SlideShare ist ein Scribd-Unternehmen logo
1 von 33
Downloaden Sie, um offline zu lesen
THE CITY OF EL PASO
Footer Text
THE CITY OF EL PASO
QUARTERLY UPDATE
Tuesday, March 17, 2015
3/17/15
OUR MISSION:
“Work with others to provide
safe and reliable
transportation solutions for
Footer Text
transportation solutions for
Texas.”
2
Key El PasoKey El PasoKey El PasoKey El Paso
ConstructionConstructionConstructionConstruction
ProjectsProjectsProjectsProjects
Footer Text
ProjectsProjectsProjectsProjects
3
Border West Expressway Project LimitsBorder West Expressway Project LimitsBorder West Expressway Project LimitsBorder West Expressway Project Limits
Footer Text 4
Border West ExpresswayBorder West ExpresswayBorder West ExpresswayBorder West Expressway
Description:
The Border West Expressway project will provide an alternate route for I-
10 and will address needed improvements to safely guide the region’s
growth and development. The project is located west of downtown El
Paso, south of I-10 and extends approximately 7.4 miles from Racetrack
Drive near Doniphan Road and New Mexico 273 east to one mile east of
Park Street near US 54.
Design Build: $ 447.5 M
Footer Text 5
Design Build: $ 447.5 M
Construction Start Date: March 2015
Estimated Completion Date : Fall 2017/Spring 2018
I-10 Collector Distributor lanes
Footer Text 6
A Segment of the I-10 Collector Distributor
Project
I-10 Collector Distributor lanes
Description:
This project includes intersection improvements and the addition of
collector-distributor (C-D) lanes, main lanes, frontage roads and direct
connector ramps on Interstate 10 (I-10) between State Highway (SH) 20
(Mesa St.) and Executive Center Blvd. in El Paso. The I-10 CD lanes
project will improve connectivity and reliability to the segment of I-10
through El Paso where there currently are no frontage roads. This project
will provide a vital connection to the Border Highway West project, which
completes the southern segment of LP 375 that connects international
Footer Text 7
ports of entries such as Zaragoza and the Bridge of the Americas, as well
as downtown El Paso.
Low Bid: $158.8 Million
Let Date: October 2014
Construction Start Date: April 2015
Expected Completion Date: August 2019
SPUR 1966SPUR 1966SPUR 1966SPUR 1966
Construction Photos
Footer Text 8
SPUR 1966SPUR 1966SPUR 1966SPUR 1966
Description:
The Spur 1966 Project connects the existing Schuster
Avenue terminus on the UTEP campus east of Interstate
Highway 10 (I-10) to existing US 85 (Paisano Dr.) south of
I-10, via a bridge over I-10. The project length is
approximately 0.7 miles. The project limits are US 85
(Paisano Dr.) to Schuster Avenue.
Footer Text 9
(Paisano Dr.) to Schuster Avenue.
Low Bid: $31 Million
Let Date : February 2013
Start Date: May 2013
Expected Completion Date: May 2015
Footer Text 10
IIII----10 at Americas Interchange10 at Americas Interchange10 at Americas Interchange10 at Americas Interchange
Description:
The Americas Interchange will be a four level, fully
directional interchange, including eight (8) direct
connectors, which is being constructed in phases. In
addition to the direct connectors, there will realignment of
frontage roads, relocation of access ramps, and
adjustment/relocation of conflicting utilities.
Footer Text 11
adjustment/relocation of conflicting utilities.
Phase 1 ($108M-Design Build): Completed
Phase 2 ($42.5M): April 2015 Completion
Phase 3 ($31.5M): April 2015 Construction Start
Winter 2016 Completion
Phase 4 ($20M): Anticipated 2016 LET Date
I-10 Widening and Braided Ramp
Construction Photos
Footer Text 12
IIII----10 Operational Improvements (Zaragoza to Loop 375)10 Operational Improvements (Zaragoza to Loop 375)10 Operational Improvements (Zaragoza to Loop 375)10 Operational Improvements (Zaragoza to Loop 375)
Description:
The project will provide an additional lane in both directions
from Loop 375 to Zaragoza, upgrade the frontage roads and
provide a braided ramp.
Low Bid: $24.8 Million
Footer Text 13
Let Date: August 2013
Construction Completion: June 2015
IIII----10 Operational Improvements (Viscount to Zaragoza)10 Operational Improvements (Viscount to Zaragoza)10 Operational Improvements (Viscount to Zaragoza)10 Operational Improvements (Viscount to Zaragoza)
Description:
The proposed project would provide and additional lane in
both directions from Viscount to Zaragoza. This project
replaces the centerline HPS lighting with High Mast LED
lighting and includes a sound wall.
Low Bid: $18.1Million
Footer Text 14
Low Bid: $18.1Million
Let Date: July 2014
Construction Start Date: September 2014
Construction Completion: December 2015
AlamedaAlamedaAlamedaAlameda ////PaisanoPaisanoPaisanoPaisano Intersection ImprovementsIntersection ImprovementsIntersection ImprovementsIntersection Improvements
Footer Text 15
Construction Photos: Lanes open to traffic.
Description:
Reconstruct and improve SH 20 (Alameda Ave.) The
proposed improvements consist of the reconstruction and
reconfiguration of the existing SH 20 (Alameda Ave.) and
US 62 (Paisano Dr.) intersection with two modern
roundabouts and a new “T” intersection at El Paso Drive.
Improvements also include improved drainage,
AlamedaAlamedaAlamedaAlameda ////PaisanoPaisanoPaisanoPaisano Intersection ImprovementsIntersection ImprovementsIntersection ImprovementsIntersection Improvements
Footer Text
illumination and sidewalks.
Low Bid: $10.5 Million
Let Date: August 2013
Construction Completion: July 2015
16
US 54 Renovation at the Spaghetti BowlUS 54 Renovation at the Spaghetti BowlUS 54 Renovation at the Spaghetti BowlUS 54 Renovation at the Spaghetti Bowl
Footer Text 17
Description:
Provide an aesthetically pleasing corridor compatible with
the City of El Paso. The project limits are on I-10 from
Raynolds Street to Copia Street and on US 54 from
Yandell Drive to Alameda Avenue.
Total Cost Estimate: $19.5 Million
US 54 Renovation at the Spaghetti BowlUS 54 Renovation at the Spaghetti BowlUS 54 Renovation at the Spaghetti BowlUS 54 Renovation at the Spaghetti Bowl
Footer Text
Total Cost Estimate: $19.5 Million
Phase 1 Completed
Phase 2 Anticipated Completion Date June 2015
Phase 3 LET April 2014
Anticipated Completion Date August 2015
18
LP 375/SPUR 601 Intersection Improvements
Footer Text 19
LP 375/SPUR 601 Intersection Improvements
Description:
The project overlaid LP 375 from Montana to north of Spur 601 and
modifies the SPUR 601 and LP 375 intersection to safely and efficiently
accommodate the high volume left turn movements (DDI). Traffic within
the intersection briefly drives on the left side of the road to allow left turn
movement to occur without crossing oncoming traffic or stopping. Phase
2 adds a dual right turn lane from Spur 601 to LP 375 and an auxiliary
lane from Spur 601 to Iron Medics interchange.
Footer Text 20
lane from Spur 601 to Iron Medics interchange.
Phase 1: ($4.6 M) Completed
Phase 2: ($.9 M) Construction Start April 2015
Construction Completion: December 2015
Montana (US 62) Widening
Description:
This project will provide improvements to US Highway (US) 62/180
(Montana Avenue) from Yarbrough Drive to the Loop 375
intersection. The improvements include construction of a six-lane
divided arterial as well as associated drainage improvements,
sidewalks on the south side, shoulder improvements, bike lane, right
turn lanes, landscaping and sound walls.
Footer Text 21
Low Bid: $5.7 Million
Let Date: August 2013
Construction Completion: June 2015
Description:
The project will replace the existing 2-lane bridge on FM 1110
over I-10 located at the Clint exit with a 4-lane bridge with left
turn lanes (includes a dual left turn from FM 1110 North to I-10
West). Also included is a U-Turn bridge on the west side of
the new bridge.
FM 1110 Bridge Replacement
Footer Text 22
the new bridge.
Low Bid: $9.5 Million
Letting Date: July 2014
Construction Completion: December 2015
Other Projects in Construction
I10 HMAC Overlay and MBGF($6 Million)
– I10 pavement overlay and guardrail installation within the limits of
SH20(Mesa St.) to New Mexico State Line. Estimated Completion is
May 2015. Traffic Control will be periodic lane closures on i-10 from 9
a.m. to 4 p.m., Monday- Friday.
I10 Rehab and Operational Improvements ($6 Million)
– Frontage road reconstruction, pedestrian facilities and provide
connectivity to Loop 375. The limits are LP 375 to David Road.
Footer Text 23
connectivity to Loop 375. The limits are LP 375 to David Road.
Estimated completion is August 2016. Traffic control will reduce to one
lane in each direction.
I10 Pavement Repair (Maintenance Contract, $4.1 Million)
– I10 concrete pavement pothole repair within the limits of Lee Trevino to
Executive Center. Estimated completion date is June 2015. Traffic
control will have I10 closures Sunday through Thursday 9 p.m. to 6
a.m.
Key El PasoKey El PasoKey El PasoKey El Paso
UpcomingUpcomingUpcomingUpcoming ProjectsProjectsProjectsProjects
Footer Text
UpcomingUpcomingUpcomingUpcoming ProjectsProjectsProjectsProjects
24
LP 375 (Montana to Bob Hope )
Description:Description:Description:Description:
The Loop 375 project will provide an additional lane in each
direction. The project is located in far east El Paso, southeast of
Fort Bliss, and extends approximately 7.8 miles from Bob Hope
Drive near IH 10, to Montana Avenue.
Footer Text 25
Cost EstimateCost EstimateCost EstimateCost Estimate:::: $22 Million
EstimatedEstimatedEstimatedEstimated Let Date :Let Date :Let Date :Let Date : December 2015
Desert Boulevard Phase II
DescriptionDescriptionDescriptionDescription::::
The proposed project will provide improvements to Desert
North and Desert South from Loop 375 to Vinton including
pedestrian sidewalks and a return bridge over I-10 connecting
the two frontage roads..
Footer Text 26
the two frontage roads..
CostCostCostCost Estimate:Estimate:Estimate:Estimate: $ 16 Million
Let Date:Let Date:Let Date:Let Date: July 2015July 2015July 2015July 2015
Carolina Bridge Replacement
DescriptionDescriptionDescriptionDescription::::
This project with replace the current bridge and upgrade the
pedestrian facilities from Stiles Drive to Alameda Drive (SH20).
CostCostCostCost Estimate:Estimate:Estimate:Estimate: $7.4 Million$7.4 Million$7.4 Million$7.4 Million
Footer Text 27
CostCostCostCost Estimate:Estimate:Estimate:Estimate: $7.4 Million$7.4 Million$7.4 Million$7.4 Million
Estimated Let Date:Estimated Let Date:Estimated Let Date:Estimated Let Date: July 2015July 2015July 2015July 2015
I10 Operational Improvements
DescriptionDescriptionDescriptionDescription::::
The proposed project will provide operational ramp and lane
improvements, including a braided ramp, to be made on I-10
from Viscount Blvd to Airway.
Footer Text 28
CostCostCostCost Estimate:Estimate:Estimate:Estimate: $15 Million$15 Million$15 Million$15 Million
Estimated Let Date:Estimated Let Date:Estimated Let Date:Estimated Let Date: 2016201620162016
I10 Widening (LP375 to Eastlake)
DescriptionDescriptionDescriptionDescription::::
The proposed project will provide an additional lane on both
sides from Loop 375 to Eastlake.
CostCostCostCost Estimate:Estimate:Estimate:Estimate: $20 Million$20 Million$20 Million$20 Million
Footer Text 29
CostCostCostCost Estimate:Estimate:Estimate:Estimate: $20 Million$20 Million$20 Million$20 Million
Estimated Let Date:Estimated Let Date:Estimated Let Date:Estimated Let Date: 2016201620162016
Franklin Mountain State Park Connectivity
DescriptionDescriptionDescriptionDescription::::
The proposed project will provide connectivity for wildlife,
hikers and cyclists between the north and south sides of Loop
375 near the entrance to Franklin Mountain State Park.
Footer Text 30
CostCostCostCost Estimate:Estimate:Estimate:Estimate: $ 3 Million$ 3 Million$ 3 Million$ 3 Million
Estimated Let Date:Estimated Let Date:Estimated Let Date:Estimated Let Date: 2016201620162016
Old Hueco Tanks
DescriptionDescriptionDescriptionDescription::::
This project will construct a new 4 lane roadway with raised
medians.
CostCostCostCost Estimate:Estimate:Estimate:Estimate: $10.4 Million$10.4 Million$10.4 Million$10.4 Million
Footer Text 31
CostCostCostCost Estimate:Estimate:Estimate:Estimate: $10.4 Million$10.4 Million$10.4 Million$10.4 Million
Let Date:Let Date:Let Date:Let Date: June 2016June 2016June 2016June 2016
Mesa Park Improvements
DescriptionDescriptionDescriptionDescription::::
The proposed project will provide an interchange at Mesa Park
and frontage roads and ramps to I-10.
CostCostCostCost Estimate:Estimate:Estimate:Estimate: $25 Million$25 Million$25 Million$25 Million
Footer Text 32
CostCostCostCost Estimate:Estimate:Estimate:Estimate: $25 Million$25 Million$25 Million$25 Million
Let Date:Let Date:Let Date:Let Date: August 2016August 2016August 2016August 2016
Questions?
Footer Text
Questions?
33

Weitere ähnliche Inhalte

Was ist angesagt?

Marc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire
 
Mid County Parkway Update Presentation_RCTC
Mid County Parkway Update Presentation_RCTCMid County Parkway Update Presentation_RCTC
Mid County Parkway Update Presentation_RCTCapwacoachellavalley
 
Spokane Street Viaduct Ramp & Widening Project Slides
Spokane Street Viaduct Ramp & Widening Project SlidesSpokane Street Viaduct Ramp & Widening Project Slides
Spokane Street Viaduct Ramp & Widening Project Slidesallieger
 
JAN 2010 Community Improvement Update
JAN 2010 Community Improvement UpdateJAN 2010 Community Improvement Update
JAN 2010 Community Improvement UpdateWashington, DC
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina
 
7.15.15 RCTC 91 Project Update
7.15.15 RCTC 91 Project Update 7.15.15 RCTC 91 Project Update
7.15.15 RCTC 91 Project Update City of Corona
 
Report - District 10 Snowmobile Bridge - February 14, 2011
Report - District 10 Snowmobile Bridge - February 14, 2011Report - District 10 Snowmobile Bridge - February 14, 2011
Report - District 10 Snowmobile Bridge - February 14, 2011Mark Steenhof
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingVDOT Northern Virginia
 
McKenney resume March 2015
McKenney resume March 2015McKenney resume March 2015
McKenney resume March 2015Tom McKenney
 
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINALCandice Spiroski
 
PCW_Community_Report_2016-web
PCW_Community_Report_2016-webPCW_Community_Report_2016-web
PCW_Community_Report_2016-webMary Murphy
 
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects City of Corona
 

Was ist angesagt? (20)

Marc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire Resume_2015 general
Marc McIntire Resume_2015 general
 
DTavaers-noref-res
DTavaers-noref-resDTavaers-noref-res
DTavaers-noref-res
 
Mid County Parkway Update Presentation_RCTC
Mid County Parkway Update Presentation_RCTCMid County Parkway Update Presentation_RCTC
Mid County Parkway Update Presentation_RCTC
 
91 Design Build Update
91 Design Build Update91 Design Build Update
91 Design Build Update
 
Spokane Street Viaduct Ramp & Widening Project Slides
Spokane Street Viaduct Ramp & Widening Project SlidesSpokane Street Viaduct Ramp & Widening Project Slides
Spokane Street Viaduct Ramp & Widening Project Slides
 
JAN 2010 Community Improvement Update
JAN 2010 Community Improvement UpdateJAN 2010 Community Improvement Update
JAN 2010 Community Improvement Update
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter Project
 
Paquette, Jason 2016 CV
Paquette, Jason 2016 CVPaquette, Jason 2016 CV
Paquette, Jason 2016 CV
 
7.15.15 RCTC 91 Project Update
7.15.15 RCTC 91 Project Update 7.15.15 RCTC 91 Project Update
7.15.15 RCTC 91 Project Update
 
Report - District 10 Snowmobile Bridge - February 14, 2011
Report - District 10 Snowmobile Bridge - February 14, 2011Report - District 10 Snowmobile Bridge - February 14, 2011
Report - District 10 Snowmobile Bridge - February 14, 2011
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meeting
 
Senior Project PSR
Senior Project PSRSenior Project PSR
Senior Project PSR
 
Part 2 MyCiTi Cape Town IRT System
Part 2 MyCiTi Cape Town IRT SystemPart 2 MyCiTi Cape Town IRT System
Part 2 MyCiTi Cape Town IRT System
 
McKenney resume March 2015
McKenney resume March 2015McKenney resume March 2015
McKenney resume March 2015
 
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
 
PCW_Community_Report_2016-web
PCW_Community_Report_2016-webPCW_Community_Report_2016-web
PCW_Community_Report_2016-web
 
Why glendal04.29.10
Why glendal04.29.10Why glendal04.29.10
Why glendal04.29.10
 
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
 
How the West was One Gold Rush Survival Kit
How the West was One Gold Rush Survival KitHow the West was One Gold Rush Survival Kit
How the West was One Gold Rush Survival Kit
 
Who Is Red Regional Economic Development
Who Is Red Regional Economic  DevelopmentWho Is Red Regional Economic  Development
Who Is Red Regional Economic Development
 

Ähnlich wie TxDOT City of El Paso Quarterly Report 031715

South Park Development Presentation
South Park Development PresentationSouth Park Development Presentation
South Park Development PresentationJordan Dias
 
Franklin rRute 140 - Traffic Assessment
Franklin rRute 140 - Traffic AssessmentFranklin rRute 140 - Traffic Assessment
Franklin rRute 140 - Traffic AssessmentFranklin Matters
 
Mount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and RestripingMount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and RestripingFairfax County
 
Center City Streetcar Info Flyer
Center City Streetcar Info FlyerCenter City Streetcar Info Flyer
Center City Streetcar Info FlyerZach Shaner
 
I-285-SR400InterchangeReconstruction
I-285-SR400InterchangeReconstructionI-285-SR400InterchangeReconstruction
I-285-SR400InterchangeReconstructionAlain Gonzalez
 
Measure K 2015-2016 Annual Report
Measure K 2015-2016 Annual ReportMeasure K 2015-2016 Annual Report
Measure K 2015-2016 Annual ReportChristine Corrales
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureMobility Lab
 
Splost Presentation 2008
Splost Presentation 2008Splost Presentation 2008
Splost Presentation 2008Brett Deaton
 
May 2015 PROPOSED Service Changes
May 2015 PROPOSED Service ChangesMay 2015 PROPOSED Service Changes
May 2015 PROPOSED Service ChangesCOTA BUS
 
Pcw community report_2016-web
Pcw community report_2016-webPcw community report_2016-web
Pcw community report_2016-webMary Murphy
 
I-670, North Fourth Street Exit Redesign
I-670, North Fourth Street Exit RedesignI-670, North Fourth Street Exit Redesign
I-670, North Fourth Street Exit RedesignSean Deken
 
"News and Views" newsletter
"News and Views" newsletter "News and Views" newsletter
"News and Views" newsletter Maribel Castillo
 
Los Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to CaltrainLos Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to CaltrainAdina Levin
 
Fairfax county roadway rehabilitation projects
Fairfax county roadway rehabilitation projectsFairfax county roadway rehabilitation projects
Fairfax county roadway rehabilitation projectsFairfax County
 

Ähnlich wie TxDOT City of El Paso Quarterly Report 031715 (20)

South Park Development Presentation
South Park Development PresentationSouth Park Development Presentation
South Park Development Presentation
 
Franklin rRute 140 - Traffic Assessment
Franklin rRute 140 - Traffic AssessmentFranklin rRute 140 - Traffic Assessment
Franklin rRute 140 - Traffic Assessment
 
Splost Projects
Splost ProjectsSplost Projects
Splost Projects
 
Mount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and RestripingMount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and Restriping
 
Center City Streetcar Info Flyer
Center City Streetcar Info FlyerCenter City Streetcar Info Flyer
Center City Streetcar Info Flyer
 
I-285-SR400InterchangeReconstruction
I-285-SR400InterchangeReconstructionI-285-SR400InterchangeReconstruction
I-285-SR400InterchangeReconstruction
 
Measure K 2015-2016 Annual Report
Measure K 2015-2016 Annual ReportMeasure K 2015-2016 Annual Report
Measure K 2015-2016 Annual Report
 
Final PSR_Jeff
Final PSR_JeffFinal PSR_Jeff
Final PSR_Jeff
 
The State of Rail in Illinois
The State of Rail in IllinoisThe State of Rail in Illinois
The State of Rail in Illinois
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation Future
 
Splost Presentation 2008
Splost Presentation 2008Splost Presentation 2008
Splost Presentation 2008
 
May 2015 PROPOSED Service Changes
May 2015 PROPOSED Service ChangesMay 2015 PROPOSED Service Changes
May 2015 PROPOSED Service Changes
 
Pcw community report_2016-web
Pcw community report_2016-webPcw community report_2016-web
Pcw community report_2016-web
 
Four Mile Run Joint Task Force Presentation
Four Mile Run Joint Task Force PresentationFour Mile Run Joint Task Force Presentation
Four Mile Run Joint Task Force Presentation
 
I-670, North Fourth Street Exit Redesign
I-670, North Fourth Street Exit RedesignI-670, North Fourth Street Exit Redesign
I-670, North Fourth Street Exit Redesign
 
TeamTX Austin 2015 Presentations
TeamTX Austin 2015 PresentationsTeamTX Austin 2015 Presentations
TeamTX Austin 2015 Presentations
 
900 S Reconstruction and 9-Line Trail Update (April 2018)
900 S Reconstruction and 9-Line Trail Update (April 2018)900 S Reconstruction and 9-Line Trail Update (April 2018)
900 S Reconstruction and 9-Line Trail Update (April 2018)
 
"News and Views" newsletter
"News and Views" newsletter "News and Views" newsletter
"News and Views" newsletter
 
Los Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to CaltrainLos Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to Caltrain
 
Fairfax county roadway rehabilitation projects
Fairfax county roadway rehabilitation projectsFairfax county roadway rehabilitation projects
Fairfax county roadway rehabilitation projects
 

Mehr von elpasonaturally

Elpaso #1240252-v1-city council-presentation_2-29-16
Elpaso #1240252-v1-city council-presentation_2-29-16Elpaso #1240252-v1-city council-presentation_2-29-16
Elpaso #1240252-v1-city council-presentation_2-29-16elpasonaturally
 
Mhna – epe meeting 08112015
Mhna – epe meeting 08112015Mhna – epe meeting 08112015
Mhna – epe meeting 08112015elpasonaturally
 
Proposed Northwest citizen collection station
Proposed Northwest citizen collection stationProposed Northwest citizen collection station
Proposed Northwest citizen collection stationelpasonaturally
 
Municipal drainage funding report 2014
Municipal drainage funding report 2014Municipal drainage funding report 2014
Municipal drainage funding report 2014elpasonaturally
 
Open space projects status
Open space projects statusOpen space projects status
Open space projects statuselpasonaturally
 
Disposable water bottles
Disposable water bottlesDisposable water bottles
Disposable water bottleselpasonaturally
 

Mehr von elpasonaturally (7)

Elpaso #1240252-v1-city council-presentation_2-29-16
Elpaso #1240252-v1-city council-presentation_2-29-16Elpaso #1240252-v1-city council-presentation_2-29-16
Elpaso #1240252-v1-city council-presentation_2-29-16
 
Mhna – epe meeting 08112015
Mhna – epe meeting 08112015Mhna – epe meeting 08112015
Mhna – epe meeting 08112015
 
Proposed Northwest citizen collection station
Proposed Northwest citizen collection stationProposed Northwest citizen collection station
Proposed Northwest citizen collection station
 
Water rate survey
Water rate surveyWater rate survey
Water rate survey
 
Municipal drainage funding report 2014
Municipal drainage funding report 2014Municipal drainage funding report 2014
Municipal drainage funding report 2014
 
Open space projects status
Open space projects statusOpen space projects status
Open space projects status
 
Disposable water bottles
Disposable water bottlesDisposable water bottles
Disposable water bottles
 

Kürzlich hochgeladen

call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urgesnarwatsonia7
 
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMadurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...saminamagar
 
productionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxproductionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxHenryBriggs2
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...narwatsonia7
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Christina Parmionova
 
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Servicenarwatsonia7
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxTechSoupConnectLondo
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Christina Parmionova
 

Kürzlich hochgeladen (20)

call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual UrgesCall Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
Call Girl Benson Town - Phone No 7001305949 For Ultimate Sexual Urges
 
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMadurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
 
productionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxproductionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptx
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Laxmi Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mayapuri DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptx
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
 

TxDOT City of El Paso Quarterly Report 031715

  • 1. THE CITY OF EL PASO Footer Text THE CITY OF EL PASO QUARTERLY UPDATE Tuesday, March 17, 2015 3/17/15
  • 2. OUR MISSION: “Work with others to provide safe and reliable transportation solutions for Footer Text transportation solutions for Texas.” 2
  • 3. Key El PasoKey El PasoKey El PasoKey El Paso ConstructionConstructionConstructionConstruction ProjectsProjectsProjectsProjects Footer Text ProjectsProjectsProjectsProjects 3
  • 4. Border West Expressway Project LimitsBorder West Expressway Project LimitsBorder West Expressway Project LimitsBorder West Expressway Project Limits Footer Text 4
  • 5. Border West ExpresswayBorder West ExpresswayBorder West ExpresswayBorder West Expressway Description: The Border West Expressway project will provide an alternate route for I- 10 and will address needed improvements to safely guide the region’s growth and development. The project is located west of downtown El Paso, south of I-10 and extends approximately 7.4 miles from Racetrack Drive near Doniphan Road and New Mexico 273 east to one mile east of Park Street near US 54. Design Build: $ 447.5 M Footer Text 5 Design Build: $ 447.5 M Construction Start Date: March 2015 Estimated Completion Date : Fall 2017/Spring 2018
  • 6. I-10 Collector Distributor lanes Footer Text 6 A Segment of the I-10 Collector Distributor Project
  • 7. I-10 Collector Distributor lanes Description: This project includes intersection improvements and the addition of collector-distributor (C-D) lanes, main lanes, frontage roads and direct connector ramps on Interstate 10 (I-10) between State Highway (SH) 20 (Mesa St.) and Executive Center Blvd. in El Paso. The I-10 CD lanes project will improve connectivity and reliability to the segment of I-10 through El Paso where there currently are no frontage roads. This project will provide a vital connection to the Border Highway West project, which completes the southern segment of LP 375 that connects international Footer Text 7 ports of entries such as Zaragoza and the Bridge of the Americas, as well as downtown El Paso. Low Bid: $158.8 Million Let Date: October 2014 Construction Start Date: April 2015 Expected Completion Date: August 2019
  • 8. SPUR 1966SPUR 1966SPUR 1966SPUR 1966 Construction Photos Footer Text 8
  • 9. SPUR 1966SPUR 1966SPUR 1966SPUR 1966 Description: The Spur 1966 Project connects the existing Schuster Avenue terminus on the UTEP campus east of Interstate Highway 10 (I-10) to existing US 85 (Paisano Dr.) south of I-10, via a bridge over I-10. The project length is approximately 0.7 miles. The project limits are US 85 (Paisano Dr.) to Schuster Avenue. Footer Text 9 (Paisano Dr.) to Schuster Avenue. Low Bid: $31 Million Let Date : February 2013 Start Date: May 2013 Expected Completion Date: May 2015
  • 11. IIII----10 at Americas Interchange10 at Americas Interchange10 at Americas Interchange10 at Americas Interchange Description: The Americas Interchange will be a four level, fully directional interchange, including eight (8) direct connectors, which is being constructed in phases. In addition to the direct connectors, there will realignment of frontage roads, relocation of access ramps, and adjustment/relocation of conflicting utilities. Footer Text 11 adjustment/relocation of conflicting utilities. Phase 1 ($108M-Design Build): Completed Phase 2 ($42.5M): April 2015 Completion Phase 3 ($31.5M): April 2015 Construction Start Winter 2016 Completion Phase 4 ($20M): Anticipated 2016 LET Date
  • 12. I-10 Widening and Braided Ramp Construction Photos Footer Text 12
  • 13. IIII----10 Operational Improvements (Zaragoza to Loop 375)10 Operational Improvements (Zaragoza to Loop 375)10 Operational Improvements (Zaragoza to Loop 375)10 Operational Improvements (Zaragoza to Loop 375) Description: The project will provide an additional lane in both directions from Loop 375 to Zaragoza, upgrade the frontage roads and provide a braided ramp. Low Bid: $24.8 Million Footer Text 13 Let Date: August 2013 Construction Completion: June 2015
  • 14. IIII----10 Operational Improvements (Viscount to Zaragoza)10 Operational Improvements (Viscount to Zaragoza)10 Operational Improvements (Viscount to Zaragoza)10 Operational Improvements (Viscount to Zaragoza) Description: The proposed project would provide and additional lane in both directions from Viscount to Zaragoza. This project replaces the centerline HPS lighting with High Mast LED lighting and includes a sound wall. Low Bid: $18.1Million Footer Text 14 Low Bid: $18.1Million Let Date: July 2014 Construction Start Date: September 2014 Construction Completion: December 2015
  • 15. AlamedaAlamedaAlamedaAlameda ////PaisanoPaisanoPaisanoPaisano Intersection ImprovementsIntersection ImprovementsIntersection ImprovementsIntersection Improvements Footer Text 15 Construction Photos: Lanes open to traffic.
  • 16. Description: Reconstruct and improve SH 20 (Alameda Ave.) The proposed improvements consist of the reconstruction and reconfiguration of the existing SH 20 (Alameda Ave.) and US 62 (Paisano Dr.) intersection with two modern roundabouts and a new “T” intersection at El Paso Drive. Improvements also include improved drainage, AlamedaAlamedaAlamedaAlameda ////PaisanoPaisanoPaisanoPaisano Intersection ImprovementsIntersection ImprovementsIntersection ImprovementsIntersection Improvements Footer Text illumination and sidewalks. Low Bid: $10.5 Million Let Date: August 2013 Construction Completion: July 2015 16
  • 17. US 54 Renovation at the Spaghetti BowlUS 54 Renovation at the Spaghetti BowlUS 54 Renovation at the Spaghetti BowlUS 54 Renovation at the Spaghetti Bowl Footer Text 17
  • 18. Description: Provide an aesthetically pleasing corridor compatible with the City of El Paso. The project limits are on I-10 from Raynolds Street to Copia Street and on US 54 from Yandell Drive to Alameda Avenue. Total Cost Estimate: $19.5 Million US 54 Renovation at the Spaghetti BowlUS 54 Renovation at the Spaghetti BowlUS 54 Renovation at the Spaghetti BowlUS 54 Renovation at the Spaghetti Bowl Footer Text Total Cost Estimate: $19.5 Million Phase 1 Completed Phase 2 Anticipated Completion Date June 2015 Phase 3 LET April 2014 Anticipated Completion Date August 2015 18
  • 19. LP 375/SPUR 601 Intersection Improvements Footer Text 19
  • 20. LP 375/SPUR 601 Intersection Improvements Description: The project overlaid LP 375 from Montana to north of Spur 601 and modifies the SPUR 601 and LP 375 intersection to safely and efficiently accommodate the high volume left turn movements (DDI). Traffic within the intersection briefly drives on the left side of the road to allow left turn movement to occur without crossing oncoming traffic or stopping. Phase 2 adds a dual right turn lane from Spur 601 to LP 375 and an auxiliary lane from Spur 601 to Iron Medics interchange. Footer Text 20 lane from Spur 601 to Iron Medics interchange. Phase 1: ($4.6 M) Completed Phase 2: ($.9 M) Construction Start April 2015 Construction Completion: December 2015
  • 21. Montana (US 62) Widening Description: This project will provide improvements to US Highway (US) 62/180 (Montana Avenue) from Yarbrough Drive to the Loop 375 intersection. The improvements include construction of a six-lane divided arterial as well as associated drainage improvements, sidewalks on the south side, shoulder improvements, bike lane, right turn lanes, landscaping and sound walls. Footer Text 21 Low Bid: $5.7 Million Let Date: August 2013 Construction Completion: June 2015
  • 22. Description: The project will replace the existing 2-lane bridge on FM 1110 over I-10 located at the Clint exit with a 4-lane bridge with left turn lanes (includes a dual left turn from FM 1110 North to I-10 West). Also included is a U-Turn bridge on the west side of the new bridge. FM 1110 Bridge Replacement Footer Text 22 the new bridge. Low Bid: $9.5 Million Letting Date: July 2014 Construction Completion: December 2015
  • 23. Other Projects in Construction I10 HMAC Overlay and MBGF($6 Million) – I10 pavement overlay and guardrail installation within the limits of SH20(Mesa St.) to New Mexico State Line. Estimated Completion is May 2015. Traffic Control will be periodic lane closures on i-10 from 9 a.m. to 4 p.m., Monday- Friday. I10 Rehab and Operational Improvements ($6 Million) – Frontage road reconstruction, pedestrian facilities and provide connectivity to Loop 375. The limits are LP 375 to David Road. Footer Text 23 connectivity to Loop 375. The limits are LP 375 to David Road. Estimated completion is August 2016. Traffic control will reduce to one lane in each direction. I10 Pavement Repair (Maintenance Contract, $4.1 Million) – I10 concrete pavement pothole repair within the limits of Lee Trevino to Executive Center. Estimated completion date is June 2015. Traffic control will have I10 closures Sunday through Thursday 9 p.m. to 6 a.m.
  • 24. Key El PasoKey El PasoKey El PasoKey El Paso UpcomingUpcomingUpcomingUpcoming ProjectsProjectsProjectsProjects Footer Text UpcomingUpcomingUpcomingUpcoming ProjectsProjectsProjectsProjects 24
  • 25. LP 375 (Montana to Bob Hope ) Description:Description:Description:Description: The Loop 375 project will provide an additional lane in each direction. The project is located in far east El Paso, southeast of Fort Bliss, and extends approximately 7.8 miles from Bob Hope Drive near IH 10, to Montana Avenue. Footer Text 25 Cost EstimateCost EstimateCost EstimateCost Estimate:::: $22 Million EstimatedEstimatedEstimatedEstimated Let Date :Let Date :Let Date :Let Date : December 2015
  • 26. Desert Boulevard Phase II DescriptionDescriptionDescriptionDescription:::: The proposed project will provide improvements to Desert North and Desert South from Loop 375 to Vinton including pedestrian sidewalks and a return bridge over I-10 connecting the two frontage roads.. Footer Text 26 the two frontage roads.. CostCostCostCost Estimate:Estimate:Estimate:Estimate: $ 16 Million Let Date:Let Date:Let Date:Let Date: July 2015July 2015July 2015July 2015
  • 27. Carolina Bridge Replacement DescriptionDescriptionDescriptionDescription:::: This project with replace the current bridge and upgrade the pedestrian facilities from Stiles Drive to Alameda Drive (SH20). CostCostCostCost Estimate:Estimate:Estimate:Estimate: $7.4 Million$7.4 Million$7.4 Million$7.4 Million Footer Text 27 CostCostCostCost Estimate:Estimate:Estimate:Estimate: $7.4 Million$7.4 Million$7.4 Million$7.4 Million Estimated Let Date:Estimated Let Date:Estimated Let Date:Estimated Let Date: July 2015July 2015July 2015July 2015
  • 28. I10 Operational Improvements DescriptionDescriptionDescriptionDescription:::: The proposed project will provide operational ramp and lane improvements, including a braided ramp, to be made on I-10 from Viscount Blvd to Airway. Footer Text 28 CostCostCostCost Estimate:Estimate:Estimate:Estimate: $15 Million$15 Million$15 Million$15 Million Estimated Let Date:Estimated Let Date:Estimated Let Date:Estimated Let Date: 2016201620162016
  • 29. I10 Widening (LP375 to Eastlake) DescriptionDescriptionDescriptionDescription:::: The proposed project will provide an additional lane on both sides from Loop 375 to Eastlake. CostCostCostCost Estimate:Estimate:Estimate:Estimate: $20 Million$20 Million$20 Million$20 Million Footer Text 29 CostCostCostCost Estimate:Estimate:Estimate:Estimate: $20 Million$20 Million$20 Million$20 Million Estimated Let Date:Estimated Let Date:Estimated Let Date:Estimated Let Date: 2016201620162016
  • 30. Franklin Mountain State Park Connectivity DescriptionDescriptionDescriptionDescription:::: The proposed project will provide connectivity for wildlife, hikers and cyclists between the north and south sides of Loop 375 near the entrance to Franklin Mountain State Park. Footer Text 30 CostCostCostCost Estimate:Estimate:Estimate:Estimate: $ 3 Million$ 3 Million$ 3 Million$ 3 Million Estimated Let Date:Estimated Let Date:Estimated Let Date:Estimated Let Date: 2016201620162016
  • 31. Old Hueco Tanks DescriptionDescriptionDescriptionDescription:::: This project will construct a new 4 lane roadway with raised medians. CostCostCostCost Estimate:Estimate:Estimate:Estimate: $10.4 Million$10.4 Million$10.4 Million$10.4 Million Footer Text 31 CostCostCostCost Estimate:Estimate:Estimate:Estimate: $10.4 Million$10.4 Million$10.4 Million$10.4 Million Let Date:Let Date:Let Date:Let Date: June 2016June 2016June 2016June 2016
  • 32. Mesa Park Improvements DescriptionDescriptionDescriptionDescription:::: The proposed project will provide an interchange at Mesa Park and frontage roads and ramps to I-10. CostCostCostCost Estimate:Estimate:Estimate:Estimate: $25 Million$25 Million$25 Million$25 Million Footer Text 32 CostCostCostCost Estimate:Estimate:Estimate:Estimate: $25 Million$25 Million$25 Million$25 Million Let Date:Let Date:Let Date:Let Date: August 2016August 2016August 2016August 2016