in E-commerce
Legal challenges in E-commerce
 
abc analysis and eoq
abc analysis and eoq abc analysis and eoq
abc analysis and eoq
 

Similar to 03.chapter3.4.spares.criticality

1661351030Unit 4 1056-V1 Equipment Management.pdf
1661351030Unit 4 1056-V1 Equipment Management.pdf1661351030Unit 4 1056-V1 Equipment Management.pdf
1661351030Unit 4 1056-V1 Equipment Management.pdfahsansaeed78
 
Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptxRASHMIPANWAR10
 
Maintenance and material handling methods (1)
Maintenance and material handling methods (1)Maintenance and material handling methods (1)
Maintenance and material handling methods (1)Harpreet Singh Grover
 
Plant layout by Rishabh gupta
Plant layout by Rishabh guptaPlant layout by Rishabh gupta
Plant layout by Rishabh guptarishabh gupta
 
BEE.pdfUHF They good view year keep know
BEE.pdfUHF They good view year keep knowBEE.pdfUHF They good view year keep know
BEE.pdfUHF They good view year keep knowteddiyfentaw
 
Service Parts Logistics
Service Parts LogisticsService Parts Logistics
Service Parts Logisticsalvinjchua
 
Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes) Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes) Priyanshu
 
maintenance-management-UNIT-I-and-II-1.ppt
maintenance-management-UNIT-I-and-II-1.pptmaintenance-management-UNIT-I-and-II-1.ppt
maintenance-management-UNIT-I-and-II-1.pptYunusEmreKarabacak2
 
Management of repairable warehouse-stocked spare equipment
Management of repairable warehouse-stocked spare equipmentManagement of repairable warehouse-stocked spare equipment
Management of repairable warehouse-stocked spare equipmentfxudegbu
 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its typesKritika Garg
 
Chp-5-FRSI-2043-Type-of-Maivcsdntenance.ppt
Chp-5-FRSI-2043-Type-of-Maivcsdntenance.pptChp-5-FRSI-2043-Type-of-Maivcsdntenance.ppt
Chp-5-FRSI-2043-Type-of-Maivcsdntenance.pptTausifAhmad53
 
Mit204 iadm project1
Mit204 iadm project1Mit204 iadm project1
Mit204 iadm project1Richard Lim
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Sanjeev Deshmukh
 
Basic concept of inventory management
Basic concept of inventory management Basic concept of inventory management
Basic concept of inventory management Molla Morshad
 

Similar to 03.chapter3.4.spares.criticality (20)

Spares management.pdf
Spares management.pdfSpares management.pdf
Spares management.pdf
 
1661351030Unit 4 1056-V1 Equipment Management.pdf
1661351030Unit 4 1056-V1 Equipment Management.pdf1661351030Unit 4 1056-V1 Equipment Management.pdf
1661351030Unit 4 1056-V1 Equipment Management.pdf
 
Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptx
 
Material handling
Material handling Material handling
Material handling
 
Plant layout
Plant layout Plant layout
Plant layout
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Maintenance and material handling methods (1)
Maintenance and material handling methods (1)Maintenance and material handling methods (1)
Maintenance and material handling methods (1)
 
Plant layout by Rishabh gupta
Plant layout by Rishabh guptaPlant layout by Rishabh gupta
Plant layout by Rishabh gupta
 
BEE.pdfUHF They good view year keep know
BEE.pdfUHF They good view year keep knowBEE.pdfUHF They good view year keep know
BEE.pdfUHF They good view year keep know
 
Service Parts Logistics
Service Parts LogisticsService Parts Logistics
Service Parts Logistics
 
Inventory Control
Inventory ControlInventory Control
Inventory Control
 
Inventory
InventoryInventory
Inventory
 
Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes) Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes)
 
maintenance-management-UNIT-I-and-II-1.ppt
maintenance-management-UNIT-I-and-II-1.pptmaintenance-management-UNIT-I-and-II-1.ppt
maintenance-management-UNIT-I-and-II-1.ppt
 
Management of repairable warehouse-stocked spare equipment
Management of repairable warehouse-stocked spare equipmentManagement of repairable warehouse-stocked spare equipment
Management of repairable warehouse-stocked spare equipment
 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its types
 
Chp-5-FRSI-2043-Type-of-Maivcsdntenance.ppt
Chp-5-FRSI-2043-Type-of-Maivcsdntenance.pptChp-5-FRSI-2043-Type-of-Maivcsdntenance.ppt
Chp-5-FRSI-2043-Type-of-Maivcsdntenance.ppt
 
Mit204 iadm project1
Mit204 iadm project1Mit204 iadm project1
Mit204 iadm project1
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Basic concept of inventory management
Basic concept of inventory management Basic concept of inventory management
Basic concept of inventory management
 

More from Amirul Faiz Amil Azman (8)

Critical facility mapping
Critical facility mappingCritical facility mapping
Critical facility mapping
 
Presentation maintenance (lcc)
Presentation maintenance (lcc)Presentation maintenance (lcc)
Presentation maintenance (lcc)
 
Bab5 150211
Bab5 150211Bab5 150211
Bab5 150211
 
Lecture 4 ver2 diode_app
Lecture 4 ver2 diode_appLecture 4 ver2 diode_app
Lecture 4 ver2 diode_app
 
Chapter 1 techniques of dc circuit analysis
Chapter 1 techniques of dc circuit analysisChapter 1 techniques of dc circuit analysis
Chapter 1 techniques of dc circuit analysis
 
Chapter 4 bj ts dc biasing
Chapter 4 bj ts dc biasingChapter 4 bj ts dc biasing
Chapter 4 bj ts dc biasing
 
Business plan lesson 5.0 copy
Business plan  lesson 5.0   copyBusiness plan  lesson 5.0   copy
Business plan lesson 5.0 copy
 
Bab2 010211
Bab2 010211Bab2 010211
Bab2 010211
 

Recently uploaded

Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 

Recently uploaded (20)

Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 

03.chapter3.4.spares.criticality

  • 1. SPARES CRITICALITY ASSESSMENT METHOD Group Members Kelvin Lazarus Kong Chiou Shin Loh Vuan Yee Hou Xiao Ming
  • 2. What are Spares Parts  Spare parts are extra parts that are near to a functioning part  When a machine has problems, spare parts can be used to replace broken /damaged parts so that the machine can function.  Example :-  power module (eg. Transformer)  Electronic parts (eg. Integrated components / semi- conductors and etc.
  • 3. What is Criticality Assessment  Give an indication of which items of plant are most critical to your process.  Good idea to do a criticality assessment so everybody involved on your plant knows how crucial any single item of plant is to the process and how quickly to act when diagnosed an impending failure.
  • 4. What is Spare Criticality Assessment  Spare Critically Assessment plays an important role in achieving the desired plant availability at an optimum cost  Downtime for such plant and machinery is prohibitively expensive  It has been observed in many industries that the non-availability of spare parts, as and when required for repairs, contributes to as much as 50% of the total down time
  • 5. Classification of Spare Parts 1. Critical spares  without which the machine can’t be operated even in suboptimal efficiency  with a high failure rate  with long procurement lead time  without a substitute  used in critical machines (identified for preventive maintenance) 2. Non critical spares  without which machine can run (at least sub optimally)  that have high reliability  that can be made / purchased in short notice  that have substitutes  available off shelf as standard parts (bearings etc.)
  • 6. Models for Type of Spares  Non-repairable Spares  Partswhich fail can’t be repaired and must be replaced with a new parts
  • 7. Models for Type of Spares  Repairable Spares  Parts which fail can be repaired and be used back as spares
  • 8. Assessment Method  Analytic hierarchy process  findout relevant factors of the critical spare parts and determine the relative importance  Grey prediction model  find a sequence of each element corresponding to future dynamism, thereby developing prediction model  Back-propagation network  used as a tool for judging the predictability  Moving average method  The moving average (MA) is the mean of the previous data sets used to perform CSP demand
  • 10. Management of Spare Parts  Proper planning and control of spare parts inventory.  Eg: Material forecast planning, Asset recovery services, Equipment receiving and staging, Equipment tracking and reporting.
  • 11. How To Manage Spare Parts 1. Identify requirement  Standard procedures and relevant documentation is obtained  Current holdings are monitored and checked against levels determined by procedures  Each holding location is checked as to needs
  • 12. How To Manage Spare Parts 2. Procure parts  Current holdings are matched with need  Requests for additional parts are made in accordance with enterprise procedures  Checks are made as to extra holdings in other locations
  • 13. How To Manage Spare Parts 3. Initiate replacement process  Need for spare parts is determined  Data base is activated to check possible location of specific parts required  Arrangements are put in place to deploy the part to the site where it is required  Part is changed over with the faulty part  Faulty part is recovered and disposed of or returned for repair as determined by condition and enterprise policy
  • 14. How To Manage Spare Parts 4. Reorder part replacements  Relevant part request (forms/documentation) is completed and forwarded to the vendor  Delivery of replacement is followed up on a regular and ongoing basis (eg: phone call)  Alternate spares are sought where difficulties (delay/no stock) are experienced with replacement
  • 15. How To Manage Spare Parts 5. Complete administrative tasks  Relevant documentation is completed, signed and forwarded to the appropriate area (eg: Account Payable - Boucher, Account Receivable – receiving documentation, Filing and Retention document – filing history)  Regular audit of stock holdings is conducted in accordance with enterprise policy  Checks are made to ensure that all parts are latest issue and are compatible with installed systems and equipment
  • 16. Inventory  Inventory is the total amount of goods and/or materials contained in a store or factory at any given time.  Helps us know the precise number of items on the shelves and storage areas in order to place orders or control losses
  • 17. Inventory Analysis  Commonly used inventory analyses are:  (1) FSN Analysis  (2) HML Analysis  (3) VED Analysis
  • 18. Inventory Analysis  FSN Analysis  Fast Moving (F) = Items that are frequently issued say more than once a month.  Slow Moving (S) = Items that are issued less than once a month  Non-Moving (N) = Items that are not issuedused for more than 2 years.  Help establishing most suitable stores layout by locating all the fast moving items near the dispensing window to reduce the handling efforts
  • 19. Inventory Analysis  HML Analysis  HighCost (H) : Item whose unit value is very high  Medium Cost (M) : Item whose unit value is of medium value  Low Cost (L) : Item whose unit value is low  Efforts may be necessary to find out the means for prolonging the life of high value parts through reconditioning and repair
  • 20. Inventory Analysis  VED Analysis  VITAL (V) : A spare part will be termed vital, if on account of its non-availability there will be very high loss due to production downtime and/or a very high cost will be involved if the part is procured on emergency basis. In a process industry, most spare parts for the bottleneck machine or process will be of vital nature.For example, bearings for a kiln in a cement plant will be considered vital.  ESSENTIAL (E) : A spare part will be considered essential if, due to its non-availability, moderate loss is incurred. For example, bearings for motors of auxiliary pumps will be classified as essential.  DESIRABLE (D) : A spare part will be desirable if the production loss is not very significant due to its non-availability. Most of the parts will fall under this category. For example, gaskets for piping connection.