6. Micro-Modular Value Proposition Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com = Put cooling directly where it is needed.
7. Average Data Center Today 2.5 PUE RASER based data center 1.5 PUE “ Built in” efficiency RASER “ Forces” 40% reduction in Carbon Emissions RASER eligible for Rebates/ Carbon credits
8.
9.
10.
11.
12.
13.
14.
15. Micro-Modular “HOT AND COLD AISLE CONTAINMENT”* The True Meaning of Built to Last: The A/C “Compressors have a mean time before failure rate of 52.0 years .” “ The A/C blower has a mean time before failure rate of 228.3 years .” -McLean Cooling Technologies CLOSED LOOP COOLING REDUCES POWER REQUIRED TO COOL EQUIPMENT BY 50%+ 16.5 KW Water 12 KW Air Cold Air Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com *Best Practice for Datacenter Efficiency -LBNL 2008 Equipment Equipment Equipment Equipment Equipment
21. Venting Option Examples Door Door Outside Building air Hot air from RASER High power Exhaust fan Room-Level Option Cool air from outside building draw in and hot air exhausted outside of building without ducts Cool air from outside building draw in through ducts and hot air exhausted out outside of building with ducts Individual RASER-Level Option Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com
22. Enclosed RASER ROOM or “Pod” Dedicated “make up” air supply or high volume adiabatic cooling for redundancy RASER is free standing Room isolated so it can be “pumped” effectively
23.
24. Isolated Hot Out Outside air or “water wall” or adiabatic (swamp) cooling Ambient Air supplied by high volume adiabatic cooling
25.
26. Individually Isolated External Loop Heat rejection from building Hot side of packaged DX Unconditioned outside air or “make up” air Unconditioned air intakes Ambient comfort cooling
27.
28. Copyright Elliptical Mobile Solutions 2009 www.ellipticalmobilesolutions.com 10 Air Cooled RASER 120 KW IT 10 HVAC units (incl.) 60 KW Total Power: 180KW Total Gen Power: 200KW Total UPS (N+1) 300KVA “ EMS20” (20 RASER Infrastructure Block) 20 Air Cooled RASER 240 KW IT (see Fig1) 20 HVAC units (incl.) 120 KW Total Power: 360KW Total Gen Power: 400KW Total UPS (N+1): 600KVA Fig.1 Scale from 1, 10, 20, 200 or more
29.
30.
31. * Uptime Institute 2008 Assumptions: 4.8 MW IT Load Data Center (Traditional) Capital Expenditure Traditional Tier III Raised Floor Data Center Total IT Load (KW) 4,800 PUE 2.0 Total Power (KW) 9,600 Rack Density (KW) 5 “ Raised Floor” ft² (30ft²/Rack) 28,800 Number of Racks 960 Watts/ft² Raised Floor Design 167 Watts/ft² Overall Design 83 Cost of Building/Raised Floor * 190 Overall DC ft² 57,600 Infrastructure ($/KW) * $23,000 Building ($245/ft²) * $14,112,000 Mechanical/Electrical/Power $110,400,000 Subtotal $124,512,000 $/KW $25,940 $/ft² $2,162
32. * Uptime Institute ** Turner Logistics Model Assumptions: 4.8 MW IT Load Data Center (RASER) Capital Expenditure Micro-Modular Tier III Data Center Total IT Load (KW) 4,800 PUE 1.5 Total Power (KW) 7,200 Rack Density (KW) 12 “ White Space” ft² (35ft²/Rack) 14,000 Number of RASER units 400 Watts/ft² White Floor Design 342 Watts/ft² Overall Design 305 Cost of Building Shell* 190 Overall DC ft² 15,000 Infrastructure ($/KW) $8,084 Building ($190/ft²)* $2,850,000 Ele. Dist/Gen/UPS/Cabling** $18,304,738 RASER $20,500,000 Subtotal $41,654,738 $/KW $8,678 $/ft² $2,777
33. CAPEX Comparison of 4.8 MW IT Data Center *Capital and Operational Expense calculations are based on industry standard figures. Actual costs will vary by project. Comparison Traditional MMDC SAVINGS Capital Expense* $124,512,000 $41,654,738 67% Operational Expense year 5* $17,915,000 $9,075,000 49% Operational Expense Year 10* $38,838,000 $19,595,000 50% Data Center size 57,600ft² 15,000ft² 74% Cost per KW of IT load $25,940/KW $8,678/KW 67% Time to Deploy 24 months 90 days or less PRICELESS
34. Your New “GREEN” Data Center is now turned into a shipping event vs. a Construction Project.
Editor's Notes
Proprietary and Confidential Copyright Elliptical Mobile Solutions 2009