Biogas Upgrading with Membrane Technology
2013 International Biomass Conference & Expo –
Gas Conditioning: Clean Up and Systemic Approaches Worth Deploying

Kyle Goehring, Regional Sales Manager




                                                                      www.eisenmann.com
                                                                       www.eisenmann.us.com
                                                                     © Eisenmann AG 2013
                                                                           © Eisenmann 2013
Agenda


 1 Biomethane Incentives

 2 Membrane Technology for Gas Upgrading

 3 Case Study: Gas Upgrading

 4 Membrane Technology and Anaerobic Digestion Integration

 5 US Application

 6 About Eisenmann

 7 Conclusions and Questions




                                                             2
Agenda


 1 Biomethane Incentives

 2 Membrane Technology for Gas Upgrading

 3 Case Study: Gas Upgrading

 4 Membrane Technology and Anaerobic Digestion Integration

 5 US Application

 6 About Eisenmann

 7 Conclusions and Questions




                                                             3
Drivers

Most biogas plants generate electricity and heat with a CHP
    The thermal energy cannot always be used close by


Incentives to use biogas as biomethane or CNG for transportation fuel
     More than 250,000 natural gas vehicles in the US

      (source: GE)
     12-15% public transit buses in US

      (source: CNG Now)
     A natural gas powered bus can displace 1,400 gallons of

      diesel fuel a year
      (source: CNG Now)
     Natural gas vehicles reduce greenhouse gas emissions

      between 20-29%
      (source: Natural Gas Vehicle Association)



                                                                        4
Advantages of Biomethane

 Decentralized production
 Independent, flexible and storable energy source
 Efficient use according to requirements
 Storage capability for when demand is higher
 Offsets non-renewable sources
  (coal, oil, fossil fuel derived natural gas)
 Production creates US jobs and benefits local economies




                                                            5
Agenda


 1 Biomethane Incentives

 2 Membrane Technology for Gas Upgrading

 3 Case Study: Gas Upgrading

 4 Membrane Technology and Anaerobic Digestion Integration

 5 US Application

 6 About Eisenmann

 7 Conclusions and Questions




                                                             6
Highly Selective Membrane Technology


                                Offgas   Biomethane
                                  CO2       CH4




                  Biogas
                 CH4 + CO2




                     Membrane Function




                                                  7
Flow diagram


    biogas              cooling                         desulfurization     compressor
                                       and drying


                                                        temperature
                     particle filter   control filter
                                                           control


                                       membrane          membrane         biomethane
                                        stage I           stage II        > 98% CH4

 biogas production

 pre-treatment                         membrane                           offgas CO2
 compression                            stage III                         < 0.5% CH4

 purification

 gas separation                                                           purified gas
 offgas treatment
                                                                            0.0% CH4



                                                                                         8
Advantages of Upgrading with Membrane Technology


Biogas upgrading with selective and permeable
membranes offers advantages over other technologies

   Minimized gas recirculation rates
   Lower operating costs
   Low capital expenditure
   Compact modular design
   Rapid system start-up
   Easier system control
   Low methane leakage
   High energy efficiency
   No need for additional chemicals or water
   Injection into the natural gas grid without
    further compression



                                                      9
Agenda


 1 Biomethane Incentives

 2 Membrane Technology for Gas Upgrading

 3 Case Study: Gas Upgrading

 4 Membrane Technology and Anaerobic Digestion Integration

 5 US Application

 6 About Eisenmann

 7 Conclusions and Questions




                                                             10
Case Study: Membrane Technology

Project: Biogas Plant in Switzerland
Limited success with previous biogas upgrading technology

Installed Membrane Upgrading System in 2012
Gas is used to fuel city buses




                                                            11
Site




       12
Facts and Figures

Biogas plant:                       Volume flow biogas:           123 CFM
                                    Volume flow biomethane:        73 CFM
high solids digestion of biowaste   Concentration biomethane:   > 96 vol.-%
Utilization:

grid injection and fuel


for public transportation fleet




Membrane room                       Biogas upgrading plant




                                                                              13
Measurement Data

Successful test operation in December 2012
Grid injection since January 26, 2013




                                                                              concentration [vol.-%]
 concentration [vol.-




                                        concentration biomethane [vol.-%]
                                                                                                                       concentration methane [vol.-%]
                                        concentration CO2 [vol.-%]
                                                                                                                       concentration CO2 [vol.-%]
        %]




                        Dec 3   Dec 4     Dec 5         Dec 6        Dec 7                             Dec 3   Dec 4     Dec 5        Dec 6     Dec 7
                                           2012                                                                           2012


Biomethane to grid injection: methane > 96 %                                 Offgas to atmosphere: methane leakage < 1.0 %


                                                                                                                                                        14
Operating Data

Specific energy consumption without peripherals
Compressor duty
0.20 kWh/Nm³ biogas

Specific energy consumption with peripherals
Compressor duty
Blower, cooling and air conditioning
0.29 kWh/Nm³ biogas

Operation
Fast start-up and shut-down
Good adjustability
No heat requirement
No operational supplements
Easy handling




                                                  15
Agenda


 1 Biomethane Incentives

 2 Membrane Technology for Gas Upgrading

 3 Case Study: Gas Upgrading

 4 Membrane Technology and Anaerobic Digestion Integration

 5 US Application

 6 About Eisenmann

 7 Conclusions and Questions




                                                             16
Anaerobic Digestion and Biogas Upgrading

Total process chain from a single source.




                          Plug flow digester   CHP / biogas upgrading



                                                                        17
Container

Compact and modular design. Turn-key solution.


                                                     33 ft

                                             10 ft




                                                             18
Pre-treatment


Requirements for grid injection concerning pollutant gas components and dew point reached.




 Heat exchangers                      Blower                               Activated carbon filters
 Cooling, condensation                Pre-compression, drying              Fine desulfurization

 T = 41°F                             p = 17.4 PSI, T = 86°F               H2S < 10 ppm




                                                                                                      19
Compression

Ensuring the required pressure difference for gas separation.



Oil injected screw compressor

 Stable operation
 No pulsation
 Waste heat from engine used

  for container air conditioning
 Internal heat recovery
 Oil deposition
 Heat utilization for temperature control


p = 232 PSI and T = 131°F                    Detail oil circulation   Construction compressor




                                                                                                20
Purification

Fine purification in order to ensure a long lifetime of the membranes.



Heat exchangers                 Control filter                       Particle filter
Temperature control             Activated carbon for fine cleaning   ISO-filter for fine particulate matter

T = 77 - 86°F                   Pollutant gas, oil                   Particles, aerosols (ISO 8573-1)




                                                                                                         21
Gas separation with highly selective membranes

Small recirculation rate minimizing compressor duty
High selectivity facilitating a methane yield greater than 99.5%.



                                                             compressor



                                                              membrane         membrane       biomethane
                                                               stage I          stage II      > 98% CH4


                                                                                vacuum


                                                              membrane                         offgas CO2
                                                               stage III                       < 0.5% CH4
Two-staged upgrading to biomethane                      Third membrane stage to minimize methane leak



                                                                                                      22
Process Control and Visualization

Automated operation and process control
Walk-in switch cabinet



Process control
 Siemens S7


Remote access
 Monitoring and operation
  through internet access
 Failure report notification via
  mobile phone

Visualization
 Touch-screen
                                          Biogas upgrading visualization




                                                                           23
Agenda


 1 Biomethane Incentives

 2 Membrane Technology for Gas Upgrading

 3 Case Study: Gas Upgrading

 4 Membrane Technology and Anaerobic Digestion Integration

 5 US Application

 6 About Eisenmann

 7 Conclusions and Questions




                                                             24
Business Study: Waste Collection Vehicles

Fuel costs for waste collection fleets are negatively impacted by
 Low miles per gallon
 Long service routes
 Increasing age of the fleets

Current Situation – 179,000 waste collection vehicles in America
 91% are diesel-fuel
 40% are over 10 years old
 Average 25,000 miles driven annually

Fuel Costs
 Average 3 miles to the gallon
 8,600 gallons of fuel use on average per truck per year
 For a fleet of 100 trucks, the average annual fuel costs would be $3.44 Million
  (assuming $4/gallon cost of diesel)



                                                                                    25
Business Study: Waste Collection Vehicles

Benefits of switching a fleet to natural gas

   Cleaner alternative fuel
   Significant cost savings
    At $2/gallon of CNG, on 100 truck fleet: daily savings is $4,800, annual savings is $1.75 M
   ROI: Just over a year with annual fuel savings
    (based on average cost of converting diesel engines)
   Cleaner, less noisy truck
   Non-corrosive, non-carcinogenic fuel is not a threat to soil, surface water or ground water
   Up to 90% less air pollution than diesel fuel




                                                                                                  26
Business Study: Waste Collection Vehicles


Example: Waste Management displaces 8 million gallons of petroleum and eliminates over
45,000 metric tons of greenhouse gas emissions in just one year by operating 1,400 natural
gas trucks.




                                                                                             27
Business Study: Waste Collection Vehicles


  Assumptions:                                   Diesel - $4 / gallon
                                                 CNG - $2 / gallon
  Feed Rate of Biogas System                     100 tons/day @ 350 days/yr

  Methane Production                             540,933 SCF (CH4)/day

  Methane (HHV)                                  1,000 BTU/SCF

  Upgrading Slip (Loss)                          1%

  Energy potential of upgraded RNG               535 MM BTU/day

  Equivalent Diesel Production                   3938 DGE/day

  Trucks Fueled by System                        164 Trucks per day

  Potential Fuel Savings (240 days collection)   $ 2,873,000.-/year




                                                                              28
Agenda


 1 Biomethane Incentives

 2 Membrane Technology for Gas Upgrading

 3 Case Study: Gas Upgrading

 4 Membrane Technology and Anaerobic Digestion Integration

 5 US Application

 6 About Eisenmann

 7 Conclusions and Questions




                                                             29
Leading International Supplier


     Environmental technology

     General finishing

     Material handling & conveyor systems

     Process and high-temperature technology




1                                               30
Offerings

     Green, sustainable engineering

     Top quality and reliability

     Modular and custom solutions

     Detailed system and process solutions

     Dedicated industrial service team

     Worldwide reference installations

     Global services




2                                             31
Facts and Figures

     Established 1951; Stuttgart, Germany

     12 locations worldwide

     US location since late 70‘s; Crystal Lake, IL

     3,600 employees

     More than 90 biogas facilities

                                                      Founding
                                                       Member




3                                                                32
Eisenmann Biogas



Since 2003                   Since 2008                Since 2012




Agricultural biogas plants   Biowaste biogas plants    Biogas upgrading plants

Plants in operation:         Plants in operation:      Plants in operation:
 Germany, 55 plants          Sweden, 1 plant          Switzerland, 1 plant
 Italy, 22 plants            Switzerland, 3 plants
 Czech Republic, 1 plant




                                                                                 33
Agenda


 1 Biomethane Incentives

 2 Membrane Technology for Gas Upgrading

 3 Case Study: Gas Upgrading

 4 Membrane Technology and Anaerobic Digestion Integration

 5 US Application

 6 About Eisenmann

 7 Conclusions and Questions




                                                             34
Conclusions


 There is a rising demand for biomethane to be used as CNG, especially as transportation fuel

 The use of biomethane has many advantages including being a lower cost and clean,
  alternative fuel

 Biomethane can be upgraded to pipeline grade natural gas by using highly selective and
  permeable membranes

 By using membrane technology,
  there is less methane slip




                                                                                                 35
Questions




                                  Green Engineering


Sustainability is in Our System




                                                      36
New Website

Introducing Eisenmann’s New Website


www.eisenmann.us.com/biomass13




Available for download:
 Today’s presentation
 CNG to Fuel your Fleet
  (white paper)
 Sustainability in an Urban Environment
  (white paper)




                                           37
Contact


Kyle Goehring
Regional Sales Manager

Phone: (815) 900-1443
E-Mail: kyle.goehring@eisenmann.com
150 East Dartmoor Dr. Crystal Lake, IL 60014
www.eisenmann.us.com




Follow Us:
  Eisenmann Corporation   Eisenmann Corporation   @EISENMANNUSA




                                                                  38

More Related Content

What's hot

Carbon footprint of_euro_village_compound
Carbon footprint of_euro_village_compoundCarbon footprint of_euro_village_compound
Carbon footprint of_euro_village_compoundAhmad AlQahtani
 
ICE-SEAM 2013 Conference Melaka, Malaysia
ICE-SEAM 2013 Conference Melaka, MalaysiaICE-SEAM 2013 Conference Melaka, Malaysia
ICE-SEAM 2013 Conference Melaka, MalaysiaBemgba Nyakuma
 
IRJET- Assessment of Thermophysical Properties of Biodiesel from Sunflower Wa...
IRJET- Assessment of Thermophysical Properties of Biodiesel from Sunflower Wa...IRJET- Assessment of Thermophysical Properties of Biodiesel from Sunflower Wa...
IRJET- Assessment of Thermophysical Properties of Biodiesel from Sunflower Wa...IRJET Journal
 
CRI - TCBiomass2011
CRI - TCBiomass2011CRI - TCBiomass2011
CRI - TCBiomass2011CRICatalyst
 
CCS Projects Integration Workshop - London 3Nov11 - TCM - Project Integration
CCS Projects Integration Workshop - London 3Nov11 - TCM - Project IntegrationCCS Projects Integration Workshop - London 3Nov11 - TCM - Project Integration
CCS Projects Integration Workshop - London 3Nov11 - TCM - Project IntegrationGlobal CCS Institute
 
4.17 - "Thermal conversion of biomass as a source of fuel for electricity gen...
4.17 - "Thermal conversion of biomass as a source of fuel for electricity gen...4.17 - "Thermal conversion of biomass as a source of fuel for electricity gen...
4.17 - "Thermal conversion of biomass as a source of fuel for electricity gen...Pomcert
 
Syngas routes to alternative fuels - John Bogild Hansen
Syngas routes to alternative fuels - John Bogild HansenSyngas routes to alternative fuels - John Bogild Hansen
Syngas routes to alternative fuels - John Bogild HansenEBAconference
 
Making Renewable Fuel by Carbon Recycling - KC Tran - Carbon Recycling Intern...
Making Renewable Fuel by Carbon Recycling - KC Tran - Carbon Recycling Intern...Making Renewable Fuel by Carbon Recycling - KC Tran - Carbon Recycling Intern...
Making Renewable Fuel by Carbon Recycling - KC Tran - Carbon Recycling Intern...Burton Lee
 
Refining petrochemical integration bangkok june 2012 final draft
Refining petrochemical integration bangkok june 2012 final draftRefining petrochemical integration bangkok june 2012 final draft
Refining petrochemical integration bangkok june 2012 final draftNoor Jivraj
 
IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...
IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...
IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...IRJET Journal
 
4.15 - "Technologies of Biomass Gasification" - Aleksander Sobolewski, Sławom...
4.15 - "Technologies of Biomass Gasification" - Aleksander Sobolewski, Sławom...4.15 - "Technologies of Biomass Gasification" - Aleksander Sobolewski, Sławom...
4.15 - "Technologies of Biomass Gasification" - Aleksander Sobolewski, Sławom...Pomcert
 
Microbial catalysis of syngas fermentation into biofuels precursors - An expe...
Microbial catalysis of syngas fermentation into biofuels precursors - An expe...Microbial catalysis of syngas fermentation into biofuels precursors - An expe...
Microbial catalysis of syngas fermentation into biofuels precursors - An expe...Pratap Jung Rai
 
Downdraft biomass gasification: experimental investigation and aspen plus sim...
Downdraft biomass gasification: experimental investigation and aspen plus sim...Downdraft biomass gasification: experimental investigation and aspen plus sim...
Downdraft biomass gasification: experimental investigation and aspen plus sim...Antonio Geraldo de Paula Oliveira
 
IRJET - Production of Biogas from Cow Dung and Determination of Calorific Value
IRJET - Production of Biogas from Cow Dung and Determination of Calorific ValueIRJET - Production of Biogas from Cow Dung and Determination of Calorific Value
IRJET - Production of Biogas from Cow Dung and Determination of Calorific ValueIRJET Journal
 
GasTechno - Gtl Conference London (40 Min)
GasTechno - Gtl Conference London (40 Min)GasTechno - Gtl Conference London (40 Min)
GasTechno - Gtl Conference London (40 Min)Walter Breidenstein
 
Nitrogen removal for chemicals production
Nitrogen removal for chemicals productionNitrogen removal for chemicals production
Nitrogen removal for chemicals productionJorge Arizmendi-Sanchez
 

What's hot (20)

Carbon footprint of_euro_village_compound
Carbon footprint of_euro_village_compoundCarbon footprint of_euro_village_compound
Carbon footprint of_euro_village_compound
 
Modelling, Simulation and Optimization of Refining Processes
Modelling, Simulation and Optimization of Refining ProcessesModelling, Simulation and Optimization of Refining Processes
Modelling, Simulation and Optimization of Refining Processes
 
ICE-SEAM 2013 Conference Melaka, Malaysia
ICE-SEAM 2013 Conference Melaka, MalaysiaICE-SEAM 2013 Conference Melaka, Malaysia
ICE-SEAM 2013 Conference Melaka, Malaysia
 
IRJET- Assessment of Thermophysical Properties of Biodiesel from Sunflower Wa...
IRJET- Assessment of Thermophysical Properties of Biodiesel from Sunflower Wa...IRJET- Assessment of Thermophysical Properties of Biodiesel from Sunflower Wa...
IRJET- Assessment of Thermophysical Properties of Biodiesel from Sunflower Wa...
 
CRI - TCBiomass2011
CRI - TCBiomass2011CRI - TCBiomass2011
CRI - TCBiomass2011
 
CO2 Separation - A Proposal
CO2 Separation - A Proposal CO2 Separation - A Proposal
CO2 Separation - A Proposal
 
CCS Projects Integration Workshop - London 3Nov11 - TCM - Project Integration
CCS Projects Integration Workshop - London 3Nov11 - TCM - Project IntegrationCCS Projects Integration Workshop - London 3Nov11 - TCM - Project Integration
CCS Projects Integration Workshop - London 3Nov11 - TCM - Project Integration
 
Bionic - From Biomass To Energy
Bionic - From Biomass To EnergyBionic - From Biomass To Energy
Bionic - From Biomass To Energy
 
4.17 - "Thermal conversion of biomass as a source of fuel for electricity gen...
4.17 - "Thermal conversion of biomass as a source of fuel for electricity gen...4.17 - "Thermal conversion of biomass as a source of fuel for electricity gen...
4.17 - "Thermal conversion of biomass as a source of fuel for electricity gen...
 
Syngas routes to alternative fuels - John Bogild Hansen
Syngas routes to alternative fuels - John Bogild HansenSyngas routes to alternative fuels - John Bogild Hansen
Syngas routes to alternative fuels - John Bogild Hansen
 
Making Renewable Fuel by Carbon Recycling - KC Tran - Carbon Recycling Intern...
Making Renewable Fuel by Carbon Recycling - KC Tran - Carbon Recycling Intern...Making Renewable Fuel by Carbon Recycling - KC Tran - Carbon Recycling Intern...
Making Renewable Fuel by Carbon Recycling - KC Tran - Carbon Recycling Intern...
 
Selection of amine solvents for CO2 capture from natural gas power plant - pr...
Selection of amine solvents for CO2 capture from natural gas power plant - pr...Selection of amine solvents for CO2 capture from natural gas power plant - pr...
Selection of amine solvents for CO2 capture from natural gas power plant - pr...
 
Refining petrochemical integration bangkok june 2012 final draft
Refining petrochemical integration bangkok june 2012 final draftRefining petrochemical integration bangkok june 2012 final draft
Refining petrochemical integration bangkok june 2012 final draft
 
IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...
IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...
IRJET- Removal of CO2 from Raw Biogas using Water Scrubbing based Up-Gradatio...
 
4.15 - "Technologies of Biomass Gasification" - Aleksander Sobolewski, Sławom...
4.15 - "Technologies of Biomass Gasification" - Aleksander Sobolewski, Sławom...4.15 - "Technologies of Biomass Gasification" - Aleksander Sobolewski, Sławom...
4.15 - "Technologies of Biomass Gasification" - Aleksander Sobolewski, Sławom...
 
Microbial catalysis of syngas fermentation into biofuels precursors - An expe...
Microbial catalysis of syngas fermentation into biofuels precursors - An expe...Microbial catalysis of syngas fermentation into biofuels precursors - An expe...
Microbial catalysis of syngas fermentation into biofuels precursors - An expe...
 
Downdraft biomass gasification: experimental investigation and aspen plus sim...
Downdraft biomass gasification: experimental investigation and aspen plus sim...Downdraft biomass gasification: experimental investigation and aspen plus sim...
Downdraft biomass gasification: experimental investigation and aspen plus sim...
 
IRJET - Production of Biogas from Cow Dung and Determination of Calorific Value
IRJET - Production of Biogas from Cow Dung and Determination of Calorific ValueIRJET - Production of Biogas from Cow Dung and Determination of Calorific Value
IRJET - Production of Biogas from Cow Dung and Determination of Calorific Value
 
GasTechno - Gtl Conference London (40 Min)
GasTechno - Gtl Conference London (40 Min)GasTechno - Gtl Conference London (40 Min)
GasTechno - Gtl Conference London (40 Min)
 
Nitrogen removal for chemicals production
Nitrogen removal for chemicals productionNitrogen removal for chemicals production
Nitrogen removal for chemicals production
 

Similar to Membrane Technology - International Biomass 2013

Desktop study for biomethane utilization from POME.pptx
Desktop study for biomethane utilization from POME.pptxDesktop study for biomethane utilization from POME.pptx
Desktop study for biomethane utilization from POME.pptxWindri Aji Brata
 
FYP presentation
FYP presentationFYP presentation
FYP presentationNajlaJaved
 
Biogas_Permeation_EN
Biogas_Permeation_ENBiogas_Permeation_EN
Biogas_Permeation_ENPedro Serra
 
GE / Texaco Gasifier Feed to a Lurgi Methanol Plant and its Effect on Methano...
GE / Texaco Gasifier Feed to a Lurgi Methanol Plant and its Effect on Methano...GE / Texaco Gasifier Feed to a Lurgi Methanol Plant and its Effect on Methano...
GE / Texaco Gasifier Feed to a Lurgi Methanol Plant and its Effect on Methano...Gerard B. Hawkins
 
Fast Chemical Analysis for Fuels R&D: The RTGA White Paper 2012
Fast Chemical Analysis for Fuels R&D: The RTGA White Paper 2012Fast Chemical Analysis for Fuels R&D: The RTGA White Paper 2012
Fast Chemical Analysis for Fuels R&D: The RTGA White Paper 2012TransGlobal Distributors
 
Application of Bio-FAEG, a Biofouling Assessment Model in Engine Performance...
Application of Bio-FAEG, a Biofouling Assessment Model  in Engine Performance...Application of Bio-FAEG, a Biofouling Assessment Model  in Engine Performance...
Application of Bio-FAEG, a Biofouling Assessment Model in Engine Performance...Tosin Onabanjo
 
f_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdff_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdfRiswandaHimawan3
 
SERI presentation1-5-10
SERI presentation1-5-10SERI presentation1-5-10
SERI presentation1-5-10Julie Rouse
 
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...NazrulIslam657555
 
Decision Guide
Decision GuideDecision Guide
Decision GuideEggfuel
 
Bio - CNG - a sustainable energy solution
Bio - CNG - a sustainable energy solutionBio - CNG - a sustainable energy solution
Bio - CNG - a sustainable energy solutionAyisha586983
 
Upgradation technology.pdf of biogas project
Upgradation technology.pdf of biogas projectUpgradation technology.pdf of biogas project
Upgradation technology.pdf of biogas projectRaj kumar
 
PRACTICAL GUIDE ON THE SELECTION OF PROCESS TECHNOLOGY FOR THE TREATMENT OF A...
PRACTICAL GUIDE ON THE SELECTION OF PROCESS TECHNOLOGY FOR THE TREATMENT OF A...PRACTICAL GUIDE ON THE SELECTION OF PROCESS TECHNOLOGY FOR THE TREATMENT OF A...
PRACTICAL GUIDE ON THE SELECTION OF PROCESS TECHNOLOGY FOR THE TREATMENT OF A...Gerard B. Hawkins
 
Sustainability in an Urban Environment Through Anaerobic Digestion
Sustainability in an Urban Environment Through Anaerobic DigestionSustainability in an Urban Environment Through Anaerobic Digestion
Sustainability in an Urban Environment Through Anaerobic Digestioneisenmannusa
 
Biomass gassification based ammonia plant
Biomass gassification based ammonia plantBiomass gassification based ammonia plant
Biomass gassification based ammonia plantDeepak Kumar Ojha, PhD
 

Similar to Membrane Technology - International Biomass 2013 (20)

Biogas as a vehicle fuel
Biogas as a vehicle fuelBiogas as a vehicle fuel
Biogas as a vehicle fuel
 
Desktop study for biomethane utilization from POME.pptx
Desktop study for biomethane utilization from POME.pptxDesktop study for biomethane utilization from POME.pptx
Desktop study for biomethane utilization from POME.pptx
 
FYP presentation
FYP presentationFYP presentation
FYP presentation
 
Biogas_Permeation_EN
Biogas_Permeation_ENBiogas_Permeation_EN
Biogas_Permeation_EN
 
267
267267
267
 
GE / Texaco Gasifier Feed to a Lurgi Methanol Plant and its Effect on Methano...
GE / Texaco Gasifier Feed to a Lurgi Methanol Plant and its Effect on Methano...GE / Texaco Gasifier Feed to a Lurgi Methanol Plant and its Effect on Methano...
GE / Texaco Gasifier Feed to a Lurgi Methanol Plant and its Effect on Methano...
 
Fast Chemical Analysis for Fuels R&D: The RTGA White Paper 2012
Fast Chemical Analysis for Fuels R&D: The RTGA White Paper 2012Fast Chemical Analysis for Fuels R&D: The RTGA White Paper 2012
Fast Chemical Analysis for Fuels R&D: The RTGA White Paper 2012
 
Carbon Dioxide Capture Technology
Carbon Dioxide Capture TechnologyCarbon Dioxide Capture Technology
Carbon Dioxide Capture Technology
 
Application of Bio-FAEG, a Biofouling Assessment Model in Engine Performance...
Application of Bio-FAEG, a Biofouling Assessment Model  in Engine Performance...Application of Bio-FAEG, a Biofouling Assessment Model  in Engine Performance...
Application of Bio-FAEG, a Biofouling Assessment Model in Engine Performance...
 
f_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdff_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdf
 
Renewable Natural Gas
Renewable Natural GasRenewable Natural Gas
Renewable Natural Gas
 
SERI presentation1-5-10
SERI presentation1-5-10SERI presentation1-5-10
SERI presentation1-5-10
 
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
 
C3 Technology - When and How to Use
C3 Technology - When and How to UseC3 Technology - When and How to Use
C3 Technology - When and How to Use
 
Decision Guide
Decision GuideDecision Guide
Decision Guide
 
Bio - CNG - a sustainable energy solution
Bio - CNG - a sustainable energy solutionBio - CNG - a sustainable energy solution
Bio - CNG - a sustainable energy solution
 
Upgradation technology.pdf of biogas project
Upgradation technology.pdf of biogas projectUpgradation technology.pdf of biogas project
Upgradation technology.pdf of biogas project
 
PRACTICAL GUIDE ON THE SELECTION OF PROCESS TECHNOLOGY FOR THE TREATMENT OF A...
PRACTICAL GUIDE ON THE SELECTION OF PROCESS TECHNOLOGY FOR THE TREATMENT OF A...PRACTICAL GUIDE ON THE SELECTION OF PROCESS TECHNOLOGY FOR THE TREATMENT OF A...
PRACTICAL GUIDE ON THE SELECTION OF PROCESS TECHNOLOGY FOR THE TREATMENT OF A...
 
Sustainability in an Urban Environment Through Anaerobic Digestion
Sustainability in an Urban Environment Through Anaerobic DigestionSustainability in an Urban Environment Through Anaerobic Digestion
Sustainability in an Urban Environment Through Anaerobic Digestion
 
Biomass gassification based ammonia plant
Biomass gassification based ammonia plantBiomass gassification based ammonia plant
Biomass gassification based ammonia plant
 

More from eisenmannusa

High Solids Anaerobic Digestion - International Biomass 2013
High Solids Anaerobic Digestion - International Biomass 2013High Solids Anaerobic Digestion - International Biomass 2013
High Solids Anaerobic Digestion - International Biomass 2013eisenmannusa
 
Sustainability in an urban environment through anaerobic digestion
Sustainability in an urban environment through anaerobic digestionSustainability in an urban environment through anaerobic digestion
Sustainability in an urban environment through anaerobic digestioneisenmannusa
 
Business of anaerobic digestion project delivery basics
Business of anaerobic digestion project delivery basicsBusiness of anaerobic digestion project delivery basics
Business of anaerobic digestion project delivery basicseisenmannusa
 
Biomass to Steam - The Environmental Challenge
Biomass to Steam - The Environmental ChallengeBiomass to Steam - The Environmental Challenge
Biomass to Steam - The Environmental Challengeeisenmannusa
 
Cleaning up Gasification Producer Gas for Use in an IC Engine
Cleaning up Gasification Producer Gas for Use in an IC EngineCleaning up Gasification Producer Gas for Use in an IC Engine
Cleaning up Gasification Producer Gas for Use in an IC Engineeisenmannusa
 
Biomass to Steam: The Environmental Challenge
Biomass to Steam: The Environmental ChallengeBiomass to Steam: The Environmental Challenge
Biomass to Steam: The Environmental Challengeeisenmannusa
 

More from eisenmannusa (6)

High Solids Anaerobic Digestion - International Biomass 2013
High Solids Anaerobic Digestion - International Biomass 2013High Solids Anaerobic Digestion - International Biomass 2013
High Solids Anaerobic Digestion - International Biomass 2013
 
Sustainability in an urban environment through anaerobic digestion
Sustainability in an urban environment through anaerobic digestionSustainability in an urban environment through anaerobic digestion
Sustainability in an urban environment through anaerobic digestion
 
Business of anaerobic digestion project delivery basics
Business of anaerobic digestion project delivery basicsBusiness of anaerobic digestion project delivery basics
Business of anaerobic digestion project delivery basics
 
Biomass to Steam - The Environmental Challenge
Biomass to Steam - The Environmental ChallengeBiomass to Steam - The Environmental Challenge
Biomass to Steam - The Environmental Challenge
 
Cleaning up Gasification Producer Gas for Use in an IC Engine
Cleaning up Gasification Producer Gas for Use in an IC EngineCleaning up Gasification Producer Gas for Use in an IC Engine
Cleaning up Gasification Producer Gas for Use in an IC Engine
 
Biomass to Steam: The Environmental Challenge
Biomass to Steam: The Environmental ChallengeBiomass to Steam: The Environmental Challenge
Biomass to Steam: The Environmental Challenge
 

Recently uploaded

How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 

Recently uploaded (20)

DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 

Membrane Technology - International Biomass 2013

  • 1. Biogas Upgrading with Membrane Technology 2013 International Biomass Conference & Expo – Gas Conditioning: Clean Up and Systemic Approaches Worth Deploying Kyle Goehring, Regional Sales Manager www.eisenmann.com www.eisenmann.us.com © Eisenmann AG 2013 © Eisenmann 2013
  • 2. Agenda 1 Biomethane Incentives 2 Membrane Technology for Gas Upgrading 3 Case Study: Gas Upgrading 4 Membrane Technology and Anaerobic Digestion Integration 5 US Application 6 About Eisenmann 7 Conclusions and Questions 2
  • 3. Agenda 1 Biomethane Incentives 2 Membrane Technology for Gas Upgrading 3 Case Study: Gas Upgrading 4 Membrane Technology and Anaerobic Digestion Integration 5 US Application 6 About Eisenmann 7 Conclusions and Questions 3
  • 4. Drivers Most biogas plants generate electricity and heat with a CHP  The thermal energy cannot always be used close by Incentives to use biogas as biomethane or CNG for transportation fuel  More than 250,000 natural gas vehicles in the US (source: GE)  12-15% public transit buses in US (source: CNG Now)  A natural gas powered bus can displace 1,400 gallons of diesel fuel a year (source: CNG Now)  Natural gas vehicles reduce greenhouse gas emissions between 20-29% (source: Natural Gas Vehicle Association) 4
  • 5. Advantages of Biomethane  Decentralized production  Independent, flexible and storable energy source  Efficient use according to requirements  Storage capability for when demand is higher  Offsets non-renewable sources (coal, oil, fossil fuel derived natural gas)  Production creates US jobs and benefits local economies 5
  • 6. Agenda 1 Biomethane Incentives 2 Membrane Technology for Gas Upgrading 3 Case Study: Gas Upgrading 4 Membrane Technology and Anaerobic Digestion Integration 5 US Application 6 About Eisenmann 7 Conclusions and Questions 6
  • 7. Highly Selective Membrane Technology Offgas Biomethane CO2 CH4 Biogas CH4 + CO2 Membrane Function 7
  • 8. Flow diagram biogas cooling desulfurization compressor and drying temperature particle filter control filter control membrane membrane biomethane stage I stage II > 98% CH4 biogas production pre-treatment membrane offgas CO2 compression stage III < 0.5% CH4 purification gas separation purified gas offgas treatment 0.0% CH4 8
  • 9. Advantages of Upgrading with Membrane Technology Biogas upgrading with selective and permeable membranes offers advantages over other technologies  Minimized gas recirculation rates  Lower operating costs  Low capital expenditure  Compact modular design  Rapid system start-up  Easier system control  Low methane leakage  High energy efficiency  No need for additional chemicals or water  Injection into the natural gas grid without further compression 9
  • 10. Agenda 1 Biomethane Incentives 2 Membrane Technology for Gas Upgrading 3 Case Study: Gas Upgrading 4 Membrane Technology and Anaerobic Digestion Integration 5 US Application 6 About Eisenmann 7 Conclusions and Questions 10
  • 11. Case Study: Membrane Technology Project: Biogas Plant in Switzerland Limited success with previous biogas upgrading technology Installed Membrane Upgrading System in 2012 Gas is used to fuel city buses 11
  • 12. Site 12
  • 13. Facts and Figures Biogas plant: Volume flow biogas: 123 CFM Volume flow biomethane: 73 CFM high solids digestion of biowaste Concentration biomethane: > 96 vol.-% Utilization: grid injection and fuel for public transportation fleet Membrane room Biogas upgrading plant 13
  • 14. Measurement Data Successful test operation in December 2012 Grid injection since January 26, 2013 concentration [vol.-%] concentration [vol.- concentration biomethane [vol.-%] concentration methane [vol.-%] concentration CO2 [vol.-%] concentration CO2 [vol.-%] %] Dec 3 Dec 4 Dec 5 Dec 6 Dec 7 Dec 3 Dec 4 Dec 5 Dec 6 Dec 7 2012 2012 Biomethane to grid injection: methane > 96 % Offgas to atmosphere: methane leakage < 1.0 % 14
  • 15. Operating Data Specific energy consumption without peripherals Compressor duty 0.20 kWh/Nm³ biogas Specific energy consumption with peripherals Compressor duty Blower, cooling and air conditioning 0.29 kWh/Nm³ biogas Operation Fast start-up and shut-down Good adjustability No heat requirement No operational supplements Easy handling 15
  • 16. Agenda 1 Biomethane Incentives 2 Membrane Technology for Gas Upgrading 3 Case Study: Gas Upgrading 4 Membrane Technology and Anaerobic Digestion Integration 5 US Application 6 About Eisenmann 7 Conclusions and Questions 16
  • 17. Anaerobic Digestion and Biogas Upgrading Total process chain from a single source. Plug flow digester CHP / biogas upgrading 17
  • 18. Container Compact and modular design. Turn-key solution. 33 ft 10 ft 18
  • 19. Pre-treatment Requirements for grid injection concerning pollutant gas components and dew point reached. Heat exchangers Blower Activated carbon filters Cooling, condensation Pre-compression, drying Fine desulfurization T = 41°F p = 17.4 PSI, T = 86°F H2S < 10 ppm 19
  • 20. Compression Ensuring the required pressure difference for gas separation. Oil injected screw compressor  Stable operation  No pulsation  Waste heat from engine used for container air conditioning  Internal heat recovery  Oil deposition  Heat utilization for temperature control p = 232 PSI and T = 131°F Detail oil circulation Construction compressor 20
  • 21. Purification Fine purification in order to ensure a long lifetime of the membranes. Heat exchangers Control filter Particle filter Temperature control Activated carbon for fine cleaning ISO-filter for fine particulate matter T = 77 - 86°F Pollutant gas, oil Particles, aerosols (ISO 8573-1) 21
  • 22. Gas separation with highly selective membranes Small recirculation rate minimizing compressor duty High selectivity facilitating a methane yield greater than 99.5%. compressor membrane membrane biomethane stage I stage II > 98% CH4 vacuum membrane offgas CO2 stage III < 0.5% CH4 Two-staged upgrading to biomethane Third membrane stage to minimize methane leak 22
  • 23. Process Control and Visualization Automated operation and process control Walk-in switch cabinet Process control  Siemens S7 Remote access  Monitoring and operation through internet access  Failure report notification via mobile phone Visualization  Touch-screen Biogas upgrading visualization 23
  • 24. Agenda 1 Biomethane Incentives 2 Membrane Technology for Gas Upgrading 3 Case Study: Gas Upgrading 4 Membrane Technology and Anaerobic Digestion Integration 5 US Application 6 About Eisenmann 7 Conclusions and Questions 24
  • 25. Business Study: Waste Collection Vehicles Fuel costs for waste collection fleets are negatively impacted by  Low miles per gallon  Long service routes  Increasing age of the fleets Current Situation – 179,000 waste collection vehicles in America  91% are diesel-fuel  40% are over 10 years old  Average 25,000 miles driven annually Fuel Costs  Average 3 miles to the gallon  8,600 gallons of fuel use on average per truck per year  For a fleet of 100 trucks, the average annual fuel costs would be $3.44 Million (assuming $4/gallon cost of diesel) 25
  • 26. Business Study: Waste Collection Vehicles Benefits of switching a fleet to natural gas  Cleaner alternative fuel  Significant cost savings At $2/gallon of CNG, on 100 truck fleet: daily savings is $4,800, annual savings is $1.75 M  ROI: Just over a year with annual fuel savings (based on average cost of converting diesel engines)  Cleaner, less noisy truck  Non-corrosive, non-carcinogenic fuel is not a threat to soil, surface water or ground water  Up to 90% less air pollution than diesel fuel 26
  • 27. Business Study: Waste Collection Vehicles Example: Waste Management displaces 8 million gallons of petroleum and eliminates over 45,000 metric tons of greenhouse gas emissions in just one year by operating 1,400 natural gas trucks. 27
  • 28. Business Study: Waste Collection Vehicles Assumptions: Diesel - $4 / gallon CNG - $2 / gallon Feed Rate of Biogas System 100 tons/day @ 350 days/yr Methane Production 540,933 SCF (CH4)/day Methane (HHV) 1,000 BTU/SCF Upgrading Slip (Loss) 1% Energy potential of upgraded RNG 535 MM BTU/day Equivalent Diesel Production 3938 DGE/day Trucks Fueled by System 164 Trucks per day Potential Fuel Savings (240 days collection) $ 2,873,000.-/year 28
  • 29. Agenda 1 Biomethane Incentives 2 Membrane Technology for Gas Upgrading 3 Case Study: Gas Upgrading 4 Membrane Technology and Anaerobic Digestion Integration 5 US Application 6 About Eisenmann 7 Conclusions and Questions 29
  • 30. Leading International Supplier  Environmental technology  General finishing  Material handling & conveyor systems  Process and high-temperature technology 1 30
  • 31. Offerings  Green, sustainable engineering  Top quality and reliability  Modular and custom solutions  Detailed system and process solutions  Dedicated industrial service team  Worldwide reference installations  Global services 2 31
  • 32. Facts and Figures  Established 1951; Stuttgart, Germany  12 locations worldwide  US location since late 70‘s; Crystal Lake, IL  3,600 employees  More than 90 biogas facilities Founding Member 3 32
  • 33. Eisenmann Biogas Since 2003 Since 2008 Since 2012 Agricultural biogas plants Biowaste biogas plants Biogas upgrading plants Plants in operation: Plants in operation: Plants in operation:  Germany, 55 plants  Sweden, 1 plant  Switzerland, 1 plant  Italy, 22 plants  Switzerland, 3 plants  Czech Republic, 1 plant 33
  • 34. Agenda 1 Biomethane Incentives 2 Membrane Technology for Gas Upgrading 3 Case Study: Gas Upgrading 4 Membrane Technology and Anaerobic Digestion Integration 5 US Application 6 About Eisenmann 7 Conclusions and Questions 34
  • 35. Conclusions  There is a rising demand for biomethane to be used as CNG, especially as transportation fuel  The use of biomethane has many advantages including being a lower cost and clean, alternative fuel  Biomethane can be upgraded to pipeline grade natural gas by using highly selective and permeable membranes  By using membrane technology, there is less methane slip 35
  • 36. Questions Green Engineering Sustainability is in Our System 36
  • 37. New Website Introducing Eisenmann’s New Website www.eisenmann.us.com/biomass13 Available for download:  Today’s presentation  CNG to Fuel your Fleet (white paper)  Sustainability in an Urban Environment (white paper) 37
  • 38. Contact Kyle Goehring Regional Sales Manager Phone: (815) 900-1443 E-Mail: kyle.goehring@eisenmann.com 150 East Dartmoor Dr. Crystal Lake, IL 60014 www.eisenmann.us.com Follow Us: Eisenmann Corporation Eisenmann Corporation @EISENMANNUSA 38

Editor's Notes

  1. Thank Valentino for the introduction and BBI for the great forum. Touch on previous speakers upgrading technology before beginning.
  2. (Insert Description of Format)
  3. There are a number of incentives for renewable energy projects across technologies and geographies. Biomethane, with its capabilities and advantages over other forms of fuel and/or energy, is entirely renewable when derived from biogas and a low carbon alternative fuel.
  4. The US and European markets are very different. In Sweden more than half of the natural gas vehicles are running on biomethane. In fact, the word biogas in Sweden is associated with a vehicle fuel due to this prevalence. Additionally, Germany and Austria have established biomethane vehicle fuel target goals. There are several factors why the markets for biomethane are so different across the world. 1.) The physical size of the US makes for infrastructure challenges 2.) The availability of fossil fuels in the US lead to lower costs per unit of energy which in turn make the financing of biomethane projects more difficult as signing a long-term off-take agreement with a utility or fleet is difficult or impossible 3.) European countries are more like US states than the US in total. An overarching structure for upgraded biogas across the US is problematic due to differing state laws and regulations 4.) Population density – outside of the major cities, the US has very few people over many square miles. The US is the 142 nd ranked country in population density while many EU countries are ranked much higher with 8 in the top 50, including the Netherlands, Belgium, the UK, Germany, Italy and Switzerland.
  5. A vast network of pipelines in the US allows for convenient distribution of upgraded biogas while offering the advantage of lower distribution losses. Electricity grid is an aging, deteriorating system with an increasing costs required to maintain. Power lines and systems are subject or exposed to natural phenomena which increases risk and likelihood of power outages (i.e. Hurricane Sandy) There are currently 400 underground gas storage fields in the US (source: Forbes)
  6. Gas permeation with selective membranes from high-performance polymers Design membrane module Biogas: CH 4 + CO 2 (feed) Biomethane: CH 4 (retentate) Offgas: CO 2 (permeate) Hollow fiber membranes Separation of CO 2 and CH 4 through different gas permeation velocities CH 4 slow CO 2 fast
  7. Speak slowly through the stages!
  8. While these are all advantages, lets focus on two primarily: methane leakage or slippage, and lower operating as well as initial costs. As the rate of return and return on investment are primary drivers in initial project approval, the lower cost of a membrane system can be THE difference as to whether a project is financeable. With the purpose of a biomethane project being production of biomethane, a system which offers less slippage or methane loss during the upgrading process holds obvious benefit: more of the desired output!
  9. If I were in the audience right now, I would be thinking that all of this sounds great in theory but I need to learn about an actual application or system. Let’s explore one such facility.
  10. (Note: What was the technology? This will likely be a question and I need the answer!)
  11. Fueling station for buses is off-site so biomethane is injected. We could reach a higher % of CH4 but it is not necessary with this location or under the regulations As evidenced with the picture on your right, the membranes are within a containerized unit
  12. (Go through the graphs as it may be difficult to see in the room) We chose this case study as it is recent and relevant
  13. Even with energy consumption not directly related to the biomethane conditioning, the energy required is offset by the low rate of slippage associated with the membrane technology. Once again numerous advantages associated with this technology. One we haven’t discussed yet is that with the membrane, one does not need a source of heat for treatment of solution or material. The heat requirement associated with other upgrading technologies leads a facility or system to invest in peripheral equipment such as a boiler and divert a % of biogas to generate said heat.
  14. Standard equipment and technologies shown here. Note: the greater sulfur content in the biogas, the more activated carbon or material needed to absorb this gas is required.
  15. I have discussed and highlighted numerous advantages of the membrane technology. The modularity of the systems can serve benefit both in purification methane as well as treating increased volumes of biogas.
  16. Eisenmann as an organization prides itself upon service and reliability. With this as a core value, our biogas upgrading technology utilizes the latest in remote access technology keeping Eisenmann’s service team and the owner/operator in contact with the system.
  17. Environmental Technology Air and water treatment Anaerobic Digestion We were commissioned by the US Gov’t. to build munitions disposal facility which combines multiple technologies of Eisenmann’s including water treatment, high temperature kilns, exhaust air treatment and others. A very unique project which sets Eisenmann further apart from biogas companies. General Finishing Painting auto bodies, wood, plastics Material Handling Moving autobodies and parts through factories Pallet distribution systems Process and High Temp High temp kilns Ceramic firing lines
  18. This global network and rich history affords Eisenmann opportunities and capabilities few companies, if any, can match. A true solution based company, we will optimize or configure a technology to meet the exact need or desire for a client. Outstanding customer support with a 100% customer satisfaction rating over the past 9 years.
  19. Established in 1951 outside of Stuttgart Germany. Since, we have grown to 12 locations globally. Our US Office was one of the first locations outside of Germany and has been successfully completing projects for over 35 years. We are in Crystal Lake IL in the greater Chicago area. As I like to say it, we are where Chicago meets cornfields. We have 3,600 employees with the vast majority of engineers. To date, we have successfully realized over 90 biogas facilities and broke ground on our first US facility in the greater Chicago area in 4 th Q 2012. And we are one of the founding members of the American Biogas Council who’s goals are promoting environmental stewardship, promoting greenhouse gas reduction, and policy development
  20. Eisenmann installed over 2,500 environmental technology installations, including water treatment, exhaust air purification and waste treatment across the globe. Biogas technology only recently in our company history become a focus and is just a small part of the Eisenmann product portfolio. A company as diverse and deep as Eisenmann has begun allocating more resources toward the biogas industry which lead to our recent development and deployment of the membrane technology. Eisenmann’s primary digester technology is the horizontal plug flow technology. My colleague, John McDowell, will be presenting on this tomorrow afternoon and I strongly encourage you to attend!