BUILDING TECHNOLOGY 1
[BLD 61403/ ARC3514/ ARC3512]
ASSIGNMENT 2 - CONSTRUCTION SOLUTION
NAME	 : PENG YEP SIANG
ID			: 0315259
TUTOR	 : MR. ADIB
CONTENT
INTRODUCTION
PRECEDENT STUDY
STRUCTURAL SYSTEM
-STEEL FRAME CONSTRUCTION
FLOOR SYSTEM
-COMPOSITE STEEL FLOOR SYSTEM
ROOF SYSTEM
-GLAZED ROOF SYSTEM
FACADE
-GLAZED EXTERNAL WALL INSULATION STSTEM
-DOUBLE-SKIN WALL SYSTEM
FACADE DESIGN SCHEME
SECTIONAL PERSPECTIVE
INTRODUCTION
This assignment is an integration project with Architecture
Studio 5. The aim of this project is to students to consider
the construction aspects throughtout the design process.
The design project is a community library in Jalan Haji
Salleh, Sentul, Kuala Lumpur.
In this particular design, the library emphasizes the impor-
tance of natural light and acoustic quality. Large opening
can be found throughout the library. As the site is located
among a shophouse, the facade facing the context is only
limited to the north and south elevation. Therefore, the
opening also acts an interaction between the interior and
the exterior.
N
CULTURE FOREST
PRECEDENT STUDY - STEEL FRAME CONSTRUCTION
ADVANTAGESMANUFACTURER
DISADVANTAGES
MATERIALS
CONSTRUCTION PROCESS
1.	 Positioning of components on readied
foundation
2.	 Erection of components (columns and
beams)
3.	 Installation of bracing to stabilize struc-
ture
4.	 Site bolting or welding of components
5.	 Addition of substructure (girder, joist,-
metal descking, etc)
Mild steel, also known as carbon steel, is a
type of steel that contain a small percent-
age of carbon. The steel with a higher car-
bon content has greater strength and lower
melting point. However, it reduces ductility
and weldability.
•	 Long-life durability
•	 Lightweight
•	 Elimination of formwork reduces construc-
tion waste
•	 High strength-to-weight ratio allows less
members to support greater load
•	 Provide large span space at low cost
•	 Small space used provide freedom of space
•	 Prefabricated members reduce on-site con-
struction time
•	 Bend instead of crack under great force
wind and seismic load, greatly reduce the
risk of sudden collapse
•	 Lessen structural load and subsequently-
material cost
•	 Environmental friendly
•	 Highly susceptible to fire. At 500o
C, struc-
tural strength is halved. Prevention can be
achieved with addition of fire resistive.
•	 Prone to corrosion in humid environment.
Prevention can be achieved with applica-
tion of waterproof coating
Architect	 : Unsanddong Architects
Location	 : Seoul, South Korea
Use		 : Welfare, education and research,
culture, nursery school
Site Area	 : 1694.0m2
Bldg Area	 : 1001.8m2
A lightweight construction with a grid-like
skeleton of vertical and horizontal members
in which the substructure are attached.
JSPL has pioneered the production of medi-
um and heavy hot rolled parallel flange beams
and column sections in India. These sections
are cost-effective through savings in steel con-
sumption and provide ultimate design flexibil-
ity to the structural designers.
Steel frame construction allows the design
with a long narrow nature to have lesser num-
ber of components used as compared to con-
ventional concrete construction, thus provide
more design flexibility and daylighting.
TYPE OF CONSTRUCTION
SITE CONTEXT
MANCHESTER CIVIL JUSTICE
CENTRE
PRECEDENT STUDY - COMPOSITE STEEL FLOOR SYSTEM
ADVANTAGESMANUFACTURER
DISADVANTAGES
COMPONENTS
CONSTRUCTION PROCESS
1.	 Installation of corrugated steel deck to
the structural steel below
2.	 Shear connector is welded or nailed to
the beam
3.	 Pouring of concrete with the side of the
floor bordered by a curb of galvanized
steel. 50% percent of concrete is saved as
compared to conventional concrete floor
slab
4.	 Mineral wool and plasterboard are gen-
erally associated to provide better acous-
tic and thermal quality.
1. Soldered connector
2. Poured concrete
3. Reinforcement mesh
4. Bosses on the sidewalls
5. Joists
6. Corrugated sheet of galvanized steel deck
7. Beam
•	 Lightweight
•	 Speed in construction
•	 Versatile, can be integrate with various oth-
er feature
•	 Act as tensile reinforecement during fire
•	 Stabilize structure against lateral buckling
•	 Good heat insulation
•	 Good sound insulation
•	 Require delicate handling to prevent mois-
ture penetration
•	 Different contractor needed for installation
•	 Specialized installation increase field cost
Architect	 : Denton Corker Marshall
Location	 : Manchester, UK
Project Year	: 2008
Bldg Area	 : 34000m2
Composite steel deck is the assimilation of
twoload-carryingstructuralmembers.Com-
mon examples are conrete fill and girder.
Established in Seoul, Korea, Duckshin Housing
is company specialized in steel construction
materials, deck plates, deck construction, iron
works and import business.
The thin yet soundproof property is a essential
factor in the library design. This construction
technique also facilitates large space span,
which enable easy space planning.
TYPE OF CONSTRUCTION
SITE CONTEXT
1
7
6
5
4
3
2
MYOENJI COLUMBARIUM
PRECEDENT STUDY - GLAZED ROOF SYSTEM
ADVANTAGES
DISADVANTAGES
COMPONENTSMATERIAL
•	 Light penetration
•	 Advantage of wide visual field
•	 Good sound absorption
•	 Balance the solid aspect of design
•	 Replace the function of window
•	 Eliminate dependence on artificial lighting
•	 Costly
•	 High maintenance
•	 Poor heat insulation
•	 High embodied energy
Architect	 : Furumori Koichi Architectural 		
		 Design Studio
Location	 : Fukuoka, Japan
Bldg Area	 : 335m2
1.	 Installation of structural joist
2.	 Fixation of laminated glass panel and
firerated glass onto the joist by pressure
bar on all four sides
3.	 Purlins span between the joist to provide
interconnecting drainage and conden-
sate channels
4.	 Addition of cover cap as finishing
1.	 Structural laminated glass panel
2.	 Silicon sealant
3.	 Firerated glass
4.	 Structural joist
5.	 Pressure bar
Laminated glass is a type of safety glass that
sandwich an interlayer between two pieces of
glass. The interlayer is typicallypolyvinyl butyral
or ethylene-vinyl acetate. In the event of break-
ing, it holds the shattered glass pieces together
and appear as web of cracks. Laminated glass is
heavier than common glass. It also provides UV
protection and sound insulation.
Glazed roof system is highly compatible with
steel frame construction to span a wide area.
The design’s north-south orientation without
any westward or eastward facade also poses a
high demand of natural lighting for comfort-
able reading.
CONSTRUCTION PROCESS
SITE CONTEXT
1
22
3
4
5
PRECEDENT STUDY - GLAZED EXTERNAL WALL INSULATION SYSTEM
ADVANTAGES
DISADVANTAGES
COMPONENTS
CONSTRUCTION PROCESS
•	 Accomodate large area of facade
•	 Advantage of wide visual field
•	 Control on natural light penetration
•	 Flexibility in design
•	 Thermal efficient
•	 Offsite prefabricated components reduce
delays and erection time
•	 Reduction of site waste
•	 Dimensional accuracy
•	 Complexity of material
•	 Expensive
Architect	 : Sou Fujimoto
Location	 : Tokyo, Japan
Project Year	: 2010
Bldg Area	 : 2883.18m2
1.	 Wall plate
2.	 Interior finish
3.	 Mineral wool
4.	 Breather membrane
5.	 Gypsum sheathing
6.	 Timber panel
7.	 Timber stud
8.	 Laminated glass panels with stainless
steel spider fitting
Beside fufilling all basic requirement of a wall
system, the freedom of final finishing is an im-
portant feature. The construction of external
wall is also versatile and time-saving.
SITE CONTEXT
1.	 Cladding of steel column with a protective
layer of fire resistant board
2.	 Erection of common timber stud along with
top and bottom wall plate
3.	 Addition of bracing to reduce lateral buckling
if necessary.
4.	 Insert mineral wool in stud space for insula-
tion.
5.	 Installation of gypsum sheathing and breather
membrane to prevent moisture penetration.
6.	 Installation of timber panel as finish
7.	 Connection of glass panels to the timber fin
on the timber panel with spider fitting.
8.	 Application of silicon sealant between glass
panels
External wall insulation systems are gener-
ally comprised of an insulant, a fixing and a
final finish. The main framework is typically
made of steel or timber. Waterproof and in-
sulative material are generally included. The
choice of the exterior and interior finishing
is pretty wide and flexible.
TYPE OF SONSTRUCTION
MUSASHINO ART UNIVERSITY
MUSEUM & LIBRARY
1
2
3
4
5
6
7
PRECEDENT STUDY - DOUBLE-SKIN WALL SYSTEM
ADVANTAGES
DISADVANTAGES
•	 Diffuse natural light penetration
•	 Framing of view to exterior
•	 Introduce ventilation into the interior
•	 Mitigate solar gain and decrease cooling
load
•	 High insulative value
•	 Decrease in usable floor space
•	 Condensation in interior
•	 Increase in material and construction cost
•	 Questionable thermal performance
Architect	 : Cor & Asociados
Location	 : Albacete, Spain
Bldg Area	 : 4375m2
Double skin can used fro many purpose. In this
case, the skin serve as to introduce different
level of brightness and texture in reaction to
the weather. It also add interest to the view
from interior to exterior.
SITE CONTEXT
There are many different types of dou-
ble-skin facade that serve different purpos-
es. Initially, the double-skin facade is a sys-
tem of building consisting of two skins, or
facades, placed in such a way that air flows
in the intermediate cavity. The ventilation of
the cavity can be natural, fan supported or
mechanical.
TYPE OF SONSTRUCTION
CENTRAL OFFICE OF FEDA CON-
FEDERATION OF EMPLOYERS OF
ALBACETE COMPONENTS
FACADE DESIGN SCHEME 1
SOUTH ELEVATION [FRONT]
SCALE 1:100
DOUBLE-SKIN FACADE A
Void
The exposed area are mostly curtain win-
dow without the cover of double-skin fa-
cade. These spaces need lights and view
more than privacy. These space are also
double volume space, the sound echo less
thus acoustic aspect is not as emphasized.
FACADE DESIGN SCHEME 2
SOUTH ELEVATION [BACK]
SCALE 1:100
DOUBLE-SKIN FACADE A
Solid
Latticed double-skin facade allows only dif-
fused natural light to penetrate. Only opening
that need privacy is placed behind the latticed
skin, such as office area, toilets and private
study room. Most importantly, the latticed skin
can dilute the exterior noise from entering the
private area that need silence more.
FACADE DESIGN SCHEME 1
NORTH ELEVATION [FRONT]
SCALE 1:100
DOUBLE-SKIN FACADE
Solid
Solid wall without any openings. Allocate to
private area. As solid wall does not allowed
natural light penetration, they are designed as
long narrow strip. Therefore, the area with sol-
id wall can still accept minimal diffused light
from adjacent space with openings.
FACADE DESIGN SCHEME 2
NORTH ELEVATION [BACK]
SCALE 1:100
DOUBLE-SKIN FACADE B
Void
The openings of finned double-skin facade
is larger. A balance of natural light and shade
by fin is achieved. Therefore, large area of
void can be applied on the facade. The fin
of the double-skin also framed the view ro
exterior.
SECTIONAL PERSPECTIVE 1
GROUND FLOOR
SCALE 1:30
STUDIO
SECTIONAL PERSPECTIVE 2
THIRD FLOOR
SCALE 1:30

Weitere ähnliche Inhalte

Was ist angesagt?

Effective wall cladding
Effective wall claddingEffective wall cladding
Effective wall claddingManan Sethi
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopesDanishPathan7
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1Gertrude Lee
 
plastic Facade- PLOYCARBONATE AND PTFE
plastic Facade- PLOYCARBONATE AND PTFE plastic Facade- PLOYCARBONATE AND PTFE
plastic Facade- PLOYCARBONATE AND PTFE Revathy Royer
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Soh Shing
 
Hi-Tech Building Systems
Hi-Tech Building SystemsHi-Tech Building Systems
Hi-Tech Building SystemsDori Schmitz
 
Performance Summary of Autoclaved Aerated Concrete
Performance Summary of Autoclaved Aerated ConcretePerformance Summary of Autoclaved Aerated Concrete
Performance Summary of Autoclaved Aerated ConcreteBENAY MUNDA
 
High Tech Building Materials: ETFE
High Tech Building Materials: ETFEHigh Tech Building Materials: ETFE
High Tech Building Materials: ETFESneha Nagarajan
 
ICF Commercial Presentation
ICF Commercial PresentationICF Commercial Presentation
ICF Commercial PresentationBenKeim
 
Architectural Conservation "Proposal For Adaptive Reuse"
Architectural Conservation "Proposal For Adaptive Reuse"Architectural Conservation "Proposal For Adaptive Reuse"
Architectural Conservation "Proposal For Adaptive Reuse"Digital Space Consultancy Ltd
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS Mohammed Naeem Darwish
 
Insulated Concrete Forms
Insulated Concrete FormsInsulated Concrete Forms
Insulated Concrete Formsguest64aa9a
 
Heydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreHeydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreTanisha Agarwal
 

Was ist angesagt? (20)

Effective wall cladding
Effective wall claddingEffective wall cladding
Effective wall cladding
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopes
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
plastic Facade- PLOYCARBONATE AND PTFE
plastic Facade- PLOYCARBONATE AND PTFE plastic Facade- PLOYCARBONATE AND PTFE
plastic Facade- PLOYCARBONATE AND PTFE
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)
 
Hi-Tech Building Systems
Hi-Tech Building SystemsHi-Tech Building Systems
Hi-Tech Building Systems
 
Performance Summary of Autoclaved Aerated Concrete
Performance Summary of Autoclaved Aerated ConcretePerformance Summary of Autoclaved Aerated Concrete
Performance Summary of Autoclaved Aerated Concrete
 
Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"
 
High Tech Building Materials: ETFE
High Tech Building Materials: ETFEHigh Tech Building Materials: ETFE
High Tech Building Materials: ETFE
 
ICF Commercial Presentation
ICF Commercial PresentationICF Commercial Presentation
ICF Commercial Presentation
 
Architectural Conservation "Proposal For Adaptive Reuse"
Architectural Conservation "Proposal For Adaptive Reuse"Architectural Conservation "Proposal For Adaptive Reuse"
Architectural Conservation "Proposal For Adaptive Reuse"
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
 
Insulated Concrete Forms
Insulated Concrete FormsInsulated Concrete Forms
Insulated Concrete Forms
 
Sandwich panels
Sandwich panelsSandwich panels
Sandwich panels
 
Tour ppt (2)
Tour ppt (2)Tour ppt (2)
Tour ppt (2)
 
6) UBS AT Home Improvements 2015 PDF
6) UBS  AT Home Improvements 2015 PDF6) UBS  AT Home Improvements 2015 PDF
6) UBS AT Home Improvements 2015 PDF
 
My paper
My paperMy paper
My paper
 
Sips structrual insulated panels
Sips structrual insulated panelsSips structrual insulated panels
Sips structrual insulated panels
 
Heydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreHeydar Aliyev Cultural Centre
Heydar Aliyev Cultural Centre
 

Ähnlich wie INTEGRATION

B tech project 2
B tech project 2B tech project 2
B tech project 2Pei Di
 
BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT Darshiini Vig
 
Building tech Project 2
Building tech Project 2Building tech Project 2
Building tech Project 2zerospaces_
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsJing Fan Koh
 
Construction solutions
Construction solutionsConstruction solutions
Construction solutionskennett2203
 
BIOCLIMATIC ARCHITECTURE PRESENTATION.pdf
BIOCLIMATIC ARCHITECTURE PRESENTATION.pdfBIOCLIMATIC ARCHITECTURE PRESENTATION.pdf
BIOCLIMATIC ARCHITECTURE PRESENTATION.pdfRachitaDalpati
 
Fire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptx
Fire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptxFire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptx
Fire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptxAr. Md Shahroz Alam
 
Smart Use of Glass in Modern Green Buildings
Smart Use of Glass in Modern Green BuildingsSmart Use of Glass in Modern Green Buildings
Smart Use of Glass in Modern Green BuildingsDivya Kothari
 
B tech 1 final
B  tech 1 finalB  tech 1 final
B tech 1 finalSchani B
 
Building technology report
Building technology reportBuilding technology report
Building technology reportChong Yi Hui
 
ANALYSIS OF THERMAL MASS AS A PRINCIPLE OF SUSTAINABLE DESIGN
ANALYSIS OF THERMAL MASS AS A PRINCIPLE OF SUSTAINABLE DESIGNANALYSIS OF THERMAL MASS AS A PRINCIPLE OF SUSTAINABLE DESIGN
ANALYSIS OF THERMAL MASS AS A PRINCIPLE OF SUSTAINABLE DESIGNSheila Ojwang
 
Asian architecture- Implementation of Sun Shading strategies in 8D House
Asian architecture- Implementation of Sun Shading strategies in 8D HouseAsian architecture- Implementation of Sun Shading strategies in 8D House
Asian architecture- Implementation of Sun Shading strategies in 8D HouseWmin fOO
 
Green building materials, tools and appliances
Green building materials, tools and appliancesGreen building materials, tools and appliances
Green building materials, tools and appliancesHARISH J
 
Kew Xun Long's Portfolio (2010-2014)
Kew Xun Long's Portfolio (2010-2014)Kew Xun Long's Portfolio (2010-2014)
Kew Xun Long's Portfolio (2010-2014)Kew Xun Long
 
Smart Material for Green Buildings...pdf
Smart Material for Green Buildings...pdfSmart Material for Green Buildings...pdf
Smart Material for Green Buildings...pdfRThileepRaj
 

Ähnlich wie INTEGRATION (20)

B tech project 2
B tech project 2B tech project 2
B tech project 2
 
Btech 1, 2
Btech 1, 2Btech 1, 2
Btech 1, 2
 
BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT
 
Building tech Project 2
Building tech Project 2Building tech Project 2
Building tech Project 2
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
Construction solutions
Construction solutionsConstruction solutions
Construction solutions
 
BIOCLIMATIC ARCHITECTURE PRESENTATION.pdf
BIOCLIMATIC ARCHITECTURE PRESENTATION.pdfBIOCLIMATIC ARCHITECTURE PRESENTATION.pdf
BIOCLIMATIC ARCHITECTURE PRESENTATION.pdf
 
Fire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptx
Fire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptxFire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptx
Fire-Casestudy (AkankshaBajaj,Anahat,Kripa,Prakriti).pptx
 
Smart Use of Glass in Modern Green Buildings
Smart Use of Glass in Modern Green BuildingsSmart Use of Glass in Modern Green Buildings
Smart Use of Glass in Modern Green Buildings
 
Btech
BtechBtech
Btech
 
BMC II 03 GLASS.pptx
BMC II 03 GLASS.pptxBMC II 03 GLASS.pptx
BMC II 03 GLASS.pptx
 
B tech 1 final
B  tech 1 finalB  tech 1 final
B tech 1 final
 
Smart High Performanc Facades
Smart High Performanc FacadesSmart High Performanc Facades
Smart High Performanc Facades
 
Building technology report
Building technology reportBuilding technology report
Building technology report
 
ANALYSIS OF THERMAL MASS AS A PRINCIPLE OF SUSTAINABLE DESIGN
ANALYSIS OF THERMAL MASS AS A PRINCIPLE OF SUSTAINABLE DESIGNANALYSIS OF THERMAL MASS AS A PRINCIPLE OF SUSTAINABLE DESIGN
ANALYSIS OF THERMAL MASS AS A PRINCIPLE OF SUSTAINABLE DESIGN
 
Asian architecture- Implementation of Sun Shading strategies in 8D House
Asian architecture- Implementation of Sun Shading strategies in 8D HouseAsian architecture- Implementation of Sun Shading strategies in 8D House
Asian architecture- Implementation of Sun Shading strategies in 8D House
 
LHP PROJECT.pdf
LHP PROJECT.pdfLHP PROJECT.pdf
LHP PROJECT.pdf
 
Green building materials, tools and appliances
Green building materials, tools and appliancesGreen building materials, tools and appliances
Green building materials, tools and appliances
 
Kew Xun Long's Portfolio (2010-2014)
Kew Xun Long's Portfolio (2010-2014)Kew Xun Long's Portfolio (2010-2014)
Kew Xun Long's Portfolio (2010-2014)
 
Smart Material for Green Buildings...pdf
Smart Material for Green Buildings...pdfSmart Material for Green Buildings...pdf
Smart Material for Green Buildings...pdf
 

Mehr von Pengeneee Peng (20)

SENTUL
SENTULSENTUL
SENTUL
 
CALCULATION
CALCULATIONCALCULATION
CALCULATION
 
ACOUSTIC
ACOUSTICACOUSTIC
ACOUSTIC
 
LIGHTING
LIGHTINGLIGHTING
LIGHTING
 
Thematic Analysis
Thematic AnalysisThematic Analysis
Thematic Analysis
 
FETTICCINE BRIDGE
FETTICCINE BRIDGEFETTICCINE BRIDGE
FETTICCINE BRIDGE
 
[Group] building structure project
[Group] building structure project[Group] building structure project
[Group] building structure project
 
Individual Caluculation
Individual CaluculationIndividual Caluculation
Individual Caluculation
 
Bcon1
Bcon1Bcon1
Bcon1
 
Studio presentation
Studio presentationStudio presentation
Studio presentation
 
Binder2
Binder2Binder2
Binder2
 
COMP APP 2A
COMP APP 2ACOMP APP 2A
COMP APP 2A
 
Work In Progress 1
Work In Progress 1Work In Progress 1
Work In Progress 1
 
Measured Drawings
Measured DrawingsMeasured Drawings
Measured Drawings
 
BCON Report
BCON ReportBCON Report
BCON Report
 
BCON Report
BCON  ReportBCON  Report
BCON Report
 
DV 2C
DV 2CDV 2C
DV 2C
 
DV 2B
DV 2BDV 2B
DV 2B
 
Portfolio
PortfolioPortfolio
Portfolio
 
Case Study
Case StudyCase Study
Case Study
 

Kürzlich hochgeladen

FULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | DelhiFULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | DelhiMalviyaNagarCallGirl
 
A Selection of Tim Walsh's Recent Paintings
A Selection of Tim Walsh's  Recent PaintingsA Selection of Tim Walsh's  Recent Paintings
A Selection of Tim Walsh's Recent PaintingsTim Walsh
 
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts ServiceRussian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Servicedoor45step
 
Zoo_championship_Wrestling (action/comedy sample)
Zoo_championship_Wrestling (action/comedy sample)Zoo_championship_Wrestling (action/comedy sample)
Zoo_championship_Wrestling (action/comedy sample)DavonBrooks
 
Indian High Profile Call Girls In Sector 18 Noida 8375860717 Escorts Service
Indian High Profile Call Girls In Sector 18 Noida 8375860717 Escorts ServiceIndian High Profile Call Girls In Sector 18 Noida 8375860717 Escorts Service
Indian High Profile Call Girls In Sector 18 Noida 8375860717 Escorts Servicedoor45step
 
Call Girls In Lajpat Nagar 8375860717 Escorts Service Free Home Delivery
Call Girls In Lajpat Nagar 8375860717 Escorts Service Free Home DeliveryCall Girls In Lajpat Nagar 8375860717 Escorts Service Free Home Delivery
Call Girls In Lajpat Nagar 8375860717 Escorts Service Free Home Deliverydoor45step
 
Hauz Khas Call Girls : ☎ 8527673949, Low rate Call Girls
Hauz Khas Call Girls : ☎ 8527673949, Low rate Call GirlsHauz Khas Call Girls : ☎ 8527673949, Low rate Call Girls
Hauz Khas Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available
8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available
8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Availabledollysharma2066
 
TOP BEST Call Girls In SECTOR 62 (Noida) ꧁❤ 8375860717 ❤꧂ Female Escorts Serv...
TOP BEST Call Girls In SECTOR 62 (Noida) ꧁❤ 8375860717 ❤꧂ Female Escorts Serv...TOP BEST Call Girls In SECTOR 62 (Noida) ꧁❤ 8375860717 ❤꧂ Female Escorts Serv...
TOP BEST Call Girls In SECTOR 62 (Noida) ꧁❤ 8375860717 ❤꧂ Female Escorts Serv...door45step
 
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call GirlsJagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
Jlt Call Girl +971509430017 Indian Call Girl in Jlt By Dubai Call Girl
Jlt Call Girl +971509430017 Indian Call Girl in Jlt By Dubai Call GirlJlt Call Girl +971509430017 Indian Call Girl in Jlt By Dubai Call Girl
Jlt Call Girl +971509430017 Indian Call Girl in Jlt By Dubai Call Girllijeho2176
 
Triangle Vinyl Record Store, Clermont Florida
Triangle Vinyl Record Store, Clermont FloridaTriangle Vinyl Record Store, Clermont Florida
Triangle Vinyl Record Store, Clermont FloridaGabrielaMiletti
 
Karol Bagh Call Girls : ☎ 8527673949, Low rate Call Girls
Karol Bagh Call Girls : ☎ 8527673949, Low rate Call GirlsKarol Bagh Call Girls : ☎ 8527673949, Low rate Call Girls
Karol Bagh Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
Bobbie goods colorinsssssssssssg book.pdf
Bobbie goods colorinsssssssssssg book.pdfBobbie goods colorinsssssssssssg book.pdf
Bobbie goods colorinsssssssssssg book.pdflunavro0105
 
Subway Stand OFF storyboard by Raquel Acosta
Subway Stand OFF storyboard by Raquel AcostaSubway Stand OFF storyboard by Raquel Acosta
Subway Stand OFF storyboard by Raquel Acostaracosta58
 
Russian⚡ Call Girls In Sector 39 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 39 Noida✨8375860717⚡Escorts ServiceRussian⚡ Call Girls In Sector 39 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 39 Noida✨8375860717⚡Escorts Servicedoor45step
 
Strip Zagor Extra 322 - Dva ortaka.pdf
Strip   Zagor Extra 322 - Dva ortaka.pdfStrip   Zagor Extra 322 - Dva ortaka.pdf
Strip Zagor Extra 322 - Dva ortaka.pdfStripovizijacom
 
Benjamin Portfolio Process Work Slideshow
Benjamin Portfolio Process Work SlideshowBenjamin Portfolio Process Work Slideshow
Benjamin Portfolio Process Work Slideshowssuser971f6c
 
Iffco Chowk Call Girls : ☎ 8527673949, Low rate Call Girls
Iffco Chowk Call Girls : ☎ 8527673949, Low rate Call GirlsIffco Chowk Call Girls : ☎ 8527673949, Low rate Call Girls
Iffco Chowk Call Girls : ☎ 8527673949, Low rate Call Girlsashishs7044
 
Jvc Call Girl +971528604116 Indian Call Girl in Jvc By Dubai Call Girl
Jvc Call Girl +971528604116 Indian Call Girl in Jvc By Dubai Call GirlJvc Call Girl +971528604116 Indian Call Girl in Jvc By Dubai Call Girl
Jvc Call Girl +971528604116 Indian Call Girl in Jvc By Dubai Call Girllijeho2176
 

Kürzlich hochgeladen (20)

FULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | DelhiFULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | Delhi
FULL ENJOY - 9953040155 Call Girls in Gandhi Vihar | Delhi
 
A Selection of Tim Walsh's Recent Paintings
A Selection of Tim Walsh's  Recent PaintingsA Selection of Tim Walsh's  Recent Paintings
A Selection of Tim Walsh's Recent Paintings
 
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts ServiceRussian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 104 Noida✨8375860717⚡Escorts Service
 
Zoo_championship_Wrestling (action/comedy sample)
Zoo_championship_Wrestling (action/comedy sample)Zoo_championship_Wrestling (action/comedy sample)
Zoo_championship_Wrestling (action/comedy sample)
 
Indian High Profile Call Girls In Sector 18 Noida 8375860717 Escorts Service
Indian High Profile Call Girls In Sector 18 Noida 8375860717 Escorts ServiceIndian High Profile Call Girls In Sector 18 Noida 8375860717 Escorts Service
Indian High Profile Call Girls In Sector 18 Noida 8375860717 Escorts Service
 
Call Girls In Lajpat Nagar 8375860717 Escorts Service Free Home Delivery
Call Girls In Lajpat Nagar 8375860717 Escorts Service Free Home DeliveryCall Girls In Lajpat Nagar 8375860717 Escorts Service Free Home Delivery
Call Girls In Lajpat Nagar 8375860717 Escorts Service Free Home Delivery
 
Hauz Khas Call Girls : ☎ 8527673949, Low rate Call Girls
Hauz Khas Call Girls : ☎ 8527673949, Low rate Call GirlsHauz Khas Call Girls : ☎ 8527673949, Low rate Call Girls
Hauz Khas Call Girls : ☎ 8527673949, Low rate Call Girls
 
8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available
8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available
8377087607, Door Step Call Girls In Gaur City (NOIDA) 24/7 Available
 
TOP BEST Call Girls In SECTOR 62 (Noida) ꧁❤ 8375860717 ❤꧂ Female Escorts Serv...
TOP BEST Call Girls In SECTOR 62 (Noida) ꧁❤ 8375860717 ❤꧂ Female Escorts Serv...TOP BEST Call Girls In SECTOR 62 (Noida) ꧁❤ 8375860717 ❤꧂ Female Escorts Serv...
TOP BEST Call Girls In SECTOR 62 (Noida) ꧁❤ 8375860717 ❤꧂ Female Escorts Serv...
 
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call GirlsJagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
Jagat Puri Call Girls : ☎ 8527673949, Low rate Call Girls
 
Jlt Call Girl +971509430017 Indian Call Girl in Jlt By Dubai Call Girl
Jlt Call Girl +971509430017 Indian Call Girl in Jlt By Dubai Call GirlJlt Call Girl +971509430017 Indian Call Girl in Jlt By Dubai Call Girl
Jlt Call Girl +971509430017 Indian Call Girl in Jlt By Dubai Call Girl
 
Triangle Vinyl Record Store, Clermont Florida
Triangle Vinyl Record Store, Clermont FloridaTriangle Vinyl Record Store, Clermont Florida
Triangle Vinyl Record Store, Clermont Florida
 
Karol Bagh Call Girls : ☎ 8527673949, Low rate Call Girls
Karol Bagh Call Girls : ☎ 8527673949, Low rate Call GirlsKarol Bagh Call Girls : ☎ 8527673949, Low rate Call Girls
Karol Bagh Call Girls : ☎ 8527673949, Low rate Call Girls
 
Bobbie goods colorinsssssssssssg book.pdf
Bobbie goods colorinsssssssssssg book.pdfBobbie goods colorinsssssssssssg book.pdf
Bobbie goods colorinsssssssssssg book.pdf
 
Subway Stand OFF storyboard by Raquel Acosta
Subway Stand OFF storyboard by Raquel AcostaSubway Stand OFF storyboard by Raquel Acosta
Subway Stand OFF storyboard by Raquel Acosta
 
Russian⚡ Call Girls In Sector 39 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 39 Noida✨8375860717⚡Escorts ServiceRussian⚡ Call Girls In Sector 39 Noida✨8375860717⚡Escorts Service
Russian⚡ Call Girls In Sector 39 Noida✨8375860717⚡Escorts Service
 
Strip Zagor Extra 322 - Dva ortaka.pdf
Strip   Zagor Extra 322 - Dva ortaka.pdfStrip   Zagor Extra 322 - Dva ortaka.pdf
Strip Zagor Extra 322 - Dva ortaka.pdf
 
Benjamin Portfolio Process Work Slideshow
Benjamin Portfolio Process Work SlideshowBenjamin Portfolio Process Work Slideshow
Benjamin Portfolio Process Work Slideshow
 
Iffco Chowk Call Girls : ☎ 8527673949, Low rate Call Girls
Iffco Chowk Call Girls : ☎ 8527673949, Low rate Call GirlsIffco Chowk Call Girls : ☎ 8527673949, Low rate Call Girls
Iffco Chowk Call Girls : ☎ 8527673949, Low rate Call Girls
 
Jvc Call Girl +971528604116 Indian Call Girl in Jvc By Dubai Call Girl
Jvc Call Girl +971528604116 Indian Call Girl in Jvc By Dubai Call GirlJvc Call Girl +971528604116 Indian Call Girl in Jvc By Dubai Call Girl
Jvc Call Girl +971528604116 Indian Call Girl in Jvc By Dubai Call Girl
 

INTEGRATION

  • 1. BUILDING TECHNOLOGY 1 [BLD 61403/ ARC3514/ ARC3512] ASSIGNMENT 2 - CONSTRUCTION SOLUTION NAME : PENG YEP SIANG ID : 0315259 TUTOR : MR. ADIB
  • 2. CONTENT INTRODUCTION PRECEDENT STUDY STRUCTURAL SYSTEM -STEEL FRAME CONSTRUCTION FLOOR SYSTEM -COMPOSITE STEEL FLOOR SYSTEM ROOF SYSTEM -GLAZED ROOF SYSTEM FACADE -GLAZED EXTERNAL WALL INSULATION STSTEM -DOUBLE-SKIN WALL SYSTEM FACADE DESIGN SCHEME SECTIONAL PERSPECTIVE
  • 3. INTRODUCTION This assignment is an integration project with Architecture Studio 5. The aim of this project is to students to consider the construction aspects throughtout the design process. The design project is a community library in Jalan Haji Salleh, Sentul, Kuala Lumpur. In this particular design, the library emphasizes the impor- tance of natural light and acoustic quality. Large opening can be found throughout the library. As the site is located among a shophouse, the facade facing the context is only limited to the north and south elevation. Therefore, the opening also acts an interaction between the interior and the exterior. N
  • 4. CULTURE FOREST PRECEDENT STUDY - STEEL FRAME CONSTRUCTION ADVANTAGESMANUFACTURER DISADVANTAGES MATERIALS CONSTRUCTION PROCESS 1. Positioning of components on readied foundation 2. Erection of components (columns and beams) 3. Installation of bracing to stabilize struc- ture 4. Site bolting or welding of components 5. Addition of substructure (girder, joist,- metal descking, etc) Mild steel, also known as carbon steel, is a type of steel that contain a small percent- age of carbon. The steel with a higher car- bon content has greater strength and lower melting point. However, it reduces ductility and weldability. • Long-life durability • Lightweight • Elimination of formwork reduces construc- tion waste • High strength-to-weight ratio allows less members to support greater load • Provide large span space at low cost • Small space used provide freedom of space • Prefabricated members reduce on-site con- struction time • Bend instead of crack under great force wind and seismic load, greatly reduce the risk of sudden collapse • Lessen structural load and subsequently- material cost • Environmental friendly • Highly susceptible to fire. At 500o C, struc- tural strength is halved. Prevention can be achieved with addition of fire resistive. • Prone to corrosion in humid environment. Prevention can be achieved with applica- tion of waterproof coating Architect : Unsanddong Architects Location : Seoul, South Korea Use : Welfare, education and research, culture, nursery school Site Area : 1694.0m2 Bldg Area : 1001.8m2 A lightweight construction with a grid-like skeleton of vertical and horizontal members in which the substructure are attached. JSPL has pioneered the production of medi- um and heavy hot rolled parallel flange beams and column sections in India. These sections are cost-effective through savings in steel con- sumption and provide ultimate design flexibil- ity to the structural designers. Steel frame construction allows the design with a long narrow nature to have lesser num- ber of components used as compared to con- ventional concrete construction, thus provide more design flexibility and daylighting. TYPE OF CONSTRUCTION SITE CONTEXT
  • 5. MANCHESTER CIVIL JUSTICE CENTRE PRECEDENT STUDY - COMPOSITE STEEL FLOOR SYSTEM ADVANTAGESMANUFACTURER DISADVANTAGES COMPONENTS CONSTRUCTION PROCESS 1. Installation of corrugated steel deck to the structural steel below 2. Shear connector is welded or nailed to the beam 3. Pouring of concrete with the side of the floor bordered by a curb of galvanized steel. 50% percent of concrete is saved as compared to conventional concrete floor slab 4. Mineral wool and plasterboard are gen- erally associated to provide better acous- tic and thermal quality. 1. Soldered connector 2. Poured concrete 3. Reinforcement mesh 4. Bosses on the sidewalls 5. Joists 6. Corrugated sheet of galvanized steel deck 7. Beam • Lightweight • Speed in construction • Versatile, can be integrate with various oth- er feature • Act as tensile reinforecement during fire • Stabilize structure against lateral buckling • Good heat insulation • Good sound insulation • Require delicate handling to prevent mois- ture penetration • Different contractor needed for installation • Specialized installation increase field cost Architect : Denton Corker Marshall Location : Manchester, UK Project Year : 2008 Bldg Area : 34000m2 Composite steel deck is the assimilation of twoload-carryingstructuralmembers.Com- mon examples are conrete fill and girder. Established in Seoul, Korea, Duckshin Housing is company specialized in steel construction materials, deck plates, deck construction, iron works and import business. The thin yet soundproof property is a essential factor in the library design. This construction technique also facilitates large space span, which enable easy space planning. TYPE OF CONSTRUCTION SITE CONTEXT 1 7 6 5 4 3 2
  • 6. MYOENJI COLUMBARIUM PRECEDENT STUDY - GLAZED ROOF SYSTEM ADVANTAGES DISADVANTAGES COMPONENTSMATERIAL • Light penetration • Advantage of wide visual field • Good sound absorption • Balance the solid aspect of design • Replace the function of window • Eliminate dependence on artificial lighting • Costly • High maintenance • Poor heat insulation • High embodied energy Architect : Furumori Koichi Architectural Design Studio Location : Fukuoka, Japan Bldg Area : 335m2 1. Installation of structural joist 2. Fixation of laminated glass panel and firerated glass onto the joist by pressure bar on all four sides 3. Purlins span between the joist to provide interconnecting drainage and conden- sate channels 4. Addition of cover cap as finishing 1. Structural laminated glass panel 2. Silicon sealant 3. Firerated glass 4. Structural joist 5. Pressure bar Laminated glass is a type of safety glass that sandwich an interlayer between two pieces of glass. The interlayer is typicallypolyvinyl butyral or ethylene-vinyl acetate. In the event of break- ing, it holds the shattered glass pieces together and appear as web of cracks. Laminated glass is heavier than common glass. It also provides UV protection and sound insulation. Glazed roof system is highly compatible with steel frame construction to span a wide area. The design’s north-south orientation without any westward or eastward facade also poses a high demand of natural lighting for comfort- able reading. CONSTRUCTION PROCESS SITE CONTEXT 1 22 3 4 5
  • 7. PRECEDENT STUDY - GLAZED EXTERNAL WALL INSULATION SYSTEM ADVANTAGES DISADVANTAGES COMPONENTS CONSTRUCTION PROCESS • Accomodate large area of facade • Advantage of wide visual field • Control on natural light penetration • Flexibility in design • Thermal efficient • Offsite prefabricated components reduce delays and erection time • Reduction of site waste • Dimensional accuracy • Complexity of material • Expensive Architect : Sou Fujimoto Location : Tokyo, Japan Project Year : 2010 Bldg Area : 2883.18m2 1. Wall plate 2. Interior finish 3. Mineral wool 4. Breather membrane 5. Gypsum sheathing 6. Timber panel 7. Timber stud 8. Laminated glass panels with stainless steel spider fitting Beside fufilling all basic requirement of a wall system, the freedom of final finishing is an im- portant feature. The construction of external wall is also versatile and time-saving. SITE CONTEXT 1. Cladding of steel column with a protective layer of fire resistant board 2. Erection of common timber stud along with top and bottom wall plate 3. Addition of bracing to reduce lateral buckling if necessary. 4. Insert mineral wool in stud space for insula- tion. 5. Installation of gypsum sheathing and breather membrane to prevent moisture penetration. 6. Installation of timber panel as finish 7. Connection of glass panels to the timber fin on the timber panel with spider fitting. 8. Application of silicon sealant between glass panels External wall insulation systems are gener- ally comprised of an insulant, a fixing and a final finish. The main framework is typically made of steel or timber. Waterproof and in- sulative material are generally included. The choice of the exterior and interior finishing is pretty wide and flexible. TYPE OF SONSTRUCTION MUSASHINO ART UNIVERSITY MUSEUM & LIBRARY 1 2 3 4 5 6 7
  • 8. PRECEDENT STUDY - DOUBLE-SKIN WALL SYSTEM ADVANTAGES DISADVANTAGES • Diffuse natural light penetration • Framing of view to exterior • Introduce ventilation into the interior • Mitigate solar gain and decrease cooling load • High insulative value • Decrease in usable floor space • Condensation in interior • Increase in material and construction cost • Questionable thermal performance Architect : Cor & Asociados Location : Albacete, Spain Bldg Area : 4375m2 Double skin can used fro many purpose. In this case, the skin serve as to introduce different level of brightness and texture in reaction to the weather. It also add interest to the view from interior to exterior. SITE CONTEXT There are many different types of dou- ble-skin facade that serve different purpos- es. Initially, the double-skin facade is a sys- tem of building consisting of two skins, or facades, placed in such a way that air flows in the intermediate cavity. The ventilation of the cavity can be natural, fan supported or mechanical. TYPE OF SONSTRUCTION CENTRAL OFFICE OF FEDA CON- FEDERATION OF EMPLOYERS OF ALBACETE COMPONENTS
  • 9. FACADE DESIGN SCHEME 1 SOUTH ELEVATION [FRONT] SCALE 1:100 DOUBLE-SKIN FACADE A Void The exposed area are mostly curtain win- dow without the cover of double-skin fa- cade. These spaces need lights and view more than privacy. These space are also double volume space, the sound echo less thus acoustic aspect is not as emphasized.
  • 10. FACADE DESIGN SCHEME 2 SOUTH ELEVATION [BACK] SCALE 1:100 DOUBLE-SKIN FACADE A Solid Latticed double-skin facade allows only dif- fused natural light to penetrate. Only opening that need privacy is placed behind the latticed skin, such as office area, toilets and private study room. Most importantly, the latticed skin can dilute the exterior noise from entering the private area that need silence more.
  • 11. FACADE DESIGN SCHEME 1 NORTH ELEVATION [FRONT] SCALE 1:100 DOUBLE-SKIN FACADE Solid Solid wall without any openings. Allocate to private area. As solid wall does not allowed natural light penetration, they are designed as long narrow strip. Therefore, the area with sol- id wall can still accept minimal diffused light from adjacent space with openings.
  • 12. FACADE DESIGN SCHEME 2 NORTH ELEVATION [BACK] SCALE 1:100 DOUBLE-SKIN FACADE B Void The openings of finned double-skin facade is larger. A balance of natural light and shade by fin is achieved. Therefore, large area of void can be applied on the facade. The fin of the double-skin also framed the view ro exterior.
  • 13. SECTIONAL PERSPECTIVE 1 GROUND FLOOR SCALE 1:30 STUDIO
  • 14. SECTIONAL PERSPECTIVE 2 THIRD FLOOR SCALE 1:30