40. ATC process : details Adjacent Air Traffic Control Cente r Airports Flight Data Processing METEO Data RADAR Data Processing Flight Plan RADAR Data Tracks Primary and secondary RADAR WAN LAN + - transmetter Receiver HF/VHF
41.
42.
43.
44. Air Traffic Control process Flight Data Processing RADAR Data Processing transmitter Receiver RADAR + - Flight Plan
89. APR Flight Data Processing RADAR Data Processing transmitter Receiver RADAR + - Flight Plan APR
90.
91. Air Traffic Control process Flight Data Processing RADAR Data Processing transmitter Receiver RADAR + - Flight Plan
92.
93.
94. Different Phases of the flight Final Approach / Departure Taxiway Apron Gate/ Stand 10 Miles Out 4 Miles Out 2 Miles Out Landing / Take-Off Taxiing Runway En-Route
133. Flight States Inactive Preactivated Proposed Coordinated Active Finished Cancelled Creation
134. Flight States Inactive Preactivated Proposed Coordinated Active Finished Cancelled Creation t t FPL/RPL
135. On Line Exchange AFTN “ Off line” “ On line” Inactive Flight Plan Active Flight Plan
136. Area and Flight states Air Traffic Control Center Air Traffic Control Center Air Traffic Control Center First Area Second Area Third Area
137. Area and Flight states First Area Second Area Third Area Active Pre active Pre active Air Traffic Control Center Air Traffic Control Center Air Traffic Control Center
138. Flight States Inactive Preactivated Proposed Coordinated Active Finished Cancelled Creation t Proposition Send Proposition Accepted
139. Area and Flight states: Transfer Protocol First Area Second Area Third Area Active Pre active Pre active Transfer Air Traffic Control Center Air Traffic Control Center Air Traffic Control Center
140. Flight States Inactive Preactivated Proposed Coordinated Active Finished Cancelled Creation t Flight Track Correlation (SSR)
141.
142.
143. Air Traffic Control process Flight Data Processing RADAR Data Processing transmitter Receiver RADAR + - Flight Plan
144.
145. Route Adherence Monitoring Delta t = Longitudinal deviation lateral deviation ETO-ATO= Delta t ETO + Delta t ATO as from APR cleared route
146. Flight information updated and Flight progress monitoring in active state Active Operator Message RADAR (APR) Time Out
147. Flight progess monitoring RDP FDP RADAR Data Processing Flight Data Processing Network Shared Flight Information Data base Tracks Table
148. Report Points Over flow Estimation 800 km/h Wind 100 km/h Report Point E1 E2 E3 E4 D1 D2 D3 Timer