Agenda

• Key Components of Project Development
• Key Elements of Project Delivery
• Project Delivery Approach and Drivers
   –   Project Development and Delivery Timeline
   –   Tools and Terminology
   –   Preliminary Engineering
   –   Project Delivery Organization
• Contract Structures
• Which Approach is Right for You?
Key Components of Project Development




             Project Developer                        XYZ Group

 Feedstock   Technology-             Operations
   (WSA)     Permitting
                           Offtake                +      Finance
Key Components of Project Development




                Fully “Baked” Project
   Feedstock   Technology-             Operations
                             Offtake                Finance
     (WSA)     Permitting
Key Elements of Project Delivery

  • Design
     – Preliminary Design Engineering
     – Detail Design Engineering
  • Build
     –   Procurement
     –   Construction Management
     –   Construction
     –   Commissioning
  • Operate
     – Operations
     – Maintenance
  • Own/Transfer
Typical Project Timeline
 Project Development


 Master Planning

 Waste Supply & Digestate
      Offtake Agreements

 Preliminary Siteing

 Interconnect Verification                 Independent rate
 Preliminary Engineering                      limiting step
 Permitting

 PPA

 Finance Due Diligence

 Detail Engineering

 Project Kickoff
                                                *
 Construction Management Delivery method
 Commissioning           defines overlap
 Operation and Maint.
Project Delivery Approaches


   Higher                                                             Lower
            Design-Bid-Build



Owner’s         Const. Manage          EPC                           Project
 Risk                                                                 Cost
                                    EPC w/ Wrap


                                       Design/Build

   Lower                                                              Higher
                                                      BOT


            Slower                                          Faster
                               Completion Rate*
Tools and Terminology

 • “Statement of Requirements”
    – Prepared by Developer and/or Owner
    – Captures key project information and goals
 • “Project Execution Plan”
    – Prepared by Engineering Firm
    – Captures project execution strategy and milestones
 • “Basis of Design” (BOD) - Preliminary Engineering
    – Prepared by Engineering Firm
    – 30% design with +/- 25% Cost accuracy
    – Crucial preliminary engineering required for;
        • Permitting
        • Siteing
        • Project Finance
Preliminary Engineering
 • Preliminary Engineering Typically Includes:
    –   Project Execution Plan
    –   Process Flow Diagram
    –   General Arrangement Drawings with Equipment Layouts
    –   Site Plans
    –   Preliminary Equipment List with Sizes
    –   Heat and Mass Balance/P&ID’s
    –   Electrical Single Line
    –   Motor List and Electrical Loads
    –   Interconnect plan
    –   Process controls outline
    –   PHA – Process Hazard Analysis
    –   O&M Plan with estimated costs
    –   Project Cost Estimate
Preliminary Engineering

 • Requires Multiple Disciplines
    –   Civil Engineering
    –   Mechanical/Process Engineering
    –   Electrical/Controls Engineering
    –   Project/Construction Management
    –   Procurement/Estimating
    –   Environmental Engineering/Permit Specialists
Project Delivery Organization Chart
Typical Project Timeline
                             Statement of
 Project Development
                             Requirements
 Master Planning

 Waste Supply & Digestate             Project
      Offtake Agreements
                                   Execution Plan
 Preliminary Siteing

 Interconnect Verification              Preliminary
 Preliminary Engineering
                                        Engineering
 Permitting

 PPA

 Finance Due Diligence

 Detail Engineering

 Project Kickoff
                                                    *
 Construction Management

 Commissioning

 Operation and Maint.
Contract Structure
  Warranty – Guarantees
  • Project “Wrap”
  • Performance Guarantee(s)
       – Construction (Time and Cost) Guarantee
       – Process Guarantee
  Typical Contract Payment Terms
  • Fixed Price
       – Milestone payments
  •   Fixed Price with Escalator(s)
       – Raw materials
       – Currency
  •   Cost Plus – Open Book
  •   Shared Savings/Shared Overruns
  •   Schedule Reward
Which approach is right for you?
 Project Delivery Approach Drivers
 • Risk
    – Strength of Developer/Owner Group
    – Complexity of Scope
    – Investor/Finance Tolerance
 • Speed
    – Integration of roles
    – Rate limiting steps
 • Cost
    – Cash Flow
    – Overall Project Cost Control
          • Strategies to manage cost risks
Thank You
       Adam Halsband
Business Development Manager
   EISENMANN Corporation
         815-482-4335
adam.halsband@eisenmann.com

Weitere ähnliche Inhalte

Was ist angesagt?

A g cs persepective on primavera unifier ppt
A g cs persepective on primavera unifier pptA g cs persepective on primavera unifier ppt
A g cs persepective on primavera unifier ppt
p6academy
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
Dale Buzzelli
 
VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2
Jerry Bauers
 
Professional Profile 05-11-15
Professional Profile 05-11-15Professional Profile 05-11-15
Professional Profile 05-11-15
Traci England
 

Was ist angesagt? (20)

Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
 
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...
 
RFPs and RFQs: Selecting the Design-Builder
RFPs and RFQs: Selecting the Design-BuilderRFPs and RFQs: Selecting the Design-Builder
RFPs and RFQs: Selecting the Design-Builder
 
Phil Welker Commissioning
Phil Welker CommissioningPhil Welker Commissioning
Phil Welker Commissioning
 
Session T4 - Deliverables Management - A strategic Opportunity
Session T4 - Deliverables Management - A strategic OpportunitySession T4 - Deliverables Management - A strategic Opportunity
Session T4 - Deliverables Management - A strategic Opportunity
 
Session T2 - Best Practice Project Controls with EcoSys
Session T2 - Best Practice Project Controls with EcoSysSession T2 - Best Practice Project Controls with EcoSys
Session T2 - Best Practice Project Controls with EcoSys
 
Capability
CapabilityCapability
Capability
 
A g cs persepective on primavera unifier ppt
A g cs persepective on primavera unifier pptA g cs persepective on primavera unifier ppt
A g cs persepective on primavera unifier ppt
 
2013 Federal D-B Downsized
2013 Federal D-B Downsized2013 Federal D-B Downsized
2013 Federal D-B Downsized
 
Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
Project Controls Expo - 31st Oct 2012 - Accurate Management Reports on 1me, e...
Project Controls Expo - 31st Oct 2012 - Accurate Management Reports on 1me, e...Project Controls Expo - 31st Oct 2012 - Accurate Management Reports on 1me, e...
Project Controls Expo - 31st Oct 2012 - Accurate Management Reports on 1me, e...
 
Project Controls Expo - 31st Oct 2012 - Improving Professionalism in Project ...
Project Controls Expo - 31st Oct 2012 - Improving Professionalism in Project ...Project Controls Expo - 31st Oct 2012 - Improving Professionalism in Project ...
Project Controls Expo - 31st Oct 2012 - Improving Professionalism in Project ...
 
Session T6 - Artificial Intelligence Meets Project Controls
Session T6 - Artificial Intelligence Meets Project ControlsSession T6 - Artificial Intelligence Meets Project Controls
Session T6 - Artificial Intelligence Meets Project Controls
 
A g cs perspective on primavera unifier - Oracle Primavera P6 Collaborate 14
A g cs perspective on primavera unifier  - Oracle Primavera P6 Collaborate 14A g cs perspective on primavera unifier  - Oracle Primavera P6 Collaborate 14
A g cs perspective on primavera unifier - Oracle Primavera P6 Collaborate 14
 
The SPH EPC Way
The SPH EPC WayThe SPH EPC Way
The SPH EPC Way
 
Douglas Carlesco Resume
Douglas Carlesco ResumeDouglas Carlesco Resume
Douglas Carlesco Resume
 
Pugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CVPugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CV
 
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
 
VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2VA Cx Presentation_SRE Training 2013 Final_v2
VA Cx Presentation_SRE Training 2013 Final_v2
 
Professional Profile 05-11-15
Professional Profile 05-11-15Professional Profile 05-11-15
Professional Profile 05-11-15
 

Andere mochten auch

HR Brochure Interim 24-7
HR Brochure Interim 24-7HR Brochure Interim 24-7
HR Brochure Interim 24-7
Bas de Greef
 
陳文茜Vs陳水扁
陳文茜Vs陳水扁陳文茜Vs陳水扁
陳文茜Vs陳水扁
lys167
 
οδυσσεας ελυτης
οδυσσεας ελυτηςοδυσσεας ελυτης
οδυσσεας ελυτης
3gel
 
Bizzelle, Mark - 1099 Offer
Bizzelle, Mark - 1099 OfferBizzelle, Mark - 1099 Offer
Bizzelle, Mark - 1099 Offer
Mark Bizzelle
 
Media opening idea.docx n
Media opening idea.docx nMedia opening idea.docx n
Media opening idea.docx n
ruthegginton
 

Andere mochten auch (15)

Como conquistar um homem sutilmente
Como conquistar um homem sutilmenteComo conquistar um homem sutilmente
Como conquistar um homem sutilmente
 
Machinebook для Бизнеса
Machinebook для БизнесаMachinebook для Бизнеса
Machinebook для Бизнеса
 
CV-JB-2016
CV-JB-2016CV-JB-2016
CV-JB-2016
 
Trastornos causados por el mal uso de las redes sociales y los dispositivos e...
Trastornos causados por el mal uso de las redes sociales y los dispositivos e...Trastornos causados por el mal uso de las redes sociales y los dispositivos e...
Trastornos causados por el mal uso de las redes sociales y los dispositivos e...
 
CV-JeanBaptiste-delapasse-French
CV-JeanBaptiste-delapasse-FrenchCV-JeanBaptiste-delapasse-French
CV-JeanBaptiste-delapasse-French
 
HR Brochure Interim 24-7
HR Brochure Interim 24-7HR Brochure Interim 24-7
HR Brochure Interim 24-7
 
陳文茜Vs陳水扁
陳文茜Vs陳水扁陳文茜Vs陳水扁
陳文茜Vs陳水扁
 
οδυσσεας ελυτης
οδυσσεας ελυτηςοδυσσεας ελυτης
οδυσσεας ελυτης
 
Sw necesario pc
Sw necesario pcSw necesario pc
Sw necesario pc
 
Bizzelle, Mark - 1099 Offer
Bizzelle, Mark - 1099 OfferBizzelle, Mark - 1099 Offer
Bizzelle, Mark - 1099 Offer
 
Cygnet power point.ppt january.ppt version 2
Cygnet power point.ppt january.ppt version 2Cygnet power point.ppt january.ppt version 2
Cygnet power point.ppt january.ppt version 2
 
Media opening idea.docx n
Media opening idea.docx nMedia opening idea.docx n
Media opening idea.docx n
 
Presentation Charles Eddolls
Presentation Charles EddollsPresentation Charles Eddolls
Presentation Charles Eddolls
 
otro
otrootro
otro
 
El Producto
El ProductoEl Producto
El Producto
 

Ähnlich wie Business of anaerobic digestion project delivery basics

Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
PMI Chennai Chapter
 
Asset information management for design build r novak arc 2008
Asset information management for design build r novak arc 2008Asset information management for design build r novak arc 2008
Asset information management for design build r novak arc 2008
ARC Advisory Group
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendations
ubk1411
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012
REDceo.net
 

Ähnlich wie Business of anaerobic digestion project delivery basics (20)

Pes profile
Pes profilePes profile
Pes profile
 
Shivamtech brochure
Shivamtech brochureShivamtech brochure
Shivamtech brochure
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
COE
COECOE
COE
 
Major CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons LearnedMajor CAPEX Project Success Assurance-Best Practices and Lessons Learned
Major CAPEX Project Success Assurance-Best Practices and Lessons Learned
 
Trishul Presentation 2012
Trishul Presentation 2012Trishul Presentation 2012
Trishul Presentation 2012
 
Why EPC
Why EPCWhy EPC
Why EPC
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
Proposed Project Management Office
Proposed Project Management OfficeProposed Project Management Office
Proposed Project Management Office
 
Asset information management for design build r novak arc 2008
Asset information management for design build r novak arc 2008Asset information management for design build r novak arc 2008
Asset information management for design build r novak arc 2008
 
Nitin cv 25 07-16
Nitin cv 25 07-16Nitin cv 25 07-16
Nitin cv 25 07-16
 
Trishul presentation 2012
Trishul presentation 2012Trishul presentation 2012
Trishul presentation 2012
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendations
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012
 
The Commissioning Process
The Commissioning ProcessThe Commissioning Process
The Commissioning Process
 
Construction Management - L1 (1).ppt
Construction Management - L1 (1).pptConstruction Management - L1 (1).ppt
Construction Management - L1 (1).ppt
 
Construction management l1
Construction management   l1Construction management   l1
Construction management l1
 
ARES PRISM - Integrating Project & Portfolio Management by Lateef Daly at Pro...
ARES PRISM - Integrating Project & Portfolio Management by Lateef Daly at Pro...ARES PRISM - Integrating Project & Portfolio Management by Lateef Daly at Pro...
ARES PRISM - Integrating Project & Portfolio Management by Lateef Daly at Pro...
 

Mehr von eisenmannusa

Membrane Technology - International Biomass 2013
Membrane Technology - International Biomass 2013Membrane Technology - International Biomass 2013
Membrane Technology - International Biomass 2013
eisenmannusa
 
High Solids Anaerobic Digestion - International Biomass 2013
High Solids Anaerobic Digestion - International Biomass 2013High Solids Anaerobic Digestion - International Biomass 2013
High Solids Anaerobic Digestion - International Biomass 2013
eisenmannusa
 
Membrane Technology - Biocycle West Coast 2013
Membrane Technology - Biocycle West Coast 2013Membrane Technology - Biocycle West Coast 2013
Membrane Technology - Biocycle West Coast 2013
eisenmannusa
 
Sustainability in an urban environment through anaerobic digestion
Sustainability in an urban environment through anaerobic digestionSustainability in an urban environment through anaerobic digestion
Sustainability in an urban environment through anaerobic digestion
eisenmannusa
 
Biomass to Steam - The Environmental Challenge
Biomass to Steam - The Environmental ChallengeBiomass to Steam - The Environmental Challenge
Biomass to Steam - The Environmental Challenge
eisenmannusa
 
Sustainability in an Urban Environment Through Anaerobic Digestion
Sustainability in an Urban Environment Through Anaerobic DigestionSustainability in an Urban Environment Through Anaerobic Digestion
Sustainability in an Urban Environment Through Anaerobic Digestion
eisenmannusa
 
Cleaning up Gasification Producer Gas for Use in an IC Engine
Cleaning up Gasification Producer Gas for Use in an IC EngineCleaning up Gasification Producer Gas for Use in an IC Engine
Cleaning up Gasification Producer Gas for Use in an IC Engine
eisenmannusa
 
Biomass to Steam: The Environmental Challenge
Biomass to Steam: The Environmental ChallengeBiomass to Steam: The Environmental Challenge
Biomass to Steam: The Environmental Challenge
eisenmannusa
 
Sustainability in an Urban Environment Through Anaerobic Digestion - Biocycle
Sustainability in an Urban Environment Through Anaerobic Digestion - BiocycleSustainability in an Urban Environment Through Anaerobic Digestion - Biocycle
Sustainability in an Urban Environment Through Anaerobic Digestion - Biocycle
eisenmannusa
 

Mehr von eisenmannusa (9)

Membrane Technology - International Biomass 2013
Membrane Technology - International Biomass 2013Membrane Technology - International Biomass 2013
Membrane Technology - International Biomass 2013
 
High Solids Anaerobic Digestion - International Biomass 2013
High Solids Anaerobic Digestion - International Biomass 2013High Solids Anaerobic Digestion - International Biomass 2013
High Solids Anaerobic Digestion - International Biomass 2013
 
Membrane Technology - Biocycle West Coast 2013
Membrane Technology - Biocycle West Coast 2013Membrane Technology - Biocycle West Coast 2013
Membrane Technology - Biocycle West Coast 2013
 
Sustainability in an urban environment through anaerobic digestion
Sustainability in an urban environment through anaerobic digestionSustainability in an urban environment through anaerobic digestion
Sustainability in an urban environment through anaerobic digestion
 
Biomass to Steam - The Environmental Challenge
Biomass to Steam - The Environmental ChallengeBiomass to Steam - The Environmental Challenge
Biomass to Steam - The Environmental Challenge
 
Sustainability in an Urban Environment Through Anaerobic Digestion
Sustainability in an Urban Environment Through Anaerobic DigestionSustainability in an Urban Environment Through Anaerobic Digestion
Sustainability in an Urban Environment Through Anaerobic Digestion
 
Cleaning up Gasification Producer Gas for Use in an IC Engine
Cleaning up Gasification Producer Gas for Use in an IC EngineCleaning up Gasification Producer Gas for Use in an IC Engine
Cleaning up Gasification Producer Gas for Use in an IC Engine
 
Biomass to Steam: The Environmental Challenge
Biomass to Steam: The Environmental ChallengeBiomass to Steam: The Environmental Challenge
Biomass to Steam: The Environmental Challenge
 
Sustainability in an Urban Environment Through Anaerobic Digestion - Biocycle
Sustainability in an Urban Environment Through Anaerobic Digestion - BiocycleSustainability in an Urban Environment Through Anaerobic Digestion - Biocycle
Sustainability in an Urban Environment Through Anaerobic Digestion - Biocycle
 

Kürzlich hochgeladen

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Kürzlich hochgeladen (20)

GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 

Business of anaerobic digestion project delivery basics

  • 1. Business of Anaerobic Digestion Project Delivery Basics BioCycle West – Pre-Conference Workshop April 16th Portland Oregon Adam Halsband – Business Development Manager EISENMANN Corporation
  • 2. Agenda • Key Components of Project Development • Key Elements of Project Delivery • Project Delivery Approach and Drivers – Project Development and Delivery Timeline – Tools and Terminology – Preliminary Engineering – Project Delivery Organization • Contract Structures • Which Approach is Right for You?
  • 3. Key Components of Project Development Project Developer XYZ Group Feedstock Technology- Operations (WSA) Permitting Offtake + Finance
  • 4. Key Components of Project Development Fully “Baked” Project Feedstock Technology- Operations Offtake Finance (WSA) Permitting
  • 5. Key Elements of Project Delivery • Design – Preliminary Design Engineering – Detail Design Engineering • Build – Procurement – Construction Management – Construction – Commissioning • Operate – Operations – Maintenance • Own/Transfer
  • 6.
  • 7. Typical Project Timeline Project Development Master Planning Waste Supply & Digestate Offtake Agreements Preliminary Siteing Interconnect Verification Independent rate Preliminary Engineering limiting step Permitting PPA Finance Due Diligence Detail Engineering Project Kickoff * Construction Management Delivery method Commissioning defines overlap Operation and Maint.
  • 8. Project Delivery Approaches Higher Lower Design-Bid-Build Owner’s Const. Manage EPC Project Risk Cost EPC w/ Wrap Design/Build Lower Higher BOT Slower Faster Completion Rate*
  • 9. Tools and Terminology • “Statement of Requirements” – Prepared by Developer and/or Owner – Captures key project information and goals • “Project Execution Plan” – Prepared by Engineering Firm – Captures project execution strategy and milestones • “Basis of Design” (BOD) - Preliminary Engineering – Prepared by Engineering Firm – 30% design with +/- 25% Cost accuracy – Crucial preliminary engineering required for; • Permitting • Siteing • Project Finance
  • 10. Preliminary Engineering • Preliminary Engineering Typically Includes: – Project Execution Plan – Process Flow Diagram – General Arrangement Drawings with Equipment Layouts – Site Plans – Preliminary Equipment List with Sizes – Heat and Mass Balance/P&ID’s – Electrical Single Line – Motor List and Electrical Loads – Interconnect plan – Process controls outline – PHA – Process Hazard Analysis – O&M Plan with estimated costs – Project Cost Estimate
  • 11. Preliminary Engineering • Requires Multiple Disciplines – Civil Engineering – Mechanical/Process Engineering – Electrical/Controls Engineering – Project/Construction Management – Procurement/Estimating – Environmental Engineering/Permit Specialists
  • 13. Typical Project Timeline Statement of Project Development Requirements Master Planning Waste Supply & Digestate Project Offtake Agreements Execution Plan Preliminary Siteing Interconnect Verification Preliminary Preliminary Engineering Engineering Permitting PPA Finance Due Diligence Detail Engineering Project Kickoff * Construction Management Commissioning Operation and Maint.
  • 14. Contract Structure Warranty – Guarantees • Project “Wrap” • Performance Guarantee(s) – Construction (Time and Cost) Guarantee – Process Guarantee Typical Contract Payment Terms • Fixed Price – Milestone payments • Fixed Price with Escalator(s) – Raw materials – Currency • Cost Plus – Open Book • Shared Savings/Shared Overruns • Schedule Reward
  • 15. Which approach is right for you? Project Delivery Approach Drivers • Risk – Strength of Developer/Owner Group – Complexity of Scope – Investor/Finance Tolerance • Speed – Integration of roles – Rate limiting steps • Cost – Cash Flow – Overall Project Cost Control • Strategies to manage cost risks
  • 16.
  • 17. Thank You Adam Halsband Business Development Manager EISENMANN Corporation 815-482-4335 adam.halsband@eisenmann.com