CONTRACT DISPUTE RESOLUTION
TECHNIQUES




          LECTURE-5

   1                  11-04-2012
CONTRACT DISPUTE
RESOLUTION TECHNIQUES
Construction Claims
   Construction contracts are seldom ideal, and claims for
    time extension or financial compensation often have to
    be made by one party on another.
   Claim analysis has become an important issue for project
    management
   Typical construction claims against owners
•   Scope changes
•   Change orders
•   Work suspension and stoppages
•   Site access or availability
•   Strikes etc.
   Typical construction claims against the contractor
•   Materials out of specification
•   Defective work
•   Property damage
•   Contractor’s late completion
Disputes

   The best practices for resolving construction disputes
    include a combination of: dispute prevention, flexibility,
    early dispute intervention, use of alternative dispute
    resolution methods, and a predetermined plan as to how
    disputes will be handled.




                          Contract Dispute Resolution Techniques
Disputes

     The various types of dispute resolution methods
      used in construction disputes are:
      Tradition Techniques
       Litigation
       Negotiation

      Alternative dispute resolution Technique
        (ADR)
       Arbitration
       Mediation
       Expert determination
       Dispute Review Boards
       Rent a Judge
                          Contract Dispute Resolution Techniques
Litigation
   Most construction disputes are tried in one of the state
    judicial systems.

   A particular state court gains jurisdiction over a case if
    one of the parties is based in that state or if the project
    itself is located in that state.

   If the two parties to the dispute are based in different
    states, whichever party initiates the litigation chooses the
    forum.
   Litigation usually refers to the process of
    submitting matters for resolution to the courts of
    the provinces, or in some instances, the federal
    court system.

   Litigation usually occurs because:
       The amount of damages is large
       One or more parties refuses to negotiate a solution
       The issue is complex
       A court-ordered solution is the quickest solution
       Litigation will not affect the project schedule
                           Contract Dispute Resolution Techniques
DISADVANTAGES OF LITIGATION:

A complex construction dispute may take anywhere from
1 to 2 years before it reaches trial.

The prolonged and detailed process makes litigation very
expensive.
Contract Negotiations
     Another way of resolving construction disputes is by
      holding negotiations
     Between the two parties without neutral party
     It is one of the most-tried methods and most-successful
      too
     Negotiations are quite simple and can be done over the
      telephone, by email or letters, at a meeting or even
      through mediation which is, another form of alternative
      dispute resolution.



                           Contract Dispute Resolution Techniques
Skills Necessary for a negotiator
     Preparation and Planning skills
     Knowledge of subject matter
     Ability to understand the interest of the firm
     Ability of persuade others
     Good listening skills
     Patience
     Ability to control emotions
     Ability to maintain flexibility



                            Contract Dispute Resolution Techniques
Arbitration
     In arbitration, each party in a dispute agrees to submit
      evidence to a neutral third party to review and render a
      judgment of responsibility.

     Arbitration is less costly and time-consuming than
      litigation, but has fallen out of favor because it is still
      more expensive and slower than mediation or
      conciliation.

     Arbitration may be binding or non-binding, depending on
      the contract provisions.
                              Contract Dispute Resolution Techniques
Mediation
     Mediation is a voluntary negotiation between the parties
      in a dispute, aided by a neutral third party (the mediator).

     The mediator’s role is to assist the parties to find their
      own solution.

     Mediation is mentioned as the desired form of problem
      resolution in agreements, and is faster and less costly
      than arbitration.


                             Contract Dispute Resolution Techniques
ADVANTAGES OF MEDIATION
Fast
Inexpensive
Conducted by experts
Confidential and convenient


DISADVANTAGES OF MEDIATION
 Mediation is non-binding
If an agreement cannot be worked out, the mediation
proceeding will have been a waste of time and money.
Expert Determination
     Some disputes are of such a nature that they can be
      resolved through objective testing or the opinion of an
      expert.

     Environmental and material testing issues are examples of
      problems in which both parties may voluntarily conclude
      that they will accept the judgment or report of an
      independent agency.




                           Contract Dispute Resolution Techniques
Dispute Review Boards

     Dispute Review Boards

         The DRB method of dispute resolution was developed by the
          committee on contracting practices of the underground
          technology research council of ASCE.
          The DRB comprises three members: one selected by the
          owner, one by the contractor, and a third selected by the first
          two.
         All DRB members are impartial and experienced in
          construction. They are appointed soon after the contract is
          awarded
                                Contract Dispute Resolution Techniques
   DRB members are sent progress reports and visit the
    project periodically.

   The DRB is not used for routine claims or differences of
    opinion, but for the resolution of major problems.

    The recommendations of the DRB are not legally
    binding, but are not likely to be reversed in litigation.
ADVANTAGES OF DISPUTES REVIEW BOARDS
The DRB hears disputes on an informal basis and can
provide recommendations for their timely resolution
before parties adopt hard positions leading to litigation.
The parties are comfortable with the recommendations of
the DRB since the selection of the DRB members is
controlled by the owner and the contractor.
 Because they meet periodically and they are sent
progress reports, the DRB members are familiar with the
elements of the project.

   Although the DRB recommendations are not binding on
    either party, there is strong motivation to accept the
    findings
   DISADVANTAGES OF DISPUTES REVIEW BOARDS
   The impartiality and conflict-of- interest portion of the
    DRB specification is so tough that sometimes there are
    not enough qualified people for the DRB.

   The project must be large enough, and the probability of
    the occurrence of disputes throughout the course of the
    project must be high enough to justify the expense of
    retaining the services of the DRB members for the entire
    duration of the project.
Rent-a- Judge
     Hire ex- judge or lawyer to give binding or non-binding
      decision




                           Contract Dispute Resolution Techniques

Weitere ähnliche Inhalte

Was ist angesagt?

Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 CompleteJohn Ashton
 
Professional practices (lec 02) by k.iqbal
Professional practices (lec 02) by k.iqbalProfessional practices (lec 02) by k.iqbal
Professional practices (lec 02) by k.iqbalZakee Kazmee
 
Nvc Fund Holding Trust Transaction Platform 2152019
Nvc Fund Holding Trust Transaction Platform 2152019Nvc Fund Holding Trust Transaction Platform 2152019
Nvc Fund Holding Trust Transaction Platform 2152019FrankEkejija1
 
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m magedDelay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m magedM Maged Hegazy, LLM, MBA, CCP, P3O
 
Nec fidic-jbcc-gcc- ct-marketing (1) (2)
Nec fidic-jbcc-gcc- ct-marketing (1) (2)Nec fidic-jbcc-gcc- ct-marketing (1) (2)
Nec fidic-jbcc-gcc- ct-marketing (1) (2)GPTraining
 
Master thesis defence presentation
Master thesis defence presentationMaster thesis defence presentation
Master thesis defence presentationYv Gao (高煜)
 
HOW TO SURVIVE CONSTRUCTION PROJECTS DURING TIMES OF ECONOMIC INSANITY
HOW TO SURVIVE CONSTRUCTION PROJECTS DURING TIMES OF ECONOMIC INSANITYHOW TO SURVIVE CONSTRUCTION PROJECTS DURING TIMES OF ECONOMIC INSANITY
HOW TO SURVIVE CONSTRUCTION PROJECTS DURING TIMES OF ECONOMIC INSANITYBurns White LLC
 
Alternative Dispute Resolution Methods
Alternative Dispute Resolution MethodsAlternative Dispute Resolution Methods
Alternative Dispute Resolution Methodscoburgpsych
 

Was ist angesagt? (11)

Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 Complete
 
Professional practices (lec 02) by k.iqbal
Professional practices (lec 02) by k.iqbalProfessional practices (lec 02) by k.iqbal
Professional practices (lec 02) by k.iqbal
 
Arbitration notes
Arbitration notesArbitration notes
Arbitration notes
 
TE&A news
TE&A newsTE&A news
TE&A news
 
Nvc Fund Holding Trust Transaction Platform 2152019
Nvc Fund Holding Trust Transaction Platform 2152019Nvc Fund Holding Trust Transaction Platform 2152019
Nvc Fund Holding Trust Transaction Platform 2152019
 
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m magedDelay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
 
Nec fidic-jbcc-gcc- ct-marketing (1) (2)
Nec fidic-jbcc-gcc- ct-marketing (1) (2)Nec fidic-jbcc-gcc- ct-marketing (1) (2)
Nec fidic-jbcc-gcc- ct-marketing (1) (2)
 
Master thesis defence presentation
Master thesis defence presentationMaster thesis defence presentation
Master thesis defence presentation
 
HOW TO SURVIVE CONSTRUCTION PROJECTS DURING TIMES OF ECONOMIC INSANITY
HOW TO SURVIVE CONSTRUCTION PROJECTS DURING TIMES OF ECONOMIC INSANITYHOW TO SURVIVE CONSTRUCTION PROJECTS DURING TIMES OF ECONOMIC INSANITY
HOW TO SURVIVE CONSTRUCTION PROJECTS DURING TIMES OF ECONOMIC INSANITY
 
Procurement negotiation tips and phases
Procurement negotiation tips and phasesProcurement negotiation tips and phases
Procurement negotiation tips and phases
 
Alternative Dispute Resolution Methods
Alternative Dispute Resolution MethodsAlternative Dispute Resolution Methods
Alternative Dispute Resolution Methods
 

Andere mochten auch

labour vs machionary (cep lecture)
labour vs machionary (cep lecture)labour vs machionary (cep lecture)
labour vs machionary (cep lecture)Safiullah Khan
 
Pile Foundation
Pile Foundation Pile Foundation
Pile Foundation Waqas Aslam
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"Abhishek Shah
 

Andere mochten auch (6)

CIVIL ENGINEERING LAW
CIVIL ENGINEERING LAWCIVIL ENGINEERING LAW
CIVIL ENGINEERING LAW
 
labour vs machionary (cep lecture)
labour vs machionary (cep lecture)labour vs machionary (cep lecture)
labour vs machionary (cep lecture)
 
Pile Foundation
Pile Foundation Pile Foundation
Pile Foundation
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
"Types and Causes of Construction Claims"
"Types and Causes of Construction Claims""Types and Causes of Construction Claims"
"Types and Causes of Construction Claims"
 
Code of Ethics
Code of EthicsCode of Ethics
Code of Ethics
 

Ähnlich wie Civil engineering practice (lec 5)

Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...
Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...
Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...TheGimhan123
 
Top 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction DisputesTop 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction DisputesSarah Fox
 
Lecture 2 - ADR vs Litigation.pdf
Lecture 2 - ADR vs Litigation.pdfLecture 2 - ADR vs Litigation.pdf
Lecture 2 - ADR vs Litigation.pdfjonathan539518
 
arbitration and it's types.pptx
arbitration and it's types.pptxarbitration and it's types.pptx
arbitration and it's types.pptxLyricCorner
 
arbitration and it's types.pptx
arbitration and it's types.pptxarbitration and it's types.pptx
arbitration and it's types.pptxLyricCorner
 
arbitration and it's types.pptx
arbitration and it's types.pptxarbitration and it's types.pptx
arbitration and it's types.pptxLyricCorner
 
Project dispute avoidance and mitigation through conciliation and arbitration
Project dispute avoidance and mitigation through conciliation and arbitrationProject dispute avoidance and mitigation through conciliation and arbitration
Project dispute avoidance and mitigation through conciliation and arbitration Dr K M SONI
 
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdfSEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdfJaphethK
 
Early Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction IndustryEarly Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction IndustryFrancis Ho
 
Utilizing Alternative Dispute Resolution Tactics in Employment Matters
Utilizing Alternative Dispute Resolution Tactics in Employment MattersUtilizing Alternative Dispute Resolution Tactics in Employment Matters
Utilizing Alternative Dispute Resolution Tactics in Employment MattersWoodrow Glass
 
Alternative Dispute Resolution (ADR)
Alternative Dispute Resolution (ADR)Alternative Dispute Resolution (ADR)
Alternative Dispute Resolution (ADR)Shyam Anandjiwala
 
ADR-converted.pdf
ADR-converted.pdfADR-converted.pdf
ADR-converted.pdfmallikmaro
 
ADR Final - short version - 16-10-2023.pptx
ADR Final - short version - 16-10-2023.pptxADR Final - short version - 16-10-2023.pptx
ADR Final - short version - 16-10-2023.pptxzulkiflimohdzain1
 
Meet the Adjudicator
Meet the Adjudicator Meet the Adjudicator
Meet the Adjudicator NiallLawless
 
Ehsan Kabir Solicitor : Strengths and Weaknesses of Judicial Determination
Ehsan Kabir Solicitor : Strengths and Weaknesses of Judicial DeterminationEhsan Kabir Solicitor : Strengths and Weaknesses of Judicial Determination
Ehsan Kabir Solicitor : Strengths and Weaknesses of Judicial DeterminationEhsan kabir Solicitor
 
ADR Presentation Assignment.pptx
ADR Presentation Assignment.pptxADR Presentation Assignment.pptx
ADR Presentation Assignment.pptxpritha36
 
ADR its processes & KP.ppt
ADR its processes & KP.pptADR its processes & KP.ppt
ADR its processes & KP.pptJohnVisca1
 

Ähnlich wie Civil engineering practice (lec 5) (20)

Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...
Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...
Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...
 
Top 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction DisputesTop 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction Disputes
 
Lecture 2 - ADR vs Litigation.pdf
Lecture 2 - ADR vs Litigation.pdfLecture 2 - ADR vs Litigation.pdf
Lecture 2 - ADR vs Litigation.pdf
 
arbitration and it's types.pptx
arbitration and it's types.pptxarbitration and it's types.pptx
arbitration and it's types.pptx
 
arbitration and it's types.pptx
arbitration and it's types.pptxarbitration and it's types.pptx
arbitration and it's types.pptx
 
arbitration and it's types.pptx
arbitration and it's types.pptxarbitration and it's types.pptx
arbitration and it's types.pptx
 
Project dispute avoidance and mitigation through conciliation and arbitration
Project dispute avoidance and mitigation through conciliation and arbitrationProject dispute avoidance and mitigation through conciliation and arbitration
Project dispute avoidance and mitigation through conciliation and arbitration
 
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdfSEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
SEMINAR_4_ALTERNATIVE_DISPUTE_ESOLUTION_MECHANISM[3].pdf
 
Early Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction IndustryEarly Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction Industry
 
Arbitration Act in Bangladesh
Arbitration Act in BangladeshArbitration Act in Bangladesh
Arbitration Act in Bangladesh
 
Priavte court
Priavte courtPriavte court
Priavte court
 
Utilizing Alternative Dispute Resolution Tactics in Employment Matters
Utilizing Alternative Dispute Resolution Tactics in Employment MattersUtilizing Alternative Dispute Resolution Tactics in Employment Matters
Utilizing Alternative Dispute Resolution Tactics in Employment Matters
 
Alternative Dispute Resolution (ADR)
Alternative Dispute Resolution (ADR)Alternative Dispute Resolution (ADR)
Alternative Dispute Resolution (ADR)
 
ADR-converted.pdf
ADR-converted.pdfADR-converted.pdf
ADR-converted.pdf
 
ADR Final - short version - 16-10-2023.pptx
ADR Final - short version - 16-10-2023.pptxADR Final - short version - 16-10-2023.pptx
ADR Final - short version - 16-10-2023.pptx
 
Meet the Adjudicator
Meet the Adjudicator Meet the Adjudicator
Meet the Adjudicator
 
Drafting Arbitration Clause
Drafting Arbitration ClauseDrafting Arbitration Clause
Drafting Arbitration Clause
 
Ehsan Kabir Solicitor : Strengths and Weaknesses of Judicial Determination
Ehsan Kabir Solicitor : Strengths and Weaknesses of Judicial DeterminationEhsan Kabir Solicitor : Strengths and Weaknesses of Judicial Determination
Ehsan Kabir Solicitor : Strengths and Weaknesses of Judicial Determination
 
ADR Presentation Assignment.pptx
ADR Presentation Assignment.pptxADR Presentation Assignment.pptx
ADR Presentation Assignment.pptx
 
ADR its processes & KP.ppt
ADR its processes & KP.pptADR its processes & KP.ppt
ADR its processes & KP.ppt
 

Kürzlich hochgeladen

Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 

Kürzlich hochgeladen (20)

Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 

Civil engineering practice (lec 5)

  • 1. CONTRACT DISPUTE RESOLUTION TECHNIQUES LECTURE-5 1 11-04-2012
  • 3. Construction Claims  Construction contracts are seldom ideal, and claims for time extension or financial compensation often have to be made by one party on another.  Claim analysis has become an important issue for project management  Typical construction claims against owners • Scope changes • Change orders • Work suspension and stoppages • Site access or availability • Strikes etc.
  • 4. Typical construction claims against the contractor • Materials out of specification • Defective work • Property damage • Contractor’s late completion
  • 5. Disputes  The best practices for resolving construction disputes include a combination of: dispute prevention, flexibility, early dispute intervention, use of alternative dispute resolution methods, and a predetermined plan as to how disputes will be handled. Contract Dispute Resolution Techniques
  • 6. Disputes  The various types of dispute resolution methods used in construction disputes are: Tradition Techniques  Litigation  Negotiation Alternative dispute resolution Technique (ADR)  Arbitration  Mediation  Expert determination  Dispute Review Boards  Rent a Judge Contract Dispute Resolution Techniques
  • 7. Litigation  Most construction disputes are tried in one of the state judicial systems.  A particular state court gains jurisdiction over a case if one of the parties is based in that state or if the project itself is located in that state.  If the two parties to the dispute are based in different states, whichever party initiates the litigation chooses the forum.
  • 8. Litigation usually refers to the process of submitting matters for resolution to the courts of the provinces, or in some instances, the federal court system.  Litigation usually occurs because:  The amount of damages is large  One or more parties refuses to negotiate a solution  The issue is complex  A court-ordered solution is the quickest solution  Litigation will not affect the project schedule Contract Dispute Resolution Techniques
  • 9. DISADVANTAGES OF LITIGATION: A complex construction dispute may take anywhere from 1 to 2 years before it reaches trial. The prolonged and detailed process makes litigation very expensive.
  • 10. Contract Negotiations  Another way of resolving construction disputes is by holding negotiations  Between the two parties without neutral party  It is one of the most-tried methods and most-successful too  Negotiations are quite simple and can be done over the telephone, by email or letters, at a meeting or even through mediation which is, another form of alternative dispute resolution. Contract Dispute Resolution Techniques
  • 11. Skills Necessary for a negotiator  Preparation and Planning skills  Knowledge of subject matter  Ability to understand the interest of the firm  Ability of persuade others  Good listening skills  Patience  Ability to control emotions  Ability to maintain flexibility Contract Dispute Resolution Techniques
  • 12. Arbitration  In arbitration, each party in a dispute agrees to submit evidence to a neutral third party to review and render a judgment of responsibility.  Arbitration is less costly and time-consuming than litigation, but has fallen out of favor because it is still more expensive and slower than mediation or conciliation.  Arbitration may be binding or non-binding, depending on the contract provisions. Contract Dispute Resolution Techniques
  • 13. Mediation  Mediation is a voluntary negotiation between the parties in a dispute, aided by a neutral third party (the mediator).  The mediator’s role is to assist the parties to find their own solution.  Mediation is mentioned as the desired form of problem resolution in agreements, and is faster and less costly than arbitration. Contract Dispute Resolution Techniques
  • 14. ADVANTAGES OF MEDIATION Fast Inexpensive Conducted by experts Confidential and convenient DISADVANTAGES OF MEDIATION  Mediation is non-binding If an agreement cannot be worked out, the mediation proceeding will have been a waste of time and money.
  • 15. Expert Determination  Some disputes are of such a nature that they can be resolved through objective testing or the opinion of an expert.  Environmental and material testing issues are examples of problems in which both parties may voluntarily conclude that they will accept the judgment or report of an independent agency. Contract Dispute Resolution Techniques
  • 16. Dispute Review Boards  Dispute Review Boards  The DRB method of dispute resolution was developed by the committee on contracting practices of the underground technology research council of ASCE.  The DRB comprises three members: one selected by the owner, one by the contractor, and a third selected by the first two.  All DRB members are impartial and experienced in construction. They are appointed soon after the contract is awarded Contract Dispute Resolution Techniques
  • 17. DRB members are sent progress reports and visit the project periodically.  The DRB is not used for routine claims or differences of opinion, but for the resolution of major problems.  The recommendations of the DRB are not legally binding, but are not likely to be reversed in litigation.
  • 18. ADVANTAGES OF DISPUTES REVIEW BOARDS The DRB hears disputes on an informal basis and can provide recommendations for their timely resolution before parties adopt hard positions leading to litigation. The parties are comfortable with the recommendations of the DRB since the selection of the DRB members is controlled by the owner and the contractor.  Because they meet periodically and they are sent progress reports, the DRB members are familiar with the elements of the project. 
  • 19. Although the DRB recommendations are not binding on either party, there is strong motivation to accept the findings
  • 20. DISADVANTAGES OF DISPUTES REVIEW BOARDS  The impartiality and conflict-of- interest portion of the DRB specification is so tough that sometimes there are not enough qualified people for the DRB.  The project must be large enough, and the probability of the occurrence of disputes throughout the course of the project must be high enough to justify the expense of retaining the services of the DRB members for the entire duration of the project.
  • 21. Rent-a- Judge  Hire ex- judge or lawyer to give binding or non-binding decision Contract Dispute Resolution Techniques