DESIGN TEAM                     OWNERS PROJECT MANAGER
Tessier Associates Architect    URS Corporation
Margo Jones Architects
Guntlow & Associates
Tsiang Engineering
aCaerus Sustainable Solutions
Hesnor Engineering Company
MPR Consulting
16 august hoosac valley school
16 august hoosac valley school
Existing and Proposed Space at Hoosac Valley:


                                  Existing      Proposed
  HIGH SCHOOL AREA                 35,158 gsf    80,440 gsf
  MIDDLE SCHOOL AREA               21,838 gsf    50,127 gsf
  SHARED & ADMINISTRATION AREAS    91,309 gsf    44,133 gsf
  VACANT POOL AREA                  7,360 gsf         0 gsf
  DISTRICT AREA                     3,161 gsf         0 gsf
  TOTAL GROSS BUILDING AREA       158,826 gsf   174,700 gsf
16 august hoosac valley school
16 august hoosac valley school
16 august hoosac valley school
Building Environmental Improvements

• Reduced potable water consumption.
• Reduced energy consumption, significantly below current usage.
• Potential use of on‐site renewable energy (photo voltaic solar 
  system).
• Improved ventilation and indoor air quality
• Improved lighting and automatic daylighting controls
• Removal of remaining asbestos containing materials.
• Regionally sourced materials, recycled products, and no v.o.c. 
  finishes will be used in the renovations and additions.
Site Environmental Issues

• The existing athletic fields are frequently inundated with stormwater.   
  Poor draining soils do not allow for infiltration rates fast enough to 
  keep fields dry.  
• Currently storm drainage is collected and piped to existing wetland 
  resource areas.  There are no provisions for removal of suspended 
  solids, infiltration or run‐off rate reduction.  
• DEP will require the site to meet the Stormwater Management policy 
  development standards for a redevelopment project.  A Stormwater
  Operation & Maintenance Plan will need to be developed and 
  adhered to.  
• Existing site lighting is outdated and inefficient.  New fixtures would 
  reduce light pollution and provide higher, safer light levels while 
  using less energy.
16 august hoosac valley school
16 august hoosac valley school
The Goal of the Project will be to have a Green 
               Certified School
Adams Cheshire Regional School Building Committee
 Donald Sommer                  Alfred Skrocki              Francis Waterman
 Former Selectman /             Superintendent              Waterman Construction
 Local Businessman              138 East Rd.,               97 Main St.,
 1 Sommer Hill Rd.,             Adams, MA 01220             Cheshire, MA 01225
 Adams, MA 01220                skrockia@acrsd.net          watermanexcavating@verizon.net
 sommerhaflingers@yahoo.com
                                Timothy Luczynski           Howard Wineberg
 Daniel Delorey                 Facilities Mgr ‐ ACRSD      Local Businessman /
 Cheshire Selectman             35 Meadowview Dr.,          Former member of Finance  
 485 N State Rd.,               Cheshire, MA 01225          Committee / Chair of ACE Foundation
 Cheshire, MA 01225             luczynskit@acrsd.net        22 Highland Ave.
 Berkshirecustomindex@msn.com                               Adams, MA  01220
                                David Hinkell               howardjw@roadrunner.com
 Jonathan Butler                Business Administrator/ 
 Adams Town Administrator       Chief Procurement Officer   Gary Herzog
 59 Notch Rd.,                  139 Cole Ave,               Long time youth sports coach /
 Adams, MA 01220                Pittsfield, MA 01201        Former member of Finance Board
 jbutler@town.adams.ma.us       hinkelld@acrsd.net          612 Notch Rd.,
                                                            Cheshire, MA  01225
 John Duval                                                 ghherzog@hotmail.com
                                Henry Duval
 School Committee               Principal
 22 Powers St,                  175 Wilshire Dr.            Scott Nichols
 Adams, MA  01220.              Cheshire, MA 01225          Athletic Director at MCLA / 
 jeduval@verizon.net            duvalh@acrsd.net            Adams Selectman
                                                            47 Walling Rd.,
 Lynn Clairmont                                             Adams, MA 01220
                                Paul Demastrie              scott.nichols@mcla.edu
 School Committee               Finance Committee
 20 Pleasantview Dr.            29 Leonard St.,
 Cheshire, MA 01225             Adams, MA 01220
 bljjcl@roadrunner.com          pauldemastrie@verizon.net
END

Weitere ähnliche Inhalte

Mehr von Erin Mucci

Forensic entomology
Forensic entomologyForensic entomology
Forensic entomologyErin Mucci
 
Fingerprinting
FingerprintingFingerprinting
FingerprintingErin Mucci
 
Introduction to Biology
Introduction to BiologyIntroduction to Biology
Introduction to BiologyErin Mucci
 
Metric Measures
Metric MeasuresMetric Measures
Metric MeasuresErin Mucci
 
Mass Volume Density
Mass Volume DensityMass Volume Density
Mass Volume DensityErin Mucci
 
What is forensics
What is forensicsWhat is forensics
What is forensicsErin Mucci
 
Biology review
Biology reviewBiology review
Biology reviewErin Mucci
 
Biology Review
Biology ReviewBiology Review
Biology ReviewErin Mucci
 
Forensic toxicology & chemical evidence
Forensic toxicology & chemical evidenceForensic toxicology & chemical evidence
Forensic toxicology & chemical evidenceErin Mucci
 
The Theory of Evolution
The Theory of EvolutionThe Theory of Evolution
The Theory of EvolutionErin Mucci
 
Extraction of DNA from human cheek cells
Extraction of DNA from human cheek cellsExtraction of DNA from human cheek cells
Extraction of DNA from human cheek cellsErin Mucci
 
Fingerprinting
FingerprintingFingerprinting
FingerprintingErin Mucci
 
Forensic Pathology
Forensic PathologyForensic Pathology
Forensic PathologyErin Mucci
 
Research development
Research developmentResearch development
Research developmentErin Mucci
 
Project management
Project managementProject management
Project managementErin Mucci
 
Forensic anthropology
Forensic anthropologyForensic anthropology
Forensic anthropologyErin Mucci
 

Mehr von Erin Mucci (20)

Forensic entomology
Forensic entomologyForensic entomology
Forensic entomology
 
Fingerprinting
FingerprintingFingerprinting
Fingerprinting
 
Introduction to Biology
Introduction to BiologyIntroduction to Biology
Introduction to Biology
 
Metric Measures
Metric MeasuresMetric Measures
Metric Measures
 
Mass Volume Density
Mass Volume DensityMass Volume Density
Mass Volume Density
 
What is forensics
What is forensicsWhat is forensics
What is forensics
 
Meiosis
MeiosisMeiosis
Meiosis
 
Biology review
Biology reviewBiology review
Biology review
 
Biology Review
Biology ReviewBiology Review
Biology Review
 
Forensic toxicology & chemical evidence
Forensic toxicology & chemical evidenceForensic toxicology & chemical evidence
Forensic toxicology & chemical evidence
 
The Theory of Evolution
The Theory of EvolutionThe Theory of Evolution
The Theory of Evolution
 
Extraction of DNA from human cheek cells
Extraction of DNA from human cheek cellsExtraction of DNA from human cheek cells
Extraction of DNA from human cheek cells
 
DNA structure
DNA structureDNA structure
DNA structure
 
Fingerprinting
FingerprintingFingerprinting
Fingerprinting
 
Forensic Pathology
Forensic PathologyForensic Pathology
Forensic Pathology
 
Hair evidence
Hair evidenceHair evidence
Hair evidence
 
Research development
Research developmentResearch development
Research development
 
Project management
Project managementProject management
Project management
 
Blog Workshop
Blog WorkshopBlog Workshop
Blog Workshop
 
Forensic anthropology
Forensic anthropologyForensic anthropology
Forensic anthropology
 

16 august hoosac valley school

  • 1. DESIGN TEAM OWNERS PROJECT MANAGER Tessier Associates Architect URS Corporation Margo Jones Architects Guntlow & Associates Tsiang Engineering aCaerus Sustainable Solutions Hesnor Engineering Company MPR Consulting
  • 4. Existing and Proposed Space at Hoosac Valley: Existing  Proposed HIGH SCHOOL AREA 35,158 gsf 80,440 gsf MIDDLE SCHOOL AREA 21,838 gsf 50,127 gsf SHARED & ADMINISTRATION AREAS 91,309 gsf 44,133 gsf VACANT POOL AREA 7,360 gsf 0 gsf DISTRICT AREA 3,161 gsf 0 gsf TOTAL GROSS BUILDING AREA 158,826 gsf 174,700 gsf
  • 8. Building Environmental Improvements • Reduced potable water consumption. • Reduced energy consumption, significantly below current usage. • Potential use of on‐site renewable energy (photo voltaic solar  system). • Improved ventilation and indoor air quality • Improved lighting and automatic daylighting controls • Removal of remaining asbestos containing materials. • Regionally sourced materials, recycled products, and no v.o.c.  finishes will be used in the renovations and additions.
  • 9. Site Environmental Issues • The existing athletic fields are frequently inundated with stormwater.    Poor draining soils do not allow for infiltration rates fast enough to  keep fields dry.   • Currently storm drainage is collected and piped to existing wetland  resource areas.  There are no provisions for removal of suspended  solids, infiltration or run‐off rate reduction.   • DEP will require the site to meet the Stormwater Management policy  development standards for a redevelopment project.  A Stormwater Operation & Maintenance Plan will need to be developed and  adhered to.   • Existing site lighting is outdated and inefficient.  New fixtures would  reduce light pollution and provide higher, safer light levels while  using less energy.
  • 13. Adams Cheshire Regional School Building Committee Donald Sommer Alfred Skrocki Francis Waterman Former Selectman /  Superintendent Waterman Construction Local Businessman 138 East Rd., 97 Main St., 1 Sommer Hill Rd.,  Adams, MA 01220 Cheshire, MA 01225 Adams, MA 01220 skrockia@acrsd.net watermanexcavating@verizon.net sommerhaflingers@yahoo.com Timothy Luczynski Howard Wineberg Daniel Delorey Facilities Mgr ‐ ACRSD Local Businessman / Cheshire Selectman 35 Meadowview Dr., Former member of Finance   485 N State Rd.,  Cheshire, MA 01225 Committee / Chair of ACE Foundation Cheshire, MA 01225 luczynskit@acrsd.net 22 Highland Ave. Berkshirecustomindex@msn.com Adams, MA  01220 David Hinkell howardjw@roadrunner.com Jonathan Butler Business Administrator/  Adams Town Administrator Chief Procurement Officer Gary Herzog 59 Notch Rd.,  139 Cole Ave, Long time youth sports coach / Adams, MA 01220 Pittsfield, MA 01201 Former member of Finance Board jbutler@town.adams.ma.us hinkelld@acrsd.net 612 Notch Rd., Cheshire, MA  01225 John Duval ghherzog@hotmail.com Henry Duval School Committee Principal 22 Powers St, 175 Wilshire Dr. Scott Nichols Adams, MA  01220. Cheshire, MA 01225 Athletic Director at MCLA /  jeduval@verizon.net duvalh@acrsd.net Adams Selectman 47 Walling Rd., Lynn Clairmont Adams, MA 01220 Paul Demastrie scott.nichols@mcla.edu School Committee Finance Committee 20 Pleasantview Dr. 29 Leonard St., Cheshire, MA 01225 Adams, MA 01220 bljjcl@roadrunner.com pauldemastrie@verizon.net
  • 14. END