Attracting and Maintaining Institutional Investment: Onshore Wind
1. Onshore wind
Bronwyn Sutton
Senior Renewable Energy
Consultant
2 July 2012
2. SgurrEnergy today
• Leading engineering consultancy
• Formed in 2002
• Joined Wood Group in 2010
• Global network of offices
• 100+ experienced personnel
• People and technology focused
• Company wide triple BSI accreditation & UKAS
ISO/IEC accreditation for wind farm power curve
analysis
3. What do we do?
Products
SgurrEnergy personnel hold unparalleled knowledge to ensure successful
renewable energy project delivery
Wind Offshore Wind Wave & Tidal Solar Bio-energy Hydro
5. Global track record
We have consulted on over 65,000 MW of renewable energy in over 40
countries covering both project development and due diligence
Europe Asia Africa
• Belgium • China • Angola
• Bulgaria • India • Kenya
• Estonia • Israel • South Africa
• France • Korea Oceania
• Germany • Mongolia
• Greece
• Australia
• Pakistan
• New Zealand
• Ireland • Philippines
• Italy • Sri Lanka
• Malta • Turkey
• Netherlands • United Arab Emirates
• Norway • Vietnam
• Poland
• Portugal
North America
• Russia • Canada
• Romania • Mexico
• Slovakia • USA
• Spain South America
• Sweden • Brazil
• UK • Chile
• Ukraine • Galapagos Islands (Ecuador)
8. 2010
• Variation in wind speed across
the UK in 2010
• Showing % deviation from the
long term (20 year) average
• West worse affected than the
East.
• 1% deviation in wind ≈ 2%
deviation in power.
9. Interannual Variation
125%
• Variation expected
year to year
Annual Wind Speed Normalised to 15 year Long-term Wind Speed
120%
• Short term 115%
measurements need 110%
to be corrected to
105%
long term forecasts
100%
95%
90%
85%
80%
1990 1995 2000 2005 2010
Year
UK 15 year average Scotland England Wales
11. SgurrEnergy Performance
• Recent (2011) comparison of 37 organisations – all
doing the same energy yield prediction on the same
data
• SgurrEnergy is number 27 here
P90 values
24. Who Are We?
• Founded in 2010
• Backed by ESB Novusmodus, PE fund of
ESB (Ireland)
• Development partnership with Savills
• Four consents already ~ 16 MW (8 WTGs)
• Personally, 25yrs experience in power/
infrastructure, 12yrs in wind. Past MD of
Your Energy ~ 200MW consented/built
25. State of Play of UK Onshore Wind
• 4,900 MW operational (325 projects)
• 1,500 MW in construction (52)
• 4,300 MW consented / not built (262)
• 7,400 MW in planning (328)
• 2020 targets ~ 10-13GW (DECC Roadmap)
Ø Ops + Constr. = 6.4 GW
Ø Ops + Constr. + 50% Cons. = 8.6 GW
Ø Ops + Constr. + 50% Cons. + 25% Plan. = 10.4 GW
26. UK onshore wind farm development
Some Common Mantras…
• There are some things you can control and a lot
of things you cannot
• There is no such thing as a perfect project
• Time / speed is of the essence
• Without local support (Parish / Ward Cllr.) you
have an uphill struggle
• Wind speed is critical! (7m/s+)
27. A to Z of wind farm development
Aviation Jockeys (Horses) Residences
Bats Keen Landowner Safety
Cultural Heritage Landscape Telecoms
Designations MOD Underground
Ecology Noise Viability
Fauna Ornithology Wind
Grid Politics X-Roads
Hydrology Quangos Yuppies
Infrasound Zoology!
39. You tick all the boxes – what next?
• With a recommendation for approval
then planning appeal >75% success
• Local consultation vital – Parish / Ward
• Projects < 5MW ~ 80% success rate
• Local “benefits” – jobs, community
benefit (£5k/MW) and direct power sales
• Brownfield / developed land sites
17
40. Thanks – any questions?